Loading...
HomeMy WebLinkAbout1.2-6825 Ph 1 Record DrawingT 0 U E 0 N 0 N 01 N 0 0 0 Qo 0 0 0 0 0 a� 3 0 d X r Ln N cc Q LN 0 CD 0 0 0 ui 0 LEGEND: TOTAL ABBREVIATIONS CL CENTERLINE INV INVERT SD STORM DRAIN MH MANHOLE CB CATCH BASIN JB JUNCTION BOX SMH SEWER MANHOLE SCO SEWER CLEANOUT SDMH STORM DRAIN MANHOLE EXIST EXISTING E LE V ELEVATION R/W RIGHT OF WAY T �.M. 363z-2 2 TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION CONSTRUCT SEWER PER CITY STANDARDS s z1A CONSTRUCT SEWER MANHOLE RI R TYPE "A" PER C.O.B. STD. S-7. © CONSTRUCT SEWER CLEANOUT PER C.O.B. STD. S-20. CONSTRUCT STORM DRAIN PER CITY STANDARDS 0 CONSTRUCT STORM DRAIN MANHOLE TYPE "A" PER C.O.B. STD. S-7. 15tr CONSTRUCT CATCH BASIN C) 0 TYPE "A" PER C.O.B. STD. S-12. fL MULTIPLE UTILITY TRENCH SEWER MAIN 5' 4' R TYP. 5, Y Y TVP. m3 5' MIN. 60" TO 7' MAX. 0 TYP. 19, MIM, ON DEEP SEWER, SLOPE LATERALS TO LOT UNE SO THAT THE END OF LATERAL IS WITHIN REQUIRED TOLERANCE. FINISHED STREET GRADE 36" TYP. It R 4' WATERLINE �3 I*] SUMMARY OF IMPROVEMENTS SEWER IMPROVEMENTS TOTAL 6" SEWER LINE 200 LF 8" SEWER LINE 2765 LF 4" LATERALS 2034 LF STANDARD MANHOLE 9 EA SEWER CLEAN OUT 2 EA STORM DRAIN IMPROVEMENTS TOTAL 18" STORM DRAIN LINE 1692 24" STORM DRAIN LINE 152 LF STORM DRAIN MANHOLES 8 EA CATCH BASINS 6 EA 1% MIN. SET LATERAL PROVIDING PROPER CLEARANCE UNDER WATERLINE AND UTILITY TRENCHES DETAIL TYPICAL SEWER LATERAL INSTALLATION �k FOR SHALLOW INSTALLATION OF SEWER LATERALS FROM SHALLOW SEWER MAINS, THE SEWER LATERALS MUST CROSS OVER THE WATER OR UTILITY TRENCH. THESE INSTALLATIONS MUST RECEIVE SPECIAL TREATMENT FOR LATERALS WHEN CROSSING OVER THE WATERMAIN. A SEWER LATERAL CROSSING ABOVE A WATER MAIN SHALL BE CONSTRUCTED OF A CONTINUOUS 20' SECTION OF CLASS 200 (DR 14 PER AWWA C900) PLASTIC PIPE OR EQUIVALENT, CENTERED ON THE PIPE BEING CROSSED. 5' MIN. TO 7' MAX. VICINITY MAP N.T.S. INDEX OF SHEETS SHEET 11 TLE Q 1. COVER SHEET 1 2. NOTES q ONORA DRIVE 3. PIRES 4. EVANSBURG AVENUE 5. PERPETUA WAY & BIDWELL DRIVE 6. RE ION SIN DETAIL VARDEN STREE"f� CITY OF AK RSF1 LD KERN COUNTY CALIFORNIA SEWER AND STORM DRAIN PLANS FOR VESTING TENTATIVE TRACT NO. 6825 PHASE 1 V ESTIN G TRNTATIV E TRACT M AP 5 5 8 5 'J IIE�1111oN sABN mo 'so w. 77-7—� 7 7 I I 1 ( I15 I ' I 1 12I --�VANSBUR AVENUE - - Z 0.--I--�---� _ 7 _ 17--�-- 3 a I rs 1 24 1 0 1 W 1 27 1 m I m l �o l � 5 1 I I 31 � I I I I I I i—P + - - - + — z o-LAJ 44 1 40 1 39 1 M 1 37 1 ae 1 35 1 34 1 33 1 71 1-a a I 1 1 — ya - - - RIVE - —s-- - r --T--+_7 0Q � a r—�---I—�--1- 4s I �s i 4a 1 �a I M 49 1 80 1 x 1 82 1 as 1 34 I I 1 I I I i I I I I I T T- P H A SE 2 BISCAYA CALL E: b: PHASES ARE E)WNEB BY !l\AIi�t PHASES TO BE GQNST-RIUGTED 6IM I TANEQ ICI hIASES TO BE CON STR U CTE) IN ORDER. KEY MAP SCALE: 1" = 200' I 22 !II P H A 9 E 8 REVISION APPROVED SY: ROGER A. AciNTo DRTi~ �EVISIoN P4 " i - P 6 APPROVED %I PFrTE DANIEL PPIflILLA 120.1: b'tDoa EXP `Ii3o�18' NOTE: i. PRIOR TO THE START OF ANY PHASE OF CONSTRUCTION, THE CIN CONSTRUCTION INSPECTION DEPARTMENT SHALL BE GIVEN 24 HOURS NOTICE. TELEPHONE 326-3049 2. ALL MATERIALS SUPPLIED FOR THIS PROJECT WILL REQUIRE A CERTIFICATE OF COMPLIANCE STATING THAT THE REQUIREMENTS &STANDARDS SET FORTH BY THE CIN OF BAKERSFlELD HAVE BEEN MET. 3. NO CITY INSPECTIONS WILL BE GIVEN FOR THE WORK IN THIS AREA UNTIL A STREET PERMIT NAhi APPROPRIATE SECURITY AND INSURANCE HAS BEEN OBTAINED. ENGINEER'S STATEMENT THESE PLANS AND SPECIFICATIONS WERE PREPARED BY ME OR UNDER MY DIRECTION AND TO THE BEST OF MY KNOWLEDGE AND BELIEF COMPLY WITH CITY OF BAKERSFlELD ORDINANCES, STANDARDS, AND DESIGN CRITERIA AND INCLUDE ALL IMPROVEMENT REQUIREMENTS OF THE ADVISORY AGENCY OR OTHER REVIEW BOARD. I AM RESPONSIBLE F ALL CALCU ATIONS AND DRAWINGS ON THESE OR 11NANCD ,4 T N UCTIez SDIESIGNOCRITERIA�SHALONS LBE C TV! CT DUR G APPROVED BY: ROGER A. McINTOSH R.C.E. 33322 EXP. 6-30-16 DATE IN ACCORDANCE WITH THE CONDITIONS OF THE VESTING TENTATIVE MAP, THE IMPROVEMENT PLANS HAVE BEEN REVIEWED BY THE CITY OF BAKERSFlELD PUBLIC WORKS DEPARTMENT. ALL IMPROVEMENTS INDICATED AS "PRIVATE" HEREIN ARE PRIVATE AND ARE TO BE PRIVATELY MAINTAINED. APPROVED BY: NICOLAS FIDLER, AGi R.C.E. NO, 61069 REVIEWED BY: C PUBLIC WORKS DIRECTOR EXP. 12-31-14 ASSISTANT PUBLIC WOR S DIRECTOR DIG ALERT Call: TOLL FREE 1-800-227-2600 AT LEAST TWO DAYS BEFORE YOU DIG UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA DATE BASIS OF BEARINGS: THE BEARING OF N. 89'06'48" W. SHOWN FOR THE NORTH LINE OF THE NORTHEAST QUARTER OF SECT ISN 30, T. 30S., R. 27E. ON K.C.S. FILED MAP NO. 7-1 BK. 6, PG. 26 IN THE OFFICE OF THE KERN COUNTY SURVEYOR WAS USED AS THE BASIS OF BEARINGS SHOWN HEREON. BENCHMARK USED: TOP OF CONCRETE MONUMENT IN LAMPHOLE AT INTERSECTION OF OLD RIVER ROAD AND BERKSHI ELEVATION = 346.42' (USGS DATUM) LEGAL DESCRIPTION: G LOTS 15 AND 16 OF SECTION 30, TOWNSHIP 30 SOUTH, 05r�a�1-7 RANGE 27 EAST, M.D.M., CITY OF BAKERSFlELD, ������� ��>t"iYY I��� COUNTY OF KERN, STATE OF CALIFORNIA, # I ACCORDING TO THE SALES MAP OF LANDS OF THE KERN COUNTY LAND COMPANY FILED JANUARY 22, 1892. F, / r -- T WHITE N eZ cu z W111TE LN D f� C I:1 LIJ it N LIJ it tri D T' z1A ac RI R o ac ig PANAMA N I� C) 0 N ILI r 4 Z 0 z m CJ e. PROJECT 00000- m z G SITE To n� 4' U; TAFT HWY I NTS MUAGE VICINITY MAP N.T.S. INDEX OF SHEETS SHEET 11 TLE Q 1. COVER SHEET 1 2. NOTES q ONORA DRIVE 3. PIRES 4. EVANSBURG AVENUE 5. PERPETUA WAY & BIDWELL DRIVE 6. RE ION SIN DETAIL VARDEN STREE"f� CITY OF AK RSF1 LD KERN COUNTY CALIFORNIA SEWER AND STORM DRAIN PLANS FOR VESTING TENTATIVE TRACT NO. 6825 PHASE 1 V ESTIN G TRNTATIV E TRACT M AP 5 5 8 5 'J IIE�1111oN sABN mo 'so w. 77-7—� 7 7 I I 1 ( I15 I ' I 1 12I --�VANSBUR AVENUE - - Z 0.--I--�---� _ 7 _ 17--�-- 3 a I rs 1 24 1 0 1 W 1 27 1 m I m l �o l � 5 1 I I 31 � I I I I I I i—P + - - - + — z o-LAJ 44 1 40 1 39 1 M 1 37 1 ae 1 35 1 34 1 33 1 71 1-a a I 1 1 — ya - - - RIVE - —s-- - r --T--+_7 0Q � a r—�---I—�--1- 4s I �s i 4a 1 �a I M 49 1 80 1 x 1 82 1 as 1 34 I I 1 I I I i I I I I I T T- P H A SE 2 BISCAYA CALL E: b: PHASES ARE E)WNEB BY !l\AIi�t PHASES TO BE GQNST-RIUGTED 6IM I TANEQ ICI hIASES TO BE CON STR U CTE) IN ORDER. KEY MAP SCALE: 1" = 200' I 22 !II P H A 9 E 8 REVISION APPROVED SY: ROGER A. AciNTo DRTi~ �EVISIoN P4 " i - P 6 APPROVED %I PFrTE DANIEL PPIflILLA 120.1: b'tDoa EXP `Ii3o�18' NOTE: i. PRIOR TO THE START OF ANY PHASE OF CONSTRUCTION, THE CIN CONSTRUCTION INSPECTION DEPARTMENT SHALL BE GIVEN 24 HOURS NOTICE. TELEPHONE 326-3049 2. ALL MATERIALS SUPPLIED FOR THIS PROJECT WILL REQUIRE A CERTIFICATE OF COMPLIANCE STATING THAT THE REQUIREMENTS &STANDARDS SET FORTH BY THE CIN OF BAKERSFlELD HAVE BEEN MET. 3. NO CITY INSPECTIONS WILL BE GIVEN FOR THE WORK IN THIS AREA UNTIL A STREET PERMIT NAhi APPROPRIATE SECURITY AND INSURANCE HAS BEEN OBTAINED. ENGINEER'S STATEMENT THESE PLANS AND SPECIFICATIONS WERE PREPARED BY ME OR UNDER MY DIRECTION AND TO THE BEST OF MY KNOWLEDGE AND BELIEF COMPLY WITH CITY OF BAKERSFlELD ORDINANCES, STANDARDS, AND DESIGN CRITERIA AND INCLUDE ALL IMPROVEMENT REQUIREMENTS OF THE ADVISORY AGENCY OR OTHER REVIEW BOARD. I AM RESPONSIBLE F ALL CALCU ATIONS AND DRAWINGS ON THESE OR 11NANCD ,4 T N UCTIez SDIESIGNOCRITERIA�SHALONS LBE C TV! CT DUR G APPROVED BY: ROGER A. McINTOSH R.C.E. 33322 EXP. 6-30-16 DATE IN ACCORDANCE WITH THE CONDITIONS OF THE VESTING TENTATIVE MAP, THE IMPROVEMENT PLANS HAVE BEEN REVIEWED BY THE CITY OF BAKERSFlELD PUBLIC WORKS DEPARTMENT. ALL IMPROVEMENTS INDICATED AS "PRIVATE" HEREIN ARE PRIVATE AND ARE TO BE PRIVATELY MAINTAINED. APPROVED BY: NICOLAS FIDLER, AGi R.C.E. NO, 61069 REVIEWED BY: C PUBLIC WORKS DIRECTOR EXP. 12-31-14 ASSISTANT PUBLIC WOR S DIRECTOR DIG ALERT Call: TOLL FREE 1-800-227-2600 AT LEAST TWO DAYS BEFORE YOU DIG UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA DATE BASIS OF BEARINGS: THE BEARING OF N. 89'06'48" W. SHOWN FOR THE NORTH LINE OF THE NORTHEAST QUARTER OF SECT ISN 30, T. 30S., R. 27E. ON K.C.S. FILED MAP NO. 7-1 BK. 6, PG. 26 IN THE OFFICE OF THE KERN COUNTY SURVEYOR WAS USED AS THE BASIS OF BEARINGS SHOWN HEREON. BENCHMARK USED: TOP OF CONCRETE MONUMENT IN LAMPHOLE AT INTERSECTION OF OLD RIVER ROAD AND BERKSHI ELEVATION = 346.42' (USGS DATUM) LEGAL DESCRIPTION: G LOTS 15 AND 16 OF SECTION 30, TOWNSHIP 30 SOUTH, 05r�a�1-7 RANGE 27 EAST, M.D.M., CITY OF BAKERSFlELD, ������� ��>t"iYY I��� COUNTY OF KERN, STATE OF CALIFORNIA, # I ACCORDING TO THE SALES MAP OF LANDS OF THE KERN COUNTY LAND COMPANY FILED JANUARY 22, 1892. F, / r -- CITY RECORDS NO: �_ 0 11 T eZ m IL Z f� I:1 LIJ it N LIJ it tri T' uJ IIS > 0 ac F o ac ig I� ILI r 4 CJ e. W n� 4' U; O u_ S`' -i, w ffir. t� J� '2' �4 CITY RECORDS NO: �_ 0 11 T eZ IL Z f� I:1 LIJ it N LIJ it tri uJ IIS > 0 ac F o ac ig I� ILI 4 CITY RECORDS NO: �_ 0 11 STANDARD NOTES 1. GENERAL CONTRACTOR WILL FURNISH ALL MATERIALS, TOOLS, LABOR, EQUIPMENT AND SUPERVISION NECESSARY TO COMPLETE INSTALLATION. UNDERGROUND SERVICE ALERT (USA) SHALL BE NOTIFIED AT LEAST 2 WORKING DAYS BEFORE CONSTRUCTION. TELEPHONE 1-800-227-2600. CONTRACTOR TO CALL FOR USA LOCATE AND POTHOLE ALL MARKED UTILITIES THAT CROSS OR ARE WITHIN 5' HORIZONTAL DISTANCE OF SEWER AND STORM DRAIN LINES. VERTICAL AND HORIZONTAL LOCATION SHALL BE ASCERTAINED BY THE CONTRACTOR AHEAD OF ANY EXCAVATIONS TO VERIFY THAT THE PROPOSED DESIGN DOES NOT CONFLICT WITH ANY UTILITIES. IN THE EVENT A CONFLICT EXISTS THE ENGINEER SHALL BE NOTIFIED IN ORDER TO REDESIGN THE ALIGNMENT. IF RELOCATION OF EXISTING UTILITIES IS DEEMED NECESSARY THE CONTRACTOR SHALL BE COMPENSATED FOR INSTRUCTED RELOCATION. IF REDESIGN OF THE ALIGNMENT REQUIRES ADDITIONAL FITTINGS, PIPE OR EXCAVATION THE CONTRACTOR SHALL BE COMPENSATED FOR REVISION. IN THE EVENT A UTILITY IS DAMAGED THE CONTRACTOR SHALL BE WHOLLY RESPONSIBLE FOR ITS REPAIR. CONTRACTOR SHALL VERIFY LOCATIONS AND ELEVATIONS OF EXISTING SEWER LINES THAT THE NEW SYSTEM TIES INTO PRIOR TO TRENCHING. ANY DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER SO THAT ANY NECESSARY ADJUSTMENTS MAY BE MADE. UTILITIES SHALL BE THOROUGHLY RESEARCHED AND LOCATED BY CONTRACTOR PRIOR TO TRENCHING. CROSSING UTILITIES SHALL BE DAYLIGHTED AND CHECKED FOR GRADE, BY CONTRACTOR PRIOR TO TRENCHING, ALL EXISTING IMPROVEMENTS, (CURB, GUTTER, SIDEWALK, CROSS GUTTER, FENCES, ETC.) THAT ARE REMOVED, DAMAGED OR UNDERCUT SHALL BE REPAIRED OR REPLACED AS DIRECTED BY THE CITY ENGINEER. ALL EXISTING PAVING AND SURFACING REMOVED, DAMAGED OR UNDERCUT SHALL BE REPLACED IN ACCORDANCE WITH THE CITY OF BAKERSFIELD STANDARD DRAWING ST -6, EXCEPT AS NOTED ON PLANS. 2. STANDARD DETAILS THE FOLLOWING CITY OF BAKERSFIELD STANDARDS SHALL BE CONSIDERED PART OF THESE PLANS: S-6, S-7, S-8, S-9, S-10, S-11, S-12, S-20, S-22, D-9. 3. VCP INSTALLATION MATERIALS : THE PIPE AND FITTINGS SHALL BE EXTRA STRENGTH VITRIFIED CLAY CONFORMING TO CURRENT ASTM SPECIFICATION C-700 AND SHALL BE INSTALLED IN CONFORMANCE WITH THE PROVISIONS OF SECTION 71 OF THE STANDARD SPECIFICATIONS OF THE STATE OF CALIFORNIA, DEPARTMENT OF TRANSPORTATION, CURRENT EDITION AND THE CURRENT ASTM SPECIFICATIONS C-12. JOINTS : THE PIPE AND FITTINGS SHALL HAVE A SOCKET END AND A SPIGOT END WITH COMPRESSION JOINTS CONFORMING WITH THE CURRENT ASTM SPECIFICATION C-425. THE PIPE AND FITTINGS FOR 6", 8", 10", AND 12" SANITARY SEWER MAINS MAY BE PLAIN -END WITH COMPRESSION COUPLINGS CONFORMING WITH THE CURRENT ASTM SPECIFICA11ON C-425. EXCEPTING THAT A STAINLESS STEEL SHEAR RING AS MANUFACTURED BY MISSION CLAY PRODUCTS CORPORATION FOR THEIR "MAINLINE" BANDSEAL COMPRESSION COUPLING, OR APPROVED EQUAL, SHALL BE REQUIRED. THE PIPE AND FITTINGS FOR PRIVATE SANITARY SEWER HOUSE OR BUILDING LATERALS MAY BE PLAIN -END WITH COMPRESSION COUPLINGS CONFORMING WITH THE CURRENT ASTM SPECIFICATION C-425. (STAINLESS STEEL SHEAR RINGS ARE NOT REQUIRED) 4, ABS PIPE INSTALLATION MATERIALS : PIPE AND FITTINGS SHALL MEET THE REQUIREMENTS OF THE CURRENT ASTM SPECIFICATIONS D-2680 AND D-2751. PIPE AND FITTINGS SHALL BE HOMOGENEOUS THROUGH OUT AND FREE FROM CRACKS, HOLES, FOREIGN INCLUSIONS OR OTHER INJURIOUS DEFECTS. FITTINGS SHALL BE INJECTION MOLDED AND SHALL BE INSTALLED IN LINE ON NEW PIPELINES; CUT -IN FITTINGS ARE NOT PERMITTED. JOINTS USE ONLY SOLVENT WELDED JOINTS. THE ASSEMBLY OF JOINTS SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. WHERE ABS PIPE CONNECTS TO VCP, USE COUPLINGS APPROVED BY THE CITY OF BAKERSFIELD. INSTALLATION : PIPE AND FITTINGS SHALL BE INSTALLED IN ACCORDANCE WITH THE CURRENT ASTM SPECIFICATION 0-2321. ONLY CLASS I, II, AND III EMBEDMENT MATERIALS WILL BE CONSIDERED SUITABLE. 5. PVC PIPE INSTALLATION MATERIALS : PIPE AND FITTINGS SHALL MEET THE REQUIREMENTS OF THE CURRENT ASTM SPECIFICATION D-3034 FOR SDR35. PIPE AND FITTINGS SHALL BE HOMOGENEOUS THROUGHOUT AND FREE FROM CRACKS, HOLES, FOREIGN INCLUSIONS OR OTHER INJURIOUS DEFECTS, FITTINGS SHALL BE INJECTION MOLDED AND SHALL BE INSTALLED IN LINE ON NEW PIPELINES; CUT -IN FITTINGS ARE NOT PERMITTED. JOINTS : USE ONLY ELASTOMERIC GASKET JOINTS. THE ASSEMBLY OF JOINTS SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS WHERE PVC PIPE CONNECTS TO VCP PIPE, USE COUPLINGS APPROVED BY THE CITY OF BAKERSFIELD. INSTALLATION : PIPE AND FITTINGS SHALL BE INSTALLED IN ACCORDANCE WITH THE CURRENT ASTM SPECIFICATION D-2321. ONLY CLASS I, 11, AND III EMBEDMENT MATERIALS WILL BE CONSIDERED SUITABLE. 6, REINFORCED CONCRETE PIPE WITH PVC LINING. REINFORCED CONCRETE PIPE WITH PVC LINING SHALL MEET THE FOLLOWING REQUIREMENTS: 1.A. MATERIALS. REINFORCED CONCRETE PIPE (RCP) SHALL BE EITHER CLASS IV OR CLASS V WITH WALLS "B" OR "C". RCP SHALL MEET ASTM C 76 FOR STRENGTH, ASTM C 361 OR AWWA C302 EXCEPT TEST PRESSURE SHALL BE 5 PSI FOR RUBBER GASKETS, AND LINER TESTS IN ACCORDANCE WITH THE FOLLOWING PARAGRAPHS. PIPE SHALL BE WET CAST, VIBRATED AND STEAM OR WATER CURED. JOINTS SHALL BE BELL AND SPIGOT DESIGN WITH A CONTAINED 0 -RING GASKET. PVC LINER SHALL BE CAST INTO THE WALL OF THE RCP AND SHALL COVER 360' OF THE PIPE. ALL WORK FOR AND IN CONNECTION WITH THE INSTALLATION OF THE UNING IN CONCRETE PIPE AND FIELD SEALING AND WELDING OF JOINTS SHALL BE DONE IN STRICT CONFORMITY WITH ALL APPLICABLE SPECIFICATIONS, INSTRUCTIONS AND RECOMMENDATIONS OF THE LINING MANUFACTURER. LINER SHALL MEET THE FOLLOWING REQUIREMENTS. 1.8. PHYSICAL PROPERTIES OF LINER. ALL PLASTIC LINER PLATE SHEETS, WELDING STRIPS AND OTHER ACCESSORY ITEMS, SHALL HAVE THE FOLLOWING PHYSICAL PROPERTIES WHEN TESTED AT 77F t5 (25'C t3 ). PROPERTY TENSILE STRENGTH INITIAL 2200 PSI MIN. (PAR, 2100 PSI MIN. __Tl (15 MPA MIN.) (14.5 MPA MIN.) ELONGATION AT BREAK 200% MIN. 200% MIN. SHORE DUROMETER, TYPE D 1 -SEC. 50-60 t5 (WITH RESPECT TO INITIAL TEST RESULT) 10 -SEC. 35-50 t5 WEIGHT CHANGE Q z (�yj_ f1.5 TENSILE SPECIMENS SHALL BE PREPARED AND TESTED IN ACCORDANCE WITH ASTM D412 USING DIE B. WEIGHT CHANGE SPECIMENS SHALL BE 1 -INCH (25 -MM) BY 3 -INCH (75 -MM) SAMPLES. SPECIMENS FOR TESTING OF INITIAL PHYSICAL PROPERTIES MAY BE TAKEN FROM LINER PLATE SHEET AND WELDING STRIP AT ANY TIME PRIOR TO FINAL ACCEPTANCE OF THE WORK. LINER PLATE LOCKING EXTENSIONS EMBEDDED IN CONCRETE SHALL WITHSTAND A TEST PULL OF AT LEAST 100 POUNDS PER LINEAR INCH (1800 KG/M), APPLIED PERPENDICULARLY TO THE CONCRETE SURFACE FOR A PERIOD OF ONE MINUTE, WITHOUT RUPTURE OF THE LOCKING EXTENSIONS OR WITHDRAWAL FROM EMBEDMENT. THIS TEST SHALL BE MADE AT A TEMPERATURE OF 70' - 80' F(21' - 27' C) INCLUSIVE. ALL PLASTIC LINER PLATE SHEETS, INCLUDING LOCKING EXTENSIONS, ALL JOINT, CORNER AND WELDING STRIPS SHALL BE FREE OF CRACKS, CLEAVAGES OR OTHER DEFECTS ADVERSELY AFFECTING THE PROTECTIVE CHARACTERISTICS OF THE MATERIAL. THE ENGINEER MAY AUTHORIZE THE REPAIR OF SUCH DEFECTS BY APPROVED METHODS. THE LINING SHALL HAVE GOOD IMPACT RESISTANCE, SHALL BE FLEXIBLE AND SHALL HAVE AN ELONGATION SUFFICIENT TO BRIDGE UP TO 1/4 -INCH (6 MM) SETTLING CRACKS, WHICH MAY OCCUR IN THE PIPE OR IN THE JOINT AFTER INSTALLATIONS, WITHOUT DAMAGE TO THE LINING. 1.C. CHEMICAL RESISTANCE OF LINER.* AFTER CONDITIONING TO CONSTANT WEIGHT AT 110 F(43 C), TENSILE SPECIMENS AND WEIGHT CHANGE SPECIMENS SHALL BE EXPOSED TO THE FOLLOWING SOLUTIONS FOR A PERIOD OF 112 DAYS AT 77' F t5 (25' C t3 ). AT 28 -DAY INTERVALS, TENSILE SPECIMENS AND WEIGHT CHANGE SPECIMENS SHALL BE REMOVED FROM EACH OF THE CHEMICAL SOLUTIONS AND TESTED IN ACCORDANCE WITH SECTION 7-2.03(1.B) PARA. 2 ABOVE. IF ANY SPECIMEN FAILS TO MEET THE 112 -DAY REQUIREMENTS BEFORE COMPLETION OF THE 112 -DAY EXPOSURE, L CHEMICAL SOLUTION SULFURIC ACID SODIUM HYDROXIDE AMMONIUM HYDROXIDE NITRIC ACID FERRIC CHLORIDE 1% SOAP DETERGENT (LINEAR ALKYL BENZYL SULFONATE OR LAS BACTERIOLOGICAL [sla [aI2a[:i. ienil BOD NOT LESS THAN 700 PPM *THIS IS TO BE USED AS A PRE -QUALIFICATION TEST AND WHEN MATERIAL FORMULATIONS ARE CHANGED. **VOLUMETRIC PERCENTAGES OF CONCENTRATED C.P. GRADE REAGENTS. 1.D. DETAILS AND DIMENSIONS OF LINER SHEETS. LINER SHEETS SHALL BE A MINIMUM OF 0.065 INCH (1.65 MM) IN THICKNESS. LOCKING EXTENSIONS OF THE SAME MATERIAL AS THAT OF THE LINER SHALL BE INTEGRALLY EXTRUDED WITH THE SHEET. 1.E. INSTALLATION OF LINING. INSTALLATION OF THE LINING, INCLUDING PREHEATING OF SHEETS IN COLD WEATHER AND THE WELDING OF ALL JOINTS, SHALL BE DONE IN ACCORDANCE WITH THE RECOMMENDATIONS OF THE LINER MANUFACTURER. COVERAGE OF THE LINING SHALL NOT BE LESS THAN THE MINIMUM SHOWN ON THE PLANS. THE LINING SHALL BE INSTALLED WITH THE LOCKING EXTENSIONS RUNNING PARALLEL WITH THE LONGITUDINAL AXIS OF THE PIPE. THE LINING SHALL BE HELD SNUGLY IN PLACE AGAINST INNER FORMS. LOCKING EXTENSION SHALL TERMINATE NOT MORE THAN 1-1/2 INCHES (38 MM) FROM THE END OF THE INSIDE SURFACE OF THE PIPE SECTION. JOINT FLAPS WHEN USED SHALL EXTEND APPROXIMATELY 4 INCHES (100 MM) BEYOND THE END OF THE INSIDE SURFACE. CONCRETE POURED AGAINST LINING SHALL BE VIBRATED, SPADED OR COMPACTED IN A CAREFUL MANNER SO AS TO PROTECT THE LINING AND PRODUCE A DENSE, HOMOGENOUS CONCRETE, SECURELY ANCHORING THE LOCKING EXTENSIONS INTO THE CONCRETE. IN REMOVING FORMS, CARE SHOULD BE TAKEN TO PROTECT THE LINING FROM DAMAGE. SHARP INSTRUMENTS SHALL NOT BE USED TO PRY FORMS FROM LINED SURFACES. WHEN FORMS ARE REMOVED, ANY NAILS THAT REMAIN IN THE LINING SHALL BE PULLED, WITHOUT TEARING THE LINING, AND THE RESULTING HOLES CLEARLY MARKED. ALL NAIL AND TIE HOLES ANO ALL CUT, TORN AND SERIOUSLY ABRADED AREAS IN THE LINING SHALL BE PATCHED. PATCHES MADE ENTIRELY WITH WELDING STRIP SHALL BE FUSED TO THE LINER OVER THE EN11RE PATCH AREA. LARGER PATCHES MAY CONSIST OF SMOOTH LINER SHEET APPLIED OVER THE DAMAGED AREA WITH ADHESIVE. ALL EDGES MUST BE COVERED WITH WELDING STRIP FUSED TO THE PATCH AND THE SOUND LINING ADJOINING THE DAMAGED AREA. HOT JOINT COMPOUNDS, SUCH AS COAL TAR, SHALL NOT BE POURED OR APPLIED TO THE LINING. THE CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO PREVENT DAMAGE TO INSTALLED LINING FROM EQUIPMENT AND MATERIALS USED IN OR TAKEN THROUGH THE WORK. 1.F APPLICATION TO CONCRETE PIPE - SPECIAL REQUIREMENTS. THE LINING SHALL BE SET FLUSH WITH THE INNER EDGE OF THE BELL OR SPIGOT END OF A PIPE SECTION AND SHALL EXTEND TO THE OPPOSITE END OR TO APPROXIMATELY 4 INCHES (100 MM) BEYOND THE OPPOSITE END DEPENDING UPON THE TYPE OF LINING JOINT TO BE MADE WITH THE ADJOINING CONCRETE PIPE. WHEREVER CONCRETE PIPE OR CAST -IN-PLACE STRUCTURES PROTECTED WITH LINING, JOIN STRUCTURES NOT SO LINED (SUCH AS BRICK STRUCTURES, CONCRETE PIPE OR CAST -IN-PLACE STRUCTURES WITH CLAY LINING OR CLAY PIPE), THE LINING SHALL BE EXTENDED OVER AND AROUND THE END OF THE PIPE AND BACK INTO THE STRUCTURE FOR NOT LESS THAN 4 INCHES (100 MM). THIS PROTECTING CAP MAY BE MOLDED OR FABRICATED FROM THE LINING MATERIAL BUT NEED NOT BE LOCKED INTO THE PIPE. WHERE A PIPE LATERAL (NOT OF PLASTIC LINED CONCRETE) IS INSTALLED THROUGH LINED CONCRETE PIPE, THE SEAL BETWEEN THE LINED PORTION AND THE LATERAL SHALL BE PER THE MANUFACTURER'S RECOMMENDATIONS. LINED CONCRETE PIPE MAY BE CURED BY STANDARD CURING METHODS. CARE SHALL BE EXERCISED IN HANDLING, TRANSPORTING AND PLACING LINED PIPE TO PREVENT DAMAGE TO THE LINING. NO INTERIOR HOOKS OR SLINGS SHALL BE USED IN LIFTING PIPE. ALL HANDLING OPERATION SHALL BE DONE WITH AN EXTERIOR SUNG OR WITH A SUITABLE FORK UFT. ON PIPE HAVING A 360' LINER COVERAGE, THE LONGITUDINAL EDGES OF THE SHEET SHALL BE BUTT WELDED. WHEN PIPE TUBES ARE FURNISHED, THESE ARE SHOP -WELDED JOINTS. NO PIPE WITH DAMAGED LINING WILL BE ACCEPTED UNTIL THE DAMAGE HAS BEEN REPAIRED TO THE SATISFACTION OF THE ENGINEER. 1.G. FIELD JOINTS IN LINING FOR CONCRETE PIPE. THE JOINT BETWEEN SECTIONS OF LINED PIPE SHALL BE PREPARED IN THE FOLLOWING MANNER: IF REQUIRED, THE INSIDE JOINT SHALL BE FILLED AND CAREFULLY POINTED WITH CEMENT MORTAR IN SUCH A MANNER THAT THE MORTAR SHALL NOT, AT ANY POINT, EXTEND INTO THE PIPE BEYOND THE STRAIGHT UNE CONNECTING THE SURFACES OF THE ADJACENT PIPE SECTIONS. PIPE JOINTS MUST BE DRY BEFORE LINING JOINTS ARE MADE. ALL MORTAR AND OTHER FOREIGN MATERIAL SHALL BE REMOVED FROM LINING SURFACES ADJACENT TO THE PIPE JOINT, LEAVING THEM CLEAN AND DRY. FIELD JOINTS IN THE LINING AT PIPE JOINTS MAY BE EITHER OF THE FOLLOWING DESCRIBED TYPES: TYPE P-1: THE JOINT SHALL BE MADE WITH A SEPARATE 4 -INCH (100 -MM) JOINT STRIP AND TWO WELDING STRIPS. THE 4 -INCH (100 -MM) JOINT STRIP SHALL BE CENTERED OVER THE JOINT, HEAT -SEALED TO THE LINING, THEN WELDED ALONG EACH EDGE TO ADJACENT LINER SHEETS WITH A 1 -INCH (25 -MM) WEU) STRIP. THE 4 -INCH (100 -MM) JOINT STRIP SHALL LAP OVER EACH SHEET A MINIMUM OF 1/2 INCH (13 MM). TYPE P-2: THE JOINT SHALL BE MADE WITH A JOINT FLAP WITH LOCKING EXTENSIONS REMOVED AND EXTENDING APPROXIMATELY 4 INCHES (100 MM) BEYOND THE PIPE END. THE JOINT FLAP SHALL OVERLAP THE LINING IN THE ADJACENT PIPE SECTION A MINIMUM OF 1/2 INCH (13 MM) AND BE HEAT -SEALED IN PLACE PRIOR TO WELDING. THE FIELD JOINT SHALL BE COMPLETED BY WELDING THE FLAP TO THE LINING OF THE ADJACENT PIPE USING 1 -INCH (25 -MM) WEU) STRIP. CARE SHALL BE TAKEN TO PROTECT THE FLAP FROM DAMAGE. EXCESSIVE TENSION AND DISTORTION IN BENDING BACK THE FLAP TO EXPOSE THE PIPE JOINT DURING LAYING AND JOINT MORTARING SHALL BE AVOIDED. AT TEMPERATURES BELOW 50 F(10 C), HEATING OF THE LINER MAY BE REQUIRED TO AVOID DAMAGE. THE JOINT FLAP OR STRIP ON BEVELED PIPE SHALL BE TRIMMED TO A WIDTH (MEASURED FROM THE END OF THE SPIGOT) OF APPROXIMATELY 4 INCHES (100 MM) FOR THE ENTIRE CIRCUMFERENTIAL LENGTH OF THE LINING. ALL WELDING OF JOINTS IS TO BE IN STRICT CONFORMANCE WITH THE SPECIFICATIONS AND INSTRUCTIONS OF THE LINING MANUFACTURER. WELDING SHALL FUSE BOTH SHEETS AND WEU) STRIP TOGETHER TO PROVIDE A CONTINUOUS JOINT EQUAL IN CORROSION RESISTANCE AND IMPERMEABILITY TO THE LINER PLATE. HOT-AIR WELDING TOOLS SHALL PROVIDE EFFLUENT AIR TO THE SHEETS TO BE JOINED AT A TEMPERATURE BETWEEN 500 AND 600 F (260 AND 316 C). WELDING TOOLS SHALL BE HELD APPROXIMATELY 1/2 INCH (13 MM) FROM AND MOVED BACK AND FORTH OVER THE JUNCTION OF THE TWO MATERIALS TO BE JOINED. THE WELDING TOOL SHALL BE MOVED SLOWLY ENOUGH AS THE WELD PROGRESSES TO CAUSE A SMALL BEAD OF MOLTEN MATERIAL TO BE VISIBLE ALONG BOTH EDGES AND IN FRONT OF THE WEU) STRIP. THE FOLLOWING SPECIAL REQUIREMENT SHALL APPLY WIZEN THE LINER COVERAGE IS 360 DEGREES: WHEN GROUNDWATER IS ENCOUNTERED THE LINING JOINT SHALL NOT BE MADE UNTIL PUMPING OF GROUNDWATER HAS BEEN DISCONTINUED FOR AT LEAST THREE DAYS AND NO VISIBLE LEAKAGE IS EVIDENT AT THE JOINT. WHEN WELDING THE DOWNSTREAM SIDE OF A JOINT STRIP OR FLAP, DO NOT WELD 6 TO 8 INCHES (150 TO 200 MM) AT THE PIPE INVERT TO PROVIDE RELIEF OF POTENTIAL FUTURE GROUNDWATER BUILD-UP. 1.H. APPLICATION TO CAST -IN-PLACE CONCRETE STRUCTURES - SPECIAL REQUIREMENTS. LINER SHEET'S SHALL BE CLOSELY FITTED AND PROPERLY SECURED TO THE INNER FORMS. SHEETS SHALL BE CUT TO FIT CURVED AND WARPED SURFACES USING A MINIMUM NUMBER OF SEPARATE PIECES. UNLESS OTHERWISE SHOWN ON THE PLANS„ THE LINING SHALL BE RETURNED AT LEAST 3 INCHES (75 MM) AT THE SURFACES OF CONTACT BETWEEN THE CONCRETE STRUCTURE AND ITEMS NOT OF CONCRETE (INCLUDING MANHOLE FRAMES, GATE GUIDES, CLAY PIPE OR BRICK MANHOLES AND CLAY OR CAST IRON PIPES). THE SAME PROCEDURE SHALL BE FOLLOWED AT JOINTS WHERE THE TYPE OF PROTECTIVE LINING IS CHANGED OR THE NEW WORK IS BUILT TO JOIN EXISTING UNLINED CONCRETE. AT EACH RETURN, THE RETURNED LINER SHALL BE SEALED TO THE ITEM IN CONTACT WITH THE PLASTIC -LINED CONCRETE. IF THE LINER CANNOT BE SEALED WITH ADHESIVE BECAUSE OF THE JOINT AT THE RETURN BEING TOO WIDE OR ROUGH OR BECAUSE OF SAFETY REGULATIONS, THE JOINT SPACE SHALL BE DENSELY CAULKED WITH LEAD WOOL OR OTHER APPROVED CAULKING MATERIAL TO A DEPTH OF 2 INCHES (50 MM) AND FINISHED 1.1. TESTING AND REPAIRING DAMAGED SURFACES. AFTER THE PIPE IS INSTALLED IN THE TRENCH, ALL SURFACES COVERED WITH LINING, INCLUDING WELDS, SHALL BE TESTED WITH AN APPROVED, CONTRACTOR SUPPLIED, ELECTRICAL HOLIDAY DETECTOR {TINKER & RASOR MODEL NO. AP -W WITH POWER PACK OR APPROVED EQUAL) WITH THE INSTRUMENT SET BETWEEN 18,000 AND 22,000 VOLTS. ALL WELDS SHALL BE PHYSICALLY Th=STED BY A NONDESTRUCTIVE PROBING METHOD. ALL PATCHES OVER HOLES, OR REPAIRS TO THE LINER WHEREVER DAMAGE HAS OCCURRED, SHALL BE ACCOMPLISHED IN ACCORDANCE WITH SECTON 7-2.03(1.E) PARA. 8 ABOVE. EACH TRANSVERSE WELDING STRIP WHICH EXTENDS TO A LOWER EDGE OF THE LINER WILL BE TESTED BY THE PURCHASING AGENCY. THE WELDING STRIPS SHALL EXTEND 2 INCHES (50 MM) BELOW THE LINER TO PROVIDE A TAB. A 10 -POUND (5 KG) PULL WALL BE APPLIED TO EACH TAB. THE FORCE WILL BE APPLIED NORMAL TO THE FACE OF THE STRUCTURE BY MEANS OF A SPRING BALANCE. LINER ADJOINING THE WELDING STRIP WILL BE HELD AGAINST THE CONCRETE DURING APPLICATION OF THE FORCE. TH= 10 -POUND (5 KG) PULL WILL BE MAINTA NED IF A WELD FAILURE DEVELOPS, UNTIL NO FURTHER SEPARATION OCCURS. DEFECTI JE WELDS WILL BE RETESTED AFTER REPAIRS HAVE BEEN MADE. TABS SHALL BE TRIMMED AWAY NEATLY BY THE IN`iTALLER OF THE LINER AFTER THE WELDING STRIP HAS PASSED INSPECTION. INSPECTION SHALL BE MADE WITHIN 2 DAYS AFTER THE JOINT HAS BEEN COMPLETED IN ORDER TO PREVENT TEARING THE PROJECTING WELD STRIP AND CONSEQUENT DAMAGE TO THE LINER FROM EQUIPMENT AND MATERIALS USED IN OR TAKEN THROUGH THE WORK. SHOP DRAWINGS. CONTRACTOR SHALL SUBMIT MANUFACTURER INFORMATION SHOWING DIMENSIONAL, MATERIAL AND JOINT CRITERIA TO THE ENGINEER FOR REVIEW. PIPE TRENCH CLASSIFICATION. RCP CLASS IV SHALL BE INSTALLED PER ASTM TRENCH DESIGNATION "C". RCP CLASS V SHALL BE INSTALLED PER ASTM TRENCH DESIGNATION "D". PVC FOR PIPE SIZES 18" AND LESS. POLY VINYL CHLORIDE PIPE SHALL MEET THE FOLLOWING REQUIREMENTS: 1. MATERIAL. PVC PIPE SHALL MEET OR EXCEED ALL REQUIREMENTS SET FORTH IN ASTM D 3034 WITH SDR OF 35. ELA`TOMERIC SEALS AND J0'NTS SHALL CONFORM TO ASTM D 3212 AND ASTM F 477. 2. TESTING. MANUFACTURING TESTNG METHODS SHALL CONFORM TO ASTM F-679 (T -WALL). CERTIFICATES OF CONPLIANCE SHALL BE MADE: AVAILABLE TO THE ENGINEER. 3. INSTALLATION. INSTALLATION Of PIPE SHALL FOLLOW MANUFACTURER'S GUIDELINES, THESE SPECIFICATIONS AND OSTM D 2321 "UNDERGROUND INSTALLATION Of- FLEXIBLE THERMOPLASTIC SEWER PIPE.". 4. FIELD TESTS. IN -FIELD PRESSURE TESTS SHALL CONFORM TO THESE SPECIFICATIONS AND THE FOLLOWING: DEFLECTION MEASUREMENT OF PVC PIPE. AFTER 30 DAYS CF INSTALLATION THE CONTRACTOR SHALL MEASURE PIPE DEFL=CTION BY PULLING A GO -NO-GO 5% MANDREL. THE MANDREL SHALL BE PULLED THROUCH THE PIPE WITH ROPE 3Y ONE PERSON WITHOUT MECHANICAL ADVANTAGE. THE MANDREL SHALL HAVE VANES AT LEAST AS LONG AS THE PIPE DIAMETER. THE MAN;)REL SHALL BE USED IN STRICT CONFORMANCE WITH PIPE AND MANDREL MANUFACTUREF'S RECOMMENDATIONS. THE MANDREL DIAMETER WILL BE CALCULATED USING THE FOLLOWING FORMULA: MANDREL DIAMETER = BASE PIPE I.D. -(Y/100 X BASE PIPE I.D.) WHERE Y = ALLOWABLE DEF-ECTION IN % (5%) BASE I.D. = ACTUAL INSIDE PIPE DIAMETER (PROVIDED BY PIPE MANUFACTURER) THE MANDREL SHALL HAVE AN ODD NUMBER OF VANES WITH SEVEN (7) MINIMUM. THE MINIMUM LENGTH OF THE CIRCU._AR PORTION OF THE MANDREL SHALL BE EQUAL TO THE NOMINAL DIAMETER OF TF'E PIPE. ANY SECTION OF INSTALLED PIPE THAT FAILS THE MANDREL TEST SHALL BE EXCAVATED, RE -BACKFILLED, RECOMPACIED AND RETESTED UNTIL THE MANDREL TEST CAN BE PASSED. RE -ROUNDING WILL NOT BE ALLOWED. PIPE TRENCH CLASSIFICATION. PVC PIPE SHALL BE INSTALLED PER CITY STANDARD S-39, AS MODIFIED ON THE CONTRACT FLANS. COMPACTION ABOVE THE PIPE ZONE SHALL BE AS SHOWN ON THE PLANS. 7. TRENCH EXCAVATION THE EXCAVATION OF TRENCHES FOR PIP114G LAID IN THE GROUND SHALL BE IN OPEN -CUT FROM THE SURFACE OF THE ',ROUND EXCEPT WHERE BORING IS REQUIRED. THE TRENCHES SHALL BE OF WIDTH AS SHOWN ON STANDARD S-39 AND DETAILED SECTIONS ON THE PLANS FOR PROPER PIPE INSTALLATION. THE HOLES FOR BELLS AND FITTINGS SHALL BE EXCAVATED BY HAND, TO A WIDTH PROVIDING UNIFORM BEARING ALONG THE LENGTH OF THE PIPE. IT IS THE INTENTION OF THESE REQUIREMENTS TO PROVIDE FIRM, UNIFORM BEARING FOR "THE PIPE. CONTRACTOR SHALL PROVIDE TRENCHING IN ACCORDANCE WITH THE DETAILED SECTIONS PROVIDED IN THE PLANS. SELECTION OF TRENCH TYPES WILL BE AS REQUIRED BY THE: TYPES OF PIPE SELECTED FOR CONSTRUCTION. STORM DRAIN AND UTILITY CONDUIT INSTALLATIONS SHALL MEET CITY STANDk.RD S-39. TRENCH LINES SHALL MEET ALL FEDERAL AND STATE SAFETY REQUIREMENTS. 8. BRACING AND SHORING EXCAVATION SHALL BE SUPPORTED AS SET FORTH IN THE RULES ORDERS, AND REGULATIONS OF THE STATE DIVISION OF INDUSTRIAL SAFETY. IF THE CONTRACTOR DESIRES TO DEVIATE FROM THE SAFETY )RDERS, HE SHALL SUBMIT DATA BY A REGISTERED CIVIL ENGINEER TO THE STAE DIVISION OF INDUSTRIAL SAFETY, JUSTIFYING THE ALTERNATE PROCEDURES TO BE USED. FAILURE TO COMPLY WITH ANY OF THESE RULES, ORDERS AND REGULATIONS SHAU. BE SUFFICIENT CAUSE FOR THE STATE DIVISION TO IMMEDIATELY SUSPEND ALL WORK. COMPENSATION FOR LOSSES INCURRED BY THE CONTRACTOR BY SUCH AN EMERGENCY SUSPENSION SHALL NOT BE ALLOWED. DURING BACKFILLING, THE BOTTOM OF THE SHORING SHALL BE KEPT ABOVE THE LEVEL OF THE BACKFILL AT ALL TIMES. SECTION 6422 OF THE CALIFORNIA LABOR CODE REQUIRES THE CONTRACTOR TO SUBMIT TO THE ENGINEER A DETAILED PLAN, DRAWING THE DESIGN OF SHORING, BRACING, SLOPING OR OTHER PROVISIONS TO BE NADE BY THE CONTRACTOR FOR THE PURPOSE OF WORKER PROTECTION FROM THE HAZARD OF CAVING GROUND DURING THE EXCAVATION OF TRENCHES NECESSARY FOR THE CONSTRUCTION OF THE PROJECT. IF SUCH PLAN VARIES FROM THE SHORING SYSTEM STANDARD ESTA3LISHED BY THE CONSTRUCTION SAFETY ORDERS, THE PLANS SHALL BE PREPARED AND CERTIFIED BY A REGISTERED CIVIL OR STRUCTURAL ENGINEER; HOWEVER, USE OF SYSTEMS THAT ARE LESS EFFECTIVE THEN THOSE REQUIRED 13Y THE CONSTRUCTION SAFETY ORDERS IS PROHIBITED ON THIS PROJECT. 9. TRENCH BACKFILL TRENCHES SHALL NOT BE LEFT OPEN FARTHER THAN THREE HUNDRED (300) FEET IN ADVANCE OF PIPE LAYING OPERATIONS CR TWO HUNDRED (200) '=EET TO THE REAR THEREOF, UNLESS OTHERWISE PERMITTED BY THE ENGINEER. ALL WORK SHALL CONFORM TO THE APPLICABLE SECTIONS OF THE STANDARD SPECIFICATIONS, DATED JULY, 1992. BEDDING CLASS SHALL BE AS SPECIFIED IN THE PIPE OPTIONS. STORM DRAIN AND UTILITY CONDUIT INSTALLATIONS SHALL BE IN ACCORDANCE WITH CITY STANDARD ST -22, EXCEPT THAT COMPACTION SHALL BE NO LESS THAN NINETY PERCENT (90%) UP TO THIRTY INCHES (30") FROM FINISHED GRADE. BACKFILL MATERIALS IN THE PIPE ZONE SHALL BE PLACED IN LAYERS NOT TO EXCEED TWELVE (12) INCHES SIMULTANEOUSLY, ON EACH SIDE OF THE PIPE, IN SUCH A MANNER AS NOT TO DAMAGE OR DISTURB THE PF E OR ITS AUGNMENT AND GRADE. BACKFILL MATERIAL ABOVE THE PIPE ZONE SHALL BE FREE OF DELETERIOUS MATERIALS AND LUMPS OR STONES EXCEEDING THREE (3) INCHES IN GREATEST DIMENSION AND SHALL BE PLACED IN LAYERS NOT EXCEEDING EIGHTEEN (18) INCHES. EACH LAYER SHALL BE THOROUGHLY COMPACTED BY VIBRATORY OR MECHANICAL TAMPING, OR BY A COMBINATION OF THESE METHODS. FLOODING AND JETTING SHAL_ NOT BE ALLOWED. THERE MUST BE AT LEAST ONE FOOT OF COVER OVER THE PIPE BEFORE COMPACTION ABOVE THE PIPE ZONE WILL BE ALLOWEE. IMPORTED BEDDING AND BACKFILL MATERIAL SHALL BE OBTAINED, AND ANY EXCESS BEDDING AND BACKFILL MATERIAL SHALL BE DISPOSED, BY ANY LEGAL MEANS AT THE DISPOSAL OF THE CONTRACTOR. THE CONTRACTOR MAY SUBMIT TO THE ENGINEER SIEVE ANALYSIS FOR UTILIZATION OF IN-SITU MATERIALS. ACHIEVING FIRM BEDDING BELOW PIPE SRINGUN . CONTRACTOR SHALL PROVIDE "FIRM BEDDING" SUPPORT FOR THE PIPE BELOW THE SPRINGUNE. FIRN BEDDING MEANS THAT THE PIPE MUST REST ON THE GRANULAR, MATERIAL SPECIFIED PREVIOUSLY IN THE SPECIFICATIONS. BED_ OR COUPLING HOLES SHALL BE CAREFULLY EXCAVATED AT PROPER INTERVALS, SO THAT NO PART OF THE LOAD IS SUPPORTED BY THE BELLS OR COUPLINGS. DURING BEDDING AND BACKFILLING, CONSOUDATION OF MATERIAL AROUND AND UNDER BELLS AND COUPLINGS SHALL BE AVOIDED. [If CONTRACTOR SHALL SHOVEL -SLICE OR HAND TAMP BEDDING IN THE HAUNCH AREAS, AS THIS WILL MINIMIZE VOIDS BENEATH THE PIPE AND IN THE HAUNCH AREAS. SHOVEL -SLICING OR HAND TAMPING SHALL BE DONE BEFORE THE BEDDING IS BROUGHT UP TO THE QUARTER POINT OF THE PIPE. INITIAL BACKFIN "BEDDING MATERIAL" AS SPECIFIED BY ASTM 2321-8 SHALL BE USED IN THE PIPE ZONE FOR INITIAL BACKFILL. AFTER THE PIPE HAS BEEN PROPERLY LAID AND INSPECTED, INITIAL BACKFILL SHALL BE PLACED ON BOTH SIDES AND OVER THE PIPE TO SUCH A DEPTH THAT, AFTER THOROUGH CONSOLIDATION, THE FINAL DEPTH SHALL BE AT LEAST TO THE ELEVATION SHOWN ON THE PLANS. THE MATERIAL SHALL BE CONSOLIDATED BY VIBRATORY OR MECHANICAL TAMPING AND THE EQUIPMENT AND MANNER OF TAMPING MUST BE APPROVED IN WRITING BY THE ENGINEER PRIOR TO COMMENCING OPERATION. IMPACT EQUIPMENT MAY BE ALLOWED UNDER THE DIREC11ON OF THE ENGINEER. HOWEVER, THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE RESULTING FROM THE USE OF THIS EQUIPMENT. HYDRA -HAMMER WILL NOT BE PERMITTED. SUBSEQUENT BACKFILL, ABOVE THE LEVEL OF INITIAL BACKFILL, THE TRENCH MAY BE BACKFILLED WITH NATIVE MATERIAL RESULTING FROM TRENCH EXCAVATION, OR AT THE OPTION OF THE CONTRACTOR, SELECT IMPORTED MATERIALS MAY BE USED. NATIVE MATERIAL OR IMPORTED MATERIAL MAY BE COMPACTED BY TAMPING AND/OR ROWING, USING EQUIPMENT AND METHODS APPROVED BY THE ENGINEER. WHEN THE CONTRACTOR COMPACTS BY TAMPING AND/OR ROLLING, THE BACKFILL MATERIAL SHALL BE PLACED IN LAYERS NOT EXCEEDING EIGHTEEN (18) INCHES IN LOOSE DEPTH, EACH LAYER BEING THOROUGHLY COMPACTED BY TAMPING AND/OR ROLLING BEFORE SUCCEEDING LAYERS ARE PLACED. COMPACTION OF SUBSEQUENT BACKFILL WITHIN TWO AND ONE-HALF (2-1/2) FEET OF FINISHED PERMANENT SURFACING GRADE SHALL BE ACCOMPLISHED BY TAMPING AND/OR ROLLING AS SPECIFIED ABOVE. WHERE THE TRENCH IS WITHIN THE PAVEMENT ON STREETS, THE BACKFILL WITHIN TWO AND ONE-HALF (2-1/2) FEET OF FINISHED PERMANENT GRADE SHALL BE COMPACTED TO NINETY PERCENT (90%) RELATIVE COMPACTION. SUBSEQUENT BACKFILL PLACED BY TAMPING AND/OR ROLLING SHALL BE FREE FROM STONES OR LUMPS EXCEEDING THREE (3) INCHES IN GREATEST DIMENSIONS, VEGETABLE MATTER, OR OTHER UNSATISFACTORY MATERIALS. IN NO CASE SHALL JETTING BE ALLOWED FOR BACKFILL COMPACTION WITHIN THE STREET. WHEN APPROVED BY THE ENGINEER, JETTING MAY BE USED IN NON -STREET AREAS. BACKFILL TESTING AND COMPACTION. TESTING OF BACKFILL MATERIALS AND COMPACTION SHALL BE IN ACCORDANCE WITH SECTION 19, "EARTHWORK" AND SECTION 6-3, "TESTING", OF THE STANDARD SPECIFICATIONS, STATE OF CALIFORNIA, DEPARTMENT OF PUBLIC WORKS, DIVISION OF HIGHWAYS. EACH LAYER OF BACKFILL MATERIAL SHALL MEET THE COMPACTION, SAND EQUIVALENT, AND GRADATION REQUIREMENTS BEFORE THE NEXT LAYER IS PLACED. EACH LAYER OF BACKFILL SHALL BE THOROUGHLY COMPACTED TO THE RELATIVE COMPACTION OF NOT LESS THAN IS SHOWN ON CITY OF BAKERSFIELD STANDARD S-39 AS MODIFIED ON THE CONTRACT PLANS, EXCEPT THAT COMPACTION WITHIN THE ROADWAY STRUCTURAL SECTION SHALL BE NO LESS THAN NINETY PERCENT (90%) RELATIVE COMPACTION FOR THE TOP FINISHED 30", AND SHALL BE DETERMINED BY CALIFORNIA TEST METHODS 216 OR 231, OR ASTM (CURRENT EDITION) D1557 AND ONE OF THE FOLLOWING D2922 OR D1556. IF THE RELATIVE COMPACTION, AS DETERMINED BY TESTING, FAILS TO MEET THE SPECIFIED PERCENTAGE, THE TRENCH SHALL BE RE -EXCAVATED AND RE -COMPACTED. COMPACTION TESTS WILL BE THE SUBDIVIDERS RESPONSIBILITY. THE NUMBER AND LOCATIONS OF THE TESTS SHALL BE DETERMINED BY THE CITY ENGINEER. SEWER PIPE SHALL CONFORM TO THE PLANS, AND THESE SPECIAL PROVISIONS. THE PRICE PER LINEAL FOOT SHALL INCLUDE BUT NOT BE LIMITED TO EXCAVATION, BEDDING AND BACKFILL. HANDLING OF MATERIALS. ALL PIPE, FITTINGS, SPECIALS AND CASTINGS MUST BE CAREFULLY HANDLED AT ALL TIMES. ONLY SUITABLE AND PROPER EQUIPMENT AND APPLIANCES SHALL BE USED FOR THE SAFE LOADING, HAULING, UNLOADING, HANDLING AND PLACING OF MATERIALS, SPECIAL CARE SHALL BE EXERCISED SO THAT PREFORMED RESIDENT JOINTS ON PIPE AND FITTINGS WILL NOT BE DAMAGED. ANY PIPE OR FITTING WITH A JOINT DAMAGED OR FLATTENED WILL CAUSE THAT PIPE OR FITTING TO BE REJECTED. PIPE LAYING. NO PIPE SHALL BE LAID UNTIL THE ENGINEER INSPECTS AND APPROVES THE CONDITION OF THE BOTTOM OF THE TRENCH. PIPE SHALL BE INSTALLED IN STRICT ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. PIPE LAYING SHALL BEGIN FROM THE DOWNSTREAM END OF THE TRUNK SEWER OR AS DIRECTED BY THE ENGINEER. PIPE LAYING SHALL PROCEED WITH EACH PIECE LAID TRUE TO LINE AND GRADE, AND IN SUCH A MANNER AS TO FORM A CLOSE CONCENTRIC JOINT WITH THE ADJOINING PIPE AND TO PREVENT SUDDEN OFFSETS IN THE FLOW LINE. AS THE WORK PROGRESSES, THE INTERIOR OF THE PIPE SHALL BE CLEARED OF ALL DIRT AND DEBRIS OF EVERY DESCRIPTION. PIPE SHALL NOT BE LAID WHEN THE CONDITION OF THE TRENCH OR THE WEATHER IS UNSUITABLE. AT TIMES WHEN WORK IS NOT IN PROGRESS, OPEN ENDS OF PIPE AND FITTINGS SHALL BE CLOSED. WITH BELLED END PIPE, BELL HOLES SHALL THEN BE EXCAVATED AT EACH JOINT TO FACILITATE THE JOINT OPERATIONS, AND SHALL BE ONLY OF SUFFICIENT SIZE FOR THAT PURPOSE. IN ORDER THAT BELL HOLES MAY BE PROPERLY LOCATED, NOT MORE THAN SIX (6) HOLES SHALL BE EXCAVATED AHEAD OF ACTUAL PIPE LAYING, ON ACCOUNT OF THE VARIATIONS IN JOINT CONSTRUCTION OPERATIONS. CUTTING PIPE. THE CONTRACTOR SHALL PERFORM ALL WORK OF CUTTING PIPE AND SPECIAL CASTING NECESSARY TO THE ASSEMBLY, ERECTION, AND COMPLETION OF THE WORK. ALL PIPE SHALL BE CUT TO FIT ACCURATELY, WITH SMOOTH EDGES AND FACES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CORRECTNESS OF CUTTING AND NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR ANY MATERIALS WHICH ARE DAMAGED OR INCORRECTLY CUT. PIPELINE TESTING. ALL SEWERS SHALL BE TESTED FOR TIGHTNESS WHEN COMPLETED AND READY FOR SERVICE. TESTING SHALL BE CONDUCTED IN ACCORDANCE WITH THE UNIFORM PLUMBING CODE AIR TEST METHOD UPC SEC. 318-6(4), OR THE WATER EXFILTRA11ON TEST OR AIR PRESSURE TEST PER SECTION 306-1.4, "TESTING PIPELINES" OF THE 1994 EDITIONS, "STANDARD SPECIFICATIONS" FOR PUBLIC WORKS CONSTRUCTION, AND CHAPTER 1.3 OF THE CITY OF BAKERSFIELD SUBDIVISION DESIGN MANUAL, AND THE PIPE SUPPLIER'S REQUIREMENTS. THE CONTRACTOR SHALL NOTIFY THE ENGINEER 24 HOURS PRIOR TO ANY TESTING. CLEANING PIPE LINES. CARE SHALL BE EXERCISED IN LAYING OF PIPE LINES TO EXCLUDE DIRT AND ANY OTHER FOREIGN MATERIAL. WHEN PIPE LAYING IS INTERRUPTED, AS AT NIGHT, THE PIPE ENDS SHALL BE SUITABLY CLOSED. UPON COMPLETION, AND BEFORE PLACING INTO SERVICE, ALL LINES SHALL BE FLUSHED AND MANDRELLED TO REMOVE ANY DIRT OR FOREIGN MATERIALS WHICH WOULD CLOG PUMPS, EQUIPMENT, SPRAY HEADS, ETC. THE CONTRACTOR SHALL MAKE PROVISIONS FOR PREVENTING FOREIGN MATERIAL FROM BEING FLUSHED INTO AN EXISTING SEWER LINE. SEWER LATERALS. SEWER LATERALS SHALL CONFORM TO THIS IN EVERY REGARD. EXISTING SEWER LATERALS SHALL BE LOCATED BY THE CONTRACTOR AND CONNECTED TO AND EXTENDED OR RECONSTRUCTED ACCORDING TO THE PLANS. COMPRESSION COUPLINGS MAY BE UTILIZED FOR CONNECTING TO EXISTING LATERALS. POSITIVE GRADE TO THE TRUNK SEWER SHALL BE MAINTAINED AND INVERT GRADES SET AS CALLED ON THE PLANS. SEWER WYES SHALL BE INSTALLED ON THE TRUNK IN ACCORDANCE WITH THE PIPE MANUFACTURERS RECOMMENDATIONS. PAYMENT FOR SEWER LATERALS WILL BE PAID AS SEWER FOR THE APPROPRIATE DIAMETERS. 11. SYSTEM TESTING A MANDREL TEST AND PRESSURE TEST SHALL BE PERFORMED ON INSTALLED PIPE IN ACCORDANCE WITH THE CITY OF BAKERSFIELD SUBDIVISION MANUAL AND THE RECOMMENDATIONS OF THE MANUFACTURER. PRIOR TO FINAL ACCEPTANCE, ALL SEWER LINES SHALL BE INSPECTED WITH VIDEO EQUIPMENT DESIGNED FOR THIS PURPOSE. THE TELEVISION CAMERA SHALL HAVE THE CAPABILITY OF ROTATING 360', IN ORDER TO VIEW AND RECORD THE TOP AND SIDES OF THE PIPE, AS REQUIRED. THE VIDEO INSPECTION SHALL BE WITNESSED BY THE CITYS CONSTRUCTION INSPECTOR, WHO WILL ALSO INITAL AND DATE THE "CHAIN OF CUSTODY" FORM. THE SUBDIVIDER SHALL IMMEDIATELY NOTIFY CITY OF ANY PIPE LOCATIONS REVEALED TO BE NOT IN COMPLIANCE WITH THE SPECIFICATIONS. A RECORDED VIDEO CASSETTE, THE COMPLETED "CHAIN OF CUSTODY" FORM AND A WRITTEN LOG (WHICH INCLUDES THE STATIONING, BASED ON THE STATIONING OF THE APPROVED PLANS, OF ALL CONNECTED LATERALS) OF THE INSPECTION SHALL BE PROVIDED FOR VIEWING, AND SHALL BE APPROVED BY THE CITY E'qGINEER PRIOR TO ACCEPTANCE. AFTER ACCEPTANCE, THE VIDEO CASSETTE SHALL BECOME THE PROPERTY OF THE CITY. 1; WYE FITTINGS SHALL BE INJECTION MOLDED IN -UNE TYPE AND SHALL BE USED FOR ALL LATERAL CONNECTIONS AND SHALL BE ROTATED A MINIMUM OF 23 DEGREES ABOVE THE HORIZONTAL PLANE RUNNING THROUGH THE CENTERLINE OF THE MAIN. ALL LATERALS SHALL BE 4" IN DIAMETER EXCEPT AS NOTED ON PLANS, EXTENDING A MINIMUM OF 4' BEYOND THE PROPERTY UNE OR RIGHT-OF-WAY LINE WITH 30" OF COVER AT FLOW LINE. SURFACE MARKERS FOR SEWER LATERALS SHALL BE INSTALLED AT THE PROPERTY LINE OR RIGHT-OF- WAY UNE AS SHOWN IN THE "SEWER LATERAL MARKER" DETAIL, C.O.B. STD. DET. SW -1. LATERALS SHALL BE A MINIMUM OF 2.25' DEEP AND A MAXIMUM OF 7' DEEP AT PROPERTY LINE OR RIGHT-OF-WAY LINE AND A MINIMUM OF 2.5' DEEP AT FLOWUNE. 13. ALL SEWER STUBS SHALL BE CLOSED WITH A STANDARD PLASTIC PLUG. SOLVENT WELDED. 14. ALL MANHOLES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF BAKERSFIELD STANDARD DRAWINGS S-7, S-8, AND S-21 AND SECTIONS 70-1.02H AND 71-1.07 OF THE STANDARD SPECIFICATIONS OF THE STATE OF CALIFORNIA, DEPARTME=NT OF TRANSPORTATION, CURRENT EDITION, ALL CLEANOUTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF BAKERSFIELD STANDARD DRAWING S-20. MANHOLES SHALL BE TYPE "A" FOR PIPES UNDER 48" IN DIAMETER AND TYPE "B" FOR PIPES 48" IN DIAMETER OR LARGER. UNLESS NOTED OTHERWISE. 11-1 BOTTOM MANHOLE BARREL AT THE MANHOLE FOUNDATION SHALL BE SET ON A 2" MOR'_AR BED OR SET ON KENT -SEAL, IN A GROOVED FOUNDATION. 15. STORM DRAIN PIP STORM DRAIN PIPE. CONTRACTOR SHALL UTILIZE RCP PIPE, CLASS III WITH RUBBER GASKET JOINTS PER ASTM SPECIFICATION C-76, UNLESS OTHERWISE NOTED ON THE CONTRACT PLANS. REINFORCED CONCRETE PIPE. REINFORCED CONCRETE PIPE SHALL CONFORM TO THE PROVISIONS IN SEC11ON 65, "REINFORCED CONCRETE PIPE", OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS. EXCEPT AS OTHERWISE DESIGNATED BY CLASSIFICATION ON THE PLANS OR IN THE SPECIFICATIONS, JOINTS FOR CULVERT AND DRAINAGE PIPES SHALL CONFORM TO THE PLANS OR SPECIFICATIONS FOR STANDARD JOINTS. HYDROSTATIC TESTS SPECIFIED BY SECTION 65-1.08 "LAYING SIPHON AND PRESSURE PIPE", OF THE STANDARD SPECIFICATIONS WILL NOT BE REQUIRED. REINFORCED CONCRETE PIPE SHALL HAVE RUBBER GASKETED JOINTS CONFORMING TO SECTION 65-1.068, "RUBBER GASKETED JOINTS", OF THE STANDARD SPECIFICATIONS. HANDLING OF MATERIALS. ALL PIPE, FITTINGS, SPECIALS AND CASTINGS MUST BE CAREFULLY HANDLED AT ALL TIMES. ONLY SUITABLE AND PROPER EDUIPMENT AND APPLIANCES SHALL BE USED FOR THE SAFE LOADING, HAULING, UNLOADING, HANDLING AND PLACING OF MATERIALS, SPECIAL CARE SHALL BE EXERCISED SC THAT PREFORMED RESILIENT JOINTS ON PIPE AND FITTINGS WILL NOT BE DAMAGED. ANY PIPE OR FITTING WITH A JOINT DAMAGED OR FLATTENED WILL CAUSE THAT PIPE OR FITTING TO BE REJECTED. PIPE LAYING. NO PIPE SHALL BE LAID UNTIL THE ENGINEER INSPECTS AND APPROVES THE CONDITION OF THE BOTTOM OF THE TRENCH. PIPE SHALL BE 114STALLED IN STRICT ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. PIPE LAYING SHALL BEGIN FROM THE DOWNSTREAM END OF THE STORM DRAIN OR AS DIRECTED BY THE ENGINEER. PIPE LAYING SHALL PROCEED WITH EACH PIECE LAID TRUE TO LINE AND GRADE, AND IN SUCH A MANNER AS TO FORM A CLOSE: CONCENTRIC JOINT WITH THE ADJOINING PIPE AND TO PREVENT SUDDEN OFFSETS IN THE FLOW LINE. AS THE WORK PROGRESSES, THE INTERIOR OF THE PIPE SHALL BE CLEARED OF ALL DIRT AND DEBRIS OF EVERY DESCRIPTION. PIPE SHALL NOT BE LAID WHEN THE CONDITION OF THE TRENCH OR THE WEATHER IS UNSUITABLE. AT TIMES WHEN WORK IS NOT IN PROGRESS, OPEN ENDS OF PIPE AND FITTINGS SHALL BE CLOSED. WITH BELLED END PIPE, BELL HOLES SHALL THEN BE EXCAVATED AT- EACH JOINT TO FACILITATE THE JOINT OPERATIONS, AND SHALL BE ONLY OF SUFFICIENT SIZE FOR THAT PURPOSE. IN ORDER THAT BELL HOLES MAY BE PROPERLY LOCATED. NOT MORE THAN SIX (6) HOLES SHALL BE EXCAVATED AHEAD OF ACTUAL PIPE LAYING, ON ACCOUNT OF THE VARIATIONS IN JOINT CONSTRUCTION OPERATIONS. THE CONTRACTOR SHALL MAKE PROVISIONS FOR PREVENTING FOREIGN MATERIAL FROM BEING FLUSHED INTO AN EXISTING STORM DRAIN UNE. CUTTING PIPE. THE CONTRACTOR SHALL PERFORM ALL WORK OF CLI' -TING PIPE AND SPECIAL CASTING NECESSARY TO THE ASSEMBLY, ERECTION, AND COMPLETION OF THE WORK. ALL PIPE SHALL BE CUT TO AT ACCURATELY, WITH SMOOTH EDGES AND FACES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CORRECTNESS OF CUTTING AND NO ADDITIONAL COMPENSATION WILL BE AU OWED FOR ANY MATERIALS WHICH ARE DAMAGED OR INCORRECTLY CUT. 16. BORED /JACKED P CASING OR SMOOTH OUTSIDE WALLED PIPE FOR BORED/JACKED PIPE: SHALL BE INSTALLED. IT SHALL HAVE EVEN BEARING THROUGHOUT ITS LENGTH AND SHALL SLOPE TOWARD ONE END. SPACE BETWEEN CASING AND PIPELINE SHALL EE BACKFILLED WITH SAND. IF THE PIPE AND CASING ARE INSTALLED BY BORING, THE SPACE AROUND THE CASING ALSO SHALL BE BACKFILLED WITH GROUT OR SAND. THE ENDS OF SPACE BETWEEN THE CASING AND THE PIPE SHALL BE SEALED WITH GROLI. THE STRENGTH OF PIPE DESIGNATED IN THE PLANS OR SPECIFICATIONS IS DETERMINED FOR VERTICAL LOAD ONLY ANY ADDITIONAL STRENGTH REQUIRED BY BORING/JACKING OPERATIONS SHALL BE FURNISHED AT THE CONTRACTOR'S EXPENSE. THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER FOR APPROVAL ALL PLANS OF BORING/JACKING OPERATIONS PRIOR TO BORING OR JACKING. BORING/JACKING OPERATIONS SHALL BE CONDUCTED IN A SAFE AND EFFICIENT MANNER, CONSISTENT WITH CURRENT ACCEPTED PROCEDURES. WATER BORING SHALL NOT BE PERMITTED. THE CASING PIPE SHALL BE JACKED WITH SUCH PRECISION THAT WILL ALLOW THE REPLACEMENT OF THE PIPELINE TO THE UNE AND GRADE AS INDICATED ON THE PLANS. UPON COMPLETION OF THE INSTALLATION OF THE CASING AND INSTALLATION OF THE PIPELINE TO GRADE, THE VOID BETWEEN THE CASING OR RC PIPE AND THE EXCAVATION SHALL BE COMPLETELY FILLED WITH SAND, COMPACTED BY THE USE OF AIR -BLOWING SAND EQUIPMENT OR ANY OTHER MEANS ACCEPTABLE TO THE ENGINEER UPON HIS APPROVAL. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN A SAFE OPERATION AT ALL TIMES. SHOULD THE TUNNEL HEADING OPERATIONS RESULT IN DAN(A..-ROUS OR UNREASONABLE SLOUGHING OF MATERIAL WHICH MAY JEOPARDIZE TH_ SAFETY OF WORKERS OR THE STABILITY OF THE SOIL AND ROADWAY ABOVE, THE CONTRACTOR SHALL FURNISH AND INSTALL BREASTBOARDING AND/OR FACE CLOSJRE WITH SUFFICIENT JACKS TO INHIBIT THE SLOUGHING AND/OR CLOSING THE WORK FACE. THE CONTRACTOR, BEFORE RESUMING WORK, SHALL FURNISH THE ENGINEER WITH A DETAILED PLAN OF PRECEDING WITH THE WORK, FOR HIS REVIEW AND APPROVAL. ANY AND ALL EXPENSES THEREFORE WILL BE CONSIDERED AS INCLUDED IN THE BID PRICE AND NO ADDITIONAL COMPENSATION WILL BE MADE THEREFOR. 17. MINOR STRUCTURES MINOR STRUCTURES. PORTLAND CEMENT CONCRETE MINOR STRUCTL RES SHALL CONFORM, IN DESIGN, MATERIALS, AND CONSTRUCTION, TO THE PRO`dISIONS OF SECTIONS 70-1.02 H OF THE STANDARD SPECIFICATIONS AND THESE: SPECIAL PROVISIONS. MANHOLES SHALL CONFORM TO THE CITY OF BAKERSFIELD STANDARDS S-7 AND S-8. DROP INLETS SHALL CONFORM TO THE CITY OF BAKERSFIELD STANDARD S-12. TEMPORARY INLET GRATES SHALL CONFORM TO DETAILS ON THE PLANS. THE PRECAST CYLINDER, TAPER, AND ECCENTRIC FLAT TOP SECTIONS SHALL MEET THE STRENGTH REQUIREMENT OF ASTM. C-478. EACH SUCCESSIVE MAN HOLE SECTION SHALL BE SET ON A BED OF PORTLAND CEMENT GROUT OR "KENT SEAL" -'O MAKE A WATERTIGHT JOINT, SHALL BE NEATLY POINTED ON THE INSIDE, AND SHALL BE SET PLUMB. 18, ADJUST SURVEY MONUMENT ENCASEMENTS SURVEY MONUMENT AND FRAME AND COVER WITH ENCASEMENTS SHALL BE ADJUSTED OR INSTALLED NEW TO FINISH GRADE AT THE LOCATIONS SHOWN ON THE PLANS, IN ACCORDANCE WITH THESE SPECIAL PROVISIONS, AND CITY STANDARD S-29. THE SURFACE OF THE CONCRETE SHALL BE PROTECTED FROM PUBLIC TRAFFIC FOR A MINIMUM OF THREE DAYS. AT THE OPTION OF THE CONTRACTOR, MINOR CONCRETE CONTAINING A MINIMUM OF SEVEN SACKS OF CEMENT PER CUBIC YARD MAY BE USED AND THE TIME REQUIRED FOR PROTECTION OF THE CONCRETE SURFACE FROM PUBLIC TRAFFIC SHALL BE REDUCED TO A MINIMUM OF ONE DAY. THE MONUMENT WILL BE SET BY OTHERS. THE OWNER WILL PROVIDE SURVEYS. CONTRACTOR SHALL GIVE THE OWNER 24 HOURS NOTICE WHEN SURVEYS ARE REQUIRED. ANY MONUMENT FRAME OR COVER DAMAGED BY THE CONTRACTOR OR HIS OPERATIONS SHALL BE REPLACED BY THE CONTRACTOR AT NO COST TO THE OWNER. AN OPEN STREET PERMIT SHALL BE OBTAINED FROM THE CITY OF EIKERSFIELD PUBLIC WORKS DEPARTMENT FOR ANY WORK PERFORMED WITHIN AC:IEPTED STREET RIGHT-OF-WAY. UNLESS SECURED BY A SUBDIVISION AGREEMENT, A DEPOSIT BASED ON APPROVED ENGINEER'S ESTIMATE FOR THE WORK PERFORMED WITHI , 'E - RIGHT-OF-WAY AND INSURANCE SHALL BE POSTED PRIOR TO ISSUANCE OF ti "• a. PERMIT. �/ It . oC 1* q'�OfCRW,`;Q' Ds-/ y-1-7 REO,* )RD DRAWINI' I.�-6 ?a:,� �pk _ J rn __Tl 0 o It CL. �- 0)o -+ v n 1. 0 _- Q z (�yj_ 0 CID < 40 0 O 1- 4t W I Qc m < -D -- -_ _j Q .I. -- - W U rr) UJI :ta N uj13 C co 3 a 2 as 0 ,-. -> w A0 3 iz to 0 (n 1_� C`J W 7 } a o Q w m 0 u ;\ �A .7 a C-) ,' -;,61' , Iti , �- � ,j Lia 0 rD cr? __Tl < ______ CL. m -+ v 0 �. Q, W I C) W b C14_j ix W CID < 40 0 F- 4� I, O W c3, at 0 G m a: < ir 1 CC N uj13 C co 3 a 2 i V) 7 z 0 �t w Q- w _pj cr II! t W s -- I - o - -i II - cr? z < CL. Z: 0 �. Q, W I C) W b C14_j ix W CID < 40 0 F- 4� I, O Z v:► c3, at 0 G m a: < ir 1 sLu i' n N uj13 C co 3 a 2 i LINE TABLE UNE # SIZE LENGTH DARING L1 18" 25.43 S12- 13' 48.05"W INSTALR25.43 LF 18" R P ® 0.12 PROVIDED BY TRACT 6916 344 , 342 , 340 INVERT 18 DRAIN 338 INVERT 8" S R 36 334 346 A SECTION 3 SCALE: 1" = 50' HORIZ. 1" = 5' VERT. A 342 CONNECT TO SEWER PROVIDED BY TRACT 6916 338 ' {L JW 3 1 � ' 334 z —i °° co 3 Wcj z_ o Z W J _ •3- z a � �+ 330 3Q ww LLJ cn w W 326 I INSTALL 146.13 LF OF 8" PVC 10+00 11+00 c 00 0� O z0zu)w J - O co ao m = J � ZILizzz Q m .- M. L www W WW INSTALL 180.00 LF OF 18" RCP 0 0.12% JW 3 N`I VERT 18" DRAIN N 0 3 ZL)>>>C.L,V) J z z z 0 Im � az* � I T rnrn� M m �re, VSTALL 180.00 Lf 12+00 Li J J J (n W W W PERPETLIA WY. SEE SHEET 5 13+00 GIN to O z W 3 z W N z� Q Zzz to z r ' . Q o+rn r M— oQwww CTI W W W (' I , , INVERT 8" SEWER MJwz3 z J cj >?> J -z zz x.11 Z 1p m + W � r M w Q w w w W J J J VI W W W INSTALL 400.00 LF OF 18" RCP ® 0.12% APPROXIMATE FINISHED GRADE 0 CENTERLINE -%j I DRIVE (STA. 11+74.65 TO 21+14.65) SCALE: 1" = 50' HORIZONTAL . LEGEND: ABBREVIATIONS CL CENTERUNE SMH SEWER MANHOLE INV INVERT SCO SEWER CLEANOUT SO STORM DRAIN SDMH STORM DRAIN MANHOLE MH MANHOLE EXIST EXISTING CB CATCH BASIN ELEV ELEVATION JB JUNCTION BOX R/W RIGHT OF WAY SGP STREET CONSTRUCTION PLAN T .M. 36322 TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION s CONSTRUCT SEWER PER CITY STANDARDS ® CONSTRUCT SEWER MANHOLE TYPE 'A' PER C.O.B. STD. S-7. (D CONSTRUCT SEWER CLEANOUT PER C.O.B. STD. S-20. BIDWELL DR. SEE SHEET 5 811 0o I I I 4 I I I 1 -7 w SSW Jui O 00 o z(j » ` zz z �04 o+ g04M CC O Q J J N1 W W INSTALL 401.19 LF OF 18" RCP ® 0.12% 34§.0 T.O.M. 348 Op z z W � �N -i •: _ M 0 11 (5) �y M>m =J II W o 344 W z < z — . J z J — z W u -o Q ci Inc1,n • JQ"R ± M M" + C/) I J _._.—•---•—•— Q W m ir w Ob�u>j W J Q a O W J(n W U ZinW PROVIDED BY TRACT 6916 344 , 342 , 340 INVERT 18 DRAIN 338 INVERT 8" S R 36 334 346 A SECTION 3 SCALE: 1" = 50' HORIZ. 1" = 5' VERT. A 342 CONNECT TO SEWER PROVIDED BY TRACT 6916 338 ' {L JW 3 1 � ' 334 z —i °° co 3 Wcj z_ o Z W J _ •3- z a � �+ 330 3Q ww LLJ cn w W 326 I INSTALL 146.13 LF OF 8" PVC 10+00 11+00 c 00 0� O z0zu)w J - O co ao m = J � ZILizzz Q m .- M. L www W WW INSTALL 180.00 LF OF 18" RCP 0 0.12% JW 3 N`I VERT 18" DRAIN N 0 3 ZL)>>>C.L,V) J z z z 0 Im � az* � I T rnrn� M m �re, VSTALL 180.00 Lf 12+00 Li J J J (n W W W PERPETLIA WY. SEE SHEET 5 13+00 GIN to O z W 3 z W N z� Q Zzz to z r ' . Q o+rn r M— oQwww CTI W W W (' I , , INVERT 8" SEWER MJwz3 z J cj >?> J -z zz x.11 Z 1p m + W � r M w Q w w w W J J J VI W W W INSTALL 400.00 LF OF 18" RCP ® 0.12% APPROXIMATE FINISHED GRADE 0 CENTERLINE -%j I DRIVE (STA. 11+74.65 TO 21+14.65) SCALE: 1" = 50' HORIZONTAL . LEGEND: ABBREVIATIONS CL CENTERUNE SMH SEWER MANHOLE INV INVERT SCO SEWER CLEANOUT SO STORM DRAIN SDMH STORM DRAIN MANHOLE MH MANHOLE EXIST EXISTING CB CATCH BASIN ELEV ELEVATION JB JUNCTION BOX R/W RIGHT OF WAY SGP STREET CONSTRUCTION PLAN T .M. 36322 TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION s CONSTRUCT SEWER PER CITY STANDARDS ® CONSTRUCT SEWER MANHOLE TYPE 'A' PER C.O.B. STD. S-7. (D CONSTRUCT SEWER CLEANOUT PER C.O.B. STD. S-20. BIDWELL DR. SEE SHEET 5 811 0o I I I 4 I I I 1 -7 w SSW Jui O 00 o z(j » ` zz z �04 o+ g04M CC O Q J J N1 W W 14+00 15+00 16+00 17+00 (STA. 11+74.65 TO 21+14.65) SCALE: 1" = 50' HORIZONTAL SCALE: 1" = 5' VERTICAL CONSTRUCT STORM DRAIN PER CITY STANDARDS 0 CONSTRUCT STORM DRAIN MANHOLE TYPE 'A" PER C.O.B. STD. S-7. O�r CONSTRUCT CATCH BASIN TYPE "A' PER C.O.B. STD. S-12. NOTES 1) ALL CATCH BASINS ARE TO BE TYPE "A" WITH 3.5' OPENINGS PER C.O.B. STD. S-12 UNLESS OTHERWISE NOTED. 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS UNLESS OTHERWISE NOTED. SECTION DESIGNATION: SECTION LETTER L-- -- A _2 SHEET WHX SECTION IS SHOIMI 18+00 ALL REVISION APPROVED B 19+00 20+00 REVISIom Q DANIEL PAviLLA^ ke blwg DATE LGXP 9f3ofIY r(p 21+00 324 rn 0 �_ rn ooz't O Zu, Q J —J Q uJ W U 00 2 J r r W t0 Q u- to N (Y W Y Q f� 0 INSTALL 401.19 LF OF 18" RCP ® 0.12% 34§.0 T.O.M. 348 APPROXIMATE FINISHED � GRADE ® CENTERLINE (5) t2 V , o 344 z Z 8" WATER Ltj Lu r rL , � J _._.—•---•—•— _ 340 INVERT 18" DRAIN Lu N J3z�, 336 �wW3 'n °D °0 3 SADDLE SEWER tn co 00 co m c OVER STORM DRAIN O 1n z > > c� PER CITY STANDARD PLAN ' > > > d'zZ r D-9 0 .z_zzZ Z 0.332 +° 11 Nt + d Q w ww ��a W 3 Q w w LJ W � � W J J J Ln w W w s 328 14+00 15+00 16+00 17+00 (STA. 11+74.65 TO 21+14.65) SCALE: 1" = 50' HORIZONTAL SCALE: 1" = 5' VERTICAL CONSTRUCT STORM DRAIN PER CITY STANDARDS 0 CONSTRUCT STORM DRAIN MANHOLE TYPE 'A" PER C.O.B. STD. S-7. O�r CONSTRUCT CATCH BASIN TYPE "A' PER C.O.B. STD. S-12. NOTES 1) ALL CATCH BASINS ARE TO BE TYPE "A" WITH 3.5' OPENINGS PER C.O.B. STD. S-12 UNLESS OTHERWISE NOTED. 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS UNLESS OTHERWISE NOTED. SECTION DESIGNATION: SECTION LETTER L-- -- A _2 SHEET WHX SECTION IS SHOIMI 18+00 ALL REVISION APPROVED B 19+00 20+00 REVISIom Q DANIEL PAviLLA^ ke blwg DATE LGXP 9f3ofIY r(p 21+00 324 rn 0 �_ rn ooz't O Zu, Q J —J Q uJ W U 00 2 J r r W t0 Q u- to N (Y W Y Q f� 0 co o o � (5) t2 V 1 o � z Z Ltj Lu r rL 0 � J 0 Lu N m m Sri OG m c A _C C3 C) �S SCALE: 1 "=50 05-t r -n 25 0 50 100 50 12.5 rRE"ORD DRAWIN f". 1 ') /-.01,(— .D I r • 00- - try L�- �.j I co z -1,01 \ z_{ V 1 m •1', i Z Ltj Lu r rL a � J 0 SCALE: 1 "=50 05-t r -n 25 0 50 100 50 12.5 rRE"ORD DRAWIN f". 1 ') /-.01,(— .D I r • 00- - try L�- �.j I co z J m •1', i Z Ltj Lu r rL � � 4 Lu N m Sri OG ac A _C C3 a, ��a V) � � s W LD- Ld c�; L l v l ujc' o co z J a. Z Ltj Lu � � 4 Lu N m OG ac A C3 I ��a W � s W 0 `d LINE TABLE UNE # SIZE LENGTH BEARING Lt 24" 60.42 S66' 13' 45.54"W L2 18" 71.20 S78. 45' 49.45"W L3 18" 28.25 S26' 39' 19.39"E RETENTION BASIN TRACT BOUNDARY err �-i-� � ■••fes ■-m� � ■-��� � ��� ■-� �-�-� �rrrrrrrr�sr II �� ffr•� �� �� �� ,.� z a J -A eh r i 1 1 1 o II y I ■fes �- II w �'•'� r7 II■" ��� ��t� f� SEE SHEET 6 I N w o z B I WQW-m II �i30�i_J Z NMr� I I I o LJ 1 I I o 3 �� Z II / ZC.D�WOw W J J J J QJ >> J I J J J Z G, J J ' J I J Z (n I I Z O c n / 4 m �21� 20 19 g w 1 J =D a. = 0 mu W W p p O J iq O O O O J I\ F— W Z NJW z- p =o l Cl0 18 I p 17 16 �J�J p p p p o 1 0 �J 1 ZtiJNO M� Q MD �MJJ 0i -0 0)O Cf. I 00 I, I OO1 5 I �- rn- 0i- =J(V 0 Wa�I / 0 O1 O Qpjtiti MO I MO I Mp I MO Z .- MO M01 4 I Ma13 I Mp12Z I^11 I z-Jnj , I.- .0 3 H ' mzUo MM z� M to U+QOW CpOM mM =M QOIr� ff) 0j ' �'� I aMOM I rM•�M ' 00M < '+ I a; C'4 JU+ 0 Z=m F N ^ r2 a (T a Q' �yN� W N W W W W O W 01 W CV W 0j W 1 f' z Q .� eF W Q+ f\ W (�� N I I I M n d I U p0 r- m J cn U _ W I Q I c0 ere I Z CJ �sr, 0�2 0� o� o� Nza ±;;� I NM I NM I MM +Ll 1 1 � M rn� �� 3+� �� WRQ �m -- -- o 'i'O �3oQ :`' MQ :� o ;n I �;n I ��n ( in (nom I "� I I �� 1 �,•Mn (Wn N I ^,� I w+F- La -4: J� OfQ-W+I- QO QO Qp ap Qp Qp \ f \ oNNON U) z N z OO Q t- O CU+ i -p �o �o r`t-o �o moo I <g I eo in �.� / U NZ I tnZ I tnZ ( NZ I UIZ (J)Z (/�Z N2 _ I Q I N Z i Q O O/ A• Q Q I I o a 3E CONSTRUCTED co �+ ul U) I 1 1 I I 1 1 1 + cn MND D-13 \ F -_-_ __ - I I I I I I W� ` ��� ----/---L_- -- -- --� - 1 - --�-- --�-- -- _I_ _ R/W / I Q �• �z $ o — - s9 �, 9 PARK LOT a V) \� ` 1 /+ 11+00 ui / i _ 12+00 13+00 15+00 ' . v g� - �— - s -—S89U6'48"E—I— - -I - �- -- m _ _ _ I 16+00 17+00 s _ �— — �— / S89'06'48' 8" SEWER 367 67' o , — � s s d •" S �\ o S89-06 48"E 8" SEWER 299.6 ' S89.0648 E 6 SEWER 100.00' 1 Z A -7R ;W �--� —- - - - - - - - _ r a� i w� ti l ¢ -- —_ __—QJ O I W 04 NL Op. Op O I O I O O p I I W _ I �J Q I O�rM NO 1 c, I NO 1 m0 O. I Of- I O O I 00 I g 1�N� q o I 1 o No I Ng I 04 1 No 1 a'o ai- I g I Q M I O.JM W�2�N I( 23�N M�24 ' NN25 ' ^N26 ' �'�'27 ' O I NO ' Ng I NO I LL I w W Q �Z(j>W a0W I m�+-� I ^RC4W I �nw I t\W NW m628 erN29 ' mN30 I Om O+ i>0 I I Z J J + + LO I M I04 LO W W '� (A N -- -- - M O I�rw� pi''7 NM Nj,rM ro '� I +� I �N I lAw ;n I C I M rn � - + iv W m 0i w o :� 1 a :� I I M - + I O Q N I m i. w a o Q o I Q o I < I ;n I r� 1 c0 Lp v~i $ I~oat cnz cnz I cnz I v~iz Enz cniz ra-o I roo I Qo I ;n I W I (nz (nz �o �o I I I I N Z ! N Z Q N tnW ISN I I 1 r I II I C' r- Ir ff I I �- 1 1 I P !-1 1 A S � 11 1 1 1 I I .11 m 1 INSTALL 28.25 LF OF 18" RCP 0 15.61 % r � zQ N W � M Z LJ 04 C4 N P G m Q Kj cr r)>co O� = o J II J Q(j Zj> >LLI> (n w (1) Z Z Z_ J Z oi- w�- Z� Q Z L� O 0) O o to NJ O oo+ m+Winn (� M JQLLI w j j p j r j a O(- JJ J Q O W J (n (n www U A z o w 1- r7 j 00 O = N O = ;z 344 342 r r INVERT 8" SEWER' 340 338 ' INVERT 18" DRAIN �h 336 334 V A SECTION 4 SCALE: 1" = 50' HORIZ. 1" = 5' VERT. PERPETUA WY. SEE SHEET 5 N ��48 CDa Wim_ J o GRADE 0 CENT � 3 y�� J Z U Z < -j j> 7 z Z '0-0 Z- C7 04 C4 N P G m Q Kj cr � M M + 1 ( r7 N1 fn IN +00 � >w > (n w (1) n W (' I W s" W o 3q5 Oix w 3 Z zNZ OJ W3 Z�LJ W mA3: W N aD 00 1- r7 j 00 O = N O = ;z •- II LLI Q� >Z> ?— Z QU Z>> O J WLLI • Z Z Of - Z J Z - W J Z- c*,N ZO Z W O 4� m Jaui O+ rr�jj 00 m+ J(W/IM 71r� �0) Q �� LJ 2 Q WLd M O -j (j J N w W O F w J J to W W Q U 0 W J Z in W INSTALL 60.42 346 LF OF 18" INSTALL 71.20 LF OF 0 3 w RCP 0 0.12% 18" RCP 0 2.68% Ix 3 o 342 o r r r r 338 r r r O _ INVERT 18" DRAIN 334 0 0 W (n INVERT 18" DRAIN CS J 00 Z V j CO f/1 J -z? 330 = m ' o + 9 3Q Ww EVANSBURG AVENUE (STA. 10+00.00 TO 17+90.00) SCALE: 1" = 50' HORIZONTAL BIDWELL DR. SEE SHEET 5 APPROXIMATE FI'VISHED QOM' 1 S"' -:RUNE ��48 CDa Wim_ J o GRADE 0 CENT 1 y�� J Z U Z < -j j> 7 z Z '0-0 Z- C7 04 C4 N P G m Q Kj cr � M M + 1 ( r7 N1 fn IN +00 � >w > (n w (1) n W (' I W s" W o 3q5 u W 1- U rry IW m i 44 W acs CIO • — J_ • O l `� 346 —• __ • _„-_ , f INVERT 6" SEWER N m • `INVERT , m o Y Y 342 8" SEWER W do cn N O u.i 0 0 3 w .- 0 3 1.,J r� Ix 3 i36 Z� '0 3 Z �� `0 3 Z J 0 338 ci > > (,) U > j (� F- Li> W Z Z W J^_ Z Z O00 - Z 04 '' a32 <Z + � Q� w + 334 '- M rc1 of 3Q w w 3¢ w w 3¢ w turn (~n w w cn cn w w (Wn w iz8 326 En (n w w INSTALL 367.67 LF OF 8" PVC 0 0.25% 10+00 11+00 LEGEND: ABBREVIATIONS CL CENTERLINE SMH SEWER MANHOLE INV INVERT SCO SEWER CLEANOUT SD STORM DRAIN SDMH STORM DRAIN MANHOLE MH MANHOLE EXIST EXISTING CB CATCH BASIN ELEV ELEVATION JB JUNCTION BOX R/W RIGHT OF WAY SCP STREET CONSTRUCTION PLAN _E 363-22 TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION s CONSTRUCT SEWER PER CITY STANDARDS ® CONSTRUCT SEWER MANHOLE TYPE "A" PER C.O.B. STD. S-7. Q CONSTRUCT SEWER CLEANOUT PER C.O.B. STD. S-20. 12+00 13+00 14+00 (STA. 10+00.00 TO 17+90.00) SCALE: 1" = 50' HORIZONTAL SCALE: 1" = 5' VERTICAL CONSTRUCT STORM DRAIN PER CITY STANDARDS CONSTRUCT STORM DRAIN MANHOLE TYPE "A' PER C.C.B. STD. S-7. CONSTRUCT CATCH BASIN ' YPE "A" PER C.O.B. STD. c-12. NOTES 1) ALL CATCH BASINS ARE TO BE TYPE "A" WITH 3.5' OPENINGS PER C.O.B. STD. S-12 UNLESS OTHERWISE VOTED. 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS UNLESS OTHERWISE VOTED. SECTION DESIGNATION: SI.CTION LETTER --�--- A _2 SHEET WHERE SECTI:M IS SHOWN INSTALL 299.69 LF OF 8" PVC 0 0.25% 15+00 16+00 INSTALL 100.00 LF OF 6" PVC 0 1.00% 17+00 18+0 w T J W Qlof r) V) Z w N 3 Z Z CDa Wim_ J o CA , '2 N N = N (Z 3 J Z U Z < -j j> 7 z Z '0-0 Z- C7 04 C4 N P G m Q Kj cr � M M + 1 ( r7 N1 fn IN +00 > >w > (n w (1) n W (' I W INSTALL 159.46 LF OF 24" RCP 0 0.58% 348 344 I : :I 340 r I 336 -- -- . `INVERT 24" DRAIN 332 8 SEC110N 4 SCALE: 1" = 50' HORIZ. 1" = 5' VERT. SCALE: 1 "='-'10' 25 0 ED 100 50 12.5 Pr=(,' VRD D A11Y IN( V) z M p � a O DQ o LO O 0 s" W o u W 1- U rry IW m a. 0 W acs CIO C* W w (n O l `� 8 f Q N m LL , m o Y Y WE cry I SCALE: 1 "='-'10' 25 0 ED 100 50 12.5 Pr=(,' VRD D A11Y IN( V) z s" W u W v a. 0 W acs CIO C* $ m co 8 f Q < W ira W do cn N O u.i J IZZ 0 r r' H A 5 r 42 43 / Ike / .5h lb csj YX,\, r O z J L,,) 3 z Li J 0 Lo - <z -i >» -Z iJ �U z Z Z Z00 n Q O + M O OQ W W w U) '(f) W w W (STA. 10+00.00 TO 12+19.78) SCALE: 1" = 50' HORIZONTAL INSTALL 300.00 LF OF 24" RCP 0 0.12% 346 , 1 APPROXIMATE FINISHED GRADE ® CENTERLINE 342 1 1 338 334 330 326 4 Z z 4 - j O0 04 N 04 W iZZZ N 00 I A d `r (4-3 In >LL, W > Ld 'WWW 348 344 340 O SEWER � I` NVERT 8" cy -- -- -- -- -- --� a 336 to- -- -- -- 1 owz3 �- pw Ici - INVERT 18" DRAIN o m m tI 3 0 "' 00 °0332 J ZU »> ty� ZJ w Zzz w ZZ = O . _ t0 17 zui ¢o � S.,¢Zo tea+ r" �+ cc\M 1328 w� a� 3¢ W W W¢ W W wnv)www vw)cnww c INSTALL 305.16 LF OF 8" PVC ® 0.25% 10+00 11+00 12+00 (STA. 10+00.00 TO 12+19.78) SCALE: 1" = 50' HORIZONTAL SCALE: 1" = 5' VERTICAL 13+00 21 20 I:J tf\ ff) INSTALL 27.15 LF OF 18" RCP 0 5.38% rI � r J 1 r l.) J LINE TABLE UNE SIZE LENGTH g Lt o N00'53'12"E 8" SEWER305.16' J L2 - v II 44 L3 18" 27.15 I L4 18" 36.12 S23' 02' 21.70"E N 22 I m m JJ fl) C:) W }> ZUU �' `f I H Na O (V 3 ,no 17 'Y 4U, + � Ato + + C3 i- "A Z¢¢H GOO -Wcn---N 3 I Jm \ (� f� I J L..1w II Tf Z \ UJI a> \ LLJ 3 CMZ •" I m w \ --- ----i ZOv)3 I N 8I lJ CU U \ I n c + � W JO I II `n 00 00 00 1 cn++ Q on I`- uj i� Iw-ch^ ZI W > o c F---�_- NN - -- -- --�_ N M J 41 22 O ww> Z I t� >>> ' zd> I E +,+ .-i I ZJw w ^zzz m�zzLJ W od z Zc� Z z Q z M if) ' �. x u ZJW ( � Q <� 45 0:)+ W N J of D+ Illyam,+ TJ �+ Lo UJ O I I w O -t0 S (^ V W�o DMO z r IWW4 I I t0 (n I I z ¢ tri o - -�- - -- - - -- -- » > www � o48 0_ oa ww + F �'�� OW JI- z o W L1C I HI- cn JJJ cn w w w HH N I m + O I INSTALL + + r+7 m I "cn to to p OF 01� ix i Ld 18" RCP I _ _ 1 pM 0, 1 S - l 0 0.12% I into 40 23 cwn¢cn c~n I • Q I Q ALo1JpRA SEE SHEET DR.EVANSBURG PERPERTUA WAY AVE. SEE SHEET 4 r O z J L,,) 3 z Li J 0 Lo - <z -i >» -Z iJ �U z Z Z Z00 n Q O + M O OQ W W w U) '(f) W w W (STA. 10+00.00 TO 12+19.78) SCALE: 1" = 50' HORIZONTAL INSTALL 300.00 LF OF 24" RCP 0 0.12% 346 , 1 APPROXIMATE FINISHED GRADE ® CENTERLINE 342 1 1 338 334 330 326 4 Z z 4 - j O0 04 N 04 W iZZZ N 00 I A d `r (4-3 In >LL, W > Ld 'WWW 348 344 340 O SEWER � I` NVERT 8" cy -- -- -- -- -- --� a 336 to- -- -- -- 1 owz3 �- pw Ici - INVERT 18" DRAIN o m m tI 3 0 "' 00 °0332 J ZU »> ty� ZJ w Zzz w ZZ = O . _ t0 17 zui ¢o � S.,¢Zo tea+ r" �+ cc\M 1328 w� a� 3¢ W W W¢ W W wnv)www vw)cnww c INSTALL 305.16 LF OF 8" PVC ® 0.25% 10+00 11+00 12+00 (STA. 10+00.00 TO 12+19.78) SCALE: 1" = 50' HORIZONTAL SCALE: 1" = 5' VERTICAL 13+00 21 20 I:J tf\ ff) INSTALL 27.15 LF OF 18" RCP 0 5.38% rI � r J 1 r l.) J LINE TABLE UNE SIZE LENGTH BEARING Lt 18" 45.34 S85' 40' 02.47"E L2 18" 40.44 N1' 02' 50.0:i"E L3 18" 27.15 S69' 53' 22.7 2"W L4 18" 36.12 S23' 02' 21.70"E O O to Z 3 N z N A W - _ - 'r • II : =_j coG0 00 rn > 00 J O II �� Z > > > > W > g- -Z z Z. J Z W J zo to z LL - C,4 J Q Iti � m+ JU O ) IX >W UJ» .��UJ > ccnn¢ www U Z Dw 348 346 346 344 CONSTRUCT PIPE SADDLE PER CITY 342 ; OF BAKERSFIELD INVERT 8" STANDARD DETAIL 342 SEWER D_g 340 ELEV. 340.72' ,� INVERT ELEV. 340.16' INVERT 18" DRAIN 338 INSTALL 45.34 LF OF 18" RCP ® 6.59% u-) : N (V (6 W V)Z(� CM3 00 00 00 nII M > a . II W- >>>� >w> Z zO Z W z .wJZ z W C rN ' m + W N d f N M > U X w w w HX aLL J J J ¢ O w- I W LI) LI) U n Z 0 L� 348 I' I 1 344 1 1-1 'Z , - 1 1 I i pINVERT 340 18" DRAIN Lo . GD + CV H 346 342 338 334 A SECTION B SECTION 5 SCALE: 1" = 50' HORIZ. 5 SCALE: 1" = 50' HORIZ. 1 " = 5' VERT. 1 " = 5' VEF: T. 330 LEGEND: ABBREVIATIONS CL CENTERLINE SMH SEWER MANHOLE INV INVERT SCO SEWER CLEANOUT SD STORM DRAIN SDMH STORM DRAIN MANHOLE MH MANHOLE EXIST EXISTING CB CATCH BASIN ELEV ELEVATION JB JUNCTION BOX R/W RIGHT OF WAY SCP STREET CONSTRUCTION PLAN T.D.M. 363.22 TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION s CONSTRUCT SEWER PER CITY STANDARDS ® CONSTRUCT SEWER MANHOLE TYPE "A' PER C.O.B. STD. S-7. CONSTRUCT SEWER CLEANOUT PER C.O.B. STD. S-20. 4STUB AND CAP FOR USE IN PHASE 2 EVANSBURG AVE. SEE SHEET 4 f I HI I I ; W i I 12 I > I I I 31 > w II e"1 N W I > o fl J� oz \ z v 41 / E 6" SEWSER V /1 100.00' O Ln C i N 22 I m m JJ fl) C:) VJ�N >w ZUU 1 O>'M o 0, `f I H Na O (V 3 ,no 17 'Y 4U, + � Ato + + C3 i- "A Z¢¢H GOO -Wcn---N Z 346 342 338 334 A SECTION B SECTION 5 SCALE: 1" = 50' HORIZ. 5 SCALE: 1" = 50' HORIZ. 1 " = 5' VERT. 1 " = 5' VEF: T. 330 LEGEND: ABBREVIATIONS CL CENTERLINE SMH SEWER MANHOLE INV INVERT SCO SEWER CLEANOUT SD STORM DRAIN SDMH STORM DRAIN MANHOLE MH MANHOLE EXIST EXISTING CB CATCH BASIN ELEV ELEVATION JB JUNCTION BOX R/W RIGHT OF WAY SCP STREET CONSTRUCTION PLAN T.D.M. 363.22 TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION s CONSTRUCT SEWER PER CITY STANDARDS ® CONSTRUCT SEWER MANHOLE TYPE "A' PER C.O.B. STD. S-7. CONSTRUCT SEWER CLEANOUT PER C.O.B. STD. S-20. 4STUB AND CAP FOR USE IN PHASE 2 EVANSBURG AVE. SEE SHEET 4 f I HI I I ; W i I 12 I > I I I 31 > w II q W I M CA =�--- / E 6" SEWSER /1 100.00' i / -- --, b 19. 00 z \\ 10 O --615- II - \ N a I Jm \ (� f� I J L..1w I Z \ UJI a> \ Tri i� 3 CMZ •" I m w \ ZOWLnZ ZOv)3 I N 8I lJ CU U \ I n c + � W JO I La-* cn `n 00 00 00 1 cn++ Q on I`- i� Iw-ch^ ZI J c F---�_- NN - -- -- --�_ ,. BIDWELL DRIVE 'L f8" WATER �- " E, d\INVERT 6" SEWER INVERT 8 SEWER _ (` to � ,) 0 3 z cn o 0 z of Ln �'^' INVERT 18" ORAIN� o ") 00 � o "' 00 � O "� +Z �qq� zJ z-� ZJ �4- vs•' wU ZZz WU zz Z RJ NQCr �z z0 Z W� GF7 uj Z ¢� � W co �t1 w W I WaL°N 3¢ W W W 3¢ W W 3¢ W T o a ' W J J J W H J J W J ¢ Q cn to w w w cn cn w w INSTALL 100.00 LF OF N N W ��iGw2,i`' INSTALL 350.16 LF OF 8" PVC ® 0.25% INSTALL 153.28 LF OF 8" PVC ®0.25% 6" PVC ® 1.00% 13+00 14+00 15+00 16+00 174 00 18+00 19+00 (STA. 10+00.00 TO 12+19.711) SCALE: 1" = 50' HORIZONTAL SCALE: 1" = 5' VERTICAL CONSTRUCT STORM DRAIN PER CITY STANDARDS ® CONSTRUCT STORM DRAIN MANHOLE TYPE "A" PER C.O.B. STD. S-7. -fj- CONSTRUCT CATCH BASIN TYPE "A' PER C.O.B. STD. S-12. NOTES 1) ALL CATCH BASINS ARE TO BE TYPE "A" WITH 3.5' OPENINGS PER C.O.B. STD. S-12 UNLESS OTHERWISE' NOTED. 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS UNLESS OTHERWISE NOTED. SECTION D_SIGNATION: SECTION LETTER -- -- A _2 SHEET WHERE SECTION IS SHOWN a KwIslcm APMOVED 11W., ROGER A• McINrto51H R•c•E. 3332.2 pgrTF APPROVED BY, . DAA IDAmEt, PADIaA Ccs 0009 EXP 9/3o/ig 348 344 340 336 W q M CA (STA. 10+00.00 TO 12+19.713) r i SCALE: 1" = 50' HORIZONTAL b O N N (� f� 3 CMZ •" Z 3En z ZOWLnZ ZOv)3 w lJ II :; > °o W JO x °o ao W� JO `n 00 00 00 W� `° ao aD 3 i� II W 2 J = J N = J O ww> Z > j> zCJ >>> ' zd> ° �' z .-i m _zZz ^zzz m�zzLJ od z LL: .O moo' Z z z M if) ' �. x u U-1 <� 0:)+ W N J of D+ Illyam,+ TJ �+ O D+ N S ¢ V) M W Kr])) z r IWW4 lt` t0 (n U ►- Of > •itaw 0'_ oa > » www 0¢ » > www 0_ oa ww F ¢ U OW JI- z o W JJJ W w w HI- cn JJJ cn w w w HH N JJ cn w w APPROXIMATE FINISHED GRADE ®CE:NTERLINE INSTALL 36.12 LF OF INSTALL APPROXIMATE FINISHED GRADE ®CENTERLINE 40.44 LF OF 01� 0 �. 18" RCP 00,44% 18" RCP p T 0,M• 1 pM 0, 1 S / 0 0.12% INSTALL 129.86 LF OF 18" RCP ® 0.12% 348 • - 3R1? 'L f8" WATER �- " E, d\INVERT 6" SEWER INVERT 8 SEWER _ (` to � ,) 0 3 z cn o 0 z of Ln �'^' INVERT 18" ORAIN� o ") 00 � o "' 00 � O "� +Z �qq� zJ z-� ZJ �4- vs•' wU ZZz WU zz Z RJ NQCr �z z0 Z W� GF7 uj Z ¢� � W co �t1 w W I WaL°N 3¢ W W W 3¢ W W 3¢ W T o a ' W J J J W H J J W J ¢ Q cn to w w w cn cn w w INSTALL 100.00 LF OF N N W ��iGw2,i`' INSTALL 350.16 LF OF 8" PVC ® 0.25% INSTALL 153.28 LF OF 8" PVC ®0.25% 6" PVC ® 1.00% 13+00 14+00 15+00 16+00 174 00 18+00 19+00 (STA. 10+00.00 TO 12+19.711) SCALE: 1" = 50' HORIZONTAL SCALE: 1" = 5' VERTICAL CONSTRUCT STORM DRAIN PER CITY STANDARDS ® CONSTRUCT STORM DRAIN MANHOLE TYPE "A" PER C.O.B. STD. S-7. -fj- CONSTRUCT CATCH BASIN TYPE "A' PER C.O.B. STD. S-12. NOTES 1) ALL CATCH BASINS ARE TO BE TYPE "A" WITH 3.5' OPENINGS PER C.O.B. STD. S-12 UNLESS OTHERWISE' NOTED. 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS UNLESS OTHERWISE NOTED. SECTION D_SIGNATION: SECTION LETTER -- -- A _2 SHEET WHERE SECTION IS SHOWN a KwIslcm APMOVED 11W., ROGER A• McINrto51H R•c•E. 3332.2 pgrTF APPROVED BY, . DAA IDAmEt, PADIaA Ccs 0009 EXP 9/3o/ig 348 344 340 336 I� 332 ,¢ ILLI IraZ _ < .j Lu W Ix � = ID,I CL 2ujto Itn cm aY iz No C �' ` < Z Exp. 6 - CIV L CIVIL it� a lW Inc o IGu N ILIw110 '^ o (VJ 0 SCALE: SSI ALE 25 0 - 50 100 50 12.5 I N- �'�CO�#C3 q M i b d t/ lJ N N ' V) }. + od Ln x u U-1 <� z I'. J F �o u I� 332 ,¢ ILLI IraZ _ < .j Lu W Ix � = ID,I CL 2ujto Itn cm aY iz No C �' ` < Z Exp. 6 - CIV L CIVIL it� a lW Inc o IGu N ILIw110 '^ o (VJ 0 SCALE: SSI ALE 25 0 - 50 100 50 12.5 I N- �'�CO�#C3 CONSTRUCT 6' CHAINLINK FENCE MATH MOW CURB AND REDWOOD PER C.O.B. STD. S-10 L f CONSTRUCT 6' TEMPORARY CHAINLINK FENCE DRAINAGE RETENTION BASIN �� 14.5' ACCESS ROAD 2% SLOPE 346 342 338 334 13.6' ACCESS ROAD 348 SLOPE 344 340 336 .00' 332 A SECTION 6 SCALE: 1" = 50' H ORI Z. 1" = 5' VERT. 15.40' x 6' CHAINLINK FENCE x PAD 2:1 SLOPE 127 -SLOPE B SECTION 6 SCALE: 1" = 50' VERT. E'CORD DRAWIh /- �- W��- r")� I rn P�2 �t IE QEeCAA�^nATG�K (�F 5cr_ MSc.' ffXW gfpf . -r -r4 r= O N DeNM/►C,f"8/�SI� SM►lL BE OVEefCCAVA--rED `ro 4. 'r-,I-rM H O CF fC- FE' $EIOW Ek6rIM¢ Gf/!pE' AAW Shc F14L Wn4 GLVAAl LEGEND: m c+csA%coyv 'Fie> As sp Ok-SW w-r+e WAIl�D ��Ls - a. si lctc 4-r la / sTo ABBREVIATIONS 6vsveP r JLA u/►'f G "Mgr-"'ClPeWfi W ; " ,v` `' ✓q 5�1 DA cL rs �s A e�jacf�, CL CENTERLINE SMH SEWER MANHOLE CONSTRUCT STORY DRAIN PER CITY STANDARDS .�►�S $. uf�J 'Tis VE CA j(TE �04^4 CWsrRuGrpnl c-rSC,H p. U a INV INVERT SCO SEWER CLEANOUT SD STORM DRAIN SDMH STORM DRAIN MANHOLE 0 CONSTRUCT STORY DRAIN 'A' Z u- I Z MH MANHOLE EXIST EXISTING MANHOLE TYPE PER C.O.B. STD. S-7. J < I o C -00-18 CB CATCH BASIN ELEV ELEVATION CONSTRUCT CATCH BASIN v , JB JJNCTION BOX R/W RIGHT OF WAY TYPE 'A' PER C.09. STD. S-12. J' ClVl1- SCP STREET CONSTRUCTION PLAN 4" �u,( T�TFOF NOTES 1) ALL CATCH BASINS ARE TO BE TYPE "A" CAL�F��� TQM, 363.22 TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION WITH 3.5' OPENINGS PER C.O.B. STD. S-12 UNLESS OTHERWISE NOTED. N W L`'�`V�I TI 2) ALL PIPE ELEVAONS SHOWN ARE INVERT ELEVATIONS o m Z < O s CONSTRUCT SEWER PER CITY STANDARDS UNLESS OTHERWISE NOTED. SCALE: VARIES SECTION DESIGNATION: ® CONSTRUCT SEWER MANHOLE TYPE 'A' PER C.O.B. STD. S-7. SECTION � R 25 0 Tao A ® CONSTRUCT SEWER CLEANOUT -i -- -- 50 12.5 PER C.O.B. STD. S-20. 2 SHEET *IERE SECTION IS SH m E'CORD DRAWIh /- �- W��- r")� I rn O N H O m tf OZ00 U a s Z u- I Z < J < I v W � 4" �u,( �; acv N W rm o m Z < O w Y W U r� m v 4" 0 z O cn ! Ld vis v, u� a.: c a o no 300 o z r- J cD Z Lu 3 cn ¢_j >Q z Ln w: (n w i L[) oo 00 a0 a0 354 0o w C) O n M M < �U II N uriZ M j z �W I Z�¢ pill N .W _jz I 2 m J (D 3 O_On :� O J M `, � � O ZN Lnz D 0 C3 L) O � O_ JQ < i rr Z 6 a` cD5``""�a —o O Uw Z -IC o4= U L(i (n O + + O O W O 'i rrrj W Z I W MO OU 0000 ZN Q _ ZN +I+ M M Quj QM �' V) (n c�c�nzo L_>j (n c m a O ¢IQ o Q�CL U_j W J 18 DRAIN c~n a c~n c~n 00 o z �' - - - SEE PHASE 2 GRADE AT CENTERLINE (n 18" DRAIN 81, SEWER 8" SEWER SEE PHASE 2 715' WIDE SEWER 1I Q EASEMENT TO C.O.B. PER DOC. NO. na01,►t,10C, w y Cn BISCAYNE DRI SEE PHASE 2 w � 11 O p l- r1 � r 2 JM fl C:),— OHO ~ M J z J nZ � NOS 1I O WLF- O O ' > C7 >- LAJ Z �' a C ) o�z uj nno�QfLu5 c � Mol � cD IU) °i Lu OO M I CL c, O 1� cD w I N M M 7r) M OJ W MW IWQO� 000 I �W F+ _ 01 L" -Lo +� I ,QL�LJT -� I +00 7M U M -JN Q- �- oo'aO O H Q W af 00 CD < Mw p (D Io� 0 1 3 mt% <� oo I o t¢ IU Q M s 00 Q v) I. in N (n (A I < m w00 r- 1— 00 T-< -7, o co Cn C� cn Z p r Z (n U D I (n (n ' - � - - N00'S3.12-•E o 0 18" DRAIN S81'46'3"E 25.35' 1 30 u � 1- r w __ a' O ODCD M I J Ln o II w JW Z_jII� S CU V) CU >J W Z J cD (D Q M Li r--: r-� M O J r\ r` M L_ � MM U MJU) ¢ M tY 360 INSTALL 10.00 LF OF 18 RCP 0 S=-0.12% 358 18" DRAIN 8" SEWER L5' -w— ALONDRA DRIVE SEE SHEET i�■iri7 300 o z r- J cD Z Lu 3 cn ¢_j >Q z Ln w: II i L[) oo 00 a0 a0 354 0o .—z C) O n M M 344 O I N uriZ M j z �W I Z�¢ pill J .W _jz I 2 UD Z UW W 3 O_On :� _Z i `n J M `, � V)n O ZN co to +M D � ao Q w < i rr L(7 U•) cn N N O _'I O Lo w Li 22 !, M ¢¢ 1 O CD (D U (D -1 (n y (~nom M I `f QQU W MW Qow w ��> ¢ I cn V) (n c�c�nzo QWWL� �JJ_j 6-h-0 I_ 257.68 L1;8" DRAIN --•__� i I N12'11'21 "E 25.43' PHASE BOUNDARYI STA. 14+72.74, C.L. I II 42 Lo Cl L6 Cr z Or- o U-1 cnin J_ ,J_ r 1 I -- -- 00 0AL. NDRIA'�A SEE SHEET 3 zo VARDEN STREET 356 of o z r- J cD Z Lu 3 cn ¢_j >Q z Ln w: O i L[) oo 00 a0 a0 354 0o .—z 350 346 M 344 UZiU Q � Z W U) z �W M (n w(o Djjjj Z Z Z Z 352 _jz cc z ����n,o W O_On N ¢ �NtDCON NN O ZN co to +M D cD C7) Q) cD +MMMM 350 Q w M M m M M M M M 22 !, M ¢¢ j W of O > > > > g J J J J 348 (~nom N W �,(nWW W W 346 344 r 342 I i� 340 338 336 i. 334 O 332�Z O � 330 ,w "Z z a o to 328`o Z N + rr� Q M 1 326 No-i(nW (STA. 13+15.16 TO 6+30.32) SCALE: 1" = 50' HORIZONTAL " INSTALL 25.43 LF OF RCP ® S=0.12% d' pJ of Z U(w 356 ¢_j >Q w 356 352 354 o MM 4 cn 350 346 M 344 CU Lj Q � Z W U) z 342 M (n w(o O M<0 W M a0 Z = O+ W O Z V) W + cD + Cn NN H J z z IN ' 00 D Q ANN ¢ Ln c')Q6 + N) " INSTALL 25.43 LF OF RCP ® S=0.12% d' pJ 362 358 360 356 358 354 356 352 354 350 352 4 cn 350 346 348 344 346 oo � Z W U) 340 342 M (n O'n a0 00 03 338 04 M a0 Z = J Ujjy > O Z J (I W .- C_jWw> 330 Z Z z Of 324 J z z IN ' 00 D Q N W M F O ¢ Ln c')Q6 + N) 22 !, M O J LD WCn'-d- p CD OI z 2 C) +Lo LD (nCn nO O Q U w ��> ¢ __j _< W > Q U QWWL� �JJ_j ¢1 U Q�CL U_j W J `n APPROX. FINISHED L/)`LJ`dL-1 �' �' (nz M w GRADE AT CENTERLINE —INV. 8" SEWER V. 18" DRAIN CONTRACTOR TO HAVE INVERT AND TOP OF PIPE SURVEYED PRIOR TO BACKFILLING. 324 322 13+00 14+00 LEGEND: ABBREVIATIONS CL CENTERLINE SMH SEWER MANHOLE INV INVERT SCO SEWER CLEANOUT SD STORM DRAIN SDMH STORM DRAIN MANHOLE MH MANHOLE EXIST EXISTING CB CATCH BASIN ELEV ELEVATION JB JUNC11ON BOX R/W RIGHT OF WAY SCP STREET CONSTRUCTION PLAN T0•M 363.22 TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION s CONSTRUCT SEWER PER CITY STANDARDS ® CONSTRUCT SEWER MANHOLE TYPE "A" PER C.O.B. STD. S-7. ® CONSTRUCT SEWER CLEANOUT PER C.O.B. STD. S-20. NOTES 0 S=0.25% 15+00 16+00 (STA. 13+15.16 TO 16+30.32) SCALE: 1" = 50' HORIZONTAL SCALE: 1" = 5' VERTICAL INV. 18" DRAIN i rn ap iCD OLiIJN N Ci � 00 00 Z U» L.LJ i z z N J O M�� Z+ Q of � l¢WW N (n W W CONSTRUCT STORM DRAIN PER CITY STANDARDS ® CONSTRUCT STORM DRAIN MANHOLE TYPE "A" PER C.O.B. STD. S-7. CONSTRUCT CATCH BASIN TYPE "A" PER C.O.B. STD. S•-12. 1) ALL CATCH BASINS ARE TO BE TYPE "A" WITH 3.5' OPENINGS PER C.O.B. STD. S-12 UNLESS OTHERWISE NOTED. 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS UNLESS OTHERWISE NOTED. SECTION DESIGNATION: SECRON LETTER ------ A 2 SHEET WHERE SECTI(N IS SHOWN 17+00 360 362 358 360 356 358 354 356 352 354 350 352 348 350 346 348 344 346 342 344 340 342 338 340 336 338 334 336 332 334 330 332 328 330 326 J Z M W. J 324 M LL: v) J 322 cD LD t� "r) INSTALL 15.31 LF OFINSTALL 25.35 LF OF 18" RCP ® S=0.13%_� F18" RCP ® !3=0.112% APPROX. FINISHED ----I GRADE -.1 INV. 18" DRAIN I w W Z W 0 Q� Q Com' I INSTALL_ PIPE SADDLE 1 ±0.40 PER C."1.B. DETAIL D-18. SECTION A SCALE: 1" = 50' HORIZ. 7 1" = 5' VERT. REVISION _ C APPROVED BY: ROGER A. McINTOSH R.C.E. 33322 DATE REVISION APPROVED BY: MARI AN 91 AW -�--r. =21 F6 DATE 1JAW1EL PPOILLA <eCE67Qod '-W '9130119 362 360 358 356 354 352 350 348 346 344 342 340 338 336 334 332 330 05 -If -17 SCALE: 1 "=5 25 0 50 100 50 12.5 ORD DRAW10%) �.a-�$�� a) o 04 D< cr o 0 Z jp 0 0 of zr Z OW a ¢J o w U 00 - w u) in O L� SD O V) N o_ m W in p W } U cn n v C-4 1 i pn L. ZJ x /W 0 I. ODM J Oar ) OM r� i Z (n LLJ 3 O O i+) l ON IIs M > 00 O 2 2 00000000 L11ON' IIs M j 00 o 1w O _j IILLJ Z Lj > W > = (J Lj » » Z c3 Z_ J Z O W J co Z Z Z Z O Z J Z M W. J N Q M LL: v) J Z cD LD t� "r) Cn Q M L+- u) cn CD Q n N N (D LD m C) J -) U MJ(nM Q U �'')-JtnM <12J Q U w ��> I^ i�MMMM jjjj Q U - > Q t1_ F_OWJ InZLW OIF_ (nNWWWW JJJJ w �OriJ 1 (nZt=JW APPROX. FINISHED ----I GRADE -.1 INV. 18" DRAIN I w W Z W 0 Q� Q Com' I INSTALL_ PIPE SADDLE 1 ±0.40 PER C."1.B. DETAIL D-18. SECTION A SCALE: 1" = 50' HORIZ. 7 1" = 5' VERT. REVISION _ C APPROVED BY: ROGER A. McINTOSH R.C.E. 33322 DATE REVISION APPROVED BY: MARI AN 91 AW -�--r. =21 F6 DATE 1JAW1EL PPOILLA <eCE67Qod '-W '9130119 362 360 358 356 354 352 350 348 346 344 342 340 338 336 334 332 330 05 -If -17 SCALE: 1 "=5 25 0 50 100 50 12.5 ORD DRAW10%) �.a-�$�� a) o 04 D< cr o 0 Z jp 0 0 of zr Z OW a ¢J o w U 00 - w u) in O L� SD O V) N o_ m W in p W } U cn n v C-4 1 i pn L. ZJ x /W 0 I. N l ZV OI co Ld I^ w w N tCM W Cl a �iN o;o cri z Q. sl a. Z' 0W co ' W 6Ll f�Nco J Z �•W a� p z� m LLI juj�l Vd