Loading...
HomeMy WebLinkAbout1.2-6536 Ph 1 & 2LEGEND: CONSTRUCT SEWER PER CITY STANDARDS ABBREVIATIONS CL CENTERLINE INV INVERT SD STORM DRAIN MH MANHOLE CB CATCH BASIN JB JUNCTION BOX SMH SEWER MANHOLE SCO SEWER CLEANOUT SDMH STORM DRAIN MANHOLE EXIST EXISTING ELEV ELEVATION R/W RIGHT OF WAY 348.5 T.0'M• TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION = • ® ® PHASE BOUNDARY �•■�■■�•�•�■■■� TRACT BOUNDARY SEWER PLANS FOR TRACT 6824 HAVE BEEN APPROVED. IF SEWER ON 6824 HAS NOT BEEN CONSTRUCTED PRIOR TO CONSTRUCTION OF TRACT 6536, THEN THE DEVELOPER OF TRACT 6536 SHALL CONSTRUCT SEWER FROM THE CONNECTION POINT TO EXISTING SEWER ON MOUNTAIN RIDGE DRIVE IN ACCORDANCE WITH TRACT 6824 SEWER PLANS AND EASEMENT PROVIDED. s CONSTRUCT SEWER PER CITY STANDARDS hM.-M� ® CONSTRUCT SEWER MANHOLE TYPE "A" PER C.O.B. STD. SW -4. mimmn ® CONSTRUCT SEWER CLEANOUT AA1 PER C.O.B. STD. SW6. CONSTRUCT STORM DRAIN PER CITY STANDARDS 0 CONSTRUCT STORM DRAIN MANHOLE TYPE "A" PER C.O.B. STD. SW -4. CONSTRUCT CATCH BASIN TYPE "A" PER C.O.B. STD. D-14. SUMMARY OF IMPROVEMENTS SEWER IMPROVEMENTS TOTAL 6" SEWER LINE 736 LF 8" SEWER LINE 3396 LF 4" LATERALS 3752 LF STANDARD MANHOLE 16 EA SEWER CLEAN OUT 2 EA STORM DRAIN IMPROVEMENTS TOTAL ' 18" STORM DRAIN LINE 1009 LF 24" STORM DRAIN LINE 1393 LF 30" STORM DRAIN LINE 64 LF fiF► STORM DRAIN MANHOLES 10 EA � � e� fiF'► CATCH BASINS 6 EA OUTLET STRUCTURE 1 EA (L MULTIPLE UTILITY TRENCH q SEWER MAIN 4' R 5' TYP. , I STAMP AN "S' S Y Y IN THE CURB TYP. <* FACE ABOVE SEWER LETERAL 1 60' 7' MAX. * ° TYP. � .!� 1� MIN, �N. e LATERAL (TYP) '� ON DEEP SEWER, SLOPE LATERALS TO LOT UNE SO THAT THE END OF LATERAL IS WITHIN REQUIRED TOLERANCE. It WATERLINE FINISHED STREET GRADE TYP. 4' 11% MIN. —� — _ _ 4' LATERAL (TYP) SET LATERAL PROVIDING PROPER CLEARANCE UNDER WATERLINE AND UTILITY TRENCHES NOTE: CONTRACTOR TO VERIFY THAT WATER DETAIL MAIN AND SEWER LATERAL CROSSINGS TYPICAL SEWER LATERAL INSTALLATION ARE IN CONFORMANCE WITH CALIFORNIA HEALTH CODE REQUIREMENTS. �k FOR SHALLOW INSTALLATION OF SEWER LATERALS FROM SHALLOW SEWER MAINS, THE SEWER LATERALS MUST CROSS OVER THE WATER OR U11UTY TRENCH. THESE INSTALLATIONS MUST RECEIVE SPECIAL TREATMENT FOR LATERALS WHEN CROSSING OVER THE WATERMAIN. A SEWER LATERAL CROSSING ABOVE A WATER MAIN SHALL BE CONSTRUCTED OF A CONTINUOUS 20' SECTION OF CLASS 200 (DR 14 PER AWWA C900) PLASTIC PIPE OR EQUIVALENT, CENTERED ON THE PIPE BEING CROSSED. 7' MAX. * — hM.-M� mimmn AA1 rim.M. O■ NO ' I fiF► � � e� fiF'► VICINITY MAP N.T.S. INDEX OF SHEETS SHEET TITLE 1. COVER SHEET 2. NOTES 3. MURFREESBORO DRIVE 4. FORT HENRY WAY 5. DAVIS DRIDGE AVENUE 6. FAIR GARDEN WAY & MOSSY CREEK WAY 7. BLOUNTSVILLE DRIVE 8. FOR SANDERS AVENUE 9. PANAMA LANE 10. SUMP DETAIL 11 I I I I I I 1 5 i 7 i 6 i 5 i 4 1 3 1 2 1 1 9 I 10 1 11 1 12 1 13 1 14 1 15 1 16 � AI S i� 1 � I ' 1 - --+-t�4 — 10 24 23 1 22 1 21 1 20 I 19 1 15 t° 1 I I I I 1 5 DAVIS DRIDGE AVENUE Z — — T-T_a O9 PANAMA LANE LOT "A' LOT LINE ADJUSTMENT NO. 15-0527 DOCUMENT NO. 000215031870, O.R. CITY. OF BAKERSFIELD KERN COUNTY CALIFORNIA SEWER AND STORM DRAIN PLANS VESTING TENTATIVE TRACT NO. 6536 PHASE 1 & 2 a 0 Q I ss 2a i! 1 2s3 30 1 31 I s2 ? 39 36 1 37 1 36 1 35 I 34 i 33 + 1 1 2 1 3 i 4 1 s i 6 1 7 1 5 1 9 i w I 11 i 12 ' 1--1--� - I 40 41 1 42 1 43 1 44 1 45 1 46 1 47 ? 11 31 62 r s3 I 54 I ss I s6 I 37 I se _BLOUNTSVILLE DRIVE s-- -1__F-1__n _�__I 23 1 22 1 21 1 20 1 19 1 16 117 1 16 ( 1s i 14 13 I AS 1E t I l I I I 4 1 25 1 25 1 27 1 26 1 20 1 30 1 31 t 32 1 33 34 ORT SANDERS AVENUE— — s O I 50 1 49 1 46 1 47 1 46 1 45 I 44 1 43 i 42 ( 41 ( 40 I 39 ( 36 ! 371; 36 35 9� 10 VESTING TENTATIVE TRACT NO. 6825 KEY MAP SCALE: 1" = 200' NOTE: 1. PRIOR TO THE START OF ANY PHASE OF CONSTRUCTION, THE CIN CONSTRUCTION INSPECTION DEPARTMENT SHALL BE GIVEN 24 HOURS NOTICE. TELEPHONE 326-3049 2. ALL MATERIALS SUPPLIED FOR THIS PROJECT WILL REQUIRE A CERTIFICATE OF COMPLIANCE STATING THAT THE REQUIREMENTS &STANDARDS SET FORTH BY THE CIN OF BAKERSFIELD HAVE BEEN MET. 3. NO CITY INSPECTIONS WILL BE GIVEN FOR THE WORK IN THIS AREA UNTIL A STREET PERMIT WITH APPROPRIATE SECURITY AND INSURANCE HAS BEEN OBTAINED. ENGINEER'S STATEMENT THESE PLANS AND SPECIFICATIONS WERE PREPARED BY ME OR UNDER MY DIRECTION AND TO THE BEST OF MY KNOWLEDGE AND BELIEF COMPLY WITH CITY OF BAKERSFIELD ORDINANCES, STANDARDS, AND DESIGN CRITERIA AND INCLUDE ALL IMPROVEMENT REQUIREMENTS OF THE ADVISORY AGENCY OR OTHER REVIEW BOARD. I AM RESPONSIBLE FOR ALL CALCULATIONS AND DRAWINGS ON THESE PLANS AND ANY ERRORS, OMISSIONS, OR VIOLATIONS OF THO ORDINANCES, STANDARDS A ESIGN CRITERIA SHALL BE C REC713 DURIN CONSTRUCTION B-tSr�� APPROVED BY: R MCINTOSH R.C.E. 33322 DATE EXP. 06-30-18 IN ACCORDANCE WITH THE CONDITIONS OF THE VESTING TENTATIVE MAP, THE IMPROVEMENT PLANS HAVE BEEN REVIEWED `BY THE CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT. ALL IMPROVEMENTS INDICATED AS "PRIVATE" HEREIN ARE PRIVATE AND ARE TO BE PRIVATELY MAINTAINED. APPROVED BY: NICOLAS FIDLER,1 PUBLIC WORKS DIRECTOR R.C.E. NO. 61069 EXP. 12-31-16 //- / 9 - z 1, DATE REVIEWED BY:-,�'--'•--� ASSISTANT PUBLIC WORKS DIRECTOR BASIS OF BEARINGS: THE BEARING OF N. 89'06'48" W. SHOWN FOR THE NORTH LINE OF THE NORTHEAST QUARTER OF SECTION 30, T. 30S., R. 27E. ON K.C.S. FILED MAP NO. 7-1 BK. 6, PG. 26 IN THE OFFICE OF THE KERN COUNTY SURVEYOR WAS USED AS THE BASIS OF BEARINGS SHOWN HEREON. BENCHMARK USED: TOP OF CONCRETE MONUMENT IN LAMPHOLE AT THE INTERSECTION OF OLD RIVER ROAD AND BERKSHIRE ROAD. ELEVATION = 346.42' (USGS 'DATUM) LEGAL DESCRIPTION: BEING A SUBDIVISION OF LOT "B" OF LOT LINE ADJUSTMENT NO. 15-0527 PER CERTIFICATE OF COMPLIANCE RECORDED MARCH 15, 2016 AS DOCUMENT NO. 000216031870, OFFICIAL RECORDS, IN THE OFFICE OF THE KERN COUNTY RECORDER; ALSO BEING A PORTION OF SECTION 30, TOWNSHIP 30 SOUTH, RANGE 27 EAST, M.D.M., IN THE CITY OF BAKERSFIELD, COUNTY OF KERN, STATE OF CALIFORNIA. Know whaf s below. Cali before you dig. ' ,tc N b/ M > J .46 z P to r a 0 7\ mimmn 7\ STANDARD NOTES 1. GENERAL CONTRACTOR WILL FURNISH ALL MATERIALS, TOOLS, LABOR; EQUIPMENT AND SUPERVISION NECESSARY TO COMPLETE INSTALLATION. UNDERGROUND SERVICE ALERT (USA) SHALL BE NOTIFIED AT LEAST 2 WORKING DAYS BEFORE CONSTRUCTION. TELEPHONE 1-800-227-2600. CONTRACTOR TO CALL FOR USA LOCATE AND POTHOLE ALL MARKED UTILITIES THAT CROSS OR ARE WITHIN 5' HORIZONTAL DISTANCE OF SEWER AND STORM DRAIN LINES. VERTICAL AND HORIZONTAL LOCATION SHALL BE ASCERTAINED BY THE CONTRACTOR AHEAD OF ANY EXCAVATIONS TO VERIFY THAT THE PROPOSED DESIGN DOES NOT CONFLICT WITH ANY UTILITIES. IN THE EVENT A CONFLICT EXISTS THE ENGINEER SHALL BE NOTIFIED IN ORDER TO REDESIGN THE ALIGNMENT. IF RELOCATION OF EXISTING UTILITIES IS DEEMED NECESSARY THE CONTRACTOR SHALL BE COMPENSATED FOR INSTRUCTED RELOCATION. IF REDESIGN OF THE ALIGNMENT REQUIRES ADDITIONAL FITTINGS, PIPE OR EXCAVATION THE CONTRACTOR SHALL BE COMPENSATED FOR REVISION. IN THE EVENT A UTILITY IS DAMAGED THE CONTRACTOR SHALL BE WHOLLY RESPONSIBLE FOR ITS REPAIR. CONTRACTOR SHALL VERIFY LOCATIONS AND ELEVATIONS OF EXISTING SEWER LINES THAT THE NEW SYSTEM TIES INTO PRIOR TO TRENCHING. ANY DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER SO THAT ANY NECESSARY ADJUSTMENTS MAY BE MADE. UTILITIES SHALL BE THOROUGHLY RESEARCHED AND LOCATED BY CONTRACTOR PRIOR TO TRENCHING. CROSSING UTILITIES SHALL BE DAYUGHTED AND CHECKED FOR GRADE, BY CONTRACTOR PRIOR TO TRENCHING. ALL EXISTING IMPROVEMENTS, (CURB, GUTTER, SIDEWALK, CROSS GUTTER, FENCES, ETC.) THAT ARE REMOVED, DAMAGED OR UNDERCUT SHAD_ BE REPAIRED OR REPLACED AS DIRECTED BY THE CITY ENGINEER. ALL EXISTING PAVING AND SURFACING REMOVED, DAMAGED OR UNDERCUT SHALL BE REPLACED IN ACCORDANCE WITH THE CITY OF BAKERSFIELD STANDARD DRAWING ST -6, EXCEPT AS NOTED ON PLANS. AN OPEN STREET PERMIT SHALL BE OBTAINED FROM THE CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT FOR ANY WORK PERFORMED WITHIN EXISTING ACCEPTED STREET RIGHT-OF-WAY. UNLESS SECURED BY AN IMPROVEMENT AGREEMENT, APPROVED INSURANCE AND SECURITY BASED ON AN APPROVED ENGINEER'S ESTIMATE FOR THE WORK PERFORMED WITHIN THE RIGHT-OF-WAY SHALL BE POSTED PRIOR TO ISSUANCE OF THE PERMIT. COMPACTION TESTS SHALL BE THE RESPONSIBILITY OF THE DEVELOPER/SUBDIVIDER/ CONTRACTOR. THE NUMBER AND LOCATION OF REQUIRED TESTS SHALL BE DETERMINED BY THE CITY ENGINEER. 24 HOUR NOTICE: PRIOR TO THE START OF ANY PHASE OF CONSTRUCTION, THE CITY CONSTRUCTION INSPECTION SECTION SHALL BE GIVEN AT LEAST 24 HOURS NOTICE THE SECTION MAY BE NOTIFIED AT (661) 326-3049. 2. STANDARD DETAILS THE FOLLOWING CITY OF BAKERSFIELD STANDARDS SHALL BE CONSIDERED PART OF THESE PLANS: S-6, S-7, S-8, S-9, S-10, S-11, S-12, S-20, S-22. 3. VCP INSTALLATION MATERIALS : THE PIPE AND FITTINGS SHALL BE EXTRA STRENGTH VITRIFIED CLAY CONFORMING TO CURRENT ASTM SPECIFICATION C-700 AND SHALL BE INSTALLED IN CONFORMANCE WITH THE PROVISIONS OF SECTION 71 OF THE STANDARD SPECIFICATIONS OF THE STATE OF CALIFORNIA, DEPARTMENT OF TRANSPORTATION, CURRENT EDITION AND THE CURRENT ASTM SPECIFICATIONS C-12. JOINTS : THE PIPE AND FITTINGS SHALL HAVE A SOCKET END AND A SPIGOT END WITH COMPRESSION JOINTS CONFORMING WITH THE CURRENT ASTM SPECIFICATION C-425. THE PIPE AND FITTINGS FOR 6". 8', 10', AND 12" SANITARY SEWER MAINS MAY BE PLAIN -END WITH COMPRESSION COUPLINGS CONFORMING WITH THE CURRENT ASTM SPECIFICATION C-425. EXCEPTING THAT A STAINLESS STEEL SHEAR RING AS MANUFACTURED BY MISSION CLAY PRODUCTS CORPORATION FOR THEIR "MAINLINE" BANDSEAL COMPRESSION COUPLING, OR APPROVED EQUAL, SHALL BE REQUIRED. THE PIPE AND FITTINGS FOR PRIVATE SANITARY SEWER HOUSE OR BUILDING LATERALS MAY BE PLAIN -END WITH COMPRESSION COUPLINGS CONFORMING WITH THE CURRENT ASTM SPEGFlCAl1ON C-425. (STAINLESS STEEL SHEAR RINGS ARE NOT REQUIRED) 4. ABS PIPE INSTALLATION MATERIALS : PIPE AND FITTINGS SHALL MEET THE REQUIREMENTS OF THE CURRENT ASTM SPECIFICATIONS D-2680 AND D-2751. PIPE AND FITTINGS SHALL BE HOMOGENEOUS THROUGH OUT AND FREE FROM CRACKS, HOLES, FOREIGN INCLUSIONS OR OTHER INJURIOUS DEFECTS. FITTINGS SHALL BE INJECTION MOLDED AND SHALL BE INSTALLED IN UNE ON NEW PIPELINES; CUT -IN FITTINGS ARE NOT PERMITTED. JOINTS : USE ONLY SOLVENT WELDED JOINTS. THE ASSEMBLY OF JOINTS SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. WHERE ABS PIPE CONNECTS TO VCP, USE COUPLINGS APPROVED BY THE CITY OF BAKERSFIEL-D. INSTALLATION : PIPE AND FITTINGS SHALL BE INSTALLED IN ACCORDANCE WITH THE CURRENT ASTM SPECIFICATION D-2321. ONLY CLASS I, 11, AND III EMBEDMENT MATERIALS WILL BE CONSIDERED SUITABLE. 5, PVC PIPE INSTALLATION MATERIALS : PIPE AND FITTINGS SHALL MEET THE REQUIREMENTS OF THE CURRENT ASTM SPECIFICATION D-3034 FOR SDR35. PIPE AND FITTINGS SHALL BE HOMOGENEOUS THROUGHOUT AND FREE FROM CRACKS, HOLES, FOREIGN INCLUSIONS OR OTHER INJURIOUS DEFECTS. FITTINGS SHALL BE INJECTION MOLDED AND SHALL BE INSTALLED IN UNE ON NEW PIPELINES; CUT -IN FITTINGS ARE NOT PERMITTED. JOINTS : USE ONLY ELASTOMERIC GASKET JOINTS. THE ASSEMBLY OF JOINTS SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS WHERE PVC PIPE CONNECTS TO VCP PIPE, USE COUPLINGS APPROVED BY THE CITY OF BAKERSFIELD. INSTALLATION :PIPE AND FITTINGS SHALL BE INSTALLED IN ACCORDANCE WITH THE CURRENT ASTM SPECIFICATION D-2321. ONLY CLASS 1, 11, AND III EMBEDMENT MATERIALS WILL BE CONSIDERED SUITABLE. 6, REINFORCED CONCRETE PIPE WITH PVC LINING. REINFORCED CONCRETE PIPE WITH PVC LINING SHALL MEET THE FOLLOWING REQUIREMENTS: 1.A. MATERIALS. REINFORCED CONCRETE PIPE (RCP) SHALL BE EITHER CLASS IV OR CLASS V WITH WALLS "B" OR "C". RCP SHALL MEET ASTM C 76 FOR STRENGTH, ASTM C 361 OR AWWA C302 EXCEPT TEST PRESSURE SHALL BE 5 PSI FOR RUBBER GASKETS, AND LINER TESTS IN ACCORDANCE WITH THE FOLLOWING PARAGRAPHS. PIPE SHALL BE WET CAST, VIBRATED AND STEAM OR WATER CURED. JOINTS SHALL BE BELL AND SPIGOT DESIGN WITH A CONTAINED O-RING GASKET. PVC LINER SHALL BE CAST INTO THE WALL OF THE RCP AND SHALL COVER 360' OF THE PIPE ALL WORK FOR AND IN CONNECTION WITH THE INSTALLATION OF THE LINING IN CONCRETE PIPE AND FIELD SEALING AND WELDING OF JOINTS SHALL BE DONE IN STRICT CONFORMITY WITH ALL APPLICABLE SPECIFICATIONS, INSTRUCTIONS AND RECOMMENDATIONS OF THE LINING MANUFACTURER. LINER SHALL MEET THE FOLLOWING REQUIREMENTS. 1.B. PHYSICAL PROPERTIES OF LINER. ALL PLASTIC LINER PLATE SHEETS, WELDING STRIPS AND OTHER ACCESSORY ITEMS, SHALL HAVE THE FOLLOWING PHYSICAL PROPERTIES WHEN TESTED AT 77F t5 (25'C t3 ). PROPERTY INITIAL (PAR, TENSILE STRENGTH 2200 PSI MIN. 2100 PG MIN. (15 MPA MIN.) (14.5 MPA MIN.) ELONGATION AT BREAK 200% MIN. 200% MIN. SHORE DUROMETER, TYPE D 1 -SEC. 50-60 t5 (WITH RESPECT TO INITIAL TEST RESULT) 10 -SEC. 35-50 t5 WEIGHT CHANGE 11.5 TENSILE SPECIMENS SHALL BE PREPARED AND TESTED IN ACCORDANCE WITH ASTM D412 USING DIE B. WEIGHT CHANGE SPECIMENS SHALL BE 1 -INCH (25 -MM) BY 3 -INCH (75 -MM) SAMPLES. SPECIMENS FOR TESTING OF INITIAL PHYSICAL PROPERTIES MAY BE TAKEN FROM LINER PLATE SHEET AND WELDING STRIP AT ANY TIME PRIOR TO FINAL ACCEPTANCE OF THE WORK. LINER PLATE LOCKING EXTENSIONS EMBEDDED IN CONCRETE SHALL WITHSTAND A TEST PULL OF AT LEAST 100 POUNDS PER LINEAR INCH (1800 KG/M), APPLIED PERPENDICULARLY TO THE CONCRETE SURFACE FOR A PERIOD OF ONE MINUTE, WITHOUT RUPTURE OF THE LOCKING EXTENSIONS OR WITHDRAWAL FROM EMBEDMENT. THIS TEST SHALL BE MADE AT A TEMPERATURE OF 70' - 80' F(21' - 27' C) INCLUSIVE ALL PLASTIC LINER PLATE SHEETS, INCLUDING LOCKING EXTENSIONS, ALL JOINT, CORNER AND WELDING STRIPS SHALL BE FREE OF CRACKS, CLEAVAGES OR OTHER DEFECTS ADVERSELY AFFECTING THE PROTECTIVE CHARACTERISTICS OF THE MATERIAL. THE ENGINEER MAY AUTHORIZE THE REPAIR OF SUCH DEFECTS BY APPROVED METHODS. THE LINING SHALL HAVE GOOD IMPACT RESISTANCE, SHALL BE FLEXIBLE AND SHALL HAVE AN ELONGATION SUFFICIENT TO BRIDGE UP TO 1/4 -INCH (6 MM) SETTLING CRACKS, WHICH MAY OCCUR IN THE PIPE OR IN THE JOINT AFTER INSTALLATIONS, WITHOUT DAMAGE TO THE LINING. 1.C. CHEMICAL RESISTANCE OF UNER.* AFTER CONDITIONING TO CONSTANT WEIGHT AT 110 F(43 C), TENSILE SPECIMENS AND WEIGHT CHANGE SPECIMENS SHALL BE EXPOSED TO THE FOLLOWING SOLUTIONS FOR A PERIOD OF 112 DAYS AT 77* F t5 (25' C t3 ). AT 28 -DAY INTERVALS, TENSILE SPECIMENS AND WEIGHT CHANGE SPECIMENS SHAD_ BE REMOVED FROM EACH OF THE CHEMICAL SOLUTIONS AND TESTED IN ACCORDANCE WITH SECTION 7-2.03(1.B) PARA. 2 ABOVE. IF ANY SPECIMEN FAILS TO MEET THE 112 -DAY REQUIREMENTS BEFORE COMPLETION OF THE 112 -DAY EXPOSURE, THE MATERIAL WILL BE SUBJECT TO REJECTION. CHEMICAL SOLUTION SULFURIC ACID SODIUM HYDROXIDE AMMONIUM HYDROXIDE NITRIC ACID FERRIC CHLORIDE 1% SOAP DETERGENT (LINEAR ALKYL BENZYL SULFONATE OR LAS BACTERIOLOGICAL CONCENTRATION 20%** 5% 5%** 1 %** 196 0.1% 0.1% BOD NOT LESS THAN 700 PPM *THIS IS TO BE USED AS A PRE -QUALIFICATION TEST AND WHEN MATERIAL FORMULATIONS ARE CHANGED. **VOLUMETRIC PERCENTAGES OF CONCENTRATED C.P. GRADE REAGENTS. 1.D. DETAILS AND DIMENSIONS OF LINER SHEETS. LINER SHEETS SHAD_ BE A MINIMUM OF 0.065 INCH (1.65 MM) IN THICKNESS. LOCKING EXTENSIONS OF THE SAME MATERIAL AS THAT OF THE LINER SHALL BE INTEGRALLY EXTRUDED WITH THE SHEET. I.E. INSTALLATION OF LINING. INSTALLATION OF THE LINING, INCLUDING PREHEATING OF SHEETS IN COLD WEATHER AND THE WELDING OF ALL JOINTS, SHALL BE DONE IN ACCORDANCE WITH THE RECOMMENDATIONS OF THE LINER MANUFACTURER. COVERAGE OF THE LINING SHALL NOT BE LESS THAN THE MINIMUM SHOWN ON THE PLANS. THE LINING SHALL BE INSTALLED WITH THE LOCKING EXTENSIONS RUNNING PARALLEL WITH THE LONGITUDINAL AXIS OF THE PIPE THE LINING SHALL BE HELD SNUGLY IN PLACE AGAINST INNER FORMS. LOCKING EXTENSION SHALL TERMINATE NOT MORE THAN 1-1/2 INCHES (38 MM) FROM THE END OF THE INSIDE SURFACE OF THE PIPE SECTION. JOINT FLAPS WHEN USED SHALL EXTEND APPROXIMATELY 4 INCHES (100 MM) BEYOND THE END OF THE INSIDE SURFACE CONCRETE POURED AGAINST LINING SHALL BE VIBRATED, SPADED OR COMPACTED IN A CAREFUL MANNER SO AS TO PROTECT THE LINING AND PRODUCE A DENSE, HOMOGENOUS CONCRETE. SECURELY ANCHORING THE LOCKING EXTENSIONS INTO THE CONCRETE. IN REMOVING FORMS, CARE SHOULD BE TAKEN TO PROTECT THE LINING FROM DAMAGE SHARP INSTRUMENTS SHALL NOT BE USED TO PRY FORMS FROM LINED SURFACES. WHEN FORMS ARE REMOVED, ANY NAILS THAT REMAIN IN THE LINING SHALL BE PULLED, WITHOUT TEARING THE LINING, AND THE RESULTING HOLES CLEARLY MARKED. ALL NAIL AND TIE HOLES AND ALL CUT, TORN AND SERIOUSLY ABRADED AREAS IN THE LINING SHALL BE PATCHED. PATCHES MADE ENTIRELY WITH WELDING STRIP SHALL BE FUSED TO THE LINER OVER THE ENTIRE PATCH AREA. LARGER PATCHES MAY CONSIST OF SMOOTH LINER SHEET APPLIED OVER THE DAMAGED AREA WITH ADHESIVE ALL EDGES MUST BE COVERED WITH WELDING STRIP FUSED TO THE PATCH AND THE SOUND LINING ADJOINING THE DAMAGED AREA. HOT JOINT COMPOUNDS, SUCH AS COAL TAR, SHALL NOT BE POURED OR APPLIED TO THE LINING. THE CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO PREVENT DAMAGE TO INSTALLED LINING FROM EQUIPMENT AND MATERIALS USED IN OR TAKEN THROUGH THE WORK. 1.F APPLICATION TO CONCRETE PIPE - SPECIAL REQUIREMENTS. THE LINING SHALL BE SET FLUSH WITH THE INNER EDGE OF THE BELL OR SPIGOT END OF A PIPE SECTION AND SHALL EXTEND TO THE OPPOSITE END OR TO APPROXIMATELY 4 INCHES (100 MM) BEYOND THE OPPOSITE END DEPENDING UPON THE TYPE OF LINING JOINT TO BE MADE WITH THE ADJOINING CONCRETE PIPE. WHEREVER CONCRETE PIPE OR CAST -IN-PLACE STRUCTURES PROTECTED WITH LINING, JOIN STRUCTURES NOT SO LINED (SUCH AS BRICK STRUCTURES, CONCRETE PIPE OR CAST -IN-PLACE STRUCTURES WITH CLAY LINING OR CLAY PIPE), THE LINING SHALL BE EXTENDED OVER AND AROUND THE END OF THE PIPE AND BACK INTO THE STRUCTURE FOR NOT LESS THAN 4 INCHES (100 MM). THIS PROTECTING CAP MAY BE MOLDED OR FABRICATED FROM THE LINING MATERIAL BUT NEED NOT BE LOCKED INTO THE PIPE WHERE A PIPE LATERAL (NOT OF PLASTIC LINED CONCRETE) IS INSTALLED THROUGH LINED CONCRETE PIPE, THE SEAL BETWEEN THE UNED PORTION AND THE LATERAL SHALL BE PER THE MANUFACTURER'S RECOMMENDATIONS. LINED CONCRETE PIPE MAY BE CURED BY STANDARD CURING METHODS. CARE SHALL BE EXERCISED IN HANDUNG, TRANSPORTING AND PLACING LINED PIPE TO PREVENT DAMAGE TO THE LINING. NO INTERIOR HOOKS OR SLINGS SHALL BE USED IN LIFTING PIPE. ALL HANDUNG OPERATION SHALL BE DONE WITH AN EXTERIOR SUNG OR WITH A SUITABLE FORK LIFT. ON PIPE HAVING A 360' LINER COVERAGE, THE LONGITUDINAL EDGES OF THE SHEET SHALL BE BUTT WELDED. WHEN PIPE TUBES ARE FURNISHED, THESE ARE SHOP -WELDED JOINTS. NO PIPE WITH DAMAGED LINING WILL BE ACCEPTED UNTIL THE DAMAGE HAS BEEN REPAIRED TO THE SATISFACTION OF THE ENGINEER. 1.G. FIELD JOINTS IN LINING FOR CONCRETE PIPE THE JOINT BETWEEN SECTIONS OF LINED PIPE SHALL BE PREPARED IN THE FOLLOWING MANNER: IF REQUIRED, THE INSIDE JOINT SHALL BE FILLED AND CAREFULLY POINTED WITH CEMENT MORTAR IN SUCH A MANNER THAT THE MORTAR SHALL NOT, AT ANY POINT. EXTEND INTO THE PIPE BEYOND THE STRAIGHT UNE CONNECTING THE SURFACES OF THE ADJACENT PIPE SECTIONS. PIPE JOINTS MUST BE DRY BEFORE LINING JOINTS ARE MADE. ALL MORTAR AND OTHER FOREIGN MATERIAL SHALL BE REMOVED FROM LINING SURFACES ADJACENT TO THE PIPE JOINT, LEAVING THEM CLEAN AND DRY. FIELD JOINTS IN THE LINING AT PIPE JOINTS MAY BE EITHER OF THE FOLLOWING DESCRIBED TYPES: TYPE P-1: THE JOINT SHALL BE MADE WITH A SEPARATE 4 -INCH (100 -MM) JOINT STRIP AND TWO WELDING STRIPS. THE 4 -INCH (100 -MM) JOINT STRIP SHALL BE CENTERED OVER THE JOINT, HEAT -SEALED TO THE LINING, THEN WELDED ALONG EACH EDGE TO ADJACENT LINER SHEETS WITH A 1 -INCH (25 -MM) WELD STRIP. THE 4 -INCH (100 -MM) JOINT STRIP SHALL LAP OVER EACH SHEET A MINIMUM OF 1/2 INCH (13 MM). TYPE P-2: THE JOINT SHALL BE MADE WITH A JOINT FLAP WITH LOCKING EXTENSIONS REMOVED AND EXTENDING APPROXIMATELY 4 INCHES (100 MM) BEYOND THE PIPE END. THE JOINT FLAP SHALL OVERLAP THE LINING IN THE ADJACENT PIPE SECTION A MINIMUM OF 1/2 INCH (13 MM) AND BE HEAT -SEALED IN PLACE PRIOR TO WELDING. THE FIELD JOINT SHALL BE COMPLETED BY WELDING THE FLAP TO THE LINING OF THE ADJACENT PIPE USING 1 -INCH (25 -MM) WELD STRIP. . CARE SHALL BE TAKEN TO PROTECT THE FLAP FROM DAMAGE EXCESSIVE TENSION AND DISTORTION IN BENDING BACK THE FLAP TO EXPOSE THE PIPE JOINT DURING LAYING AND JOINT MORTARING SHALL BE AVOIDED. AT TEMPERATURES BELOW 50 F(10 C), HEATING OF THE UNER MAY BE REQUIRED TO AVOID DAMAGE. THE JOINT FLAP OR STRIP ON BEVELED PIPE SHALL BE TRIMMED TO A WIDTH (MEASURED FROM THE END OF THE SPIGOT) OF APPROXIMATELY 4 INCHES (100 MM) FOR THE ENTIRE CIRCUMFERENTIAL LENGTH OF THE LINING. ALL WELDING OF JOINTS IS TO BE IN STRICT CONFORMANCE WITH THE SPECIFICATIONS AND INSTRUCTIONS OF THE LINING MANUFACTURER. WELDING SHALL FUSE BOTH SHEETS AND WELD STRIP TOGETHER TO PROVIDE A CONTINUOUS JOINT EQUAL IN CORROSION RESISTANCE AND IMPERMEABILITY TO THE LINER PLATE. HOT-AIR WELDING TOOLS SHALL PROVIDE EFFLUENT AIR TO THE SHEETS TO BE JOINED AT A TEMPERATURE BETWEEN 500 AND 600 F (260 AND 316 C). WELDING TOOLS SHALL BE HELD APPROXIMATELY 1/2 INCH (13 MM) FROM AND MOVED BACK AND FORTH OVER THE JUNCTION OF THE TWO MATERIALS TO BE JOINED. THE WELDING TOOL SHALL BE MOVED SLOWLY ENOUGH AS THE WELD PROGRESSES TO CAUSE A SMALL BEAD OF MOLTEN MATERIAL TO BE VISIBLE ALONG BOTH EDGES AND IN FRONT OF THE WELD STRIP. THE FOLLOWING SPECIAL REQUIREMENT SHALL APPLY WHEN THE LINER COVERAGE IS 360 DEGREES: WHEN GROUNDWATER IS ENCOUNTERED THE LINING JOINT SHALL NOT BE MADE UNTIL PUMPING OF GROUNDWATER HAS BEEN DISCONTINUED FOR AT LEAST THREE DAYS AND NO VISIBLE LEAKAGE IS EVIDENT AT THE JOINT. WHEN WELDING THE DOWNSTREAM SIDE OF A JOINT STRIP OR FLAP, DO NOT WELD 6 TO 8 INCHES (150 TO 200 MM) AT THE PIPE INVERT TO PROVIDE RELIEF OF POTENTIAL FUTURE GROUNDWATER BUILD-UP. 1.H. APPLICATION TO CAST -IN-PLACE CONCRETE STRUCTURES - SPECIAL REQUIREMENTS. LINER SHEETS SHALL BE CLOSELY FITTED AND PROPERLY SECURED TO THE INNER FORMS. SHEETS SHALL BE CUT TO FIT CURVED AND WARPED SURFACES USING A MINIMUM NUMBER OF SEPARATE PIECES. UNLESS OTHERWISE SHOWN ON THE PLANS„ THE LINING SHALL BE RETURNED AT LEAST 3 INCHES (75 MM) AT THE SURFACES OF CONTACT BETWEEN THE CONCRETE STRUCTURE AND ITEMS NOT OF CONCRETE (INCLUDING MANHOLE FRAMES, GATE GUIDES, CLAY PIPE OR BRICK MANHOLES AND CLAY OR CAST IRON PIPES). THE SAME PROCEDURE SHALL BE FOLLOWED AT JOINTS WHERE THE TYPE OF PROTECTIVE LINING IS CHANGED OR THE NEW WORK IS BUILT TO JOIN EXISTING UNLINED CONCRETE. AT EACH RETURN, THE RETURNED LINER SHALL BE SEALED TO THE ITEM IN CONTACT WITH THE PLASTIC -LINED CONCRETE. IF THE LINER CANNOT BE SEALED WITH ADHESIVE BECAUSE OF THE JOINT AT THE RETURN BEING TOO WIDE OR ROUGH OR BECAUSE OF SAFETY REGULATIONS, THE JOINT SPACE SHALL BE DENSELY CAULKED WITH LEAD WOOL OR OTHER APPROVED CAULKING MATERIAL TO A DEPTH OF 2 INCHES (50 MM) AND FINISHED WITH A MINIMUM OF 1 INCH 925 MM) OF AN APPROVED CORROSION RESISTANT MATERIAL. 1.1. TESTING AND REPAIRING DAMAGED SURFACES. AFTER THE PIPE IS INSTALLED IN THE TRENCH, ALL SURFACES COVERED WITH LINING, INCLUDING WELDS, SHALL BE TESTED WITH AN APPROVED, CONTRACTOR SUPPLIED, ELECTRICAL HOLIDAY DETECTOR (TINKER & RASOR MODEL NO. AP -W WITH POWER PACK OR APPROVED EQUAL) WITH THE INSTRUMENT SET BETWEEN 18,000 AND 22,000 VOLTS. ALL WELDS SHALL BE PHYSICALLY TESTED BY A NONDESTRUCTIVE PROBING METHOD. ALL PATCHES OVER HOLES, OR REPAIRS TO THE UNER WHEREVER DAMAGE HAS OCCURRED, SHALL BE ACCOMPLISHED IN ACCORDANCE WITH SECTION 7-2.03(1.E) PARA. 8 ABOVE. EACH TRANSVERSE WELDING STRIP WHICH EXTENDS TO A LOWER EDGE OF THE LINER WILL BE TESTED BY THE PURCHASING AGENCY. THE WELDING STRIPS SHALL EXTEND 2 INCHES (50 MM) BELOW THE LINER TO PROVIDE A TAB. A 10 -POUND (5 KG) PULL WILL BE APPLIED TO EACH TAB. THE FORCE WILL BE APPLIED NORMAL TO THE FACE OF THE STRUCTURE BY MEANS OF A SPRING BALANCE LINER ADJOINING THE WILDING STRIP WILL BE HELD AGAINST THE CONCRETE DURING APPLICATION OF THE FORCE. THE 10 -POUND (5 KG) PULL WILL BE MAINTAINED IF A WELD FAILURE DEVELOPS, UNTIL NO FURTHER SEPARATION OCCURS. DEFECTIVE WELDS WILL BE RETESTED AFTER REPAIRS HAVE BEEN MADE. TABS SHALL BE TRIMMED AWAY NEATLY BY THE INSTALLER OF THE LINER AFTER THE WELDING STRIP HAS PASSED INSPECTION. INSPECTION SHALL BE MADE WITHIN 2 DAYS AFTER THE JOINT HAS BEEN COMPLETED IN ORDER TO PREVENT TEARING THE PROJECTING WELD STRIP AND CONSEQUENT DAMAGE TO THE LINER FROM EQUIPMENT AND MATERIALS USED IN OR TAKEN THROUGH THE WORK. SHOP DRAWINGS. CONTRACTOR SHALL SUBMIT MANUFACTURER INFORMATION SHOWING DIMENSIONAL, MATERIAL AND JOINT CRITERIA TO THE ENGINEER FOR REVIEW. PIPE TRENCH CLASSIFICATION. RCP CLASS IV SHALL BE INSTALLED PER ASTM TRENCH DESIGNATION "C". RCP CLASS V SHALL BE INSTALLED PER ASTM TRENCH DESIGNATION V. PVC FOR PIPE SIZES 18" AND LESS. POLY VINYL CHLORIDE PIPE SHALL MEET THE FOLLOWING REQUIREMENTS: 1. MATERIAL. PVC PIPE SHALL MEET OR EXCEED ALL REQUIREMENTS SET FORTH IN ASTM D 3034 WITH SDR OF 35. ELASTOMERIC SEALS AND JOINTS SHALL CONFORM TO ASTM D 3212 AND ASTM F 477. 2. TESTING. MANUFACTURING TESTING METHODS SHALL CONFORM TO ASTM F-679 (T -WALL). CERTIFICATES OF COMPLIANCE SHALL BE MADE AVAILABLE TO THE ENGINEER. 3. INSTALLATION. INSTALLATION OF PIPE SHALL FOLLOW MANUFACTURER'S GUIDELINES, THESE SPECIFICATIONS AND ASTM D 2321 "UNDERGROUND INSTALLATION OF FLEXIBLE THERMOPLASTIC SEWER PIPE". 4. FIELD TESTS. IN -FIELD PRESSURE TESTS SHALL CONFORM TO THESE SPECIFICATIONS AND THE FOLLOWING: DEFLECTION MEASUREMENT OF PVC PIPE AFTER 30 DAYS OF INSTALLATION THE CONTRACTOR SHALL MEASURE PIPE DEFLECTION BY PULLING A GO -NO-GO 5% MANDREL THE MANDREL SHALL BE PULLED THROUGH THE PIPE WITH ROPE BY ONE PERSON WITHOUT MECHANICAL ADVANTAGE THE MANDREL SHALL HAVE VANES AT LEAST AS LONG AS THE PIPE DIAMETER. THE MANDREL SHALL BE USED IN STRICT CONFORMANCE WITH PIPE AND MANDREL MANUFACTURER'S RECOMMENDATIONS. THE MANDREL DIAMETER WILL BE CALCULATED USING THE FOLLOWING FORMULA: MANDREL DIAMETER = BASE PIPE I.D. -(Y/100 X BASE PIPE I.D.) WHERE Y = ALLOWABLE DEFLECTION IN % (5%) BASE I.D. = ACTUAL INSIDE PIPE DIAMETER (PROVIDED BY PIPE MANUFACTURER) THE MANDREL SH HAVE AN ODD NUMBER OF VANES WITH SEVEN 7 EL ALL MINIMUM. THE MINIMUM LENGTH OF THE CIRCULAR PORTION OF THE MANDREL SHALL BE EQUAL TO THE NOMINAL DIAMETER OF THE PIPE ANY SECTION OF INSTALLED PIPE THAT FAILS THE MANDREL TEST SHALL BE EXCAVATED, RE -BACKFILLED, RECOMPACTED AND RETESTED UNTIL THE MANDREL TEST CAN BE PASSED. RE -ROUNDING WILL NOT BE ALLOWED. PIPE TRENCH CLASSIFICATION. PVC PIPE SHALL BE INSTALLED PER CITY STANDARD S-39, AS MODIFIED ON THE CONTRACT PLANS. COMPACTION ABOVE THE PIPE ZONE SHALL BE AS SHOWN ON THE PLANS. 7. TRENCH EXCAVATION THE EXCAVATION OF TRENCHES FOR PIPING LAID IN THE GROUND SHALL BE IN OPEN -CUT FROM THE SURFACE OF THE GROUND EXCEPT WHERE BORING IS REQUIRED. THE TRENCHES SHALL BE OF WIDTH AS SHOWN ON STANDARD S-39 AND DETAILED SECTIONS ON THE PLANS FOR PROPER PIPE INSTALLATION. THE HOLES FOR BELLS AND FITTINGS SHALL BE EXCAVATED BY HAND, TO A WIDTH PROVIDING UNIFORM BEARING ALONG THE LENGTH OF THE PIPE. IT IS THE INTENTION OF THESE REQUIREMENTS TO PROVIDE FIRM, UNIFORM BEARING FOR THE PIPE CONTRACTOR SHALL PROVIDE TRENCHING IN ACCORDANCE WITH THE DETAILED SECTIONS PROVIDED IN THE PLANS. SELECTION OF TRENCH TYPES WILL BE AS REQUIRED BY THE TYPES OF PIPE SELECTED FOR CONSTRUCTION. STORM DRAIN AND UTILITY CONDUIT INSTALLATIONS SHALL MEET CITY STANDARD S-39. TRENCH LINES SHALL MEET ALL FEDERAL AND STATE SAFETY REQUIREMENTS. & BRACING AND SHORING EXCAVATION SHALL BE SUPPORTED AS SET FORTH IN THE RULES, ORDERS, AND REGULATIONS OF THE STATE DIVISION OF INDUSTRIAL SAFETY. IF THE CONTRACTOR DESIRES TO DEVIATE FROM THE SAFETY ORDERS, HE SHALL SUBMIT DATA BY A REGISTERED CIVIL ENGINEER TO THE STATE DIVISION OF INDUSTRIAL SAFETY, JUSTIFYING THE ALTERNATE PROCEDURES TO BE USED. FAILURE TO COMPLY WITH ANY OF THESE RULES, ORDERS AND REGULATIONS SHALL BE SUFFICIENT CAUSE FOR THE STATE DIVISION TO IMMEDIATELY SUSPEND ALL WORK. COMPENSATION FOR LOSSES INCURRED BY THE CONTRACTOR BY SUCH AN EMERGENCY SUSPENSION SHALL NOT BE ALLOWED. DURING BACKFILLING, THE BOTTOM OF THE SHORING SHALL BE KEPT ABOVE THE LEVEL OF THE BACKFILL AT ALL TIMES. SECTION 6422 OF THE CALIFORNIA LABOR CODE REQUIRES THE CONTRACTOR TO SUBMIT TO THE ENGINEER A DETAILED PLAN, DRAWING THE DESIGN OF SHORING, BRACING, SLOPING OR OTHER PROVISIONS TO BE MADE BY THE CONTRACTOR FOR THE PURPOSE OF WORKER PROTECTION FROM THE HAZARD OF CAVING GROUND DURING THE EXCAVATION OF TRENCHES NECESSARY FOR THE CONSTRUCTION OF THE PROJECT. IF SUCH PLAN VARIES FROM THE SHORING SYSTEM STANDARD ESTABLISHED BY THE CONSTRUCTION SAFETY ORDERS, THE PLANS SHALL BE PREPARED AND CERTIFIED BY A REGISTERED CIVIL OR STRUCTURAL ENGINEER; HOWEVER, USE OF SYSTEMS THAT ARE LESS EFFECTIVE THEN THOSE REQUIRED BY THE CONSTRUCTION SAFETY ORDERS IS PROHIBITED ON THIS PROJECT. 9. TRENCH Br9CKFILL TRENCHES SHALL NOT BE LEFT OPEN FARTHER THAN THREE HUNDRED (300) FEET IN ADVANCE OF PIPE LAYING OPERATIONS OR TWO HUNDRED (200) FEET TO THE REAR THEREOF, UNLESS OTHERWISE PERMITTED BY THE ENGINEER. ALL WORK SHALL CONFORM TO THE APPLICABLE SECTIONS OF THE STANDARD SPECIFICATIONS, DATED JULY, 1992. BEDDING CLASS SHALL BE AS SPECIFIED IN THE PIPE OPTIONS. STORM DRAIN AND UTILITY CONDUIT INSTALLATIONS SHALL BE IN ACCORDANCE WITH CITY STANDARD ST -22, EXCEPT THAT COMPACTION SHALL BE NO LESS THAN NINETY PERCENT (90%) UP TO THIRTY INCHES (30') FROM FINISHED GRADE BACKFILL MATERIALS IN THE PIPE ZONE SHALL BE PLACED IN LAYERS NOT TO EXCEED TWELVE (12) INCHES SIMULTANEOUSLY, ON EACH SIDE OF THE PIPE, IN SUCH A MANNER AS NOT TO DAMAGE OR DISTURB THE PIPE OR ITS ALIGNMENT AND GRADE. BACKFILL MATERIAL ABOVE THE PIPE ZONE SHALL BE FREE OF DELETERIOUS MATERIALS AND LUMPS OR STONES EXCEEDING THREE (3) INCHES IN GREATEST DIMENSION AND SHALL BE PLACED IN LAYERS NOT EXCEEDING EIGHTEEN (18) INCHES. EACH LAYER SHALL BE THOROUGHLY COMPACTED BY VIBRATORY OR MECHANICAL TAMPING, OR BY A COMBINATION OF THESE METHODS. FLOODING AND JETTING SHALL NOT BE ALLOWED. THERE MUST BE AT LEAST ONE FOOT OF COVER OVER THE PIPE BEFORE COMPACTION ABOVE THE PIPE ZONE WILL BE ALLOWED. IMPORTED BEDDING AND BACKFILL MATERIAL SHALL BE OBTAINED, AND ANY EXCESS BEDDING AND BACKFILL MATERIAL SHALL BE DISPOSED, BY ANY LEGAL MEANS AT THE DISPOSAL OF THE CONTRACTOR. THE CONTRACTOR MAY SUBMIT TO THE ENGINEER SIEVE ANALYSIS FOR UTILIZATION OF IN-SITU MATERIALS, iIO ACHIEVING FIRM BEDDING BELOW PIPE SPRINGUNE, CONTRACTOR SHALL PROVIDE "FIRM BEDDING" SUPPORT FOR THE PIPE BELOW THE SPRINGUNE. FIRM BEDDING MEANS THAT THE PIPE MUST REST ON THE GRANULAR MATERIAL SPECIFIED PREVIOUSLY IN THE SPECIFICATIONS. BELL OR COUPLING HOLES SHALL BE CAREFULLY EXCAVATED AT PROPER INTERVALS, SO THAT NO PART OF THE LOAD IS SUPPORTED BY THE BELLS OR COUPLINGS. DURING BEDDING AND BACKFILLING, CONSOLIDATION OF MATERIAL AROUND AND UNDER BELLS AND COUPLINGS SHALL BE AVOIDED. CONTRACTOR SHALL SHOVEL -SLICE OR HAND TAMP BEDDING IN THE HAUNCH AREAS, AS THIS WILL MINIMIZE VOIDS BENEATH THE PIPE AND IN THE HAUNCH AREAS. SHOVEL -SLICING OR HAND TAMPING SHALL BE DONE BEFORE THE BEDDING IS BROUGHT UP TO THE QUARTER POINT OF THE PIPE. INITIAL BACKFILL "BEDDING MATERIAL" AS SPECIFIED BY ASTM 2321-8 SHALL BE USED IN THE PIPE ZONE FOR INITIAL BACKFILL. AFTER THE PIPE HAS BEEN PROPERLY LAID AND INSPECTED, INITIAL BACKFILL SHALL BE PLACED ON BOTH SIDES AND OVER THE PIPE TO SUCH A DEPTH THAT, AFTER THOROUGH CONSOLIDATION, THE FINAL DEPTH SHALL BE AT LEAST TO THE ELEVATION SHOWN ON THE PLANS. THE MATERIAL SHALL BE CONSOLIDATED BY VIBRATORY OR MECHANICAL TAMPING AND THE EQUIPMENT AND MANNER OF TAMPING MUST BE APPROVED IN WRITING BY THE ENGINEER PRIOR TO COMMENCING OPERATION. IMPACT EQUIPMENT MAY BE ALLOWED UNDER THE DIRECTION OF THE ENGINEER. HOWEVER, THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE RESULTING FROM THE USE OF THIS EQUIPMENT. HYDRA -HAMMER WILL NOT BE PERMITTED. SUBSEQUENT BACKFILL. ABOVE THE LEVEL OF INITIAL BACKFILL, THE TRENCH MAY BE BACKFILLED WITH NATIVE MATERIAL RESULTING FROM TRENCH EXCAVATION, OR AT THE OPTION OF THE CONTRACTOR, SELECT IMPORTED MATERIALS MAY BE USED. NATIVE MATERIAL OR IMPORTED MATERIAL MAY BE COMPACTED BY TAMPING AND/OR ROLLING, USING EQUIPMENT AND METHODS APPROVED BY THE ENGINEER. WHEN THE CONTRACTOR COMPACTS BY TAMPING AND/OR ROLLING, THE BACKFILL MATERIAL SHALL BE PLACED IN LAYERS NOT EXCEEDING EIGHTEEN (18) INCHES IN LOOSE DEPTH, EACH LAYER BEING THOROUGHLY COMPACTED BY TAMPING AND/OR ROLLING BEFORE SUCCEEDING LAYERS ARE PLACED. COMPACTION OF SUBSEQUENT BACKFILL WITHIN TWO AND ONE-HALF (2-1/2) FEET OF FINISHED PERMANENT SURFACING GRADE SHALL BE ACCOMPLISHED BY TAMPING AND/OR ROLLING AS SPECIFIED ABOVE. WHERE THE TRENCH IS WITHIN THE PAVEMENT ON STREETS, THE BACKFILL WITHIN TWO AND ONE-HALF (2-1/2) FEET OF FINISHED PERMANENT GRADE SHALL BE COMPACTED TO NINETY PERCENT (90%) RELATIVE COMPACTION. SUBSEQUENT BACKFILL PLACED BY TAMPING AND/OR ROLLING SHALL BE FREE FROM STONES OR LUMPS EXCEEDING THREE (3) INCHES IN GREATEST DIMENSIONS, VEGETABLE MATTER, OR OTHER UNSATISFACTORY MATERIALS. IN NO CASE SHALL JETTING BE ALLOWED FOR BACKFILL COMPACTION WITHIN THE STREET. WHEN APPROVED BY THE ENGINEER, JETTING MAY BE USED IN NON -STREET AREAS. BACKFILL TESTING AND COMPACTION. TESTING OF BACKFILL MATERIALS AND COMPACTION SHALL BE IN ACCORDANCE WITH SECTION 19, "EARTHWORK" AND SECTION 6-3, "TESTING", OF THE STANDARD SPECIFICATIONS, STATE OF CALIFORNIA, DEPARTMENT OF PUBLIC WORKS, DIVISION OF HIGHWAYS. EACH LAYER OF BACKFILL MATERIAL SHALL MEET THE COMPACTION, SAND EQUIVALENT, AND GRADA11ON REQUIREMENTS BEFORE THE NEXT LAYER IS PLACED. EACH LAYER OF BACKFILL SHALL BE THOROUGHLY COMPACTED TO THE RELATIVE COMPACTION OF NOT LESS THAN IS SHOWN ON CITY OF BAKERSFIELD STANDARD S-39 AS MODIFIED ON THE CONTRACT PLANS, EXCEPT THAT COMPACTION WITHIN THE ROADWAY STRUCTURAL SECTION SHALL BE NO LESS THAN NINETY PERCENT (90%) RELATIVE COMPACTION FOR THE TOP FINISHED 30", AND SHALL BE DETERMINED BY CALIFORNIA TEST METHODS 216 OR 231, OR ASTM (CURRENT EDITION) D1557 AND ONE OF THE FOLLOWING D2922 OR D1556. IF THE RELATIVE COMPACTION, AS DETERMINED BY TESTING, FAILS TO MEET THE SPECIFIED PERCENTAGE, THE TRENCH SHALL BE RE -EXCAVATED AND RE -COMPACTED. COMPACTION TESTS WILL BE THE SUBDIVIDERS RESPONSIBILITY. THE NUMBER AND LOCATIONS OF THE TESTS SHALL BE DETERMINED BY THE CITY ENGINEER. SEWER PIPE SHALL CONFORM TO THE PLANS, AND THESE SPECIAL PROVISIONS. THE PRICE PER LINEAL FOOT SHALL INCLUDE BUT NOT BE LIMITED TO EXCAVATION, BEDDING AND BACKFILL. HANDLING OF MATERIALS. ALL PIPE, FITTINGS, SPECIALS AND CASTINGS MUST BE CAREFULLY HANDLED AT ALL TIMES. ONLY SUITABLE AND PROPER EQUIPMENT AND APPLIANCES SHALL BE USED FOR THE SAFE LOADING, HAULING, UNLOADING, HANDLING AND PLACING OF MATERIALS, SPECIAL CARE SHALL BE EXERCISED SO THAT PREFORMED RESIDENT JOINTS ON PIPE AND FITTINGS WILL NOT BE DAMAGED. ANY PIPE OR FITTING WITH A JOINT DAMAGED OR FLATTENED WILL CAUSE THAT PIPE OR FITTING TO BE REJECTED. PIPE LAYING. NO PIPE SHALL BE LAID UNTIL THE ENGINEER INSPECTS AND APPROVES THE CONDITION OF THE BOTTOM OF THE TRENCH. PIPE SHALL BE INSTALLED IN STRICT ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. PIPE LAYING SHALL BEGIN FROM THE DOWNSTREAM END OF THE TRUNK SEWER OR AS DIRECTED BY THE ENGINEER. PIPE LAYING SHALL PROCEED WITH EACH PIECE LAID TRUE TO UNE AND GRADE, AND IN SUCH A MANNER AS TO FORM A CLOSE CONCENTRIC JOINT WITH THE ADJOINING PIPE AND TO PREVENT SUDDEN OFFSETS IN THE FLOW UNE AS THE WORK PROGRESSES, THE INTERIOR OF THE PIPE SHALL BE CLEARED OF ALL DIRT AND DEBRIS OF EVERY DESCRIPTION. PIPE SHALL NOT BE LAID WHEN THE CONDITION OF THE TRENCH OR THE WEATHER IS UNSUITABLE AT TIMES MEN WORK IS NOT IN PROGRESS, OPEN ENDS OF PIPE AND FITTINGS SHALL BE CLOSED. WITH BELLED END PIPE, BELL HOLES SHALL THEN BE EXCAVATED AT EACH JOINT TO FACILITATE THE JOINT OPERATIONS, AND SHALL BE ONLY OF SUFFICIENT SIZE FOR THAT PURPOSE IN ORDER THAT BELL HOLES MAY BE PROPERLY LOCATED, NOT MORE THAN SIX (6) HOLES SHALL BE EXCAVATED AHEAD OF ACTUAL PIPE LAYING. ON ACCOUNT OF THE VARIA11ONS IN JOINT CONSTRUCTION OPERATIONS. CUTTING PIPE THE CONTRACTOR SHALL PERFORM ALL WORK OF CUTTING PIPE AND SPECIAL CASTING NECESSARY TO THE ASSEMBLY, ERECTION, AND COMPLETION OF THE WORK. ALL PIPE SHALL BE CUT TO FIT ACCURATELY, WITH SMOOTH EDGES AND FACES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CORRECTNESS OF CUTTING AND NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR ANY MATERIALS WHICH ARE DAMAGED OR INCORRECTLY CUT. PIPELINE TESTING. ALL SEWERS SHALL BE TESTED FOR TIGHTNESS WHEN COMPLETED AND READY FOR SERVICE. TESTING SHALL BE CONDUCTED IN ACCORDANCE WITH THE UNIFORM PLUMBING CODE AIR TEST METHOD UPC SEC. 318-6(4), OR THE WATER EXFlLTRATION TEST OR AIR PRESSURE TEST PER SECTION 306-1.4, 'TESTING PIPELINES" OF THE 1994 EDITIOONS, 'STANDARD SPECIFICATIONS" FOR PUBLIC WORKS CONSTRUCTION, AND CHAPTER 1.3 OF THE CITY OF BAKERSFIELD SUBDIVISION DESIGN MANUAL, AND THE PIPE SUPPLIER'S REQUIREMENTS. THE CONTRACTOR SHALL NOTIFY THE ENGINEER 24 HOURS PRIOR TO ANY TESTING. CLEANING PIPE LINES. CARE SHALL BE EXERCISED IN LAYING OF PIPE LINES TO EXCLUDE DIRT AND ANY OTHER FOREIGN MATERIAL. WHEN PIPE LAYING IS INTERRUPTED, AS AT NIGHT, THE PIPE ENDS SHALL BE SUITABLY CLOSED. UPON COMPLETION, AND BEFORE PLACING INTO SERVICE, ALL LINES SHALL BE FLUSHED AND MANDRELLED TO REMOVE ANY DIRT OR FOREIGN MATERIALS WHICH WOULD CLOG PUMPS, EQUIPMENT, SPRAY HEADS, ETC. THE CONTRACTOR SHALL MAKE PROVISIONS FOR PREVENTING FOREIGN MATERIAL FROM BEING FLUSHED INTO AN EXISTING SEWER LINE SEWER LATERALS. SEWER LATERALS SHALL CONFORM TO THIS IN EVERY REGARD. EXISTING SEWER LATERALS SHALL BE LOCATED BY THE CONTRACTOR AND CONNECTED TO AND EXTENDED OR RECONSTRUCTED ACCORDING TO THE PLANS. COMPRESSION COUPLINGS MAY BE UTILIZED FOR CONNECTING TO EXISTING LATERALS. POSITIVE GRADE TO THE TRUNK SEWER SHALL BE MAINTAINED AND INVERT GRADES SET AS CALLED ON THE PLANS. SEWER WYES SHALL BE INSTALLED ON THE TRUNK IN ACCORDANCE WITH THE PIPE MANUFACTURERS RECOMMENDATIONS. PAYMENT FOR SEWER LATERALS WILL BE PAID AS SEWER FOR THE APPROPRIATE DIAMETERS. 11. SYSTEM TESTING A MANDREL TEST AND PRESSURE TEST SHALL BE PERFORMED ON INSTALLED PIPE IN ACCORDANCE WITH THE CITY OF BAKERSFIELD SUBDIVISION MANUAL AND THE RECOMMENDATIONS OF THE MANUFACTURER. PRIOR TO FINAL ACCEPTANCE, ALL SEWER LINES SHALL BE INSPECTED WITH VIDEO EQUIPMENT DESIGNED FOR THIS PURPOSE. THE TELEVISION CAMERA SHALL HAVE THE CAPABILITY OF ROTATING 360. IN ORDER TO VIEW AND RECORD THE TOP AND SIDES OF THE PIPE, AS REQUIRED. THE VIDEO INSPECTION SHALL BE WITNESSED BY THE CITYS CONSTRUCTION INSPECTOR, WHO WILL ALSO INITIAL AND DATE THE "CHAIN OF CUSTODY" FORM. THE SUBDIVIDER SHALL IMMEDIATELY NOTIFY CITY OF ANY PIPE LOCATIONS REVEALED TO BE NOT IN COMPLIANCE WITH THE SPECIFICATIONS. A RECORDED VIDEO CASSETTE, THE COMPLETED "CHAIN OF CUSTODY" FORM AND A WRITTEN LOG (WHICH INCLUDES THE STATIONING, BASED ON THE STATIONING OF THE APPROVED PLANS, OF ALL CONNECTED LATERALS) OF THE INSPECTION SHALL BE PROVIDED FOR VIEWING, AND SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO ACCEPTANCE. AFTER ACCEPTANCE, THE VIDEO CASSETTE SHALL BECOME THE PROPERTY OF THE CITY. 12. WYE FITTINGS SHALL BE INJECTION MOLDED IN -UNE TYPE AND SHALL BE USED FOR ALL LATERAL CONNECTIONS AND SHALL BE ROTATED A MINIMUM OF 23 DEGREES ABOVE THE HORIZONTAL PLANE RUNNING THROUGH THE CENTERLINE OF THE MAIN. ALL LATERALS SHALL BE 4" IN DIAMETER EXCEPT AS NOTED ON PLANS, EXTENDING A MINIMUM OF 4' BEYOND THE PROPERTY UNE OR RIGHT-OF-WAY LINE WITH 30" OF COVER AT FLOW LINE SURFACE MARKERS FOR SEWER LATERALS SHALL BE INSTALLED AT THE PROPERTY UNE OR RIGHT-OF- WAY LINE AS SHOWN IN THE "SEWER LATERAL MARKER" DETAIL, C.O.B. STD. DET. SW -1. LATERALS SHALL BE A MINIMUM OF 2.25' DEEP AND A MAXIMUM OF 7' DEEP AT PROPERTY UNE OR RIGHT-OF-WAY UNE AND A MINIMUM OF 2.5' DEEP AT FLOWUNE. 13. ALL SEWER STUBS SHALL BE CLOSED WITH A STANDARD PLASTIC PLUG. SOLVENT WELDED. 14. ALL MANHOLES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF BAKERSFIELD STANDARD DRAWINGS S-7, S-8, AND S-21 AND SECTIONS 70-1.02H AND 71-1.07 OF THE STANDARD SPECIFICATIONS OF THE STATE OF CALIFORNIA, DEPARTMENT OF TRANSPORTATION, CURRENT EDITION. ALL CLEANOUIS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF BAKERSFIELD STANDARD DRAWING S-20. MANHOLES SHALL BE TYPE "A' FOR PIPES UNDER 48" IN DIAMETER AND TYPE "B" FOR PIPES 48' IN DIAMETER OR LARGER. UNLESS NOTED OTHERWISE. THE BOTTOM MANHOLE BARREL AT THE MANHOLE FOUNDATION SHALL BE SET ON A 2" MORTAR BED OR SET ON KENT -SEAL, IN A GROOVED FOUNDATION. 15. STORM DRAIN PIPE STORM DRAIN PIPE. CONTRACTOR SHALL UTILIZE RCP PIPE, CLASS 111 WITH RUBBER GASKET JOINTS PER ASTM SPECIFICATION C-76, UNLESS OTHERWISE NOTED ON THE CONTRACT PLANS. 16. REINFORCED CONCRETE PIPE. REINFORCED CONCRETE PIPE SHALL CONFORM TO THE PROVISIONS IN SECTION 65, "REINFORCED CONCRETE PIPE% OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS. EXCEPT AS OTHERWISE DESIGNATED BY CLASSIFICATION ON THE PLANS OR IN THE SPECIFICATIONS, JOINTS FOR CULVERT AND DRAINAGE PIPES SHALL CONFORM TO THE PLANS OR SPECIFICATIONS FOR STANDARD JOINTS. HYDROSTATIC TESTS SPECIFIED BY SECTION 65-1.08 "LAYING SIPHON AND PRESSURE PIPE% OF THE STANDARD SPECIFICATIONS WILL NOT BE REQUIRED. REINFORCED CONCRETE PIPE SHALL HAVE RUBBER GASKETED JOINTS CONFORMING TO SECTION 65-1.066, "RUBBER GASKETED JOINTS", OF THE STANDARD SPECIFICATIONS. HANDLING OF MATERIALS. ALL PIPE, FITTINGS, SPECIALS AND CASTINGS MUST BE CAREFULLY HANDLED AT ALL TIMES. ONLY SUITABLE AND PROPER EQUIPMENT AND APPLIANCES SHALL BE USED FOR THE SAFE LOADING, HAULING, UNLOADING, HANDLING AND PLACING OF MATERIALS, SPECIAL CARE SHALL BE EXERCISED SO THAT PREFORMED RESILIENT JOINTS ON PIPE AND FITTINGS WILL NOT BE DAMAGED. ANY PIPE OR FITTING WITH A JOINT DAMAGED OR FLATTENED WILL CAUSE THAT PIPE OR FITTING TO BE REJECTED. PIPE LAYING. NO PIPE SHALL BE LAID UNTIL THE ENGINEER INSPECTS AND APPROVES THE CONDITION OF THE BOTTOM OF THE TRENCH. PIPE SHALL BE INSTALLED IN STRICT ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. PIPE LAYING SHALL BEGIN FROM THE DOWNSTREAM END OF THE STORM DRAIN OR AS DIRECTED BY THE ENGINEER. PIPE LAYING SHALL PROCEED WITH EACH PIECE LAID TRUE TO LINE AND GRADE, AND IN SUCH A MANNER AS TO FORM A (LOSE CONCENTRIC JOINT WITH THE ADJOINING PIPE AND TO PREVENT SUDDEN OFFSETS IN THE FLOW UNE AS THE WORK PROGRESSES, THE INTERIOR OF THE PIPE SHALL BE CLEARED OF ALL DIRT AND DEBRIS OF EVERY DESCRIPTION. PIPE SHALL NOT BE LAID WHEN THE CONDITION OF THE TRENCH OR THE WEATHER IS UNSUITABLE AT TIMES WHEN WORK IS NOT IN PROGRESS, OPEN ENDS OF PIPE AND FITTINGS SHALL BE CLOSED. WITH BELLED END PIPE, BELL HOLES SHALL THEN BE EXCAVATED AT EACH JOINT TO FACILITATE THE JOINT OPERATIONS, AND SHALL BE ONLY OF SUFFICIENT SIZE FOR THAT PURPOSE. IN ORDER THAT BELL HOLES MAY BE PROPERLY LOCATED, NOT MORE THAN SIX (6) HOLES SHALL BE EXCAVATED AHEAD OF ACTUAL PIPE LAYING, ON ACCOUNT OF THE VARIATIONS IN JOINT CONSTRUCTION OPERATIONS. THE CONTRACTOR SHALL MAKE PROVISIONS FOR PREVENTING FOREIGN MATERIAL FROM BEING FLUSHED INTO AN EXISTING STORM DRAIN LINE. CUTTING PIPE. THE CONTRACTOR SHALL PERFORM ALL WORK OF CUTTING PIPE AND SPECIAL CASTING NECESSARY TO THE ASSEMBLY, ERECTION, AND COMPLETION OF THE WORK. ALL PIPE SHALL BE CUT TO FIT ACCURATELY, WITH SMOOTH EDGES AND FACES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CORRECTNESS OF CUTTING AND NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR ANY MATERIALS WHICH ARE DAMAGED OR INCORRECTLY CUT. CASING OR SMOOTH OUTSIDE WALLED PIPE FOR BORED/JACKED PIPE SHALL BE INSTALLED. IT SHALL HAVE EVEN BEARING THROUGHOUT ITS LENGTH AND SHALL SLOPE TOWARD ONE END. SPACE BETWEEN CASING AND PIPELINE SHALL BE BACKFILLED WITH SAND. IF THE PIPE AND CASING ARE INSTALLED BY BORING, THE SPACE AROUND THE CASING ALSO ALL BE BACKFILLED WITH GROUT OR SAND. THE ENDS OF SPACE BETWEEN THE CASING AND THE PIPE SHALL BE SEALED WITH GROUT. THE STRENGTH OF PIPE DESIGNATED IN THE PLANS OR SPECIFICATIONS IS DETERMINED FOR VERTICAL LOAD ONLY ANY ADDITIONAL STRENGTH REQUIRED BY BORING/JACKING OPERATIONS SHALL BE FURNISHED AT THE CONTRACTOR'S EXPENSE. THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER FOR APPROVAL ALL PLANS OF BORING/JACKING OPERATIONS PRIOR TO BORING OR JACKING. BORING/JACKING OPERATIONS SHALL BE CONDUCTED IN A SAFE AND EFFICIENT MANNER, CONSISTENT WITH CURRENT ACCEPTED PROCEDURES. WATER BORING SHALL NOT BE PERMITTED. THE CASING PIPE SHALL. BE JACKED WITH SUCH PRECISION THAT WILL ALLOW THE REPLACEMENT OF THE PIPELINE TO THE LINE AND GRADE AS INDICATED ON THE PLANS. UPON COMPLETION OF THE INSTALLATION OF THE CASING AND INSTALLATION OF THE PIPELINE TO GRADE, THE VOID BETWEEN THE CASING OR RC PIPE AND THE EXCAVATION SHALL BE COMPLETELY FILLED WITH SAND, COMPACTED BY THE USE OF AIR -BLOWING SAND EQUIPMENT OR ANY OTHER MEANS ACCEPTABLE TO THE ENGINEER UPON HIS APPROVAL IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN A SAFE OPERATION AT ALL TIMES. SHOULD THE TUNNEL HEADING OPERATIONS RESULT IN DANGEROUS OR UNREASONABLE SLOUGHING OF MATERIAL WHICH MAY JEOPARDIZE THE SAFETY OF WORKERS OR THE STABIUTY OF THE SOIL AND ROADWAY ABOVE, THE CONTRACTOR SHALL FURNISH AND INSTALL BREASTBOARDING AND/OR FACE CLOSURE WITH SUFFICIENT JACKS TO INHIBIT THE SLOUGHING AND/OR CLOSING THE WORK FACE THE CONTRACTOR, BEFORE RESUMING WORK, SHALL FURNISH THE ENGINEER WITH A DETAILED PLAN OF PRECEDING WITH THE WORK, FOR HIS REVIEW AND APPROVAL ANY AND ALL EXPENSES THEREFORE WILL BE CONSIDERED AS INCLUDED IN THE BID PRICE AND NO ADDITIONAL COMPENSATION WILL BE MADE THEREFORE 17. MINOR STRUCTURES MINOR STRUCTURES. PORTLAND CEMENT CONCRETE MINOR STRUCTURES SHALL CONFORM, IN DESIGN, MATERIALS, AND CONSTRUCTION, TO THE PROVISIONS OF SECTIONS 70-1.02 H OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS. MANHOLES SHALL CONFORM TO THE CITY OF BAKERSFIELD STANDARDS S-7 AND S-8. DROP INLETS SHALL CONFORM TO THE CITY OF BAKERSFIELD STANDARD S-12. TEMPORARY INLET GRATES SHALL CONFORM TO DETAILS ON THE PLANS. THE PRECAST CYLINDER, TAPER, AND ECCENTRIC FLAT TOP SECTIONS SHALL MEET THE STRENGTH REQUIREMENT OF ASTM. C-478. EACH SUCCESSIVE MANHOLE SECTION SHALL BE SET ON A BED OF PORTLAND CEMENT GROUT OR "KENT SEAL" TO MAKE A WATERTIGHT JOINT, SHALL BE NEATLY POINTED ON THE INSIDE, AND SHALL BE SET PLUMB. 18. SURVEY MONUMENT AND FRAME AND COVER WITH ENCASEMENTS SHALL BE ADJUSTED OR INSTALLED NEW TO FINISH GRADE AT THE LOCATIONS SHOWN ON THE PLANS, IN ACCORDANCE WITH THESE SPECIAL PROVISIONS, AND CITY STANDARD S-29. THE SURFACE OF THE CONCRETE SHALL BE PROTECTED FROM PUBLIC TRAFFIC FOR A MINIMUM OF THREE DAYS. AT THE OPTION OF THE CONTRACTOR, MINOR CONCRETE CONTAINING A MINIMUM OF SEVEN SACKS OF CEMENT PER CUBIC YARD MAY BE USED AND THE TIME REQUIRED FOR PROTECTION OF THE CONCRETE SURFACE FROM PUBLIC TRAFFIC SHALL BE REDUCED TO A MINIMUM OF ONE DAY. THE MONUMENT WILL BE SET BY OTHERS. THE OWNER WILL PROVIDE SURVEYS. CONTRACTOR SHALL GIVE THE OWNER 24 HOURS NOTICE WHEN SURVEYS ARE REQUIRED. ANY MONUMENT FRAME OR COVER DAMAGED BY THE CONTRACTOR OR HIS OPERATIONS SHALL BE REPLACED BY THE CONTRACTOR AT NO COST TO THE OWNER. AN OPEN STREET PERMIT SHALL BE OBTAINED FROM THE CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT FOR ANY WORK PERFORMED WITHIN ACCEPTED STREET RIGHT-OF-WAY. UNLESS SECURED BY A SUBDIVISION AGREEMENT, A DEPOSIT BASED ON APPROVED ENGINEER'S ESTIMATE FOR THE WORK PERFORMED WITHIN THE RIGHT-OF-WAY AND INSURANCE SHALL BE POSTED PRIOR TO ISSUANCE OF THE PERMIT. menti * 153.77 LF OF 8" SEWER O 0.25% FROM TRACT 6824 * TEMPORARY CLEANOUT PER APPROVED TRACT 6824 PHASE 3 SEWER do STORM DRAIN PLANS. REMOVE CLEANOUT AND CONSTRUCT SEWER MANHOLE. * SEWER PLANS FOR TRACT 6824 HAVE BEEN APPROVED. IF SEWER ON 6824 HAS NOT BEEN CONSTRUCTED PRIOR TO CONSTRUCTION OF TRACT 6536, THEN THE DEVELOPER OF TRACT 6536 SHALL CONSTRUCT SEWER FROM THE CONNECTION POINT TO EXISTING SEWER ON MOUNTAIN RIDGE DRIVE IN ACCORDANCE WITH TRACT 6824 SEWER PLANS AND EASEMENT PROVIDED. 358 354 350 rzh * 153.77 LF OF 8" SEWER O 0.25% FROM TRACT 6824 342 338 334 330 326 MURFREESBORO DRIVE (STA. 10+00.00 TO 15+46.44) SCALE: 1" = 50' HORIZONTAL FORT HENRY WAY SEE SHEET 4 I I 1 3 FORT HENRY WAY SEE SHEET 4 12 2 CENTERLINE cm 8 -c'' �� NO o V-11 p CV o N INp SDMH Z 9 l 0;10 00 04 12 JUNCTION BOX W 14 Z O}+M I + Lou, %M + ci pi N + J I Lr)a + Z Ui Q P M P IP V12 M O N + o I II II I Z II'( �' j I 1 c 0 Mz g 1 I I ■ � I I I I IN MURFREESBORO DRIVE (STA. 10+00.00 TO 15+46.44) SCALE: 1" = 50' HORIZONTAL FORT HENRY WAY SEE SHEET 4 I I 1 3 FORT HENRY WAY SEE SHEET 4 12 2 10+00 11+00 LEGEND: CL CENTERLINE SMH INV INVERT SCO SD STORM DRAIN SDMH MH MANHOLE EXIST CB CATCH BASIN ELEV JB JUNCTION BOX R/W J o U 0 Mz g IIIIIIIIII + U Q Q N r— PPROXIMATE FINISHED t� 0 RADE CEN UNE g5� g6 * CONTRACTOR TO HAVE SURVEYOR ----VERIFY LOCATION AND INVERT ELEVATION OF 8" WA R SEWER STUB PRIOR TO BACK FILL SEWER STUB 1 RT 8" SEWS S = .25%IN INVER 8" S R INVERT 18"DRAIN 0 3 w 00 CD oo 3c 8 m V) 000 z z I, T,U Go Z m $I M w (U N N — ~WD +M {- +MM �srM� >Z M V M » M W Q-� Q W(A WW 4L�i � � W M fn W INST QL 35.00 LF OF n rn W 10+00 11+00 LEGEND: CL CENTERLINE SMH INV INVERT SCO SD STORM DRAIN SDMH MH MANHOLE EXIST CB CATCH BASIN ELEV JB JUNCTION BOX R/W SCP STREET CONSTRUCTION PLAN r� w w■w s PHASE BOUNDARY �■■�■■�■■� TRACT BOUNDARY 12+00 SEWER MANHOLE SEWER CLEANOUT STORM DRAIN MANHOLE EXISTING ELEVATION RIGHT OF WAY g48 TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION S CONSTRUCT SEWER PER CITY STANDARDS ® CONSTRUCT SEWER MANHOLE TYPE "A" PER C.O.B. STD. SW -4. 0 CONSTRUCT SEWER CLEANOUT PER C.O.B. STD. SW -6. 13+00 (STA. 10+00.00 TO 15+46.44) SCALE: 1" = 50' HORIZONTAL SCALE: 1" = 5' VERTICAL E 14+00 CONSTRUCT STORM DRAIN PER CITY STANDARDS CONSTRUCT STORM DRAIN MANHOLE TYPE "A" PER C.O.B. STD. SW -4. CONSTRUCT CATCH BASIN TYPE "A" PER C.O.B. STD. D-14. NOTES : 1) ALL CATCH BASINS ARE TO BE TYPE "A" WITH 3.5 OPENINGS PER C.O.B. STD. D-14. 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS UNLESS OTHERWISE NOTED. SECTION DESIGNATION: SECTION LETTER 2 SHEET WHERE SECTION Is SHOWN 15+00 16+00 CONSTRUCTION NOTES: O1 CONSTRUCT PIPE SADDLE PER C.O.B. STD. DET. D-9. O ENCASE SEWER UNE IN HOT—DIPPED, BITUMINOUS—COATED CLASS 150 CAST IRON PIPE WITH APPROVED MECHANICAL OR FLANGED JOINTS. ENCASEMENT SHALL PROVIDE A MINIMUM 4' HORIZONTAL CLEARANCE FROM THE WATER UNE (EACH SIDE) PER CITY OF BAKERSFlELD STANDARDS AND SPECIFICATIONS FOR DOMESTIC WATER SYSTEMS SECTION 4.9.3. O3 ENCASE SEWER LINE IN HOT—DIPPED, BITUMINOUS—COATED CLASS 150 CAST IRON PIPE WITH APPROVED MECHANICAL OR FLANGED JOINTS. ENCASEMENT SHALL PROVIDE A MINIMUM 10' HORIZONTAL CLEARANCE FROM THE WATER LINE (EACH SIDE) PER CITY OF BAKERSFlELD STANDARDS AND SPECIFICATIONS FOR DOMESTIC WATER SYSTEMS SECTION 4.9.2. 360 356 352 344 340 336 332 WC -1 324 SCALE: 1"=50' 25 0 50 100 50 12.5 Know what's below. 0111 before you dig. r an IIIIIIIIII r DAVIS DRIGE DRIVE MURFREESBORO DR. PANAMA LANE SEE SHEET 5 SEE SHEET 3 SEE SHEET 9 T I 5' I 5, I I �l 3059' R/W I o 59' o I T a I 66' + I 30 30 18 I I I 75' I - I 15 2 o I w•I R 5' RAW 20' 21Y R/W oo �- z --T- - - - - - - --L 30 060 30 1-- co 00 wfo) w+ 17 I 16 I 1_ o a ,� + -_ -- -- ?� � RAW oD ! R/W o + to a —W-- N p C, 18" SD 32 b N M S00'53'43"W 470.02' I-`pV _ 1111+00 12+00 310.00' 13+00-1 - - —� - �— - - - 24" DRAIN cov '�� � � 14+00 in , 236.48' 15+00 INTERSECTION N M STA. 15+46.48 C.L. FORT HENRY WAY = STA. 15+47.32 C.L. PANAMA LANE INTERSECTION R/W 00=INTERSECTION z STA 10+00.00 C.L FORT HENRY WAY48STA. 14+90.30 C.L DAVIS DRIDGE AVENUE STA. 13+10.00 C.L. FORT HENRY WAY = co L OT "A" STA. 15+46.44 C.L. MURFREESBORO DRIVE PANAMA LANE FORT HENRY WAY SEE SHEET 9 (STA. 10+00.00 TO 15+46.48) SCALE: 1" = 50' HORIZONTAL 362 358 354 350 91 R 342 338 11+00 LEGEND: CL ABBREVIATIONS CENTERLINE SMH SEWER MANHOLE INV INVERT SCO SEWER CLEANOUT SD STORM DRAIN SDMH STORM DRAIN MANHOLE MH MANHOLE EXIST EXISTING CB CATCH BASIN ELEV ELEVATION JB JUNCTION BOX R/W RIGHT OF WAY 0) r O 3 Zo w N Z w N w J ._ 00 10 J Q = ¢ NN = ZJ r % SEWER LATERAL LINE TABLE UNE BEARING DISTANCE L1 N 31'59'31" W 51.41' L2 S 34'25'40" W 63.94' 0 S 30'19'52" E 35.73' I ■ II i 1 � II I 3Q I I J J O W o Z 'N L, ■■'■'■}w�- t• t _M II ~^'!� - ~pp- �II �- � �iII I ���II ►-M'(I Cp IIII Na�g0O i• ►- J o24 23 IB817 �o�J 22g 21 g 20� o ■• CVNCD LLI 0 NCCZ NNog O J _jO O O OO N 0;' W) rnO •M �I CZ UCj I0N CV Q ■Q Zn' c; U W Z.m W ± m N�K).C1 NWA,n tie nz n $ o g Wz u'NunN v' U)Ui / R/Wl0�Q�fn0 II ■N89.0617 W ■ i 6 SfWER 100.00 N N89U6'1i"W 8` 190. 1 +00 S89`06'1TE 190-00`14+00 10+0 I- - _ _ •00+00 s ORT HENRY WAY SEE SHEET 4 I 1 � 5I20' 20' 'O O Z co 3 D IM I� I 24 SD 1 N I u o J D os �o JJ U CU + M d� n N 0 00) S O $ W Z Z0 O 00 ZO 1� MO L6 - ■ �pjIMjI( •�Og JM00JTRACT BOUNDARY I = n 00 W)� rt) In z25 2 27 28 29 3<sNMsW ° 32ujO I M M I `^-"i .N --M O• I Z �M � M Z I Z . m I I C) !n !n ■ 1 N$ ( N$I $ 1 Ng I N 5, 10+ Nzz 1 vrQi�z p+ I m + + 5, _ I w I I I I20' 20' I oa ( OQ W�� ■ I I I I N I r I cn cn I c 1 IT FAIR GARDEN WAY SEE SHEET 6 358 354 350 346 342 338 334 330 326 DAVIS DRIDGE AVENUE (STA. 10+00.00 TO 14+90.30) SCALE: 1" = 50' HORIZONTAL u M Q 3 JLd .�-JtWx;; H J C5 0 0 8 4 cn PHASE LINE LEGEND: - ABBREVIATIONS CENTERUNE SMH :•�_- c� INV INVERT SCO SEWER CLEANOUT SD STORM DRAIN SDMH STORM DRAIN MANHOLE MH MANHOLE EXIST EXISTING INSTALL 54.71 LF OF INSTALL 50.00 N I u o J D os �o JJ U CU + M d� n N 0 00) S O $ W Z Z0 O 00 ZO 1� MO L6 - ■ �pjIMjI( •�Og JM00JTRACT BOUNDARY I = n 00 W)� rt) In z25 2 27 28 29 3<sNMsW ° 32ujO I M M I `^-"i .N --M O• I Z �M � M Z I Z . m I I C) !n !n ■ 1 N$ ( N$I $ 1 Ng I N 5, 10+ Nzz 1 vrQi�z p+ I m + + 5, _ I w I I I I20' 20' I oa ( OQ W�� ■ I I I I N I r I cn cn I c 1 IT FAIR GARDEN WAY SEE SHEET 6 358 354 350 346 342 338 334 330 326 DAVIS DRIDGE AVENUE (STA. 10+00.00 TO 14+90.30) SCALE: 1" = 50' HORIZONTAL u M Q 3 JLd .�-JtWx;; H J C5 0 0 8 4 cn PHASE LINE 10+00 11+00 LEGEND: CL ABBREVIATIONS CENTERUNE SMH SEWER MANHOLE INV INVERT SCO SEWER CLEANOUT SD STORM DRAIN SDMH STORM DRAIN MANHOLE MH MANHOLE EXIST EXISTING INSTALL 54.71 LF OF INSTALL 50.00 LF JUNCTION BOX R/W RIGHT OF WAY SCP STREET CONSTRUCTION PLAN INSTALL 15!.00 LF OF 24" RCIP O 0.19 24' R O 0.1 X I OF 24' RCP O 0.12X In co IDpOdI O ctO O J J Wtn Z •s Wcn OW NN O NN MN O . NN O J ; ZZ .zZM ZZcSUZ O — a q a oo to O pp 2 M 00 M 0 M M t 0+ M M + M JJ JJcmn O�Q WWWW JJ MQ -J 9 Z 1' 04 APPROXIMATE FINISHED 1 GRAD O CE TERUN1 / wnA 1 1 1 ' , 1 " WA 1 ' • 1 2 * PLUG ' SEWER STUB �N'&RT N RT 8" SEWER ' NVERT „ SEWS 8 " SEWER *PLUG 2C 1 _ I SIVERT INVERT 24" RAIN pIN RT 4' DRA N r- W . U) W Ld 3 z z Z ,� � O . m O J a0 � 00 O , 0p OO W c O O — J > ZZ J _ZZZ J ZZ 00 > z Z Q � O Z W �M T O O C9 raj i � d Ln co Z Q N N NCV J M M F N M in � + M M � M 3 m > W � W INSALL100. LF WW �QWWW WW INSTALL 3.24 LF OF W 6 Ac SEUC." i.00% -INSTALL 190-00 OF " vWi W W ovC to 10+00 11+00 PHASE BOUNDARY � ■ ■ � 0 N � = m � TRACT BOUNDARY 348,.5 TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION -s-CONSTRUCT SEWER PER CITY STANDARDS ® CONSTRUCT SEWER MANHOLE TYPE 'A' PER C.O.B. STD. SW -4. ® CONSTRUCT SEWER CLEANOUT PER C.O.B. STD. SW -6. 12+00 13+00 14+00 (STA. 10+00.00 TO 14+90.30) SCALE: 1" = 50' HORIZONTAL SCALE: 1` = 5' VERTICAL CONSTRUCT STORM DRAIN PER CITY STANDARDS ® CONSTRUCT STORM DRAIN MANHOLE TYPE 'A' PER C.O.B. STD. SW -4. atr CONSTRUCT CATCH BASIN TYPE 'A' PER C.O.B. STD. D-14. NOTES : 1) ALL CATCH BASINS ARE TO BE TYPE 'A" WITH 3.5' OPENINGS PER C.O.B. STD. D-14. 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS UNLESS OTHERWISE NOTED. SECTION DESIGNATION: SECTION LETTER L-- -- A _2 SHEET WHERE SECTION IS SHOWN 364 360 356 352 348 344 *CONTRACTOR TO HAVE SURVEYOR VERIFY LOCATION AND INVERT ELEVATION OF SEWER STUB PRIOR TO BACK FILL 340 336 332 328 324 15+00 16+00 CONSTRUCTION NOTES: p1 CONSTRUCT PIPE SADDLE PER C.O.B. STD. DET. D-9. p2 ENCASE SEWER LINE IN HOT -DIPPED, BITUMINOUS -COATED CLASS 150 CAST IRON PIPE WITH APPROVED MECHANICAL OR FLANGED JOINTS. ENCASEMENT SHALL PROVIDE A MINIMUM 4' HORIZONTAL CLEARANCE FROM THE WATER LINE (EACH SIDE) PER CITY OF BAKERSFIELD STANDARDS AND SPECIFICATIONS FOR DOMESTIC WATER SYSTEMS SECTION 4.9.3. p3 ENCASE SEWER LINE IN HOT -DIPPED, BITUMINOUS -COATED CLASS 150 CAST IRON PIPE WITH APPROVED MECHANICAL OR FLANGED JOINTS. ENCASEMENT SHALL PROVIDE A MINIMUM 10' HORIZONTAL CLEARANCE FROM THE WATER UNE (EACH SIDE) PER CITY OF BAKERSFIELD STANDARDS AND SPECIFICATIONS FOR DOMESTIC WATER SYSTEMS SECTION 4.9.2. SCALE: 1"=50' 25 0 50 100 50 12.5 Know what's below. Call before you dig. am LEGEND: CL ABBREVIATIONS CENTERUNE SMH SEWER MANHOLE INV INVERT SCO SEWER CLEANOUT SD STORM DRAIN SDMH STORM DRAIN MANHOLE MH MANHOLE EXIST EXISTING CB CATCH BASIN ELEV ELEVATION JB JUNCTION BOX R/W RIGHT OF WAY SCP STREET CONSTRUCTION PLAN PHASE BOUNDARY � ■ ■ � 0 N � = m � TRACT BOUNDARY 348,.5 TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION -s-CONSTRUCT SEWER PER CITY STANDARDS ® CONSTRUCT SEWER MANHOLE TYPE 'A' PER C.O.B. STD. SW -4. ® CONSTRUCT SEWER CLEANOUT PER C.O.B. STD. SW -6. 12+00 13+00 14+00 (STA. 10+00.00 TO 14+90.30) SCALE: 1" = 50' HORIZONTAL SCALE: 1` = 5' VERTICAL CONSTRUCT STORM DRAIN PER CITY STANDARDS ® CONSTRUCT STORM DRAIN MANHOLE TYPE 'A' PER C.O.B. STD. SW -4. atr CONSTRUCT CATCH BASIN TYPE 'A' PER C.O.B. STD. D-14. NOTES : 1) ALL CATCH BASINS ARE TO BE TYPE 'A" WITH 3.5' OPENINGS PER C.O.B. STD. D-14. 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS UNLESS OTHERWISE NOTED. SECTION DESIGNATION: SECTION LETTER L-- -- A _2 SHEET WHERE SECTION IS SHOWN 364 360 356 352 348 344 *CONTRACTOR TO HAVE SURVEYOR VERIFY LOCATION AND INVERT ELEVATION OF SEWER STUB PRIOR TO BACK FILL 340 336 332 328 324 15+00 16+00 CONSTRUCTION NOTES: p1 CONSTRUCT PIPE SADDLE PER C.O.B. STD. DET. D-9. p2 ENCASE SEWER LINE IN HOT -DIPPED, BITUMINOUS -COATED CLASS 150 CAST IRON PIPE WITH APPROVED MECHANICAL OR FLANGED JOINTS. ENCASEMENT SHALL PROVIDE A MINIMUM 4' HORIZONTAL CLEARANCE FROM THE WATER LINE (EACH SIDE) PER CITY OF BAKERSFIELD STANDARDS AND SPECIFICATIONS FOR DOMESTIC WATER SYSTEMS SECTION 4.9.3. p3 ENCASE SEWER LINE IN HOT -DIPPED, BITUMINOUS -COATED CLASS 150 CAST IRON PIPE WITH APPROVED MECHANICAL OR FLANGED JOINTS. ENCASEMENT SHALL PROVIDE A MINIMUM 10' HORIZONTAL CLEARANCE FROM THE WATER UNE (EACH SIDE) PER CITY OF BAKERSFIELD STANDARDS AND SPECIFICATIONS FOR DOMESTIC WATER SYSTEMS SECTION 4.9.2. SCALE: 1"=50' 25 0 50 100 50 12.5 Know what's below. Call before you dig. am IDpOdI BLOUNTSVILLE DR. DAVIS DRIDGE AVE. SEE SHEET 7 SEE SHEET 5 t I C> �---- -- -- I -- __ --J I 5' I n -- -- ---, 1-1 I Fz J--- - I N I C_V t o 20' I 5 I I I 20' W I J O 1 20' n 20' I 1 �, 1 30• J in 44 1 �. �. 35 29. Z .+ INTERSECTION fn 20 STA. 10+00.00 C.L.FAIR GARDEN WAY a STA. 12+89.15 C.L. BLOUNTSALLE DRIVE I 13 + __ I W to W- I I . N _• 4—_�' __ co NOO'53 43w E 8w 12+00En SEWER 320.00' S "' N M 13+00 45 +-NOO'53'43"E--I - -310.00' --I - - - s w "' 24" SO SOO.53'43'W 300.00' 7-4,9 + + n 19 Z I Z .o I W IN I -- -- -- -- -- o Q z 1 wo Q' o o d T .n v °' a �o--- -- to I d z Z 1 ao �5 46 1 ` 5, ,- 1 34 30 J W+� 5'� =_j __jJ z z � 5' 18 I 1 cici - I 20 20' 9 S M z _�- Z �, m 'i_ 1 c>o0 �ci I 30-1, I vWi + + + jr 0 o+ -- — I — -- �+ �7- 1 i I( g o —<< 47 1 I oaI 31 oa I+ W� 33 U)- 4 1 \11 17 BLOUNTSVILLE DR. DAVIS DRIDGE AVE. SEE SHEET 7 SEE SHEET 5 358 354 350 346 342 338 334 330 326 FAIR GARDEN WAY (STA. 10+00.00 TO 13+10.00) SCALE: 1" = 50' HORIZONTAL 10+00 11+00 12+00 (STA. 10+00.00 TO 13+10.00) SCALE: 1" = 50' HORIZONTAL SCALE: 1" = 5' VERTICAL 13+00 LEGEND: KU 356 358 352 354 348 350 344 346 340 342 336 338 332 334 328 LINE TABLE UNE III SIZE LENGTH I BEARING INSTALL 300.00 LF OF 24" RCP O 0.18% ci p MIS AIM It w D U C; -3 c I _j In 33 n Z PHASE UNE W a a t J N N 01 J > > Z Ibghlll Z - o 110101111111mm, AIM MEMEME MENEM - . - o,- Ell o� 011 M M Q W LL v� w .1 A PROXIM TE FINISHED W g LO.M. 0•�• 111MOME G ADE ENTER INE — _ — 1101101!N." 01.11 , 2 AIM . Imm •8" Mimi MEN N ZRT J r _On 3 W n wiz 00 00 p Lc 1010 I'm ao z z »> oo ZZ z OCRQ Z N N M m+ �M EIR 1M M M AIM •WW w »>Q Ww WW W cncf J J _j WWW INSTALL 320 00 LF of, 8" PVC SEWER a 0.3511 10+00 11+00 12+00 (STA. 10+00.00 TO 13+10.00) SCALE: 1" = 50' HORIZONTAL SCALE: 1" = 5' VERTICAL 13+00 LEGEND: KU 356 358 352 354 348 350 344 346 340 342 336 338 332 334 328 LINE TABLE UNE III SIZE LENGTH I BEARING L1 18" I 25.0' S5213 -57-E MENEEN 34 ■■� I AIM ci p MIS AIM w D U C; -3 c I _j In 33 » z o PHASE UNE --m. Ibghlll 1101010--20mmum110 110101111111mm, AIM MEMEME MENEM MENNEN 324 A SECTION 6 SCALE: 1" = 50' HORIZ. 1" = 5' VERT. CL CENTERLINE SMH SEWER MANHOLE INV INVERT SCO SEWER CLEANOUT SD STORM DRAIN SDMH STORM DRAIN MANHOLE MH MANHOLE EXIST EXISTING CB CATCH BASIN ELEV ELEVATION JB JUNCTION BOX R/W RIGHT OF WAY SCP STREET CONSTRUCTION PLAN ® ■ PHASE BOUNDARY ■ ■ ■� ■ ■ ■ ■ TRACT BOUNDARY 348 TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION S CONSTRUCT SEWER PER CITY STANDARDS ® CONSTRUCT SEWER MANHOLE TYPE "A' PER C.O.B. STD. SW -4. 0 CONSTRUCT SEWER CLEANOUT PER C.O.B. STD. SW -6. 48 47 45 0 z J -- -- ---z 360 356 352 348 344 340 336 332 CONSTRUCT STORM DRAIN PER CITY STANDARDS 0 CONSTRUCT STORM DRAIN MANHOLE TYPE 'A" PER C.O.B. STD. SW -4• CONSTRUCT CATCH BASIN TYPE "A' PER C.O.B. STD. D-14. NOTES 1) ALL CATCH BASINS ARE TO BE TYPE "A" WITH 3.5' OPENINGS PER C.O.B. STD. D-14. 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS UNLESS OTHERWISE NOTED. SECTION DESIGNATION: SECTION LETTER L-- -- A 2 SHEET WHERE SECTION IS SHOWN 44 0 354 350 346 338 334 330 326 322 FORT SANDERS AVE. SEE SHEET 8 ll 1,15'ICI� BLOUNTSVILLE DR. SEE SHEET 7 II I ( A 111 I :I �Nrp 25 �� 1,:,: 25 I 22 N I FORT SANDERS AVE. BLOUNTSVILLE DR. SEE SHEET 8 SEE SHEET 7 MOSSY CREEK WAY (STA. 10+00.00 TO 13+10.01) SCALE: 1" = 50' HORIZONTAL AIM 34 J N I ci p MIS AIM w D U C; -3 c I _j In 33 » z o PHASE UNE :I �Nrp 25 �� 1,:,: 25 I 22 N I FORT SANDERS AVE. BLOUNTSVILLE DR. SEE SHEET 8 SEE SHEET 7 MOSSY CREEK WAY (STA. 10+00.00 TO 13+10.01) SCALE: 1" = 50' HORIZONTAL AIM mmmmmmmmmimm amnnn MIS AIM --m. Ibghlll Ell 011 a, .1 111MOME MEN, 1101101!N." 01.11 AIM Imm Mimi MEN EIR AIM m__ 10+00 11+00 12+00 (STA. 10+00.00 TO 13+10.01) SCALE: 1" = 50' HORIZONTAL SCALE: 1" = 5' VERTICAL CONSTRUCTION NOTES: Ot CONSTRUCT PIPE SADDLE PER C.O.B. STD. DET. D-9. O2 ENCASE SEWER LINE IN HOT -DIPPED, BITUMINOUS -COATED CLASS 150 CAST IRON PIPE WITH APPROVED MECHANICAL OR FLANGED JOINTS. ENCASEMENT SHALL PROVIDE A MINIMUM 4' HORIZONTAL CLEARANCE FROM THE WATER UNE (EACH SIDE) PER CITY OF BAKERSFIELD STANDARDS AND SPECIFICATIONS FOR DOMESTIC WATER SYSTEMS SECTION 4.9.3. O3 ENCASE SEWER LINE IN HOT -DIPPED, BITUMINOUS -COATED CLASS 150 CAST IRON PIPE WITH APPROVED MECHANICAL OR FLANGED JOINTS. ENCASEMENT SHALL PROVIDE A MINIMUM 10' HORIZONTAL CLEARANCE FROM THE WATER LINE (EACH SIDE) PER CITY OF BAKERSFIELD STANDARDS AND SPECIFICATIONS FOR DOMESTIC WATER SYSTEMS SECTION 4.9.2. 13+00 SCALE: 1 "=50' 25 0 50 100 50 12.5 2 356 352 348 344 336 332 328 324 Know what's below. 0111 before you dig. amnnn Ibghlll FAIR GARDEN WAY 1 SEE SHEET 6 I I ■ t I fes- 1 1 R/W"-I Ii i I r --}--- --�-- ---I— --j---- �,, ---) 115' -- ---I--- -- ■ I I I 1 0 3 5' I i I I I I !!j 20' 1 1 I CK 11 301. , H I H ~ N J Z • ' I 1 I I = I I -� 1 8 4 M �� I� I o t Go o I $o O� 1 I t o MN� 'oo 0 38 to 37oM MM36 �M35 �: 34M� ^M33z� M 1 Q I� W I C4 W �n g i v1 N in os + r) (n ( 1 w a ■ I I +� I +"v I cid waOoS ! i ItR yy $M ( '�?io m,°n'LLL'.c°, Z 'la-$ ao ( a$ I r< -g I viii rv-�aw IM o+ ■ _` Nz t (nz zv~iv~i M a to I (n$z� (n$ o I I R - OD - -- - -- N .. 11+00 N 24" D S89'06'170E 185.00' N L > y- T �3 I I �1 Y A J W A STORM DRAIN SDMH 1... MH MANHOLE nm 2 Mo _QF CATCH BASIN ELEV ELEVATION .J JUNCTION BOX R/W LU C3 W M STREET CONSTRUCTION PLAN �i 0 W W t I *o 4D J $ I $ c IQ m .- O cc 10 MgI la- 12go W m ;� ii> f 0;1181 I M 1 1 1 I I I I I 1 1 J I J ( J ( J I J I c I I c I I c I 3 0 1 $ I o I $ I o I g( 4 MM ( 5 M$ ( 6$ I 7 oM O � C6 k"5p 1p Na I ~ I 4$ I 48 C I I Hz I V)z I (nz I VIZ 1 TRACT BOUNDARY L 0 T �� 0 7 A 1 1 1 I I I I I 1 1 J I J ( J ( J I J I c I I c I I c I 3 0 1 $ I o I $ I o I g( 4 MM ( 5 M$ ( 6$ I 7 oM O � C6 k"5p 1p Na I ~ I 4$ I 48 C I I Hz I V)z I (nz I VIZ 1 TRACT BOUNDARY A SMH SEWER MANHOLE P A R 7 1 1 1 I I I I I 1 1 J I J ( J ( J I J I c I I c I I c I 3 0 1 $ I o I $ I o I g( 4 MM ( 5 M$ ( 6$ I 7 oM O � C6 k"5p 1p Na I ~ I 4$ I 48 C I I Hz I V)z I (nz I VIZ 1 TRACT BOUNDARY 1 sss'0617"E +00 286.15 S +00 i--- - - " +0016+O+00 + -I S89ros 17"E- '195.00 f } 1-9-+f-0-0 779.20' _20+00 - -1+00 - - -I F- t N89'06'17"W 6' SEWER to N ' N89'O6' 7"W 8" SEWER 190.55' 13+00 89•06'17�W 8" SEWER 204.91'14+00 S ■\ i S89t6' 7"E 8'E00' S S S 9'0617-E 6-270.09'WER 400. ■ 100 R � r r r T ■ Jf I II 1 1 711� I 1 R/W cr. Of $"Ix o bO •� t $ ap ooio a;o ( cz �-p Qo,o, ooSo o z W o I $ I g la $ $ $ $ $ o ■ ZI— C3 Iej ( NO I NO I NO ( NO Ir NO 1 NO I NO Q ! O '� N O N 0" I 0" I ci" pi" I Of" I Oi" ( O O ■ J o ci of I �i,1 $ I N$ I $ I N g I N o 0 0 p 10 ?i 1: 1 rn I vo 1 c�i°' i �ciV' �� NO IO MN I .=N I NO i 0 1 Of0 I NO O i N$ I N I N i Oi" r V) �j N N N I r= 0 J N M N N N N I I Of I vi �zoo�-0 (►�iW41 W X42 c�0;,, 43 441 ZJ�45 0;..� 46 �W NW 47 N 0 � Z En 23 d W MW 22 tOW 21 d W 20 tOW1 9 0) l g� � NN 17 16 °°" cc ' NN ,Z�� Q 1 +� ���� �� ^� +� �J +� + (+M �Jcd� (� �, (p 15 14 X13 W M (O (C •- M •- M M _ " W + { d + d ( + ( f �D'1,� Z • (n O W OD ih ih p W ■ _jrnrn I .-rn i= Kj .In ( In I In I=.-� In I !n 1^� Ixoo �rh IwM r -M M �M �:r .�� o+�r I o� I +� p 'Ici ■ U++ p�p IQo0 la-$ I IQ8 1 a Iz44 Qo I a t �• R/W Zci� In In I !n 1 Ifs I In 1 ""� O NI � I �M I NM t N- Ix r W 0 ( NZ ++ V)Z V)Z $ 1- $ ao ro t- , $ IQ ra-$ I a$ t to (Qo i a I 1< 1j x fA !n rn V>z m+N (na �z (nz 5 ��+ (nz (~ilz V~iz (~i�z v~iz$ �z Q rnl �$ t �$ t Ia-$ I1a-$ lau�In Nam I� 1 I I� 5(��.1 I I +Go (nz cnz (nz �z IW+N 1`'ad �i,� II Icq ■ I I W 1- I 1 13Qa i i 20.20'tWa� �I I ( 1 ■ I rn I 1 I N 'u-) I I 3011 130' 11 1 V3 j I r j� HII r l —I— I N cn -}— 1 I 1 I Icn -EM I__ __-�------�----------- -- -----�-------I-------I-------�-------�--- -- ■ I I I PHASE BOUN=+f=DA-RY I t 1 I TI 1 k�/W 1 I I ■ 1 1 1 MOSSY CREEK WAY SEE SHEET 6 358 354 350 346 342 338 334 330 326 322 BLOUNTSVILLE DRIVE (STA. 10+00.00 TO 22+63.35) SCALE: 1" = 50' HORIZONTAL 22+00 --j — -- - a 0 z U $ MOLD RIVER ROAD LEGEND: ABBREVIATIONS CENTERLINE SMH SEWER MANHOLE INV INVERT SCO SEWER CLEANOUT SD STORM DRAIN SDMH STORM DRAIN MANHOLE MH MANHOLE EXIST EXISTING _QF CATCH BASIN ELEV ELEVATION JB JUNCTION BOX R/W O + STREET CONSTRUCTION PLAN �i 0 W < 4D J $ I $ c IQ m '>'A V/ cc 10 MgI F— "L 12go W m ;� ii> f 0;1181 I M � J W + I m W g W I � epi W t+A C 0(3 � p s W NY• 1 '4M t � NpM 0WsUi to to $ I ++ NZ NZ 1-O �N� I t N z Zdd --- J- -- �- - 0 o1 1 sss'0617"E +00 286.15 S +00 i--- - - " +0016+O+00 + -I S89ros 17"E- '195.00 f } 1-9-+f-0-0 779.20' _20+00 - -1+00 - - -I F- t N89'06'17"W 6' SEWER to N ' N89'O6' 7"W 8" SEWER 190.55' 13+00 89•06'17�W 8" SEWER 204.91'14+00 S ■\ i S89t6' 7"E 8'E00' S S S 9'0617-E 6-270.09'WER 400. ■ 100 R � r r r T ■ Jf I II 1 1 711� I 1 R/W cr. Of $"Ix o bO •� t $ ap ooio a;o ( cz �-p Qo,o, ooSo o z W o I $ I g la $ $ $ $ $ o ■ ZI— C3 Iej ( NO I NO I NO ( NO Ir NO 1 NO I NO Q ! O '� N O N 0" I 0" I ci" pi" I Of" I Oi" ( O O ■ J o ci of I �i,1 $ I N$ I $ I N g I N o 0 0 p 10 ?i 1: 1 rn I vo 1 c�i°' i �ciV' �� NO IO MN I .=N I NO i 0 1 Of0 I NO O i N$ I N I N i Oi" r V) �j N N N I r= 0 J N M N N N N I I Of I vi �zoo�-0 (►�iW41 W X42 c�0;,, 43 441 ZJ�45 0;..� 46 �W NW 47 N 0 � Z En 23 d W MW 22 tOW 21 d W 20 tOW1 9 0) l g� � NN 17 16 °°" cc ' NN ,Z�� Q 1 +� ���� �� ^� +� �J +� + (+M �Jcd� (� �, (p 15 14 X13 W M (O (C •- M •- M M _ " W + { d + d ( + ( f �D'1,� Z • (n O W OD ih ih p W ■ _jrnrn I .-rn i= Kj .In ( In I In I=.-� In I !n 1^� Ixoo �rh IwM r -M M �M �:r .�� o+�r I o� I +� p 'Ici ■ U++ p�p IQo0 la-$ I IQ8 1 a Iz44 Qo I a t �• R/W Zci� In In I !n 1 Ifs I In 1 ""� O NI � I �M I NM t N- Ix r W 0 ( NZ ++ V)Z V)Z $ 1- $ ao ro t- , $ IQ ra-$ I a$ t to (Qo i a I 1< 1j x fA !n rn V>z m+N (na �z (nz 5 ��+ (nz (~ilz V~iz (~i�z v~iz$ �z Q rnl �$ t �$ t Ia-$ I1a-$ lau�In Nam I� 1 I I� 5(��.1 I I +Go (nz cnz (nz �z IW+N 1`'ad �i,� II Icq ■ I I W 1- I 1 13Qa i i 20.20'tWa� �I I ( 1 ■ I rn I 1 I N 'u-) I I 3011 130' 11 1 V3 j I r j� HII r l —I— I N cn -}— 1 I 1 I Icn -EM I__ __-�------�----------- -- -----�-------I-------I-------�-------�--- -- ■ I I I PHASE BOUN=+f=DA-RY I t 1 I TI 1 k�/W 1 I I ■ 1 1 1 MOSSY CREEK WAY SEE SHEET 6 358 354 350 346 342 338 334 330 326 322 BLOUNTSVILLE DRIVE (STA. 10+00.00 TO 22+63.35) SCALE: 1" = 50' HORIZONTAL 22+00 --j — -- - a 0 z U $ MOLD RIVER ROAD 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 (STA. 10+00.00 TO 22+63.35) SCALE: 1" = 50' HORIZONTAL SCALE: 1" = 5' VERTICAL CL LEGEND: ABBREVIATIONS CENTERLINE SMH SEWER MANHOLE INV INVERT SCO SEWER CLEANOUT SD STORM DRAIN SDMH STORM DRAIN MANHOLE MH MANHOLE EXIST EXISTING _QF CATCH BASIN ELEV ELEVATION JB JUNCTION BOX R/W RIGHT OF WAY SCP STREET CONSTRUCTION PLAN �i 0 W < 4D J c IQ m '>'A V/ cc F— "L W Q ii> > ¢�adO z � J < m C W W INSTA 185.00 LF 247 CP O 0.16% NIIN Z Z W J , 3 (n J 41 q = a = ZQ N N N N Z Z . z j Z Q d Lc) LOIC •- •- ID M I� 1� r '6_ I� - MM d IM M O)k— — - D�• OQ WW W APPROMATE— -- ""— RADE CENTS UNE �0�`' W w GRADE ®CEN ._ -- RUNE — — — — — — -- k t0�'' _ — - -- 6" IERTr7NVERT SEWER N_ SEWER 8' SEWER RT 8 ;-INVERT 5! -SEM 1 3 -- -- INVERT "SEWS 1 8' WATI R _- I VERT 4 DRAIW 0 3 .- W 00 W ^ W Z t0 O 3 W = 0 W s a O (O O = CO /o O a O Z OD ap J O Z J co j Z -1 '> Z Z jj Z-! C) j j •jj W 7ZI W r > W _ O — �_ _ _00 Z 0 x co 0 O O = Z Ln N M Q Z �� Q Z Q R OR M '' t7 W ZQ co • _OD M M U+ M M M M M x j . j a jj W j j >> J V) W W N J INSTALL W 100. LF OF vWi W W Li W W W W W INSTALL OF 8" VC O 0.35%IN V) W LL 270.0 LF OF 'PVC WER 01,00% PV SEWER 1.00X INSTALL 90.55 OF 8" C SEWS ! 0.35 STALL 4.91 LF OF 8' P SEWER ®0.25% .00 nnlnn 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 (STA. 10+00.00 TO 22+63.35) SCALE: 1" = 50' HORIZONTAL SCALE: 1" = 5' VERTICAL CL LEGEND: ABBREVIATIONS CENTERLINE SMH SEWER MANHOLE INV INVERT SCO SEWER CLEANOUT SD STORM DRAIN SDMH STORM DRAIN MANHOLE MH MANHOLE EXIST EXISTING CB CATCH BASIN ELEV ELEVATION JB JUNCTION BOX R/W RIGHT OF WAY SCP STREET CONSTRUCTION PLAN �i 0 W ■■■ PHASE BOUNDARY ■� ■ ■ �■� ■ ■ � ■ ■ � TRACT BOUNDARY 348.5 T•0'M' TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION S CONSTRUCT SEWER PER CITY STANDARDS ® CONSTRUCT SEWER MANHOLE TYPE 'A' PER C.O.B. STD. SW -4. ® CONSTRUCT SEWER CLEANOUT PER C.O.B. STD. SW -6. kNzPIC CONSTRUCT STORM DRAIN PER CITY STANDARDS o CONSTRUCT STORM DRAIN MANHOLE TYPE 'A' PER C.U.B. STD. SW -4 - CONSTRUCT CATCH BASIN TYPE "A' PER C.O.B. STD. D-14. NOTES : 1) ALL CATCH BASINS ARE TO BE TYPE 'A" WITH 3.5' OPENINGS PER C.O.B. STD. D-14. 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS UNLESS OTHERWISE NOTED. SECTION DESIGNATION: SECTION LETTER _2 SHEET WHERE SECTION IS SHOWN IvlI uu LV"rVV CONSTRUCTION NQTES: a CONSTRUCT PIPE SADDLE PER C.O.B. STD. DET. D-9. 20 ENCASE SEWER LINE IN HOT -DIPPED, BITUMINOUS -COATED CLASS 150 CAST IRON PIPE WITH APPROVED MECHANICAL OR FLANGED JOINTS. ENCASEMENT SHALL PROVIDE A MINIMUM 4' HORIZONTAL CLEARANCE FROM THE WATER LINE (EACH SIDE) PER CITY OF BAKERSFIELD STANDARDS AND SPECIFICATIONS FOR DOMESTIC WATER SYSTEMS SECTION 4.9.3. O3 ENCASE SEWER LINE IN HOT -DIPPED, BITUMINOUS -COATED CLASS 150 CAST IRON PIPE WITH APPROVED MECHANICAL OR FLANGED JOINTS. ENCASEMENT SHALL PROVIDE A MINIMUM 10' HORIZONTAL CLEARANCE FROM THE WATER LINE (EACH SIDE) PER CITY OF BAKERSFIELD STANDARDS AND SPECIFICATIONS FOR DOMESTIC WATER SYSTEMS SECTION 4.9.2. LI -IF VV �� 1 vv 360 356 352 348 gl 340 336 332 W-1 324 LINE TABLE UNESIZE BEARING LENGTH BEARING L1 18' 25.00' S52'13'S7'E SEWER LATERAL UNE TABLE UNE BEARING DISTANCE L2 N 30'54'34' W 59.49' L3 S 19'04'57' W 51.23' L4 N 16'13'06" W 30.34' SCALE: 1"=50' 25 0 50 100 50 12.5 Know what's below. 0111 before you dig. 1. a - 53 G ail.. CITY RECORDS NO: w 0 W ti co Z 1111111111 J N 0 J CL J -WZ� W Ac p _ QQ� �y+ Q < z IL �i 0 W < 4D J c IQ m '>'A V/ cc F— "L W Q ii> > ¢�adO z � J < m C W W NIIN W ti co Z J N 0 J CL J -WZ� W Ac p _ QQ� �y+ Q < z IL �i 0 W < 4D J c IQ m '>'A V/ cc F— "L W Q ii> > ¢�adO z � J < m C W W W ti 356 354 35C 346 342 338 334smim,10MEN * TEMPORARY CLEANOUT PER APPROVED TRACT 6824 PHASE 2 SEWER do STORM DRAIN PLANS. REMOVE CLEANOUT AND CONSTRUCT SEWER MANHOLE. —S� * 319.98 LF OF 8" SEWER O 0.25% FROM TRACT 6824 LINE TABLE UNE SIZE LENGTH BEARING L1 30" 39.36' SOO'53'43"W L2 30" 25.00' SOO'53'43"W L3 24" 15.00' ISM'53'43"W SEWER LATERAL LINE TABLE UNE BEARING DISTANCE L4 S 33V50* W 61.20' L5 N 3117'54' W 48.97' * SEWER PLANS FOR TRACT 6824 HAVE BEEN APPROVED. IF SEINER ON 6824 HAS NOT BEEN CONSTRUCTED PRIOR TO CONSTRUCTION OF TRACT 6536, THEN THE DEVELOPER OF TRACT 6536 SHALL CONSTRUCT SEWER FROM THE CONNECTION POINT TO EXISTING SEWER ON MOUNTAIN RIDGE DRIVE IN ACCORDANCE WITH TRACT 6824 SEWER PLANS AND EASEMENT PROVIDED. 3% 31 3A 3d *319.98 LF OF 8" SEWER O 0.25% FROM TRACT 6824 3; co ■ rn I I 1 U 1 H LAU= ��mm��imm O o■ Q O ■ O J J I J Z Ln ■ O ' 51 M � p I R BE M O ■ ■ M' (> M O W U M 50 0-,) ■ ■ CA / 3% 31 3A 3d *319.98 LF OF 8" SEWER O 0.25% FROM TRACT 6824 3; A SECTION $ SCALE: 1" = 50' HORIL 1" = 5' VERT. 3' 3' 3� 32 co rn I I 1 Im. 1 H LAU= ��mm��imm mum imum Q INSTkLL J J I J Z • O 1 52 O 53 = p I HIM= I BE Z La_ < J lac W Q 014=Elmmi� In M W U M 50 0-,) u'i w G V 0 <Ix LL i m oM I N o¢ F. W Q O + Q ds oz. p Qp a co 0 11 o V) cV O m Q =E�@ W_ 0 E N � M J v �Z P N in m z 0 Ln W Z (n ON,E > -mom O -j w julin PAN ME E 0 x • E1111111MINEEN Zo Z J N N fn E L1111401 ism Elm 11MMENENEWERNME A SECTION $ SCALE: 1" = 50' HORIL 1" = 5' VERT. 3' 3' 3� 32 TRACT BOUNDARY J MOSSY CREEK WAY SEE SHEET 6 H i z f2LO - --5' IYi.I `�' I 1 20' 1 z`,� i I �N JJ J F= i" J1 I I I I J 1 J 1_ �� o;- ( g I O i O 1 J i . J Z�� 24 0 25 M 26 ;0 27 1 o i 3 I o I o J of ass �M ;M �M0 28Mo 29Mg 30Mo 31 32s 33 3 IadC I� W CT I pj M I IA CD I - Of M OI i i/I W, I NWI 1 'n " M r7 `a'o - oI " o n W 10 CD lm + 1 M Ki NW] I 1 0; : I� —Sn +aF 40 1U%iiOMW II11I /(CanVoW N l(nzl (nz II v`-iI �I II �I I ( I �I 36 Wg, II vWJW"Q 4 I NNNLd pIN Z J.O �44432q1N I O; ( C; 'm d = - aiOnW��I g I "Z -•NiV+ 10 _ D .d:� . D 1:W 338 7. O " M I NW d IdQ OSI DI +M OD v> ~�IU' 0� d + _�) a0 Q�Z 'M CCii o' g ' t Co Qz Co 0 z + z NZ°+znz Nz z N�W I 1 I ILa` _ I 1 I 1 1 i U) cn 1 I I 1 N ..�■.I.�..lNNlNg..I ■.�■.� i i 1 1 1 rioN, T .. Flu .. ■ FORT SANDERS AVENUE (STA. 10+00.00 TO 21+99.99) SCALE: 1" = 50' HORIZONTAL co rn I I 1 a•- 1 H a J "' N Q INSTkLL J J I J Z • O 1 52 O 53 = p C'4 O '_C3 o' M o Z La_ < J lac W Q o In M W U M 50 0-,) u'i w G V 0 <Ix LL i m oM I N o¢ F. W Q O + Q ds oz. p Qp W co U Q CSN TRACT BOUNDARY J MOSSY CREEK WAY SEE SHEET 6 H i z f2LO - --5' IYi.I `�' I 1 20' 1 z`,� i I �N JJ J F= i" J1 I I I I J 1 J 1_ �� o;- ( g I O i O 1 J i . J Z�� 24 0 25 M 26 ;0 27 1 o i 3 I o I o J of ass �M ;M �M0 28Mo 29Mg 30Mo 31 32s 33 3 IadC I� W CT I pj M I IA CD I - Of M OI i i/I W, I NWI 1 'n " M r7 `a'o - oI " o n W 10 CD lm + 1 M Ki NW] I 1 0; : I� —Sn +aF 40 1U%iiOMW II11I /(CanVoW N l(nzl (nz II v`-iI �I II �I I ( I �I 36 Wg, II vWJW"Q 4 I NNNLd pIN Z J.O �44432q1N I O; ( C; 'm d = - aiOnW��I g I "Z -•NiV+ 10 _ D .d:� . D 1:W 338 7. O " M I NW d IdQ OSI DI +M OD v> ~�IU' 0� d + _�) a0 Q�Z 'M CCii o' g ' t Co Qz Co 0 z + z NZ°+znz Nz z N�W I 1 I ILa` _ I 1 I 1 1 i U) cn 1 I I 1 N ..�■.I.�..lNNlNg..I ■.�■.� i i 1 1 1 rioN, T .. Flu .. ■ FORT SANDERS AVENUE (STA. 10+00.00 TO 21+99.99) SCALE: 1" = 50' HORIZONTAL 360 IV VV 356 352 348 344 340 336 332 1 1 Tvu I/ _rvV13 I4+uu 15+UU 16+00 17+00 (STA. 10+00.00 TO 21+99.99) SCALE: 1" = 50' HORIZONTAL SCALE: 1" = 5' VERTICAL LEGEND: ABBREVIATIONS CL CENTERUNE SMH SEWER MANHOLE INV INVERT SCO SEWER CLEANOUT SD STORM DRAIN SDMH STORM DRAIN MANHOLE MH MANHOLE EXIST EXISTING CB CATCH BASIN ELEV ELEVATION JB JUNCTION BOX R/W RIGHT OF WAY SCP STREET CONSTRUCTION PLAN `NN OMM UNN 11110111111 ® PHASE BOUNDARY � ■ ■ � ■ ■ � ■ ■ � TRACT BOUNDARY g45 5 -T o.VA. TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION s CONSTRUCT SEWER PER CITY STANDARDS ® CONSTRUCT SEWER MANHOLE TYPE "A" PER C.O.B. STD. SVII-4. ® CONSTRUCT SEWER CLEANOUT PER C.O.B. STD. SW -6. CONSTRUCT STORM DRAIN PER CITY STANDARDS ® CONSTRUCT STORM DRAIN MANHOLE TYPE "A" PER C.O.B. STD. SW -4. nor CONSTRUCT CATCH BASIN TYPE "A" PER C.O.B. STD. D-14. NOTES : 1) ALL CATCH BASINS ARE TO BE TYPE "A" WITH 3.5' OPENINGS PER C.O.B. STD. D-14. 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS UNLESS OTHERWISE NOTED. SECTION DESIGNATION: SECTION LETTER 2 SHEET TMIERE SECTION IS SHOYMJ 18+00 CONSTRUCTION NOTES: Ot CONSTRUCT PIPE SADDLE PER C.O.B. STD. DET. D-9. O2 ENCASE SEWER UNE IN HOT -DIPPED, BITUMINOUS -COATED CLASS 150 CAST IRON PIPE WITH APPROVED MECHANICAL OR FLANGED JOINTS. ENCASEMENT SHALL PROVIDE A MINIMUM 4' HORIZONTAL CLEARANCE FROM THE WATER UNE (EACH SIDE) PER CITY OF BAKERSFIELD STANDARDS AND SPECIFICATIONS FOR DOMESTIC WATER SYSTEMS SECTION 4.9.3. O3 ENCASE SEWER UNE IN HOT -DIPPED, BITUMINOUS -COATED CLASS 150 CAST IRON PIPE WITH APPROVED MECHANICAL OR FLANGED JOINTS. ENCASEMENT SHALL PROVIDE A MINIMUM 10' HORIZONTAL CLEARANCE FROM THE WATER LINE (EACH SIDE) PER CITY OF BAKERSFIELD STANDARDS AND SPECIFICATIONS FOR DOMESTIC WATER SYSTEMS SECTION 4.9.2. 19+00 20+00 21+00 SCALE: 1 "=50' 25 0 50 100 50 12.5 22+00 356 352 348 344 340 336 332 328 324 Know what's below. 0111 before you dig. CITY RECORDS NO: co rn Z M0 (o F CD a J "' N Q INSTkLL 330.00 LF OF 24" RCP O 0.45% U =tea z � ' 0c* O * i < mom= p m0Z Z La_ < J lac W Q o z W U M Q 11- ;_c a 00 G V 0 <Ix LL 3:: o¢ F. W _j W co o V) cV O m Q m � � i4 N � M J v �Z P N in m z 0 Ln W Z (n > O -j w 0 x • : Zo Z J N N fn ' »>=J N to -1 ZZZ Z C3 >.; og T�,aM -- Z ��� �� a 'o ~ a WWW "� PPROXI ATE FI (SHED ,6 Q . > RADE CENTERLINE 9 APPSO FINISH D in WWW (n W tai — — — — — — — — — — — — — — Z GRA E CE TERUN �` OM 9 — — — — — — — — — — .2 NVE T 8" SEWER. 1 1 1 • , • • , - . 1 S=0 _ -- - `- - N RT 8" SEWER 25% INVERT 8" EWE 4 INVER F-24 MAIN - U W N 3 W M 3 W Z W 0 O %I- O cD aJ a0 a0 c0 O GD �O O > W J J O c0 OU J ZZ_Z_ ZZ ., 0- �- O �O _ - J O. -- W Z L- q1tZ �p +M .- pp O i� O MM M+MMM MMM i� MM Q0N 6 MM �+ WJ H J J 3 Q W W _ d'U W • J ( WW cn WWW j WW " NMI 11 4nn-00 oF " WQJ • PVC R 0 (n W 2 360 IV VV 356 352 348 344 340 336 332 1 1 Tvu I/ _rvV13 I4+uu 15+UU 16+00 17+00 (STA. 10+00.00 TO 21+99.99) SCALE: 1" = 50' HORIZONTAL SCALE: 1" = 5' VERTICAL LEGEND: ABBREVIATIONS CL CENTERUNE SMH SEWER MANHOLE INV INVERT SCO SEWER CLEANOUT SD STORM DRAIN SDMH STORM DRAIN MANHOLE MH MANHOLE EXIST EXISTING CB CATCH BASIN ELEV ELEVATION JB JUNCTION BOX R/W RIGHT OF WAY SCP STREET CONSTRUCTION PLAN `NN OMM UNN 11110111111 ® PHASE BOUNDARY � ■ ■ � ■ ■ � ■ ■ � TRACT BOUNDARY g45 5 -T o.VA. TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION s CONSTRUCT SEWER PER CITY STANDARDS ® CONSTRUCT SEWER MANHOLE TYPE "A" PER C.O.B. STD. SVII-4. ® CONSTRUCT SEWER CLEANOUT PER C.O.B. STD. SW -6. CONSTRUCT STORM DRAIN PER CITY STANDARDS ® CONSTRUCT STORM DRAIN MANHOLE TYPE "A" PER C.O.B. STD. SW -4. nor CONSTRUCT CATCH BASIN TYPE "A" PER C.O.B. STD. D-14. NOTES : 1) ALL CATCH BASINS ARE TO BE TYPE "A" WITH 3.5' OPENINGS PER C.O.B. STD. D-14. 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS UNLESS OTHERWISE NOTED. SECTION DESIGNATION: SECTION LETTER 2 SHEET TMIERE SECTION IS SHOYMJ 18+00 CONSTRUCTION NOTES: Ot CONSTRUCT PIPE SADDLE PER C.O.B. STD. DET. D-9. O2 ENCASE SEWER UNE IN HOT -DIPPED, BITUMINOUS -COATED CLASS 150 CAST IRON PIPE WITH APPROVED MECHANICAL OR FLANGED JOINTS. ENCASEMENT SHALL PROVIDE A MINIMUM 4' HORIZONTAL CLEARANCE FROM THE WATER UNE (EACH SIDE) PER CITY OF BAKERSFIELD STANDARDS AND SPECIFICATIONS FOR DOMESTIC WATER SYSTEMS SECTION 4.9.3. O3 ENCASE SEWER UNE IN HOT -DIPPED, BITUMINOUS -COATED CLASS 150 CAST IRON PIPE WITH APPROVED MECHANICAL OR FLANGED JOINTS. ENCASEMENT SHALL PROVIDE A MINIMUM 10' HORIZONTAL CLEARANCE FROM THE WATER LINE (EACH SIDE) PER CITY OF BAKERSFIELD STANDARDS AND SPECIFICATIONS FOR DOMESTIC WATER SYSTEMS SECTION 4.9.2. 19+00 20+00 21+00 SCALE: 1 "=50' 25 0 50 100 50 12.5 22+00 356 352 348 344 340 336 332 328 324 Know what's below. 0111 before you dig. CITY RECORDS NO: W 00 co rn Z M0 (o F CD a J "' N Q JW ZZ M n U =tea z � ' 0c* O * i < mom= p m0Z Z La_ < J lac W Q o z W U M Q 11- ;_c a 00 G V 0 <Ix LL 3:: o¢ F. W _j W co o V) cV O m Q m � � N � M J v �Z P in m z 0 Ln > w 0 W 00 co Z J a J "' n W JW ZZ GO < < —LU Q> =tea z � ' 0c* < mom= p m0Z lac W Q F.ac co � z Q 11- ;_c a G V 0 <Ix LL o¢ F. W W 8 =c W 00 362 358 354 350 346 342 362 358 354 350 346 NONE CENTERUNE � N LO ORM 13 W I Z 11011 ZJ 1 0 MW 1 _ ( m I8 Z� Q N ELEV 'o JB JUNCTION BOX R/W + .- MEIN Ln i 5 305.811 LF OF 1fr RCP 410.11% z o a20' � 20' v~i 53 LF OF 30' 30' W W 1 r` Erin, �* 12-0. lam 1 SM NEIMIN MENE NELION EEN.E au MENE A SECTION g SCALE: 1" = 50' HORIZ. 1" = 5' VERT. 364 12+00 13+00 360 Li 356 352 348 344 364 356 352 348 344 B SECTION g SCALE: 1" = 50' HORIZ. 1" = 5' VERT. 362 354 350 346 342 .J./ M O 110 11 M C3 -3 Z J W 1J M M a^<UJ Ni�N Z 4 I 1 11 q PANAMA LANE TRACT BOUNDARY S89`06 14+00 15+00 3 2 1 Lb z,d. CENTERUNE � N LO ORM 13 W I Z ' ZJ 1 0 ed� IO' 1 _ ( m I8 Z� Q N ELEV 'o JB JUNCTION BOX R/W + .- MEIN Ln i 5 305.811 LF OF 1fr RCP 410.11% z o a20' � 20' v~i 53 LF OF 30' 30' W W r` �* WIL9 lam 1 SM EEN.E au 364 12+00 13+00 360 Li 356 352 348 344 364 356 352 348 344 B SECTION g SCALE: 1" = 50' HORIZ. 1" = 5' VERT. 362 354 350 346 342 .J./ M O 110 11 M C3 -3 Z J W 1J M M a^<UJ Ni�N Z 4 I 1 11 q PANAMA LANE TRACT BOUNDARY S89`06 14+00 15+00 3 2 1 Lb z,d. CENTERUNE � N LO ORM 13 W I Z ' ZJ 1 0 ed� IO' 1 _ ( m I8 Z� Q N ELEV 'o JB JUNCTION BOX R/W + .- SCP Ln i 5 305.811 LF OF 1fr RCP 410.11% z o a20' � 20' v~i 53 LF OF 30' 30' JIA. 10*W.JL V.L- rANAMA LANG m STA. 15+46.48 C.L. FORT HENRY WAY i 1� 17+00 _S89-06 '480E 18+ ■1 r M � �iui � ► iii i FORT HENRY WAY SEE SHEET 6 PANAMA LANE (STA. 12+00.00 TO 16+98.65) SCALE: 1" = 50' HORIZONTAL 13+00 LEGEND: 14+00 CL CENTERUNE � N LO ORM m rn INVERT C3 _j N WJ SEWER CLEANOUT j W Z CjUl Ld �' STORM DRAIN W 48Q mJ � 4. W MANHOLE co to EXISTING t-Ivv� z C CATCH BASIN ELEV LOT `A4 13+00 LEGEND: 14+00 CL CENTERUNE SMH SEWER MANHOLE INV INVERT SCO SEWER CLEANOUT SD STORM DRAIN SDMH STORM MAIN MANHOLE MH MANHOLE EXIST EXISTING CB CATCH BASIN ELEV ELEVATION JB JUNCTION BOX R/W RIGHT OF WAY SCP STREET CONSTRUCTION PLAN INSTALL 305.811 LF OF 1fr RCP 410.11% z � INSTALL 156 53 LF OF 18' RCF A 0.11% W W r` o 0 INIINIII Z v /n W 3 = O� W a a zin OD OD 00 =Ma QJZjj ZQ Q z z''�iom _zz �d Z O jr to MMM cnig O + o a w -APPROXIMATE FINISHED W W ::j W W cn W GRADE ® CEN RUNE 00- U_ W W , I J I , . ......... . . ............. . . . ..... INVERT 18" DRI NVER 18" BRAIN 13+00 LEGEND: 14+00 CL CENTERUNE SMH SEWER MANHOLE INV INVERT SCO SEWER CLEANOUT SD STORM DRAIN SDMH STORM MAIN MANHOLE MH MANHOLE EXIST EXISTING CB CATCH BASIN ELEV ELEVATION JB JUNCTION BOX R/W RIGHT OF WAY SCP STREET CONSTRUCTION PLAN > ® PHASE BOUNDARY TRACT BOUNDARY 348 TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION s CONSTRUCT SEWER PER CITY STANDARDS ® CONSTRUCT SEWER MANHOLE TYPE me PER C.O.B. STD. SW -4. 0 CONSTRUCT SEWER CLEANOUT PER C.O.B. STD. SW -6. 15+00 16+00 (STA. 12+00.00 TO 16+98.65) SCALE: 1" = 50' HORIZONTAL SCALE: 1" = 5' VERTICAL CONSTRUCT STORM DRAIN PER CITY STANDARDS ® CONSTRUCT STORM DRAIN MANHOLE TYPE me PER C.O.B. STD. SW -4. utr CONSTRUCT CATCH BASIN TYPE me PER C.O.B. STD. D-14. NOTES : 1) ALL CATCH BASINS ARE TO BE TYPE "A" WITH 3.5' OPENINGS PER C.O.B. STD. D-14. 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS UNLESS OTHERWISE NOTED. SECTION DESIGNATION: SECTION LE TIER 42 SHEET WHERE SECTION IS SHOWN 17+00 368 364 360 356 352 348 344 340 CONSTRUCTION NOTES: 0 CONSTRUCT PIPE SADDLE PER C.O.B. STD. DET. D-9. 0 ENCASE SEWER UNE IN HOT -DIPPED, BITUMINOUS -COATED CLASS 150 CAST IRON PIPE WITH APPROVED MECHANICAL OR FLANGED JOINTS. ENCASEMENT SHALL PROVIDE A MINIMUM 4' HORIZONTAL CLEARANCE FROM THE WATER UNE (EACH SIDE) PER CITY OF BAKERSFIELD STANDARDS AND SPECIFICATIONS FOR DOMESTIC WATER SYSTEMS SECTION 4.9.3. 0 ENCASE SEWER UNE IN HOT -DIPPED, BITUMINOUS -COATED CLASS 150 CAST IRON PIPE WITH APPROVED MECHANICAL OR FLANGED JOINTS. ENCASEMENT SHALL PROVIDE A MINIMUM 10' HORIZONTAL CLEARANCE FROM TIME WATER LINE (EACH SIDE) PER CITY OF BAKERSFIELD STANDARDS AND SPECIFICATIONS FOR DOMESTIC WATER SYSTEMS SECTION 4.9.2. 50 LINE TABLE LINE # SIZE LENGTH BEARING L1 18" 8.66' NOO'53'12'E l2 18" 10.45' NDO'53'12"E SCA(E: 1 "-50' 25 0 50 12.5 100 Know what's below. 0111 before you dig. PH i.d T CITY RECORDS NO: O H � OC Q d 0 Of O Z Q J W U 00 _j OL�� N of W m Q a Z N IL W J r _au n ZW `<a> aC = `do Z a V) <m�JX �w oc o .� a m0Z > c� z � o v J ¢ O W W r` INIINIII Z N IL W J r _au n ZW `<a> aC = `do Z a V) <m�JX �w oc o .� a m0Z > c� z � o v J ¢ O W W r`