Loading...
HomeMy WebLinkAbout1.2-6759 OffsiteEXISTING 36" SEWER I (SEE CITY OF BAKERSFIELD , SEWER IMPROVEMENT PLANS) I FD. K.C.S. CONC. MON. DOWN 24" FOR WITNESS CORNER 40' NORTH OF / \ PROPOSED MANHOLE S.W. COR. SEC. 34, 304,13 7 I (SEE CALTRANS ENCROACHMENT PER R/S BK. 15, PG. �, PERMIT NO. 06 -17 -6 -UJ -0014) PROP. 36" SEWER - - (SEE CALTRANS ENCROACHMENT PERMIT NO. 06 -17 -6 -UJ -0014) S. W. COR. T. 3o S. 9- SR 119 SEC. 34, 30/27_ _ I rA T HIQHWAI) . T. 31 S.�- — — U) i PROPOSED MANHOLE �I (SEE CALTRANS ENCROACHMENT 1 I PERMIT NO. 06 -17 -6 -UJ -0014) I 1 ,I PROP. 36" SEWER STUB (SEE CALTRANS ENCROACHMENT 3O q PERMIT NO. 06 -17 -6 -UJ -0014) 1 I II i i I . ; If % U I fit I I L, 0Irk I it 00 � If i It I I q 36" SEWER v, it EX. R/W I I ill II STUB do PLUG I q S SEWER II EXST. 20' WIDE SEWER UNE EASEMENT SMH NO. 1 STUB do PLUG - — _ - - - - - - - PER C.O.B. DOC.#0207213732 I — �- 36" SEWER II--------- -- - I Iq I q PROPOSED 8" SEWER EX. R/W (SEE TRACT 6759 SEWER PLANS) I j l I KEY MAP SCALE: 1" = 100' O3 DENOTES SHEET NUMBER PACHECIO ROAD GOS D 23 FAIRVIEW ROAD 19 20 21 22 T30SHF_] E 24 19 0 Q 30 0 28 0 27 a o 26 30 McC TCHEN 29J. ROAD 25 HOSKING 31 32 0 = 34 35 .36 31 cr Q NotMcKEE ROAD GREENFIELD T FT pR. H NY. PUMPIGN 5 1194 3 N CENTERyd C s�— — -- — — - - - m 2 a t, 0 c� F IEJ 17 F161 VICINITY MAP NO SCALE EXIST. R/W CITY OF BAKERSFIELD SEWER CONSTRUCTION PLAN FOR TRACT 6759 - OFFSITE ASHE ROAD (STA. 30+34.09 C.L. TO STA. 35+02.59 C.L.) ASHE ROAD 44' I 6' I 2 I 110.5 110.5 W FUTURE I I w DEVELOPMEIYr CL I a W N I 0 �I I I o I o (-.0 uj EXIST. GRADE ---- -------------- ------ -- -- _ ; 1X MIN. GRADE t-- - IMPROVEMENTS I FUTURE ROAD _c - - FUTURE DAYLIGHT EXISTING ROAD EXIST. IMPROVEMENTS FUTURE -TO EX. GROUND CURB GUTTER AND FUTURE COMBINATION SIDEWALK PROPOSED 36" SEWER SECTION — ASHE ROAD A SCALE 1"=10' HORIZ. 1 1 "=5' VERT. m 0 N Q C7 Z . w w z cD z w I U • C� Z W co CDZ Q J �1 ENGINEER'S STATEMENT THESE PLANS AND SPECIFICATIONS WERE PREPARED BY ME OR UNDER MY DIRECTION AND TO THE BEST OF MY KNOWLEDGE AND BELIEF COMPLY WITH CITY OF BAKERSFIELD ORDINANCES, STANDARDS, AND DESIGN CRITERIA AND INCLUDE ALL IMPROVEMENT REQUIREMENTS OF THE ADVISORY AGENCY OR OTHER REVIEW BOARD. I AM RESPONSIBLE FOR ALL CALCULATIONS AND DRAWINGS ON THESE PLANS AND ANY ERRORS, OMISSIONS, OR VIOLATIONS OF THOSE ORDINANCES, STANDARDS AND DE7GJ�V CRITERIA SHALL BE CORFE'GTI9 DURING QQNSTRUCTION. CV W m o ' Y � e m APPRO BY: ROGER A. McINTOSH R.C.E. 33322 DATE EXP. 6-30-18 IMPROVEMENT PLANS HAVE BEEN REVIEWED BY THE CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT. ALL IMPROVEMENTS HEREIN ARE PUBLIC AND ARE TO BE PUBLICLY MAINTAINED. N W� M APPROVED BY: NICOL FIDLER, PUBLIC WORKS DIRECTOR DATE R.C.E. NO. 61069 EXP. 12-31-18 Q 0 NOTES: 1. THE CONTRACTOR MUST POSSESS A VALID CLASS A CONTRACTOR'S LICENSE AT THE TIME BIDS ARE RECEIVED. 2. ALL UTILITY LOCATIONS SHOWN ARE APPROXIMATE AND ARE SHOWN FOR INFORMATION ONLY. 3. CONTRACTOR SHALL CALL USA AT 1-800-642-2444 AND VERIFY UTILITY LOCATIONS 48 HOURS BEFORE STARTING CONSTRUCTION. 4. ALL TRENCHING, BACKFILL AND COMPACTION OPERATIONS SHALL BE PER C.O.B. STD. DETAIL ST -22 ON SHEET 2. INDEX OF SHEETS SHEET TI TLE 1. COVER SHEET 2. NOTES & SPECIFICATIONS 3. ASHE ROAD - SUMMARY OF IMPROVEMENTS SEWER IMPROVEMENTS TOTAL 8" SEWER LINE 10 LF 36" SEWER LINE 460 LF STANDARD MANHOLE 1 EA v Know what's belo'W. Call before you dig. I _ REVIEWED BY: ASSISTANT PUBLIC WORKS DIRECTOR LEG ND: ABBREVIATIONS S FURNISH & INSTALL SEWER — OH- - E - EXISTING POWER LINE CL CENTERUNE UNE PER CITY STANDARDS —.E- RELOCATED POWER LINE INV INVERT ® FURNISH & INSTALL SEWER — / -e- FUTURE STREET LIGHT SD STORM DRAIN MANHOLE TYPE "A" PER BENCHMARK: MH MANHOLE C.O.B. STD. SW -4. - - p FUTURE STORM DRAIN LINE CB CATCH BASIN 0 STORM DRAIN MANHOLE u PROPOSED GAS AND ELEC. BENCHMARK DISK STAMPED — Q 1157 RESET 1969 AT OLD RIVER, AT JB JUNCTION BOX JOINT TRENCH THE JUNCTION OF STATE HIGHWAY 119 AND OLD RIVER ROAD, IN THE SMH SC0 SEWER MANHOLE SEWER CLEANOUT CATCH BASIN TV EXISTING CABLE UNE TOP OF THE EAST END OF THE NORTH CONCRETE HEAD WALL OF TRIPLE SDMH STORM DRAIN MANHOLE EXISTING DOWN GUY CONCRETE BOX CULVERT B 11.44 OVER STINE CANAL, 19 1/2 FEET EXIST EXISTING � NOTE NORTH OF THE CENTER LINE OF THE HIGHWAY, 50 FEET WEST OF THE ELEV ELEVATION EXISTING POWER .POLE 1) ALL PIPE ELEVATIONS SHOWN ARE EXTENDED CENTER LINE OF OLD RIVER ROAD LEADING SOUTH, 64 FEET R/W / RIGHT OF WAY EXISTING SEWER LINE INVERT ELEVATIONS UNLESS EAST OF THE CENTER LINE OF OLD RIVER ROAD LEADING NORTH, AND M.H. MANHOLE — EXISTING GAS LINE OTHERWISE NOTED. ABOUT LEVEL WITH THE FL FLOWLINE EXISTING FENCE LINE . PP POWER POLE SECTION DE GNATION: . 1 — TOP OF MANHOLE — — - — — — — — — EXISTING EDGE OF PAVEMENT HIGHWAY. ELEVATION = 343.30 (U.S.G.S. DATUM NAVD 88) T EXISTING TELEPHONE LINE SECTION LETTER r RELOCATED TELEPHONE LINE L - - - - A - 2 BASIS OF BEARINGS: SHEET WHERE SECTION IS SHOWN THE BEARING OF N. 89'04'33" W. SHOWN FOR. THE SOUTH LINE OF THE SOUTHWEST 1/4 OF SECTION 34, T.30 S., R.27 E. AS SHOWN ON SURVEY INVESTIGATION MAP NO. 7-1 BK. 6, PG. 27 WAS USED AS THE BASIS OF BEARINGS SHOWN HEREON. NOTES: 1. THE CONTRACTOR MUST POSSESS A VALID CLASS A CONTRACTOR'S LICENSE AT THE TIME BIDS ARE RECEIVED. 2. ALL UTILITY LOCATIONS SHOWN ARE APPROXIMATE AND ARE SHOWN FOR INFORMATION ONLY. 3. CONTRACTOR SHALL CALL USA AT 1-800-642-2444 AND VERIFY UTILITY LOCATIONS 48 HOURS BEFORE STARTING CONSTRUCTION. 4. ALL TRENCHING, BACKFILL AND COMPACTION OPERATIONS SHALL BE PER C.O.B. STD. DETAIL ST -22 ON SHEET 2. INDEX OF SHEETS SHEET TI TLE 1. COVER SHEET 2. NOTES & SPECIFICATIONS 3. ASHE ROAD - SUMMARY OF IMPROVEMENTS SEWER IMPROVEMENTS TOTAL 8" SEWER LINE 10 LF 36" SEWER LINE 460 LF STANDARD MANHOLE 1 EA v Know what's belo'W. Call before you dig. I STANDARD NOTES 1. GENERAL CONTRACTOR WILL FURNISH ALL MATERIALS, TOOLS, LABOR, EQUIPMENT AND SUPERVISION NECESSARY TO COMPLETE INSTALLATION. UNDERGROUND SERVICE ALERT (USA) SHALL BE NOTIFIED AT LEAST 2 WORKING DAYS BEFORE CONSTRUCTION. TELEPHONE 1-800-227-2600. CONTRACTOR TO CALL FOR USA LOCATE AND, POTHOLE ALL MARKED UTILITIES THAT CROSS OR ARE WITHIN 5' HORIZONTAL DISTANCE OF SEWER AND STORM DRAIN LINES. VERTICAL AND HORIZONTAL LOCATION SHALL BE ASCERTAINED BY THE CONTRACTOR AHEAD OF ANY EXCAVATIONS TO VERIFY THAT THE PROPOSED DESIGN DOES NOT CONFLICT WITH ANY UTILITIES. IN THE EVENT A CONFLICT EXISTS THE ENGINEER SHALL BE NOTIFIED IN ORDER TO REDESIGN THE ALIGNMENT. IF RELOCATION OF EXISTING UTILITIES IS DEEMED NECESSARY THE CONTRACTOR SHALL BE COMPENSATED FOR INSTRUCTED RELOCATION. IF REDESIGN OF THE ALIGNMENT REQUIRES ADDITIONAL FITTINGS, PIPE OR EXCAVATION THE CONTRACTOR SHALL BE COMPENSATED FOR REVISION. IN THE EVENT A UTILITY IS DAMAGED THE CONTRACTOR SHALL BE WHOLLY RESPONSIBLE FOR ITS REPAIR. CONTRACTOR SHALL VERIFY LOCATIONS AND ELEVA11ONS OF EXISTING SEWER LINES THAT THE NEW SYSTEM TIES INTO PRIOR TO TRENCHING. ANY DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER SO THAT ANY NECESSARY ADJUSTMENTS MAY BE MADE. UTILITIES SHALL BE THOROUGHLY RESEARCHED AND LOCATED BY CONTRACTOR PRIOR TO TRENCHING. CROSSING UTIU11ES SHALL BE DAYUGHTED AND CHECKED FOR GRADE, BY CONTRACTOR PRIOR TO TRENCHING. ALL EXISTING IMPROVEMENTS, (CURB, GUTTER, SIDEWALK, CROSS GUTTER, FENCES, ETC.) THAT ARE REMOVED, DAMAGED OR UNDERCUT SHALL BE REPAIRED OR REPLACED AS DIRECTED BY THE CITY ENGINEER. ALL EXISTING PAVING AND SURFACING REMOVED, DAMAGED OR UNDERCUT SHALL BE REPLACED IN ACCORDANCE WITH THE CITY OF BAKERSFIELD STANDARD DRAWING ST -6, EXCEPT AS NOTED ON PLANS. STAMP AN "S" INTO THE CURB FACE OVER EACH SEWER LATERAL AN OPEN STREET PERMIT SHALL BE OBTAINED FROM THE CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT FOR ANY WORK PERFORMED WITHIN EXISTING ACCEPTED STREET RIGHT- OF-WAY. UNLESS SECURED BY AN IMPROVENT AGREEMENT, APPROVED INSURANCE AND SECURITY BASED ON AN APPROVED ENGINEER'S ESTIMATE FOR THE WORK PERFORMED WITHIN THE RIGHT-OF-WAY SHALL BE POSTED PRIOR TO ISSUANCE OF THE PERMIT COMPACTION TESTS SHALL BE THE RESPONSIBLITY OF THE DEVELOPER/CONTRACTOR. THE NUMBER AND LOCATION OF REQUIRED TESTS SHALL BE DETERMINED BY THE CITY ENGINEER 2. STANDARD DETAILS THE FOLLOWING CITY OF BAKERSFIELD STANDARDS SHALL BE CONSIDERED PART OF THESE PLANS: D-11, D-14, D-16, D-18 SW -1, SW -2, SW -3, SW -4, SW -5, SW -6, SW -9, SW -11, ST -6, ST -22 3. VCP INSTALLA11ON MATERIALS -L THE PIPE AND FITTINGS SHALL BE EXTRA STRENGTH VITRIFIED CLAY CONFORMING TO CURRENT ASTM SPECIFICATION C-700 AND SHALL BE INSTALLED IN CONFORMANCE WITH THE PROVISIONS OF SECTION 71 OF THE STANDARD SPECIFICATIONS OF THE STATE OF CALIFORNIA, DEPARTMENT OF TRANSPORTATION, CURRENT EDITION AND THE CURRENT ASTM SPECIFICATIONS C-12. JOINTS : THE PIPE AND FITTINGS SHALL HAVE A SOCKET END AND A SPIGOT END MATH COMPRESSION JOINTS CONFORMING WITH THE CURRENT ASTM SPECIFICATION C-425. THE PIPE AND FITTINGS FOR 6", 8", 10", AND 12" SANITARY SEWER MAINS MAY BE PLAIN -END WITH COMPRESSION COUPLINGS CONFORMING WITH THE CURRENT ASTM SPECIFICATION C-425. EXCEPTING THAT A STAINLESS STEEL SHEAR RING AS MANUFACTURED BY MISSION CLAY PRODUCTS CORPORATION FOR THEIR "MAINUNE" BANDSEAL COMPRESSION COUPLING, OR APPROVED EQUAL, SHALL BE REQUIRED. THE PIPE AND FITTINGS FOR PRIVATE SANITARY SEWER HOUSE OR BUILDING LATERALS MAY BE PLAIN -END WITH COMPRESSION COUPLINGS CONFORMING WITH THE CURRENT ASTM SPECIFICATION C-425. (STAINLESS STEEL SHEAR RINGS ARE NOT REQUIRED) 4. PVC PIPE INSTALLA11ON MATERIALS : PIPE AND FITTINGS SHALL MEET THE REQUIREMENTS OF THE CURRENT ASTM SPECIFICATION F-679 FOR PS46 & D3034 FOR SD35. PIPE AND FITTINGS SHALL BE HOMOGENEOUS THROUGHOUT AND FREE FROM CRACKS, HOLES, FOREIGN INCLUSIONS OR OTHER INJURIOUS DEFECTS. FITTINGS SHALL BE INJECTION MOLDED AND SHALL BE INSTALLED IN LINE ON NEW PIPELINES: CUT -IN FITTINGS ARE NOT PERMITTED. JOINTS : USE ONLY ELASTOMERIC GASKET JOINTS. THE ASSEMBLY OF JOINTS SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS WHERE PVC PIPE CONNECTS TO VCP PIPE, USE COUPLINGS APPROVED BY THE CITY OF BAKERSFIELD. INSTALLATION : PIPE AND FITTINGS SHALL BE INSTALLED IN ACCORDANCE WITH THE CURRENT ASTM SPECIFICATION D-2321. ONLY CLASS I, II, AND III EMBEDMENT MATERIALS WILL BE CONSIDERED SUITABLE. ' PVC FOR PIPE SIZES 18" AND LESS. POLY VINYL CHLORIDE PIPE SHALL MEET THE FOLLOWING REQUIREMENTS: 1. MATERIAL. PVC PIPE SHALL MEET OR EXCEED ALL REQUIREMENTS SET FORTH IN ASTM D 3034 WITH SDR OF 35. ELASTOMERIC SEALS AND JOINTS SHALL CONFORM TO ASTM D 3212 AND ASTM F 477. 2. TESTING. MANUFACTURING TESTING METHODS SHALL CONFORM TO ASTM F-679 (T -WALL). CERTIFICATES OF COMPLIANCE SHALL BE MADE AVAILABLE TO THE ENGINEER. 3. INSTALLATION. INSTALLATION OF PIPE SHALL FOLLOW MANUFACTURER'S GUIDELINES, THESE SPECIFICATIONS AND ASTM D 2321 "UNDERGROUND INSTALLATION OF FLEXIBLE THERMOPLASTIC SEWER PIPE". FIELD TESTS. IN -FIELD PRESSURE TESTS SHALL CONFORM TO THE SPECIFICATIONS ABOVE AND THE FOLLOWING: DEFLECTION MEASUREMENT OF PVC PIPE. AFTER 30 DAYS OF INSTALLATION THE CONTRACTOR SHALL MEASURE PIPE DEFLECTION BY PULLING A GO -NO-GO 5% MANDREL THE MANDREL SHALL BE PULLED THROUGH THE PIPE WITH ROPE BY ONE PERSON WITHOUT MECHANICAL ADVANTAGE. THE MANDREL SHALL HAVE VANES AT LEAST AS LONG AS THE PIPE DIAMETER. THE MANDREL SHALL BE USED IN STRICT CONFORMANCE WITH PIPE AND MANDREL MANUFACTURER'S RECOMMENDATIONS. THE MANDREL DIAMETER WILL BE CALCULATED USING THE FOLLOWING FORMULA: MANDREL DIAMETER = BASE PIPE I.D. -(Y/100 X BASE PIPE I.D.) WHERE Y = ALLOWABLE DEFLECTION IN % (5X) BASE I.D. = ACTUAL INSIDE PIPE DIAMETER (PROVIDED BY PIPE MANUFACTURER) THE MANDREL SHALL HAVE AN ODD NUMBER OF VANES WITH SEVEN (7) MINIMUM. THE MINIMUM LENGTH OF THE CIRCULAR PORTION OF THE MANDREL SHALL BE EQUAL TO THE NOMINAL DIAMETER OF THE PIPE. ANY SECTION OF INSTALLED PIPE THAT FAILS THE MANDREL TEST SHALL BE EXCAVATED, RE -BACKFILLED, RECOMPACTED AND RETESTED UNTIL THE MANDREL TEST CAN BE PASSED. RE -ROUNDING WILL NOT BE ALLOWED. PIPE TRENCH CLASSIFICATION. PVC PIPE SHALL BE INSTALLED PER CITY STANDARD ST -22, AS MODIFIED ON THE CONTRACT PLANS. COMPACTION ABOVE THE PIPE ZONE SHALL BE AS SHOWN ON THE PLANS. 5. THE EXCAVATION OF TRENCHES FOR PIPING LAID IN THE GROUND SHALL BE IN OPEN -CUT FROM THE SURFACE OF THE GROUND EXCEPT WHERE BORING IS REQUIRED. THE TRENCHES SHALL BE OF WIDTH AS SHOWN ON STANDARD ST -22 AND DETAILED SECTIONS ON THE PLANS FOR PROPER PIPE INSTALLATION. THE HOLES FOR BELLS AND FITTINGS SHALL BE EXCAVATED BY HAND, TO A WIDTH PROVIDING UNIFORM BEARING ALONG THE LENGTH OF THE PIPE. IT IS THE INTENTION OF THESE REQUIREMENTS TO PROVIDE FIRM, UNIFORM BEARING FOR THE PIPE. CONTRACTOR SHALL PROVIDE TRENCHING IN ACCORDANCE WITH THE DETAILED SECTIONS PROVIDED IN THE PLANS. SELECTION OF TRENCH TYPES WILL BE AS REQUIRED BY THE TYPES OF PIPE SELECTED FOR CONSTRUCTION. STORM DRAIN, SEWER AND UTILITY CONDUIT INSTALLATIONS SHALL MEET CITY STANDARD ST -22. TRENCH LINES SHALL MEET ALL FEDERAL AND STATE SAFETY REQUIREMENTS. 6. BRACING AND SHORING EXCAVATION SHALL BE SUPPORTED AS SET FORTH IN THE RULES, ORDERS. AND REGULATIONS OF THE STATE DIVISION OF INDUSTRIAL SAFETY. IF THE CONTRACTOR DESIRES TO DEVIATE FROM THE SAFETY ORDERS, HE SHALL SUBMIT DATA BY A REGISTERED CIVIL ENGINEER TO THE STATE DIVISION OF INDUSTRIAL SAFETY, JUSTIFYING THE ALTERNATE PROCEDURES TO BE USED. FAILURE TO COMPLY WITH ANY OF THESE RULES, ORDERS AND REGULATIONS SHALL BE SUFFICIENT CAUSE FOR THE STATE DIVISION TO IMMEDIATELY SUSPEND ALL WORK. COMPENSATION FOR LOSSES INCURRED BY THE CONTRACTOR BY SUCH AN EMERGENCY SUSPENSION SHALL NOT BE ALLOWED. DURING BACKFILLING, THE BOTTOM OF THE SHORING SHALL BE KEPT ABOVE THE LEVEL OF THE BACKFILL AT ALL TIMES. SECTION 6422 OF THE CALIFORNIA LABOR CODE REQUIRES THE CONTRACTOR TO SUBMIT TO THE ENGINEER A DETAILED PLAN, DRAWING THE DESIGN OF SHORING, BRACING, SLOPING OR OTHER PROVISIONS TO BE MADE BY THE CONTRACTOR FOR THE PURPOSE OF WORKER PROTECTION FROM THE HAZARD OF CAVING GROUND DURING THE EXCAVATION OF TRENCHES NECESSARY FOR THE CONSTRUCTION OF THE PROJECT. IF SUCH PLAN VARIES FROM THE SHORING SYSTEM STANDARD ESTABLISHED BY THE CONSTRUCTION SAFETY ORDERS, THE PLANS SHALL BE PREPARED AND CERTIFIED BY A REGISTERED CIVIL OR STRUCTURAL ENGINEER; HOWEVER, USE OF SYSTEMS THAT ARE LESS EFFECTIVE THEN THOSE REQUIRED BY THE CONSTRUCTION SAFETY ORDERS IS PROHIBITED ON THIS PROJECT. 6. TRENCH BACKFILL TRENCHES SHALL NOT BE LEFT OPEN FARTHER THAN THREE HUNDRED (300) FEET IN ADVANCE OF PIPE LAYING OPERATIONS OR TWO HUNDRED (200) FEET TO THE REAR THEREOF, UNLESS OTHERWISE PERMITTED BY THE ENGINEER. ALL WORK SHALL CONFORM TO THE APPLICABLE SECTIONS OF THE STANDARD SPECIFICATIONS, DATED JULY, 1992. BEDDING CLASS SHALL BE AS SPECIFIED IN THE PIPE OPTIONS. STORM DRAIN, SEWER AND UTILITY CONDUIT INSTALLATIONS SHALL BE IN ACCORDANCE WITH CITY STANDARD ST -22, EXCEPT THAT COMPACTION SHALL BE NO LESS THAN NINETY PERCENT (90X) UP TO THIRTY INCHES (30") FROM FINISHED GRADE. BACKFILL MATERIALS IN THE PIPE ZONE SHALL BE PLACED IN LAYERS NOT TO EXCEED TWELVE (12) INCHES SIMULTANEOUSLY, ON EACH SIDE OF THE PIPE, IN SUCH A MANNER AS NOT TO DAMAGE OR DISTURB THE PIPE OR ITS ALIGNMENT AND GRADE. BACKFILL MATERIAL ABOVE THE PIPE ZONE SHALL BE FREE OF DELETERIOUS MATERIALS AND LUMPS OR STONES EXCEEDING THREE (3) INCHES IN GREATEST DIMENSION AND SHALL BE PLACED IN LAYERS NOT EXCEEDING EIGHTEEN (18) INCHES. EACH LAYER SHALL BE THOROUGHLY COMPACTED BY VIBRATORY OR MECHANICAL TAMPING, OR BY A COMBINATION OF THESE METHODS. FLOODING AND JETTING SHALL NOT BE ALLOWED. THERE MUST BE AT LEAST ONE FOOT OF COVER OVER THE PIPE BEFORE COMPACTION ABOVE THE PIPE ZONE WILL BE ALLOWED. IMPORTED BEDDING AND BACKFILL MATERIAL SHALL BE OBTAINED, AND ANY EXCESS BEDDING AND BACKFILL MATERIAL SHALL BE DISPOSED, BY ANY LEGAL MEANS AT THE DISPOSAL OF THE CONTRACTOR. THE CONTRACTOR MAY SUBMIT TO THE ENGINEER SIEVE ANALYSIS FOR UTILIZATION OF IN-SITU MATERIALS. ACHIEVING FIRM BEDDING BELOW PIPE SPRINGLINE. CONTRACTOR SHALL PROVIDE "FIRM BEDDING" SUPPORT FOR THE PIPE BELOW THE SPRINGLINE. FIRM BEDDING MEANS THAT THE PIPE MUST REST ON THE GRANULAR MATERIAL SPECIFIED PREVIOUSLY IN THE SPECIFICATIONS. BELL OR COUPLING HOLES SHALL BE CAREFULLY EXCAVATED AT PROPER INTERVALS, SO THAT NO PART OF THE LOAD IS SUPPORTED BY THE BELLS OR COUPLINGS. DURING BEDDING AND BACKFILLING, CONSOLIDATION OF MATERIAL AROUND AND UNDER BELLS AND COUPLINGS SHALL BE AVOIDED. UUN I KAU I VK JMALL bMVVtL-JU(;t VK MANU I AMV MIJUINU IN IMt MAUNUM AKtA,, AS THIS WILL MINIMIZE VOIDS BENEATH THE PIPE AND IN THE HAUNCH AREAS. SHOVEL -SLICING OR HAND TAMPING SHALL BE DONE BEFORE THE BEDDING IS BROUGHT UP TO THE QUARTER POINT OF THE PIPE. INITIAL BACKFILL "BEDDING MATERIAL" AS SPECIFIED BY ASTM 2321-8 SHALL BE USED IN THE PIPE ZONE FOR INITIAL BACKFILL. AFTER THE PIPE HAS BEEN PROPERLY LAID AND INSPECTED, INITIAL BACKFILL SHALL BE PLACED ON BOTH SIDES AND OVER THE PIPE TO SUCH A DEPTH THAT, AFTER THOROUGH CONSOLIDATION, THE FINAL DEPTH SHALL BE AT LEAST TO THE ELEVATION SHOWN ON THE PLANS. THE MATERIAL SHALL BE CONSOLIDATED BY VIBRATORY OR MECHANICAL TAMPING AND THE EQUIPMENT AND MANNER OF TAMPING MUST BE APPROVED IN WRITING BY THE ENGINEER PRIOR TO COMMENCING OPERATION. IMPACT EQUIPMENT MAY BE ALLOWED UNDER THE DIRECTION OF THE ENGINEER. HOWEVER, THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE RESULTING FROM THE USE OF THIS EQUIPMENT. HYDRA -HAMMER WILL NOT BE PERMITTED. SUBSEQUENT BACKFILL ABOVE THE LEVEL OF INITIAL BACKFILL, THE TRENCH MAY BE BACKFILLED WITH NATIVE MATERIAL RESULTING FROM TRENCH EXCAVATION, OR AT THE OPTION OF THE CONTRACTOR, SELECT IMPORTED MATERIALS MAY BE USED. NATIVE MATERIAL OR IMPORTED MATERIAL MAY BE COMPACTED BY TAMPING AND/OR ROLLING, USING EQUIPMENT AND METHODS APPROVED BY THE ENGINEER. WHEN THE CONTRACTOR COMPACTS BY TAMPING AND/OR ROLLING, THE BACKFILL MATERIAL SHALL BE PLACED IN LAYERS NOT EXCEEDING EIGHTEEN (18) INCHES IN LOOSE DEPTH, EACH LAYER BEING THOROUGHLY COMPACTED BY TAMPING AND/OR ROLLING BEFORE, SUCCEEDING LAYERS ARE PLACED. COMPACTION OF SUBSEQUENT BACKFILL WITHIN TWO AND ONE-HALF (2-1/2) FEET OF FINISHED PERMANENT SURFACING GRADE SHALL BE ACCOMPLISHED BY TAMPING AND/OR ROLLING AS SPECIFIED ABOVE. WHERE THE TRENCH IS WITHIN THE PAVEMENT ON STREETS, THE BACKFILL WITHIN TWO AND ONE-HALF (2-1/2) FEET OF FINISHED PERMANENT GRADE SHALL BE COMPACTED TO NINETY PERCENT (90X) RELATIVE COMPACTION. SUBSEQUENT BACKFILL PLACED BY TAMPING AND/OR ROLLING SHALL BE FREE FROM STONES OR LUMPS EXCEEDING THREE (3) INCHES IN GREATEST DIMENSIONS, VEGETABLE MATTER, OR OTHER UNSATISFACTORY MATERIALS. IN NO CASE SHALL JETTING BE ALLOWED FOR BACKFILL COMPACTION WITHIN THE STREET. WHEN APPROVED BY THE ENGINEER, JETTING MAY BE USED IN NON -STREET AREAS. BACKFILL TESTING AND COMPACTION, TESTING OF BACKFILL MATERIALS AND COMPACTION SHALL BE IN ACCORDANCE WITH SECTION 19, "EARTHWORK" AND SECTION 6-3, "TESTING", OF THE STANDARD SPECIFICATIONS, STATE OF CALIFORNIA, DEPARTMENT OF PUBLIC WORKS, DIVISION OF HIGHWAYS. EACH LAYER OF BACKFILL MATERIAL SHALL MEET THE COMPACTION, SAND EQUIVALENT, AND GRADATION REQUIREMENTS BEFORE THE NEXT LAYER IS PLACED. EACH LAYER OF BACKFILL SHALL BE THOROUGHLY COMPACTED TO THE RELATIVE COMPACTION OF NOT LESS THAN IS SHOWN ON CITY OF BAKERSFIELD STANDARD ST -22 AS MODIFIED ON THE CONTRACT PLANS, EXCEPT THAT COMPACTION WITHIN THE ROADWAY STRUCTURAL SECTION SHALL BE NO LESS THAN NINETY PERCENT (90X) RELATIVE COMPACTION FOR THE TOP FINISHED 30", AND SHALL BE DETERMINED BY CALIFORNIA TEST METHODS 216 OR 231, OR ASTM (CURRENT EDITION) D1557 AND ONE OF THE FOLLOWING D2922 OR D1556. IF THE RELATIVE COMPACTION, AS DETERMINED BY TESTING, FAILS TO MEET THE SPECIFIED PERCENTAGE, THE TRENCH SHALL BE RE -EXCAVATED AND RE -COMPACTED. COMPACTION TESTS WILL BE THE SUBDIVIDERS RESPONSIBILITY. THE NUMBER AND LOCATIONS OF THE TESTS SHALL BE DETERMINED BY THE CITY ENGINEER. 0 SEWER PIPE SHALL CONFORM TO THE PLANS, AND THESE SPECIAL PROVISIONS. THE PRICE PER LINEAL FOOT SHALL INCLUDE BUT NOT BE LIMITED TO EXCAVATION, BEDDING AND BACKFILL. HANDLING OF MATERIALS. ALL PIPE, FITTINGS, SPECIALS AND CASTINGS MUST BE CAREFULLY HANDLED AT ALL TIMES. ONLY SUITABLE AND PROPER EQUIPMENT AND APPLIANCES SHALL BE USED FOR THE SAFE LOADING, HAULING, UNLOADING, HANDLING AND PLACING OF MATERIALS, SPECIAL CARE SHALL BE EXERCISED SO THAT PREFORMED RESILIENT JOINTS ON PIPE AND FITTINGS WILL NOT BE DAMAGED. ANY PIPE OR FITTING WITH A JOINT DAMAGED OR FLATTENED WILL CAUSE THAT PIPE OR FITTING TO BE REJECTED. PIPE LAYING. NO PIPE SHALL BE LAID UNTIL THE ENGINEER INSPECTS AND APPROVES THE CONDITION OF THE BOTTOM OF THE TRENCH. PIPE SHALL BE INSTALLED IN STRICT ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. PIPE LAYING SHALL BEGIN FROM THE DOWNSTREAM END OF THE TRUNK SEWER OR AS DIRECTED BY THE ENGINEER. PIPE LAYING SHALL PROCEED WITH EACH PIECE LAID TRUE TO .LINE AND GRADE, AND IN SUCH A MANNER AS TO FORM A CLOSE CONCENTRIC JOINT WITH THE ADJOINING PIPE AND TO PREVENT SUDDEN OFFSETS ' IN THE FLOW LINE. AS THE WORK PROGRESSES, THE INTERIOR OF THE PIPE SHALL BE CLEARED OF ALL DIRT AND DEBRIS OF EVERY DESCRIPTION. PIPE SHALL NOT BE LAID WHEN THE CONDITION OF THE TRENCH OR THE WEATHER IS UNSUITABLE. AT TIMES WHEN WORK IS NOT IN PROGRESS, OPEN ENDS OF PIPE AND FITTINGS SHALL BE CLOSED. WITH BELLED END PIPE, BELL HOLES SHALL THEN BE EXCAVATED AT EACH JOINT TO FACILITATE THE JOINT OPERATIONS, AND SHALL BE ONLY OF SUFFICIENT SIZE FOR THAT PURPOSE. IN ORDER THAT BELL HOLES MAY BE PROPERLY LOCATED, NOT MORE THAN SIX (6) HOLES SHALL BE EXCAVATED AHEAD OF ACTUAL PIPE LAYING, ON ACCOUNT OF THE VARIATIONS IN JOINT CONSTRUCTION OPERATIONS. CUTTING PIPE. THE CONTRACTOR SHALL PERFORM ALL WORK OF CUTTING PIPE AND SPECIAL CASTING NECESSARY TO THE ASSEMBLY, ERECTION, AND COMPLETION OF THE WORK. ALL PIPE SHALL BE CUT TO FIT ACCURATELY, WITH SMOOTH EDGES AND FACES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CORRECTNESS OF CUTTING AND NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR ANY MATERIALS WHICH ARE DAMAGED OR INCORRECTLY CUT. PIPELINE TESTING. ALL SEWERS SHALL BE TESTED FOR TIGHTNESS WHEN COMPLETED AND READY FOR SERVICE. TESTING SHALL BE CONDUCTED IN ACCORDANCE WITH THE UNIFORM PLUMBING CODE AIR TEST METHOD UPC SEC. 318-6(4), OR THE WATER EXFILTRA11ON TEST OR AIR PRESSURE TEST PER SECTION 306-1.4, "TESTING PIPELINES" OF THE 1994 EDITIONS, "STANDARD SPECIFICATIONS" FOR PUBLIC WORKS CONSTRUCTION. AND CHAPTER 1.3 OF THE CITY OF BAKERSFIELD SUBDIVISION DESIGN MANUAL, AND THE PIPE SUPPLIER'S REQUIREMENTS. THE CONTRACTOR SHALL NOTIFY THE ENGINEER 24 HOURS PRIOR TO ANY TESTING. CLEANING PIPE LINES. CARE SHALL BE EXERCISED IN LAYING OF PIPE LINES TO EXCLUDE DIRT AND ANY OTHER FOREIGN MATERIAL. WHEN PIPE LAYING IS INTERRUPTED, AS AT NIGHT, THE PIPE ENDS SHALL BE SUITABLY CLOSED. UPON COMPLETION, AND BEFORE PLACING INTO SERVICE, ALL LINES SHALL BE FLUSHED AND MANDRELLED TO REMOVE ANY DIRT OR FOREIGN MATERIALS WHICH WOULD CLOG PUMPS, EQUIPMENT, SPRAY HEADS, ETC. THE CONTRACTOR SHALL MAKE PROVISIONS FOR PREVENTING FOREIGN MATERIAL FROM BEING FLUSHED INTO AN EXISTING SEWER LINE. SEWER LATERALS. SEWER LATERALS SHALL CONFORM TO THIS IN EVERY REGARD. EXISTING SEWER LATERALS SHALL BE LOCATED BY THE CONTRACTOR AND CONNECTED TO AND EXTENDED OR RECONSTRUCTED ACCORDING TO THE PLANS. COMPRESSION COUPLINGS MAY BE UTILIZED FOR CONNECTING TO EXISTING LATERALS. POSITIVE GRADE TO THE TRUNK SEWER SHALL BE MAINTAINED AND INVERT GRADES SET AS CALLED ON THE PLANS. SEWER WYES SHALL BE INSTALLED ON 'THE TRUNK IN ACCORDANCE WITH THE PIPE MANUFACTURERS RECOMMENDATIONS. PAYMENT FOR SEWER LATERALS WILL BE PAID AS SEWER FOR THE APPROPRIATE DIAMETERS. 8. SYSTEM TESTING A MANDREL TEST AND PRESSURE TEST SHALL BE PERFORMED ON INSTALLED PIPE IN ACCORDANCE WITH THE CITY OF BAKERSFIELD SUBDIVISION MANUAL AND THE RECOMMENDATIONS OF THE MANUFACTURER. PRIOR. TO FINAL ACCEPTANCE OF THE SEWER SYSTEM, ALL SEWER LINES SHALL BE INSPECTED WITH VIDEO EQUIPMENT DESIGNED FOR THIS PURPOSE AND AS APPROVED BY THE CITY ENGINEER. THE TELEVISION CAMERA SHALL HAVE THE CAPABILITY OF ROTATING 3607, IN ORDER TO VIEW AND RECORD THE TOP AND SIDES OF THE PIPE, AS REQUIRED. THE VIDEO INSPECTION SHALL BE WITNESSED BY THE CITY'S CONSTRUCTION INSPECTOR, WHO WILL ALSO INITIAL AND DATE THE "CHAIN OF CUSTODY" FORM. THE SUBDIVIDER SHALL IMMEDIATELY NOTIFY CITY OF ANY PIPE LOCATIONS REVEALED TO BE NOT IN COMPLIANCE WITH THE SPECIFICATIONS. A RECORDED VIDEO CASSETTE, THE COMPLETED "CHAIN OF CUSTODY FORM AND A WRITTEN LOG (WHICH INCLUDES THE STATIONING, BASED ON THE STATIONING OF THE APPROVED PLANS, OF ALL CONNECTED LATERALS) OF THE INSPECTION SHALL BE PROVIDED FOR VIEWING, AND SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO ACCEPTANCE. AFTER ACCEPTANCE, THE VIDEO CASSETTE, FORMS, & LOGS SHALL BECOME THE PROPERTY nr TMr NTY VI II IV VI I .. 9. WYE FITTINGS SHALL BE INJECTION MOLDED IN -UNE TYPE AND SHALL BE USED FOR ALL LATERAL CONNECTIONS AND SHALL BE ROTATED A MINIMUM OF 23 DEGREES ABOVE THE HORIZONTAL PLANE RUNNING THROUGH THE CENTERLINE OF THE MAIN. ALL LATERALS SHALL BE 4" IN DIAMETER EXCEPT AS NOTED ON PLANS, EXTENDING A MINIMUM OF 4' BEYOND THE PROPERTY LINE OR RIGHT-OF-WAY UNE WITH 30" OF COVER AT FLOW LINE. SURFACE MARKERS FOR SEWER LATERALS SHALL BE INSTALLED AT THE PROPERTY LINE OR RIGHT-OF- WAY UNE AS SHOWN IN THE "SEWER LATERAL MARKER" DETAIL, C.O.B. STD. DET. SW -1. LATERALS SHALL BE A MINIMUM OF 5.0' DEEP AND A MAXIMUM OF 7' DEEP AT PROPERTY LINE OR RIGHT-OF-WAY UNE AND A MINIMUM OF 2.5' DEEP AT FLOWLINE. 10. ALL SEWER STUBS SHALL BE CLOSED WITH A STANDARD PLASTIC PLUG. SOLVENT WELDED. 11. ALL MANHOLES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF BAKERSFIELD STANDARD DRAWINGS S-7, S-8, AND S-21 AND SECTIONS 70-1.02H AND 71-1.07 OF THE STANDARD SPECIFICATIONS OF THE STATE OF CALIFORNIA, DEPARTMENT OF TRANSPORTATION, CURRENT EDITION. ALL CLEANOUTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF BAKERSFIELD STANDARD DRAWING S-20. MANHOLES SHALL BE TYPE "A" FOR PIPES UNDER 48" IN DIAMETER AND TYPE "B" FOR PIPES 48" IN DIAMETER OR LARGER. UNLESS NOTED OTHERWISE. THE BOTTOM MANHOLE BARREL AT THE MANHOLE FOUNDATION SHALL BE SET ON A 2" MORTAR BED OR SET ON KENT -SEAL, IN A GROOVED FOUNDATION. MANHOLES FOR LINES 18 INCHES IN DIAMETER OR LARGER ARE TO BE LINED WITH AMERON T -LOC LINING OR EQUIVALENT AS APPROVED BY THE CITY ENGINEER. 12. ST HANDLING OF MATERIALS. ALL PIPE, FITTINGS, SPECIALS AND CASTINGS MUST BE CAREFULLY HANDLED AT ALL TIMES. ONLY SUITABLE AND PROPER EQUIPMENT AND APPLIANCES SHALL BE USED FOR THE SAFE LOADING, HAULING, UNLOADING, HANDLING AND PLACING OF MATERIALS, SPECIAL CARE SHALL BE EXERCISED SO THAT PREFORMED RESILIENT JOINTS ON PIPE AND FITTINGS WILL NOT BE DAMAGED. ANY PIPE OR FITTING WITH A JOINT DAMAGED OR FLATTENED WILL CAUSE THAT PIPE OR FITTING TO BE REJECTED. PIPE LAYING. NO PIPE SHALL BE LAID UNTIL THE ENGINEER INSPECTS AND APPROVES THE CONDITION OF THE BOTTOM OF THE TRENCH. PIPE SHALL BE INSTALLED IN STRICT ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. PIPE LAYING SHALL BEGIN FROM THE DOWNSTREAM END OF THE STORM DRAIN OR AS DIRECTED BY THE ENGINEER. PIPE LAYING SHALL PROCEED WITH EACH PIECE LAID TRUE TO UNE AND GRADE, AND IN SUCH A MANNER AS TO FORM A CLOSE CONCENTRIC JOINT WITH THE ADJOINING PIPE AND TO PREVENT SUDDEN OFFSETS IN THE FLOW UNE. AS THE WORK PROGRESSES, THE INTERIOR OF THE PIPE SHALL BE CLEARED OF ALL DIRT AND DEBRIS OF EVERY DESCRIPTION. PIPE SHALL NOT BE LAID WHEN THE CONDITION OF THE TRENCH OR THE WEATHER IS UNSUITABLE. AT TIMES WHEN WORK IS NOT IN PROGRESS, OPEN ENDS OF PIPE AND FITTINGS SHALL BE CLOSED. WITH BELLED END PIPE, BELL HOLES SHALL THEN BE EXCAVATED AT EACH JOINT TO FACILITATE THE JOINT OPERATIONS, AND SHALL BE ONLY OF SUFFICIENT SIZE FOR THAT PURPOSE. IN ORDER THAT BELL HOLES MAY BE PROPERLY LOCATED, NOT MORE THAN SIX (6) HOLES SHALL BE EXCAVATED AHEAD OF ACTUAL PIPE LAYING, ON ACCOUNT OF THE VARIATIONS IN JOINT CONSTRUCTION OPERATIONS. THE CONTRACTOR SHALL MAKE PROVISIONS FOR PREVENTING FOREIGN MATERIAL FROM BEING FLUSHED INTO AN EXISTING STORM DRAIN UNE. CUTTING PIPE. THE CONTRACTOR SHALL PERFORM ALL WORK OF CUTTING PIPE AND SPECIAL CASTING NECESSARY TO THE ASSEMBLY, ERECTION, AND COMPLETION OF THE WORK. ALL PIPE SHALL BE CUT TO FIT ACCURATELY, WITH SMOOTH EDGES AND FACES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CORRECTNESS OF CUTTING AND NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR ANY MATERIALS WHICH ARE DAMAGED OR INCORRECTLY CUT. 13. BORED /JACKED P 14. 15. CASING OR SMOOTH OUTSIDE WALLED PIPE FOR BORED/JACKED PIPE SHALL BE INSTALLED. IT SHALL HAVE EVEN BEARING THROUGHOUT ITS LENGTH . AND SHALL SLOPE TOWARD ONE END. SPACE BETWEEN CASING AND PIPELINE SHALL BE BACKFILLED WITH SAND. IF THE PIPE AND CASING ARE INSTALLED BY BORING, THE SPACE AROUND THE CASING ALSO SHALL BE BACKFILLED WITH GROUT OR SAND. THE ENDS OF SPACE BETWEEN THE CASING AND THE PIPE SHALL BE SEALED WITH GROUT. THE STRENGTH OF PIPE DESIGNATED IN THE PLANS OR SPECIFICATIONS IS DETERMINED FOR VERTICAL LOAD ONLY ANY ADDITIONAL STRENGTH REQUIRED BY BORING/JACKING OPERATIONS SHALL BE FURNISHED AT THE CONTRACTOR'S EXPENSE. THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER FOR APPROVAL ALL PLANS OF BORING/JACKING OPERATIONS PRIOR TO BORING OR JACKING. BORING/JACKING OPERATIONS SHALL BE CONDUCTED IN A SAFE AND EFFICIENT MANNER, CONSISTENT WITH CURRENT ACCEPTED PROCEDURES. WATER BORING SHALL NOT BE PERMITTED. THE CASING PIPE SHALL BE JACKED WITH SUCH PRECISION THAT WILL ALLOW THE REPLACEMENT OF THE PIPELINE TO THE UNE AND GRADE AS INDICATED ON THE PLANS. UPON COMPLETION OF THE INSTALLATION OF THE CASING AND INSTALLA11ON OF THE PIPELINE TO GRADE, THE VOID BETWEEN THE CASING OR RC PIPE AND THE EXCAVATION SHALL BE COMPLETELY FILLED WITH SAND, COMPACTED BY THE USE OF AIR -BLOWING SAND EQUIPMENT OR ANY OTHER MEANS ACCEPTABLE TO THE ENGINEER UPON HIS APPROVAL. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN A SAFE OPERATION AT ALL TIMES. SHOULD THE TUNNEL HEADING OPERATIONS RESULT IN DANGEROUS OR UNREASONABLE SLOUGHING OF MATERIAL WHICH MAY JEOPARDIZE THE SAFETY OF WORKERS OR THE STABILITY OF THE SOIL AND ROADWAY ABOVE, THE CONTRACTOR SHALL FURNISH AND INSTALL BREASTBOARDING AND/OR FACE CLOSURE WITH SUFFICIENT JACKS TO INHIBIT THE SLOUGHING AND/OR CLOSING THE WORK FACE. THE CONTRACTOR, BEFORE RESUMING WORK, SHALL FURNISH THE ENGINEER WITH A DETAILED PLAN OF PRECEDING WITH THE WORK, FOR HIS REVIEW AND APPROVAL. ANY AND ALL EXPENSES THEREFORE WILL BE CONSIDERED AS INCLUDED IN THE BID PRICE AND NO ADDITIONAL COMPENSATION WILL BE MADE THEREFORE. MINOR STRUCTURES. PORTLAND CEMENT CONCRETE MINOR STRUCTURES SHALL CONFORM, IN DESIGN, MATERIALS, AND CONSTRUCTION, TO THE PROVISIONS OF SECTIONS 70-1.02 H OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS. MANHOLES SHALL CONFORM TO THE CITY OF BAKERSFIELD STANDARDS S-7 AND S-8. DROP INLETS SHALL CONFORM TO THE CITY OF BAKERSFIELD STANDARD S-12. TEMPORARY INLET GRATES SHALL CONFORM TO DETAILS ON THE PLANS. THE PRECAST CYLINDER, TAPER, AND ECCENTRIC FLAT TOP SECTIONS SHALL MEET THE STRENGTH REQUIREMENT OF ASTM. C-478. EACH SUCCESSIVE MANHOLE SECTION SHALL BE SET ON A BED OF PORTLAND CEMENT GROUT OR "KENT SEAL" TO MAKE A WATERTIGHT JOINT, SHALL BE NEATLY POINTED ON THE INSIDE, AND SHALL BE SET PLUMB. SURVEY MONUMENT AND FRAME AND COVER WITH ENCASEMENTS SHALL BE ADJUSTED OR INSTALLED NEW TO FINISH GRADE AT THE LOCATIONS SHOWN ON THE PLANS, IN ACCORDANCE WITH THESE SPECIAL PROVISIONS, AND CITY STANDARD S-29. THE SURFACE OF THE CONCRETE SHALL BE PROTECTED FROM PUBLIC TRAFFIC FOR A MINIMUM OF THREE DAYS. AT THE OPTION OF THE CONTRACTOR, MINOR CONCRETE CONTAINING A MINIMUM OF SEVEN SACKS OF CEMENT PER CUBIC YARD MAY BE USED AND THE TIME REQUIRED FOR PROTECTION OF THE CONCRETE SURFACE FROM PUBLIC TRAFFIC SHALL BE REDUCED TO A MINIMUM OF ONE DAY. THE MONUMENT WILL BE SET BY OTHERS. THE OWNER WILL PROVIDE SURVEYS. CONTRACTOR SHALL GIVE THE OWNER 24 HOURS NOTICE WHEN SURVEYS ARE REQUIRED. ANY MONUMENT FRAME OR COVER DAMAGED BY THE CONTRACTOR OR HIS OPERATIONS SHALL BE REPLACED BY THE CONTRACTOR AT NO COST TO THE OWNER. N07ES: �. !�#Ar #ar Idle Ppx adt� aaohr>nl HIM ft An done dw bt 1W of dWalirl in ln*W 1f Aw Aaw a SW oulfie wt ff mg low 60 20 an4 " twborm to ft No" fa ft l! ► boM ro>IaW he #zai h oat to camd an 160! (J 0' "1t'" gaper% *Wb►aaraty 0 no aide at ft pipe h NO a V~ at se k 61490 or &W Oe An aR �edt and r* to * 4W shad' bar bav%llbtj► ao v- bf x W" h:r OaM nooarlal than ba fa' t► w P►hr tb aa�x+ao#a� Z Ig 1W iir" An � 0" � "Ahs I and Y� . erobegirwnt n1�rr#t an�i1 6tMa � �tar�e a1i be aad" fth eMl& ftft orad pof �olr nit be wed fe M" wvw ten Ir A61aW A0 Abe Wft and � "be Aaedpl M b Qo�a� P ProPwlj' of each -t A flop b rs�reiad for 6rtrar ; and /aauadliop &1 *0 bt to N toot b ftwito NAM Aro k*v h f Al =td"hl AAM p161cwAw carr�octe4 b ft nd tar . wd a r ja ism) ainK 9oakbl' n dw; ahad be P*ey covdaw to p hots P& 60 01=104 J 8ors}A'1 moh►>iol 4#w & pipe torte &W be ft a/dvlWelia teal rolar" and b W or #W w smodq gLe (&3rAQ it yr *Ms*" ""I6 prbasd bt A10i to Acmed ane Ibot 491 X&O by � AW � be dMirr�rigllly'aenlpewte/ fN* bh wade al�apgcr 10 warblloj► arear ivrlr .�' r.� (QAv) Aqu d boar of cw* oalaMaI Ae ,�• 111*#60ow10,(a m)offt Q 01 and h wj4 Wk ,.._.,.. M NU #4 d*ft odd ioaaMoy 0.2 80►nrn► w as'(arsm wyer 3d - .50 ` Clr� a ripww Id Siff iwd& V aenwxft k of 00W am U'(tIy0rri or mom1.5 7.0-1110 t dbat�► h pyre �I A'� � •� 0" mom MIM bt #0 _ am Ib aanhm to ■o* 11 2 ,� 77K �•� wt'd .lt � ++ For pt+ & uffA 9 , awmirte An V at Ia►' I>tibt VI -vi; . own C IMrslhS" QWa*# z QIui�vw 16r V p� N07ES: �. !�#Ar #ar Idle Ppx adt� aaohr>nl HIM ft An done dw bt 1W of dWalirl in ln*W 1f Aw Aaw a SW oulfie wt ff mg low 60 20 an4 " twborm to ft No" fa ft l! ► boM ro>IaW he #zai h oat to camd an 160! (J 0' "1t'" gaper% *Wb►aaraty 0 no aide at ft pipe h NO a V~ at se k 61490 or &W Oe An aR �edt and r* to * 4W shad' bar bav%llbtj► ao v- bf x W" h:r OaM nooarlal than ba fa' t► w P►hr tb aa�x+ao#a� Z Ig 1W iir" An � 0" � "Ahs I and Y� . erobegirwnt n1�rr#t an�i1 6tMa � �tar�e a1i be aad" fth eMl& ftft orad pof �olr nit be wed fe M" wvw ten Ir A61aW A0 Abe Wft and � "be Aaedpl M b Qo�a� P ProPwlj' of each -t A flop b rs�reiad for 6rtrar ; and /aauadliop &1 *0 bt to N toot b ftwito NAM Aro k*v h f Al =td"hl AAM p161cwAw carr�octe4 b ft nd tar . wd a r ja ism) ainK 9oakbl' n dw; ahad be P*ey covdaw to p hots P& 60 01=104 J 8ors}A'1 moh►>iol 4#w & pipe torte &W be ft a/dvlWelia teal rolar" and b W or #W w smodq gLe (&3rAQ it yr *Ms*" ""I6 prbasd bt A10i to Acmed ane Ibot 491 X&O by � AW � be dMirr�rigllly'aenlpewte/ fN* bh wade Com. &am to to xx ..,,». r~ oftyplaw +Ir AW be War (Q.3ir abs 1 of Of Ad or date ftbW &OW 0#01 aw POA 0=1 " "'Ill fart of amr w 4. delft of &CO naartwf* ate► be h 0= 0%161 00 It Wr Add d h Serft 0-301 of be S7mrrit"d Sipecbiaal6toriat I yx Teas Er be now and AW he Ne nwpw" ,per► of * Gboldr w % 9ipr9Fltelbr / cmfi+aaldar. W bwr d r of ke h.7 of 1* *& oW to a6rn*wd by 6W My ilayiw.. rx bob sw be h a®dm,a RA Io kab Ad h SaCft "of of A* bibwlod *"N*ft (1r MW VM71 i~ 10 � foal! hoer of �aa�F� � shat rrlee! E� smd "idol odd PdWa MOMWO kAVO * malt AW is pwd 7 For parmml patter mah powd arM M oWAH twine V=LP Oh1kr T/Arrl PWA 0 . Dw faN�awdn *ham awy for trrWM wdQbhm IJV t;WATE,ST TARO WG "14 th r.&" 'law &A&. Q OR SLWY M NU AcP7Fa' 0.2 80►nrn► w as'(arsm wyer 3d - .50 1,2' MSI' to .0' V U'(tIy0rri or mom1.5 7.0-1110 Out iW Q 85 the" 23 MM) Com. &am to to xx ..,,». r~ oftyplaw +Ir AW be War (Q.3ir abs 1 of Of Ad or date ftbW &OW 0#01 aw POA 0=1 " "'Ill fart of amr w 4. delft of &CO naartwf* ate► be h 0= 0%161 00 It Wr Add d h Serft 0-301 of be S7mrrit"d Sipecbiaal6toriat I yx Teas Er be now and AW he Ne nwpw" ,per► of * Gboldr w % 9ipr9Fltelbr / cmfi+aaldar. W bwr d r of ke h.7 of 1* *& oW to a6rn*wd by 6W My ilayiw.. rx bob sw be h a®dm,a RA Io kab Ad h SaCft "of of A* bibwlod *"N*ft (1r MW VM71 i~ 10 � foal! hoer of �aa�F� � shat rrlee! E� smd "idol odd PdWa MOMWO kAVO * malt AW is pwd 7 For parmml patter mah powd arM M oWAH twine V=LP Oh1kr T/Arrl PWA 0 . Dw faN�awdn *ham awy for trrWM wdQbhm IJV t;WATE,ST TARO WG CLASS I C1b14/ENS�AN Q OR SLWY r-oraim) or lei 108(0, 3qwk 0.2 80►nrn► w as'(arsm wyer t.0 a.V") u 10(a3w) � to .0' V U'(tIy0rri or mom1.5 a45m wider f.o e..3mj wtier Q both slrm both a rtLEXAMe ST-22KV Know what'sbelOW. Call before you dig. 1.2-6759 CITY RECORDS NO: 70 rn ro torn Q O z o0 U O � z U_ I Q _-:3 wU 00 00 j w co co 0O ( v N W w Y M X9321 �- z � Q z IL V J z Q � O _ V cr. V LL W..� z V ~W � CC I-- - oc co CL Z to c+) O Od Lu W g �o o OJ W Z� <' �IIIIIIIII z � Q z IL V J z Q � O _ V cr. V LL W..� z V ~W � CC I-- - oc co CL Z to c+) O Od Lu W g �o o OJ W Z� <' 350 348 346 344 342 340 338 336 334 332 330 328 326 324 322 320 318 316 314 312 310 308 306 FD. K.C.S. CONC. MON. IN L.H. FOR W. 1/4 COR. SEC. 3, 31/27 PER FILED MAP No. 7-1 BK. 6, PG. 17 N00'45'36'E 350 348 346 344 342 340 338 336 334 332 330 328 326 324 322 320 318 316 314 312 310 308 306 rA_' SECTION 1 3 SCALE: 1" = 50" HORIZ• 1 if = 5' VERT. I I 0 I� I ' 1 EXST. R/W �- J � L EXST. CALTRANS - -----�---C-- -- -- �--'� R/W o 29+00 30+00 i, ? ./, 1// �j,--- r, ,r--_ - STATE ROUTE 119/ TAFT HIGHWAY I I � FD. K.C.S. CONC. MON.-DOWN 24' FOR WITNESS CORNER'40. NORTH OF S.W. COR. SEC. 34, 30/27 PER R/S BK. 15, PG. 31 +00 32+00 178 EXST. EP. 3-=�= = - - - - -- 4+00 35•i-00 - 261.97' - 36+00.. I - _37+00 -- --- _-� 38+00 EX. USA } 40.00' =} �- 4-- 36 " 36" SEWER PROP. 36 SEWER EX. PP MARKER 10.00' S00'45'36'W _ '� TS Ts 10.00' SO ' 5'36"W (TYP.) (T rP.) N00'25'27E _ )H _ _ - OH _ _ AFI ,�-- EX. O.H. ELEC. LINE 36_SEWER (FUTURE) 50,45,3 " EX. PP - -� - _ ox _ _ _ b -� _ _ oH n I - -6 UJ -0014 6 W (TYP.) EXST. R/W - - - - - - s s S 36 SEWER ^ 449.50' s (SEE SEPARATE PLAN ENCROACHM T PERMIT N0. O6 i� R 217.55' _ _ Sl'S5'49"E PROP. 36' ,SEWS � EX - PIP II i I II EX. R/W PER C.O.B. FUTURE CURB - - - J T �`�\\ (Ty P.) Y II I �I i DOC. No. 000217011200 & GUTTER Lai cn Z i I i 8" SEWER EX. CALTRANS J Q9 N j1► ¢ z F Zo I vI 1 10.00 " w - ti T TFUNTATIV TRAFFIC SIGNAL CONDUIT W o w zQ 11 Itt � w w J I i S89'04 33 E o - 3 \ f LI I\I r. TO BE PROTECTED IN o Y e a �I m • W U I Z • w J J J G PLACE BY THE m Q o w m Z U cn z t5 vwi I i� ( I w - _ CONTRACTOR M W J O— O Oi O Z I I I -� " O r r I �(��� �(��� ...I 3 m (n Q'* W t t I �� cn U co ori J R�\ C J J\1 0 , J �J J .J a- c� t�ii W cn o I I t� EX. TRAF IC cls w 0 o to \ 0 I o0 1 0 to NJx"tC.4 WOnj I I I Z •N mO " QaJ(A z°¢- A SIGNAL =�31m MaP_+O} Wa?MM i I i m+0 30to 0 ONUo and I) O�m Z�W M r �O+O j ( I '� (~O� WOO >- m I I II =I3 c�o�Qd 00mwMM I I I 3 •Q �p(~jLn OaNO �o I II <�'M mV)iU_ (n ZFOFaH I I � MZMM V) _j � I jj I N~ p Wtnw cn I t O Z Q Q OOMM w U!I I t� 0) EXST. 20 WIDE SEWER UNE EASEMENT w o0 N N °- = I I PER C.O.B. DOC.#0207213732 Ix Q F- I 1.111 63' z r-- I I ____-------_- a. m N� I o �-4 STATE ROUTE 119/ A H E R -0 A D TAFT HIGHWAY STA. 30+34.09 C.L. TO STA. 35+02.59 C.L. SCALE: 1" = 50' HORIZONTAL 1" = 5' VERTICAL 350 348 346 344 342 340 338 336 334 332 330 328 326 324 322 320 318 316 314 312 310 308 306 Com' hh INV INVERT SD STORM DRAIN MH PPROXIM TE EXISTING GROUND JB JUNCTION BOX SMH SEWER MANHOLE I SEWER CLEANOUT SDMH STORM DRAIN MANHOLE EXIST EXISTING EL.EV ELEVATION R/W RIGHT OF WAY M.H. MANHOLE FL. FLOWLINE PP POWER POLE r IST€ PROPOSED GAS AND ELEC. JOINT TRENCH O J O Q Uj (n • INVERT SEWER z En (o co r M M "ZZ Mto cS M M WLL • l' LL W W Ir 00- D �+ cn o to J �- M IQ - to LL INSTAL- OF 8" 10.00 LF DVC SEWE 0 R 350 348 346 344 342 340 338 336 334 332 330 328 326 324 322 320 318 316 314 312 310 308 306 rA_' SECTION 1 3 SCALE: 1" = 50" HORIZ• 1 if = 5' VERT. I I 0 I� I ' 1 EXST. R/W �- J � L EXST. CALTRANS - -----�---C-- -- -- �--'� R/W o 29+00 30+00 i, ? ./, 1// �j,--- r, ,r--_ - STATE ROUTE 119/ TAFT HIGHWAY I I � FD. K.C.S. CONC. MON.-DOWN 24' FOR WITNESS CORNER'40. NORTH OF S.W. COR. SEC. 34, 30/27 PER R/S BK. 15, PG. 31 +00 32+00 178 EXST. EP. 3-=�= = - - - - -- 4+00 35•i-00 - 261.97' - 36+00.. I - _37+00 -- --- _-� 38+00 EX. USA } 40.00' =} �- 4-- 36 " 36" SEWER PROP. 36 SEWER EX. PP MARKER 10.00' S00'45'36'W _ '� TS Ts 10.00' SO ' 5'36"W (TYP.) (T rP.) N00'25'27E _ )H _ _ - OH _ _ AFI ,�-- EX. O.H. ELEC. LINE 36_SEWER (FUTURE) 50,45,3 " EX. PP - -� - _ ox _ _ _ b -� _ _ oH n I - -6 UJ -0014 6 W (TYP.) EXST. R/W - - - - - - s s S 36 SEWER ^ 449.50' s (SEE SEPARATE PLAN ENCROACHM T PERMIT N0. O6 i� R 217.55' _ _ Sl'S5'49"E PROP. 36' ,SEWS � EX - PIP II i I II EX. R/W PER C.O.B. FUTURE CURB - - - J T �`�\\ (Ty P.) Y II I �I i DOC. No. 000217011200 & GUTTER Lai cn Z i I i 8" SEWER EX. CALTRANS J Q9 N j1► ¢ z F Zo I vI 1 10.00 " w - ti T TFUNTATIV TRAFFIC SIGNAL CONDUIT W o w zQ 11 Itt � w w J I i S89'04 33 E o - 3 \ f LI I\I r. TO BE PROTECTED IN o Y e a �I m • W U I Z • w J J J G PLACE BY THE m Q o w m Z U cn z t5 vwi I i� ( I w - _ CONTRACTOR M W J O— O Oi O Z I I I -� " O r r I �(��� �(��� ...I 3 m (n Q'* W t t I �� cn U co ori J R�\ C J J\1 0 , J �J J .J a- c� t�ii W cn o I I t� EX. TRAF IC cls w 0 o to \ 0 I o0 1 0 to NJx"tC.4 WOnj I I I Z •N mO " QaJ(A z°¢- A SIGNAL =�31m MaP_+O} Wa?MM i I i m+0 30to 0 ONUo and I) O�m Z�W M r �O+O j ( I '� (~O� WOO >- m I I II =I3 c�o�Qd 00mwMM I I I 3 •Q �p(~jLn OaNO �o I II <�'M mV)iU_ (n ZFOFaH I I � MZMM V) _j � I jj I N~ p Wtnw cn I t O Z Q Q OOMM w U!I I t� 0) EXST. 20 WIDE SEWER UNE EASEMENT w o0 N N °- = I I PER C.O.B. DOC.#0207213732 Ix Q F- I 1.111 63' z r-- I I ____-------_- a. m N� I o �-4 STATE ROUTE 119/ A H E R -0 A D TAFT HIGHWAY STA. 30+34.09 C.L. TO STA. 35+02.59 C.L. SCALE: 1" = 50' HORIZONTAL 1" = 5' VERTICAL 350 348 346 344 342 340 338 336 334 332 330 328 326 324 322 320 318 316 314 312 310 308 306 Com' CENTERLINE INV INVERT SD STORM DRAIN MH PPROXIM TE EXISTING GROUND JB JUNCTION BOX SMH SEWER MANHOLE SCO SEWER CLEANOUT SDMH STORM DRAIN MANHOLE EXIST EXISTING EL.EV ELEVATION R/W RIGHT OF WAY M.H. MANHOLE FL. FLOWLINE PP POWER POLE r IST€ PROPOSED GAS AND ELEC. JOINT TRENCH TV EXISTING CABLE LINE —o-VIE_R- �o=+� o o ' J Q O O Z •t N J r U v ,� U M LO I 00 I �- U O M M . Q O (n a IL r OTE: ONTRA TOR 7`01 VERIFY _0CATION AND I VERT V. PF MS NG 36 mSEWER PRIOR 0 CON NOTIFY TRUCTI ]HE ENGNEER AND 0-- • DIS EPAN ES. •,04Y INT 36' R i VERT 3 IN T PROP. SEWER R7 INVER PROP. 36" EWER 36' SEWER a O O J O O ZN 0 0 Z(n �T MM -i O JMM JZ �Z Q J — Z F} �W W O" Wa Z_Z_ O WOL Z — 3ltJ ' O = o 3 `n v- to Q m— o 0 M O O M O M M M (O to M M (n W to M M M OV)M O�Q !m 3 W aWW H J J o Z aw F-- J Ow m W 9 WW J J _j N (n (n W W w cn W 10 00 LF a a. (n W W INSTALL 10.0 LF OF PROPOSED 3 "� PROP. 3 " SEWER 36" SEWER 0 -0.08% INSTALL 44.50 LF 017 36" SE R 0 - .08% ( F,) SEWER 0 -0.08% 0- 08% 30+00 31+00 ABBREVIATIONS CL CENTERLINE INV INVERT SD STORM DRAIN MH MANHOLE CB CATCH BASIN JB JUNCTION BOX SMH SEWER MANHOLE SCO SEWER CLEANOUT SDMH STORM DRAIN MANHOLE EXIST EXISTING EL.EV ELEVATION R/W RIGHT OF WAY M.H. MANHOLE FL. FLOWLINE PP POWER POLE r TOP OF MANHOLE 32+00 33+00 350 348 346 344 342 340 338 336 334 332 330 328 326 324 322 320 318 316 314 312 310 308 306 LEGEND: s FURNISH & INSTALL SEWER 36+00 LINE PER CITY STANDARDS ® FURNISH & INSTALL SEWER ROUTE 119 (TAFT HIGHWAY) MANHOLE TYPE "A" PER ROUTE 119 (TAFT HIGHWAY) C.O.B. STD. SW -4. ® STORM DRAIN MANHOLE PROPOSED 36" SEWER. CATCH BASIN SLEEVE CONSTRUCTION PLANS EXISTING DOWN GUY -O- EXISTING POWER POLE s EXISTING SEWER LINE - G EXISTING GAS LINE }-- EXISTING FENCE LINE - - - - - - - - - - EXISTING EDGE OF PAVEMENT T EXISTING TELEPHONE LINE r RELOCATED TELEPHONE LINE 350 348 346 344 342 340 338 336 334 332 330 328 326 324 322 320 318 316 314 312 310 308 306 NOTE : 1) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS UNLESS OTHERWISE NOTED. SECTION DESIGNATION: SECTION If= _2 SHEET WHERE SECTION IS SHOWN I 34+00 35+00 36+00 ac SEE INTERSECTION OF STATE SEE INTERSECTION OF STATE ROUTE 119 (TAFT HIGHWAY) o ROUTE 119 (TAFT HIGHWAY) CONSTRUCTION PLANS FOR AND ASHE ROAD SEWER PROPOSED 36" SEWER. SLEEVE CONSTRUCTION PLANS FOR PROPOSED 36" SEWER. - —OH- E EXISTING POWER LINE (ENCROACHMENT PERMIT NO. - E RELOCATED POWER LINE 06 -17 -6 -UJ -0014) / - D FUTURE STREET LIGHT - - D FUTURE - STORM DRAIN LINE PROPOSED GAS AND ELEC. JOINT TRENCH TV EXISTING CABLE LINE NOTE : 1) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS UNLESS OTHERWISE NOTED. SECTION DESIGNATION: SECTION If= _2 SHEET WHERE SECTION IS SHOWN 0 s 0 r I a N EXISTING 36' SEWER (SEE CITY OF BAKERSFIELD SEWER IMPROVEMENT PLANS) 39+00 n TS— n I— X STANDARD MANHOLE FRAME & COVER PER C.O.B. STD. DWG. S-8. COVER SHALL BE LEVEL WITH EXISTING GRADE. EXISTING GROUND I 0. OOQ _v:��m o�o�8 �'---FILL ANNULAR VOID �� 8` WITH 4t" PEA GRAVEL 48" CMP ac SEE INTERSECTION OF STATE m ROUTE 119 (TAFT HIGHWAY) o AND ASHE ROAD SEWER SLEEVE CONSTRUCTION PLANS FOR PROPOSED 36" SEWER. 0 s 0 r I a N EXISTING 36' SEWER (SEE CITY OF BAKERSFIELD SEWER IMPROVEMENT PLANS) 39+00 n TS— n I— X STANDARD MANHOLE FRAME & COVER PER C.O.B. STD. DWG. S-8. COVER SHALL BE LEVEL WITH EXISTING GRADE. EXISTING GROUND STANDARD MANHOLE RAISED TO GRADE IN NON—PAVED AREAS A 1 r% Tf•" n _ 1. ALL UTILITY LOCATIONS SHOWN ARE APPROXIMATE AND ARE SHOWN FOR INFORMATION ONLY. CONTRACTOR TO VERIFY. 2. CONTRACTOR SHALL CALL USA AT 1-800-642-2444 AND VERIFY UTILITY LOCATIONS 48 HOURS BEFORE STARTING CONSTRUCTION. 3. ALL TRENCHING, BACKFILL AND COMPACTION OPERATIONS SHALL BE PER C.O.B. STD. DETAIL ST -22 ON SHEET 2. SCALE: 1 " = 50' 50' 25' 0' 50' 100' Know what's below. Call before you dig. CITY RECURDS NU: I 0. OOQ _v:��m o�o�8 �'---FILL ANNULAR VOID �� 8` WITH 4t" PEA GRAVEL 48" CMP ,--STANDARD MANHOLE CONE STANDARD MANHOLE RAISED TO GRADE IN NON—PAVED AREAS A 1 r% Tf•" n _ 1. ALL UTILITY LOCATIONS SHOWN ARE APPROXIMATE AND ARE SHOWN FOR INFORMATION ONLY. CONTRACTOR TO VERIFY. 2. CONTRACTOR SHALL CALL USA AT 1-800-642-2444 AND VERIFY UTILITY LOCATIONS 48 HOURS BEFORE STARTING CONSTRUCTION. 3. ALL TRENCHING, BACKFILL AND COMPACTION OPERATIONS SHALL BE PER C.O.B. STD. DETAIL ST -22 ON SHEET 2. SCALE: 1 " = 50' 50' 25' 0' 50' 100' Know what's below. Call before you dig. CITY RECURDS NU: