Loading...
HomeMy WebLinkAboutUST-BILLING AND PERMIT 1/28/2011BILLING & PERMIT STATEMENT PERMIT # BAKERSFIELD FIRE DEPARTMENT H R S F 1 o Prevention Services FIRE r 1501 Truxtun Avenue, 1St Floor Bakersfield, CA 93301 Phone: 661 - 326 -3979 • Fax: 661 - 852 -2171 1 ❑ permits must be reviewed, stamped., and approved PRIOR TO BEGINNING WORK • CALCULATION PERMIT TYPE FEE • DUE Alarm - New & Modification (minimum charge) $280 • ONLY • li ❑ Over 10,000 sq ft $0 .028 x sq ft SITE INFORMATION ❑ Sprinkler - New & Modification (minimum charge) LOCATION OF PROJECT PROPERTY OWNER ` ❑ S-S $0 .028 x sq ft I ❑ 1, STARTING DATE COMPL ION TE 84 NAME ❑ Commercial Hood (New & Modification) $470 ❑ Additional hood PROJECT N ME /' r � ADDRESS 5 !/ PHONE # 1 � 6A I � On �� Aboveground Storage Tank (1 inspection per installation) AST PROJECT ADDRESS v 82 cm g�4FC�1zS�� �LT� STATE CA ZIP COD D 82 ❑ Aboveground Storage Tank (Removal, Mod,or Inspect'n) ATR $109 /tank 82 CONTRACTOR Underground Storage Tank (Installation /Inspection) NI •• • 82 CONTRACTOR NAME , ' CA LICENSE # TYPE OF CENS EXPI ION ATE PHO E # r d. v� ( 82 1 (31/7,0)3 Underground Storage Tank (Removal) TR b> CONT R COMPANY NAME 84 ❑ Mandated Leak Detection (test) /Fuel Mont Cert/SB989 NOTE: $96 /hr for each type of test/per site even if scheduled at the same time TT FAX # ADDRESS', 82 CITYM. (_ $96 /hr ZIP 1 ❑ permits must be reviewed, stamped., and approved PRIOR TO BEGINNING WORK • CALCULATION PERMIT TYPE FEE • DUE Alarm - New & Modification (minimum charge) $280 • ONLY • li ❑ Over 10,000 sq ft $0 .028 x sq ft ❑ Sprinkler - New & Modification (minimum charge) $280 ❑ Over 10,000 sq ft $0 .028 x sq ft ❑ Minor Sprinkler Modification ( <10 heads) $96 (inspection only) 84 ❑ Commercial Hood (New & Modification) $470 ❑ Additional hood $58 ❑ Spray Booth (New & Modification) $470 98 ❑ Aboveground Storage Tank (1 inspection per installation) AST $180 /tank 82 ❑ Additional Tank ATI $96 /tank 82 ❑ Aboveground Storage Tank (Removal, Mod,or Inspect'n) ATR $109 /tank 82 ❑ Underground Storage Tank (Installation /Inspection) NI $878 /tank 82 ❑ Underground Storage Tank (Modification) MOD $878 /site 82 Underground Storage Tank (Minor Modification) MTM $167 /site e 4(11'6 L450 (- ZS -1 i ,(, 7 82 ❑ Underground Storage Tank (Removal) TR $573 /tank 84 ❑ Mandated Leak Detection (test) /Fuel Mont Cert/SB989 NOTE: $96 /hr for each type of test/per site even if scheduled at the same time TT $96 /hr (2 hrs minimum) =$192 82 ❑ Oil well (Installation, Inspection, or re- inspection) X $96 /hr 82 ❑ Tent # $96 /tent 84 ❑ After -hours inspection fee $121/hr (2 hrs minimum) =$242 ❑ Pyrotechnic (1 permit per event, plus an inspection fee of $96 /hr during business hours) PY NOTE: After hours Pyrotechnic event inspection is @ $121/hr $96 /hr + (5 hrs min standby fee /insp) =$576 5 hrs min standby fee /ins = 605 84 ❑ Re- inspection /Follow -up Inspection $96 /hr 84 ❑ Portable LPG (Propane): # of Cages? $96 /hr 84 ❑ Explosive Storage $266 84 ❑ Copying & File Research (File Research fee $50 /hr) $0.25 /page 84 ❑ Miscellaneous 84 FD2021 (R y 04/08)