Loading...
HomeMy WebLinkAbout1.8-7240E C 2 I 3 LOT LINE (LOTS 2 AND 49) LOT LINE LOT LINE 1'-6" -+�{ Lo GSTC STUB I Ia C -- \ NL� -� — — �- — R/W WATER METER I MAIN TRENCH 0 I Lo -- -- -- -- R/W W ICL LOT LINE I I+ V-6" TYPICAL INTERIOR STUB INSTALLATION NO SCALE NOTE: ALL SERVICES AND SUB -STRUCTURES ARE NOT TO SCALE FOR CLARITY. ALL COMPONENTS SHALL FIT WITHIN THE PUE OR FRANCHISE AREA UNLESS OTHERWISE NOTED. REFER TO DETAILS FOR LOCATIONS. 81 SUBSTRUCTURE VERIFICATION STAMP DEVELOPER PLEASE NOTE AND SIGN ALL P.G.& E. ENCLOSURES AND BOXES HAVE BEEN SET TO GRADE ACCORDING TO GRADE STAKES PROVIDED BY DEVELOPERS ENGINEER. ALL COSTS TO RELOCATE OR RE -ADJUST BOXES AT A LATER DATE WILL BE BILLED TO THE DEVELOPER. PLEASE HAVE YOUR JOB SUP. VERIFY THE CORRECTED GRADE OF ALL ENCLOSURES AND BOXES. AND SIGN AND DATE DRAWING. THANK YOU SIGNED DATE C� D_ a. w 11' z -1 6' w Fw- z TRENCH CENTERLINE VARIES 7' TO 14'-6" - WALL PAD -MOUNTED EQUIPMENT SUBSURFACE ENCLOSURE STOCKDALE RANCH DRIVE NO SCALE J 10' z PUE VARIES -I 4',6' OR 8' z 1' w V PAD -MOUNTED EQUIPMENT SUBSURFACE TRENCH ENCLOSURE CENTERLINE (FOLLOW 1' UNDER BACK OF WALK) TYPI CAL INTERIOR STREET NO SCALE 24" MADE (COMMON) _T FINISH GRADE 30" MINIMUM IN FRANCHISE AREA _ 30" MINIMUM IN FRANCHISE AREA .12- 12" SAND MIN �. OVER TELEif .�. '. 2' OR 4 " POSSIBLE 58" ���. C 4C =' � ` 1 4" ` 12" MIN. TOP OF GAS LEVEL 3" MIN. WITH BOTTOM OF'' '''' . °:.. TELEPHONE OR TV a:: S SSL . 4" OR 6' P:: P.. ` 2" or 4" SHADING 1) 2" SAND SHADING AROUND GAS & ELECTRIC IF SOIL IS NOT ROCK FREE 2) ONLY PARTIES PARTICIPATING IN U.S.A. ARE ALLOWED IN JOINT TRENCH 3) ANY PARTY EXCEEDING ITS TRENCH ALLOTMENT SHALL MAKE ARRANGEMENTS TO ENSURE THAT TRENCH WILL ACCOMMODATE ADDED FACILITIES 4) GAS TO GO ON SIDE OF TRENCH NEAREST STREET 5) TRENCH LAYOUT SHALL CONFORM TO UO STANDARD S5453. TYPICAL DISTRIBUTION TRENCH NO SCALE C� WALL 8' 4' TRENCH CENTERLINE (ROPE BEHIND SUBSURFACE SUBSTRUCTUREAS REQUIRED) SUBSURFACE ENCLOSURE w z J w 1- z w v NEWBURY ST., PADDINGTON ST., AMBELSIDE CT., AND KI NGSBRI DGE ST. ENTRY'S NO SCALE JOINT TRENCH RECAP TRENCH OCCUPANTS DISTRIBUTION OR SERVICE TRENCH SIZE DEPTH FOOTAGE BACKFILL SURFACE GSTC DIST 24" x 59" 2,218' SPREAD DIRT GPTC DIST 24" x 59" 3,724' SPREAD DIRT GPSTC DIST 24" x 59" 4,799' SPREAD DIRT GTC DIST 24" x 59" 570' SPREAD DIRT GPC DIST 24" x 59" 261' SPREAD DIRT GC DIST 24" x 59" 210' SPREAD DIRT PC DIST 24" x 59" 92' SPREAD DIRT S DIST 24" x 59" 33' SPREAD DIRT P DIST 24" x 59" 342' SPREAD DIRT GSTC SERV FRANCH 18" x 46" 2,142' 1 SPREAD DIRT GSTC SERV PRIVATE 18" x 46" 860' SPREAD DIRT GSTC SERV COMP. 18" x 46" 3,800' SPREAD DIRT 18" MINIMUM -OR TRENCH INSPECTION 24" CALL (559) 263-7312 " IN (30 STREET) 42" 3'9 MIN. MIN. ®© 3 6" 12" 1) 2" SAND SHADING AROUND GAS & ELECTRIC MIN. IF NATIVE SOIL IS NOT ROCK FREE. 2) SEE OTHER DETAIL IF NON -PG&E ESEDDING G 4" 3) ONLYYPPAIGHT IS IN RTIES PARTICIPA NG IN U.S.A. ARE MATERIAL ALLOWED IN THIS TRENCH j- t 2" FIG. 2 (VIEW FACING DISTRIBUTION TRENCH) ANY CHANGES TO THIS DESIGN MUST FIRST BE APPROVED BY PG&E. GAS ADE: DOMINIC OTHART PHONE: (661) 398-5817 JOINT TRENCH COMPOSITE APPROVED BY: GAS ADE: ELECT ADE: DATE: 9 10 GENERAL NOTES: 1. DEVELOPER TO DO ALL TRENCHING, SHADING, AND BACKFILLING. PER UO STANDARD S-5453. 2. PHONE AND CABLE TV FACILITIES ARE SUBJECT TO CHANGE AT THE DISCRETION OF THOSE COMPANIES. 3. PADS, BOXES AND OTHER FACILITES ARE N9j SHOWN TO SCALE. 4. GAS AND ELECTRIC FACILITIES WILL REQUIRE SAND SHADING IF NATIVE SOIL IS NOT ROCK -FREE. PG&E WILL INSPECT BACKFILL MATERIAL. TEL AND/OR CATV MAY ALSO REQUIRE 12" OF SAND BACKFILL 5. GROUND TO BE WITHIN .2 FT OF FINISH GRADE PRIOR TO TRENCHING. 6. GAS AND ELECTRIC FACILITES REQUIRE AT LEAST 3' OF SEPARATION (1' UNDISTURBED SOIL) FROM PARALLEL RUNS OF WATER, SEWER, OR STORM DRAIN. 7. PRE -CONSTRUCTION MEETING REQUIRED TWO WEEKS PRIOR TO THE START OF INSTALLATION. 8. CALL U.S.A. AT LEAST 48 HOURS PRIOR TO TRENCHING (DIAL 811) 9. PG&E WILL ASSIST IN LOCATING ENDS OF EXISTING GAS MAINS. 10. DEVELOPER IS RESPONSIBLE FOR OBTAINING ENCROACHMENT PERMITS.. 11. STREETLIGHT LOCATIONS MAY HAVE CHANGED. REFER TO THE APPROVED STREETLIGHT IMPROVEMENT PLAN FOR STREETLIGHT INSTALLATION. 12. DEVELOPER SHALL CONTACT ALL INVOLVED PARTIES PRIOR TO MAKING ANY CHANGES FROM THIS DRAWING. 13. REFER TO EACH PARTY'S INSTALLATION INSTRUCTIONS FOR MORE PRECISE DESCRIPTION OF SUBSTRUCTURES AND OTHER REQUIREMENTS. LEGEND: G T ICIS P COVER GAS G GAS 12" - 1"112"12" "n STREET P ELECTRIC PRIMARY ELEC. SEC. S ELECTRIC SECONDARY 12"12"12" 3" - 30"36" STREET T TELEPHONE C CABLE TV m / SLASH INDICATES CHANGE IN OCCUPANCY STOCKDALE HIGHWAY PROPOSED SERVICE TRENCH -- — PROPOSED MAIN LINE TRENCH CD EXISTING UNDERGROUND FACILITY [2� PROPOSED #2 (17" x 30" x 18") ELECTRIC SPLICE BOX rLZ PROPOSED #2 (17" x 30" x 26") SECONDARY ELECTRIC SPLICE BOX [3� PROPOSED #3 (24" x 36" x 18") ELECTRIC SPLICE BOX �5] PROPOSED #5 (3' x 5' x 3'-6") SUB -SURFACE ENCLOSURE �6] PROPOSED #6 (4' x 6'-6"' x 5') SUB -SURFACE ENCLOSURE L7J PROPOSED #7 (4'-6" x 8'-6" x 7') SUB -SURFACE PRIMARY ENCL. PIONEER CANAL PROPOSED LANDSCAPE METER LTJ PROPOSED TELEPHONE PEDESTAL\SPLICE BOX CL PROPOSED CABLE SPLICE BOX LW PROPOSED PAD MOUNTED TRANSFORMER 1 PROPOSED PMHI PAD MOUNT SWITCH / INTERRUPTER 10' INDICATES TRENCH FOOTAGE & OCCUPANCY ---;,� PROPOSED LS 2A STREET LIGHT LOCATION (SEE NOTE 11) PROPOSED SERVICE LOCATION X PROPOSED PG&E POLE ALL FIELD CHANGES REQUIRE PRIOR APPROVAL FROM: COMPANY TELEPHONE 1. LES INGLES P G & E (661) 398-975 2. REGGIE SMITH ATT (661) 631-3473 3. MARK BAIZE BRIGHTHOUSE (661) 634-2296 MINIMUM COVER AND CLEARANCES* NON PG&E STREETLIGHTS WILL BE CONSIDERED SECOND ELECT. FACILITIES. CITY ST. LITE FACILITIES MAY NOT BE PLACED AT THE GAS OR PG&E ELECT. SUPPLY LEVEL OF ANY TRENCH G T ICIS P COVER GAS - 12 12" 6" 12"24' 30" IN STREET TELE. 12" - 1"112"12" "n STREET CAN 12 1. - 12" 12 180 ELEC. SEC. 6" 2" 12" - 3 24",30" STREET 30" IN STREET ELEC. PRI. 12"12"12" 3" - 30"36" STREET STREETLIGHT 6" 12" 12"11- 3" SEE EX.B AG -1 NON PG&E STREETLIGHTS WILL BE CONSIDERED SECOND ELECT. FACILITIES. CITY ST. LITE FACILITIES MAY NOT BE PLACED AT THE GAS OR PG&E ELECT. SUPPLY LEVEL OF ANY TRENCH TYPICAL SERVICE TRENCH VICINITY MAP NO SCALE NOTE: DO NOT USE THIS DRAWING FOR STAKING. REFER TO APPROVED ELECTRICAL DRAWINGS FOR ELECTRIC FACILITY PLACEMENT, DETAILS, AND CLEARANCES. 6 5 4 3 w n Lj Li < O Li LL_ O 0 > In w Q cr- m w O n O U Ln 2 ry o " �w -v -i-"-1+- 0 Li l a Q Z N c— J m U"13 � Q STOCKDALE HIGHWAY a � L 0 CD 6i o o Lam. z P J T � ,�/ `i' IT Q L w W = O C:) c"m S m PIONEER CANAL C_> NTS TYPICAL SERVICE TRENCH VICINITY MAP NO SCALE NOTE: DO NOT USE THIS DRAWING FOR STAKING. REFER TO APPROVED ELECTRICAL DRAWINGS FOR ELECTRIC FACILITY PLACEMENT, DETAILS, AND CLEARANCES. 6 5 4 3 w n Lj Li < O Li LL_ O 0 > In w Q cr- m w O n O U Ln 2 z o °Ocn I N o " �w -v -i-"-1+- Li l a >__ N c— ulli o m U"13 LCA � L Ln CD 6i o `i O LL_ L W = O C:) c"m S m Q C_> C) Z O N CL U M Z �j-' O rn Q V-4 a 04 =��0-C, N Ey V Cl. LnLn tO Q N Z�- N U p m C> 00 U o w N gQ � Z w Ln ILL_r-- Q 0 'Z ?� w O tY = _ a_ a CD fG ■ a m S C.7 W z o °Ocn I N o " �w -v -i-"-1+- Li l a >__ U N m a� m Ln a `i W : c"m Q o J Z C-) Q Q a a Y =��0-C, c V Cl. W tO Q N Z�- N U p m E-+ w Lo gQ D E ILL_r-- Q � ?� w = Y a 1 INCH 0 W >__ 0 U Z Q J Z Y o c p Z�- N U p E-+ w Lo gQ E ILL_r-- Q � ?� w = Y CD '< m S W J Q C3'. Y p 1- v � W N O cx 1 INCH 0 E lug C :1 m T �" �y' DOSING r W ft SQUEEZE LOCATION -/ PGE TO SQUEEZE 87 PL MAIN PER GS&S A-93.1 INSTALL: (1) 8- PLASTIC BUTT FUSION TEE CODE: 02-0202 (3) 8' ELECTROFUSION COUPLING CODE: 02-1631 LOCATING WIRE PER GS&S A-90.2 It 111 lu :K3 MISTING d, W PL T SQUEEZE LOCATION APPLICANT TO: INSTALL: (1) 8- X 6" PLASTIC REDUCER CCODE: 02-0766 (1) 6- X 4- PLASTIC REDUCER CODE: 02-7992 GAS TIE-IN DETAIL NO SCN.E 5 I.S. ANODE - CODE: 56-9145 LOCATING WIRE 1 CTS BLIND CPLD 1 CTS BUND CPLG CODE 01-5608 � CODE: Ot-5608 29 MIN. ` / MIN. a a (1) 1" CTS 3 -WAY BLIND END WYE CODE 02-1547 e- 0 OU CL z�m (1) 2- x 1- BRANCHING SADDLE CODE: 02-9784 PROPOSED 2- HP PL TYPICAL STUB SERVICE TIE-IN DETAIL No SCALE NOTE: ALL SERVICES AND SUB -STRUCTURES ARE NOT TO SCALE FOR CLARITY. ALL COMPONENTS SHALL FIT WITHIN THE PUE OR FRANCHISE AREA UNLESS OTHERWISE NOTED. REFER TO DETAILS FOR LOCATIONS. 5 LB. ANODE - CODE: 56-9145 LOCATING WIRE CAUTION TAPE FNISH QUM 1 1- CTS BLIND CPLG () 4 tr MIN. CODE; 01-5608 WARNING TAPE C G.S.&S L-16 6- X 1000' ROLL 1 V 8'-1 ' INSTALL EXCESS FLOW VALVES 2 TERA TAPE CODE: 37-9947 � 5; S FROM SERVICE TEE. PER GSS Qvs ffi A-93.3 PG 4 OF 6 G LIZ Cn � a W (1) 1- EXCESS FLOW VALVE z W CL / CODE: 02-0953 r-- s r /J Se a- C (1) 2- x 1BRANCHING SADDLE .. W o CODE: 02-9784 V Z 0 to a. a ATTACH EFV. I.D. TAG TO PROPOSED 2" HP PL STUB END USING THE LOC. WIRE. TYPICAL SINGLE STUB SERVICE TIE-IN DETAIL O No SCALE GASLINE CAUTION TAPE FNISH QUM _ 4 tr MIN. A_ WARNING TAPE C G.S.&S L-16 6- X 1000' ROLL TERA TAPE CODE: 37-9947 WARNING TAPE INSTALATION ZONE Qvs 12" MIN. tin G LIZ GAS PIPELINE INSTALLATION TESTED OR INSPECTED AND NOTED ON DRAWING ALL CORROSION LEVELS SATISFACTORY PER PG&E GAS UTILITY STANDARD TO -4181S QUALIFIED EMPLOYEE DATE Corrosion mechanic's signature Is required when a CPA boundary Is wftWn the scope of the project ATTENTION FOREMAN PRIOR TO STARTING JOB, CONSULT AREA CORROSION MECHANIC FOR LOCATING WIRE INSTALLATION AND CATHODIC PRO- TECTION REQUIREMENTS CONTACT:. SAM HENRY PHONE: 661-342-0855 NOTIFIED U.S.A. DATE: TICKET , BY - 'Ir r TYPICAL GAS LOADS: TANKLESS WH: 200 MBTU/HR FURNACE: 100 MBTU/HR RANGE: 45 MBTi l/HR DRYER: 35 MBTU/HR STOCKDALE HIGHWAY j a I� 0 W4bW W �O a GAS NOTES: 1. DEVELOPER TO INSTALL ALL GAS PIPE. 2. DEVELOPER TO DO ALL TRENCHING, BACKFILLING AND COMPACTING. 3. REFER TO TRENCHING COMPOSITE DRAWING FOR PRECISE LOCATION OF TRENCH, TRENCHING DETAILS, SHADING AND OCCUPANCY. 4 GAS PIPE REQUIRES SAND SHADING IF NATIVE SOIL IS NOT ROCK -FREE. PG&E WILL INSPECT BACKFILL MATERIAL 5. GROUND TO BE WITHIN .2 FT OF FINISH GRADE PRIOR TO INSTALLATION OF GAS PIPE. 6. GAS REQUIRES AT LEAST S OF SEPARATION (1' UNDISTURBED SOIL) FROM PARALLEL RUNS OF WATER. SEWER, OR STORM DRAIN. 7. PRE -CONSTRUCTION MEETING REQUIRED AT LEAST 2 WEEKS PRIOR TO START OF INSTALLATION. & CONSULT WITH PG&E REPRESENTATIVE PRIOR TO INSTALLING CONDUIT FOR GAS PIPE. 9. CONTACT PG&E REPRESENTATIVE PRIOR TO MAKING ANY CHANGES FROM THIS DRAVANG. 10. ALL EXCESS FLOW VALVES TO BE PLACED 8'-12' FROM GAS MAIN. 11. CALL U.S.A. AT LEAST 48 HRS PRIOR TO TRENCHING (DIAL 811) CONTRACM 0011 n UCIM REFEI ND CES 1. REFER TO GAS STANDARDS A-90, A-93 & A-93.1 FOR TYPICAL DIRECT BURIAL PLASTIC GAS MAIN AND SERVICE INSTALLATION. 2. REFER TO GAS STANDARDS A-90, A-903 & A-93.1 FOR TYPICAL PLASTIC GAS MAIN AND SERVICE INSERT CONSTRUCTION. & REFER TO GAS STANDARDS A-90.2, 0-14 0-13, 0-13.1 FOR TYPICAL ANODE AND LOCATING WIRE INSTALLATION ON DIRECT BURIAL PLASTIC GAS MAIN AND SERVICES. 4. REFER TO GAS STANDARDS AND A-90 & A-91 FOR TYPICAL GAS SERVICE RISER INSTALLATION 5. REFER TO GAS STANDARD A-34 FOR TEST CRITERIA ON GAS MAIN AND SERVICES. & PACIFIC GAS AND ELECTRIC TO PERFORM ALL HOT TIE-INS AND PURGING OF GAS PIPING PER GAS STANDARD A-38 7. CONTRACTOR IS RESPONSIBLE FOR CROSSING EXISTING WATER, SEWER AND STORM DRAIN LINES, EITHER UNDER OR OVER, AS REQUIRED TO MEET P.G.&E. COVER AND CLEARANCE REQUIREMENTS. REFER TO UO STANDARD S5453. S. THE LOCATION OF ALL EXISTING OR NEWLY INSTALLED WATER, SEWER, AND STORM DRAIN OR OTHER LINES, SHALL BE DETERMINED BY THE CONTRACTOR. THE CONTRACTOR SHALL NOT RELY ON PG&E TO LOCATE FACILITIES. (PG&E WILL LOCATE PG&E FACILITIES UPON PROPER USA NOTIFICATION). CALL USA AT 811. 9. THE CONTRACTOR WALL BE REQUIRED TO REMOVE AND REPLACE TRENCH SPOIL WITH SELECT BACKFILL AS REQUIRED BY PG&E SPECIFICATIONS, AND ANY LOCAL CITY, COUNTY OR STATE REQUIREMENTS. 10. THE CONTRACTOR WILL BE REQUIRED TO PLACE TEMPORARY AND/OR PERMANENT PAVING IN ACCORDANCE WITH ANY LOCAL CITY, COUNTY OR STATE REQUIREMENTS. 11. USE #10 WARE ON ALL MAINS AND SERVICES. 12. REFER TO GAS STANDARD J-15 FOR GAS METER LOCATIONS. -- W 11- 14 PIONEER CANAL NTS VICINITY MAP APPLICANT TO VERIFY RIGHT OF WAY. THE CONTRACTOR SHALL OBTAIN ALL APPLICABLE PUBLIC UTILITY EASEMENT AND PUBLIC SERNCE PEf6ufiTS PRIOR 70 CIAIMENCIIG THE WORN( EASEMENT ACQUNSITION PRIOR CONSTRUCTION AT NO COST TO PG&E LEGEND: -- -- -- -- - PROPOSED SERVICE -- -- - PROPOSED MAIN LINE EXISTING GAS FACILITY PROPOSED 5 -LB ZINC ANODE -}/�- EFV PROPOSED EXCESS FLOW VALVE (} PROPOSED 4- VALVE W/ FRAME AND COVER DESIGN CHANGE COMPONENT ANY CHANGES TO THIS DESIGN MUST BE APPROVED BY DOMINIC OTHART (661) 398-5817 PG&E GAS ADE RECAP -'s 1. INSTALL 2,510' OF 4" HP PL MAIN (BETTERMENT) 2. INSTALL 9.080' OF 2- HP PL MAIN 3. INSTALL (171) 5# ZINC ANODES 4. INSTALL (20) 1- EFV VALVES ON SINGLE SERVICES 5. INSTALL (86) 1- PL SERVICE STUBS (3,194') 6. INSTALL (151) 1- PL SERVICE COMPLETIONS (3,800') 7. TIE-IN (1) 8" PL X 4- PL (BY PGE) PLAT M.A.O.P. 60 PSIG C.P.A./C.P.S 502500 T.B.A. T-01 EMERGENCY ZONE: 6 5 4 3 2 In W tj cia W _ S E ""mss g saa •� 4 C Qvs G tin m LIZ .._. � o W O z W 0 "' r-- 0 S Se a- C m r -C -Z= .. W m C> V Z O to a. U M O cCie O N V CQ 1� r1 v O M +E-4 Z _j W '4; g a� a r �.y F.y m � N v W Z �• t� W z Ge~fl- 0 w W J u(D a E ""mss g c� J saa •� 4 C Qvs G Fm m .._. 0 fJ W cm z W Z o4 S Se a- C CL W m a v c� J I I I I -I -o 1 INCH 0 W G U Z Q W cCie O c V CQ O Q O +E-4 Z _j W 04 a r �.y W t� m W J a v Z Y U O t- F- W 2. 0 o�. I I I I -I -o 1 INCH 0 E ❑c GPTC 9 7 69' i I �I DWY - - DWY 6' 2 MATCH LINE A—A SEE SHEET 3 56 3 El I 54 53 �l 10 \ 6 I 9 10 MATCH LINE A—A SEE SHEET 3 50 51 I 52 I 53 I 54 55 56 I i100 I I I i ` I ' 16 SHORT SIDE SERVICE L 2� 63 64 \\ i BROCKBANK AVENUE 609 \ - --- ; - - I 57 I \ � \ ® � -L--- ; SS Ss ss SS SS :�S -- -- � II 96 10. i I ° — 100 -- — M M — M M �.! PUE/" 64' LONG \ q' 'gy/ � - --,� -- - - -_ - -_ _ L.L.) „ SIDE SERVICE DWY DWY LJ I 6 2 I I I I �,�, I 58 I 9 98 9 7 96 I 65 9 95 95 I (n--- I I S I I- N GSTC \ I I I I 0-' 349' \ _ _Dw,- DWY 16' SHO_RT SIDE SERVICE I L2EJ 1 O' _ U - PUE- v 10 I I v g 4 PSPUE T 1 I ! 94 9.3 92 I i I 328 I i W I PUE I i I I I i I W I 59 I 60 �,► 3: I I I I w 61 I z 2 I I w ► 66 v I 6 7 68 64'LONG 10' �N I , 69 85 86 87 88 89 90 91 r o _\ I �. 4 SIDE SERVICE PUE 64 LONG SIDE SERVICE I I I I i i I U 64' LONG I - - SIDE SERVICE I ' 64 LONG 93 I w -- --f — — — DE, SERVICE I / 1O PUE I I %( I I I w — SI SIDE SERVICE - - ' o PST i -- — — --fi ----- --- -- _;= - — -tq' — — w DWY r���, ss ss 6 s ---� 21s' H NNAH - - — — — -� ___.-.--.-1--_ s �- DwY 16' SHORT �2E — ss -- ss ss_ _ I� o LYN i csTc :L--j STUB FORA EN U E SIDE SERVICE ...�_.. _ s co 141' j FU URE o /� r-� rT r�� S ' SS S� -- SS - - sill", ! S SS o LcJ LJ _- c '-N-' _ - - 6 6'li fi s S ss -- - s - -- - s - -- - - f r"1 -I I 92 I GPTC 16' SHORT 16' SHORT i '� .— r" 1 r� - 136' SIDE SERVICE I SIDE SERVICE T rT16' SHORT '"---C C W Y' N 77 U' I PST60 LA - U I I 91 259' -- 6 6' o CD Li t w U O Q Q 0 DwYL Z Q I o DWI' 16' SHORT rl SIDE SERVICE I n �� PUE I U Z O � " Q - Q n II 78 90 I � 4' I D z Y I GPTC I SIDE SERVICE 16' SHORT .}---;.1 S16' SHORT IDE SERVICE \,Lgy 10, PST I SIDE SERVICE _ 1 0+ T PUE 259 Jl PUE / 76 75 i74 i I 60' I ' ► I 9 I lo ► 73 72 71 I I I I I 6' I 70 84 8.3 82 i I GPC i I I 261' I I ---- - - -_ _I �� 10, I -- _ - - J PUE --- I �� -- -- - - --lT T- �I I I ► 10' I v I I I PUE ( I I I 79 80co I �I� 84 QIP I II o 81 82 ROPE TRENCH I I PST I I �� 1' BEHIND I I O I I 85 86 74 75 B 10' PUE i� 147 16' SHORT / 93' I PC I I 1 p' SD CB'S I LL_ " r - --- -- - -I - - SIDE SERVICE 92 GSTC r) rt - --- - ' - 16' SHORT ��� SIDE SERVICE 243' I PUE I W �� J _ 7-,T 16' SHORT I PST PST GPTC ' rW� C SIDE SERVICE 16' SHORT �- — --- ' 16' SHORT\ I 10 35C - -"' =--L ►- — SIDE SERVICE 180 136 SIDE SERVICE 5 PUE � - SS Ss ; i� -. _ rNJ s 1 `moi Ci__ W, — - - L — — — — -- 16' SHORT ���, �- SD—_ ELI SS -- -- SS --II - L_TJ _ j �1 T SIDE SERVICE �� D — -- �� - -- sD SANE 6 ss SS 3 sD SD 3 WA STUB OR 89 sD SD - ss ss ---- s; --- --- Ss___ ` FUTURE ss ss w ------- SD - S: -- --- -- ;D SD SD SD SD I TRENCH UNDER -� - - �1 } - - _ - - - - w - - - - o _ I PROPOSED WALL �- -----____ O"E 64' LONG O SIDE SERVICE 0 / RISER HE I I / OHE -- o"E I SUMP QUAD TIE INTO NEW PRIMARY AND CAN RISER POLE ! 88 87 73 72 0 0� 71 it I I I I I I i 76 :• INS 77 0 --- �....---- �..� ---.�-----.�--------.— — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — ----- �•--------..�—�.O"E �.. -- �•-- �—�. �.----°H�. �- — — -----_---- _ - - - - -- - NOTE: ALL SERVICES AND SUB -STRUCTURES ARE NOT TO SCALE FOR CLARITY. ALL COMPONENTS SHALL FIT WITHIN THE PUE OR FRANCHISE AREA UNLESS OTHERWISE NOTED. REFER TO DETAILS FOR LOCATIONS. NOTE: DO NOT USE THIS DRAWING FOR STAKING. REFER TO APPROVED ELECTRICAL DRAWINGS FOR ELECTRIC FACILITY PLACEMENT, DETAILS, AND CLEARANCES. 6 5 4 3 2 W N CD U' � 00 N o LA - U Ln Ocn U W J o CD Li t w U O Q Q 0 Z o o z U U Z O to Q - Q o � N D z Y O �[ H cn C\2 0 00 J rn o 0 ~ mto �. Z w L0 k W z� o P4 Oa Z G=.' (D a < m <C c.) w --- �....---- �..� ---.�-----.�--------.— — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — ----- �•--------..�—�.O"E �.. -- �•-- �—�. �.----°H�. �- — — -----_---- _ - - - - -- - NOTE: ALL SERVICES AND SUB -STRUCTURES ARE NOT TO SCALE FOR CLARITY. ALL COMPONENTS SHALL FIT WITHIN THE PUE OR FRANCHISE AREA UNLESS OTHERWISE NOTED. REFER TO DETAILS FOR LOCATIONS. NOTE: DO NOT USE THIS DRAWING FOR STAKING. REFER TO APPROVED ELECTRICAL DRAWINGS FOR ELECTRIC FACILITY PLACEMENT, DETAILS, AND CLEARANCES. 6 5 4 3 2 A W az 0 z W 00 U' � 00 N ci y C -� LA - LAJ Ocn U W J cm m Z M W O Li t w U O Q Q Q A W az 0 z 1 INCH 0 x v Z I 0 W 0 v Z Q � D � Y O �[ H C\2 O J � o 0 w Q Z Y C.7 < m w Q O Y Z U O t` W Lu c! to 0 1 INCH 0 x v Z I 0 rm■ ©■ � m �' m INSTALL 2: OF r HP CODE: 01- I Ii 43 M 7► N W W 2 MATCH LINE A—A MATCH LINE A—A N SEE SHEET 3 EE SHEET 3 4 1 o Q I 5 _ 6 0 1 2 3 4 .� o 7 6 , , , I 5 6 I 7 ; \ U U Z O N LL. 14 \ 15BROCKBANK AVENUE f '� 8 sS ss I SS ; SS SS SS---LgS SS - SS -- � S�-.•..—�- � � � •ii. �/ i M 59 / 64' LONG \ / �1»:_ _ s _ 3 ! SIDE SERVICE - - \ �., 4 _ _ M__ -- _ _ = r41 _ _- - w :- - --- _"M=� t d U a 13 5# - 4 --- 16 r 58 ' 57 56 55 I'. r I 54 53 52 ! 51 z ' F.,. I INSTALL 11141,111 I o 9aN� of I I I I I PUE PHASE 4 � z' ! 10'! PHASE 2 -- — -- - - __- _ PUE I 10 ! � Z PUE ! ! i o K 10 � Lu � � ! I INSTALL 146 f � f � , � g w 1/ / 2 l (n 1 ! r HP PL MAiN I f Y a"� Z 2' ' CODE: 01-6079 I ( I I I W os .$ r( 1 17 I' o ! ow 4 18 1g ~ . N .. 64• LONG f 10' ; �" (NEW) 20 44 4 5 I 4 6 ` 4 7Cft SDE SERVICE PUE ! �64' LONG ! - 9 0 I2 vs m m C a SIDE SERVICE ! C:) W a ,, -- 064' LONG O .. SID- SERVICE �M �. '- ! 84' LONG 10' PUE 64' LONG I I f V = 0�. t4? $ CC 61 W SIDE SERVICE SIDE SERVICE f CL W ss— ._.„�._ . ss S ; SS ss H NNAI-� .... V EFV Ss sS _ I B FO — _... --� � Y o LYN S `° sS RE o A EN U E I I s SS - ----- S - ...-• -' 6' Ij --- SS I s H 1 (NEW) I I 5 ss ss s ---s _ _ ss _._J (NEW) # __ SIE SERVICE 1 16' SHORT "��+ ...�.. ,.-� - - moo SIDE SERVICE •..... . '""- ! 1 16 SHORT E SISERVICE 16' SHORT 16' SHORT lop ! SIDE SERVICE _ __- 10, SIDE SERVICE 28 7 PUE PUE I ! 2 26 � I o 25 60 I Plastic Pipe Data INSTALL 352' OF Y HP PL MAIN 24 231� TEST AT 100-110 PSI FOR MINIMUM OF 5 MIN CODE: 01-6079 1 22 6' s i % 41 42 1 ! INSTALL 306" ```f (NEW} ((`� 41 Prmsuro st Duration initials Dafe of Te OF .2" HP PL MAIN j 1 CODE 01-6079 ( j 1 INSTALL 281' I I I I f ( 2 OF 2r! HP 10, �- --� CODE Ot-6079 N 10' I I c 0 PUE j-- PUE PHASE 4 Plastic Pipe Data I INSTALL 663' � s r. �. -- F-- _,.. - _ � � - 1 � 011-11; 101 s�" ► 10' w PHASE 2 _ - Footage and Size Id P -.- SDR / Wali Thickness a 29 E UE I— 1 _____ (� I INSTALL 143" Pipe Manufacture 30 31 ( OF r HP PL 01--6079 N I I Oats, Manufacfurod 32 33 35 © 1 ( ❑ PE 2406/2708 ❑Other PE: 1 34 0 36 3 7 3 3 3" T. Footage and Size �E SERVICE / ! 16' SHORT \ 1 ! 10 1 0 f SDR / Wall Thickness __..PDE SERVICE 1 PUE 1 j W Pipe Manufacture -- ""• "" ---- — SIDE SHORT'E I ( p rr m 1 , I I Date Manufactured a � 1 _ 16 SHORT / 16' SHORT\ 1 I 1 I I OPE 2406/2708 ❑other PE: Z 1 i i ( -+•- --- SIDE SERVICE ..e. f t ; t �..-. _t � -_____ _ SIDE SERVICE � It � � PUE , WT Uv,.v I I I SIE SERVICE t I I i SUMP ! � N 14- I 1 c w 0 0 39 38 (n 10 32 31 Q 30 i a. a- - I I I I I -----_._......_--..._--..._...._...__..--.-,.----.,.:.--_..-------_....."----------------------------- --—,—..,----"'.__._.."'..---._,__.--------.___.--..------.-..----,...-..-...:......_.....—_---..._ L OTE: LL SERVICES AND SUB --STRUCTURES ARE NOT TO SCALE FOR CLARITY. LL COMPONENTS SHALL FiT WITHIN THE PUE OR FRANCHISE AREA UNLESS NOTE: DO NOT USE THIS DRAWING FOR STAKING. REFER TO APPROVED ELECTRICAL THERWISE NOTED. REFER TO DETAILS FOR LOCATIONS. DRAWINGS FOR ELECTRIC FACILITY PLACEMENT, DETAILS, AND CLEARANCES. SCALE: 1 "=50' 1 ' 1 1"mml� N1 0' 50' 100' 1 PLAT 5025-D1 M.A.O.P. 60 PSIG C.P.A./C.P.S 502500 T.B.A. T-01 EMERGENCY ZONE: 6 5 4 3 W D U Z Q >Y a QCe. Y � Ngo V 0 C:1 In C Q W N CL E-4 s�- L) Q W C? m Z U = w W J V_ O Y U v tLd L W C> Z i,I C> aC a 0 2 1 INCH 0 IE C c lu W 2 3 NOTE: ALL SERVICES AND SUB -STRUCTURES ARE NOT TO SCALE FOR CLARITY. ALL COMPONENTS SHALL FIT WITHIN THE PUE OR FRANCHISE AREA UNLESS OTHERWISE NOTED. REFER TO DETAILS FOR LOCATIONS. MATCH LINE B—B SEE SHEET 4 34 I — _ ss ss — A -`3 ELEC. WATER — EUi 7 ��C SD CB \ I \ \ XFMR I WELL \ 10 I � v / 12 p v \ 38 2 i m 49 42 PUE \ ° 41 'loll/ 64 LONG / 1 °' SIDE SERVIC� PUE A 440 i v GPTC ' � �� _ � �.� 16' SHORT SIDE SERVICE 5C 0 v ti PST 153' 10' PUE 3 GICE SS \ ROPE TRENCH 1' 4 BEHIND SD CB \ I-000, SHORT / SIDE SERVICE / ® PST 5 \ O� � 239 / 16' SHORT y / - Gj SIDE SERVICE A. GPTC 4_ 187' O 1000, ox 10 MATCH LINE B—B SEE SHEET 4 IRRIGATION moo° ��GSTC 6, METER 52 /0" _ \1� � .,, •• 128' 57 / �\ . v \SD SHORT 51 \ \, � < % � SIDE SERVICE � \' G LG SIDE'SERVICE >4k\ l A\G GPTC / \\ 320' / 2 GPTC °s ' /> 198 / / ss / / 4' � s� 1 pyo o / 14 �` 1 3 STUB FOR I ! /////' ` Ss /� \ SS o. �\ 5 9 \ \ - \ FUTURE I _ / 6' � / \ / PST AT ROW \_ ss / \ i? r? °s ��� 169' V L '^S�' I�/ 16' SHORT \ 2 SIDE SERVICE ss Fn L� �- - - - GPTC ► /`\ 10 317 // \ fi �/ \ og GPTC PUE ' 64' LONG \ i 54 _ RR SIDE SERVICE SS �t0 I -_ 'o ss�— ss ' ,� —''' yoxy0 80 \ OS s � 61 0 \ ss �� \ \ / Ss 79 1� ss OS GPTC GSTC / .�, \ � 7g 4 GTC� 6 -0 , \ / sS ` � \ 207' 333 _ c \ < 16' SHORT 78 �.�' ��(yG SIDE SERVICE \ &V LONG 10' SIDE SERVICE i/ \ ,"p/ / ` �� 6751 \PUE ���\��� / \ 73 I J _ - 2 , ` I PUE O 50 64LONG Ss '0 '71 4 1 2' Z /SIDE SER PUE 3, 70 /PS , ss 16'SHORT /101 74 16' SHORTSTUB AT P/L - - - SIDE SERVICE / 100 GPTC SI GPTC PST / / "X SIDE SERVICE 198 `r1 90' ss So/- \ Q 99 , 10' cn --� — ` \ o SIDE, SERVICE` / \ LONGI 6 CJ 1 1 \ i I \ \ PUE ` M 3 ROPE TRENCH \ \ 64' LONG _ .►�' � } ss \ 1' BEHIND SERVICE �0 USD CB'S y Y \ .� - — �o S C 16' SHORT _ s _ �,� SIDE SERVICE \ I \ \ - ss \ — ®'s' n,._,... 5 10' \ ' ° 6 ` 72 71 16' SHORT / _,,�-� -'�--► `� GPTC PUE 6 �„ \� PUE \ I I I SIDE SERVICE J` ss ` \ \ 69 ss , �LC SHORT PST 78 GPTC \ �►• SIDE SERVICE 126' \ \ GSTC 2 \-- ss , �� `'� �''( , 98 21' ���' �N-► 1� 1 ° J` 1 6' o0 77 G -- -- — -— -- � 52 16' SHORT U t � LTi — — — — ----�— — — — GPTC - �--- PST SIDE SERVICE ,53 60 4' � 232' 1 \� 2� 5 0 - -?*e51.}-- 54 101 \52 53 54 55 r -- - - ---- 3 o - - L - ---- -- - o o STUB FOR 9 7 ' �� . . 56 55 FUTURE MATCH LINE A—A SEE SHEET 2 MATCH LINE A—A SEE SHEET 2 NOTE: DO NOT USE THIS DRAWING FOR STAKING. REFER TO APPROVED ELECTRICAL DRAWINGS FOR ELECTRIC FACILITY PLACEMENT, DETAILS, AND CLEARANCES. 6 5 4 i� 3 w U) 0 a W L 2 on - N I W W W WE cQ� gx c °O co N w co U"3 Q ul�l Lc) C14 >-- O c OO m M Ln C3 O C C) o v z 'Q U U Z O N a_ x U0 � > o U w 0 Z p W� Z w to N Lo Ln Lo U O et •c,[ oma.. � o S Z O �' ��j o U cd W rn Q to O � N Z w Lo � m o ►@-� 0 z Z o_ a o O a a Ne - cQ� gx c °O co v �_ w Q U >-- c =3N m Ln C3 O C v C> 'Q �... 17) m FN— C�o x O � > U w 0 Z p W� Z w Lo U O et •c,[ oma.. Q S MEa- U U � W � Q to c.7 m m m 0 W a O a Ne - CD 0- U O W � U � 0 3:: 0 0 ag 0 W U Z Q Y O C C> 'Q �... N U FN— C�o C~ G 0 Q w Lo E-� u_ w � c.7 m m W J O Ne - CD U O W � U � 0 0 1 INCH 0 INUID C F TE: L SERVICES AND SUB -STRUCTURES ARE NOT TO SCALE FOR CLARITY. L COMPONENTS SHALL FIT WITHIN THE PUE OR FRANCHISE AREA UNLESS HERWISE NOTED. REFER TO DETAILS FOR LOCATIONS. HW Cie w 48 o a a 49 10' 42 PUE \ 0oo` , �• 1 o' SIDE LONG / PUE g' � � � � ♦ 40 (NEW) MATCH LINE p OF 2ro�'w , �iF • ;� /16' SHORT I�, B—� \ CODE: Ot-6079�N +3� a� �/ SERVICE . f1 P SEE SHEET 4 4 \ �• V�`� n \ 39� 10' 132 sy SrxSE. 5 3 �? \ / - PUE 3 F ti LONGSim SERVI37 4 10, } PUE INSTALL 203' 36 L •�,,,� ` / 16 SHORT OF r HP PL MAIN / J i 3 4 3 5 SyDEwcE % SIDE SERVICE CODE: 01-6079 / INSTALL 187' OF 4 HP PL MAIN i I Ij ' / t •/ \ /� aS CODE: 01-60 81 GS Plastic Pipe Data i I 3 i Plastic Pipe Data TEST AT 100-110 PSI FOR MINIMUM OF S MIN Pressure Duration Initials Date of Test Plastic Pipe Data Footage and Size SDR /Wal! Thickness Pipe Manufacture Date Manufactured 0 PE 2406/2708 O Other PE: Footage and Size __ f ^� SDR / Wall Thickness Pipe Manufacture Date Manufactured 0 PE 2406/2708 0 Other PE: O tJ) CL Foreman LAN ID: Date:_- Foreman Signature: List ail plastic pipe by footage, size, manufacture and date manufactured per Geis Design Standard A-93.1 SIS NICE1_01 9 \ ' / 9 oo vvy► w W ( _ 5# 2A ,i- ' '� �''� a� 'g 4 sem' 01 to 69 I - ---"' INSTALL 239 / a •� # ss O \ 7 OF r HP PL MAIN Q (NEW)ago � � s � SS ..� � tmDE: 01-6079 .01 -- o CD � P ,��., \ $ MATCH LINE B -B U j z --- s ss P ' ; QR B FOR \ / ' / \ c� 0 .--1—� 0- 6 N 4 ��-' SEE SHEET 4 = _ C FUTU E NEW) INSTALL 227'�. '., d a in SC - OF 2 HP PL MAIN � 4 coDE o1-6079 a, L i"-" EX?S�ING 9 ► ! INSTALL 320' _ 52 ELIC 2 ' %t OF 4" HP PL MAIN xl=al� i �� WATER � Q. a WELL 57 INSTALL 24' '� CODE: 01-6081 ��' 5 1 ` / 16' SHORT � 10 N �, \ � SIDE SERVICE li I OF r HP � MAIN CODE: 01-6079 LOPI`�. // � `�►.. H 10,00,10,00,�� SIDE SERVICE / /o/ / /- 58 13 •�' 2 / ♦ � � NEW 3e 400l 49 10000, 62 82 SS CPO. f _---ss� (NEW) -/ \ Nis / \ 59 INSTALL 317' r r TALL 198 0 A� OF 2" HP PL MAIN . _ `C 4' HP PL MAIN S�0 " '� . r/� CODE: 01-6079 2 �� / 0-' 16' SSHORT RVICE INSTALL 297' ~ ~M CODE: 01-6081 =a ` I \ �/ OF r HP PL MAIN 81 .4151 � t�DE: 01-6079 SS 60 79 1 INSTALL 333' PUE o 0 _. -- - OF 4 HP PL MAIN p - 55 '� '' \ 64' LONG / IZ - CODE: 01-6081 80 \ SIDE SERVICE 55 �+ y N�w___ IPo �O� V � ` / rQ.i La Cie 69 (NEW) �. �� / 4' moi` ,,,..-- Ci tom► 7 / y �6' SHORT WOW, SS ( \ / INSTALL 207' OF 2 HP PL MAIN (•j1 \ s B4' LONG / / SIDE SERVICE ` • / CODE: 01-6079 .� 4' `,"'r 2 \ PUE SIDE r C��' / ` ` y2 ` V t � (NEW) � P� � � \ � � INSTALL 198' I , / , ` X 73 1 '7 2 0 / as , /'J~ r , INSTAL. 54 / EFV \ CODE 01-8079 2' 1" ' 'Z ,� , �pE�M / '� S5 /i / 1 d OF r HP PL MAIN U'c� PUE $ 2 i # ,,, •- / I PUE CODE 01-6079 / TM 5# STUB AT P/L \ 52 �� '' j ss /�, �// 3 SS / 71 .. —'`'� y r SIDE SHORT 74 / 5 "� SIDE SERJ�VICE of SERvtcE # ZA 16' SHORT PLAT 5025-D1 .► \ / I SIDE SERVICE I 50 -"""' - '"� r 5� \ INSTAR 381' ` ,- M.A.O.P. 60 PSIG ' OF r HP ' \ i 0 �, —t, �'"�� \ CODE: 01 92' LONG C.P.A. f C.P.S 502500 \ N. OF 2* HP 1PL MAIN 1 64' LONG ` + PUE ` 3' \ 75 SIDE SERVICE r T.B.A. T-01 CODE: 01-6079DoE�� ,�,... S EFV ...-- ---,_.►r , 5 �' ' �, O EMERGENCY ZONE: ' s i s16'IDE SHORT 0, 10 Z SIDE SER GE / r 5# ZA 1 � 3 , S5 (NEW) '"'.". '" ti , P10, UE 76 �.G I71 GM■ ___ Ss ` r,,.• ••-- `...- •-- .... ...-�- MOE SHORT Z \` 6' I �C 49 �., ....- '�."' .., r-- 10 i iA 77 ` (NEW) �,p- �c 16' SHORT PUE , � 3 INSTALL 126' \ �7' PHASE 5 I � 31860 INSTALL 60' , J �"''� ✓• ` SIDE SERVICE 6 , cr PHASE 4 —`—_-...... PHASE 5 �` fso * T� OF r HP PL MAIN �, 4 CODE: 01-6079 � r � PL MAIN i� �, '�' �G� PHASE 4 I CODE: of -6079 (NEW) l i t INSTALL 232' 1 �- , 1 R I �... _ OF r HP PL MAiN 5 INSTALL 330' � D n � I CODE: 01-11 OF Y HP PL MAIN L 7 CODE 01-6079 5# ZA �WWI 4 e� 48 I STUB FOR °� � . FUTURE � " MATCH LINE A -A SCALE: 1 =50' SEE SHEET 2 NOTE: DO NOT USE THIS DRAWING FOR STAKING. REFER TO APPROVED ELECTRICAL MATCH LiNE A -A DRAWINGS FOR ELECTRIC FACILITY PLACEMENT, DETAILS, AND CLEARANCES. SEE SHEET 2 50' 0' 50' 100' 6 5 4 W t? V Z O tJ) CL 0 O � N E Z Gi Q O o� 0 U � U iy w C � N 4> z A civo �. eii W v � Q .? R U W In = Y SIS NICE1_01 9 \ ' / 9 oo vvy► w W ( _ 5# 2A ,i- ' '� �''� a� 'g 4 sem' 01 to 69 I - ---"' INSTALL 239 / a •� # ss O \ 7 OF r HP PL MAIN Q (NEW)ago � � s � SS ..� � tmDE: 01-6079 .01 -- o CD � P ,��., \ $ MATCH LINE B -B U j z --- s ss P ' ; QR B FOR \ / ' / \ c� 0 .--1—� 0- 6 N 4 ��-' SEE SHEET 4 = _ C FUTU E NEW) INSTALL 227'�. '., d a in SC - OF 2 HP PL MAIN � 4 coDE o1-6079 a, L i"-" EX?S�ING 9 ► ! INSTALL 320' _ 52 ELIC 2 ' %t OF 4" HP PL MAIN xl=al� i �� WATER � Q. a WELL 57 INSTALL 24' '� CODE: 01-6081 ��' 5 1 ` / 16' SHORT � 10 N �, \ � SIDE SERVICE li I OF r HP � MAIN CODE: 01-6079 LOPI`�. // � `�►.. H 10,00,10,00,�� SIDE SERVICE / /o/ / /- 58 13 •�' 2 / ♦ � � NEW 3e 400l 49 10000, 62 82 SS CPO. f _---ss� (NEW) -/ \ Nis / \ 59 INSTALL 317' r r TALL 198 0 A� OF 2" HP PL MAIN . _ `C 4' HP PL MAIN S�0 " '� . r/� CODE: 01-6079 2 �� / 0-' 16' SSHORT RVICE INSTALL 297' ~ ~M CODE: 01-6081 =a ` I \ �/ OF r HP PL MAIN 81 .4151 � t�DE: 01-6079 SS 60 79 1 INSTALL 333' PUE o 0 _. -- - OF 4 HP PL MAIN p - 55 '� '' \ 64' LONG / IZ - CODE: 01-6081 80 \ SIDE SERVICE 55 �+ y N�w___ IPo �O� V � ` / rQ.i La Cie 69 (NEW) �. �� / 4' moi` ,,,..-- Ci tom► 7 / y �6' SHORT WOW, SS ( \ / INSTALL 207' OF 2 HP PL MAIN (•j1 \ s B4' LONG / / SIDE SERVICE ` • / CODE: 01-6079 .� 4' `,"'r 2 \ PUE SIDE r C��' / ` ` y2 ` V t � (NEW) � P� � � \ � � INSTALL 198' I , / , ` X 73 1 '7 2 0 / as , /'J~ r , INSTAL. 54 / EFV \ CODE 01-8079 2' 1" ' 'Z ,� , �pE�M / '� S5 /i / 1 d OF r HP PL MAIN U'c� PUE $ 2 i # ,,, •- / I PUE CODE 01-6079 / TM 5# STUB AT P/L \ 52 �� '' j ss /�, �// 3 SS / 71 .. —'`'� y r SIDE SHORT 74 / 5 "� SIDE SERJ�VICE of SERvtcE # ZA 16' SHORT PLAT 5025-D1 .► \ / I SIDE SERVICE I 50 -"""' - '"� r 5� \ INSTAR 381' ` ,- M.A.O.P. 60 PSIG ' OF r HP ' \ i 0 �, —t, �'"�� \ CODE: 01 92' LONG C.P.A. f C.P.S 502500 \ N. OF 2* HP 1PL MAIN 1 64' LONG ` + PUE ` 3' \ 75 SIDE SERVICE r T.B.A. T-01 CODE: 01-6079DoE�� ,�,... S EFV ...-- ---,_.►r , 5 �' ' �, O EMERGENCY ZONE: ' s i s16'IDE SHORT 0, 10 Z SIDE SER GE / r 5# ZA 1 � 3 , S5 (NEW) '"'.". '" ti , P10, UE 76 �.G I71 GM■ ___ Ss ` r,,.• ••-- `...- •-- .... ...-�- MOE SHORT Z \` 6' I �C 49 �., ....- '�."' .., r-- 10 i iA 77 ` (NEW) �,p- �c 16' SHORT PUE , � 3 INSTALL 126' \ �7' PHASE 5 I � 31860 INSTALL 60' , J �"''� ✓• ` SIDE SERVICE 6 , cr PHASE 4 —`—_-...... PHASE 5 �` fso * T� OF r HP PL MAIN �, 4 CODE: 01-6079 � r � PL MAIN i� �, '�' �G� PHASE 4 I CODE: of -6079 (NEW) l i t INSTALL 232' 1 �- , 1 R I �... _ OF r HP PL MAiN 5 INSTALL 330' � D n � I CODE: 01-11 OF Y HP PL MAIN L 7 CODE 01-6079 5# ZA �WWI 4 e� 48 I STUB FOR °� � . FUTURE � " MATCH LINE A -A SCALE: 1 =50' SEE SHEET 2 NOTE: DO NOT USE THIS DRAWING FOR STAKING. REFER TO APPROVED ELECTRICAL MATCH LiNE A -A DRAWINGS FOR ELECTRIC FACILITY PLACEMENT, DETAILS, AND CLEARANCES. SEE SHEET 2 50' 0' 50' 100' 6 5 4 2 1 INCH 0 W U Z Q o� O C � J ctr C%2 civo w eii v � .? iw W = Y C7 m W C:) 0 Z Y U 1.1 2 O - a 2 1 INCH 0 1 2 3 4 5 6 7 8 9 10 MATCH LINE C-C SEE SHEET 5 W 30 29 ��! 19 18 17cn 16 28 27 26 25 24 23 2 21 20i� M I STUB FOR 4 T FUTURE 15 C14 Qo �� ----- -- -- -- 14 NF �� o � Lid E -- _— 1� 0 �I IV- 101 ao c 60p S�E o I NLL:H O,'o 00 33 fCIO 12 I; I o0 00 10 PUE rz I I Ii 10' PUE �� o v v z o vi 31 32 I 20 I 21 I 22 23 I 24 I 25 I I ' ( MCD I I I , 26 12 7 I 28 29 I 30 ' ' , o I I 31 a s II 32 33� cn 16' SERVICE 0 !�IP:SIDE o v� 0 a' 1€a 16' SERVICE 16' SERVICE PUE 64 LONG 64 LONG 64' LONG , 34. <,, �vSIDE SERVICE ' LONG 10/ _ SERVICE SIDE SERVICE /lad N1 rC1 --- SERVICE SIDE L-J .�:PUEv64 LONG .�I SIDE SERVICE _--— �' 64LONG�—N,-SIDESERVICE ��V, -_ I I o - - . -- --i— / z GSTC GSTC PST GSTC I O 48' 62' ss' �' CHAT WORTH csrc AVN E I ! `� — 86' LONG 4co - - �� -- -- ---- — - I 48 0; I I So I / 1 GPTC I I i �' SIDE SERVICE ® / °O �s -- - s,, -- - --1-- sS ss co ss s� S� 40' I CH�'T WORTH AVE. 20' 6' s� ss -L --- o T I 6' s I �, s 3f ss ss `-fl ss — -� --- Ss - ---- - ��� T - I s ss � --- � Ell,-- ---- -- - - -- ----- HT1 r� - — � _ -�- ' I I ! I ' S � ` \ � / rar Z i�-� vii r r-�Lo L-=— - _` ��� � L_J cn C'4 ! rT� wi I _ r� ��I S 6 GSTC \ / / C-+ �+ GTC�157 (� / L _ �a r--1 a / S f STUB FOR 5 10 44' N GPTC 1Ln 0' PST SIDE SERVICE 1 PST C 16' SHORT 16' SHORTl CJ �J S RT•� �' ,-� \I ' 3 / / 0 16' SHORT 'd �.+ FUTURE I PUE 9 86 PUE 284' ?8, SIDE SERVICE 0 SIDE SERVICE P$T SIDE SERVICE _L_ r� �,> Z = 4 `°' GPTC GPTC PUE Jl 203'`-� / <N, / I I / �-+' a- 33 I 19 14 ROPE TRENCH 1' 120' f=. r ■ D � I BEHIND SD CB'S 6 C I I I I 16' SI R 16' SHORT ` r� 3 %� 1 44 43 ' 12 41 40 I SIDE SERVICE - --- -- - i i - N 89' LONG DWY SIDE SERVICE cn W Q > U SIDE SERVICE DWY I 12 I—� I 6' ( I I I I 39 ' 3V J ' ss — ' 10 0-L I..- o o / / / I I co 25 I GSTC O PUE PUE 37 �( 16' SHORT I I - - 241' W 16' SHORT 1 — — — _ 3� I o} i / I I CD c H SIDE SERVICE Q v .-- t ^ > ` J SIDS SERVICE I DWY 64' LONG _ — — — — — _ .� / / / I o� ,c LAJ r 8 SIDE SERVICE / I II i > c� - - -- - - - - �V ��/ I I I I Ca 'O / --�– <�� �. a 36 / / /i ;III / I I \ // I I a� o m o ��'-- I IC7 m C> I/16'\ ° 11 I �� 45 III Z -- ® >_ 4 II p SHORT O cn= I O Cif 26 I SIDE SERVICE 10 O 4 \ GPTC // / I I I c16' SHORT.> LLj z o OlloPUE I z -I E SERVICE I / 660 / i I z J � J __ DWY / I I V O Q Q Q ° -- / \ / / I I Ir— cin= -w oQ� cn / � 16 -� I I - - - - -- - - -- / 1 / / 288' 16' SHORT \ 48 r z 46 SIDE SERVICE GSTC I � v `A ✓� v 141' I I I / <v � I r��p SHORT 1 0 SIDE SERVICE 46 I 6 27 I �� -�' \ 10' PUECL �' SHORT li i \ `� �� < SIDE SERVICE �/ I I N y rj I G -- 9 5� 4 Wy SIDEQj •SERVIC LONG2� D� A� I I I f z -- I 64 LONG \ 1 o \ SIDE SERVICE '` c, ` , / I� �7 4 /119 N 28 \ 8 1-100' / 4 7 / 0 45 / 14'--6'' I I I Cl 6 7 10 SIDE SERVICE 64' LONG 8'/- PUE ' �lb' SHO 4�� f � PUE 3' � � � � � � I - - --- - ---- --- - � ` \ \ SIDE SE CE Q 64' LONG / �,S GPTC \ 4V / G� 4 /�. / / G' f SHORT 2 I 16' SHORT SIDE SERVICE �� , \ tJj O �T' c' SIDE SERVICE \ \ SIDE SERVICE •�� °s J,� 49 ° 10 " / 1A, - / o \ PUE j A / PST o o mak, �� 0 142 5(J , y�, / , II o — R s� sem. - <�, �v 49 s I I En _ - --- --- --- w s \ 43 / / 3 /%� r — 40 N \� 7"� `� I I W GPTC �� \ NG 4' I �\ \ �% �,�6' SHORT 80' \ `PiP \ 64' LONG -- I SS �' /�� SIDE SERVIC10� °s \ SIDE SERVIC� GG6' �1�O 30 0 �j, �� s �� 10' 1 PUE 6, / V���' 26' B N :�� �� s� PST PUE 1 GPTC / °�// �` PST v �� 61'103' �' e� 71 5 v 16 SHORT / < ; SIDE SERVICE 4 f ` �° C9 PST / /SllDE 6' SHORT S16' SHORT DE SERVICE2p o ���' �2 `rs 1 142' / ®� ( ( I I o SERVICE / s sa 1 oft GSTC J 1 33' .� / e I I z �31 O� 177 ,� �y o /o 10 0\ 4 / I PUE L.\NDSCAPE 6' 3 GPTC METER CAN �\ I 4 76' / \ I I w V, - - ---- -- -- --- - --- POWER 2 / °� S� /% SUPPLY PST \ 55 �32 � LINEg-B < �y 102 ;�/ MATCH 3 y �.� — w J z SEE SHE �"��� Q / SIDE � SERVICE _ E-4 O \� V A � OQ� 54 / ��, ®� �- �� �- o / PST CV �, c�, o �� ��Q. �� 0 Q Ln A 180 0 'A T E-' LLj CD i' 53 �. / / ��� �� �.�.� / 3:: °° \ 64' LONG 16' SHORT F~� SIDE SERVICE --*.-SIDE SERVICE F� J NOTE: o 0 ALL SERVICES AND SUB-STRUCTURES ARE NOT TO SCALE FOR CLARITY. / \ \ \ 516 Z ? v O ALL COMPONENTS SHALL FIT WITHIN THE PUE OR FRANCHISE AREA UNLESS NOTE: DO NOT USE THIS DRAWING FOR STAKING. REFER TO APPROVED ELECTRICAL 52 o. �� GSTC 5 7 moo W N Z OTHERWISE NOTED. REFER TO DETAILS FOR LOCATIONS. DRAWINGS FOR ELECTRIC FACILITY PLACEMENT, DETAILS, AND CLEARANCtS. 124' [—.r o — 0 6 5 4 3 2 1 INCH 0 MATCH LINE C --C E i' 30 29 Iv E i #' 32 w V r 64• LONG (L SIDE SERVICE { I ..a,vv 9 -WIN FUTURE D 'E 33 l PHASE 3 PHASE 5 25 i< e I v E [ 31 t 0 in Eno 32 17 6 u)' r TEST AT 100-110 PSI FOR MINIMUM OF S MIN LLJ Li Q Plastic Pipe Data Footage and Size SDR / Wall Thickness Pipe Manufacture Date Manufactured ❑ PE 2406/27DS rqi -1 Fcotage and Size SDR /Wal! Thickness�— Pipe Manufacture Date Manufactured ❑ PE 2406/2708 MAT SUN H,E� 3 S'E� SEE SHEET 5 r t 8 10_ 18 17 V 1 16 i C11 F I 15 14 t CINE N CID ASE 3 I C.,C L" o 1 13 .. cr, o ,. ,�• PHASE 1 SE m HP PL MAIN 01-6079 12 F•�- m . U U Z Oto tL I { 1 30 , 31 32 Q 33 / ;' f10• l 34 1 E sloEii ��n� GC;n' '-4 PUE / � ---- � 64• LONG 4t,1 a _ ._._ - --- ...� DE SERVICE ,� 35 / ! = / �° ' SIDE SERVICLl E CH T�WORTH AVE. I 9 IS SSS N I a ICE 16' SHORT . ,�� �SIDE SERVICE ` �s i �� 5# ZA / Z 1E EFv i f c Xsi ' SSHOR EFV 4D 39 INSTALL38 5# ZAl LnOF 2" H L MAIN { I i P Com: 01-45079 37 v PHASE 1 / SIDE BICE / / fl ; ff � c VIM PHASE 5 � / J � ' 36 // / if�f i''I S�- 47cm 5 Lai U = —1 LH I � 1 f itI I1I I I I Cj- 16" SHORT SIDE C 48 IE SHORT�46 6} 4(NEW) 457 01PL 9N , PUE COIJ 01-607SHORT W Jim Q dN EFVSiDE SERVICE �a 9 / SID \SIDE•LONN, 5 ZA `� 64' LONG ,C /) S IDE SSERR VI / 4 7 4' (NEW) 45 / f I 8'LONG �. \ \ SIDE'SERVIy `\(NEW / EFV/ NOTE: DO NOT USE THIS DRAWING FOR STAKING. REFER TO APPROVED ELECTRICAL DRAWINGS FOR ELECTRIC FACILITY PLACEMENT, DETAILS, AND CLEARANCES. 44 10' ' ` PUE 43 � / EF 64' LONG` SIDE SERVI \ i 67 `y SIDE SHORT i� 10 PUE t INSTALL 147' 01 I ` OF 2" MAIN CODE: a1-66 079 Jill 2 sti ': 4' S IEW) //1 '-67 I I I ;I-- % 49 , 111 j INSTALL 283'OF ES 01-6079 9N ORT CODHP RMCE 5V �f / INSTALL" HP PL MAIN t II zo O / �� i CODE: a1-sosl t� PLAT 5025—Di Nil /�� M.A.O.P. 60 PSIG C.I*A./C.P.S 502500 fill T.B.A. T-01 { w EMERGENCY ZONE: IN \ SCALE. 1 =50 'QS e, 50' 0' 50' 100' z INSTALL 228'.......................... ` /' S5 �s `• `\\ z OF 2" HP PL MJill COIF: 01-6079 ♦ '� \ ti \ \ iE Sp 9 ' ' / SIDEsSERVICE !VQ 3860 Q O 6 (NEW) '/ 5# ZR o v Ji O Q to 100, ' INSTALL 180' \, a / ' �` �' ` O Q 54 1W H � s Iir / CODE: o% 0 1 A'" / G y ` 5# ZA .Oy �, a ce. Eli \ 1 64 LONG (N ""'16' SHORT Z W SIDE SERVICE �r.SIDE SERVICE W / �5 Q 56 INSTALL z 124' _. U 52 / 5 � 07A'" W O Z O. Gt INCH 0 C F Plastic Pipe Data TEST AT 100-110 PSI FOR MINIMUM OF S MIN Pressure Duration Initials Date of Test Plastic Pipe Data Footage and Size SDR / Wall Thickness Pipe Manufacture Date Manufactured ❑ PE 2406/27DS O Other PE: Fcotage and Size SDR /Wal! Thickness�— Pipe Manufacture Date Manufactured ❑ PE 2406/2708 7-7 ❑ Other PE: Foreman LAN ID:-._______ Dgte:_. Foreman Signature: List all plastic pipe by footage, size, manufacture and date manufactured per Gas Desian Standard A-93.1 67 `y SIDE SHORT i� 10 PUE t INSTALL 147' 01 I ` OF 2" MAIN CODE: a1-66 079 Jill 2 sti ': 4' S IEW) //1 '-67 I I I ;I-- % 49 , 111 j INSTALL 283'OF ES 01-6079 9N ORT CODHP RMCE 5V �f / INSTALL" HP PL MAIN t II zo O / �� i CODE: a1-sosl t� PLAT 5025—Di Nil /�� M.A.O.P. 60 PSIG C.I*A./C.P.S 502500 fill T.B.A. T-01 { w EMERGENCY ZONE: IN \ SCALE. 1 =50 'QS e, 50' 0' 50' 100' z INSTALL 228'.......................... ` /' S5 �s `• `\\ z OF 2" HP PL MJill COIF: 01-6079 ♦ '� \ ti \ \ iE Sp 9 ' ' / SIDEsSERVICE !VQ 3860 Q O 6 (NEW) '/ 5# ZR o v Ji O Q to 100, ' INSTALL 180' \, a / ' �` �' ` O Q 54 1W H � s Iir / CODE: o% 0 1 A'" / G y ` 5# ZA .Oy �, a ce. Eli \ 1 64 LONG (N ""'16' SHORT Z W SIDE SERVICE �r.SIDE SERVICE W / �5 Q 56 INSTALL z 124' _. U 52 / 5 � 07A'" W O Z O. Gt INCH 0 C F �� X U OHE T OHE — DHE STOCKDALE TIE INTO PRIMARY RISER POLE (RELOCATED LOCATION) T. 1' FROM - -- - - ----- - ---' .;�_� OLD ROW ------- - - --- - - - w I ol i I 9 ' 10 I II AVENUE II cn V) - 19 18 17 MATCH LINE C --C SEE SHEET 4 15 NOTE: ALL SERVICES AND SUB -STRUCTURES ARE NOT TO SCALE FOR CLARITY. ALL COMPONENTS SHALL FIT WITHIN THE PUE OR FRANCHISE AREA UNLESS OTHERWISE NOTED. REFER TO DETAILS FOR LOCATIONS. OHE HIGHWAY L•� 6" HP PL GAS 47' (TO NEW ROW) MgrcH L/N \\ c TIE INTO EXISTING GAS, AN D CAN 8" HP PL GAS 37, (EXISTING) 39 46' II I I 90' TIE INTO EXISTING TELEPHONE � I GPTC 371' q I \ 6' \ / ' -_1 / o I 12' S&S g 10 me— O U O U N o CCD 1� O Z L: t O �n OCD = N CD LC7 I� z O f47 � ci = •cn c - W W � 401N Ln w o Z co N m Z Q� ce 9� M W o a < L 9: w Q U Ln Ln 13- W O Q (n rl O V 00 co HN N Z w ul v Aim W a� NZNO I+i CL_ O O Y � O Q U(DQi Ngo mok 6 5 4 3 W E—+ 0 a 0 L) 0 z L) z W Q+ H N O z f47 Q 00 00 N ci = •cn c - W W 43 U O 401N Ln w o Z a cm _J Q M m Z Q� ce 9� M W o a < L 9: w Q U U 13- W O Q (n mok 6 5 4 3 W E—+ 0 a 0 L) 0 z L) z W Q+ H N W 0 z <c a� O Y � O Q Ngo E o0 aW� H �N L.L_� �W =Y �a m w J Q O D .- � Y Z_ U O W in Z O a 0 1 INCH 0 . 6 • /�;-,