Loading...
HomeMy WebLinkAboutBUSINESS PLAN 7/23/2011❑' ROUTINE COMBINED ❑ - JOINT AGENCY ❑ MULTI- AGENCY ❑ COMPLAINT ❑ RE'- INSPECTION C-Compliance - C V ( ) OPERATION COMMENTS POST INSPECTION INSTRUCTIONS: • Correct the violation(s) noted above by it f �� Signature (that all violations have been corrected as noted) Within 5 days of correcting all of the violations, sign and return a copy of this page to: V =Violation APPROPRIATE ON HAND (BMC:" 15:65.080) �Z ❑ PERMIT I�1 ❑ w Business PLAN CONTACT INFORMATION ACCURATE (CCR: 2729.1) aJ2 ❑ _ .: VISIBLE ADDRESS (CFC: 505.1, BMC: 15.52.020) ;❑ ❑ CORRECT OCCUPANCY (CBC` 401) ' ❑ VERIFICATION OF INVENTORY MATERIALS (CCR: 2729.3)' LI ❑ :'VERIFICATION OF QUANTITIES. (CCR: 2729.4) ' ❑ VERIFICATION OF LOCATION (CCR: 2729.2) ❑ PROPER SEGREGATION OF MATERIAL (CFC: 2704.1) },] ❑ VERIFICATION OF MSDS AVAILABILITY (CCR: 2729.2(3)(b)) El VERIFICATION OF HAZ MAT TRAINING (CCR:.2732) . ❑ VERIFICATION OF ABATEMENT SUPPLIES & PROCEDURES (CCR: 2731(c)) •` ❑ EMERGENCY PROCEDURES. ADEQUATE (CCR: 2731) - .CONTAINERS PROPERLY LABELED (CCR; 66262.34(f), CFC` 2703.5) ❑. HOUSEKEEPLNG (CFC: 30471) ;0 ❑ FIRE. PROTECTION (CFC: 903 & 906) ❑ )Z1 r SITE DIAGRAM ADEQUATE & ON HAND (CCR: 2729:2) lu ANY 'HAZARDOUS WASTE. ON SITE ?. ❑ YES. ❑ NO SiertattimlofReceipt—, t Explain: �p.` x POST INSPECTION INSTRUCTIONS: • Correct the violation(s) noted above by it f �� Signature (that all violations have been corrected as noted) Within 5 days of correcting all of the violations, sign and return a copy of this page to: