Loading...
HomeMy WebLinkAbout2544 Mt. Vernon Drainage Study Approval LetterApril 6, 2017 Civil Design Studio P.O. Bo x 199 Cambria, CA 93428 ~-------.----~~ BAI( ERSFI EL D PUBLIC WORKS DEPARTMENT NI CK FIDLER' DIRECTOR· CITY ENGINEER RE: Drainage Study for 2544 Mount Vernon Avenue Dear Robert D Winslow : We have completed review of the revised drainage study for 2544 Mount Vernon Avenue dated March 28, 2017. As a result of our review, we approve the drainage study with the following comments. 1. Please make sure to address the comments from the Kern County Public Works Department. 2. The proposed ramps on the NWC and SWC in Mt. Vernon shall be constructed per Cal Trans Standard Case "B". The proposed cross gutter shall be e xtended 4' from the lip to the west to minimize any additional runoff f rom Mt. Vernon to the property. 3. Please add a note to the grading plan "The onsite catch basins and storm drain system shall be maintained privately and the City of Bakersfield will not assume responsibility over the maintenance ". 4. Please provide a copy of the calculations on a CD. As a back up to the hard copy submitted, the City is asking all the engineering firms to submit a digital PDF copy. Should you have any questioFls, please contact Manny Behl at (661) 326-3576 . Very truly yours , NICK FIDLER Public Works Director By l?:!a !~ Civil Engineer IV -Subdivision cc: Projec t f iles : 2544 Mount Vernon Avenue Read ing File \mb S:\LETTERS\ORAINAGE\2017\COS OS 2544 Mt Vernon oppr.doc 1600 Truxtun Ave nue Bakersfield · Cali forn ia ' 9330 1 (66 1) 326-3724 Fax (66 1) 852-21 20 www .b akersfi el dcity.u s