HomeMy WebLinkAboutSB989 RE-TEST 2016SWRCB, January 2002 Page ____ of ____
Secondary Containment Testing Report Form
This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the
appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and
printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency.
1.FACILITY INFORMATION
Facility Name: Date of Testing:
Facility Address:
Facility Contact: Phone:
Date Local Agency Was Notified of Testing :
Name of Local Agency Inspector (if present during testing):
2.TESTING CONTRACTOR INFORMATION
Company Name:
Technician Conducting Test:
Credentials: CSLB Licensed Contractor SWRCB Licensed Tank Tester
License Type: License Number:
Manufacturer Training
Manufacturer Component(s)Date TrainingExpires
3.SUMMARY OF TEST RESULTS
Component PassFail Not
Tested
Repairs
Made Component PassFail Not
Tested
Repairs
Made
If hydrostatic testing was performed, describe what was done with the water after completion of tests:
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements
Technician’s Signature:________________________________________________ Date:_________________________
$POGJEFODF6454FSWJDFT
*OD
")B[
$%
110
#3367/Fastrip#640(East)12/08/2016
8001WhiteLane Bakersfield,CA93309
OmeroGarcia (661)393-7000
ShaneGardner
KyleSelf
✔
ICC CAUSTServiceTechnician 10/07/2018
INCON TS-STS 10/14/2018
87Annular ✔DieselSTP
91Annular ✔
DieselAnnular ✔
87Secondary ✔
87VentSecondary ✔
91Secondary ✔
91VentSecondary ✔
DieselVentSecondary ✔
VaporReturnSecondary ✔
87STP ✔
91STP
DieselSecondary ✔
✔
✔
UDC13-14 ✔
UDC15-16 ✔
UDC17-18 ✔
UDC19-20 ✔
UDC21-22 ✔
UDC23-24 ✔
87FillSump ✔
91FillSump ✔
DieselFillSump ✔
87-1FillSpillBucket ✔
87-2FillSpillBucket ✔
12/08/2016
Test water was hauled off by Confidence UST
SWRCB, January 2002 Page ____ of ____
Secondary Containment Testing Report Form
This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the
appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and
printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency.
1.FACILITY INFORMATION
Facility Name: Date of Testing:
Facility Address:
Facility Contact: Phone:
Date Local Agency Was Notified of Testing :
Name of Local Agency Inspector (if present during testing):
2.TESTING CONTRACTOR INFORMATION
Company Name:
Technician Conducting Test:
Credentials: CSLB Licensed Contractor SWRCB Licensed Tank Tester
License Type: License Number:
Manufacturer Training
Manufacturer Component(s)Date TrainingExpires
3.SUMMARY OF TEST RESULTS
Component PassFail Not
Tested
Repairs
Made Component PassFail Not
Tested
Repairs
Made
If hydrostatic testing was performed, describe what was done with the water after completion of tests:
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements
Technician’s Signature:________________________________________________ Date:_________________________
$POGJEFODF6454FSWJDFT
*OD
")B[
$%
210
#3367/Fastrip#640(East)12/08/2016
8001WhiteLane
OmeroGarcia (661)393-7000
ShaneGardner
KyleSelf
✔
ICC CAUSTServiceTechnician 10/07/2018
INCON TS-STS 10/14/2018
91FillSpillBucket ✔
DieselFillSpillBucket ✔
87-1VaporSpillBucket ✔
87-2VaporSpillBucket ✔
91VaporBucket ✔
VentBox ✔
12/08/2016
SWRCB, January 2002 Page ____ of ____
4.TANK ANNULAR TESTING
Test Method Developed By: Tank Manufacturer Industry Standard Professional Engineer
Other (Specify)
Test Method Used: Pressure Vacuum Hydrostatic
Other (Specify)
Test Equipment Used: Equipment Resolution:
Tank # Tank # Tank # Tank #
Is Tank Exempt From Testing?1 Yes No Yes No Yes No Yes No
Tank Capacity:
Tank Material:
Tank Manufacturer:
ProductStored:
Wait time between applying
pressure/vacuum/water and
starting test:
Test Start Time:
Initial Reading (RI):
Test End Time:
Final Reading (RF):
TestDuration:
Change in Reading (RF-RI):
Pass/Fail Threshold or Criteria:
Test Result: Pass Fail Pass Fail Pass Fail Pass Fail
Was sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA
Was sensor properly replaced and
verified functional after testing? Yes No NA Yes No NA Yes No NA Yes No NA
Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests)
1 Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary
containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment
testing. {California Code of Regulations, Title 23, Section 2637(a)(6)}
310
✔
✔
CalibratedGauges 0.00"
87
✔
12,000
Steel
Unknown
87Unleaded
15 min.
0.00
1hour
-10hg
10:15 am
-10hg
9:15 am
0.00"
✔
✔
✔
91
✔
12,000
Steel
Unknown
91Unleaded
15 min.
9:15 am
-10 hg
10:15 am
-10hg
1hour
0.00"
0.00"
✔
✔
✔
Diesel
✔
12,000
Steel
Unknown
Diesel
15 min.
9:15 am
-10 hg
10:15 am
-10hg
1 hour
0.00"
0.00"
✔
✔
✔
✔
SWRCB, January 2002 Page ____ of ____
6.PIPING SUMP TESTING
Test Method Developed By: Sump Manufacturer Industry Standard Professional Engineer
Other (Specify)
Test Method Used: Pressure Vacuum Hydrostatic
Other (Specify)
Test Equipment Used: Equipment Resolution:
Sump # Sump # Sump #Sump #
Sump Diameter:
Sump Depth:
Sump Material:
Height from Tank Top to Top of
Highest Piping Penetration:
Height from Tank Top to Lowest
Electrical Penetration:
Condition of sump prior to testing:
Portion of Sump Tested1
Does turbine shut down when
sump sensor detects liquid (both
product and water)?* Yes No NA Yes No NA Yes No NA Yes No NA
Turbine shutdown response time
Is system programmed for fail-safe
shutdown?* Yes No NA Yes No NA Yes No NA Yes No NA
Was fail-safe verified to be
operational?* Yes No NA Yes No NA Yes No NA Yes No NA
Wait time between applying
pressure/vacuum/water and starting
test:
Test Start Time:
Initial Reading (RI):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading (RF-RI):
Pass/Fail Threshold or Criteria:
Test Result: Pass Fail Pass Fail Pass Fail Pass Fail
Was sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA
Was sensor properly replaced and
verified functional after testing? Yes No NA Yes No NA Yes No NA Yes No NA
Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests)
1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an
asterisk (*) is “NO” or “NA”, the entire sump must be tested. (See SWRCB LG-160)
7 10
✔
✔
TS-STS 0.00"
87
38.00"
57.00"
Fiberglass
36.00"
14.00"
Clean
18.00"
✔
NA
✔
✔
15min
10:22am
3.4060"
10:37am
3.3767"
15min
0.0293"
0.00"
✔
✔
✔
NA
Diesel
NA
Hydrostatic test in 87 STP sump tested multiple times above product penetration test failed. Tested multiple times below product penetration test passed
all penetrations are near the same level in the sump . Recommend resealing all penetrations.