Loading...
HomeMy WebLinkAbout1.8-7240 Ph 4GENERAL DESIGN INFORMATION.- STREET NFORMATION: STREET LIGHTS - LS2A LARGEST HOME = 3600 AVG HOUSE SIZE BASED ON 2800 SQ FT HOM 200 AMP MAIN PANELS SCI 10,000 AT ALL PANELS 5 TON A/C UNITS (170 LRA) APPLICANT TO TRENCH, BACKFILL, INSTALL ALL SUBSTRUCTURE AND INSTALL ALL DIST. PG&E TO PERFORM TIE IN WORK AND SERVICE CABLE IN THIS SKETCH IS INTENDED FOR ELECTRIC CONSTRUCTION PLEASE SEE JOINT TRENCH COMPOSITE FOR TRENCHING AND SUBSTRUCTURE INSTALLATION DETAILS ;TALLATION. ONLY )ETAILS TYPICAL 36" X 52" PAD DETAIL ENVIRONMENTAL ISSUES ❑ NONE APPARENT (IF PROJECT DESIGN CHANGES, CONTACT ADE) El BASED ON APPLICANT/DEVELOPER-SUPPLIED PLANS ❑ PERMITS ❑ TAILBOARD ❑ OTHER ❑ APPLICANT DESIGN/RESPONSIBILITY (CHECK PERMITS BOX IF PERMIT CONDITIONS APPLY TO PG&E ACTIONS.) SIGNATURE N NOTES 1. THIS IS AN APPLICANT DESIGN AND INSTALL PROJECT. 2. TRENCH TO BE JOINT WITH ELECTRIC, GAS, PHONE & CATV. 3. APPLICANT SHALL OBTAIN ALL NECESSARY PERMITS.. 4. RIGID CAP ALL SPARE CONDUITS. 5. IMPORTANT! DEVELOPER, GENERAL & ELECTRICAL CONTRACTOR BEFORE BEGINNING SUBSTRUCTURE WORK, PLEASE CONTACT PGE UNDERGROUND TRENCH INSPECTOR AT LEAST TWO BUSINESS DAYS PRIOR TO REQUESTING INSPECTION. REQUEST FOR INSPECTIONS RECEIVED AFTER 12:OOPM WILL NOT BE INSPECTED UNTIL THE 3RD WORKING DAY. (WORK NOT PROPERLY INSPECTED. MAY BE REJECTED) 6. APPLICANT CONTRACTOR TO LOCATE ALL UNDERGROUND FACILITIES BEFORE TRENCH & EXCAVATION. CALL UNDERGROUND SERVICE ALERT AT 811 AT LEAST TWO WORKING DAYS PRIOR TO DIGGING. 7. DO NOT EXCEED 300 DEGREES OF BENDS IN ANY CONDUIT RUN (INCLUDING BEND AT THE FEED LOCATION). 8. PROVIDE CLEARANCES AND WORKING SPACE PER PGE DWG. 051122. 9. PGE SHALL INSPECT ALL WORK AND PERFORM ALL HOT TIE-IN WORK. 10. BOX AND CONDUIT SIZES AND LOCATIONS SHALL CONFORM TO THE PGE ELECTRIC CONSTRUCTION DWG. 062288. 11. ENCLOSURES SHALL CONFORM TO THE PGE ELECTRIC CONSTRUCTION DWG. 062000. 12. APPLICANTS CONTRACTOR TO PERFORM ALL AND ANY NECESSARY INCIDENTAL TRENCHING, BACKFILL, COMPACTION AND PAVING. ALL RES SERVICES ARE INVENTORIED AT LOC SEE JOB INSTRUCTIONS FOR CONDUIT IN (:sD FRANCHISE AND PRIVATE PROPERTY. roup All Secondary and ervice Conduits Together ear the Back of the Window Primary Conduit Section Of Pad Secondary Conduit Section COO Detail A Placement of Conduits Underground Service Alert OR yo DESCRIPTION Call: Toll Free 811 c Qr ��RbuNb SE CALL TWO WORKING DAYS BEFORE YOU DIG PG&E GAS CONFLICT IDENTIFIED FOR THIS PROJECT -W-------S2-S2- GAS PLAT. 5024-D8 & 5025-D1 SVt SV1-----SV1 SERVICE CABLE - 4/OAL TPX IN NEW 1-3" CONDUIT PG&E GAS FACILITIES IN CONFLICT WITH EXCAVATION AT LOCATION(S) - 812/86, 87 PG&E GAS FACILITIES IN PROXIMITY WITH EXCAVATION AT LOCATIONS) - NONE CABLE PULLING DATA O LOC 802 TO LOC 5 USE 2.5 -GAL & 4- FRONT END PKS. EST. PULL 277LBS. ACTUAL PUH L............ LBS. FOREMAN'S INITIALS .......... 14 LOC 19 TO LOC 11 USE 2.5 -GAL & 2- FRONT END PKS. EST. PULL 174LBS. ACTUAL PULL ............ LBS. FOREMAN'S INITIALS .......... 31 LOC 34 TO LOC 26 USE 2.5 -GAL & 2- FRONT END PKS. EST. PULL 101 LBS. ACTUAL PULL ............ LBS. FOREMAN'S INITIALS .......... LOC 46 TO LOC 38 USE 2.5 -GAL & 2- FRONT END PKS. EST. PULL 198LBS. ACTUAL PULL ............ LBS. FOREMAN'S INITIALS .......... O LOC 800 TO LOC 802 USE 2.5 -GAL & 4- FRONT END PKS. EST. PULL 237LBS. ACTUAL PULL ............ LBS. FOREMAN'S INITIALS .......... SHEET INDEX SHEET E2 SHEET E3 SHEET E4 CD LOC 5 TO LOC 11 USE 2.5 -GAL & 2- FRONT END PKS. EST. PULL 102LBS. ACTUAL PULL ............ LBS. FOREMAN'S INITIALS .......... LOC 19 TO LOC 26 USE 2.5 -GAL & 2- FRONT END PKS. EST. PULL 296LBS. ACTUAL PULL ............ LBS. FOREMAN'S INITIALS .......... 37 LOC 34 TO LOC 38 USE 2.5 -GAL & 2- FRONT END PKS. EST. PULL 48LBS. ACTUAL PULL ............ LBS. FOREMAN'S INITIALS .......... 60 LOC 807 TO LOC 57 USE 2.5 -GAL & 3- FRONT END PKS. EST. PULL 101 LBS. ACTUAL PULL ............ LBS. FOREMAN'S INITIALS.......... LEGEND INSTALL DESCRIPTION -"P -P"" -P -P PRIMARY CABLE - 1-1/OAL EPR ENCAP IN EXISTING 1-2" CONDUIT P1 P7 P1 PRIMARY CABLE - 1-1/OAL EPR ENCAP IN NEW 1-2" CONDUIT S1 S1 S1 SECONDARY CABLE - 4/OAL TPX IN NEW 1-3" CONDUIT -W-------S2-S2- SECONDARY CABLE - 350AL TPX IN NEW 1-4" CONDUIT SVt SV1-----SV1 SERVICE CABLE - 4/OAL TPX IN NEW 1-3" CONDUIT SERIAL NUMBER ALL SHORT SIDE SERVICES ARE 25'/39' UNLESS OTHERWISE SHOWN 11 STREETLIGHT CABLE EXISTING DESCRIPTION �-- 3 PHASE PRIMARY CONDUCTOR W/ COMMON NUETRAL - SIZE AS SHOWN 21 KV 3 PHASE PRIMARY CABLE/CONDUCTOR - SIZE AS SHOWN 10 1 PHASE PRIMARY CABLE/CONDUCTOR - SIZE AS SHOWN - -- -- - - -- - VACANT CONDUIT (PRIMARY) - SIZE AS SHOWN INSTALL EXISTING DESCRIPTION 50KVA ® 17" x 30" x 18" SECONDARY BOX r2E' 2E 17" x 30" x 26" SECONDARY BOX �3E� 24" x 36" x 26" SECONDARY BOX r5 -i �5 3' x 5' x 3'6" PRIMARY ENCLOSURE ® ® PM TRANSFORMER, DF -LB, SIZE AS SHOWN F 100KVA 0 SOLE OWNED POLE 1W/2B CUTOUT - FUSED AS SHOWN 21 KV ® PMHI PADMOUNT SWITCH / INTERRUPTER 10 SOLELY OWNED ANCHOR TRANSFORMER DATA TABLE REVISION LOC.# TRF# TX. SIZE #CUST WIRE BUSH. ESD. KVA. PRI. VOLTS SEC. VOLTS COC RDINATE # SERIAL NUMBER MANUFACTURER 11 T-894771 100KVA 10 CUST 1W/2B 77 21 KV 120/240V 10 000002469 Q 26 T-279643 50KVA 9 CUST 1W/2B 69 21 KV 120/240V 10 000002470 OT--793320 100KVA 11 CUST 1W/2B 81 21 KV 120/240V 10 000002471 OT-957752 100KVA 14 CUST 1W/2B 99 21 KV 120/240V 100000002472 57 T--479846 100KVA 13 CUST 1W/28 95 21 KV 120/240V 100000002473 PG&E Plan Check does not release the Applicant froin responsibility to construct the facilities according to PG&E Standards. In the event of a conflict during construction between PG&E Standards and the plans, PG&E Standards will control Final Awroval: Date04/20/16 CIRCUIT MAP 30261-B INS DIST: B RENFRO 2101 CLIMATE ZONE R VOLT CLASS 1 NON -CORROSIVE LIGHTNING DIST: 2 SUMMER INTERIOR SCALE: 1 "=40' SCALE 40' 0 40' 80' Yo pH y NO. REVISION BY Electric Design by: UTILITY DESIGN SERVICESJ 11 L�*P E S Office (559) 641 2954 46325 Wallu Lane Cell (559) 760 9464 Ahwahnee, California 93601 ELECTRIC CONSTRUCTION SKETCH TRACT 7240 PHASE 4 SOUTH WEST OF STOCKDALE RANCH DRIVE7591 FOR: WOODSIDE HOMES BAKERSFIELD CALIFORNIA`` 800-227-260 '' ��' �,' Project Management by: California Utility Consultants Inc N Ingram Ave. Suite 103 Fresno, CA 93711 Phone (559) 261-9880 Fax (559) 261-9707 RULE 15 16 PM 311863 5 5 NOT 110656793 DATE 3-18-16 SHEET El OF E5 SHEETS SEPARATED INTO TWO JOBS. PHASE 4 AND PHASE 3 & 5. SCALE NONE DESIGNER Cliff Lopes DRAFTER Cliff Lopes Q .JOB NO. REVISION BY Electric Design by: P E S Lk-ITY DESIGN SERVICES Office (5 59) 641 2954 4632 5 Wallu Lane Cel( (559) 760 9464 Ahwahnee, California 93601 ELECTRIC CONSTRUCTION SKETCH TRACT 7240 PHASE 4 SOUTH W EST O F STO C K DA L E RANCH DRIVE FOR: WOODSIDE HOMES BAKERSFIELD CALIFORNIA 800-227-260 ��� Project Management by: California UtilityConsultants Inc 7591 N Ingram Ave. Suite 103 Fresno, CA 93711 Phone 559 26 - ( ) 1 9880 Fax (559) 261-9707 RULE 15, 16^^ Plvl 311863 ,..7� 5 NOT 110656793 DATE 3-18-16 SHEET E2 I OF E5 SHEETS SCALE AS SHOWN DESIGNER Cliff Lopes DRAFTER Cliff Lopes SOB NO. REVISION BY Electric Design by: ELECTRIC CONSTRUCTION SKETCH P E S TRACT 7240 PHASE 4 .,7 UTILITY DESIGN SERVICES SOUTH WEST OF STOCKDALE RANCH DRIVE Office (559) 641 2954 46325 Wallu Lane FOR: WOODSIDE HOMES Cell (559) 760 9464 Ahwahnee, California 93601 BAKERSFIELD CALIFORNIAI' Yroject Management ny: California Utility Consultants Inc 7591 N Ingram Ave. Suite 103 Fresno, CA 93711 Phone (559) 261-9880 Fax (559) 261-9707 RULE 15, 16 PM 3118635 5 NOT 110656793 SCALE AS SHOWN DESIGNER Cliff Lopes E3 DRAFTER Cliff Lopes JOB OF ES SHEETS I # J`'+ `�-v l L v I KAL /240 PHASE 4 UTILITY DESIGN SERVICES SOUTH WEST OF STOCKDALE RANCH DRIVE Office (559) 641 2954 46325 Wallu Lane Cell (559) 760 9464 Ahwahnee, California 93601 BAKERSFIELD FOR: WOODSIDE HOMES CALIFORNIA California Utility Consultants In 7591 N Ingram Ave. Suite 103 Fresno, CA 93711 Phone (559) 261-9880 Fax (559) 261-9707 RULE 159 16 PM 31186355 NOT 110656793 DATE SCALE DESIGNER DRAFTER JOB 3-18-16 SHEET AS SHOWN Cliff Lopes E4 Cliff Lopes -'T OF E5 SHEETS 34SHEET E4 807 T-27803 i OOKVA, BO 36 37 33 34 35 805 57 � O T-479846 (_56__� 36 — — ' i OOKVA, AW - Srw1_ 9OA — — 53 — 2_ S2 —S2 C14 P----P----P---P------P---P-----P-----P----P----P-P----P — — - --�---P1 P1 P1 P P7 P1 P1 ------P1 P1 ------P1 P`UL'L' 325'EXiST; \ 240'/579' E WAY � \ ELLA JAN 60 IF 3`397A 21 KV & 4/OA CN & RCN TO L251 50' 20145 1DOT 21 Kv L T14933 2500 50' 39 38 MEN] WW Un (%) Q Q 0 -In 32 37 I, I � 0 I w i w W v Cn I 52 Q i 145'/159' 2-----S2 50351 S? 51 50350 V ? 135'/149' 135'/149- VD 4.2 135'/149 135'/ 149' FD 4.7 120'/134' 120'/134' VD 6.0 FD 5..22 31 we, 29 LEGEND INSTALL DESCRIPTION —"PP_ PRIMARY CABLE — 1-1/OAL EPR ENCAP IN EXISTING 1-2" CONDUIT Pi P1 P1 PRIMARY CABLE — 1-1/OAL EPR ENCAP IN NEW 1-2" CONDUIT St 51---S1 SECONDARY CABLE — 4/OAL TPX IN NEW 1-3" CONDUIT 2—S2—S2— SECONDARY CABLE — 350AL TPX IN NEW 1-4" CONDUIT ALL SHORT SIDE SERVICES ARE 25'/39' UNLESS OTHERWISE SHOWN ---_—SV1 SVi SV1 SERVICE CABLE — 4/OAL TPX IN NEW 1-3" CONDUIT STREETLIGHT CABLE 28 27 24 25 26 SHEET E4 -------------- -- -- — — — — — — — — — — I I � PG&E Plan Check does not release the Applicant from responsibility to construct the facilities according to PG&E Standards. In the event of a conflict during construction between PG&E Standards and the plans, PG&E Standards will control. Final A roval: / AD . � DateO4/20/16 CIRCUIT MAP 30261-B INS DIST: B RENFRO 2101 CLIMATE ZONE R VOLT CLASS 1 NON --CORROSIVE LIGHTNING DIST: 2 SUMMER INTERIOR SCALE: 1 "=40' SCALE 40' 0 40' 80' A 9- 7J VO P114 NO. REVISION I35 Electric Design by: Li P E S ,IN , �1*TRACT UTILITY DESIGN SERVICES Office (5 59) 641 2954 46325 Wallu Lane Cell (559) 760 9464 Ahwahnee, California 93601 I I 800-227 _260 Project Management by: Q California Utility Consultants Inc 7591 N Ingram Ave. Suite 103 `"�. �,�' Fresno, CA 93711 Phone (559) 261-9880 Fax (559) 261-9707 RULE 15, 16 PM 311863 5 5 NOT 11065,6793 DATE 3-18-16 w � A SCALE AS SHOWN I DESIGNER Cliff Lopes 0 a: O 36 37 33 34 35 805 57 � O T-479846 (_56__� 36 — — ' i OOKVA, AW - Srw1_ 9OA — — 53 — 2_ S2 —S2 C14 P----P----P---P------P---P-----P-----P----P----P-P----P — — - --�---P1 P1 P1 P P7 P1 P1 ------P1 P1 ------P1 P`UL'L' 325'EXiST; \ 240'/579' E WAY � \ ELLA JAN 60 IF 3`397A 21 KV & 4/OA CN & RCN TO L251 50' 20145 1DOT 21 Kv L T14933 2500 50' 39 38 MEN] WW Un (%) Q Q 0 -In 32 37 I, I � 0 I w i w W v Cn I 52 Q i 145'/159' 2-----S2 50351 S? 51 50350 V ? 135'/149' 135'/149- VD 4.2 135'/149 135'/ 149' FD 4.7 120'/134' 120'/134' VD 6.0 FD 5..22 31 we, 29 LEGEND INSTALL DESCRIPTION —"PP_ PRIMARY CABLE — 1-1/OAL EPR ENCAP IN EXISTING 1-2" CONDUIT Pi P1 P1 PRIMARY CABLE — 1-1/OAL EPR ENCAP IN NEW 1-2" CONDUIT St 51---S1 SECONDARY CABLE — 4/OAL TPX IN NEW 1-3" CONDUIT 2—S2—S2— SECONDARY CABLE — 350AL TPX IN NEW 1-4" CONDUIT ALL SHORT SIDE SERVICES ARE 25'/39' UNLESS OTHERWISE SHOWN ---_—SV1 SVi SV1 SERVICE CABLE — 4/OAL TPX IN NEW 1-3" CONDUIT STREETLIGHT CABLE 28 27 24 25 26 SHEET E4 -------------- -- -- — — — — — — — — — — I I � PG&E Plan Check does not release the Applicant from responsibility to construct the facilities according to PG&E Standards. In the event of a conflict during construction between PG&E Standards and the plans, PG&E Standards will control. Final A roval: / AD . � DateO4/20/16 CIRCUIT MAP 30261-B INS DIST: B RENFRO 2101 CLIMATE ZONE R VOLT CLASS 1 NON --CORROSIVE LIGHTNING DIST: 2 SUMMER INTERIOR SCALE: 1 "=40' SCALE 40' 0 40' 80' A 9- 7J VO P114 NO. REVISION BY Electric Design by: Li P E S ,IN , �1*TRACT UTILITY DESIGN SERVICES Office (5 59) 641 2954 46325 Wallu Lane Cell (559) 760 9464 Ahwahnee, California 93601 ELECTRIC CONSTRUCTION SKETCH 7240 PHASE 4 SOUTH WEST OF STOCKDALE RANCH DRIVE FOR: WOODSIDE HOMES BAKERSFIELD CALIFORNIA`" 800-227 _260 Project Management by: Q California Utility Consultants Inc 7591 N Ingram Ave. Suite 103 `"�. �,�' Fresno, CA 93711 Phone (559) 261-9880 Fax (559) 261-9707 RULE 15, 16 PM 311863 5 5 NOT 11065,6793 DATE 3-18-16 SHEET E4 of E5 SHEETS A SCALE AS SHOWN DESIGNER Cliff Lopes DRAFTER Cliff Lopes log 1090 397A 21 KV & 4/OA CN STOCKDALE HWY STOCKDALE HWY R CIRCUIT SKETCH LEGEND INSTALL DESCRIPTION Pt Pt PRIMARY CABLE - 1-1/OAL EPR ENCAP IN NEW 1-2" CONDUIT ----P-----P,--..—p PRIMARY CABLE - 1-1/OAL EPR ENCAP IN EXISTING 1-2" CONDUIT EXISTING DESCRIPTION 1 PHASE PRIMARY UG CONDUCTOR - SIZE AS SHOWN 3 PHASE PRIMARY UG CONDUCTOR - SIZE AS SHOWN 3 PHASE PRIMARY CONDUCTOR W/ COMMON NUETRAL - SIZE AS SHOWN -- — — -- — — — VACANT PRIMARY DUCT - SIZE AS SHOWN FUTURE INSTALL EXISTING DESCRIPTION 9947 STOCKDALE HIGHWAY 200A SEPARABLE DEADBREAK CONNECTOR 4/OA 21KV & 4/OA CN 20T 200A SEPARABLE LOADBREAK CONNECTOR BO= E— 600A SEPARABLE CONNECTOR = 27AMPS • RISER T-894771 X CUTOUT - SIZE AS SHOWN T-479846 CO x DISCONNECT - SIZE AS SHOWN 50KVA, CO UST 1100CUST AIR SWITCH z T CAPACITOR W ® PADMOUNT TRANSFORMER - SIZE AS SHOWN /rTx O FAULT INDICATOR - UNDERGROUND LOADING CALCULATIONS BASED ON 6.5 FAULT INDICATOR - OVERHEAD CUSTOMER 19195 SUBSURFACE SWITCH 3 WAY 3 WAYS SWITCHED ® PMHI-9 PADMOUNT SWITCH / INTERRUPTER 9947 STOCKDALE HIGHWAY 41 4/OA 21KV & 4/OA CN 20T 1-48920 BO= 51 CUST = 27AMPS 1-91232 CO= T-894771 .-�� T-957752 T-479846 CO _ 100KVA, CO 3 50KVA, CO UST 1100CUST 13 CUST z 10 CUST ESD ESD 95KVA p U ESD 77KVA , ,F,—P1 �,L—P1 P1 P1 P1 Ef; P1 P1 zo' ALDRIDGE AVE T-279643 raw I 161Lo 50KVA, CO (n •- 10 CUST7 tr j ESD 50KVA a Q 6"/ T-39201 FUTURE PHASE 3 & 5 100KVA, SO " CHATSWORTH AVE n It H U O V) 397A 21 KV & 4/OA CN SW -59115 a 1-1/OA 2 1-1 OA 2 1-1 OA 2 4 In 17 a J- 35891 1� Q Zi_ T-52319 N T-68199 , 2 T-793320 0 100KVA, BG 0 1OOKVA, SO 100KVA CO 12 CUST ESD 88KVA _ p V O T -94126 28b T-75861 o 100KVA, A4 CL is O� 1-1/OA 2" 2" / _ CL T-27805T6XF I \ SW -9 32 41Q 50KVA, B0 50KVA AO 1-6891$ 10 CUST / 1-48920 ESD 77KVA as 1-91232 I-81138 I-68912 I MPS T-42808 /' 1-48918 as NORMP �' 10OKVA, A0 SW -47205 LP1 P1 p1 ti T&7X / '� /' N 9 CUST T5342 / `` ESD 69KVA Q 300 / \ ODp, T-94537 PG&E TO REMOVE UG LINEM a -Al -452 100KVA, CO ON SEPERATE ESTIMATE �,,,/ .00, 9y� pAEE R�� ANCH DR,i�'RFs STOCK 6" c�VNN\N �'� T-27$01 N N J D m 397A 21 KV & 4/OA CN 19302 65E N N i � � N 0 1-68918 AO= 41 CUST = 21 AMPS 1-48920 BO= 51 CUST = 27AMPS 1-91232 CO= 56 CUST = 29AMPS 1-81138 AO= 44 CUST = 23AMPS 1-68912 BO= 44 CUST = 23AMPS 1-48918 CO= 47 CUST = 24AMPS LOADING CALCULATIONS BASED ON 6.5 KVA PER CUSTOMER 100K A, CW >, 26 T-279643 50KVA, AO r 9 CUST 0 ; a ESD 69KVA I N T-43869 y P1 P1 P1 P1 _P1 a. a N 100KVA, CO o r BROCKBANK AVENUE i o Ni 0 O T-793320 t c~i QT -894771 W r 1 OOKVA, Ate w 11 100KVA, AO 11 CUST 10 CUST x ESD 81KVA z ESD 77KVA co co W v� T-59746 I a W a 100KVA, CO I �� 5 HANNAH LYN HANNAH LYN AVENUE 1 _ 1/OA AVENUE P1 i 1-1/OA 2"�� Y�T_9557752 T-78719 ~ is N 46 100KVA, Ab ' 100KVA, 60 T-86226 N o a 100KVA, BO 14I CUST o o = o Q. r M T-27803 I W 10OKVA, SO J O T-479846 ELLA JANE WAY 57 100KVA, AO r----P------p—}--P7 _P1 P1 13 CUST (-- — s„ -- — — — M _ L251 ESD 95KVA SW -93237 900TSC-V 397A 21 KV & 4/OA CN�20145 r-, 1If*' 100T PG&E Plan Check does not release the Applicant from responsibility to construct the facilities according to PG&E Standards. In the event of a conflict during construction between PG&E Standards and the plans, PG&E Standards will control. � Final AnprovaI; T14933 L511 `V 2500 30 # CVC7T' 1200TS-V Z o T1452 18509 Z+ R 2000-30 25T Z U 16131 T11378 SB 300 0 14523 4889 40T RVE N N .6/30/2016 LSP E S UTILITY DESIGN SERVICES J REVISION Q Electric Design by: L P E UTILITY DESIGN SERVICE 'I ? s Office (559) 641 2954 46325 Wallu Lane Cell (559) 760 9464 Ahwahnee, California 93601 ELECTRIC CIRCUIT SKETCH TRACT 7240 PHASE 4 STOCKDALE RANCH DRIVE SOUTH WEST O F S OC FOR. WOODSIDE HOMES BAKERSFIELD CALIFORNIA 800-227-260 Project Management by: California Utility Consultants Inc 7591 N Ingram Ave. Suite 103 `�� � Fresno, CA 93711 � � °' Phone (559) 261-9880 Fax (559) 261-9707 RULE 15 16 PM 311863 5 5 NOT 110656793 DATE 3-18-16 <L SCALE AS SHOWN z M O Cr W p 0) W R _... C141100A JOB Q T13844 o �- 75-30 19194 19193 19195 N 0 o� N 0o 0 O U_ R w Vi 19205 900A N CIRCUIT MAP 30261—B INS DIST: B RENFRO 2101 CLIMATE ZONE R VOLT CLASS 1 NON—CORROSIVE LIGHTNING DIST: 2 SUMMER INTERIOR N.T.S. NO. REVISION BY Electric Design by: L P E UTILITY DESIGN SERVICE 'I ? s Office (559) 641 2954 46325 Wallu Lane Cell (559) 760 9464 Ahwahnee, California 93601 ELECTRIC CIRCUIT SKETCH TRACT 7240 PHASE 4 STOCKDALE RANCH DRIVE SOUTH WEST O F S OC FOR. WOODSIDE HOMES BAKERSFIELD CALIFORNIA 800-227-260 Project Management by: California Utility Consultants Inc 7591 N Ingram Ave. Suite 103 `�� � Fresno, CA 93711 � � °' Phone (559) 261-9880 Fax (559) 261-9707 RULE 15 16 PM 311863 5 5 NOT 110656793 DATE 3-18-16 SHEET E 5 OF E5 SHEETS SCALE AS SHOWN DESIGNER Cliff Lopes DRAFTER Cliff Lopes JOB Q