Loading...
HomeMy WebLinkAboutMinor Mod Billing Statement 1-6-17BILLING & PERMIT STATEMENT BAKERSFIELD FIRE DEPARTMENT 0 Over 10,000 sq ft $ 0 .028 x sq ft Prevention Services • PERMIT # $ 98/hr (2 hrs minimum) $196 FIRE 2101 H Street • Sprinkler - New & Modification (minimum charge) FIRE $ 288 RTM Bakersfield, CA 93301 0 Over 10,000 sq ft $ 0 .028 x sq ft ebooe: L61-326-32Zq FaX@ 661 -81;2-2171 Sprinkler - Minor Modification (<10 heads) $ 98/hr (2 hrs minimum) $196 . j I R 0 Commercial Hood (New & UL 300 Upgrade Modification) FHD Additional Hood A LOCATION SqFj O�1-7 ;DATF— �—'LLS PROPE OWNER $ 98/hr (2 hrs minimum) $196 G STAPT17NG — 11) — f COMPLETION DATE U • NAME $ 241 PROJECT NAME • Aboveground Storage Tank (1 inspection per installation) AST ADDRESS PHONE # PROJE DDRESS Additional Tank ATI $ 98/tank CITY -PAf<-'(5T;�,'SF[ELD STATE CA ZIP CODE-,,,,f_ • Aboveground Storage Tank (Removal, Mod, or Inspection) ATR $ 112/tank NfT SPI, 70 j! Underground Storage Tank (Installation/Inspection) NI QA LICENSE # TYPE OF 14 C 3E '.EN! E);PIRATION DAT E 1 PHONE $ 900/site Underground Storage Tank (Minor Modification) MTM p4c) CONTRACTOR COMPANY NAME 1 Underground Storage Tank (Removal) TR W FAX#—, �5&&- I ADDREck CQ&-j1r-1 n $ 98/hr (2 hrs minimum) $196 c6l.; J6 ZIV� P�ease make checks payaWe to 01-79 OF- BAKE LrISFEELD. M, 0 CAESH Mease. 7hank you. 0 Alarm - New & Modification (minimum charge) FA $ 288 0 Over 10,000 sq ft $ 0 .028 x sq ft • Alarm - Minor Modification (Add 1 device/Relocation of 2 devices) $ 98/hr (2 hrs minimum) $196 84 • Sprinkler - New & Modification (minimum charge) FIRE $ 288 0 Over 10,000 sq ft $ 0 .028 x sq ft 0 Sprinkler - Minor Modification (<10 heads) $ 98/hr (2 hrs minimum) $196 84 0 Commercial Hood (New & UL 300 Upgrade Modification) FHD Additional Hood $ 241 $ 59/hood 0 Commercial Hood - Minor Modification (add/move nozzle) $ 98/hr (2 hrs minimum) $196 84 • Spray Booth (New & Modification) SB $ 241 • Aboveground Storage Tank (1 inspection per installation) AST $ 185/tank 0 Additional Tank ATI $ 98/tank • Aboveground Storage Tank (Removal, Mod, or Inspection) ATR $ 112/tank • Underground Storage Tank (Installation/Inspection) NI $ 900/tank 0, Underground Storage Tank (Modification) MOD $ 900/site Underground Storage Tank (Minor Modification) MTM $ 171/site Underground Storage Tank (Removal) TR $ 587/tank 0 Mandated UST Testing: Fuel Mont Cert/SB989/Cath. Prot. NOTE: $98/hr for each type of test/per site/per UST system even if scheduled at the same time TT $ 98/hr (2 hrs minimum) $196 • Oil well (Installation, Inspection, or re-inspection) x $ 98/hr 84 • Tent TENT $ 98/hr • After-hours inspection fee $ 124/hr (2 hrs minimum) = $248 • ,NOTE: Pyrotechnic (1 permit per event, plus an inspection fee of $98/hr during business hours) PYRO After hours Pyrotechnic event inspection is @ $124/hr $ 98/hr + (5 hrs min standby fee/insp) $588 (5 hrs min standbv fee/insp) = $620 • Re-inspection/Follow-up Inspection $ 98/hr 84 • Portable LPG (Propane): # of Cages? $ 98/hr 84 • Explosive Storage $ 241 84 0 Copying 8L File Research (File Research fee $51/hr) $ 0.02/page 84 13 Miscellaneous Site Plan Review (Carnival & Fairs/Vehicle Disrflav/Motion Picture) $ 98/hr 84 FD2021 (Rev 7/16)