Loading...
HomeMy WebLinkAbout1.8-7243 Record Drawingv J 10' PUE d PAD -MOUNTED EQUIPMENT SUBSURFACE ENCLOSURE TRENCH CENTERLINE w z J tr W I - z w U TYPICAL INTERIOR STREET NO SCALE (TRENCH IN FRONT OF ROW) LOT LINE LOT LINE V-6" 1 W GSTC STUB 0- C -- — / � N" N o WATER METER I MAIN TRENCH O c0 W a o LOT LINE I TYPICAL INTERIOR STUB INSTALLATION NO SCALE (TRENCH IN FRONT OF ROW) DRAINING OF RECORD L. ALBERTO LOPE I R.C.E. 67+802 EXP. 6/30/I NOTE: ALL SERVICES AND SUB -STRUCTURES ARE NOT TO SCALE FOR CLARITY. ALL COMPONENTS SHALL FIT WITHIN THE PUE OR FRANCHISE AREA UNLESS OTHERWISE NOTED. REFER TO DETAILS FOR LOCATIONS. IAL 81 SUBSTRUCTURE VERIFICATION STAMP DEVELOPER PLEASE NOTE AND SIGN ALL P.G.& E. ENCLOSURES AND BOXES HAVE BEEN SET TO GRADE ACCORDING TO GRADE STAKES PROVIDED BY DEVELOPERS ENGINEER. ALL COSTS TO RELOCATE OR RE—ADJUST BOXES AT A LATER DATE WILL BE BILLED TO THE DEVELOPER. PLEASE HAVE YOUR JOB SUP. VERIFY THE CORRECTED GRADE OF ALL ENCLOSURES AND BOXES. AND SIGN AND DATE DRAWING. THANK YOU SIGNED DATE R/W R/W W z J w 1- z W U J CL 10' 1O'PUE - PAD -MOUNTED EQUIPMENT 1' 2' 0 0 PROPOSED WATER T\ - TRENCH SUB -SURFACE ENCLOSURE CENTERLINE SUGAR MAPLE STREET NO SCALE (TRENCH IN REAR OF PUE) 36" TYPICAL FINISH GRADE f ' OTHER i ALLOWED IN 30" PAVED 24' P.U.E. 3uTIES '— S SPACE, -T- 12" 12" 12' SAND M OVER TELE IN. MIN. 11 1 2" OR 4" C C © POSSIBLE 58" SHADING 12" (MIN) 8" 3" MIN. 4" OR 6" P P\ S S S 2" or 4" SHADING 1. NO FACILITIES ARE ALLOWED OVER THE GAS MAIN. PGE MUST BE ABLE TO ACCESS THE GAS MAIN WITH SQUEEZERS IN CASE OF AN EMERGENCY. 2. MAINTAIN 12" OF HORIZONTAL CLEARANCE FROM ALL FACILITIES IN THE JOINT TRENCH. 3. CONTRACTOR SHOULD CONTACT PGE'S TRENCH INSPECTOR WITH QUESTIONS. 4. THIS TRENCH LAYOUT CAN BE ALTERED AS LONG ALL CLEARANCES ARE MAINTAINED. TYPICAL DISTRIBUTION TRENCH 1'-6" LOT LINE 1 LOT LINE GSTC STUB T o \ / Lu I C MAIN TRENCH o i- T -- -- -- -- -- -- R/W U O co En R/W 24" WADE (COMMON) i rte- FINISH GRADE LOT UNE W a o V-6- TYPICAL -6" TYPICAL STUB INSTALLATION 30" MINIMUM IN FRANCHISE AREA 30" MINIMUM IN 12" FRANCHISE AREA OVER TELE 2" OR 4" C C • , `:. POSSIBLE 58" • ^•:• ::: ` 12" MIN. TOP OF GAS LEVEL WITH BOTTOM OF TELEPHONE OR TV S SSL . 4" OR 6- 2* or 4" SHADING 1) 2" SAND SHADING AROUND GAS & ELECTRIC IF SOIL IS NOT ROCK FREE 2) ONLY PARTIES PARTICIPATING IN U.S.A. ARE ALLOWED IN JOINT TRENCH 3) ANY PARTY EXCEEDING ITS TRENCH ALLOTMENT SHALL MAKE ARRANGEMENTS TO ENSURE THAT TRENCH WALL ACCOMMODATE ADDED FACILITIES 4) GAS TO GO ON SIDE OF TRENCH NEAREST STREET 5 TRENCH LAYOUT SHALL CONFORM TO UO STANDARD S545& TYPICAL DISTRIBUTION TRENCH NO SCALE (TRENCH IN REAR OF PUE) NO SCALE 18" MINIMUM NO SCALE 8" GAS IN TRENCH `Musa be considered a `Uti ' as defined � Uti9i3Y Sfarndard dS3. "�rir�t Trench.' NOes A. 5.T and 13 ars in Standard ndard 55153. E*AWt 8_ .kiin1 Imoc � Cc guzation and O Guide GENERAL NOTES: 1. DEVELOPER TO DO ALL TRENCHING, SHADING, AND BACKFILLING. PER UO STANDARD S-5453. 2. PHONE AND CABLE TV FACILITIES ARE SUBJECT TO CHANGE AT THE DISCRETION OF THOSE COMPANIES. 3. PADS, BOXES AND OTHER FACILITES ARE NQI SHOWN TO SCALE. 4. GAS AND ELECTRIC FACILITIES WILL REQUIRE SAND SHADING IF NATIVE SOIL IS NOT ROCK -FREE. PG&E WILL INSPECT BACKFILL MATERIAL. TEL AND/OR CAN MAY ALSO REQUIRE 12" OF SAND BACKFILL 5. GROUND TO BE WITHIN .2 FT OF FINISH GRADE PRIOR TO TRENCHING. 6. GAS AND ELECTRIC FACILITES REQUIRE AT LEAST 3' OF SEPARATION (1' UNDISTURBED SOIL) FROM PARALLEL RUNS OF WATER, SEWER, OR STORM DRAIN. 7. PRE -CONSTRUCTION MEETING REQUIRED TWO WEEKS PRIOR TO THE START OF INSTALLATION. 8. CALL U.S.A. AT LEAST 48 HOURS PRIOR TO TRENCHING (DIAL 811) 9. PG&E WILL ASSIST IN LOCATING ENDS OF EXISTING GAS MAINS. 10. DEVELOPER IS RESPONSIBLE FOR OBTAINING ENCROACHMENT PERMITS.. 11. STREETLIGHT LOCATIONS MAY HAVE CHANGED. REFER TO THE APPROVED STREETLIGHT IMPROVEMENT PLAN FOR STREETLIGHT INSTALLATION. 12. DEVELOPER SHALL CONTACT ALL INVOLVED PARTIES PRIOR TO MAKING ANY CHANGES FROM THIS DRAWING. 13. REFER TO EACH PARTYS INSTALLATION INSTRUCTIONS FOR MORE PRECISE DESCRIPTION OF SUBSTRUCTURES AND OTHER REQUIREMENTS. LEGEND: TRENCH OCCUPANTS DISTRIBUTION OR SERVICE G GAS BACKFILL P ELECTRIC PRIMARY S ELECTRIC SECONDARY T TELEPHONE DIRT C CABLE TV 24" x 59" / SLASH INDICATES CHANGE IN OCCUPANCY — — — — — PROPOSED SERVICE TRENCH — — PROPOSED MAIN LINE TRENCH GTC EXISTING UNDERGROUND FACILITY 259' LzJ PROPOSED #2 (17" x 30" x 18") ELECTRIC SPLICE BOX L2_EJ PROPOSED #2E (17" x 30" x 26") ELECTRIC SPLICE BOX L3 j PROPOSED #3E (24" x 36" x 26") ELECTRIC SPLICE BOX L5J PROPOSED #5 (3' x 5' x 3'-6") SUB—SURFACE ENCLOSURE L6] PROPOSED #6 (4' x 6'-6" x 5') SUB—SURFACE ENCLOSURE LTJ PROPOSED TELEPHONE PEDESTAL\SPLICE BOX L__J PROPOSED CABLE SPLICE BOX W PROPOSED PAD MOUNTED TRANSFORMER 10' INDICATES TRENCH FOOTAGE & OCCUPANCY } ---� PROPOSED LS 2A STREET LIGHT LOCATION (SEE NOTE 11) SPREAD PROPOSED SERVICE LOCATION SERV PRIVATE 18" x 46" 276' SPREAD DIRT S 17SERVICE o 18" x 46" 1 24' ® # • • . ®®®®®®E w ME U U `Musa be considered a `Uti ' as defined � Uti9i3Y Sfarndard dS3. "�rir�t Trench.' NOes A. 5.T and 13 ars in Standard ndard 55153. E*AWt 8_ .kiin1 Imoc � Cc guzation and O Guide GENERAL NOTES: 1. DEVELOPER TO DO ALL TRENCHING, SHADING, AND BACKFILLING. PER UO STANDARD S-5453. 2. PHONE AND CABLE TV FACILITIES ARE SUBJECT TO CHANGE AT THE DISCRETION OF THOSE COMPANIES. 3. PADS, BOXES AND OTHER FACILITES ARE NQI SHOWN TO SCALE. 4. GAS AND ELECTRIC FACILITIES WILL REQUIRE SAND SHADING IF NATIVE SOIL IS NOT ROCK -FREE. PG&E WILL INSPECT BACKFILL MATERIAL. TEL AND/OR CAN MAY ALSO REQUIRE 12" OF SAND BACKFILL 5. GROUND TO BE WITHIN .2 FT OF FINISH GRADE PRIOR TO TRENCHING. 6. GAS AND ELECTRIC FACILITES REQUIRE AT LEAST 3' OF SEPARATION (1' UNDISTURBED SOIL) FROM PARALLEL RUNS OF WATER, SEWER, OR STORM DRAIN. 7. PRE -CONSTRUCTION MEETING REQUIRED TWO WEEKS PRIOR TO THE START OF INSTALLATION. 8. CALL U.S.A. AT LEAST 48 HOURS PRIOR TO TRENCHING (DIAL 811) 9. PG&E WILL ASSIST IN LOCATING ENDS OF EXISTING GAS MAINS. 10. DEVELOPER IS RESPONSIBLE FOR OBTAINING ENCROACHMENT PERMITS.. 11. STREETLIGHT LOCATIONS MAY HAVE CHANGED. REFER TO THE APPROVED STREETLIGHT IMPROVEMENT PLAN FOR STREETLIGHT INSTALLATION. 12. DEVELOPER SHALL CONTACT ALL INVOLVED PARTIES PRIOR TO MAKING ANY CHANGES FROM THIS DRAWING. 13. REFER TO EACH PARTYS INSTALLATION INSTRUCTIONS FOR MORE PRECISE DESCRIPTION OF SUBSTRUCTURES AND OTHER REQUIREMENTS. LEGEND: TRENCH OCCUPANTS DISTRIBUTION OR SERVICE G GAS BACKFILL P ELECTRIC PRIMARY S ELECTRIC SECONDARY T TELEPHONE DIRT C CABLE TV 24" x 59" / SLASH INDICATES CHANGE IN OCCUPANCY — — — — — PROPOSED SERVICE TRENCH — — PROPOSED MAIN LINE TRENCH GTC EXISTING UNDERGROUND FACILITY 259' LzJ PROPOSED #2 (17" x 30" x 18") ELECTRIC SPLICE BOX L2_EJ PROPOSED #2E (17" x 30" x 26") ELECTRIC SPLICE BOX L3 j PROPOSED #3E (24" x 36" x 26") ELECTRIC SPLICE BOX L5J PROPOSED #5 (3' x 5' x 3'-6") SUB—SURFACE ENCLOSURE L6] PROPOSED #6 (4' x 6'-6" x 5') SUB—SURFACE ENCLOSURE LTJ PROPOSED TELEPHONE PEDESTAL\SPLICE BOX L__J PROPOSED CABLE SPLICE BOX W PROPOSED PAD MOUNTED TRANSFORMER 10' INDICATES TRENCH FOOTAGE & OCCUPANCY } ---� PROPOSED LS 2A STREET LIGHT LOCATION (SEE NOTE 11) SPREAD PROPOSED SERVICE LOCATION JOINT TRENCH RECAP TRENCH OCCUPANTS DISTRIBUTION OR SERVICE TRENCH SIZE DEPTH FOOTAGE BACKFILL SURFACE GSTC DIST 24" x 59" 594' SPREAD DIRT GPTC DIST 24" x 59" 642' SPREAD DIRT GPSTC DIST 24" x 59" 1,867' SPREAD DIRT GTC DIST 24" x 59" 259' SPREAD DIRT GP DIST 24" x 59" 68' SPREAD DIRT GPS DIST 24" x 59" 79' SPREAD DIRT G DIST 24" x 59" 14' SPREAD DIRT P DIST 24" x 59" 92' SPREAD DIRT GSTC SERV FRANCH 18" x 46" 858' SPREAD DIRT GSTC SERV PRIVATE 18" x 46" 276' SPREAD DIRT S 17SERVICE o 18" x 46" 1 24' 1 SPREADI DIRT 24" (30" IN STREET) 42" MIN. TO 6" 12" 1) 2" SAND SHADING AROUND GAS & ELECTRIC MIN. IF NATIVE SOIL IS NOT ROCK FREE. 2) SEE OTHER DETAIL IF NON -PG&E S G 4" STREETLIGHT IS IN TRENCH 3) ONLY PARTIES PARTICIPATING IN U.S.A. ARE BEDDING MATERIAL ALLOWED IN THIS TRENCH 2" FIG. 2 (VIEW FACING DISTRIBUTION TRENCH) TYPICAL SERVICE TRENCH NO SCALE NOTE: USE THIS DRAWING FOR STAKING TRENCHES ONLY. REFER TO APPROVED ELECTRICAL DRAWINGS FOR ELECTRIC FACILITY PLACEMENT, DETAILS, AND CLEARANCES. FOR TRENCH INSPECTION CALL (559) 263-7312 ANY CHANGES TO THIS DESIGN MUST JOINT TRENCH COMPOSITE APPROVED BY. FIRST BE APPROVED BY PG&E. GAS ADE: GAS ADE: DOMINIC OTHART ELECT ADE: PHONE: (661) 398-5817 DATE: ALL FIELD CHANGES REQUIRE PRIOR APPROVAL FROM: COMPANY TELEPHONE 1. LES INGLES P G & E (661) 398-5975 2. REGGIE SMITH ATT (661) 631-3473 3. GREG EOF BRIGHTHOUSE (661) 395-3351 VICINITY MAP I I I 6 5 4 Z Of 0 W � 0 0- W li I— O LL_ LL_ O o V w Q M �. w w U) OC) O w O O rj Cn 3 2 PANAMA LANE RD. Q OD li oPROJECT o SITE N pp co rn I N co oC o w H Q U Q O U U U rn u-> 1f) W O 2 LL v V co ca J Q ::E ED c/i >- Z Q Q: D >- m m W p a- a. Q Q Cl:f U ` roo z LdJ Q m McCLUTCHEN ROAD O NTS VICINITY MAP I I I 6 5 4 Z Of 0 W � 0 0- W li I— O LL_ LL_ O o V w Q M �. w w U) OC) O w O O rj Cn 3 2 c� E OD z o 0-) CDo C pp co rn I N co oC o H Q U Q O U U U rn u-> 1f) W O 2 LL v V co ca J Q ::E ED c/i >- Z Q Q: D >- m m W p a- a. Q L c Vj Q U Cn Cl:f U ` roo N W rn O C) J U O II-— O p Q C14 LL_ L E— Q N o 0o = w ME U U Z O V) I CL >_m 0 O r- D J to c O CV Lo �••� v OL) 000 co C� N E- a .-. Z w Lo ko ZE, z 0 - .. U c� E z o CDo C pp co rn I N U N C vs .c v oC o H Q U Q O U U U rn u-> 1f) W O 2 LL v V co ca J Q ::E ED c/i >- Z Q Q: D >- m m W p a- a. Q L c Vj Q U Cn O Z H U w O a 1 INCH 0 Y W Q Cl:f U z W ":t4 C) J U II-— O p Q C14 E— Q N C> w Y � >_m D J O 1 INCH 0 "i �� m N I lc 10' 00�' 12' (EXISTING) I s LOCATE IN SIDEWALK Z ` 2' BEHIND -� cn P EX. WALK at s2' v TIE INTO EXISTING G 8" GAS MAIN 14 I GP ROSE CREEK WAY PRIOR TO 4" MAIN -� 68' o GPS F- 5' GPS 4" HP PL GAS T. AL 81 U DEVELOPER PLEASE NOTE AND SIGN ALL P.G.& E. ENCLOSURES AND BOXES HAVE BEEN SET TO GRADE ACCORDING TO GRADE STAKES PROVIDED BY DEVELOPERS ENGINEER. ALL COSTS TO RELOCATE OR RE -ADJUST BOXES AT A LATER DATE WILL BE BILLED TO THE DEVELOPER. PLEASE HAVE YOUR JOB SUP. VERIFY THE CORRECTED GRADE OF ALL ENCLOSURES AND BOXES. AND SIGN AND DATE DRAWING. THANK YOU SIGNED DATE i 6' (EXISTING) i ( TIE INTO EXISTING �- GAS, PRIMARY, TEL AND CAN 16' SHORT SIDE SERVICE Dom, — — DWY — 67 I 68 SHORT SIDE SERVICE Dom. I '1011161 SHORT SIDE SERVICE Dom. — DWY I of 70 (� PUE I,- _ _ _ _ ' 71 � H SIDE SERVICE DW 6' (EXISTING) i ( TIE INTO EXISTING �- GAS, PRIMARY, TEL AND CAN 16' SHORT SIDE SERVICE Dom, — — DWY — 67 I 68 SHORT SIDE SERVICE Dom. I '1011161 SHORT SIDE SERVICE Dom. — DWY I of 70 (� PUE I,- _ _ _ _ ' 71 " 16' SHORT I (D SIDE SERVICE DW 00 � — — DWY a I 7 I I I I 142' 1 1 i I IIII �J C OF RECORD zz� I ' 4 -71-ollo L. ALBERTO LOPEZ R. C. E. 67602 EXP. 6/30/—.,._1 ? STUB AT P/L I 1� SCALE: 1 "=40' SCALE 40 0' 40' 80' 6 5 4 N I\ 0 N.- -7 STUB 5' PAST IMPROVEMENTS GPTC 'VI I 13' I I I ry 6' W I Iy �W I >I I of 3 9.7)v� T 2 00 C) � O o U N r� rn 0 u:L o Z I (D W N N o N = V) a 00 � a m M Y o Z o W Q aZ U m N O rn � G..-) U Lil J Z > O w Z U H r— U O Q D co x 0 J U F1 O D U coo U cd Q co C) (n Obt O W H N m Q � n Z Lo w Q� J a lf� � 0 Z z 0 a 0 U N CC:c CD U C co 00 N U N C -� c O o vi m H Q 0 a m Y W Q aZ U m � O rn � G..-) U Lil J Z > O w Z U H r— U O Q Q a Q 0 J U F1 W D Q t!1 E- Q N C) � W m � Q W 0 J a 0 a a N 0 Y S U 3 0 oz 0 Z o O H 2' (n U N O � W w F 0 1 INCH 0 Q Y W Q aZ U � W � G..-) Z5 Li J U H r— 0 J E- Q N C) � W Y � Q W m J 0 0 1 INCH 0 6 7 120'/1 34e' VD 6.2 FD 6.5 AS 38 27 28 28 29 /155'/169' 8 1 -D4- 115'/129' STUB FOR 'FUTURE 30 TRANSFORMER VD 4.5 9 FD 4.6 SITE OF FUTURE 10 WELL PUM-P LEGEND INSTALL DESCRIPTION USE 2.5 -GAL & 2- FRONT END PKS. VACANT DUCT r -----04- VACANT DUCT 2" P P P PRIMARY CABLE 1-1/DAL EPR ENCAP IN EXISTING 1-2w CONDUIT P1 -PI PRIMARY CABLE I -I/OAL EPR ENCAP IN NEW 1-2w CONDUIT 23 LOC 18 TO LOC 34 ( SECONDARY CAME - 4/OAA TPX IN NEW 1-3- CONDUIT USE 2.5 -GAL & 2- FRONT END PKS. SECONRW CABLE - 350AL TPX IN NEW 1--e CONMU Sit------ SERVICE CABLE - 4/OAL TPX IN NEW 1-3" CONDUIT ACTUAL PULL ............ LBS. SERVICE CABLE - I/OAL TPX IN NEC 1-3- CONDUIT STREETLIGHT CABLE EXISTING DESCRIPTION (ED LOC 803 TO LOC 805 I PHASE PRIMARY CABLE/bONDUCTOR - SIZE AS SHOWN INSTALL EXISTING DESCRIPTION M 17" x W x 1W SECONDARY BOX He Ir x W x 26" SECONDARY BOX re"E] j-3 24" x 30" x 26" SECONDARY BOX r - 3' ,x,V x 38 Iff] '* PRIMARY ENCLOSURE I 4! x 6*6" x W PRUARY ENCLOSURE M 4!6r x WS* x 6,* PRIMARY ENCLOSURE PM TRANSFORMER, DF --LB, SIZE AS SHOWN I.S2A STREET LIGHT CIRCLED LOT #'S INDICATE : WATER CONFLICT Age 41 1 0 A. MUM 31 32 155'/169 155'/169- 02 47 PULL P1 -P1- -Pf -Pi -4-41 -Pi Pi T-65714 45 1 0OKVA, AO 15 CUST 46 11 12 13 33 34 1 165'/179' 65'/179 - VD 6.0 FD 6.0 CABLE PULLING DATA LOC 7 TO LOC 3 LOC 56 TO LOC 46 USE 2.5 -GAL & 2- FRONT END PKS. USE 2.5 -GAL & 2- FRONT END PKS. EST. PULL 10OLBS. to ACTUAL PULL ........... LBS, ACTUAL PULL ........... Las. FOREMAN'S INITIALS.......... FOREMAN'S INITIALS.......... 23 LOC 18 TO LOC 34 ( LOC 800 TO LOC 802 Age 41 1 0 A. MUM 31 32 155'/169 155'/169- 02 47 PULL P1 -P1- -Pf -Pi -4-41 -Pi Pi T-65714 45 1 0OKVA, AO 15 CUST 46 11 12 13 33 34 1 165'/179' 65'/179 - VD 6.0 FD 6.0 CABLE PULLING DATA LOC 7 TO LOC 3 LOC 56 TO LOC 46 USE 2.5 -GAL & 2- FRONT END PKS. USE 2.5 -GAL & 2- FRONT END PKS. EST. PULL 10OLBS. EST. PULL 208LBS. ACTUAL PULL ........... LBS, ACTUAL PULL ........... Las. FOREMAN'S INITIALS.......... FOREMAN'S INITIALS.......... 23 LOC 18 TO LOC 34 ( LOC 800 TO LOC 802 USE 2.5 -GAL & 2- FRONT END PKS. USE 2.5 -GAL & 2- FRONT END PM EST. PULL 235LBS. EST, PULL 95LBS. ACTUAL PULL ............ LBS. ACTUAL PULL ....... i..LBS. FOREMAN'S INITIALS.......... FOREMAN'S INITIALS.......... a) LOC 7 TO LOC 46 (ED LOC 803 TO LOC 805 USE 2.5 -GAL & 2- FRONT END PKS. USE 2.5 -GAL & 2- FRONT END PKS. EST. PULL 24ILDS. EST. PULL 153LBS. ACTUALPULL..... . .... LBS. ACTUAL PULL ........... LBS. FOREMAN'S INITIALS.......... FOREMAN'S INITIALS.......... TYPICAL 36" X 52" PAD DETAIL. MOM Group Ali Secondary Conduits Together Near the Book of the Window Primary Conduit Section Secondary Conduit Sectlon of Pad Mg 35 36 145'/159' 145'/159' ALMOND CREEK DR 62984y P1 -P1 __v N 1207134' V0 4.7 M 4.4 17 18 37 38 135'/150' 135'/150' MCI 39 125'/140' VD 5.9 FD 5.8 �Iee 11 I 01� I v j 00 001 100 001 01VAII IIS, HIM 00 NMI ------ - - - - - - - - - - - - - - - - - VO&E oan Check tines not release the Applicant fro responsibility to construct the facilities according to PG&E Standards. In the eve%-DfAspnflict during construction bctwacfiPG&EAt '�ndards and the plans, PG&E � J-2714 EXISTING 46" x 8*6" x 6"D IVT. BOX 00 00 00 001 100 001 00 001 00 00 00 00 001 100 001 00 CURB, SIDEWALK, PUE, AND P/L to CD 11E INTO 2" APPLICANT +0 INSTALL NEW CONDUIT & ROUTE TO NEW SPLICE BOX. 00 00 001 100 00 00 FUTURE FUSE 4' x 66" x 5' WT. BOX SPLICE BOX 3' x 5' x 36"D IVT. BOX 00 ..00 -1 8 Co tCS 0 71 72 SEE BY LOC I SHEET E2 FOR LOC 65-67 STUB rJ' VNU EDGE OF IMPROVEMENTS, APPROX.41 CUSTOMERS si-CjI e-e-sel- 20 /134'.62 62983 61 4? vp VD 6.3 FD 5.8 FLS 1. THIS IS AN APPLICANT DESIGN AND INSTALL PROJECT. 2. TRENCH TO BE JOINT WITH ELECTRIC, GAS, PHONE & CATV, 3. APPLICANT SHALL OBTAIN ALL NECESSARY PERMITS.. 4. RIGID CAP ALL SPARE CONDUITS, 5. IMPORTANTI DEVELOPER, GENERAL & ELECTRICAL CONTRACTOR BEFORE BEGINNING SUBSTRUCTURE WORK, PLEASE CONTACT PGE UNDERGROUND TRENCH INSPECTOR AT LEAST TWO BUSINESS DAYS PRIOR TO REQUESTING INSPECTION. REQUEST FOR INSPECTIONS RECEIVED AFTER 12:OOPM WILL NOT BE INSPECTED UNTIL THE 3RD WORKING DAY. (V DED PROEERLY INSPEMD, MAY BE REJEMD) 6. APPLICANT CONTRACTOR TO LOCATE ALL UNDERGROUND FACILITIES BEFORE TRENCH & EXCAVATION. CALL UNDERGROUND SERVICE ALERT AT 81,1 AT LEAST TWO WORKING DAYS PRIOR TO DIGGING. 7. DO NOT EXCEED 300 DEGREES OF BENDS IN ANY CONDUIT RUN (INCLUDING BEND AT THE FEED LOCATION). 8. PROVIDE CLEARANCES AND WORKING SPACE PER PGE DWG. 051122. 9. PGE SHALL INSPECT ALL WORK AND PERFORM ALL HOT TIE-IN WORK. 10. BOX AND CONDUIT SIZES AND LOCATIONS SHALL CONFORM TO THE PGE ELECTRIC CONSTRUCTION DWG. 062288. 11. ENCLOSURES SHALL CONFORM TO THE PGE ELECTRIC CONSTRUCTION DWG. 062000. 12. APPLICANTS CONTRACTOR TO PERFORM ALL AND ANY NECESSARY INCIDENTAL TRENCHING, BACKFILL, COMPACTION AND PAVING. 13. SEE UTILITY COMPOSITE DRAWING FOR ACTUAL TRENCH & SUBSTRUCTURE LOCATIONS 14. 800 SERIES SKETCH LOCATIONS INDICATE PG&E WORK. all if ----- ----- ELECTRIC CONSTRUCTION SKETCH TRACT 7243 OLD RIVER ROAD & ROSE CREEK WAY BAKERSFIELD CALIFORNIA 000-227-26 Project Management by: California Utility Consultants Inc Fresno, CA 93711 Phone (559) 261-9880 Fax (559) 261-9707 RULE 15,16 PM 31141487 1� NOT 109587426 DATE 6/2/2015 1 T OF E3 $HEM SCALE ASSHOWN DESIGNER Cliff Lopes MR DRAFTER Cliff Lopes