Loading...
HomeMy WebLinkAbout1.8-6410 Ph 1A U C 0 0 --- CONFLICTS- -- �!E SIE CIRCLED LOT NUMBERS INDICATE THE FOLLOWING. STORM DRAIN CONFLICT WITH ELECTRIC SERVICE AT LOT LINE: N/A ATTER SERVICE CONFLICT WITH ELECTRIC SERVICE AT LOT LINE: WATER SERVICE CONFLICT WITH ELECTRIC EQUIPMENT AT LOT LINE: 1,2,3,4,15,16,32,33,49,50 The conflicts noted below have been communicated to the Applicant or their Agent on ___712_3114_—_ (date). The Applicant is responsible to make modifications to the proposed facilities noted in conflict to establish the required proper clearance from PG&E's proposed facilities as stipulated in PG&E's standards. ---WORK AGENT RESPONSIBILITIES --- PG&E TO INSTALL ELEC. DISTRIBUTION FACILITIES APPLICANT TO INSTALL DIST. CONDUIT & SUBSTRUCTURES PG&E TO INSTALL ELEC SERVICE FACILITIES APPLICANT TO INSTALL SERVICE CONDUITS & SUBSTRUCTURES FOR QUESTIONS REGARDING THIS JOB: EST: MELISSA VARGAS (559) 347-502 ADE: LINDA PRIAULX (559) 347-5040 SUP: KEN HENDRICKS OFFICE: (559) 347-5023 CELL: (559) 970-0283 REP: WARREN ALBERT OFFICE: (661) 398-3907 CELL: (661) 369-5593 PROJECT CONDITIONS STAMP Type(s) of Work: ® New Business ❑ PG&E Maintenance & Construction Project Conditions: X❑ NONE APPARENT (if project design changes, contact ADE) or ❑ CONDITIONS APPLY: ❑ PERMITS ❑ TAILBOARD ❑ OTHER (Provide additional information on line below) BY. MELISSA VARGAS, MCMQ, 7/2014 SIGNATURE, NAME, [CORPORATE ID], DATE Underground Service Alert ;n3 Call: TOLL FREE 811 �. • WORKING DAYS BEFORE YOU DIG 3 D TYPICAL INTERIOR STREET PATTERN 5 9 7 TYPICAL EXTERIOR STREET PATTERN 9 9 1 10 NOTES: 04-30-07 N REFER TO ELECTRIC & GAS SERVICE REQUIREMENTS (GREEN BOOK) UJI OR SEPARATE PG&E STANDARD DRAWINGS. CONTACT YOUR PG&E REPRESENTATIVE FOR COPIES, OR ACCESS www.pge.com/greenbook CD CONDUIT, TRENCHING, AND BACKFILL: o � 1) ALL DIMENSIONS AND LOCATIONS ARE ESTIMATED, APPROXIMATE � M d - AND MAY BE SUPERSEDED BY A JOINT TRENCH DRAWING. REFER TO o THE JOINT TRENCH COMPOSITE DRAWING FOR EXACT TRENCH ` o LOCATION m •• 2) MAINTAIN MAXIMUM PRACTICABLE HORIZONTAL CLEARANCE BETWEEN 66 o .s = PG&E FACILITIES AND "WET" UTILITIES (WATER, SEWER, STORM DRAIN, " `r' o "' 0 - ETC.). THE MIN. ALLOWABLE SEPARATION BETWEEN PG&E FACILITIES z a AND ANY PARALLEL "WET" UTILITY IS 3/FT. WITH A PRESENCE OF � 12, � 11/17T. OF UNDISTURBED EARTH OR THE INSTALLATION OF A SUITABLE M BARRIER. THIS MEASUREMENT IS BETWEEN THE OUTER EDGE OF THE O Cn PG&E FACILITY AND THE OUTER EDGE OF THE PARALLEL "WET" W o Cl FACILITY. IF 3/17T. CANNOT BE MAINTAINED, A FORMAL VARIANCE MUS W BE OBTAINED FROM PG&E WORK WITH THE PG&E INSPECTORF— (REFERENCE PG&E UO STANDARD S5453). �' J 3) BOX, PAD, AND CONDUIT SIZES AND LOCATIONS SHALL CONFORM A'' LIJ TO THE PG&E ELECTRIC CONSTRUCTION DRAWING. Q N z 4) PROVIDE LONG CONDUIT SWEEPS WHERE INDICATED. Cs Q RECOMMENDED SWEEP RADIUS (10' OF RADIUS PER INCH OF M cn CONDUIT DIAMETER) EXAMPLE: 4" CONDUIT = 40' RADIUS w PQ " d 5) DO NOT EXCEED 300 DEGREES OF BENDS IN CONDUIT RUNS. 94 w SECONDARY CONDUIT RUNS LESS THAN 200 IN LENGTH ALLOW 315 w W — DEGREES (INCLUDING FEED LOCATION). 10-1 co 6) MANUFACTURED BENDS OR APPLICATION OF HEAT SHALL NOT BE :2f: USED TO OBTAIN LONG CONDUIT SWEEPS. W 7) ALL CONDUITS SHALL BE PROVEN AND A POLYESTER PULLING TAPE INSTALLED. 8) MANUFACTURED BENDS ARE NOT TO BE CUT, SHORTENED, OR ALTERED IN ANY WAY. UJI oa 9) IDENTIFY ENDS OF BURIED CONDUIT WITH AN ELECTRONIC MARKER AND A VERTICAL CONDUIT SCRAP INSTALLED FROM RIGID CAP TO c3e GROUND LEVEL. 10) CONDUITS ENTERING PRIMARY BOXES SHALL BE AT A RIGHT ANGLE TO THE WINDOW OR WALL. 11) STUB CONDUITS AT RISER POLES IN QUADRANTS AS SHOWN. AT > L "I IDENTIFIED POLE LOCATIONS, THE TRENCHING AGENT IS TO EXCAVATE w Q N U5 � 0 TO TRENCH DEPTH AND INSTALL A 30 DIAMETER CARDBOARD TUBE. THE RISER CONDUIT BEND IS TO BE PLACED OUTSIDE AND m ADJACENT TO THE TUBE AT THE POLE QUADRANT INDICATED. > BACKFILL AROUND AND INSIDE TUBE WITH CLEAN NATIVE FILL. �12) LS2-STREET LIGHT CONDUIT GOING TO PG&E BOXES OR_._..___, PEDESTALS NOT DESIGNATED AS P.O.S. (INCLUDING TRANSFORMERS) N WILL NOT BE ACCEPTED OR CONNECTED. x 13) ONLY ONE LS2 STREET LIGHT (P.O.S.) CONNECTION PER BOX OR PEDESTAL. o LAND RIGHTS AND EASMENTS: 14) APPLICANT TO PROVIDE ADEQUATE P.U.E'S AND/OR ROW'S FOR o PG&E FACILITIES. ANY ADDITIONAL REQUIRED RIGHTS OF WAY ARE TO o BE SURVEYED AND DOCUMENTED BY PG&E AT THE APPLICANT'S EXPENSE. SAFETY AND WORKMANSHIP: 15) NOTIFY USA (811) 48 HOURS PRIOR TO DIGGING FOR UNDERGROUND LOCATING. Z 16) 48 HOUR NOTICE REQUIRED FOR UNDERGROUND INSPECTION. zo 0 17) MATERIALS AND WORKMANSHIP SHALL BE FIRST QUALITY IN a EVERY RESPECT, PLUMB AND TRUE, AND ACCORDING TO THE — SPECIFIC REQUIREMENTS OF THE DRAWINGS AND THE ABOVE o '' APPLICABLE NOTES AND SPECIFICATIONS. 18) THE APPLICANT IS TO VERIFY ALL PROPOSED INSTALLATIONS, CONDITIONS & SPECIFICATIONS PRIOR TO COMMENCING WITH ANY PORTION OF WORK. ANY DISCREPANCIES, DELETIONS OR INCONSISTENCIES ARE TO BE REPORTED TO THE PG&E REPRESENTATIVE IMMEDIATELY. THE APPLICANT SHALL COMPLY WITH ALL APPLICABLE SPECIFICATIONS. ANY VARIATIONS FROM PLANS OR W SPECIFICATIONS RELIEVES PG&E OF ALL RESPONSIBILITY FOR THE o SUBSTRUCTURE OR DESIGN. 0 z (AVG.) SQUARE FEET: 2,200 I 04 E, Q F— = V) w Q 1z LLJ Y Q 00 MAIN SIZE: 200 MAX AC TONNAGE: 5 TYPICAL SERVICE SETBACK LENGTH: 35'/49' VICINITY SKETCH Primary Voltage: 2 1 KV Plot Map: 3027356 Circuit: STOCKDALE 2109 Voltage Class: 1 Insulation Dist.: B Corrosion Dist.: NON Estimator. MELISSA VARGAS PHONE: 559-347-5027 PAGER: THESE DRAWINGS ARE BASED ON DEVELOPER PLANS DATED: * 6 5 4 3 2 1 INCH 0 x ca z C-7 0 w si luo 1 A, 14 3 M, 5 7 18 MATCHLINE A cav fa m FUTURE TX FUTURE TX I 1 a ON 571994-00 ON 57094-C4 a I It - 235'/0' ADDED TO GABBRO COURT 430' EXISTING 1-2' CL TIE-IN ' a FUTURE ! PARK. SITE 4 , o FUTURE a$ 15 16 17 18 19 20 21 22 s35BK �� j low PULL BOX PULL BOX SEE DETAIL A I Is s 0 I I J95694 { Ig CD 1 51. I 50 49 48 47 I 46 / T53593 / 0y / IOOWA A$ I / I� T27458 VD: 5.89V 120/24OV, 10 o �s ( 1OOkVA Ad6 / VF: 6.OQV° CDESD: 95kVA m V @ v o ' 120/240V, 1 I 13 FUTURE MERS CUST , I/ p5 ` ESD: 88kVA O12 S Q AO / 12 CUSTOMERS `? / p PULL BOX 516-8711-6-4523 516-8771-6-4523 sor/ IN 5 165/179' N 8T/t0i' 13'/87' ,,� 165'/179' PULL 78'lg2' 88`/102' 78' 92' 140/154' St si St St s1 si S2 N S2 S2 32 s2 S2 N' 525'/562' - _ `� st St SZ S2---�N�— s2 / s2 N S1 51- sA / P1 Pi f 1 P1 P1 P1 Pt Pt Pi Pi Pt Pt Pt -- Pt Pi Pt P1 Pi LPI `�Pt Pt Pt Pt P1 Pt Pi Pt Pt t Q�''� "� P1 _.Z &t 85'/0' D2 363'/377' 02 D2—D2—D2—M-02—CD2 D2 D2 D2 D2 D2--D2—D2 D2 D2 / 348'/385' 462/476' 1 �v' 4� /a, na I �r6358N / D2 02-02 OZ D2—D2-02—D2 ^— D2 D2 I, OZ D2 D2-- D2 02 77WIOP D2�— DZ--rD2 / PULL � PULL I `—�/ .. \ 635BM „ 1� f �� •-.. i / 635 ROLLING ROCK AVE, �\ ROLLING ROCK AVE1041 VD. 6.13v C, BH d \ { rs) VF 6.09V 85' 99' 85' 99' 85'/99' 85'/99'''85 99' 85' j99' a j / / 85/99 � 85'/99` o. VD: 5.82V 13 12 I 11 10 9 I VF: 5 24V 8 26 VD: 3.58V 27 I 28 29 I 30 0 d o. I j VF:3.86V I 44 I , ( I ( z ( VD. 5.92V .. _-.. .._ - _ _ i j 0 a ' VP _ 5.85V.._._ LLJz I j Jr,__ 0 ( 10 ( � + � � _ a � � I ` 1 �2E I� I I PULL BOX I PULL BOX 1= a ( I 1 ( C 43 I ¢ o ( I I E! I x Q d d 14 I 15 16 ( 17 ! 18 19 35 34 33 ( 32 31 T64760 w 8 40851 11 O N10 Nil IOOkVA AO Y a)120 24OVVA A 10 635BG 120/24OV, 10 ,o ( ¢ , / , 1 ESD: 88kVA ESD: 104kVA 1 I 12 CUSTOMERS Qp I/ c Q �- SV / 14 CUSTOMERS 516-8710-6-4492 r ' — 4A 116 /130 �+cm 516-8780-6-4493 78' 92' , \ 4 a a 78792' 79792' 7e/92' 82'/96' Nr-' / 78 92 291 305 III / INI 78/92 1$0'/194 �(_ 5 tNt� Si Si WI NI '�� 31 �L S1 S1 S2 S2 LN�' S� $� SZ--�/rSl Qp — P1 �R1L Pt Pt S2—'�N-� St St S1 S1 \ Q N Pt Pt Pt S2 P1 S2 Pi �S2 11 S2 P1 C2L 42 I ''}" •- F 369 383 > 286/300' � / � "`�• 63580 °° AQUASTONE .CT 635BR ,Q 6356E SMOKY ROCK CT INI / , { 88'/102' 88'/102' 88'fia2' Uf i 88/102 I 88 jt 02 ( t05/tt9 r , ! ( tt5'/t29' I 1097123' f � I B � $ TAFT HWY IV 25 VD: 3.84v I 24 I 23 i W. 4.5-N I ( I I I 1 22 I I 21 I �:6.YN 20 / , VD: 6.04Y ' 144' �c 36 VD: 5.95V I 3? I 38 i 39 I 40 VF: 5.83Y I VF 130' 6.63Y / 100AMAIN VF 5.75V ' ESD: 5kVA 1 VD: 5.72V I/ W. 7.78V t00W OOW 30' C635BE PG0592-1 W V > ' o TAFT HWY 55' �' 3-2C 12.0 kV A 14372 _ 4QT cn ' 30' 10/10STUB CONDUIT FOR FUTURE 1-1/OA QAC BACK -TIE WHEN PANAMA 2101 240 7900 WILL BE UPGRADED 8740-44641 45' O 41 3-2C 1 9 LEGEND LOC. INSTALL EXIST. DESCRIPTION m P W PRIMARY CABLE: 3-1/OALEPR 25KV IN 3-2" CONDUIT 201 Pi WLAJ PRIMARY CABLE: 1-1/DAL EPR 25KV IN 1-2" CONDUIT V P5 t%7 PRIMARY CABLE: 3-600AL EPR 25KV IN 1-6" CONDUIT 202 S1 SECONDARY CABLE - 4/OAL TPX 600V IN 1-3" CONDUIT S2 LAJ SECONDARY CABLE - 350AL TPX 600V IN 1-4" CONDUITS 203 L_2J m 17' x 30' x 18' SECONDARY BOX L2EJ 2E 17' x 30' x 26' SECONDARY BOX 204 svi SERVICE CABLE - 4/OAL TPX 600V IN 1-3" CONDUIT 205 SV ~ NON -RES CABLE - 1/OAL TPX 600V IN 1-3" CONDUIT N D2 VACANT CONDUIT (PRIMARY), 1-2" 206 D6 = VACANT CONDUIT (PRIMARY), 1-6" V W LS2A STREETLIGHT, 70W (UNLESS OTHERWISE NOTED) N C`� a- CUSTOMER OWNED STREETLIGHT CABLE & CONDUIT d- PCS LS2A STREETLIGHT POiNT OF SERVICE INSTALL EXiST. FUTURE DESCRIPTION M ® PM TRANSFORMER, DF -LB, W/BOX PAD oo o � 5� Q5 3' x 5' x 3'6" PRIMARY ENCLOSURE � 6� ® 4' x 6'6" x 5' PRIMARY ENCLOSURE L_J m 4'6" x 8'6" x 6' PRIMARY ENCLOSURE L ® PM19 PADMOUNT INTERRUPTER t= O O F= 2 SOLELY OWNED POLE C) • Z RISER (n 0- X CUTOUT/DISCONNECT - SIZE AS SHOWN H E� AIR SWITCH Z CAPACITOR DENOTES TYPICAL SHORT SIDE SERVICE 25'/39' L TiHN E ODENOTES TIE-IN FACILITIES WITHIN DRAWING. o FIRE HYDRANT O i PROPOSED STORM DRAIN INLET XX CIRCLED LOT #'S INDICATE POSSIBLE CONFLICT ,fes INSTALL EXISTING DESCRIPTION 3 PHASE PRIMARY CABLE/CONDUCTOR - SIZE AS SHOWN 1 PHASE PRIMARY CABLE/CONDUCTOR - SIZE AS SHOWN -- -- -- -- VACANT CONDUIT (PRIMARY) - SIZE AS SHOWN 3 PHASE PRIMARY CONDUCTOR W/ CN Q � o cis s=2 m 0 W d— WLAJ Z V t%7 W LLJ H �G LAJ 3 = Q L LJ ::3LLJ S N Y ~ N Z = L LJ V W Q N C`� a- Ch d- Lu M -;t- oo o W C\ LA_ L (5 t= O m .� F= 2 C) V Z 0 (n 0- E� Z L E . o W O Lo U W r, ,fes FE Li V M ^ ' to Q wwwLo W ai w z Ot CL W EM Q � o cis s=2 m 0 W d— WLAJ Z V t%7 LLJ H �G LAJ 3 = Q =E ::3LLJ LLJ N Y ~ CL - Z = L LJ V W Q N C`� a- Ch m i 7 � o Q W LLJ H �G = Q N m LLJ N Y Z v z Q 6 5 4 3 2 1 INCH 0 co QQ 00 0 /, (�- - 6 � /0 PA -,l E 110 13 n■ Ci 1 5 7 w 2 8 BABG@°GE.COM 3 49 50 51 52 53 M 54 CRWR@°GE.COM 14 RUTURE TX ON 57094 -Cd 15 16 6 5 4 FUTURE TX ON 57094-C4 GABBRO COURT FUTURE T68@2-2 17 18 19 I 55 3 20 4 56 57 I 1 Uj (W� w 2 cn a I � I INSTALL 106' OF 2" GAS MAIN 1 I 1 I 21 22 I I I { I I N w L 6 5 7 w z Q 8 BABG@°GE.COM c� co 9 NAH29PGE.COM w VICINITY SKETCH M Q CRWR@°GE.COM WORK SUMMARY Uj L BETTERMENT HOSKING TIE-IN N EXCAVA7F 55(5114' U BELLHOLE FOR GAS z TIE IM. MAKE TIE WTH 3 4" ELE07ROFUSYOM COUPLING. 6 NAMEE 7 � z Q 8 BABG@°GE.COM 2. NANCY DONNELL Y -GAS ADE 9 NAH29PGE.COM w VICINITY SKETCH M Q CRWR@°GE.COM WORK SUMMARY Uj L HOSKING AVENUE N (LaZ TRENCH -STREET AREA: (L<z U m z ac 3 ' EXCAVATE 1 TRENCH /BORE / 000 0 Iii PIPE WRAP REMOVAL N 0 C0 � BACKFILL PAVE co o o TRENCH -PVT PROPERTY: C/1)m -Far work on pre -1972 pipe, assume the wrap o to tY � EXCAVATE / TRENCH / BACKFILL 000, L: GAS PIPE + GAS MATPROVIDE contains >1% asbestos unfit the wrap can be tested. a � O z -Obtain samples of the wrap, and have samples ( Q o +INSTALL �0O cl- tested for asbestos in accordance with RP 4711. McKEE ROAD R'+ PERMIT -ENCROACHMENT: -Test results are to be included with as-builts. w 0 APPLY +SECURE 000 �E__4 -Follow procedure in RP 4711 for removal of pipe wrap. E-4 w o v w 'Ik � LEGEND PIPE TYPE: x U W 6410-2 YEAR INSTALLED: 6410-1 PROPOSED GAS MAIN TAFT HIGHWAY ------- PROPOSED GAS SERVICE EXISTING OAS MAIN 5'x5' BELLHOLE I* PROPOSED 51 ZINC ANODE PROPOSED E. T.S, FRAME & 0 V PROPOSED EFV PROPOSED ELECTRONIC MARKER FUTURE PARK SITE z � � I 51 50 I 49 48 47 46 2 ! 3 I 4 I 5 ( 6 I 7 1 I I ! f I I I ��0-4 � I\ � 45 1 ROLLING ROCK E AVE 1 ROLLING ROCK AVE I 1 1 I I W 13 12 11 10 9 8 I 26 27 ( 28 29 I 30 >_4 j Zt ( 44 x { - W INSTALL 405' OF I INSTALL 1156' OF { 0 I �. { 2" GAS MAIN 12 ' GAS MAI Z p I I ! I � I 0 43 j 1 i 14 ( { { ( { I I 32 I 3115 16 17 18 19 35 34 33 L / I y ' SMOKY ` ROCK CT B AQUASTONE CT ,� \ I I I I I I I \ 25 ( 24 23 22 21 ! 20{ ' I 36 37 38 39 40 41 115.72' \ TIE-IN TAFT HWY H L.LHOLCA VAE � AS 7TE A /N. MAKE TIE WI7H TAFT HWY MUELLER BOTTOM TAP. Q �._._.-�....__.-...- T. T...,.a.w.,......-„�..... 25 ti 3-2C 12.0 kV CCn CCA (n RECAP 1. INSTALL 1038' OF 4" HP PL MAIN 2. INSTALL 2667' OF 2" HP PL MAIN 3. INSTALL 1184' OF I" PLASTIC SVC -STUBS 4. INSTALL 1275' OF 1-9 PLASTIC -SVC COMPLETIONS 5. TIE --IN (1) 4" MUELLER BOTTOM TAP 6. TIE-IN (1) 4" ELECTROFUSTION COUPLING 7. INSTALL (31) 2'x 1 " BRANCHING SADDLES 8. INSTALL (10) EFVS 9. INSTALL (3) 51 ZINC ANODES 10. INSTALL (4) ETS'S IN FRAME & COVER 10 Q NOTIFIED U.S.A. C a DATE: TICKET # BY: 1 NOTES 1) Developer to do all trenching, shading, and backfilling. 2) Refer to each party's installation instructions for more precise description of substructures and other requirements. 3) Gas and electric facilities will require sand shading if native soil is not rock free. PG&E will inspect backfill material. 4) Ground to be within .2 ft of finish grade prior to trenching. 5) Gas and electric facilities require at least 3' of separation (undisturbed soil) from parallel runs of water, sewer or storm drain. 6) Pre -construction meeting required at least 2 weeks prior to start of installation. 7) Call USA at least 48 hours prior to any trenching. 8) Contact PG&E representative WARREN ALBERT prior to making any changes to this drawing. 9) Developer shall contact all involved parties prior to making any changes to this drawing. 10) Developer is responsible for obtaining all encroachment permits. 11) PG&E to install gas main and services. PG&E to do gas tie-ins. 12) PG&E to install electric cable and transformers and electric service cable. NOTES: APPLICANT TRENCH 1. CALL "USA" 2 WORKING DAYS BEFORE EXCAVATING. UNDERGROUND SERVICE ALERT 1-800-227-2600 2. SPECIFIC CONDITIONS REQUIRED BY PG&E FOR JOINT TRENCH WORK ARE OUTLINED IN PG&E'S UTILITY OPERATIONS STANDARD S5453. 3. BACKFILL MATERIAL REQUIREMENTS ARE DETAILED IN U.O. STANDARD S5453, EXHIBIT B. 4. PG&E INSPECTOR TO APPROVE ALL EXCAVATIONS AND TRENCHES (LOCATION AND BACKFILL MATERIAL) PRIOR TO BACKFILLING. 5. TRENCHING AGENT TO DISPOSE OF ALL SPOIL. 6. MINIMUM COVER FROM FINAL GRADE REQUIRED FOR ALL FACILITIES IN THE STREET AREA. 7. TRENCHING AGENT TO SECURE ALL PERMITS. 8. CONTRACTOR IS RESPONSIBLE FOR CROSSING EXISTING WATER, SEWER, AND STORM DRAIN LINES, EITHER UNDER OR OVER, AS REQUIRED TO MEET PG&E COVER AND CLEARANCE REQUIREMENTS. REFER TO G.S. STANDARD 453-4. 9. THE CONTRACTOR WILL BE REQUIRED TO REMOVE AND REPLACE TRENCH SPOIL WITH 10079 SELECT BACKFILL AS REQUIRED BY PG&E SPECIFICATIONS, AND ANY LOCAL CITY, COUNTY, OR STATE REQUIREMENTS. 10. THE CONTRACTOR WILL BE REQUIRED TO PLACE TEMPORARY AND/OR PERMANENT PAVING IN ACCORDANCE WITH ANY LOCAL CITY, OR STATE REQUIREMENTS. 11. APPLICANT TO PROVIDE AND INSTALL ANY PROTECTION EQUIPMENT (BARRIER POSTS, FENCES, ETC...) REQUIRED BY PG&E. 12. THE APPLICANT/CONTRACTOR WILL ACCEPT RESPONSIBILITY OF MAINTENANCE OF THE TRENCH (E.G. COMPACTION, PAVING, ETC..) FOR A PERIOD OF TWO (2) YEARS OR AS SPECIFIED IN THE PERMIT, WHICHEVER IS LONGER. 13. TRENCHING AGENT TO MAINTAIN THE REQUIRED DISTANCE OF THREE (3) FEET BETWEEN GAS AND THE WET UTILITIES. WETUTILITIES MUST BE OFFSET BY 3' FROM ANY PG&E GAS MAIN OR SERV/CE. PG&E REP. PHONE: WARREN ALBERT 661-398-3907 ALL FIELD CHANGES REWIRE PR/OR APPROVAL FROM- NAMEE �cc) O � z Q W W BABG@°GE.COM 2. NANCY DONNELL Y -GAS ADE (559) 347-5046 NAH29PGE.COM w (559 347-5023 KEH49PGE. COM M Q CRWR@°GE.COM w Uj L � CD N 1-0 U m z ac 3 ' 0 Iii z N 0 C0 � w co o o C/1)m W BAKERSFIELD to tY � N w � z GAS PLAT 5127-01, D> ( Q o Cnn cl- GAS CPA 5127-_�, }- � U z z w 0 � � �E__4 L� INCH 0 w o v w 'Ik � ` x U W E- Q NOTIFIED U.S.A. C a DATE: TICKET # BY: 1 NOTES 1) Developer to do all trenching, shading, and backfilling. 2) Refer to each party's installation instructions for more precise description of substructures and other requirements. 3) Gas and electric facilities will require sand shading if native soil is not rock free. PG&E will inspect backfill material. 4) Ground to be within .2 ft of finish grade prior to trenching. 5) Gas and electric facilities require at least 3' of separation (undisturbed soil) from parallel runs of water, sewer or storm drain. 6) Pre -construction meeting required at least 2 weeks prior to start of installation. 7) Call USA at least 48 hours prior to any trenching. 8) Contact PG&E representative WARREN ALBERT prior to making any changes to this drawing. 9) Developer shall contact all involved parties prior to making any changes to this drawing. 10) Developer is responsible for obtaining all encroachment permits. 11) PG&E to install gas main and services. PG&E to do gas tie-ins. 12) PG&E to install electric cable and transformers and electric service cable. NOTES: APPLICANT TRENCH 1. CALL "USA" 2 WORKING DAYS BEFORE EXCAVATING. UNDERGROUND SERVICE ALERT 1-800-227-2600 2. SPECIFIC CONDITIONS REQUIRED BY PG&E FOR JOINT TRENCH WORK ARE OUTLINED IN PG&E'S UTILITY OPERATIONS STANDARD S5453. 3. BACKFILL MATERIAL REQUIREMENTS ARE DETAILED IN U.O. STANDARD S5453, EXHIBIT B. 4. PG&E INSPECTOR TO APPROVE ALL EXCAVATIONS AND TRENCHES (LOCATION AND BACKFILL MATERIAL) PRIOR TO BACKFILLING. 5. TRENCHING AGENT TO DISPOSE OF ALL SPOIL. 6. MINIMUM COVER FROM FINAL GRADE REQUIRED FOR ALL FACILITIES IN THE STREET AREA. 7. TRENCHING AGENT TO SECURE ALL PERMITS. 8. CONTRACTOR IS RESPONSIBLE FOR CROSSING EXISTING WATER, SEWER, AND STORM DRAIN LINES, EITHER UNDER OR OVER, AS REQUIRED TO MEET PG&E COVER AND CLEARANCE REQUIREMENTS. REFER TO G.S. STANDARD 453-4. 9. THE CONTRACTOR WILL BE REQUIRED TO REMOVE AND REPLACE TRENCH SPOIL WITH 10079 SELECT BACKFILL AS REQUIRED BY PG&E SPECIFICATIONS, AND ANY LOCAL CITY, COUNTY, OR STATE REQUIREMENTS. 10. THE CONTRACTOR WILL BE REQUIRED TO PLACE TEMPORARY AND/OR PERMANENT PAVING IN ACCORDANCE WITH ANY LOCAL CITY, OR STATE REQUIREMENTS. 11. APPLICANT TO PROVIDE AND INSTALL ANY PROTECTION EQUIPMENT (BARRIER POSTS, FENCES, ETC...) REQUIRED BY PG&E. 12. THE APPLICANT/CONTRACTOR WILL ACCEPT RESPONSIBILITY OF MAINTENANCE OF THE TRENCH (E.G. COMPACTION, PAVING, ETC..) FOR A PERIOD OF TWO (2) YEARS OR AS SPECIFIED IN THE PERMIT, WHICHEVER IS LONGER. 13. TRENCHING AGENT TO MAINTAIN THE REQUIRED DISTANCE OF THREE (3) FEET BETWEEN GAS AND THE WET UTILITIES. WETUTILITIES MUST BE OFFSET BY 3' FROM ANY PG&E GAS MAIN OR SERV/CE. PG&E REP. PHONE: WARREN ALBERT 661-398-3907 ALL FIELD CHANGES REWIRE PR/OR APPROVAL FROM- NAMEE �cc) O � z Q (559 347-5038 BABG@°GE.COM 2. NANCY DONNELL Y -GAS ADE (559) 347-5046 NAH29PGE.COM w (559 347-5023 KEH49PGE. COM M Q CRWR@°GE.COM w Uj L � � w 1-0 U m z ac 3 v z U Q NOTIFIED U.S.A. C a DATE: TICKET # BY: 1 NOTES 1) Developer to do all trenching, shading, and backfilling. 2) Refer to each party's installation instructions for more precise description of substructures and other requirements. 3) Gas and electric facilities will require sand shading if native soil is not rock free. PG&E will inspect backfill material. 4) Ground to be within .2 ft of finish grade prior to trenching. 5) Gas and electric facilities require at least 3' of separation (undisturbed soil) from parallel runs of water, sewer or storm drain. 6) Pre -construction meeting required at least 2 weeks prior to start of installation. 7) Call USA at least 48 hours prior to any trenching. 8) Contact PG&E representative WARREN ALBERT prior to making any changes to this drawing. 9) Developer shall contact all involved parties prior to making any changes to this drawing. 10) Developer is responsible for obtaining all encroachment permits. 11) PG&E to install gas main and services. PG&E to do gas tie-ins. 12) PG&E to install electric cable and transformers and electric service cable. NOTES: APPLICANT TRENCH 1. CALL "USA" 2 WORKING DAYS BEFORE EXCAVATING. UNDERGROUND SERVICE ALERT 1-800-227-2600 2. SPECIFIC CONDITIONS REQUIRED BY PG&E FOR JOINT TRENCH WORK ARE OUTLINED IN PG&E'S UTILITY OPERATIONS STANDARD S5453. 3. BACKFILL MATERIAL REQUIREMENTS ARE DETAILED IN U.O. STANDARD S5453, EXHIBIT B. 4. PG&E INSPECTOR TO APPROVE ALL EXCAVATIONS AND TRENCHES (LOCATION AND BACKFILL MATERIAL) PRIOR TO BACKFILLING. 5. TRENCHING AGENT TO DISPOSE OF ALL SPOIL. 6. MINIMUM COVER FROM FINAL GRADE REQUIRED FOR ALL FACILITIES IN THE STREET AREA. 7. TRENCHING AGENT TO SECURE ALL PERMITS. 8. CONTRACTOR IS RESPONSIBLE FOR CROSSING EXISTING WATER, SEWER, AND STORM DRAIN LINES, EITHER UNDER OR OVER, AS REQUIRED TO MEET PG&E COVER AND CLEARANCE REQUIREMENTS. REFER TO G.S. STANDARD 453-4. 9. THE CONTRACTOR WILL BE REQUIRED TO REMOVE AND REPLACE TRENCH SPOIL WITH 10079 SELECT BACKFILL AS REQUIRED BY PG&E SPECIFICATIONS, AND ANY LOCAL CITY, COUNTY, OR STATE REQUIREMENTS. 10. THE CONTRACTOR WILL BE REQUIRED TO PLACE TEMPORARY AND/OR PERMANENT PAVING IN ACCORDANCE WITH ANY LOCAL CITY, OR STATE REQUIREMENTS. 11. APPLICANT TO PROVIDE AND INSTALL ANY PROTECTION EQUIPMENT (BARRIER POSTS, FENCES, ETC...) REQUIRED BY PG&E. 12. THE APPLICANT/CONTRACTOR WILL ACCEPT RESPONSIBILITY OF MAINTENANCE OF THE TRENCH (E.G. COMPACTION, PAVING, ETC..) FOR A PERIOD OF TWO (2) YEARS OR AS SPECIFIED IN THE PERMIT, WHICHEVER IS LONGER. 13. TRENCHING AGENT TO MAINTAIN THE REQUIRED DISTANCE OF THREE (3) FEET BETWEEN GAS AND THE WET UTILITIES. WETUTILITIES MUST BE OFFSET BY 3' FROM ANY PG&E GAS MAIN OR SERV/CE. PG&E REP. PHONE: WARREN ALBERT 661-398-3907 ALL FIELD CHANGES REWIRE PR/OR APPROVAL FROM- NAMEE TELEPHONE EMAIL 1. BELINOA GURSKY -GAS EST. (559 347-5038 BABG@°GE.COM 2. NANCY DONNELL Y -GAS ADE (559) 347-5046 NAH29PGE.COM 3. KEN HENOR/CKS-SUPVSR (559 347-5023 KEH49PGE. COM 4. CHASE WHARTON-GAS ENGR (661) 398-5751 CRWR@°GE.COM 6 5 4 3 2 Y .J-! z � W C9 z o �- 0 Q d W Z z _ Uj i J m z ac 3 v cx � w C/1)m W Q to tY � N W a I( i - 1(9 W-1) QUI 1-- L.a_ J I ~ 46 LL_a Ul C/1)m w Q U z 0 1 INCH 0 I( i - 1(9 W-1) QUI IEI IC 111111011111 2 Underground Service Alert Call: TOLL FREE 811 TWO WORKING DAYS BEFORE YOU DIG NOTIFIED U.S.A. DATE: TICKET � BY: PROJECT CONDITIONS STAMP Type(s) of Work: QX New Business ❑ PG&E Maintenance & Construction Project Conditions: 0 NONE APPARENT (if project design changes, contact ADE) or CONDITIONS APPLY: PERMITS ❑ TAILBOARD ❑ OTHER (Provide additional information on line below) BY: SIGNATURE, NAME, [CORPORATE ID], DATE CONSTRUCTION NOTE: GAS PIPELINE UNDERGROUND WARNING TAPE TO BE INSTALLED ABOVE GAS PIPE IN ALL TRENCHES AS SHOWN IN DETAIL BELOW. CAUTION CAUTION GAS LINE BURIED BELOW GAS PIPELINE UNDERGROUND WARNING TAPE CODE #379947. YELLOW TAPE WITH BLACK LETTERING. FINISH GRADE MIN. 12" WARNING TAPE WARNING TAPE INSTALLATION ZONE GAS PIPELINE MIN. 12" TEST AT 100-110 PSI FOR MINIMUM OF 5 MIN. PRESURE DURATION INITIALS DATE OF TEST INITIALS DATE OF TEST SERVICE TRENCH MIN. COVER G 18" MIN. — 12" L 18" MIN. PLASTIC PIPE DATA SIZE MANUFACTURED DATE OF MANUFACTURE 4" 4" PLASTIC MAIN PLASTIC PIPE INSPECTION/DATA PIPE MANUFACTURER DATE MANUFACTURED STANDARD DIMENSIONAL RATIO TEST AT 100-110 PSI FOR MINIMUM OF 5 MIN. PRESURE DURATION INITIALS DATE OF TEST SERVICE TRENCH MIN. COVER G 18" MIN. — 12" L 18" MIN. 6" 12" 6" W� T PLASTIC PIPE DATA SIZE MANUFACTURED DATE OF MANUFACTURE 2„ 2" PLASTIC MAIN PLASTIC PIPE INSPECTION/DATA PIPE MANUFACTURER DATE MANUFACTURED STANDARD DIMENSIONAL RATIO 3 n t=CiL\»II<19:014I7:a 11039:0 a a' _ owC,I ETS INSTALLATION NOT TO SCALE BEHIND CURB /— ETS BOX (37-5) 5# ZINC ANODE CURB & GUTTER /— A/C LOCATING WIRE _ ` LOCATING WIRE (YELLOW) (YELLOW) PROPOSED 2" OR 4" HP PLASTIC E.T.S. MATERIALS (1) VALVE BOX LID, CONCRETE, ETS (SEE GSK; K-44) (1) VALVE BOX HEAD, CRISTY FIBRELYTE (SEE ('S&S K-44) (1) VALVE BOX EXTENSION, PLASTIC (SEE GS&� K-44) (1) ANODE, ZINC, 5 -POUND (SEE GS&S 0-13.1) CONSTRUCTION NOTE: CREW TO THUMP IN WIRES TO E.T.S. LDCATIONS. E.T.S. STATIONS TO BE INSTALLED BEHIND CURB AS SHOWN IN DETAIL. TIE —IN MAKE 4" PLASTIC TO 4" PL/ISTIC TSE WITH 4"ELECTROFUSION COUPLING PER G. S. &S. B-90.3 INSTALL 4" ELECTROFUSION PER G.S.&S. E3-90.3 (CODE 02-1637) '" T — 4" PLASTIC 1 4" PLASTIC NEW 4" PLASTIC MAIN aw EXISTING 4" PLASTIC MAIN 5 R/W 0 TYPICAL EXTERIOR STREET -PATTERN TYPICAL STUB INSTALLATION 60' STREET SECTION (NON—WATER SIDE) LOT LINE LOT LIN E 18" T GSTC STUB 10,0�1 12 I � I 1 1 GSTC STUB 1 10' L 18" — MAIN TRENCH 1 W Q R/W 4" STEEL TIE-IN TIE-IN/ETS INSTALLATION NO SCALE PLASTIC TO STEEL TRANSITION CURB & GUTTER A/C ETS BOX (G-5) 4 LINE STOPPER FITTING SOLID COPPER WIRE ZINC ANODE BOTTOM TAP (CODE 02-2742) P11 -- I �- ------ I SOLID COPPER WIRE I I — LOCATING WIRE PLASTIC TO STEEL -----� EXIST. 4n HP 5TL TRANSITION FITTING 90' STEEL ELBOW (CODE 02-9807) (CODE 02-2039} A „ NOTE: *BOND SOLID COPPER WIRES TO STEEL MAIN, SEE GS&S 0-10 *BRING ALL WIRES AND WIRE CONNECTIONS INTO ETS, DO NOT BOND WIRES, SEE GS&S 0-10 *INSTALL ETS BOX BEHIND BACK OF CURB, SEE GS&S K-40.1 *CONTACT CORROSION FOR FINAL INSPECTION, SEE GS&S 0-16 C G MINIMUM COVER AND CLEARANCES MINIMUM SEPARATION FROM to TYPICAL T C TYPICAL DISTRIBUTION TRENCH SERVICE TRENCH MIN. COVER G 18" MIN. — 12" L 18" MIN. 6" 12" 6" W� T (TELEPHONE) 12 - 1" 12» d 12„ 24„ C (CATV) t- � it a - 12" 12" 12" � S z 6 12 12 - 3 1 W W a 5 (NON PG&E) z Z 12" .N. - (PREFERRED) roi N (STREET LIGHT) Z Z 1 12" 1 1" 3" Z 30" T C SL M oo M T C M z �ti `° i � G � � N P 3" 3"V -\S IN S MIN SL 6" MIN. G a PRIMARY SECONDARY OR SERVICE MINIMUM COVER AND CLEARANCES MINIMUM SEPARATION FROM 5 LB. ZINC ANODES TO BE SPACED 1000' APART PER A-90.2 p.1 OF 3 ELECTROLYSIS TEST STATION CONNECTION TO MAIN PER GS&S 0-10 p. 1 of 5 3. PG&E shall install test leads on new facilities as follows: Type A: Distribution, on new pipe, at approximately 500' (1 --block) intervals, unless there is sufficient electrical access at existing test leads or services. INSTALL DIRECT BURIAL PLASTIC MAINS & SERVICES PER GAS _ STANDARDS A90—A91.2, A93—A93.1 & D21. INSTALL PLASTIC MAIN & SERVICE INSERT PER GAS STANDARDS A90.1—A90.3, A91.2—A93.1 & D21 WET UTILITIES MUST BE OFFSET BY 3' FROM ANY PG&E GAS MAIN OR SERVICE. ATTENTION FOREMAN PRIOR TO STARTING JOB, CONSULT AREA CORROSION MECHANIC FOR LOCATING WIRE INSTALLATION AND CATHODIC PRO— TECTION REQUIREMENTS m C..) to G T C S P SL MIN. COVER G (GAS) — 12" 12" 6" 12" 6" 30" T (TELEPHONE) 12 - 1" 12» 12» 12„ 24„ C (CATV) 12” 1” - 12" 12" 12" 24" S (SECONDARY) 6 12 12 - 3 1 30 P (PRIMARY) 12" 12" 12" 3" - 3" 30" SL (STREET LIGHT) 6" 12" 1 12" 1 1" 3" - 30" 5 LB. ZINC ANODES TO BE SPACED 1000' APART PER A-90.2 p.1 OF 3 ELECTROLYSIS TEST STATION CONNECTION TO MAIN PER GS&S 0-10 p. 1 of 5 3. PG&E shall install test leads on new facilities as follows: Type A: Distribution, on new pipe, at approximately 500' (1 --block) intervals, unless there is sufficient electrical access at existing test leads or services. INSTALL DIRECT BURIAL PLASTIC MAINS & SERVICES PER GAS _ STANDARDS A90—A91.2, A93—A93.1 & D21. INSTALL PLASTIC MAIN & SERVICE INSERT PER GAS STANDARDS A90.1—A90.3, A91.2—A93.1 & D21 WET UTILITIES MUST BE OFFSET BY 3' FROM ANY PG&E GAS MAIN OR SERVICE. ATTENTION FOREMAN PRIOR TO STARTING JOB, CONSULT AREA CORROSION MECHANIC FOR LOCATING WIRE INSTALLATION AND CATHODIC PRO— TECTION REQUIREMENTS m C..) to a Q a Z O N o in CD o co r` o >Z s w ton Q � � Z �► O 0 GC\2 °; U �' w tom-, Ld m Z Ld w V < R)z p I Q w ' W 1�: w oo = </� I I I I I I I' 1 6 5 4 3 2 1 INCH 0 /' or-- - � t1w Z� s � i� Q � W Z �► J 0 N.- m Z Y = V I I I I I I I' 1 6 5 4 3 2 1 INCH 0 /' or-- - � t1w s � i� o J 0 N.- < cn W a I I I I I I I' 1 6 5 4 3 2 1 INCH 0 /' or-- - � t1w