�!E SIE CIRCLED LOT NUMBERS INDICATE THE FOLLOWING.
STORM DRAIN CONFLICT WITH ELECTRIC SERVICE AT LOT LINE:
N/A
ATTER SERVICE CONFLICT WITH ELECTRIC SERVICE AT LOT LINE:
WATER SERVICE CONFLICT WITH ELECTRIC EQUIPMENT AT LOT LINE:
1,2,3,4,15,16,32,33,49,50
The conflicts noted below have been communicated to the
Applicant or their Agent on ___712_3114_—_ (date). The Applicant
is responsible to make modifications to the proposed facilities
noted in conflict to establish the required proper clearance from
PG&E's proposed facilities as stipulated in PG&E's standards.
---WORK AGENT RESPONSIBILITIES ---
PG&E TO INSTALL ELEC. DISTRIBUTION FACILITIES
APPLICANT TO INSTALL DIST. CONDUIT & SUBSTRUCTURES
PG&E TO INSTALL ELEC SERVICE FACILITIES
APPLICANT TO INSTALL SERVICE CONDUITS & SUBSTRUCTURES
FOR QUESTIONS REGARDING THIS JOB:
EST: MELISSA VARGAS (559) 347-502
ADE: LINDA PRIAULX (559) 347-5040
SUP: KEN HENDRICKS
OFFICE: (559) 347-5023
CELL: (559) 970-0283
REP: WARREN ALBERT
OFFICE: (661) 398-3907
CELL: (661) 369-5593
PROJECT CONDITIONS STAMP
Type(s) of Work:
® New Business
❑ PG&E Maintenance & Construction
Project Conditions:
X❑ NONE APPARENT (if project design changes, contact ADE)
or
❑ CONDITIONS APPLY:
❑ PERMITS ❑ TAILBOARD ❑ OTHER
(Provide additional information on line below)
BY. MELISSA VARGAS, MCMQ, 7/2014
SIGNATURE, NAME, [CORPORATE ID], DATE
Underground Service Alert
;n3
Call: TOLL FREE
811 �.
• WORKING DAYS BEFORE YOU DIG
3
D
TYPICAL INTERIOR STREET PATTERN
5
9
7
TYPICAL EXTERIOR STREET PATTERN
9
9 1 10
NOTES: 04-30-07 N
REFER TO ELECTRIC & GAS SERVICE REQUIREMENTS (GREEN BOOK) UJI
OR SEPARATE PG&E STANDARD DRAWINGS. CONTACT YOUR PG&E
REPRESENTATIVE FOR COPIES, OR ACCESS www.pge.com/greenbook
CD
CONDUIT, TRENCHING, AND BACKFILL: o �
1) ALL DIMENSIONS AND LOCATIONS ARE ESTIMATED, APPROXIMATE � M d -
AND MAY BE SUPERSEDED BY A JOINT TRENCH DRAWING. REFER TO o
THE JOINT TRENCH COMPOSITE DRAWING FOR EXACT TRENCH ` o
LOCATION
m ••
2) MAINTAIN MAXIMUM PRACTICABLE HORIZONTAL CLEARANCE BETWEEN 66 o .s =
PG&E FACILITIES AND "WET" UTILITIES (WATER, SEWER, STORM DRAIN, " `r' o "' 0 -
ETC.). THE MIN. ALLOWABLE SEPARATION BETWEEN PG&E FACILITIES z
a
AND ANY PARALLEL "WET" UTILITY IS 3/FT. WITH A PRESENCE OF � 12, �
11/17T. OF UNDISTURBED EARTH OR THE INSTALLATION OF A SUITABLE M
BARRIER. THIS MEASUREMENT IS BETWEEN THE OUTER EDGE OF THE O
Cn
PG&E FACILITY AND THE OUTER EDGE OF THE PARALLEL "WET" W o Cl
FACILITY. IF 3/17T. CANNOT BE MAINTAINED, A FORMAL VARIANCE MUS W
BE OBTAINED FROM PG&E WORK WITH THE PG&E INSPECTORF—
(REFERENCE PG&E UO STANDARD S5453). �' J
3) BOX, PAD, AND CONDUIT SIZES AND LOCATIONS SHALL CONFORM A'' LIJ
TO THE PG&E ELECTRIC CONSTRUCTION DRAWING. Q N z
4) PROVIDE LONG CONDUIT SWEEPS WHERE INDICATED. Cs Q
RECOMMENDED SWEEP RADIUS (10' OF RADIUS PER INCH OF M cn
CONDUIT DIAMETER) EXAMPLE: 4" CONDUIT = 40' RADIUS w PQ " d
5) DO NOT EXCEED 300 DEGREES OF BENDS IN CONDUIT RUNS. 94 w
SECONDARY CONDUIT RUNS LESS THAN 200 IN LENGTH ALLOW 315 w W —
DEGREES (INCLUDING FEED LOCATION). 10-1
co
6) MANUFACTURED BENDS OR APPLICATION OF HEAT SHALL NOT BE :2f:
USED TO OBTAIN LONG CONDUIT SWEEPS. W
7) ALL CONDUITS SHALL BE PROVEN AND A POLYESTER PULLING
TAPE INSTALLED.
8) MANUFACTURED BENDS ARE NOT TO BE CUT, SHORTENED, OR
ALTERED IN ANY WAY.
UJI
oa
9) IDENTIFY ENDS OF BURIED CONDUIT WITH AN ELECTRONIC MARKER
AND A VERTICAL CONDUIT SCRAP INSTALLED FROM RIGID CAP TO c3e
GROUND LEVEL.
10) CONDUITS ENTERING PRIMARY BOXES SHALL BE AT A RIGHT
ANGLE TO THE WINDOW OR WALL.
11) STUB CONDUITS AT RISER POLES IN QUADRANTS AS SHOWN. AT > L "I
IDENTIFIED POLE LOCATIONS, THE TRENCHING AGENT IS TO EXCAVATE w Q N U5 � 0
TO TRENCH DEPTH AND INSTALL A 30 DIAMETER CARDBOARD TUBE.
THE RISER CONDUIT BEND IS TO BE PLACED OUTSIDE AND m
ADJACENT TO THE TUBE AT THE POLE QUADRANT INDICATED. >
BACKFILL AROUND AND INSIDE TUBE WITH CLEAN NATIVE FILL.
�12) LS2-STREET LIGHT CONDUIT GOING TO PG&E BOXES OR_._..___,
PEDESTALS NOT DESIGNATED AS P.O.S. (INCLUDING TRANSFORMERS) N
WILL NOT BE ACCEPTED OR CONNECTED. x
13) ONLY ONE LS2 STREET LIGHT (P.O.S.) CONNECTION PER BOX OR
PEDESTAL. o
LAND RIGHTS AND EASMENTS:
14) APPLICANT TO PROVIDE ADEQUATE P.U.E'S AND/OR ROW'S FOR o
PG&E FACILITIES. ANY ADDITIONAL REQUIRED RIGHTS OF WAY ARE TO o
BE SURVEYED AND DOCUMENTED BY PG&E AT THE APPLICANT'S
EXPENSE.
SAFETY AND WORKMANSHIP:
15) NOTIFY USA (811) 48 HOURS PRIOR TO DIGGING FOR
UNDERGROUND LOCATING.
Z
16) 48 HOUR NOTICE REQUIRED FOR UNDERGROUND INSPECTION. zo 0
17) MATERIALS AND WORKMANSHIP SHALL BE FIRST QUALITY IN a
EVERY RESPECT, PLUMB AND TRUE, AND ACCORDING TO THE —
SPECIFIC REQUIREMENTS OF THE DRAWINGS AND THE ABOVE o ''
APPLICABLE NOTES AND SPECIFICATIONS.
18) THE APPLICANT IS TO VERIFY ALL PROPOSED INSTALLATIONS,
CONDITIONS & SPECIFICATIONS PRIOR TO COMMENCING WITH ANY
PORTION OF WORK. ANY DISCREPANCIES, DELETIONS OR
INCONSISTENCIES ARE TO BE REPORTED TO THE PG&E
REPRESENTATIVE IMMEDIATELY. THE APPLICANT SHALL COMPLY WITH
ALL APPLICABLE SPECIFICATIONS. ANY VARIATIONS FROM PLANS OR W
SPECIFICATIONS RELIEVES PG&E OF ALL RESPONSIBILITY FOR THE o
SUBSTRUCTURE OR DESIGN.
0
z
(AVG.) SQUARE FEET:
2,200
I
04
E,
Q
F—
=
V)
w
Q
1z
LLJ
Y
Q
00
MAIN SIZE:
200
MAX AC TONNAGE:
5
TYPICAL SERVICE SETBACK LENGTH:
35'/49'
VICINITY SKETCH
Primary Voltage: 2 1 KV
Plot Map: 3027356
Circuit: STOCKDALE 2109
Voltage Class: 1
Insulation Dist.: B
Corrosion Dist.: NON
Estimator. MELISSA VARGAS
PHONE: 559-347-5027
PAGER:
THESE DRAWINGS ARE BASED ON
DEVELOPER PLANS DATED: *
6 5 4 3 2 1 INCH 0
x
ca
z
C-7
0
w
si
luo
1
A,
14
3
M,
5
7
18 MATCHLINE A
cav fa m
FUTURE TX FUTURE TX I 1 a
ON 571994-00 ON 57094-C4 a I
It
- 235'/0' ADDED TO
GABBRO COURT 430' EXISTING 1-2' CL
TIE-IN '
a
FUTURE ! PARK. SITE
4 , o
FUTURE
a$
15 16 17 18 19 20 21 22 s35BK ��
j low PULL BOX
PULL BOX SEE DETAIL A I
Is s 0 I I
J95694
{ Ig
CD 1 51. I 50 49 48 47 I 46 /
T53593 / 0y /
IOOWA A$ I / I� T27458
VD: 5.89V 120/24OV, 10 o �s ( 1OOkVA Ad6 /
VF: 6.OQV° CDESD: 95kVA m V @ v o ' 120/240V, 1 I
13
FUTURE MERS CUST , I/ p5 ` ESD: 88kVA
O12 S Q AO / 12 CUSTOMERS `? / p
PULL BOX 516-8711-6-4523 516-8771-6-4523 sor/
IN 5 165/179' N 8T/t0i' 13'/87' ,,� 165'/179' PULL 78'lg2' 88`/102' 78' 92' 140/154'
St si St St s1 si S2 N S2 S2 32 s2 S2 N' 525'/562' - _ `� st St SZ S2---�N�— s2 / s2 N S1 51- sA /
P1 Pi f 1 P1 P1 P1 Pt Pt Pi Pi Pt Pt Pt -- Pt Pi Pt P1 Pi LPI `�Pt Pt Pt Pt P1 Pt Pi Pt Pt t Q�''� "� P1 _.Z &t
85'/0' D2 363'/377' 02 D2—D2—D2—M-02—CD2 D2 D2 D2 D2 D2--D2—D2 D2 D2 / 348'/385' 462/476' 1 �v' 4�
/a, na I �r6358N / D2 02-02 OZ D2—D2-02—D2 ^— D2 D2 I, OZ D2 D2-- D2 02 77WIOP D2�— DZ--rD2 / PULL � PULL
I `—�/ .. \ 635BM „ 1� f �� •-.. i / 635
ROLLING ROCK AVE, �\ ROLLING ROCK AVE1041
VD. 6.13v
C, BH
d \ {
rs) VF 6.09V
85' 99' 85' 99' 85'/99' 85'/99'''85 99' 85' j99' a
j / / 85/99 � 85'/99`
o.
VD: 5.82V
13 12 I 11 10 9 I VF: 5 24V 8 26 VD: 3.58V 27 I 28 29 I 30 0 d
o.
I j VF:3.86V I 44
I , ( I ( z ( VD. 5.92V
.. _-.. .._ - _ _ i j 0 a ' VP _ 5.85V.._._
LLJz I j Jr,__
0 ( 10 ( � + � � _ a � � I ` 1 �2E
I� I I
PULL BOX I PULL BOX
1= a ( I 1 ( C 43
I ¢ o ( I I E!
I x Q d
d 14 I 15 16 ( 17 ! 18 19 35 34 33 ( 32 31
T64760 w 8 40851
11 O N10 Nil
IOOkVA AO Y a)120 24OVVA A 10 635BG
120/24OV, 10 ,o ( ¢ , / ,
1 ESD: 88kVA ESD: 104kVA
1 I
12 CUSTOMERS Qp I/ c Q �- SV / 14 CUSTOMERS
516-8710-6-4492 r ' — 4A 116 /130 �+cm 516-8780-6-4493 78' 92' , \ 4
a a
78792' 79792' 7e/92' 82'/96' Nr-' / 78 92 291 305
III / INI 78/92 1$0'/194 �(_ 5
tNt� Si Si WI NI '�� 31 �L S1 S1 S2 S2 LN�' S� $� SZ--�/rSl Qp
— P1 �R1L Pt Pt S2—'�N-� St St S1 S1 \ Q N Pt Pt Pt S2 P1 S2 Pi �S2 11 S2 P1 C2L 42
I ''}" •- F
369 383 >
286/300' � / � "`�•
63580 °° AQUASTONE .CT 635BR ,Q 6356E SMOKY ROCK CT
INI
/ , { 88'/102' 88'/102' 88'fia2'
Uf i 88/102 I 88 jt 02 ( t05/tt9 r , ! ( tt5'/t29' I 1097123' f
� I
B �
$
TAFT HWY
IV
25 VD: 3.84v I 24 I 23 i
W. 4.5-N I ( I
I I 1
22
I I
21 I �:6.YN 20 / , VD: 6.04Y '
144' �c 36 VD: 5.95V I 3? I 38 i 39 I 40 VF: 5.83Y
I VF 130' 6.63Y / 100AMAIN VF 5.75V '
ESD: 5kVA
1 VD: 5.72V
I/ W. 7.78V
t00W OOW
30' C635BE
PG0592-1
W V
>
' o TAFT HWY
55' �' 3-2C 12.0 kV A
14372 _
4QT
cn
' 30'
10/10STUB CONDUIT FOR FUTURE
1-1/OA QAC BACK -TIE WHEN PANAMA 2101
240 7900 WILL BE UPGRADED
8740-44641 45' O
41
3-2C 1
9
LEGEND
LOC.
INSTALL EXIST. DESCRIPTION
m
P
W
PRIMARY CABLE: 3-1/OALEPR 25KV IN 3-2" CONDUIT
201
Pi
WLAJ
PRIMARY CABLE: 1-1/DAL EPR 25KV IN 1-2" CONDUIT
V
P5
t%7
PRIMARY CABLE: 3-600AL EPR 25KV IN 1-6" CONDUIT
202
S1
SECONDARY CABLE - 4/OAL TPX 600V IN 1-3" CONDUIT
S2
LAJ
SECONDARY CABLE - 350AL TPX 600V IN 1-4" CONDUITS
203
L_2J
m
17' x 30' x 18' SECONDARY BOX
L2EJ
2E
17' x 30' x 26' SECONDARY BOX
204
svi
SERVICE CABLE - 4/OAL TPX 600V IN 1-3" CONDUIT
205
SV
~
NON -RES CABLE - 1/OAL TPX 600V IN 1-3" CONDUIT
N
D2
VACANT CONDUIT (PRIMARY), 1-2"
206
D6
=
VACANT CONDUIT (PRIMARY), 1-6"
V
W
LS2A STREETLIGHT, 70W (UNLESS OTHERWISE NOTED)
N
C`�
a-
CUSTOMER OWNED STREETLIGHT CABLE & CONDUIT
d-
PCS
LS2A STREETLIGHT POiNT OF SERVICE
INSTALL EXiST. FUTURE DESCRIPTION
M
®
PM TRANSFORMER, DF -LB, W/BOX PAD
oo o
� 5�
Q5
3' x 5' x 3'6" PRIMARY ENCLOSURE
� 6�
®
4' x 6'6" x 5' PRIMARY ENCLOSURE
L_J
m
4'6" x 8'6" x 6' PRIMARY ENCLOSURE
L
®
PM19 PADMOUNT INTERRUPTER
t=
O
O
F=
2
SOLELY OWNED POLE
C)
•
Z
RISER
(n
0-
X
CUTOUT/DISCONNECT - SIZE AS SHOWN
H
E�
AIR SWITCH
Z
CAPACITOR
DENOTES TYPICAL SHORT SIDE SERVICE
25'/39'
L
TiHN
E
ODENOTES
TIE-IN FACILITIES WITHIN DRAWING.
o
FIRE HYDRANT
O
i
PROPOSED STORM DRAIN INLET
XX
CIRCLED LOT #'S INDICATE POSSIBLE CONFLICT
,fes
INSTALL EXISTING
DESCRIPTION
3 PHASE PRIMARY CABLE/CONDUCTOR - SIZE AS SHOWN
1 PHASE PRIMARY CABLE/CONDUCTOR - SIZE AS SHOWN
-- -- -- --
VACANT CONDUIT (PRIMARY) - SIZE AS SHOWN
3 PHASE PRIMARY CONDUCTOR W/ CN
Q
� o
cis
s=2
m
0
W
d—
WLAJ
Z
V
t%7
W
LLJ
H �G
LAJ
3
= Q
L LJ
::3LLJ
S
N
Y
~
N
Z
=
L LJ
V
W
Q
N
C`�
a-
Ch
d-
Lu
M
-;t-
oo o
W
C\
LA_
L
(5
t=
O
m
.�
F=
2
C)
V
Z
0
(n
0-
E�
Z
L
E
.
o
W
O
Lo
U
W
r,
,fes
FE
Li
V
M
^
'
to
Q
wwwLo
W
ai
w
z
Ot
CL
W
EM
Q
� o
cis
s=2
m
0
W
d—
WLAJ
Z
V
t%7
LLJ
H �G
LAJ
3
= Q
=E
::3LLJ
LLJ
N
Y
~
CL -
Z
=
L LJ
V
W
Q
N
C`�
a-
Ch
m
i
7
� o
Q W
LLJ
H �G
= Q
N m
LLJ
N
Y
Z
v
z
Q
6 5 4 3 2 1 INCH 0
co
QQ
00
0
/, (�- - 6 � /0 PA -,l
E
110
13
n■
Ci
1
5
7
w
2
8
BABG@°GE.COM
3
49
50
51
52
53
M
54
CRWR@°GE.COM
14
RUTURE TX
ON 57094 -Cd
15
16
6
5
4
FUTURE TX
ON 57094-C4
GABBRO COURT
FUTURE T68@2-2
17 18 19 I
55
3
20
4
56 57 I
1
Uj
(W�
w
2
cn
a I
� I
INSTALL 106' OF
2" GAS MAIN
1
I
1
I
21 22 I
I
I {
I
I N w
L
6
5
7
w
z
Q
8
BABG@°GE.COM
c� co
9
NAH29PGE.COM
w
VICINITY
SKETCH
M
Q
CRWR@°GE.COM
WORK SUMMARY
Uj
L
BETTERMENT
HOSKING
TIE-IN
N
EXCAVA7F 55(5114'
U
BELLHOLE FOR GAS
z
TIE IM. MAKE TIE WTH
3
4" ELE07ROFUSYOM
COUPLING.
6
NAMEE
7
�
z
Q
8
BABG@°GE.COM
2. NANCY DONNELL Y -GAS ADE
9
NAH29PGE.COM
w
VICINITY
SKETCH
M
Q
CRWR@°GE.COM
WORK SUMMARY
Uj
L
HOSKING
AVENUE
N
(LaZ
TRENCH -STREET AREA: (L<z
U
m
z
ac
3
'
EXCAVATE 1 TRENCH /BORE / 000
0
Iii
PIPE WRAP REMOVAL
N
0
C0
�
BACKFILL PAVE
co
o
o
TRENCH -PVT PROPERTY:
C/1)m
-Far work on pre -1972
pipe, assume the wrap
o
to
tY
�
EXCAVATE / TRENCH / BACKFILL 000,
L:
GAS PIPE + GAS MATPROVIDE
contains >1% asbestos unfit the wrap can be tested.
a
�
O
z
-Obtain samples of the
wrap, and have samples
(
Q
o
+INSTALL �0O
cl-
tested for asbestos in
accordance with RP 4711.
McKEE
ROAD
R'+
PERMIT -ENCROACHMENT:
-Test results are to be
included with as-builts.
w
0
APPLY +SECURE 000
�E__4
-Follow procedure in RP
4711 for removal of pipe wrap.
E-4
w o
v
w
'Ik �
LEGEND
PIPE TYPE:
x U
W
6410-2
YEAR INSTALLED:
6410-1
PROPOSED GAS MAIN
TAFT
HIGHWAY
------- PROPOSED GAS SERVICE
EXISTING OAS MAIN
5'x5' BELLHOLE
I* PROPOSED 51 ZINC ANODE
PROPOSED E. T.S, FRAME & 0 V
PROPOSED EFV
PROPOSED ELECTRONIC MARKER
FUTURE
PARK SITE
z � � I 51 50 I 49 48 47 46
2 ! 3 I 4 I 5 ( 6 I 7
1 I
I ! f I I I ��0-4
�
I\ � 45
1
ROLLING ROCK E AVE 1 ROLLING ROCK AVE
I 1 1 I
I
W 13 12 11 10 9 8 I 26 27 ( 28 29 I 30 >_4 j
Zt ( 44
x { -
W INSTALL 405' OF I INSTALL 1156' OF { 0 I �.
{ 2" GAS MAIN 12 ' GAS MAI Z
p I I ! I � I
0
43
j 1
i 14 ( { { ( { I I 32 I 3115 16 17 18 19 35 34 33
L
/
I y
' SMOKY ` ROCK CT
B AQUASTONE CT ,� \
I I I I I I I
\ 25 ( 24 23 22 21 ! 20{ '
I 36 37 38 39 40 41
115.72' \
TIE-IN
TAFT HWY H L.LHOLCA VAE � AS 7TE
A /N. MAKE TIE WI7H TAFT HWY
MUELLER BOTTOM TAP. Q
�._._.-�....__.-...- T. T...,.a.w.,......-„�..... 25 ti 3-2C 12.0 kV
CCn CCA (n
RECAP
1. INSTALL 1038' OF 4" HP PL MAIN
2. INSTALL 2667' OF 2" HP PL MAIN
3. INSTALL 1184' OF I" PLASTIC SVC -STUBS
4. INSTALL 1275' OF 1-9 PLASTIC -SVC COMPLETIONS
5. TIE --IN (1) 4" MUELLER BOTTOM TAP
6. TIE-IN (1) 4" ELECTROFUSTION COUPLING
7. INSTALL (31) 2'x 1 " BRANCHING SADDLES
8. INSTALL (10) EFVS
9. INSTALL (3) 51 ZINC ANODES
10. INSTALL (4) ETS'S IN FRAME & COVER
10
Q
NOTIFIED U.S.A. C a
DATE:
TICKET #
BY: 1
NOTES
1) Developer to do all trenching, shading, and backfilling.
2) Refer to each party's installation instructions for more precise
description of substructures and other requirements.
3) Gas and electric facilities will require sand shading if native soil
is not rock free. PG&E will inspect backfill material.
4) Ground to be within .2 ft of finish grade prior to trenching.
5) Gas and electric facilities require at least 3' of separation (undisturbed
soil) from parallel runs of water, sewer or storm drain.
6) Pre -construction meeting required at least 2 weeks prior to start of installation.
7) Call USA at least 48 hours prior to any trenching.
8) Contact PG&E representative WARREN ALBERT prior to making any changes to this drawing.
9) Developer shall contact all involved parties prior to making any changes to this drawing.
10) Developer is responsible for obtaining all encroachment permits.
11) PG&E to install gas main and services. PG&E to do gas tie-ins.
12) PG&E to install electric cable and transformers and electric service cable.
NOTES: APPLICANT TRENCH
1. CALL "USA" 2 WORKING DAYS BEFORE EXCAVATING.
UNDERGROUND SERVICE ALERT 1-800-227-2600
2. SPECIFIC CONDITIONS REQUIRED BY PG&E FOR JOINT
TRENCH WORK ARE OUTLINED IN PG&E'S UTILITY
OPERATIONS STANDARD S5453.
3. BACKFILL MATERIAL REQUIREMENTS ARE DETAILED
IN U.O. STANDARD S5453, EXHIBIT B.
4. PG&E INSPECTOR TO APPROVE ALL EXCAVATIONS AND
TRENCHES (LOCATION AND BACKFILL MATERIAL)
PRIOR TO BACKFILLING.
5. TRENCHING AGENT TO DISPOSE OF ALL SPOIL.
6. MINIMUM COVER FROM FINAL GRADE REQUIRED
FOR ALL FACILITIES IN THE STREET AREA.
7. TRENCHING AGENT TO SECURE ALL PERMITS.
8. CONTRACTOR IS RESPONSIBLE FOR CROSSING EXISTING
WATER, SEWER, AND STORM DRAIN LINES, EITHER UNDER
OR OVER, AS REQUIRED TO MEET PG&E COVER AND
CLEARANCE REQUIREMENTS. REFER TO G.S. STANDARD 453-4.
9. THE CONTRACTOR WILL BE REQUIRED TO REMOVE AND REPLACE
TRENCH SPOIL WITH 10079 SELECT BACKFILL AS REQUIRED BY
PG&E SPECIFICATIONS, AND ANY LOCAL CITY, COUNTY, OR
STATE REQUIREMENTS.
10. THE CONTRACTOR WILL BE REQUIRED TO PLACE TEMPORARY AND/OR
PERMANENT PAVING IN ACCORDANCE WITH ANY LOCAL CITY,
OR STATE REQUIREMENTS.
11. APPLICANT TO PROVIDE AND INSTALL ANY PROTECTION EQUIPMENT
(BARRIER POSTS, FENCES, ETC...) REQUIRED BY PG&E.
12. THE APPLICANT/CONTRACTOR WILL ACCEPT RESPONSIBILITY
OF MAINTENANCE OF THE TRENCH (E.G. COMPACTION, PAVING,
ETC..) FOR A PERIOD OF TWO (2) YEARS OR AS SPECIFIED IN THE
PERMIT, WHICHEVER IS LONGER.
13. TRENCHING AGENT TO MAINTAIN THE REQUIRED DISTANCE OF
THREE (3) FEET BETWEEN GAS AND THE WET UTILITIES.
WETUTILITIES MUST BE OFFSET BY 3'
FROM ANY PG&E GAS MAIN OR SERV/CE.
PG&E REP.
PHONE:
WARREN ALBERT
661-398-3907
ALL FIELD CHANGES REWIRE PR/OR APPROVAL FROM-
NAMEE
�cc)
O
�
z
Q
W
W
BABG@°GE.COM
2. NANCY DONNELL Y -GAS ADE
(559) 347-5046
NAH29PGE.COM
w
(559 347-5023
KEH49PGE. COM
M
Q
CRWR@°GE.COM
w
Uj
L
�
CD
N
1-0
U
m
z
ac
3
'
0
Iii
z
N
0
C0
�
w
co
o
o
C/1)m
W
BAKERSFIELD
to
tY
�
N
w
�
z
GAS PLAT 5127-01, D>
(
Q
o
Cnn
cl-
GAS CPA 5127-_�,
}-
�
U
z
z
w
0
� �
�E__4
L�
INCH 0
w o
v
w
'Ik �
`
x U
W
E-
Q
NOTIFIED U.S.A. C a
DATE:
TICKET #
BY: 1
NOTES
1) Developer to do all trenching, shading, and backfilling.
2) Refer to each party's installation instructions for more precise
description of substructures and other requirements.
3) Gas and electric facilities will require sand shading if native soil
is not rock free. PG&E will inspect backfill material.
4) Ground to be within .2 ft of finish grade prior to trenching.
5) Gas and electric facilities require at least 3' of separation (undisturbed
soil) from parallel runs of water, sewer or storm drain.
6) Pre -construction meeting required at least 2 weeks prior to start of installation.
7) Call USA at least 48 hours prior to any trenching.
8) Contact PG&E representative WARREN ALBERT prior to making any changes to this drawing.
9) Developer shall contact all involved parties prior to making any changes to this drawing.
10) Developer is responsible for obtaining all encroachment permits.
11) PG&E to install gas main and services. PG&E to do gas tie-ins.
12) PG&E to install electric cable and transformers and electric service cable.
NOTES: APPLICANT TRENCH
1. CALL "USA" 2 WORKING DAYS BEFORE EXCAVATING.
UNDERGROUND SERVICE ALERT 1-800-227-2600
2. SPECIFIC CONDITIONS REQUIRED BY PG&E FOR JOINT
TRENCH WORK ARE OUTLINED IN PG&E'S UTILITY
OPERATIONS STANDARD S5453.
3. BACKFILL MATERIAL REQUIREMENTS ARE DETAILED
IN U.O. STANDARD S5453, EXHIBIT B.
4. PG&E INSPECTOR TO APPROVE ALL EXCAVATIONS AND
TRENCHES (LOCATION AND BACKFILL MATERIAL)
PRIOR TO BACKFILLING.
5. TRENCHING AGENT TO DISPOSE OF ALL SPOIL.
6. MINIMUM COVER FROM FINAL GRADE REQUIRED
FOR ALL FACILITIES IN THE STREET AREA.
7. TRENCHING AGENT TO SECURE ALL PERMITS.
8. CONTRACTOR IS RESPONSIBLE FOR CROSSING EXISTING
WATER, SEWER, AND STORM DRAIN LINES, EITHER UNDER
OR OVER, AS REQUIRED TO MEET PG&E COVER AND
CLEARANCE REQUIREMENTS. REFER TO G.S. STANDARD 453-4.
9. THE CONTRACTOR WILL BE REQUIRED TO REMOVE AND REPLACE
TRENCH SPOIL WITH 10079 SELECT BACKFILL AS REQUIRED BY
PG&E SPECIFICATIONS, AND ANY LOCAL CITY, COUNTY, OR
STATE REQUIREMENTS.
10. THE CONTRACTOR WILL BE REQUIRED TO PLACE TEMPORARY AND/OR
PERMANENT PAVING IN ACCORDANCE WITH ANY LOCAL CITY,
OR STATE REQUIREMENTS.
11. APPLICANT TO PROVIDE AND INSTALL ANY PROTECTION EQUIPMENT
(BARRIER POSTS, FENCES, ETC...) REQUIRED BY PG&E.
12. THE APPLICANT/CONTRACTOR WILL ACCEPT RESPONSIBILITY
OF MAINTENANCE OF THE TRENCH (E.G. COMPACTION, PAVING,
ETC..) FOR A PERIOD OF TWO (2) YEARS OR AS SPECIFIED IN THE
PERMIT, WHICHEVER IS LONGER.
13. TRENCHING AGENT TO MAINTAIN THE REQUIRED DISTANCE OF
THREE (3) FEET BETWEEN GAS AND THE WET UTILITIES.
WETUTILITIES MUST BE OFFSET BY 3'
FROM ANY PG&E GAS MAIN OR SERV/CE.
PG&E REP.
PHONE:
WARREN ALBERT
661-398-3907
ALL FIELD CHANGES REWIRE PR/OR APPROVAL FROM-
NAMEE
�cc)
O
�
z
Q
(559 347-5038
BABG@°GE.COM
2. NANCY DONNELL Y -GAS ADE
(559) 347-5046
NAH29PGE.COM
w
(559 347-5023
KEH49PGE. COM
M
Q
CRWR@°GE.COM
w
Uj
L
�
�
w
1-0
U
m
z
ac
3
v
z
U
Q
NOTIFIED U.S.A. C a
DATE:
TICKET #
BY: 1
NOTES
1) Developer to do all trenching, shading, and backfilling.
2) Refer to each party's installation instructions for more precise
description of substructures and other requirements.
3) Gas and electric facilities will require sand shading if native soil
is not rock free. PG&E will inspect backfill material.
4) Ground to be within .2 ft of finish grade prior to trenching.
5) Gas and electric facilities require at least 3' of separation (undisturbed
soil) from parallel runs of water, sewer or storm drain.
6) Pre -construction meeting required at least 2 weeks prior to start of installation.
7) Call USA at least 48 hours prior to any trenching.
8) Contact PG&E representative WARREN ALBERT prior to making any changes to this drawing.
9) Developer shall contact all involved parties prior to making any changes to this drawing.
10) Developer is responsible for obtaining all encroachment permits.
11) PG&E to install gas main and services. PG&E to do gas tie-ins.
12) PG&E to install electric cable and transformers and electric service cable.
NOTES: APPLICANT TRENCH
1. CALL "USA" 2 WORKING DAYS BEFORE EXCAVATING.
UNDERGROUND SERVICE ALERT 1-800-227-2600
2. SPECIFIC CONDITIONS REQUIRED BY PG&E FOR JOINT
TRENCH WORK ARE OUTLINED IN PG&E'S UTILITY
OPERATIONS STANDARD S5453.
3. BACKFILL MATERIAL REQUIREMENTS ARE DETAILED
IN U.O. STANDARD S5453, EXHIBIT B.
4. PG&E INSPECTOR TO APPROVE ALL EXCAVATIONS AND
TRENCHES (LOCATION AND BACKFILL MATERIAL)
PRIOR TO BACKFILLING.
5. TRENCHING AGENT TO DISPOSE OF ALL SPOIL.
6. MINIMUM COVER FROM FINAL GRADE REQUIRED
FOR ALL FACILITIES IN THE STREET AREA.
7. TRENCHING AGENT TO SECURE ALL PERMITS.
8. CONTRACTOR IS RESPONSIBLE FOR CROSSING EXISTING
WATER, SEWER, AND STORM DRAIN LINES, EITHER UNDER
OR OVER, AS REQUIRED TO MEET PG&E COVER AND
CLEARANCE REQUIREMENTS. REFER TO G.S. STANDARD 453-4.
9. THE CONTRACTOR WILL BE REQUIRED TO REMOVE AND REPLACE
TRENCH SPOIL WITH 10079 SELECT BACKFILL AS REQUIRED BY
PG&E SPECIFICATIONS, AND ANY LOCAL CITY, COUNTY, OR
STATE REQUIREMENTS.
10. THE CONTRACTOR WILL BE REQUIRED TO PLACE TEMPORARY AND/OR
PERMANENT PAVING IN ACCORDANCE WITH ANY LOCAL CITY,
OR STATE REQUIREMENTS.
11. APPLICANT TO PROVIDE AND INSTALL ANY PROTECTION EQUIPMENT
(BARRIER POSTS, FENCES, ETC...) REQUIRED BY PG&E.
12. THE APPLICANT/CONTRACTOR WILL ACCEPT RESPONSIBILITY
OF MAINTENANCE OF THE TRENCH (E.G. COMPACTION, PAVING,
ETC..) FOR A PERIOD OF TWO (2) YEARS OR AS SPECIFIED IN THE
PERMIT, WHICHEVER IS LONGER.
13. TRENCHING AGENT TO MAINTAIN THE REQUIRED DISTANCE OF
THREE (3) FEET BETWEEN GAS AND THE WET UTILITIES.
WETUTILITIES MUST BE OFFSET BY 3'
FROM ANY PG&E GAS MAIN OR SERV/CE.
PG&E REP.
PHONE:
WARREN ALBERT
661-398-3907
ALL FIELD CHANGES REWIRE PR/OR APPROVAL FROM-
NAMEE
TELEPHONE
EMAIL
1. BELINOA GURSKY -GAS EST.
(559 347-5038
BABG@°GE.COM
2. NANCY DONNELL Y -GAS ADE
(559) 347-5046
NAH29PGE.COM
3. KEN HENOR/CKS-SUPVSR
(559 347-5023
KEH49PGE. COM
4. CHASE WHARTON-GAS ENGR
(661) 398-5751
CRWR@°GE.COM
6 5 4 3 2
Y
.J-!
z
�
W
C9
z
o
�-
0
Q
d
W
Z
z
_
Uj
i
J
m
z
ac
3
v
cx
�
w
C/1)m
W
Q
to
tY
�
N
W
a
I( i - 1(9 W-1) QUI
1--
L.a_
J
I
~
46
LL_a
Ul
C/1)m
w
Q
U
z
0
1
INCH 0
I( i - 1(9 W-1) QUI
IEI
IC
111111011111
2
Underground Service Alert
Call: TOLL FREE
811
TWO WORKING DAYS BEFORE YOU DIG
NOTIFIED U.S.A.
DATE:
TICKET �
BY:
PROJECT CONDITIONS STAMP
Type(s) of Work:
QX New Business
❑ PG&E Maintenance & Construction
Project Conditions:
0 NONE APPARENT (if project design changes, contact ADE)
or
CONDITIONS APPLY:
PERMITS ❑ TAILBOARD ❑ OTHER
(Provide additional information on line below)
BY:
SIGNATURE, NAME, [CORPORATE ID], DATE
CONSTRUCTION NOTE:
GAS PIPELINE UNDERGROUND WARNING TAPE TO BE INSTALLED ABOVE
GAS PIPE IN ALL TRENCHES AS SHOWN IN DETAIL BELOW.
CAUTION CAUTION
GAS LINE BURIED BELOW
GAS PIPELINE UNDERGROUND
WARNING TAPE CODE #379947.
YELLOW TAPE WITH BLACK LETTERING.
FINISH GRADE
MIN. 12"
WARNING TAPE
WARNING TAPE INSTALLATION ZONE
GAS PIPELINE MIN. 12"
TEST AT 100-110
PSI FOR MINIMUM OF 5 MIN.
PRESURE
DURATION INITIALS
DATE OF TEST
INITIALS
DATE OF TEST
SERVICE TRENCH
MIN. COVER
G
18" MIN.
—
12"
L 18" MIN.
PLASTIC PIPE DATA
SIZE MANUFACTURED DATE OF MANUFACTURE
4"
4" PLASTIC MAIN
PLASTIC PIPE
INSPECTION/DATA
PIPE MANUFACTURER
DATE MANUFACTURED
STANDARD DIMENSIONAL RATIO
TEST AT 100-110
PSI FOR
MINIMUM OF 5 MIN.
PRESURE
DURATION
INITIALS
DATE OF TEST
SERVICE TRENCH
MIN. COVER
G
18" MIN.
—
12"
L 18" MIN.
6"
12"
6"
W�
T
PLASTIC PIPE DATA
SIZE MANUFACTURED DATE OF MANUFACTURE
2„
2" PLASTIC MAIN
PLASTIC PIPE
INSPECTION/DATA
PIPE MANUFACTURER
DATE MANUFACTURED
STANDARD DIMENSIONAL RATIO
3
n
t=CiL\»II<19:014I7:a 11039:0 a a' _ owC,I
ETS INSTALLATION
NOT TO SCALE BEHIND CURB
/— ETS BOX (37-5)
5#
ZINC ANODE
CURB & GUTTER
/— A/C
LOCATING WIRE _ ` LOCATING WIRE
(YELLOW) (YELLOW)
PROPOSED 2" OR 4" HP PLASTIC
E.T.S. MATERIALS
(1) VALVE BOX LID, CONCRETE, ETS (SEE GSK; K-44)
(1) VALVE BOX HEAD, CRISTY FIBRELYTE (SEE ('S&S K-44)
(1) VALVE BOX EXTENSION, PLASTIC (SEE GS&� K-44)
(1) ANODE, ZINC, 5 -POUND (SEE GS&S 0-13.1)
CONSTRUCTION NOTE:
CREW TO THUMP IN WIRES TO E.T.S. LDCATIONS.
E.T.S. STATIONS TO BE INSTALLED
BEHIND CURB AS SHOWN IN DETAIL.
TIE —IN
MAKE 4" PLASTIC TO 4" PL/ISTIC TSE
WITH 4"ELECTROFUSION COUPLING
PER G. S. &S. B-90.3
INSTALL 4" ELECTROFUSION
PER G.S.&S. E3-90.3 (CODE 02-1637)
'" T —
4" PLASTIC 1 4" PLASTIC
NEW 4" PLASTIC MAIN aw EXISTING 4" PLASTIC MAIN
5
R/W
0
TYPICAL EXTERIOR STREET -PATTERN
TYPICAL STUB INSTALLATION
60' STREET SECTION (NON—WATER SIDE)
LOT LINE LOT LIN E
18"
T GSTC STUB
10,0�1
12
I
� I
1
1
GSTC STUB 1
10'
L
18"
— MAIN TRENCH
1
W
Q
R/W
4" STEEL TIE-IN TIE-IN/ETS INSTALLATION
NO SCALE PLASTIC TO STEEL TRANSITION
CURB & GUTTER
A/C ETS BOX (G-5)
4 LINE STOPPER FITTING SOLID COPPER WIRE ZINC ANODE
BOTTOM TAP
(CODE 02-2742) P11 --
I �- ------ I SOLID COPPER WIRE
I
I
— LOCATING WIRE
PLASTIC TO STEEL -----�
EXIST. 4n HP 5TL TRANSITION FITTING
90' STEEL ELBOW (CODE 02-9807)
(CODE 02-2039} A „
NOTE:
*BOND SOLID COPPER WIRES TO STEEL MAIN, SEE GS&S 0-10
*BRING ALL WIRES AND WIRE CONNECTIONS INTO ETS,
DO NOT BOND WIRES, SEE GS&S 0-10
*INSTALL ETS BOX BEHIND BACK OF CURB, SEE GS&S K-40.1
*CONTACT CORROSION FOR FINAL INSPECTION, SEE GS&S 0-16
C
G
MINIMUM COVER AND CLEARANCES
MINIMUM SEPARATION FROM
to
TYPICAL
T
C
TYPICAL
DISTRIBUTION TRENCH
SERVICE TRENCH
MIN. COVER
G
18" MIN.
—
12"
L 18" MIN.
6"
12"
6"
W�
T
(TELEPHONE)
12
-
1"
12»
d
12„
24„
C
(CATV)
t-
�
it
a
-
12"
12"
12"
�
S
z
6
12
12
-
3
1
W
W
a
5
(NON PG&E)
z
Z
12"
.N.
-
(PREFERRED)
roi
N
(STREET LIGHT)
Z
Z
1 12"
1 1"
3"
Z
30"
T C SL
M
oo
M T C M
z �ti
`°
i
� G
�
� N
P 3" 3"V -\S
IN S MIN SL
6" MIN. G a
PRIMARY
SECONDARY
OR SERVICE
MINIMUM COVER AND CLEARANCES
MINIMUM SEPARATION FROM
5 LB. ZINC ANODES TO BE SPACED
1000' APART PER A-90.2 p.1 OF 3
ELECTROLYSIS TEST STATION CONNECTION TO MAIN
PER GS&S 0-10 p. 1 of 5
3. PG&E shall install test leads on new facilities as follows:
Type A: Distribution, on new pipe, at approximately 500'
(1 --block) intervals, unless there is sufficient
electrical access at existing test leads or services.
INSTALL DIRECT BURIAL PLASTIC MAINS &
SERVICES PER GAS _ STANDARDS A90—A91.2,
A93—A93.1 & D21. INSTALL PLASTIC MAIN
& SERVICE INSERT PER GAS STANDARDS
A90.1—A90.3, A91.2—A93.1 & D21
WET UTILITIES MUST BE OFFSET BY 3'
FROM ANY PG&E GAS MAIN OR SERVICE.
ATTENTION FOREMAN
PRIOR TO STARTING JOB, CONSULT AREA
CORROSION MECHANIC FOR LOCATING
WIRE INSTALLATION AND CATHODIC PRO—
TECTION REQUIREMENTS
m
C..)
to
G
T
C
S
P
SL
MIN. COVER
G
(GAS)
—
12"
12"
6"
12"
6"
30"
T
(TELEPHONE)
12
-
1"
12»
12»
12„
24„
C
(CATV)
12”
1”
-
12"
12"
12"
24"
S
(SECONDARY)
6
12
12
-
3
1
30
P
(PRIMARY)
12"
12"
12"
3"
-
3"
30"
SL
(STREET LIGHT)
6"
12"
1 12"
1 1"
3"
-
30"
5 LB. ZINC ANODES TO BE SPACED
1000' APART PER A-90.2 p.1 OF 3
ELECTROLYSIS TEST STATION CONNECTION TO MAIN
PER GS&S 0-10 p. 1 of 5
3. PG&E shall install test leads on new facilities as follows:
Type A: Distribution, on new pipe, at approximately 500'
(1 --block) intervals, unless there is sufficient
electrical access at existing test leads or services.
INSTALL DIRECT BURIAL PLASTIC MAINS &
SERVICES PER GAS _ STANDARDS A90—A91.2,
A93—A93.1 & D21. INSTALL PLASTIC MAIN
& SERVICE INSERT PER GAS STANDARDS
A90.1—A90.3, A91.2—A93.1 & D21
WET UTILITIES MUST BE OFFSET BY 3'
FROM ANY PG&E GAS MAIN OR SERVICE.
ATTENTION FOREMAN
PRIOR TO STARTING JOB, CONSULT AREA
CORROSION MECHANIC FOR LOCATING
WIRE INSTALLATION AND CATHODIC PRO—
TECTION REQUIREMENTS
m
C..)
to
a
Q
a
Z
O
N
o
in
CD
o
co
r`
o
>Z
s
w
ton
Q
�
�
Z
�►
O
0
GC\2
°; U
�'
w tom-,
Ld
m
Z
Ld
w
V
<
R)z
p
I Q
w
'
W
1�:
w
oo
= </�
I I I I I I I' 1
6 5 4 3 2 1 INCH 0
/' or-- - � t1w
Z�
s
�
i�
Q
�
W
Z
�►
J
0
N.-
m
Z
Y
=
V
I I I I I I I' 1
6 5 4 3 2 1 INCH 0
/' or-- - � t1w
s
�
i�
o
J
0
N.-
<
cn
W
a
I I I I I I I' 1
6 5 4 3 2 1 INCH 0
/' or-- - � t1w