Loading...
HomeMy WebLinkAbout1.2-6760LEGEND. CONSTRUCT SEWER PER CITY STANDARDS ABBREVIATIONS CL CENTERLINE INV INVERT SD STORM DRAIN MH MANHOLE CB CATCH BASIN JB JUNCTION BOX SMH SEWER MANHOLE SCO SEWER CLEANOUT SDMH STORM DRAIN MANHOLE EXIST EXISTING ELEV ELEVATION R/W RIGHT OF WAY r 0-M- 363 22~_ TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION • s CONSTRUCT SEWER PER CITY STANDARDS CONSTRUCT SEWER MANHOLE TYPE "A" PER C.O.B. STD. S-7. CONSTRUCT SEWER CLEANOUT PER C.O.B. STD. S-20. CONSTRUCT STORM DRAIN PER CITY STANDARDS CONSTRUCT STORM DRAIN MANHOLE TYPE "A" PER C.O.B. STD. S-7. Istr CONSTRUCT CATCH BASIN TYPE "A" PER C.O.B. STD. S-12. W_ WATER LINE SHOWN AT LOCATIONS OF PIPE CROSSINGS MULTIPLE UTILITY TRENCH q SEWER MAIN 4' R 5' q TYP. JIN MP AN *S" 5 �; HE CURBTYP. m ABOVER LETERAL I sawl 7' MAX. ° TYP. IWIN e LATERAL (TYP) ON DEEP SEWER, SLOPE LATERALS TO LOT LINE SO THAT THE END OF ~ LATERAL IS WITHIN REQUIRED TOLERANCE, q R. 4' WATERLINE Y FINISHED STREET -' GRADE Al 36" TYP. 1% MIN. ..- _�------ TSET LATERAL (TYP) LATERAL PROVIDING PROPER CLEARANCE UNDER WATERLINE AND UTILITY TRENCHES NOTE:• O. TO VERIFY THAT WATER DETAIL MAIN AND SEWER LATERAL CROSSINGS TYPICAL l! SEWER LATERAL F !. ! ! O ARE IN CONFORMANCE .. CALIFORNIA •n+ HEALTH CODE REQUIREMENTS. FOR SHALLOW INSTALLATIONOF '• CROSSTHE SEWER LATERALS MUST OVER THE WATER OR UTILITY TRENCH. THESE INSTALLATIONS MUST RECEIVE SPECIAL TREATMENT FOR LATERALS MEN CROSSING , ABOVEA SEWER LATERAL CROSSING # CONTINUOUS 20' SECTION OF CLASS 200 (DR 14 PER AWWA C900) PLASTIC PIPE OR EQUIVALENT, CENTERED ON THE PIPE •: r i. BEING r s 28 r ti fi c nnr-1r----1 VICINITY MAP CITY OF BAKERSFIELD KERN COUNTY CALIFORNIA SEWER. & STORM DRAIN PLANS FOR T ACT NO. TRACT No. 5290 UNIT 3 , BK. 56, I'Ga 131 TAFT HIGHWAY • • i PROJECT MAP SCALE: 1 "=200' SHEET ® INDEX WA us ' ► ii iii SHEET TI TLE 1. COVER SHEET 2. NOTES & SPECIFICATIONS 3. KANOSH COBBLE DRIVE 4® AGASSIZ ROCK WAY SEMS IMPROVEM NTS JQTAL 6" SEWER LINE 941 LF 7 MAX. 8" SEWER LINE 165 LF 4" LATERALS 1266 LF STANDARD MANHOLE 4 EA SEWER CLEAN OUT 1 EA w,! DRAIN LINE 900 LF DRAINSTORM CATCH B. NOTE: PRIOR r• • START • ANY PHASE CONSTRUCTION, CONSTRUCTION Ii INSPEC11ON DEPARTMENT 24 HOURS • • 326-3049 2. ALL MATERIALS SUPPLIED FOR THIS PROJECT WILL REQUIRE A CERTIFICATE OF COMPLIANCE STATING THAT THE REQUIREMENTS & STANDARDS� SET FORTH BY THE CITY OF BAKERSFIELD HAVE BEEN 3. NO CITY INSPEC11ONSBE GIVEN FOR THE WORK IN THIS AREA UNTIL A STREET PERMIT WITH APPROPRIATE rir•rr,, SECURITY INSURANCE HAS BEEN OBTAINED. ENGINEER'S STATEMENT THESE PLANS AND SPECIFICATIONS WERE PREPARED BY ME OR UNDER MY DIRECTION AND TO THE BEST OF MY KNOWLEDGE AND BELIEF COMPLY WITH CITY OF BAKERSFIELD ORDINANCES, STANDARDS, AND DESIGN CRITERIA AND INCLUDE ALL IMPROVEMENT REQUIREMENTS OF THE ADVISORY AGENCY OR OTHER REVIEW BOARD. ANY ERRORS, OMISSIONS, OR VIOLATIONS OF THOSE ORDINANCES, STANDARDS, AND DESIGN CRITERIA ENCOUNTERED DURING CONSTRUCTION SHALL BE CORRECTED AND SUCH CORRECTIONS REFLECTED ON CORRECTED PLANS SUBMITTED TO THE CITY ENGINEER. BY: GREGG A. BUCKLE R.C.E. 41845 p■► a ai d APPROVED BY: NICOLAS FIDLER, PUBLIC WORKS DIRECTOR O 61069 EXP. 12-31-18 r • *- TOP OF CONCRETE MONUMENT IN LAMPHOLE AT THE EAST END OF AGASSIZ ROCK WAY, ELEVATION = 347.12' (U.S.G.S. DATUM NAVD 88) (PER TRACT 6491 MONUMENT ELEVATION MAP) BASIS QF BEARINGS: THE BEARING OF N 89'04'29" W SHOWN FOR THE SOUTH LINE OF THE SOUTHEAST QUARTER OF SECTION 34, T. 30 S., R. 27 E. SHOWN ON TRACT NO. 6491 PHASE 3, M. BOOK 58, PAGE 91 WAS USED AS THE BASIS OF BEARINGS SHOWN HEREON. THE EAST HALF OF THE WEST HALF OF THE SOUTHWEST QUARTER OF THE SOUTHEAST QUARTER OF SECTION 34, TOWNSHIP 30 SOUTH, RANGE 27 EAST, MOUNT DIABLO MERIDIAN, AS PER THE OFFICIAL PLAT THEREOF ON FILE IN THE OFFICE OF THE SURVEYOR GENERAL. EXCEPTING THEREFROM THE WEST 208 FEET OF THE SOUTH 225 FEET OF THE EAST HALF OF THE WEST HALF OF THE SOUTHWEST QUARTER OF THE SOUTHEAST QUARTER OF SECTION 34, TOWNSHIP 30 SOUTH, RANGE 27 EAST, MOUNT DIABLO MERIDIAN, AS PER THE OFFICIAL PLAT THEREOF ON FILE IN THE OFFICE OF THE SURVEYOR GENERAL. loellll��11' m ��IIIIIIII UNDERGROUND SERVICE ALERT (USA) SHALL BE NOTIFIED AT LEAST 2 WORKING DAYS BEFORE CONSTRUCTION. TELEPHONE 1-800-227-2600. CONTRACTOR TO CALL FOR USA LOCATE AND POTHOLE ALL MARKED UTILITIES THAT CROSS OR ARE WITHIN 5' HORIZONTAL DISTANCE OF SEWER AND STORM DRAiN LINES. VERTICAL AND HORIZONTAL LOCATION SHALL BE ASCERTAINED BY THE CONTRACTOR AHEAD OF ANY EXCAVATIONS TO VERIFY THAT THE PROPOSED DESIGN DOES NOT CONFLICT WITH ANY UTILITIES. iN THE EVENT A CONFLICT EXISTS THE ENGINEER SHALL BE NOTIFIED IN ORDER TO REDESIGN THE ALIGNMENT. IF RELOCATION OF EXISTING UTILITIES IS DEEMED NECESSARY THE CONTRACTOR SHALL BE COMPENSATED FOR INSTRUCTED RELOCATION. IF REDESIGN OF THE ALIGNMENT REQUIRES ADDITIONAL FITTINGS, PIPE OR EXCAVATION THE CONTRACTOR SHALL BE COMPENSATED FOR REVISION. IN THE EVENT A UTILITY IS DAMAGED THE CONTRACTOR SHALL BE WHOLLY RESPONSIBLE FOR ITS REPAIR. CONTRACTOR SHALL VERIFY LOCATIONS AND ELEVATIONS OF EXISTING SEWER LINES THAT THE NEW SYSTEM TIES INTO PRiOR TO TRENCHING. ANY DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER SO THAT ANY NECESSARY ADJUSTMENTS MAY BE MADE. UTILITIES SHALL BE THOROUGHLY RESEARCHED AND LOCATED BY CONTRACTOR PRIOR TO TRENCHING. CROSSING UTILITIES SHALL BE DAYLIGHTED AND CHECKED FOR GRADE, BY CONTRACTOR PRiOR TO TRENCHING. ALL EXISTING IMPROVEMENTS, (CURB, GUTTER, SIDEWALK, CROSS GUTTER, FENCES, ETC.) THAT ARE REMOVED, DAMAGED, UNDERCUT OR THAT DO NOT MEET CURRENT C.O.B. STANDARDS SHALL BE REPAIRED OR REPLACED AS DIRECTED BY THE CITY ENGINEER. ALL EXISTING PAVING AND SURFACING REMOVED, DAMAGED OR UNDERCUT SHALL BE REPLACED IN ACCORDANCE WITH THE CiTY OF BAKERSFIELD STANDARD DRAWING ST -6, EXCEPT AS NOTED ON PLANS. STAMP AN "S" INTO THE CURB FACE OVER EACH SEWER LATERAL AN OPEN STREET PERMIT SHALL BE OBTAINED FROM THE CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT FOR ANY WORK PERFORMED WITHIN EXISTING ACCEPTED STREET RIGHT— OF—WAY. UNLESS SECURED BY AN IMPROVENT AGREEMENT, APPROVED INSURANCE AND SECURITY BASED ON AN APPROVED ENGINEER'S ESTIMATE FOR THE WORK PERFORMED WITHIN THE RIGHT—OF—WAY SHALL BE POSTED PRIOR TO ISSUANCE OF THE PERMIT COMPACTION TESTS SHALL BE THE RESPONSIBLITY OF THE DEVELOPER/CONTRACTOR. THE NUMBER AND LOCATION OF REQUIRED TESTS SHALL BE DETERMINED BY THE CITY ENGINEER 2. STANDARD DETAILS THE FOLLOWING CITY OF BAKERSFIELD STANDARDS SHALL BE CONSIDERED PART OF THESE PLANS: D-11, D-14, D-16, D-18 SW -1, SW -2, SW -3, SW -4, SW -5, SW -6, SW -9, SW -11, ST -6, ST -22 3. VCP INSTAMT10 MATERIALS :. THE PIPE AND FITTINGS SHALL BE EXTRA STRENGTH VITRIFIED CLAY CONFORMING TO CURRENT ASTM SPECIFICATION C-700 AND SHALL BE INSTALLED IN CONFORMANCE WITH THE PROVISIONS OF SECTION 71 OF THE STANDARD SPECIFICATIONS OF THE STATE OF CALIFORNIA, DEPARTMENT OF TRANSPORTATION, CURRENT EDITION AND THE CURRENT ASTM SPECIFICATIONS C-12. THE PiPE AND FITTINGS FOR 6", 8", 10", AND 12" SANITARY SEWER MAiNS MAY BE PLAIN—ENO WITH COMPRESSION COUPLINGS CONFORMING WITH THE CURRENT ASTM SPECIFICATION C-425. EXCEPTING THAT A STAINLESS STEEL SHEAR RING AS MANUFACTURED BY MISSION CLAY PRODUCTS CORPORATION FOR THEIR "MAINLINE" BANDSEAL COMPRESSION COUPLING, OR APPROVED EQUAL, SHALL BE REQUIRED. THE PiPE AND FITTINGS FOR PRIVATE SANITARY SEWER HOUSE OR BUILDING LATERALS MAY BE PLAIN—END WITH COMPRESSION COUPLINGS CONFORMING WITH THE CURRENT ASTM SPECIFICATION C-425, (STAINLESS STEEL SHEAR RINGS ARE NOT REQUIRED) 4. ABS PIPE INSTALLATION MATERIALS : PIPE AND FITTINGS SHALL MEET THE REQUIREMENTS OF THE CURRENT ASTM SPECIFICATIONS D-2680 AND D-2751. PIPE AND FITTINGS SHALL BE HOMOGENEOUS THROUGH OUT AND FREE FROM CRACKS, HOLES, FOREIGN INCLUSIONS OR OTHER INJURIOUS DEFECTS. FITTINGS SHALL BE INJECTION MOLDED AND SHALL BE INSTALLED IN LiNE ON NEW PIPELINES; CUT—iN FITTINGS ARE NOT PERMITTED. JOINTS : USE ONLY SOLVENT WELDED JOINTS. THE ASSEMBLY OF JOINTS SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. WHERE ABS PIPE CONNECTS TO VCP, USE COUPLINGS APPROVED BY THE CITY OF BAKERSFIELD. INSTALLATION : PIPE AND FITTINGS SHALL BE INSTALLED IN ACCORDANCE WITH THE CURRENT ASTM SPECIFICATION D-2321. ONLY CLASS I, 11, AND III EMBEDMENT MATERIALS WILL BE CONSIDERED SUITABLE. 5, PVC PIPE INSTALLATION MATERIALS : PIPE AND FITTINGS SHALL MEET THE REQUIREMENTS OF THE CURRENT ASTM SPECIFICATION D-3034 FOR SDR35. PIPE AND FITTINGS SHALL BE HOMOGENEOUS THROUGHOUT AND FREE FROM CRACKS, HOLES, FOREIGN INCLUSIONS OR OTHER INJURIOUS DEFECTS. FITTINGS SHALL BE INJECTION MOLDED AND SHALL BE INSTALLED IN UNE ON NEW PIPELINES; CUT—IN FITTINGS ARE NOT PERMITTED. JOINTS : USE ONLY ELASTOMERIC GASKET JOINTS. THE ASSEMBLY OF JOINTS SHALL BE IN ACCORDANCE WITH THE MANUFACTURERS RECOMMENDATIONS WHERE PVC PIPE CONNECTS TO VCP PIPE, USE COUPLINGS APPROVED BY THE CITY OF BAKERSFIELD. INSTALLATION : PIPE AND FITTINGS SHALL BE INSTALLED IN ACCORDANCE WITH THE CURRENT ASTM SPECIFICATION D-2321. ONLY CLASS 1, 11, AND III EMBEDMENT MATERIALS WILL BE CONSIDERED SUITABLE. 6, REINFORCED CONCRETE PIPE WITH PVC LINING. REINFORCED CONCRETE PIPE WITH PVC LINING SHALL MEET THE FOLLOWING REQUIREMENTS: 1.A. MATERIALS. REINFORCED CONCRETE PIPE (RCP) SHALL BE EITHER CLASS IV OR CLASS V WITH WALLS "B' OR "C". RCP SHALL MEET ASTM C 76 FOR STRENGTH, ASTM C 361 OR AWWA C302 EXCEPT TEST PRESSURE SHALL BE 5 PSI FOR RUBBER GASKETS, AND LINER TESTS IN ACCORDANCE WITH THE FOLLOWING PARAGRAPHS. PIPE SHALL BE WET CAST, VIBRATED AND STEAM OR WATER CURED. JOINTS SHALL BE BELL AND SPIGOT DESIGN WITH A CONTAINED 0—RING GASKET. PVC LINER SHALL BE CAST INTO THE WALL OF THE RCP AND SHALL COVER 360' OF THE PIPE. ALL WOK FOR AND IN CONNECTION LITH THE INSTALLATION OF THE LINING IN CONCRETE PIPE AND FIELD SEALING AND WELDING OF JOINTS SHALL BE DONE IN STRICT CONFORMITY WITH ALL APPLICABLE SPECIFICATIONS, INSTRUCTIONS AND RECOMMENDATIONS OF THE LINING MANUFACTURER. LINER SHALL MEET THE FOLLOWING REQUIREMENTS. 1.B. PHYSICAL PROPERTIES OF LINER. ALL PLASTIC LiNER PLATE SHEETS, WELDING STRIPS AND OTHER ACCESSORY ITEMS, SHALL HAVE THE FOLLOWING PHYSICAL PROPERTIES MEN PP��TESTED AT 777 t5 (25-C t3 ). INITIAL 1_C`t TENSILE STRENGTH 2200 PSI MIN. 2100 PSI MIN. (15 MPA MIN.) (14.5 MPA MIN.) ELONGATION AT BREAK 200% MIN. 200% MIN. SHORE DUROMETER, TYPE D 1—SEC. 50-60 t5 (WITH RESPECT TO INITIAL TEST RESULT) 10—SEC. 35-50 t5 WEIGHT CHANGE i1.5 TENSILE SPECIMENS SHALL BE PREPARED AND TESTED IN ACCORDANCE WITH ASTM D412 USING DIE B. WEIGHT CHANGE SPECIMENS SHALL BE 1—INCH (25—MM) BY 3—INCH (75—MM) SAMPLES. SPECIMENS FOR TESTING OF INITIAL PHYSICAL PROPERTIES MAY BE TAKEN FROM LINER PLATE SHEET AND WELDING STRIP AT ANY TIME PRIOR TO FINAL ACCEPTANCE OF THE WORK, LINER PLATE LOCKING EXTENSIONS EMBEDDED IN CONCRETE SHALL WITHSTAND A TEST PULL OF AT LEAST 100 POUNDS PER LINEAR INCH (1800 KG/M), APPLIED PERPENDICULARLY TO THE CONCRETE SURFACE FOR A PERF OF ONE MINUTE, WITHOUT RUPTURE OF THE LOCKING EXTENSIONS OR WITHDRAWAL FROM EMBEDMENT. THIS TEST SHALL BE MADE AT A TEMPERATURE OF 70' — 80' F(21- — 27' C) INCLUSIVE. ALL PLASTIC LINER PLATE SHEETS, INCLUDING LOCKING EXTENSIONS, ALL JOINT, CORNER AND WELDING STRIPS SHALL BE FREE OF CRACKS, CLEAVAGES OR OTHER DEFECTS ADVERSELY AFFECTING THE PROTECTIVE CHARACTERISTICS OF THE MATERIAL. THE ENGINEER MAY AUTHORIZE THE REPAIR OF SUCH DEFECTS BY APPROVED METHODS. THE LINING SHALL HAVE GOOD IMPACT RESISTANCE, SHALL BE FLEXIBLE AND SHALL HAVE AN ELONGATION SUFFICIENT TO BRIDGE UP TO 1/4—INCH 6 MM SETTLING CRACKS, WHICH MAY OCCUR IN THE PiPE OR IN THE JOINT AFTER INSTALLATIONS, WITHOUT DAMAGE TO THE LINING. 1.C. CHEMICAL RESISTANCE OF LINER.* AFTER CONDITIONING TO CONSTANT WEIGHT AT 110 F(43 C), TENSILE SPECIMENS AND WEIGHT CHANGE SPECIMENS SHALL BE EXPOSED TO THE FOLLOWING SOLUTIONS FOR A PERIOD OF 112 DAYS AT 77' F t5 (25' C t3 ). AT 28—DAY INTERVALS, TENSILE SPECIMENS AND WEIGHT CHANGE SPECIMENS SHALL BE REMOVED FROM EACH OF THE CHEMICAL SOLUTIONS AND TESTED IN ACCORDANCE WITH SECTION 7-2.03(1.8) PARA. 2 ABOVE. iF ANY SPECIMEN FAILS TO MEET THE 112—DAY REQUIREMENTS BEFORE COMPLETION OF THE 1 i 2—DAY EXPOSURE, THE MATERIAL WILL BE SUBJECT TO REJECTION. 1 t1 i',1 # 1'# . r w r j r 1 i : f • t1 • i1 'r,r *THIS IS TO BE USED AS A PRE—QUALIFICATION TEST AND WHEN MATERIAL FORMULATIONS ARE CHANGED. **VOLUMETRIC PERCENTAGES OF CONCENTRATED C.P. GRADE REAGENTS® i , i ! • i • ; t i it/: » !, /. +' ! • • • THE LiNING SHALL BE INSTALLED WITH THE LOCKING EXTENSIONS RUNNING PARALLEL WITH THE LONGITUDINAL AXiS OF THE PIPE. THE LINING SHALL BE HELD SNUGLY IN PLACE AGAINST INNER FORMS. '! ! l: 1 i y• � i i t 1 f •t i :' r ''/ 1 • i ! f i i`„ i ` • i ! id i r i !r •r i 1 M ! •r• ri !` • r ' • ! f ! i r ,. r it ,• s s r ` !., i r ! 1r . - •. ,.: : , r: i. � r i r r ! r , • r ,,. •" MKINULTAMWA ! !••• r ! • ! ri • i h r r i, , ! A • r •• i it "i `' i r 1 • i# i •lw 1 + w 1 s! 1 i- • • • r r : • r' • . ! • ! • ! ,1 .. 1 • ;, � • --! .i is i, 1 i t ♦ • i i ml I# r , • . , - f! .tis «/ i !' r ' • � r 1 ! • 1 ` - w It. . r , ." i r , i • r ! r .. • 1 7. r • ' • ..� 1 i i r! • i .il, • is s. , . l - " • . ! . .. • s: r:. ! h r • 1 • • r � r • ! i r • r. r i • . } • # #• i ! i - • • i #• ! w - 'logIpma FLI i ♦ ' • i r ! f ! ;r w •# ! r • r r • :s # • • w • i r ry• •� : • r r. • r • COMPACTION OF SUBSEQUENT BACKFILL WITHIN TWO AND ONE—HALF (2-1/2) FEET OF FINISHED PERMANENT SURFACING GRADE SHALL BE ACCOMPLISHED BY TAMPING AND/OR ROLLING AS SPECIFIED ABOVE. WHERE THE TRENCH IS WITHIN THE PAVEMENT ON STREETS, THE BACKFILL WITHIN TWO AND ONE—HALF (2-1/2) FEET OF FINISHED PERMANENT GRADE SHALL BE COMPACTED TO NiNETY PERCENT (90%) RELATIVE COMPACTION. • T MI w v(i Wmz• y !. # •r IN NO CASE SHALL JETTING BE ALLOWED FOR BACKFILL COMPACTION WITHIN THE STREET. WHEN APPROVED BY THE ENGINEER, JETTING MAY BE USED IN NON—STREET AREAS. !r i i , i • • ! • ` ! i" !r !- •� • ! i r r ! • -• ! r r : • SEWER PIPE SHALL CONFORM TO THE PLANS, AND THESE SPECIAL PROVISIONS. THE PRICE PER LINEAL FOOT SHALL INCLUDE BUT NOT BE LIMITED TO EXCAVATION, BEDDING AND BACKFILL. HANDLING OF MATERIALS. ALL PIPE, FITTINGS, SPECIALS AND CASTINGS MUST BE CAREFULLY HANDLED AT ALL TIMES. ONLY SUITABLE AND PROPER EQUIPMENT AND APPLIANCES SHALL BE USED FOR THE SAFE LOADING, HAULING, UNLOADING, HANDLING AND PLACING OF MATERIALS, SPECIAL CARE SHALL BE EXERCISED SO THAT PREFORMED RESILIENT JOINTS ON PiPE AND FITTINGS WILL NOT BE DAMAGED. ANY PIPE OR FITTING NTH A JOINT DAMAGED OR FLATTENED WILL CAUSE THAT PIPE OR FITTING TO BE REJECTED. s • r- ir• i 1 . ! r • . i i • i i r • ! •. : ! r • • i ! • r' •ri r ."! `: •■ is rr! # •• •r r. • ,.3 • s A -. w s .i. w, r. , r a . • .i w i s • w r r 1 r i !" ! 1 !•1 � . i r• ! ' `. r r `i t • s w 11. SYSTEM TESTING t ! •. w.t • - • •• 1 i ! i i !! i• i• ! ! • � • .1 r. • i • • i SURFACE MARKERS FOR .SEWER LATERALS SHALL BE INSTALLED AT THE PROPERTY LINE OR RIGHT—OF— WAY LINE AS SHOWN IN THE "SEWER LATERAL MARKER" DETAIL, C.O.B. STD. DET. SW -1. LATERALS SHALL BE A MINIMUM OF 5<0' DEEP AND A MAXIMUM OF 7' DEEP AT PROPERTY LINE OR RiGHT—OF—WAY LINE AND A MiNIMUM OF 2.5' DEEP AT FLOWUNE. 13. ALL SEWER STUBS SHALL BE CLOSED WITH A STANDARD PLASTIC PLUG. SOLVENT WELDED. 14. ALL MANHOLES SHALL BE CONSTRUCTED IN ACCORDANCE 41111TH THE CITY OF BAKERSFIELD STANDARD DRAWINGS S-7, S-8, AND S--21 AND SECTIONS 70-1.02H AND 71-1.07 OF THE STANDARD SPECIFICATIONS OF THE STATE OF CALIFORNIA, DEPARTMENT OF TRANSPORTATION, CURRENT EDITION. ALL CLEANOUTS SHALL BE CONSTRUCTED iN ACCORDANCE WITH THE CITY OF BAKERSFIELD STANDARD DRAWING S-20. MANHOLES SHALL BE TYPE "A" FOR PIPES UNDER 48" IN DIAMETER AND TYPE "B" FOR PIPES 48" IN DIAMETER OR LARGER. UNLESS NOTED OTHERWISE. THE BOTTOM MANHOLE BARREL AT THE MANHOLE FOUNDATION SHALL BE SET ON A 2" MORTAR BED OR SET ON KENT—SEAL, IN A GROOVED FOUNDATION. 15. NORM DRAIN PIPE STORM DRAiN PIPE. CONTRACTOR SHALL UTILIZE RCP PIPE, CLASS Ill WITH RUBBER GASKET JOINTS PER ASTM SPECIFICATION C-76, UNLESS OTHERWISE NOTED ON THE CONTRACT PLANS. REINFORCED CONCRETE PiPE. REINFORCED CONCRETE PIPE SHALL CONFORM TO THE PROVISIONS IN SECTION 65, "REINFORCED CONCRETE PIPE", OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS. EXCEPT AS OTHERWISE DESIGNATED BY CLASSIFICATION ON THE PLANS OR IN THE SPECIFICATIONS, JOINTS FOR CULVERT AND DRAINAGE PiPES SHALL CONFORM TO THE PLANS OR SPECIFICATIONS FOR STANDARD JOINTS. HYDROSTATIC TESTS SPECIFIED BY SECTION 65-1.08 "LAYING SIPHON AND PRESSURE PiPE% OF THE STANDARD SPECIFICATIONS WILL NOT BE REQUIRED. REINFORCED CONCRETE PIPE SHALL HAVE RUBBER GASKETED JOINTS CONFORMING TO SECTION 65-1.06B, "RUBBER GASKETED JOINTS", OF THE STANDARD SPECIFICATIONS. HANDLING OF MATERIALS. ALL PIPE, FITTINGS, SPECIALS AND CASTINGS MUST BE CAREFULLY HANDLED AT ALL TIMES. ONLY SUITABLE AND PROPER EQUIPMENT AND APPLIANCES SHALL BE USED FOR THE SAFE LOADING, HAULING, UNLOADING, HANDLING AND PLACING OF MATERIALS, SPECIAL CARE SHALL BE EXERCISED SO THAT PREFORMED RESILIENT JOINTS ON PIPE AND FITTINGS WILL NOT BE DAMAGED. ANY PIPE OR FITTING WITH A JOINT DAMAGED OR FLATTENED WILL CAUSE THAT PIPE OR FITTING TO BE REJECTED. PiPE LAYING. NO PiPE SHALL BE LAID UNTiL THE ENGINEER INSPECTS AND APPROVES THE CONDITION OF THE BOTTOM OF THE TRENCH. PIPE SHALL BE INSTALLED IN STRICT ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. PIPE LAYING SHALL BEGIN FROM THE DOWNSTREAM END OF THE STORM DRAIN OR AS DIRECTED BY THE ENGINEER. PIPE LAYING SHALL PROCEED WITH EACH PIECE LAID TRUE TO LINE AND GRADE, AND IN SUCH A MANNER AS TO FORM A CLOSE CONCENTRIC JOINT WITH THE ADJOINING PIPE AND TO PREVENT SUDDEN OFFSETS IN THE FLOW LINE. AS THE WORK PROGRESSES, THE INTERIOR OF THE PIPE SHALL BE CLEARED OF ALL DIRT AND DEBRIS OF EVERY DESCRIPTION. PiPE SHALL NOT BE LAID WREN THE CONDITION OF THE TRENCH OR THE WEATHER IS UNSUITABLE. AT TIMES WHEN WORK iS NOT iN PROGRESS, OPEN ENDS OF PIPE AND FITTINGS SHALL BE CLOSED. WITH BELLED END PIPE, BELL HOLES SHALL THEN BE EXCAVATED AT EACH JOINT TO FACILITATE THE JOINT OPERATIONS, AND SHALL BE ONLY OF SUFFICIENT SIZE FOR THAT PURPOSE. IN ORDER THAT BELL HOLES MAY BE PROPERLY LOCATED, NOT MORE THAN SIX (6) HOLES SHALL BE EXCAVATED AHEAD OF ACTUAL PIPE LAYING, ON ACCOUNT OF THE VARIATIONS IN JOINT CONSTRUCTION OPERATIONS. THE CONTRACTOR SHALL MAKE PROVISIONS FOR PREVENTING FOREIGN MATERIAL FROM BEING FLUSHED INTO AN EXISTING STORM DRAiN LINE. CUTTING PIPE. THE CONTRACTOR SHALL PERFORM ALL WORK RK OF CUTTING PIPE AND SPECIAL CASTING NECESSARY TO THE ASSEMBLY, ERECTION, AND COMPLETION OF THE WORK. ALL PIPE SHALL BE CUT TO FIT ACCURATELY, WITH SMOOTH EDGES AND FACES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CORRECTNESS OF CUTTING AND NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR ANY MATERIALS WHICH ARE DAMAGED OR INCORRECTLY CUT. CASING OR SMOOTH OUTSIDE WALLED PIPE FOR BORED/JACKED PIPE SHALL BE INSTALLED. IT SHALL HAVE EVEN BEARING THROUGHOUT ITS LENGTH AND SHAH. SLOPE TOWARD ONE END. SPACE BETWEEN CASING AND PIPELINE SHALL BE BACKFILLED WITH SAND. IF THE PIPE AND CASING ARE INSTALLED BY BORING, THE SPACE AROUND THE CASING ALSO SHALL BE BACKFILLED WITH GROUT OR SAND. THE ENDS OF SPACE BETWEEN THE CASING AND THE PIPE SHALL BE SEALED WITH GROUT. THE STRENGTH OF PiPE DESIGNATED IN THE PLANS OR SPECIFICATIONS IS DETERMINED FOR VERTICAL LOAD ONLY ANY ADDITIONAL STRENGTH REQUIRED BY BORING/JACKING OPERATIONS SHALL BE FURNISHED AT THE CONTRACTOR'S EXPENSE. THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER FOR APPROVAL ALL PLANS OF BORING/JACKING OPERATIONS PRIOR TO BORING OR JACKING. BORING/JACKING OPERATIONS SHALL BE CONDUCTED IN A SAFE AND EFFICIENT MANNER, CONSISTENT WITH CURRENT ACCEPTED PROCEDURES. WATER BORING SHALL NOT BE PERMITTED. THE CASING PIPE SHALL BE JACKED WITH SUCH PRECISION THAT WILL ALLOW THE REPLACEMENT OF THE PIPELINE TO THE LINE AND GRADE AS INDICATED ON THE PLANS. UPON COMPLETION OF THE INSTALLATION OF THE CASING AND INSTALLATION OF THE PIPELINE TO GRADE, THE VOD BETWEEN THE CASING OR RC PIPE AND THE EXCAVATION SHALL BE COMPLETELY FILLED WITH SAND, COMPACTED BY THE USE OF AIR—BLOWING SAND EQUIPMENT OR ANY OTHER MEANS ACCEPTABLE TO THE ENGINEER UPON HIS APPROVAL. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN A SAFE OPERATION AT ALL TIMES. SHOULD THE TUNNEL HEADING OPERATIONS RESULT IN DANGEROUS OR UNREASONABLE SLOUGHING OF MATERIAL WHICH MAY JEOPARDIZE THE SAFETY OF WORKERS OR THE STABILITY OF THE SOIL AND ROADWAY ABOVE, THE CONTRACTOR SHALL FURNISH AND INSTALL BREASTBOARDING AND/OR FACE CLOSURE WITH SUFFICIENT JACKS TO AND THE SLOUGHING INHIBIT OR CLOSING THE WORK FACE. H / THE CONTRACTOR, BEFORE RESUMING WORK, SHALL FURNISH THE ENGINEER WITH A DETAILED PLAN OF PRECEDING WITH THE WORK, FOR HIS REVIEW AND APPROVAL. ANY AND ALL EXPENSES THEREFORE WILL BE CONSIDERED AS INCLUDED iN THE BID PRICE AND NO ADDITIONAL COMPENSATION WILL BE MADE THEREFORE. MINOR STRUCTURES. PORTLAND CEMENT CONCRETE MINOR STRUCTURES MALL CONFORM, iN DESIGN, MATERIALS, AND CONSTRUCTION, TO THE PROVISIONS OF SECTIONS 70-1.02 H OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS. MANHOLES SHALL CONFORM TO THE CITY OF BAKERSFIELD STANDARDS S-7 AND S-8. DROP INLETS SHALL CONFORM TO THE CITY OF BAKERSFIELD STANDARD S-12. TEMPORARY INLET GRATES SHALL CONFORM TO DETAILS ON THE PLANS. THE PRECAST CYLINDER, TAPER, AND ECCENTRIC FLAT TOP SECTIONS SHALL MEET THE STRENGTH REQUIREMENT OF ASTM. C-478. EACH SUCCESSIVE MANHOLE SECTION SHALL BE SET ON A BED OF PORTLAND CEMENT GROUT OR "KENT SEAL" TO MAKE A WATERTIGHT JOiNT, SHAM BE NEATLY POINTED ON THE INSIDE, AND SHALL BE SET PLUMB. SURVEY MONUMENT AND FRAME AND COVER WITH ENCASEMENTS SHALL BE ADJUSTED OR INSTALLED NEW TO FINISH GRADE AT THE LOCATIONS SHOWN ON THE PLANS, IN ACCORDANCE LITH THESE SPECIAL PROVISIONS, AND CiTY STANDARD S-29. THE SURFACE OF THE CONCRETE SHALL BE PROTECTED FROM PUBLIC TRAFFIC FOR A MINIMUM OF THREE DAYS. AT THE OPTION OF THE CONTRACTOR MINOR CONCRETE CONTAINING A MINIMUM OF SEVEN SACKS OF CEMENT PER CUBIC YARD MAY BE USED AND THE TIME REQUIRED FOR PROTECTION OF THE CONCRETE SURFACE FROM PUBLIC TRAFFIC SHALL BE REDUCED TO A MINIMUM OF ONE DAY. THE MONUMENT WiLL BE SET BY OTHERS. THE OWNER WILL PROVIDE SURVEYS. CONTRACTOR SHALL GIVE THE OWNER 24 HOURS NOTICE WHEN SURVEYS ARE REQUIRED. ANY MONUMENT FRAME OR COVER DAMAGED BY THE CONTRACTOR OR HiS OPERATIONS SHALL BE REPLACED BY THE CONTRACTOR AT NO COST TO THE OWNER. ��IIIIIIII SEWER '�mm LINE TABLE LINE SIZE BEARING DISTANCE L5 4" N 1412'28* W 67.28' L6 e N 62*30'08* E 48.85' L7 S 62*34!12* E SEWER LATERAL LINE TABLE LINE SIZE BEARING DISTANCE L5 4" N 1412'28* W 67.28' L6 e N 62*30'08* E 48.85' L7 S 62*34!12* E 62.10' L8 4- S 10-46'45- E 54.76 L9 e N 34-0920" E 52.39 Llo 4* S 70'41'20" W 51.93' L11 4" S 381 0'43" W 61.74! 352 TAFT HIGHWAY (NOT A PART) 11 CI l Kul EX. RESIDENCE li AFN: 532-040-03 if I 52! WIDE PRIVATE ACCESS EASEMENT PER SEPARATE INSTRUMENT ft 4, - 1:1 a 1►1 25 SEWER CLEANOUT NO. 1 STA. 10+39.67, C.L. Ko—off--= STA. 10+69.85, SEWER .2 ------------- • • 394.11LF_OF1lrRGJ-RCP ri 0 -0.12% INSTALL 261.153 LF OF 18* RGJ--RCP 0 0.12% V_ • • Kul EX. RESIDENCE li AFN: 532-040-03 if I 52! WIDE PRIVATE ACCESS EASEMENT PER SEPARATE INSTRUMENT ft 4, - 1:1 a 1►1 25 SEWER CLEANOUT NO. 1 STA. 10+39.67, C.L. Ko—off--= STA. 10+69.85, SEWER .2 ........... AGASSIZ ROCK WAY SEE SHEET 4 TRACT BOUNDARY 7 7— R/W 20' 26 T2'6 5 N _j C> C4 clq 'o 7b R/W _j I' ft) >: lb a Lqea i C> C) + co _j N lk ul a -g z 0 pl) w po Co oi 6 Cj LL- - W 4 cj 29 9 c:) 98 31 oa'c> 08 1 1 1 28 193 _8 3 7 6 0) oi 6 U3 g cr. 0 w 0; .6 pz 0) cn I-zo; Ed -4 a to W) Lff r,: gi I r_� 01 1 () i 3 N MC; co w —C-4 06�1: 1 C4 �1: C14 00 (tooLL:j U0, r- tal: I �g " w - P4 r- it♦ + C'4 a ®+ a 1 0 0 + 03 C-4 ac, !N N + C%4 to co + C4 + 00 -Im V_ Ile to. v- S4 + 9 N SN I <- 6 <* CD co + C-4 C14 + vy M 4 1114 1 0) N I �i z co 0) co cn z C-31 cn cn CS cn -i Q CTP �9_ �-.C: 16: <� I cn cn I Go 1; 1 Go 2 - 19.13 .� .1� (n cn cn cn z viz - cn z (n cn z 5.-7f' R/W_L f R/W w MONUMENT 4- Z 0 410 Z w ------------- • • 394.11LF_OF1lrRGJ-RCP ri 0 -0.12% ........... AGASSIZ ROCK WAY SEE SHEET 4 TRACT BOUNDARY 7 7— R/W 20' 26 T2'6 5 N _j C> C4 clq 'o 7b R/W _j I' ft) >: lb a Lqea i C> C) + co _j N lk ul a -g z 0 pl) w po Co oi 6 Cj LL- - W 4 cj 29 9 c:) 98 31 oa'c> 08 1 1 1 28 193 _8 3 7 6 0) oi 6 U3 g cr. 0 w 0; .6 pz 0) cn I-zo; Ed -4 a to W) Lff r,: gi I r_� 01 1 () i 3 N MC; co w —C-4 06�1: 1 C4 �1: C14 00 (tooLL:j U0, r- tal: I �g " w - P4 r- it♦ + C'4 a ®+ a 1 0 0 + 03 C-4 ac, !N N + C%4 to co + C4 + 00 -Im V_ Ile to. v- S4 + 9 N SN I <- 6 <* CD co + C-4 C14 + vy M 4 1114 1 0) N I �i z co 0) co cn z C-31 cn cn CS cn -i Q CTP �9_ �-.C: 16: <� I cn cn I Go 1; 1 Go 2 - 19.13 .� .1� (n cn cn cn z viz - cn z (n cn z 5.-7f' R/W_L f R/W w MONUMENT 4- Z 0 410 Z w 10+00 11+00 12+00 13+00 14+00 15+00 16+00 (STA. 9+80.00 C.L. TO 20+11.09 C.L.) SCALE: 1" = 50' HORIZONTAL SCALE: 1" = 5' VERTICAL 14-2m;Q10A CL CENTERLINE SMH SEWER MANHOLE INV INVERT SCO SEWER NOUT SD STORM DRAIN SDMH STORM DRAIN MANHOLE MH MANHOLE EXIST EASING Cb CATCH BASIN ELEV ELEVATION JB JUNCTION BOX R/W RIGHT OF WAY SCP STREET CONSTRUCTION PLAN mm mum =SM mm 'Qum mm PHASE BOUNDARY TRACT BOUNDARY TOP OF MMHOLE/TOP OF CLEANOUT ELEVATION S_ CONSTRUCT SM PER CITY STANDARDS STRUCTS MANH TYPE "A" PER C.O.B. STD. SW -4. momme— CONSTRUCT STORM DRAIN PER CITY STANDARDS 0 CONSTRUCT STORM DRAIN MANHOLE TYPE "A" PER C.O.B. SM. SW -4. CONSTRUCT CATCH BASIN atr TYPE "A" PER C.O.B. SM. D-14. NOTES 1) ALL CATCH BASINS ARE TO BE TYPE "A" WITH 3.5' OPENINGS PER C.O.B. STD. D-14. 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS UNLESS OTHERWISE NOTED. 5EC1ION DESIGNAMON; SECTM LETTER L - - — -_ 2 SHEET WERE SECTION IS SHOIAW— Koff � mel 344 340 ------------- INSTAIA 394.11LF_OF1lrRGJ-RCP ri 0 -0.12% INSTALL 261.153 LF OF 18* RGJ--RCP 0 0.12% V_ • • 10+00 11+00 12+00 13+00 14+00 15+00 16+00 (STA. 9+80.00 C.L. TO 20+11.09 C.L.) SCALE: 1" = 50' HORIZONTAL SCALE: 1" = 5' VERTICAL 14-2m;Q10A CL CENTERLINE SMH SEWER MANHOLE INV INVERT SCO SEWER NOUT SD STORM DRAIN SDMH STORM DRAIN MANHOLE MH MANHOLE EXIST EASING Cb CATCH BASIN ELEV ELEVATION JB JUNCTION BOX R/W RIGHT OF WAY SCP STREET CONSTRUCTION PLAN mm mum =SM mm 'Qum mm PHASE BOUNDARY TRACT BOUNDARY TOP OF MMHOLE/TOP OF CLEANOUT ELEVATION S_ CONSTRUCT SM PER CITY STANDARDS STRUCTS MANH TYPE "A" PER C.O.B. STD. SW -4. momme— CONSTRUCT STORM DRAIN PER CITY STANDARDS 0 CONSTRUCT STORM DRAIN MANHOLE TYPE "A" PER C.O.B. SM. SW -4. CONSTRUCT CATCH BASIN atr TYPE "A" PER C.O.B. SM. D-14. NOTES 1) ALL CATCH BASINS ARE TO BE TYPE "A" WITH 3.5' OPENINGS PER C.O.B. STD. D-14. 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS UNLESS OTHERWISE NOTED. 5EC1ION DESIGNAMON; SECTM LETTER L - - — -_ 2 SHEET WERE SECTION IS SHOIAW— Koff � mel 344 340 ------------- INSTAIA 394.11LF_OF1lrRGJ-RCP ri 0 -0.12% INSTALL 261.153 LF OF 18* RGJ--RCP 0 0.12% V_ • Z 19illlllll • wcI J toa 00 00 OD 00 00 w CD ;E 0 . CD Z Z z z z z o) b_-) o) Z z w 04 o d < w q %% 0 0; MMM z <..: - 0 0 0 +A 04 K) v- 1r) a re) po pf) 0) 0) W) jr OD ±+ ; W www LL _j _j > APPROXIMATE FIl IISHED ;2 www _j _j _j APP R)AMATE AED NISH ce > A nrin^w A ?rl flikiltl- r*f% cn (n w w 0 r nRAnr UJNE-- www .-I I GRAD-- 0 CENTYLINE r__ N n 11;000l A FINVAIAMAMIssu. GRADE 0 fulaft'll f -w CENTERL1 E 1-0� I -0-CENTE j 'Tf.'w r :•A ------- ................... Z., INVER, r 18" DRAIN -INVERT 1 Bs DRAIN 114VERT 6" SEWER L . . �INVERT INVERT 6" SEWER Now - ................ 6' SEWQ 0 0 0 w o zcn z U) �INVER,r 6" SEWER 0 (n r 9 t6. .to Lo R o4 > > C5 z _j . Q >; 00 t a co to C5 z co ;? I -oz W z z z w - W . to w x z b) IR — b) IR — W w zzz _j .___ 00. :co no) 06 od + to fn 00 in rek rei zv. t 17 Oi 0 >: + wr Lq Lq w >: >; 0 LJ (m) j• LJ INSTALL 83.4-5 LF OF 6" INS%L 81.59 LF OF 6" Lu W w _j www _j 0u) w SEWER 0 -1.00% WER 0 --1.00% IINSTALL 400.00 U* OF 6" 'KWER 0.50% on V) w w w INSTALL 376.18 LF OF e SEWEIt 0 -1.0)% 10+00 11+00 12+00 13+00 14+00 15+00 16+00 (STA. 9+80.00 C.L. TO 20+11.09 C.L.) SCALE: 1" = 50' HORIZONTAL SCALE: 1" = 5' VERTICAL 14-2m;Q10A CL CENTERLINE SMH SEWER MANHOLE INV INVERT SCO SEWER NOUT SD STORM DRAIN SDMH STORM DRAIN MANHOLE MH MANHOLE EXIST EASING Cb CATCH BASIN ELEV ELEVATION JB JUNCTION BOX R/W RIGHT OF WAY SCP STREET CONSTRUCTION PLAN mm mum =SM mm 'Qum mm PHASE BOUNDARY TRACT BOUNDARY TOP OF MMHOLE/TOP OF CLEANOUT ELEVATION S_ CONSTRUCT SM PER CITY STANDARDS STRUCTS MANH TYPE "A" PER C.O.B. STD. SW -4. momme— CONSTRUCT STORM DRAIN PER CITY STANDARDS 0 CONSTRUCT STORM DRAIN MANHOLE TYPE "A" PER C.O.B. SM. SW -4. CONSTRUCT CATCH BASIN atr TYPE "A" PER C.O.B. SM. D-14. NOTES 1) ALL CATCH BASINS ARE TO BE TYPE "A" WITH 3.5' OPENINGS PER C.O.B. STD. D-14. 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS UNLESS OTHERWISE NOTED. 5EC1ION DESIGNAMON; SECTM LETTER L - - — -_ 2 SHEET WERE SECTION IS SHOIAW— Koff � mel 344 340 328B SECTION r N� �3SCALE: 1 10' HORIZONTAL 1 = 5' VERTICAL A • ri ■ • 328B SECTION r N� �3SCALE: 1 10' HORIZONTAL 1 = 5' VERTICAL A 19illlllll COBBLE MOUNTAIN ROAD (NOTA PART) KANOSH COBBLE DRIVE (SEE TRACT 6491 PHASE 3) SEE SHEET 3 a: 14 ------ -------- R /W 6' 4 : F- 2 26 cro 30 15 30 Z W cr- 0 cn LU J W W I + 3: 04 04 r*- z 06 0 LLJ + + \j re) + + CL V_ VV_ Ir- _ 0 IL R/W 16 t6) ti Z W un cn 00 (0 U EXST. 8" SEWER 8* SEWER 165.43' S89*2q51"E S I ®E0+00 '29-50- E 12+00 S 1665.01 5. 13+00 1 R/W 01I ca - -- -- ----- z I + - I EXST. 18 DRAINr. le DRAIN 1 : W89729 1 *W .6 C1 17 cn cr_ z Io 01 R/W Ul) 6 co ca Z Ui 00 28 (33 00 L �R 0 C4 it 1* At* 6* z 18 oc z 1 —4- 0 Tf + < -- - -------- + 2 20' j _j J C4 dF C!330 F: A- 43 00 P I. 9 Ui pppp C4 0+ + R/W Ui . _.._._ y =` I V J V l 32 19 COBBLE MOUNTAIN ROAD KANOSH COBBLE DRIVE (NOT A PART) SEE SHEET (SEE TRACT 6491 - PHASE 3) Iff A A I im mFmi %"Oiw& C RK" LD R I E (STA. 11+42.81 C.L. TO 13+03.15 C.L.) SCALE: 1" = 50' HORIZONTAL � M101 m m m mi Kul m m W41 10+00 11+00 12+00 (STA. 11+42.81 C.L. TO 13+03.15 C.L.) SCALE.- 1 " = 50' HORIZONTAL SCALE: 1" = 5' VERTICAL 111110i:1,111im CL CENTERLINE SMH SEWER MANHOLE INV IN SCO SEWER C"OUT SD STORM DRAIN SDMH STORM DRAIN MANHOLE MH MANHOLE EXIST EXISTING CB CATCH BASIN ELEV ELEVATION JB JUNCTION BOX R/W RIGHT OF WAY SCP STREET CONSTRUCTION PLAN mmm PHASE BOUNDARY m a TRACT BOUNDARY 0 �55 'T TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION • S CONSTRUCT SEWER PER CITY STANDARDS CONSTRUCT SEWER MANHOLE TYPE "e PER C.O.B. SM. SW -4. 0 CONSTRUCT SEWER CLEANOUT PER C.O.B. STD. SW -6. ma m m Nm 9v WE W m mo CONSTRUCT STORM DRAIN PER CITY STANDARDS 0 CONSTRUCT STORM DRAIN MANHOLE TYPE *A` PER C.O.B. STD. SW -4. Or CONSTRUCT CATCH BASIN TYPE 'A" PER C.O.B. SM. D-14. NOTES m 1) ALL CATCH BASINS ARE TO BE TYPE "Am WITH 3.5' OPENINGS PER C.O.B. STD. D-14. 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS UNLESS OTHERWISE NOTED. S11119H DOGNATION: SECTION LETTER 2 SHEET WHERE SECTION IS SHOWN *NOTE CONTRACTOR TO REMOVE PLUG IN EXISTING 18" STORM DRAIN AND 8" SEWER AND VERIFY EACH INVERT ELEVATION PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL N011FY THE ENGINEER OF ANY DISCREPANCIES. I 'm SCALE: 1 to, = 50' 50' 25' oil 50' 100' Know what's below. Call before you dig. 0, 914 13735 LE QE, IsmNg 10: RGJ102 0 .122 INSTALL 154.33 LF OFRGJ—RCP 0 0.1,'M _1 T si C5 z a 00 00Z Q z m 1' 2 cn 0 z Z—. i >> Zv- " � -0 -0) -0 Uj LWU 00 < en Mm X n on) N pr i[Ai cnzz En >: in x ui cn W APPROXI ATE FINK , HED• ItY r iq A A GR MATE DE 0 CE EXISTING ­ -_ - WAUt JUr 14 1 tKL NE _-OR - cncl) W W 7 z C4 WATER PRIOR TI CONSTRICTION, T-VZW CTOR IS iE-EXIM TO INVERT lir DRAIN E CONTRi ONS-jO" r SNER & 1 r STORM DRAIN Al THE TIE- IN LOCA ON AND NOTIFY T1 E ENGINE 3R 8! M___ En I �T -SEW V_ ,.,,,z M 0;mt OD ODW (0 z !�o (n (3 >; z W > > z z < to 04 8 to - 0) "rn cn a OD lot ;R + v- Z Uj W + po n to e) cna (n 1< 147.76 LF OF EXST. B* SEWER 0 0.35% INSTALL 165 �43 LF OF 8" SEWER W —i W Ai W —i 0 —0.36% 1 (n V) WiLi W 10+00 11+00 12+00 (STA. 11+42.81 C.L. TO 13+03.15 C.L.) SCALE.- 1 " = 50' HORIZONTAL SCALE: 1" = 5' VERTICAL 111110i:1,111im CL CENTERLINE SMH SEWER MANHOLE INV IN SCO SEWER C"OUT SD STORM DRAIN SDMH STORM DRAIN MANHOLE MH MANHOLE EXIST EXISTING CB CATCH BASIN ELEV ELEVATION JB JUNCTION BOX R/W RIGHT OF WAY SCP STREET CONSTRUCTION PLAN mmm PHASE BOUNDARY m a TRACT BOUNDARY 0 �55 'T TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION • S CONSTRUCT SEWER PER CITY STANDARDS CONSTRUCT SEWER MANHOLE TYPE "e PER C.O.B. SM. SW -4. 0 CONSTRUCT SEWER CLEANOUT PER C.O.B. STD. SW -6. ma m m Nm 9v WE W m mo CONSTRUCT STORM DRAIN PER CITY STANDARDS 0 CONSTRUCT STORM DRAIN MANHOLE TYPE *A` PER C.O.B. STD. SW -4. Or CONSTRUCT CATCH BASIN TYPE 'A" PER C.O.B. SM. D-14. NOTES m 1) ALL CATCH BASINS ARE TO BE TYPE "Am WITH 3.5' OPENINGS PER C.O.B. STD. D-14. 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS UNLESS OTHERWISE NOTED. S11119H DOGNATION: SECTION LETTER 2 SHEET WHERE SECTION IS SHOWN *NOTE CONTRACTOR TO REMOVE PLUG IN EXISTING 18" STORM DRAIN AND 8" SEWER AND VERIFY EACH INVERT ELEVATION PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL N011FY THE ENGINEER OF ANY DISCREPANCIES. I 'm SCALE: 1 to, = 50' 50' 25' oil 50' 100' Know what's below. Call before you dig. 0, 914