OFFICE OF THE CITY MANAGER
February 10, 2017
TO: Honorable Mayor and City Council
FROM: Alan Tandy, City Manager
SUBJECT: General Information
Notable Items
Enclosed you will find three letters which were sent this week to the State Water Resources
Control Board (SWRCB) regarding three areas the State is demanding the City provide water service to outside of City limits. The agency is giving every indication that they are
moving forward with ordering a $5 million “solution” (and it is really more than that) to
resolve what is a $60,000 problem! It is no wonder that government is often the subject of
ridicule!
In particular, Lakeside School, which is located about three miles south of the City limits,
four miles south of the nearest pipeline, and is not our water customer needs arsenic
treatment for its well. Careful research by our Water Department shows the cost to resolve
the issue to be approximately $60,000 with a $20,000 per year maintenance cost. This solution is nearly identical to the arsenic treatment the City has installed and maintains on a number of City wells. In an effort to help the school, staff performed the research,
contacted outside professionals and maintenance contractors; essentially delivering a
long-term, reliable solution to the school district and State’s issue. The SWRCB, however,
appears to be moving forward with issuing an order to the City for the installation of a four
mile pipeline to the school at a cost of $5 million, as well as higher operation and
maintenance costs than the treatment proposed by the City. Besides the high cost, the
four-mile pipeline will not be looped (meaning it should have another line connected to
it). This is a very poor engineering practice that will require constant flushing (estimated at
220,000 gallons per week) among other maintenance problems. It would also be a “throw away” pipeline because the right of way to install it in a final location does not exist and when development occurs in this area, the pipe would need to be relocated.
We have repeatedly told the SWRCB this story over and over again. We have gone as far
as sending multiple staff to Sacramento to speak with the SWRCB management - they do
not listen or care about identifying the most practical, cost-effective long-term solution.
Instead, they are proceeding with a public meeting, hearing, and unless abated, will be
followed by an order. We are copying the letter to our legislative delegation in the hope
someone with a role in the State budget would want the more economical solution to a
problem.
General Information February 10, 2017
Page 2
This is not a lack of willingness by the City to help the school - even though they are miles
from the City and not our customer, we have spent a great deal of staff time and
resources trying to help them.
The California Supreme Court has denied the Petitioner’s latest efforts in the 24th Street
Widening Project litigation to stop any physical work on the project! This decision frees the
City to continue with all aspects of the project including the removal of the houses and
construction of the soundwalls. The first phase of removal is scheduled to begin later this
month, and construction fencing has already been erected around those properties that
are under contract for demolition followed by the asbestos removal and then the
demolition itself. Petitioner’s appeal of the Superior Court’s decision that the Recirculated
Final EIR complies with the requirements of CEQA is still pending, but that appeal is not
expected to be resolved until next year. The ruling came out before the City and Cal Trans had even filed our written response to the plaintiffs filing. In sports it would be called a “walkover.”
The three entities who have the Water on the Kern River at the first point of measurement
(parties commonly referred to as “first point” interests) are Kern Delta, the City of
Bakersfield, and North Kern. For decades, there has been litigation between the three
parties. When the State enacted groundwater regulation, it resulted in the City, Kern
Delta and Improvement District #4 (ID4; a subset of the Kern County Water Agency)
forming a partnership, the Kern River Groundwater Sustainability Agency (KRGSA), and
dropping a series of legal cases.
Working with Vice Mayor Smith the City was able, this week, to reach an administrative
settlement with North Kern on two separate legal cases that were each going to trial in
March. Thanks go to North Kern Board Chair Kevin Andrew and Manager Dick Diamond
for their positive efforts in that regard.
Hopefully, this is a “baby step” towards the kind of broad based partnership we formed
with Kern Delta and ID4. Time will tell.
If “first point” interests were united it would be a positive for all on the river.
The 3rd annual Winter Showdown at Kern County Raceway Park kicks off the racing season
this weekend with racers, teams, and spectators from around the nation coming to
Bakersfield. It is the richest race event of its kind in the U.S., featuring the top Super Late
Model drivers from around the country. Visit Bakersfield once again sponsored both the
media luncheon at the raceway Thursday afternoon and the kickoff party at Buck Owens’
Crystal Palace Thursday evening. Racing begins Friday night and ends Saturday night.
Visit Bakersfield was featured in a news story on the event, which can be viewed here:
http://www.kerngoldenempire.com/video?videoId=654416890&carousel=1&index=1
General Information February 10, 2017
Page 3
Traffic Advisories
Intermittent Flagging on State Route 178 and State Route 184
Date Change for Temporary State Route 178 to State Route 184 Access Closure
Lane closures and intermittent flagging operations will be in effect along State Route 178,
between Canteria Drive and Alfred Harrell Highway next week, February 13th -17th.
Intermittent flagging will also be needed on State Route 184. Motorists traveling through these areas should stay alert and be prepared to stop. Delays are not expected to last longer than
10 minutes. Motorists should expect the lane closures and flagging operations to be in effect
between the hours of 8 a.m. and 4 p.m. each day.
The work requiring a temporary closure of access from eastbound and westbound State
Route 178 onto State Route 184 has been rescheduled for Tuesday, February 14th and
Wednesday, February 15th due to the forecasted rain event. The closure will be in effect
between the hours of 8 a.m. and 4 p.m. to allow for paving activities on State Route 184.
Motorists can access State Route 184 from Bedford Green Drive while this work is underway. Motorists travelling on State Route 184 will be able to access eastbound State Route 178 during this time period, but should anticipate intermittent flagging. Access to the gas
station/market located on the corner of State Routes 178 and 184 will remain open.
Referrals
Councilmember Rivera
o FY 2016-17 Capital Improvement Funds Reports
Streets Division work schedule for the week of February 13th Event Notifications
Event calendar for the Rabobank Arena Theater and Convention Center
On February 11th (beginning 9:00 a.m.) California State University, Bakersfield, in partnership
with the City’s Recreation and Parks Department, will be holding the Valentine’s Run/Walk
event for the entire family. Pre-registration costs $22.00 and after January 28th the cost is
$25.00. Registered participants will receive shirts.
On February 11th (beginning 9:00 a.m.) come join the “Walk with a Doc” at The Park at River Walk. Here you can walk and learn from a medical doctor about healthy life choices. This
event is free and open to everyone.
AT:cb/mc cc: Department Heads Pamela McCarthy, Interim City Clerk
OFFICE OF THE CITY MANAGER MEMORANDUM
February2,2017
TO: Alan Tandy, City Manager
FROM: Chris Huot, Assistant City Manager CH
SUBJECT: FY 2016-17 Capital Improvement Funds
Councilmember Rivera requested staff provide information regarding capital
improvement program funds that can be utilized for general operating purposes
During the Closed Session meeting on January 4, Councilmember Rivera
requested staff provide information regarding capital improvement program
funds that can be utilized for general operating purposes potentially in lieu of
further operating budget adjustments. At that time, Councilmember Rivera
recalled the approved capital improvement budget for FY 2016-17.
The adopted FY 2016-17 capital improvement budget totals approximately $54
million. Approximately $47.5 million comes from funding sources in which the uses
are restricted and cannot be utilized for general operating expenditures.
Examples of these restricted funding sources include the domestic water fund,
agricultural water fund, general aviation fund, transportation impact fees, utility
surcharge, Community Development Block Grants, sewer enterprise fund, refuse
fund and federal transportation funds. These restricted funding sources account
for over 87 percent of the total FY 2016-17 capital improvement program budget.
The remaining $6.5 million was budgeted within the capital outlay fund, which
normally accounts for projects in which the funding is discretionary and can be
used for general operating purposes. However in the current year, the majority of
the funds were allocated to street materials ($5 million) and local matches for
grants ($1.2 million). Over $4.5 million of the $5 million budgeted for street materials
has been expended to date.
The $1.2 million budgeted for required local matches is leveraging over $6.2 million in state or federal dollars to complete local road improvement projects. These
projects include rehabilitation of P Street and California Avenue within Wards 1
and 2, respectively. Reallocating the local matching funds is not recommended,
as it would effectively stop needed projects that are currently in the planning and
FY 2016-17 Capital Improvements
February 2, 2017
Page 2
design process, as well as place the City in jeopardy of not receiving certain grant
funding in the future.
Of the $540,000 balance that remains available after taking into consideration
the $1.2 million in local matching funds, $440,000 is designated for asphalt for local
road maintenance for the remainder of the fiscal year. The remaining $100,000 is
allocated for miscellaneous repairs or maintenance projects at the Arena and
Animal Care Center and for various compliance activities associated with the
Americans with Disabilities Act.
Summary of Remaining Balance in Capital Outlay Fund:
FY 2016-17 Capital Outlay Budget: $6.5 million
o Remaining Total Balance: $1.7 million
o Remaining Balance – Local Match for Grants: $1.2 million
o Remaining Non-Grant Match Balance: $540,000
Past Budget Adjustments
FY 2014-15
Sales tax started to trend negative toward the end of 2014-15. Staff was able to
avoid direct cuts to department budgets due to other revenues that
materialized at that time. The following are a summary of the various revenues
and savings:
Projected Additional Year End Department Savings $364,374
Revenue Adjustments $703,000
State Pre-2004 Reimbursement $1,829,326
Total General Fund Savings FY 2014-15 $2,896,700
FY 2015-16
The City Council adopted the FY 2015-16 budget after making $3.6 million in cuts
to the proposed budget for that fiscal year. The follow is a summary of the
adjustments:
Eliminated non-essential reimbursable (Travel and Training) $154,395
Reduced General Fund Overtime $230,000
Reduced Temporary Employee Pay $170,275
Reduced Educational Reimbursement Funds $60,200
Reduced Council Contingency $200,000
Eliminated Transfer to Equipment Fund $839,952
Reduced Parks Water Budget - Spray Parks $162,000
Eliminated East Monument Sign Project $110,000
Adjusted Department Rental Rates for Computers/Vehicles $273,960
Capital Improvement Project Savings $242,918
Deferred of Potential Future Cost of Living Adjustment $1,250,000
Total General Fund Adjustments FY 2015-16 $3,693,700
After sales tax figures continued to trend negative, staff brought forth the
following proposed adjustments as part of the mid-year budget update on
January 20, 2016. The following adjustments were approved by the City Council
at that time.
Past Budget Adjustments Page 2
Lowered Sales Tax Projections for FY 2015-16 from +2 to 0 percent
growth
Required
$1.4 million
in
adjustments
Reduced Capital Projects* $1,740,071
Adjusted City’s Compensated Absences Reserve $2,000,000
Deferred Retiree Healthcare Trust Payment $2,000,000
Deferred Potential Future Cost of Living Adjustment $1,075,000
Total General Fund Adjustments Mid-Year FY 2015-16 $6,815,071
*List is attached for reference
In addition to the adjustments approved during the FY 2015-16 mid-year budget
update, staff continued to administratively reduce General Fund spending
through:
Deferred certain budgeted equipment purchases
Reduced temporary staff
Further restricted overtime, travel and non-core service-related
expenditures
Instituted a focused hiring freeze of certain non-sworn general fund full
time vacancies
Instituted a position-by-position review by the City Manager’s Office prior
to initiating the hiring process for vacant full time positions
FY 2016-17
The following items were incorporated into the FY 2016-17 budget, as adopted
by the City Council in June 2016:
13 vacant positions within the General Fund were eliminated:
o Computer Drafting Tech (Public Works)
o Engineering Technician (Public Works)
o Maintenance Craftworker I (Public Works)
o Service Maintenance Worker (Public Works)
o Construction Inspector II (Public Works)
o Chief Code Enforcement Officer (Community Development)
o Associate Planner I (Community Development)
o Clerk Typist I (City Clerk)
o GIS Technician (Technology Services)
o Four Laborer positions (Recreation and Parks)
o Clerk Typist I (Recreation and Parks)
Past Budget Adjustments Page 3
Departments were directed to reduce General Fund spending by 3
percent for FY 2016-17
Police Asset Forfeiture funds are budgeted in the amount of $1.5 million for
callback/overtime which alleviated further need to reduce General Fund
appropriations at the time the budget was adopted
New discretionary capital projects were generally limited to grant match
requirements or for emergency type projects that are unexpectedly
needed at the Arena and Animal Care Center
Reduced fleet and technology equipment replacements
Reduced contribution to retiree healthcare trust due to prior year
overfunding status ($2,000,000)
FY 2015-16 Approved Mid Year Capital Project Reductions with Additional Information
Arena/Theater/Convention Center
Project Amount to Reduce First Year Budgeted Description of Project
CC MEETING RM REFURB 50,000.00 FY 2015-16 The project was budgeted to make aesthetic updates to
certain meeting rooms within the Convention Center. Meeting
rooms remain functional for events until funds can be budgeted in a future year.
ARENA/CC PARKING LIGHTING 35,000.00 FY 2013-14 Project was budgeted to add additional overhead fixtures to
improve lighting in parking lot behind Arena. Project was
previously on hold pending High Speed Rail alignment decision, which may provide for other options for the parking
area lighting enhancements, including the installation of solar
panels.
CC TRD SHOW PWR UPGRADE 45,000.00 FY 2013-14 This project would have upgraded the existing power system that provides electricity to trade booths on Convention Center
floor; The existing system remains functional.
Arena Total 130,000.00
Fire Department
Project Amount to Reduce First Year Budgeted Description of Project
FIRE STA ROOF REPAIRS 90,000.00 FY 2013-14 This project was budgeted to repair existing roof at Fire maintenance building locating at Fire Headquarters; Project
was previously on hold as original bids were significantly
beyond budget. Project will be revisited in a future fiscal year.
FIRE STA 11 FAC IMPRV FRR 30,000.00 FY 2014-15 Project was originally budgeted at $105,000 and included
purchase/installation of a new generator as well as miscellaneous concrete work around the exterior of the
station. Generator portion of the project is moving forward.
Generator is proposed to be awarded at the Feb. 10 Council
meeting. Remainder of project is deferred until a future fiscal year.
FIRE ST 1&2 DRIVEWAY REPL 70,814.00 FY 2013-14 This project made improvements to and replaced driveways at Fire Stations 1 and 2. Those improvements have been
completed. The remainder of the funds represent savings to
project.
Fire Department Total 190,814.00
FY 2015-16 Approved Mid Year Capital Project Reductions with Additional Information
Public Works
Project Amount to Reduce First Year Budgeted Description of Project
BRIDGE DECK IMPR VARIOUS 200,000.00 FY 2015-16 This project was budgeted in an effort to proactively apply
treatment to various bridge decks throughout the City to
improve deck conditions. Staff will review ability to include in a future year budget.
SIDEWALK INSTALL MING AVE 10,460.37 FY 2014-15 Sidewalk has been installed along the south side of Ming
Avenue, generally between Anita Lane and Benton Street.
The amount identified is savings to the project.
RE-ROOF CHS ANNEX FRR 176,000.00 FY 2012-13 This project was budgeted to replace the roof on the annex
building located directly south of City Hall North. Repairs have been made to reduce leakage during rain events, but roof will
need to be replaced in a future year.
CHN ELEVATOR REHAB 150,000.00 FY 2013-14 This project was previously budgeted to rehabilitate the two
elevators within City Hall North. The elevators remain in operating order, but do require regular maintenance due to
age.
CC PLUMBING REPLACEMENT 19,882.00 FY 2004-05 This project was budgeted over 10 years ago to make plumbing improvements to piping within the Convention
Center. The remaining fund was initially to be used to replace
an existing pipe over the exhibit hall area. However, staff
determined this to be a lower priority need and has only experienced the need for intermittent leak repairs.
RABO ARENA/CC MISC IMPROV 15,000.00 FY 2014-15 This amount represents savings from a previous fiscal year
project that is customarily budgeted for miscellaneous items
that require attention at the Rabobank Arena, Theater and Convention Center.
RABO ARENA/CC MISC IMPROV 35,915.10 FY 2014-15 This amount represents savings from a previous fiscal year
project that is customarily budgeted for miscellaneous items
that require attention at the Rabobank Arena, Theater and Convention Center.
STLT WOOD POLE TEST/INSP 62,000.00 FY 2014-15 This project was previously budgeted to begin testing and
evaluating certain wood street light poles that exist throughout the City. Testing parameters are still being developed,
however the field testing will be deferred until a future budget
year.
Public Works Total 669,257.47
Recreation and Parks
Project Amount to Reduce First Year Budgeted Description of Project
SPORTS VILLAGE PHASE III 750,000.00 FY 2013-14 This project will construct the main soccer field, play
structures, streets and other miscellaneous improvements
within the State Farm Sports Village. The $750,000 reduction
represents the remaining capital outlay funds originally budgeted for this project. As this project is ongoing, staff
identified approximately $635,000 in various Park
Improvement Funds to appropriate to the project to "backfill"
the reduction in capital outlay funds. This appropriation was
made by the City Council on 1/20/16.
Recreation and Parks Total 750,000.00
Total All Depts. 1,740,071.47
SUB PROG #DEPARTMENT/DIVISION ACTUAL POSITION VACANCIES *Salaries & Benefits
1341 CITY CLERK CITY CLERK 1 $156,717
1371 INFORMATION TECHNOLOGY NETWORK SYSTEMS TECHNICIAN 1 $68,709
1611 CVB MARKETING & EVENTS SPECIALIST 1 $87,839
2011 POLICE-ADM CLERK TYPIST I 1 $57,575
2011 POLICE-ADM DETECTIVE 1 $166,181
2011 POLICE-ADM POLICE DISPATCHER I 2 $122,840
2011 POLICE-ADM LIEUTENANT 1 $158,653
2011 POLICE-ADM POLICE OFFICER 3 $312,465
2021 POLICE-OPRS POLICE OFFICER 17 $1,770,635
2021 POLICE-OPRS SENIOR POLICE OFFICER 1 $118,527
2031 POLICE-INV LIEUTENANT 1 $158,653
2031 POLICE-INV POLICE OFFICER 1 $104,155
2041 POLICE-ANIMAL CONTROL ANIMAL CONTROL OFFICER 1 $49,000
3031 FIRE - SUPPRESSION FIRE ENGINEER 1 $103,339
3031 FIRE - SUPPRESSION FIREFIGHTER 3 $284,445
4031 PW-ENGINEERING CIVIL ENGINEER III 1 $117,141
4031 PW-ENGINEERING CIVIL ENGINEER IV 1 $155,229
4031 PW-ENGINEERING ENGINEER II 1 $100,664
4031 PW-ENGINEERING SURVEY PARTY CHIEF 1 $75,539
4051 PW-GENERAL SERVICES ELECTRICAL TECHNICIAN II 1 $81,710
4051 PW-GENERAL SERVICES SERVICE MAINTENANCE WORKER 2 $113,060
4052 PW-STREETS SERVICE MAINTENANCE WORKER 3 $169,590
4053 PW-FLEET FLEET MECHANIC I 1 $67,068
4053 PW-FLEET FLEET MECHANIC II 1 $78,765
4053 PW-FLEET FLEET SERVICE WORKER I 1 $56,530
4053 PW-FLEET FLEET SERVICE WORKER II 1 $62,146
4081 PW-SOLID WASTE SECRETARY II 1 Dept. is currently interviewing the candidates $61,368
4081 PW-SOLID WASTE SERVICE MAINTENANCE WORKER 2 $140,590
4081 PW-SOLID WASTE SOLID WASTE EQUIPMENT OPR 2 $140,268
4081 PW-SOLID WASTE SUPERVISOR II 1 $122,153
4511 AG WATER CANAL TENDER II 1 $62,146
4511 AG WATER ENGINEERING TECHNICIAN I 1 $81,932
4511 AG WATER MAINTENANCE CRAFTWORKER I 1 $96,852
4511 AG WATER SERVICE MAINTENANCE WORKER 1 $62,032
4521 DOMESTIC WATER ENGINEERING TECHNICIAN I 1 $81,932
6011 PLANNING ASSOCIATE PLANNER II 1 $95,079
6011 PLANNING PLANNING DIRECTOR 1 $161,483
6021 BUILDING BUILDING INSPECTOR II 1 $81,933
6021 BUILDING CODE ENFORCEMENT OFFICER III 1 $101,747
TOTAL 65 $6,086,690
Notes:
The above positions are all approved and included in the current FY 16-17 City Budget compliment of 1521. Nearly all of these positions are in process of being filled currently.
The approved City compliment of 1521 represents a very lean organization.
*The salary and benefits column represents the full annual costs associated with these positions.
Recruitment will open soon
Requisition required
Dept. is currently interviewing the candidates
Dept. is currently interviewing the candidates
Recruitment will open soon
Dept. is currently interviewing the candidates
Dept. is currently interviewing the candidates
Oral Interviews on 2/22/17
Recruitment required
Recruitment in process
Requisition required
Dept. is currently interviewing the candidates
Recruitment will open soon
Recruitment Required
Oral Interviews on 2/8-9/17
Recruitment required
Dept. is currently interviewing the candidates
Dept. is currently interviewing the candidates
Dept. is currently interviewing the candidates
Eligible List to be approved at Police CS on 2/8/17
On Hold-BPD wants to open with Detective
Oral Interviews on 2/6-7/17
Eligible List to be approved at Police CS on 2/8/17
In backgrounds
Recruitment required
Recruitment will open on 2/27/17
Recruitment in process
Recruitment will open on 2/16/17
Dept. is currently interviewing the candidates
Oral Interviews on 2/6/17
Position filled effective 3/6/17
Recruitment required
Backgrounds in progress
Oral Interviews on 2/6-7/17
Eligible List to be approved at Police CS on 2/8/17
COMMENTS
VACANCY LIST AS OF FEBRUARY 2, 2017
Recruitment in process - Bill Avery
Recruitment in process
Recruitment required
Week of February 13_2017_Work Schedule
Page 1 of 2 STREETS DIVISION – WORK SCHEDULE Week of February 13, 2017 – February 17, 2017
Resurfacing/Reconstructing streets in the following areas:
Maintenance Grind & Pave on Harris Rd between Wible Rd and Gosford Rd (weather permitting)
Maintenance work on “H” St between 23rd St & 24th St (weather permitting)
Miscellaneous Streets Division projects:
Video inspection of City owned sewer and storm lines to evaluate condition of pipes
Repairing damaged sewer line found during video inspection
Miscellaneous concrete repairs throughout the City
Concrete repairs to various bus stops throughout City limits
Grading and pouring concrete sidewalks at Mesa Marin
Concrete work in the four HUD areas for curb and gutter, sidewalk, and handicap ramps prior to street
repairs; the four areas are (1) El Toro Dr Area (2) Oleander Ave Area (3) Castro Ln Area, (4) “P” St Area
THIS SPACE INTENTIONALLY LEFT BLANK
Week of February 13_2017_Work Schedule
Page 2 of 2 STREETS SWEEPING SCHEDULE Monday, February 13, 2017
Between So. “H” St. & Union Ave. – Pacheco Rd. & Hosking Rd.
Between Stockdale Hwy. & Truxtun Ave. (ext.) – Coffee Rd. & Partridge Ave.
Tuesday, February 14, 2017
Between 99 Hwy. & So. “H” St. – Ming Ave. & Panama Ln.
Cul-De-Sacs on the north side of Magdelena Ave., west of So. “H” St.
Wednesday, February 15, 2017
Cul-De-Sacs on the north side of Angela Wy., between Manely Ct. & Cris Ct.
Between Oswell Park Dr. & Brundage Ln. – Oswell St. & Leeta St.
City areas between Workman St. & Sterling Rd. – 58 Hwy. & Baja Dr.
Between Morning Dr. & Park Dr. – College Ave. & Willis Ave.
Between Buena Vista Rd. & Old River Rd. – White Ln. & Panama Ln.
Between Old River Rd. & Gosford Rd. – White Ln. & Pacheco Rd.
Thursday, February 16, 2017
City areas between Stockdale Hwy. & Ming Ave. – Ashe Rd. & Gosford Rd.
Between El Portal Dr./Laurelglen Blvd. & Ashe Rd. – Ming Ave. & So. Half Moon Dr./Olympia Dr.
Between Ashe Rd. & Stine Rd. – Ming Ave. & So. Half Moon Dr./Edgemont Dr.
Between Coffee Rd. & Wilson Rd. (ext.) – White Ln. & So. Half Moon Dr./Olympia Dr. Friday, February 17, 2017
Between Stockdale Hwy. & Ming Ave. – Allen Rd. & Old River Rd.
Between Old River Rd. & Gosford Rd. – Ming Ave. & Ridge Oak Dr./Westwold Dr.
Between Ridge Oak Dr./Westwold Dr. & White Ln. – Old River Rd., east to the PG&E easement.
Between White Ln. & Asperata Dr. – Gosford Rd., west to the PG&E easement.
Between White Ln. & Cedarwood Dr. – Stine Rd. & Wilson Rd. (ext.)
NOTE: If raining, there will be no street sweeping service and all street cleaning personnel will be assigned
to cleaning plugged drains and part circle culverts. This also applies when a large number of street
sweepers are in Fleet for repairs. Areas that have been missed during this time will be swept at the end of
the month only when possible.
BOX OFFICE HOURS
Mon-Fri 10 AM - 5 PM
(Excluding Event Days)
CHARGE-BY-PHONE
1-888-929-7849
GROUP SALES INFORMATION
661-852-7309
SEASON TICKET INFORMATION
Bakersfield Condors
661-324-PUCK (7825)
www.bakersfieldcondors.com
Bakersfield Symphony
661-323-7928
www.BSOnow.org
Broadway In Bakersfield
661-852-7308
Week of February 6th
UPCOMING EVENTS
February 7 – Condors vs San Diego 7:00 PM
$35, $25, $20, $16, $12 On Sale Now
February 11 – Condors vs San Jose 6:00 PM
$35, $25, $20, $16, $12 On Sale Now
February 16 – Blake Shelton 7:30 PM
$77.50, $57.50, $27.50 On Sale Now
February 17 – Condors vs San Diego 7:00 PM
$35, $25, $20, $16, $12 On Sale Now
February 18 – WWE Live 7:30 PM
$95, $65, $50, $35, $25, $15 On Sale Now
February 20 – Harlem Globetrotters 2:00 PM
$90, $50, $40, $33, $25, $18 On Sale Now
March 3 – CIF Wrestling Session One 9:00 AM
$21, $18, $15, $14, $13, $12, $11 On Sale Now
March 18 – Elton John
$149.50, $79.50, $49.50 On Sale Now
May 26 – Lady Antebellum 7:30 PM
$62.50, $42.50 On Sale 2/10
September 30 – Tim McGraw/Faith Hill 7:30 PM
$129.50, $99.50, $69.50 On Sale Now
March 4 – CIF Wrestling Session Two 9:00 AM
$23, $20, $17, $16, $15, $14, $12 On Sale Now
March 4 – CIF Wrestling Session Three 7:00 PM
$25, $22, $19, $18, $17, $16, $13 On Sale Now
February 10 – Super Love Jam 7:30 PM
$69.50, $52.50, $42.50, $35.50, $30.50 On Sale Now
February 11 – Espinoza Paz/Luis Coronel 8:00 PM
$135, $105, $85, $65, $50, $40 On Sale Now
February 24 – Adrian Uribe 8:00 PM
$95, $80, $70, $60, $50, $40 On Sale Now
March 11 – Bakersfield Symphony 7:30 PM
$45, $35, $30, $20 On Sale Now
April 8 – Bakersfield Symphony 7:30 PM
$45, $35, $30, $20 On Sale Now
May 13 – Bakersfield Symphony 7:30 PM
$45, $35, $30, $20 On Sale Now
May 18 – Cinderella 7:30 PM
$65, $55, $35 On Sale Now
July 22 - Pepe Aguilar 8:00 PM
$199, $125, $95, $75, $60, $50 On Sale Now
www.rabobankarena.com - www.bhnamphitheatre.com