Loading...
HomeMy WebLinkAboutHAZMAT 6-2016 (2),k q UNIFIED PROGRAM INSPECTION CHECKLIST Aboveground Petroleum Storage Tank Program FACILITY NAME INSPECTION DATE INSPECTION TIME -Z.6 ADDRESS PHONE NO. NO OF EMPLOYEES FACILITY CONTACT BUSINESS ID NUMBER ! C 7 1 --c2.. -7 5- -7 CON T TO INSPE AME /TITLE _ A � Al�A.7• / \�/ . _ ... .-. _. -_■. -. !`f - - -: .�__ -. �:.C_.....:w IJww�il.. 4 0^ -V '4' ■/ f /I1Ad• 03r .37n DESCRIPTION Y NJ N/A COMMENTS Prepare an SPCC plan [CFR 112.3] Review or amend SPCC plan [CFR 112.5 (a)(d)] X ca a SPCC plan available on site [CFR 112.3(e)] X Conduct inspections and test in accordance with written procedures CFR 112.7(e)] -K Maintain records of inspections, tests and/or procedures [CFR 112.7(e)] t'> ":a 1 Records of inspections or tests signed by inspector [CFR 112.7(e)] V ■�V f ■V ■\ l.. Y. - - DESCRIPTION YJ N N/A COMMENTS Self - certification for Tier I or II facility 112.6(a)(1),(b)(1)] Professional engineer certification CFR112.3 d) and 112.6(b)(4 X Documentation of 5 year review and evaluation of SPCC plan CFR 112.5(b)] X Amendments required within 6 months of changes/certifications CFR 112.5(a) and 112.6(a) (2), (b)(4)] -K Management authorization of resource commitment to implement the SPCC [CFR 112.7 & 112.6(a)] Diagram with location and contents of containers, transfer stations, connecting piping [112.7(a)(3) jXpe of oil and storage capacity for each container [CFR 112.7(a)(3)] Discharge prevention measures and 2rocedures for routine handling CFR 11 2.7(a)(3)] Countermeasures for discovery, response and clean-up [CFR112.7(a)(3)] ' Required contact list and phone numbers [CFR 112.7(a)(3) VVV ■ ■V■\ V. v.if■v■w■ V. wv -- - - - - - - --- - DESCRIPTION Y N N/A COMMENTS Provide corrosion protection [CFR 112.8(c)(4)(5), (d)(1)] Containers co m atible with0"terials stored CFR 1 12.8(c)(1) X hn lement SPCC plan review changes or amendments within 6 months [CFR 112.5(a)(d)] X Prepare an oil contingency plan or written control /removal commitments [CFR 112.7(d)] DESCRIPTION Y NJ N/A COMMENTS Training program CFR 112.7(f) Train personnel in operation and maintenance of e ui ment [CFR 112.7(f)] Conduct annuals ill 2revention briefings [CFR 112.7(f)(3)] X DESCRIPTION YJ N N/A COMMENTS Meet provisions of conditional exemption [H &S 25270.4.5(b)] Facility security adequate [CFR 112.7(g)] Clean-up materials readily available CFR 112.7(c) X Overfill protection procedures or devices in place and operative [CFR 112.8(c)(8)] Portable /mobile containers positioned to prevent discharge CFR 112.8(c)(11)p Loading / unloading rack drains into containment area CFR 112.7(h)] Provide appropriate containment /diversionary structures to prevent discharge [CFR 1 12.8(a), 112.7(c)]` Secondary containment adequate to contain capacity of largest container + precipitation [CFR 112.8(c)] Remove accumulation of oil in secondary containment [CFR 112.8(c)(10) ' Secondary containment valve(s) closed [CFR 112.81 Implement SPCC plan elen Tents CFR 112.31 ANY HAZARDOUS WASTE ON SITE? YES ❑ NO Si natureofRecei t Explain: POST INSPECTION INSTRUCTIONS: • Refer to the back of this inspection report for regulatory citations and corrective ctions • Correct the violation(s) noted above by Signature (that all violations have been corrected as noted) • Within 5 days of correcting all of the violations, sign and return a copy of this page to: Bakersfield Fire Dept., Prevention Services, 2101 H Street, California 93301 Date White - Business Copy Yellow - Business Copy to be Sent in after return to Compliance Pink - Prevention Services Copy FD2156b (Rev 9/10)