Loading...
HomeMy WebLinkAboutTract 7253 Drainage StudyFlu 1111111'1111� k_1 March 14, 2016 ?ROFES po E 40 tpx 'SOF Prepared by: PORTER & ASSOCIATES, INC. Engineering and Surveying 1200 21" Street Bakersfield, CA 93301 DRAINAGE STUDY FOR TRACT 7253 The purpose of this study is to develop a detailed drainage plan that provides adequate drainage facilities for Tract 7253. Tract 7253 is 20.I± acres located in the south side of town. Tract 7253 is divided into two phases with one sump lot and 79 approximately 7,400 s.f. residential lots. It is bounded by Taft Highway on the north, Chevalier Road on the east, West Hills Mobile Home Park on the west, and by alfalfa crops on the south. The site is located southwest of the intersection of Taft Highway and Chevalier Road in the northwest quarter of Section 6, Township 31 South, Range 28 East, Mount Diablo Base and Meridian. The site is proposed to drain to a basin in the southwest corner of the tract. The basin can be enlarged in the future to accommodate future development to the south. The site is currently being farmed for alfalfa crops. The site is relatively flat. The soils onsite consist of Groups A and B hydrologic soil groups from the Kern County Hydrologic Soils Group Map. CALCULATIONS Initial times of concentration were based on Section 2.3.2.1 of the City of Bakersfield Subdivision and Engineering Design Manual. Street travel times were determined using the gutter flow chart attached with the hydrology calculations. Rainfall intensities were determined using the Time of Concentration- Intensity Chart for Bakersfield based on City of Bakersfield Engineering Department Standard D-1 attached with the hydrology calculations. Runoff coefficients were determined using the Rational Method Urban Runoff Coefficients Detail (D-2) in the City of Bakersfield Subdivision and Engineering Design Manual. A runoff coefficient of 0.42 was used for the residential lots and a runoff coefficient of 0.90 was used for the commercial lot. hi accordance with the gutter flow chart attached with the hydrology calculations the Q that can be carried in a gutter with a 0.20% slope and a 6" water depth is 5.3 cfs. Inlet 1 has the largest 5 year total flow of 4.18 cfs entering the inlet from two directions; therefore, the proposed 6" curb and gutter are adequate to handle the 5 year flow. All of the other gutters are adequate because they have less flow than Inlet 1. Hydraulic grade lines were calculated for each pipe reach as shown in the attached Hydraulic Grade Line Calculations. HGL control was established at the 1/2 water depth of the drainage basin or at the soffit elevations of the last pipe reach, whichever is higher. The HGL includes freeboard of a minimum of 0.5' at catch basins and manholes in accordance with City of Bakersfield Standards. Catch basins were sized in accordance with the nomograph for capacity of curb opening inlets included in the Catch Basin Sizing section. City Type "A" Catch Basin parameters were used to solve the nomograph. Standard 3.5' wide openings are adequate for all catch basins within the subdivision as shown in the attached calculations. The proposed drainage basin has a design water depth of 8 feet. To determine the required volume for Tract 7253, the runoff coefficients designated above were used for their respective tributary areas and a coefficient of 0.15 was used for the sump lot area. The required volume for the proposed drainage basin is 1.90 ac -ft and the provided volume is 2.01 ac -ft, therefore the proposed basin has adequate capacity per the City of Bakersfield Subdivision and Engineering Design Manual. Calculations that determine the design volume and the provided volume are provided in the Drainage Basin Sizing Section. Basin highwater elevations include minimum 1 foot freeboard from the lowest inlet elevation. The drainage basin for this tract is in an area where subsurface soils are composed of silty sand, sand, and sandy silt. Krazan & Associates, Inc. determined the Coefficient of Permeability for soils lying within the basin area. Results indicate that the basin will not drain within seven days as is. Kazan recommends that the bottom of the basin be excavated into the sandy soils below 13' to 18' with a Krazan representative present and be backfilled to the finished basin bottom elevation with clean sand (see attached Soils Report Excerpts). CONCLUSIONS A system of catch basins and pipes will carry runoff fi-om the Tract 7253 into one drainage basin at the southwest corner of the site. This study shows that adequate drainage facilities can be provided for this tract with the proposed drainage system and basin. DRAINAGE STUDY FOR TRACT 7253 Porter & Associates, Inc. Calculations By: TNB Date: 03/14/2016 Job No. 2769B Tract 7253 Hvdrologv Calculations Checked By: Date: Drainage Area Time of Concentration i Qi i Qp Pipeline Remarks Point of Conc. Acres "C" CA NCA R/G min. G/T min. T/T min. 5 yr in/hr 5 yr cfs 10 yr in/hr 10 yr cfs Friction Slope Vp fps d in L ft T/P min. 4.89 0.90 4.40 it 0.70 0.42 0.29 5.59 4.70 10 14 24 0.89 4.18 1.06 4.98 0.22% 2.8 18 221.0 1 25 min. @ Junction J1 J1 5.59 4.70 25 1.03 4.84 0.21% 2.7 18 220.3 1 26 min. @ Junction J2 J2 5.59 4.70 26 1.03 4.84 0.21% 2.7 18 42.8 0 26 min. @ Junction J3 i2 7.81 0.42 3.28 15 12 27 0.82 2.69 0.97 3.18 0.09% 1.8 18 25.7 0 27 min. @ Junction J3 i3 7.94 0.42 3.33 15 8 23 0.92 3.07 1.10 3.67 0.12% 2.1 18 15.7 0 23 min. @ Junction J3 J3 21.34 11.31 27 0.97 10.97 0.24% 3.5 24 226.3 1 28 min. @ Junction J4 i4 2.96 0.42 1.24 15 4 19 1.05 1.31 1.27 1.58 0.02% 0.9 18 16.7 0 19 min. @ Junction J4 J4 24.30 12.55 28 0.95 11.93 0.28% 3.8 24 285.2 1 29 min. @Junction J5 J5 24.30 12.55 29 0.95 11.93 0.28% 3.8 1 24 1 54.7 1 0 1 291 min. @ Sump R/G = Roof to Gutter Time i = Rainfall Intensity Vp = Velocity in Pipe L = Length of Pipe Reach G/T = Total Gutter Time Qi = Inlet Flow d = Pipe Diameter T/P = Pipe Travel Time T/T = Total time Qp = Pipe Flow 4 3 21 Lo 0 I( c E f c z 4 0 � 3 a 2 D 1 50 4O 30 (n Lu 20 z En 0.010 0.10 .2 .3 .4 .5 .6 .7.8.91.00 2 3 50 40 30 20 0 3 3 r 0.10 .2 .3 A .5 .6 .7.8.9 1.00 INTENSITY -INCHES PER HOUR 2 3 v MAY 6,1983 INTENSITY ��jjVS DURATION G'E.G. v nccw,vcHoco"• C U R V E S A.L.MOORE w �o� CITY OF BAKERSFIEL_D No CALIFORNIA f ENGINEERING DEPARTMENT .D- I Porter & Associates, Inc. Checked By: Calculations By: TNB Date: Date: 03/14/2016 Job No. 2769B Sheet 1 of 1 Tract 7253 Hydrology Calculations Gutter Time for Catch Basins Point of Conc. Avg Street Slope Vg fps Dist. ft G/T min. ii 0.21% 1.2 1020 14 i2 0.33% 1.4 1040 12 0 0.31% 1.4 710 8 i4 0.37% 1.5 360 4 G/T = Total Gutter Time Vg = Gutter Velocity DRAINAGE STUDY FOR TRACT 7253 Porter & Associates, Inc. Checked By: Calculations By: TNB Date: Date: 03/14/2016 Job No. 2769B Sheet 1 of 1 Tract 7253 Hydraulic Grade Line Calculations station length diameter area O velocity friction exit friction entrance flowline freeboard ft in sf cfs ft/sec slope loss loss loss HGL elevation Sump Outlet 335.40 342.50 7.10 Reach 1 54.7 24.0 3.142 11.9 3.80 0.0028 0.22 0.15 0.11 J5 335.89 342.50 6.61 Reach 2 285.2 24.0 3.142 11.9 3.80 0.0028 0.22 0.79 0.11 J4 337.02 341.91 4.89 Reach 3 226.3 24.0 3.142 11.0 3.49 0.0024 0.19 0.53 0.09 J3 337:83 341.49 3.66 Reach 4 42.8 18.0 1.767 4.8 2.74 0.0021 0.02 0.09 0.06 J2 338.00 341.51 3.51 Reach 5 220.3 18.0 1.767 4.8 2.74 0.0021 0.12 0.47 0.02 J1 338.61 342.42 3.81 Reach 6 221.0 18.0 1.767 5.0 2.82 0.0022 0.02 0.50 0.06 i1 339.19 _ 343.63 4.44 J3 337.83 341.49 3.66 Reach 7 25.7 18.0 1.767 3.2 1.80 0.0009 0.05 0.02 0.03 i2 337.93 341.49 3.56 J3 337.83 341.49 3.66 Reach 8 15.7 18.0 1.767 3.7 2.08 0.0012 0.07 0.02 0.03 i3 337.95 341.49 3.54 J4 337.02 341.91 4.89 Reach 9 16.7 18.0 1.767 1.6 0.89 0.0002 0.01 0.00 0.01 i4 337.04 341.91 4.87 J = Junction Number i = Inlet Number DRAINAGE STUDY FOR TRACT 7253 CATCH BASIN SIZING CALCULATI®NS Porter & Associates, Ince Checked By: Calculations By: TNB Date: Date: 03/14/2016 Job No. 2769B Sheet 1 of 1 Tract 7253 Catch Basin Sizing Table Catch Basin Q - cfs Opening Required Opening Provided No. 10 - year ft. ft. 1 4.98 3.11 3.50 2 3.18 1.99 3.50 3 3.67 2.29 3.50 4 1.58 0.99 3.50 Notes: 1. Catch Basins are sized in accordance with the attached Inlet Capacity Chart for Type "A" Standard Catch Basin in a sag condition. CrFY OF BAKE, RS 'VELD EVL]ET CA6'AC1TY TN A SAG TYPE "A" STANDARD CATCH BASUT h = height of opening = T' H = waaer depth = V H/h = 1.14 1,0 12 5 II 10 4 .s e 3 10 G .G 2 9 A 7 0 1.6 cfs/ft S 10 1.5 75 w 1.6x3.5=5.6cfs .G 2 ° for 3'- 6" tivide _ N =o� r curb opening 0 .9 9L�lY Lu 5.5 f rn ` .6. IU ` O F- w w 5 x .7 -.4o CL 0 x 5 LD 4 .2 0 3.5 w y f x .4 CL 4, F T .25 3 T k 2 3 o ,06 CL: w uj w t - x x 0 .04 25 2 .03 0 w z � r > ,O2 I_ a w .2 0 z L) 4 a O 1 5 .Ol Q .I5 F_ < .1 CURB h_ H-EII-GHT I'S LOCAL DEP, S I ,N 1 0.1 NOMOGRAPH FOR CAPACITY OF CURB OPENING INLETS AT LOW POINTS .I R.2 DRAINAGE STUDY FOR TRACT 7253 Porter & Associates, Inc. Checked By: Calculations By: TNB Date: Date: 03/14/2016 Job No. 2769B Sheet 1 of 1 Tract 7253 Drainage Basin Design Volume Tributaries Area Acres C AxC Alb, A2, A3, A4 19.41 0.42 8.15 Ala 4.89 0.90 4.40 Sump Lot 0.67 0.15 0.10 CxA — 12.65 Design Volume = 0.15*7(CxA) = 1.90 AC -FT Porter & Associates, Inc. Checked By: Calculations By: TNB Date: Date: 03/14/2016 Job No. 2769B Sheet 1 of 1 Tract 7253 Drainage Basin Volumes Provided Average Accumulated Accumulated Elevation Area Area Volume Volume Volume ft sq. ft. sq. ft. cu. Ft. cu.ft. ac -ft 331.4 7289 7716 7716 7716 0.18 332.4 8143 8585 8585 16301 0.37 333.4 9026 9481 9481 25782 0.59 334.4 9936 10406 10406 36187 0.83 335.4 10875 11359 11359 47546 1.09 336.4 11842 12340 12340 59885 1.37 337.4 12837 13349 13349 73234 1.68 338.4 13861 14388 14388 87622 2.01 339.4 14914 DRAINAGE STUDY FOR TRACT 7253 K.,\ No. 022-16004 Page No. 3 PERMEABILITY TESTING Three permeability tests Were performed on soil samples collected from depths of 15 to 20 feet below existing site grade- The permeability tests were performed in accordance with ASTM Test Method D2434. The test results are as follows: Borin No. Depth feet Coefficient of'Permeabilit em/sec) Soil Tv pe B 1 15 1.91 x 105 Silty Sand (SM) Bi 20 4.8 x 10--' Sand (SP) B2 15 6.07 x 10"' Sandy Silt (NIL) DRAINAGE The proposed drainage basin is still in the design phase. It is estimated that the maximum volume of water to be retained in the basin is approximately 1.95 acre-feet. It is understood the basin will have a minimum bottom area of approximately 7,290 square feet. It is anticipated that side slopes will be constructed at 2:1 (horizontal to vertical). It is anticipated the high water level will be 8 feet above basin bottom. Permeability tests were performed on the soils at depths ranging from 15 to 20 feet. These soils had coefficients of permeability ranging from 4.8 x 10 -'to 6.07 x ICcrn/sec. Based on the proposed inflows, subsurface soil conditions, and provided the drainage basin has a minimum bottom area of 7,290 square feet and extends to a minimum depth of 12 feet below existing site grade, it is anticipated the basin will drain within 7 days provided the recommendations in the Site Preparation section of this report are followed, SITE PlaP.AR.ATI®N General site clearing should include removal of vegetation and existing utilities; trees and associated root systems; rubble; and any loose and/or saturated materials. Site stripping should extend to a minimum depth of 2 to 4 inches, or until all organics in excess of 3 percent by volume are removed. Deeper stripping may be required in localized areas. These materials will not be suitable for reuse as Engineered rill. However, stripped topsoil may be stockpiled and reused in landscape or non-structural areas. Within areas to receive fill, following stripping operations, the upper 6 inches of soil should be excavated/scarified to a depth of 6 inches, worked until uniform and free from large clods; Moisture - conditioned as necessary, and recompacted to a minimum of 90 percent of maximum density based on .ASTM Test Method D1557. It is recommended that the new fill to be placed within the slope be benched into the slope. The bench should occur at every lift and extend at least 4 feet into the existing slope. Krazan & .Associates, lite. With Offices Serving The Western United States 022160J4 0-;. R-1 (Tram 7253).do KA No. 022-16004 Pau No. a Any buried structures encountered during construction should be removed in accordance with the recommendations of the Soils Engineer. The resulting excavations should be backt-illed with Engineered Fill. In order to dispose of the water, within the required 7 days, mitigation measures arc required. It is recornmended that the proposed drainage basin be constructed into the sandy soils encountered at the site. The storm water may be disposed of by excavating the bottom of the basin into the sandy soils encountered below 13 to 13 feet to remove the low permeability material kvithin the bottom of the basin. The resulting excavation should be backfilled to finished basin grade with clean sand (less than 5 percent passing the No. 200 sieve). The sand should have a permeability rate greater than 1 x10-3 cm/scc. The sand should not be compacted to more than 85 percent of maximum density based on 453'i Test Method D1557. It is further recommended that a representative of our firm inspect the excavation operation to verify soil conditions below the bottom of the basin. The estimated soil absorption factors presented in this report are based on clear water and a factor of safety should be incorporated into the design of the drainage basin to compensate for soil clogging From water impurities. The long-term absorption rate is highly dependent on the quality of infiltration water and the drainage basin maintenance. To maintain an adequate absorption rate, a maintenance program will be required. Annual maintenance should include the following: 1. Annual removal of the top I to 2 inches of sediment collecting on the surface of the basin_ This will help removal of the silt and clay sediment from accumulating from the surface and reduce the potential of silting (clogging) the upper soils within the pond. 2. Vegetation within the basin should be stripped or mowed yearly and removed from die basin site. The vegetation shall not be disced within (fie basin soils. Discing of organic material will reduce the upper soils permeability. The upper soils, during tvet winter months become very moist due to die absorptive characteristics of the. soil. Earthwork operations performed during winter months may encounter very moist unstable soils, which may require removal to grade a stable building foundation. Project site winterization consisting of placement of aggregate base and protecting exposed soils during the construction phase should be performed. A representative of our firm should be present during all site clearing and grading operations to test and observe eardnvork construction_ This testing and observation is an integral part of our service, as acceptance of carthwork construction is dependent upon compaction and stability of the material. The Soils Engineer may reject any material that does not meet compaction and stability requirements. Further recommendations of this repots are predicated upon the assumption that earthwork construction will conform to recommendations set forth in this section and the Engineered Fill section. Krazan & Associates, Ine. WiOi Offices Serving The westem Unitcd State 02--1(009 Basin Rcp.n (T—, 7253).d— KA No. 022-16004 Page Na. 5 Leased on the estimated storage volume, high water levels and provided the drainage sump is prepared as outlined above, it is anticipated the proposed basin will drain within 7 days. FEASIBrUTY OF QN-SITE SOILS FOR USE AS ENGINEERED FILL The on-site soils are predominately silty sands, sandy sifts; and sands. These soils will be suitable for rouse as Engineered Fill, provided they are cleansed of excessive organics and debris. The preferred materials specified for Engineered fill are suitable Por most applications with the exception of exposure to erosion. Project site winterization and protection of exposed soils during the construction phase should be the sole responsibility of the Contractor, since he has complete control of the project site at that time. till soils should be placed in lifts approximately 6 inches thick, moisture -conditioned as necessary, and compacted to achieve at least 90 percent maximum density as determined by ASTM 'Test Method iJ 1557. Additional lifts should not be placed if the previous lift did not meet the required dry density or if soil conditions are not stable. UTILITY TRENCH 1BACKFIE .L Drainage pipes may be installed in conjunction with the construction of the drainage basin. Trenches should be excavated according to accepted engineering practice following OSHA (Occupational Safety and Health Administration) standards by a Contractor experienced in such work. The responsibility for the safety of open trenches should be borne by the Contractor. Traffic and vibration adjacent to trenchwalls should be minimized; cyclic wetting and drying of excavation side slopes should be avoided. Depending upon the location and depth of some utility trenches, groundwater flow into open excavations could be experienced; especially during or following periods of precipitation. Utility trench backfill placed in or adjacent to buildings and exterior slabs should be compacted to at least 90 percent of maximum densit-v based on ASTivi Test Method D15.57, Utility trench backfill placed in pavement areas should be compacted to at least 90 percent of maximum density based on ASTM Test Method D1557. Pipe bedding should be in accordance with pipe manufacturer's recommendations. The Contractor is responsible for removing all water -sensitive soils from the trench regardless of the backfill location and compaction requirements. The Contractor should use appropriate equipment and methods to avoid damage to the utilities and/or structures during fill placement and compaction. PIPE BEDDING AND ENVELOPE Proper bedding and envelope should be provided for pipes. The bedding surface should be smooth and true to the design grade. At least 12 inches of compacted cohesionless soil bedding (100 percent passing the. No. 4 Sieve and not more than 8 percent passing and No. 200 Sieve) should be provided Krazan & Associates, Inc. With Offices Serving The Western United States 02216004 Rosin Report (Traci 7251),d- el+ O r -t H � d D C7 °� _e Q� G O O LOCI ,,-.)f of B'; F :ojec-: Tract 7253 - _,ac No: 022-16004 ICl'er:: Taft 20, LLC Pik e `:o.: A-1 Loccition: SW of Taft Highway & Chevalier Road, Bakersfield, CA ,, icd Ley: Wayne Andrade IDep{h to'A'atar> ini,izil: None ".t Coninle! on: None Very loose, fine- to medium -grained; ---- -- ��;i dark brown, moist, drills easily 2-- • Medium dense below 1 foot ----- 114.0 5.0 36 e Dense and drills firmly below 3 feet — 1 4 �Y hI 113.5 7.4 41 j 8 .. -- p CLAYEY SILTY SA1VD (SM/SCI j - j Loose, fine-grained; brown, moist, drills easily 10 117.0 5.4 1 10!— ljl --- - i 12-'' ! - ;�ti I r;I SILTYSAND/SAND (SM/SP) ' _ Medium dense, fine- to medium grained; - 14 I;; light grayish -brown, damp, drills easily I .c. I 116.61 16.1- 35 ° — - 16 18 SAND (SPI— Dense, fine- to medium -grained; light gray, damp, drills firmly I I 20- �,_ Drii; 61ethoc: Solid Flight G:i'.i Rig: CME45C-1 Krazan and Associates !-:ole Size: 4/z Inches Griller. Chris Wyneken Elavation; 50 Feet Sheet: 1 of 3 SUBSURFACE PROFILE + SAMPLE Penetration Test blows/ft j a Water Content (%) _ !Ia Description I �E I CL 0 20 40 60 10 20 30 40 ia m Ground Surface SILTY SAND (SM) Very loose, fine- to medium -grained; ---- -- ��;i dark brown, moist, drills easily 2-- • Medium dense below 1 foot ----- 114.0 5.0 36 e Dense and drills firmly below 3 feet — 1 4 �Y hI 113.5 7.4 41 j 8 .. -- p CLAYEY SILTY SA1VD (SM/SCI j - j Loose, fine-grained; brown, moist, drills easily 10 117.0 5.4 1 10!— ljl --- - i 12-'' ! - ;�ti I r;I SILTYSAND/SAND (SM/SP) ' _ Medium dense, fine- to medium grained; - 14 I;; light grayish -brown, damp, drills easily I .c. I 116.61 16.1- 35 ° — - 16 18 SAND (SPI— Dense, fine- to medium -grained; light gray, damp, drills firmly I I 20- �,_ Drii; 61ethoc: Solid Flight G:i'.i Rig: CME45C-1 Krazan and Associates !-:ole Size: 4/z Inches Griller. Chris Wyneken Elavation; 50 Feet Sheet: 1 of 3 i C; .7, f: LE, i l• 1 1 -fact 7253 022-16004 Ci;er.,: Taft 20, LLC A-1 Loc-a:ion: SW of Taft Highway & Chevalier Road, Bakersfield, CA LoC,qcd Fiy: Wayne Andrade D2pth to None None Crill Mwt)od: Solid Flight Rig: CME 45C-1 DA'Ier: Chris Wyneken D."11 Do:e: 2-1-16 Krazan and Associates Size-: 4% Inches Elev-ozioii: 50 Feet Sheet: 2 of 3 L. C) f B (7, r :1 rf Flroj,act: Tract 7253 Ps,Ojec! "!z).' 022-16004 Client: Taft 2D, LLC A-1 Locat ,on: SW of Taft Highway & Chevalier Road, Bakersfield, CA or-fg---d By: Wayne Andrade D e p si to 2 r> inial: None .;-1A Compzotion: None M -W fY,efhod: Solid Flight Drill .Ri:g.: CME 45C-1 Di-i!ler. Chris Wyneken Krazan and Associates 1): -;Il 2-1-16 1 - 1 o le 4/2 f n c h e s 50 Feet Sheat: 3 of 3 111.3 19.9 7 Medium derise, fine-grained; brown, H moist, drifIs easily if if 14 112.4 11 23.2 23 Dense, fine- to medium -grained; light Drill Me,hod: Solid Flight DJ�l Ric: GME 45C-1 Krazan and Associates i 4'1 , 2 Inches DrFle-r.- Chris Wyneken 50 Feet ci:jnt: Taft 20, LLG A-2 Lci7aL�cn: SW of Taft Highway & Chevalier Road, Bakersfield, CA Wayne Andracle lnit.;Gl: None Co! None SUBSURFACE PROFILE SAMPLE Penetration Test Water Content Description SILTY SAND (SM) 1, Loose, fine-grained; dark brown, moist, drills easily Medium dense with increased SILT and decreased SAND below I foot 116.2 11.8 26 111.3 19.9 7 Medium derise, fine-grained; brown, H moist, drifIs easily if if 14 112.4 11 23.2 23 Dense, fine- to medium -grained; light Drill Me,hod: Solid Flight DJ�l Ric: GME 45C-1 Krazan and Associates i 4'1 , 2 Inches DrFle-r.- Chris Wyneken 50 Feet r-- "t_og of Boring l.rojnct: Tract 7253 ^^c; ,c r7.3: 022-15004 ! Cher,;: Taft 20, LLC i!;_: -e P:c.: A-2 Locnticn: SW of Taft Highway u Chevalier Road, Bakersfield, CA _ r: t; :.d Ey: Wayne Andrade Cep -,h LC 1 \'::c ilt'iti: None i Ccm;.:etX n: None SUBSURFACE PROFILE i SAMPLE IPenetration Test I blows/ft a I Water Content (°�) Description .21 j > i I Z T 20 40 60 10 20 30 40 118.3 5.8 _ '1 47 22- til I �I f SANDY CLAYEY SILT (ML) 24 - Medium dense, fine-grained; olive- i - - i-- - - -- jI brown, moisf, drills easily l!I 26 -- IItL i l!iIiiill�„tlj�yIii 100.0 I 29.8 17 -i ----�I- -_- Il 426 _tII I1�IliIiIilIiI't ;; i i� jIl iI� '1;ljl� i1i SAND (SP) Very dense, fine- to medium -grained; light gray, damp, drills hard 115.8 _4_—.2 l ( � _-.5. 0 +30 324 SANDY CLAYEY SILT (ML) Mediumdense, fine-grained with lenses of SILTY SAND; gray and light brown, moist, drills easily 103.3 26.3 i�1�26_ t' i 36- 38- 0- 6-38-0- l1 ---- ---- _ i--- --- I -l—T------ - ---`I -- —i- - --- -.. !�j iI Very dense and drills hard below 40 feet Crill fvIeLhod: Solid Flight v'iai Dare: 2-1-16 Chili tic: CME 45C-1 KIrazcan and Associates i'i-,I -i,r,:: 41,- Inches D3 -W.dr. Chris Wyneken 7D-,,- tflon: 50 Feet Siteet: 2 of 3 r Lc)q of B2 pj,ojcc,1: Tract 7253 . � , c�act: 1-4 L; 022-16004 .•� i IA -2 Z110rit: Taft 20, LLC Locat`oji: SW of Taft Highway & Chevalier Road, Bakersfield, CA Wayne Andrade cep,,!i Lo VVa;,_�r> None ;--L None SUBSURFACE PROFfLE SAMPLE Penetration Test 6 1 14:0 OWS Water Content Description 0 4� -9 0- L__ 20 40 60 10 20 30 40 CID 117.8 5.2 1 72 42 .1 SILTY SAND/SANDY SILT (SAIIML) - ii Very dense, fine-grained with Ij MI interbedded layers of SAND; olive and fight gray, damp, drills hard 4-4- 1 20 1781 f72 n _12____ 4.0 103 50+ 46- 48 10 - End of Borehole 52- 58 F_ 60 ---------- Gill I.Ierhod: Solid Flight 2-1-16 F.'iU : CME 45C-1 Kratan and Associates 41/2 Inches Chris Wyneken 50 Feet Sliee',; 3 of 3