Loading...
HomeMy WebLinkAboutUST-BILLING/PERMIT 3/31/2014BILLING & PERMIT STATEMENT BAKERSFIELD FIRE DEPARTMENT B B A 9 P 1 D Prevention Services PERMIT # PINE r 2101 H Street Bakersfield, CA 93301 Phnne- 661 - 376 -3979 • Fax- 661 -RS7 -7171 All permits must be reviewed, stamped, and approved PRIOR TO BEGINNING WORK. CI SITE INFORMATION $280 „„ LOCATION OF PROJECT ��� P\ PROPERTY OWNER /�•- f Z, � CiC V 1 ° STARTING DATE COMPLETION DATE NAME PROJECT NAME � � � ADDRESS PHONE* PROJECT ADDRESS "z 3 � � � �� Z ✓ cm �A f C �TZS F I E l..I� STATE Gi`C ZIP CODE CONTRACTOR INFORMATION CONTRACTOR NAME ® CA LICENNSyEy# l 0 s� L#Tiy8i6W1bf0 PE OF LICENSE, ]t� EXPIRATIO DATE. JJ Z-- 13AViel PHONE # ! CONTRACTOR COMPANY NAME FAX # ADDRESS CITY •`tom l� ZIP CODE 3-3 8-0 All permits must be reviewed, stamped, and approved PRIOR TO BEGINNING WORK. CI Alarm - New & Modification (minimum charge) $280 ❑ Over 10,000 sq ft $0 .028 x sq ft ❑ Sprinkler - New & Modification (minimum charge) $280 ❑ Over 10,000 sq ft $0 .028 x sq ft • Minor Sprinkler Modification ( <10 heads) $96 (inspection only) 84 • Commercial Hood (New & Modification) $470 ❑ Additional hood $58 ❑ Spray Booth (New & Modification) $470 98 • Aboveground Storage Tank (1 inspection per installation) AST $180 /tank 82 ❑ Additional Tank ATI $96 /tank 82 • Aboveground Storage Tank (Removal, Mod,or Inspect'n) ATR $109 /tank 82 • Underground Storage Tank (Installation /Inspection) NI $878 /tank 82 • Underground Storage Tank (Modification) MOD $878 /site 82 • Underground Storage Tank (Minor Modification) MTM $167 /site 82 • Underground Storage Tank (Removal) TR $573 /tank 84 Mandated Leak Detection (test) /Fuel Mont Cert/SB989 NOTE: $96 /hr for each type of test/per site even if scheduled at the same time TT $96 /hr (2 hrs minimum) =$192 82 ❑ Oil well (Installation, Inspection, or re- inspection) X $96 /hr 82 ❑ Tent # $96 /tent 84 ❑ After -hours inspection fee $121/hr (2 hrs minimum) =$242 ❑ Pyrotechnic (1 permit per event, plus an inspection fee of $96 /hr during business hours) PY NOTE: After hours Pyrotechnic event inspection is @ $121 /hr $96 /hr + (5 hrs min standby fee /insp) =$576 5 hrs min standby fee /ins = 605 84 ❑ Re- inspection /Follow -up Inspection $96 /hr 84 ❑ Portable LPG (Propane): # of Cages? $96 /hr 84 ❑ Explosive Storage $266 84 ❑ Copying & File Research (File Research fee $50 /hr) $0.25 /page 84 ❑ Miscellaneous 84 ! ! WV fl t� '� .� 61, BILLING & PERM-IT STATEMENT BAKERSFIELD FIRE DEPARTMENT Prevention Services PERMIT # 2101 H Street Bakersfield, CA 93301 Phone: 661-326-3979 • Fax: 661-852-2171 - �Lk Y SITE INFORMATION LOCATION OF PROJECT AM4 PROPERTY OWNER STARTING DATE COMPLETION DATE NAME '776 PROJECT NAME r >b ADDRESS PHONE PROJECT ADDRESS J CITY 7E7,A K ETRS F I F L-D STATEaA ZIP CODE CONTRACTOR INFORMATION CONTRACTOR NAME CA LICENSE # I 'A, m -,'V1 • TYPE OF LICENSE JEXPI Op DATE, & 8 e& ye �p 1"Aiviv PHONE CONTRACTOR COMPANY NAME FAX # ADDRESS Slkl :544e, r�9 CITY ZIP CODE 3 6-0 All 2 ❑ permits must be reviewed,, stamped,, and approved PRIOR TO BEGINNING WORK. PERMIT TYPE FEE CALCULATION • TOTAL DUE Alarm - New & Modification (minimum charge) $280 ONLY TREASURY- ACCT NO ❑ Over 10,000 sq ft $0 .028 x sq ft ❑ Sprinkler - New & Modification (minimum charge) $280 ❑ Over 10,000 sq ft $0 .028 x sq ft ❑ Minor Sprinkler Modification (<10 heads) $96 (inspection only) 84 ❑ Commercial Hood (New & Modification) $470 ❑ Additional hood $58 ❑ Spray Booth (New & Modification) $470 98 ❑ Aboveground Storage Tank (1 inspection per installation) AST $180/tank 82 ❑ Additional Tank ATI $96/tank 82 ❑ Aboveground Storage Tank (Removal, Mod,or Inspect'n) ATR $109/tank 82 ❑ Underground Storage Tank (Installation /Inspection) NI $878/tank 82 ❑ Underground Storage Tank (Modification) MOD $878/site 82 ❑ 'Underground Storage Tank (Minor Modification) MTM $167/site 82 ❑ Underground Storage Tank (Removal) TR $573/tank 84 Mandated Leak Detection (test)/Fuel Mont Cert/SB989 NOTE: $96/hr for each type of test/per site even if pcheduled at the same time TT $96/hr (2 hrs minimum)=$192 82 ❑ Oil well (Installation, Inspection, or re-inspection) X $96/hr 82 ❑ 0 Tent # $96/tent 84 ❑ After-hours inspection fee $121/hr (2 hrs minimum)=$242 ❑ Pyrotechnic (1 permit per event, plus an inspection fee of $96/hr during business hours) Py NOTE: After hours Pyrotechnic event inspection is @ $121/hr $96/hr + (5 hrs min standby fee/insp)=$576 (5 hrs min standby fee /ins p)=$605 84 ❑ Re-inspection/Follow-up Inspection $96/hr 84 ❑ Portable LPG (Propane): # of Cages? $96/hr 84 ❑ Explosive Storage $266 84 ❑ Copying & File Research (File Research fee $50/hr) $0.25/page 84 ❑ Miscellaneous 84 FD202 I (Ray 04/0q) - �Lk Y