Loading...
HomeMy WebLinkAboutTract 6557 Sump Construction LetterV**.raZall& ASSOCIATES, I NC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION April 21, 2017 Mr. Jim Grombly Lennar Homes of California, Inc 8080 N. Palm Ave., Ste. 110 Fresno, California 93711 RE: Report of Drainage Basin Mitigation Tract 6557-2 SEC Berkshire and Mountain Ridge Bakersfield, California Dear Mr. Grombly: Project No. 026-15442 As you are aware, Krazan & Associates, Inc performed a Soil Absorption Evaluation for the proposed drainage basin (KA No. 022-05218) dated May 8, 2006, for the above referenced project. Our report provided mitigation measures in order to develop a basin with appropriate absorption characteristics. The recommended primary mitigation measure consisted of over -excavating the basin to a depth of 21 feet below the existing site grade and backfilling the basin with free draining sand approved by this office. As a result of supplemental field exploration, the developer choose to increase the depth of over -excavation to 27 to 28 feet in order to extend the removal below the deeper silt lens which was encountered from 25 to 27%2 feet below grade during our previous investigation. Observations and testing have concluded that the drainage basin has been constructed in accordance with the recommendations contained in our Soil Absorption Evaluation report. If you have any questions, or if we may be of further assistance, please do not hesitate to contact our office at (661) 837-9200. Respectfully submitted, KRAZAN & ASSOCIATES, INC. QR()FESS�a N0.59072 � �n EXP 9/00/2017 (P Ry K. Privett, PE � OCIV1I.,�Ocr?meq Project EngineerFCA1- RCE No. 59372 RKP/Ib Offices Serving The Western United States 2205 Coy Avenue • Bakersfield, CA 93307 • (661) 837-9200 • (888) 633-2200 • Fax: (661) 837-9201 02615442 Drainage Basin Final 04-21-2017.doc