Loading...
HomeMy WebLinkAbout1.5-6916 Ph 2I 6N AL NOTES: 1. PRIOR TO THE START OF AN)" PHASE OF CONSTRUCTION, I e-_ I r7L_ L-101 I I I L-./ T IL -1-L/ I I -IL -IN I �_/IN 1 1 1�IN INSPECTION DEPARTMENT SHALL BE 671VEN 24 HOURS NOTICE. ATiON P PARKS DEPARTMENT: 661-526-3354 CONSTRUCTION INSPECTION DEPARTMENT: 661-526-504`1 LANDSCAP.E AND IRRI G t= t -UK CON I I INC7 THS t`U3LIC.,, UTI TI t5 TO START I ELECTRICAL AND NATER SERVICE IN TIME FOR CONSTRUCTION- -7. CONTRACTOR SHALL BE RESPONSIBLE FOR MEETING ALL APPROPRIATE PUBLIC UTI L17Y STANDARDS, 5Pt=c11=i CAT) ONS AND METHODS FOR CONSTRUCTION. a. PRIOR TO THE START OF CONSTRUCTION, ALL UTILITY 5F=R\/IC,,E METERS (NATER AND POWER) SHOULD RE INSTALLED AND FULLY OPERATIONAL. Cf. CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING CITY RECREATION AND PARK5,661-526-5151, AND PUBLIC NOR11<51 111-521-304e--Tj FOR AN ON -51 TE PRE-CON57RUOTION MEETING. .1O.CONTRAGTOR WILL COORDINATE CONSTRUCTION WITH THE APPROPRIATE CITY INSPECTION OFFICIAL 50, THAT INSPECTIONS CAN BE MADE AT CRITICAL CONSTRUCTION PERIOD5 BUT IN NO CASE LESS THAN: 1) AT THE START OF CONSTRUCTION, 2) PRIOR TO AN' BACK FILLING, 5) PRIOR TO THE INSTALLATION OF AN)` PLANT MATERIAL/ 4) AT THE END OF CONSTRUCTION BUT PRIOR TO START OF P05T-IN5TALLATION MAINTENANCE, AND 5) AT THE END OF P05T-IN5TALLATION MAINTENANCE PERIOD FOR C I TY ACCEPTANCE. 11. CONTRACTOR -WILL PERFORM MAINTENANCE AS IDENTIFIED IN THE SPECIFICATIONS. ALL 005T INCURRED UNTIL TH15 TIME WILL BE AT THE T=Xf=1F=N5T= OF THE CONTRACTOR. 12. CONTRACTOR 15 RESPONSIBLE FOR SECURING FINAL ACCEPTANCE BY THE -Lr;) FOR TH15 WORK. IN NO GRAS WILL THE 0 17)0' OF BAKER5F I r .1 CONTRACTOR BE RELEASED FROM MAINTENANCE OF THE IRRI(5A71ON 5Y57EM OR MAINTENANCE AND REPLACEMENT OF DEAD/ DYING, DAMA&f=D1 OR OTHERWISE UNSUITABLE PLANT MATERIAL UNTIL THE 017)"/ IN WRITING, ACCEPTS THIS WORK. 15. CONTRACTOR W1 LL FIELD VERIFY FINISHED 65RADE5 AND VERIFY THAT THERE 15 P051TIVE SURFACE DRAINAGE AT ALL PLANTERS AND AWAY FROM ALL PLANTING HOLES. IF POSITIVE DRAINAGE D0E=5 NOT F-XI57 NOTIFY' LANDSCAPE ARCHITECT PRIOR TO PROCEEDING, FOR NRI TTEN AUTHORIZATION AND IN5TRUOTION5 TO PROCEED., 14. CITY OF BAKERSFIELD STANDARDS AND 5FECIFICOATI ON5 SHF=f=7/ NITH TH15 DRAWING SET/ $ C.O.B. 5TAN1:;)AR1:;) DETAIL5, TAKE PRECEDENCE OVER ALL OTHER SPECIFICATIONS OR DETAILS. 15. ALL TREES UNDER UTILITY LINES ARE SUBJECT TO CHANGE PER O.O.B. 16. CONTRACTOR SHALL INSTALL A (b" CONCRETE MON CURB AS PER C.O.B. 57ANDAR0)5 AT EACH PHASE LINE AND LIMIT OF CONSTRU07ION LINE. R007 BARRIER FOR EACH TREE VN17HIN OF ANY EXI57IN651 OR PROPOSED PAVING OR5TRUCTURE. Ie5. ALL PLANT MATERIAL SHALL BE APPROVED BY THE ONNER'5 RF-PRE5F-NTATI\/T=. lcf.. NO PLANTING SHALL BE PLANTED UNTIL THE INSTALLATION OF THE IRRIOA71ON 5Y57F=M 15 COMPLETED, FINAL GRADE -S HAVE BEEN F=57ABLISHAD, PLAN71N& ARE A5 HAVE BEEN FROFERLY'6RADED, AND 501L PREPARED AND THE WORK HAS BEEN APPROVED BY THE OWNER'S RF=FRF_5F=N7A71\/F=. 20.C.,ONTRAGTOR 5HALL.r;)f=MON5Tf;ZATt= TO THE OWNER'S REPRESENTATIVE THE TURN 15HIN6 AN01 IN57ALLA71ON OF THE 5FEOIFIF_D 501L AMENDMEN75 WHETHER 501L TEST 15 REOUIRED OR NOT. 21. CONTRACTOR 15 RESPONSIBLE FOR r-.,ARt= AND MAINTENANCE OF THE EXISTING LANDSCAPE AND IRR16A710N SYSTEM DURING CONSTRUCTION. 22.CONTRACTOR SHALL INDICATE IRRI&ATION SLEEVES E3**r CHI SEL IN& "IR" ON THE FACE OF CURB AT EACH , LOCA71 ON. 25.PRIOR 70 IN5TALLATION OF ANY 516NAGE, 5UE3DIVIDER SHALL SUBMIT TWO COPIES OF THE 5UBr;)I\/15ION IDENTIFICATION 516N PLANS TO THE BUILDIN6 RECTOR FOR REVIEW AND APPROVAL PURSUANT TO 5M0 SECTION 17.10.110N. ONE COPY OF THE 51&Nt=1:;) PLAN SHALL AL50 BE SUBMITTED 70 THE PARK5 DIY 1510N FOR Rt=\/It=N AND APPROVAL. 516N PLANS SHALL INCLUDE COPY, DIMENSIONS, COLOR MATERIAL, LI&HTING, ANCHORAGE ,ANDLOCATION OF 516N(5). SI&NA61= DE -516N AND PLANS WILL BE INCLUDED AS PART OF THEWALLPLANS SUBMITTED SEPARATELY. 24. UNIFORM DEVELOPMENT 15 Rf=0UIRSD FOR TH15 PROJECT. SHOULD ANY PORTION OF ANY PHASE OR 5U35F=aUF=NT PHASES BE CONSTRUCTED AT DIFFERENT INTF=R\/AL5 NHTHS PROJECTS, UTILITY POINT OF CONNECTIONS ARE LOCATED I AN AREA OTHER THAN THE CURRENT PROJECT AREA, THE D4=\/ELOPERSHALL BE RESPONSIBLE FOR ALL INCURRED C05T5 ASSOCIATED WITH THE AFFECTED AREAS UNTIL THE CURRENT PROJECT'S MAINTENANC.IF PERIOD HAS BEEN COMPLETED AND A WRITTEN FINAL ACCEPTANCE FROM THE 017'**r'S REFRESEN7ATIVE HAS BEEN A0HIf=\/E=r;). RLE NAME.• L:\Projects\2013\130205.02\ACAD\LS\130205.02CV.dwg - LAST SAVE. 311412016 10:31:35 AM PDT LAN, UNIT 2 BAKERSFiELD, CALiFORNIA I FUTURE TRAqT 6824 SUMP 17 18 iG ie 2. THE ELECTRICAL LINE BETWEEN THE F&$F SERVICE AND THE METER 13 12 MUST BE'IN5PFCTED AND APPROVED BY THE PUBLIC NORK5 ELECTRICAL 10 3 DFPARTMFNT: &(bI-52&-3152 5 5. WHEN LAND50APE AND WALL PLANS ARE SUBMITTED FOR FUTURE 8 CITY OF BAKERSFIELD TRAFFIC ENGINEER CONSTRUCTION 51 TE LINE EASEMENT AND LOCATION OF 41 IMPROVEMENT (WALL AND TREES) WILL BE REOUIRED. (MUNI CODE 17.00) DATE 4. THE TOTAL 5OUARE FOOTA&E OF THIS FROJEr-.,T AS MEASURED FROM BACK CITY OF BAKERSFItLp EL4 OF WALK TO BACK OF WALL 15 Icl/252 S.F. AND FROM BACK OF CURB TO 39 40 BACK OF NALL 15 50/174 S.F. 42 5. AN OPEN STREET PERMIT SHALL BE OBTAINED FROM THE 017Y OF BAKERSFIELD 45 46 PUBLIC NOR<5 DEPARTMENT FOR ANY WORK PERFORMED N17HIN FX1571N(5 E 1�) ACCEP7-STREET RI6,HT-OF-NA),0'. UNLESS SECURED BY A SUBDIVISION > 0 A BASED UPON AN APPR S ESTI MATE&REEMENT, 5ECURIT OVED F=Nr I NEER z . ,* 0 z (.) UJI > FOR THE WORK PERFORMED WITHIN THE RI&H7-OF-NAY AND INSURANCE UJI SHALL BE POSTED PRIOR TO ISSUANCE OF THE PERMIT. Imo (o. CONTRACTOR SHALL BE RESPONSIBLE FOR MEETING ALL CITY OF j 0 5A<ERS1=IELD 5TANDARD5.-4ND SPECIFICATIONS. CONTRACTOR WILL t= t -UK CON I I INC7 THS t`U3LIC.,, UTI TI t5 TO START I ELECTRICAL AND NATER SERVICE IN TIME FOR CONSTRUCTION- -7. CONTRACTOR SHALL BE RESPONSIBLE FOR MEETING ALL APPROPRIATE PUBLIC UTI L17Y STANDARDS, 5Pt=c11=i CAT) ONS AND METHODS FOR CONSTRUCTION. a. PRIOR TO THE START OF CONSTRUCTION, ALL UTILITY 5F=R\/IC,,E METERS (NATER AND POWER) SHOULD RE INSTALLED AND FULLY OPERATIONAL. Cf. CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING CITY RECREATION AND PARK5,661-526-5151, AND PUBLIC NOR11<51 111-521-304e--Tj FOR AN ON -51 TE PRE-CON57RUOTION MEETING. .1O.CONTRAGTOR WILL COORDINATE CONSTRUCTION WITH THE APPROPRIATE CITY INSPECTION OFFICIAL 50, THAT INSPECTIONS CAN BE MADE AT CRITICAL CONSTRUCTION PERIOD5 BUT IN NO CASE LESS THAN: 1) AT THE START OF CONSTRUCTION, 2) PRIOR TO AN' BACK FILLING, 5) PRIOR TO THE INSTALLATION OF AN)` PLANT MATERIAL/ 4) AT THE END OF CONSTRUCTION BUT PRIOR TO START OF P05T-IN5TALLATION MAINTENANCE, AND 5) AT THE END OF P05T-IN5TALLATION MAINTENANCE PERIOD FOR C I TY ACCEPTANCE. 11. CONTRACTOR -WILL PERFORM MAINTENANCE AS IDENTIFIED IN THE SPECIFICATIONS. ALL 005T INCURRED UNTIL TH15 TIME WILL BE AT THE T=Xf=1F=N5T= OF THE CONTRACTOR. 12. CONTRACTOR 15 RESPONSIBLE FOR SECURING FINAL ACCEPTANCE BY THE -Lr;) FOR TH15 WORK. IN NO GRAS WILL THE 0 17)0' OF BAKER5F I r .1 CONTRACTOR BE RELEASED FROM MAINTENANCE OF THE IRRI(5A71ON 5Y57EM OR MAINTENANCE AND REPLACEMENT OF DEAD/ DYING, DAMA&f=D1 OR OTHERWISE UNSUITABLE PLANT MATERIAL UNTIL THE 017)"/ IN WRITING, ACCEPTS THIS WORK. 15. CONTRACTOR W1 LL FIELD VERIFY FINISHED 65RADE5 AND VERIFY THAT THERE 15 P051TIVE SURFACE DRAINAGE AT ALL PLANTERS AND AWAY FROM ALL PLANTING HOLES. IF POSITIVE DRAINAGE D0E=5 NOT F-XI57 NOTIFY' LANDSCAPE ARCHITECT PRIOR TO PROCEEDING, FOR NRI TTEN AUTHORIZATION AND IN5TRUOTION5 TO PROCEED., 14. CITY OF BAKERSFIELD STANDARDS AND 5FECIFICOATI ON5 SHF=f=7/ NITH TH15 DRAWING SET/ $ C.O.B. 5TAN1:;)AR1:;) DETAIL5, TAKE PRECEDENCE OVER ALL OTHER SPECIFICATIONS OR DETAILS. 15. ALL TREES UNDER UTILITY LINES ARE SUBJECT TO CHANGE PER O.O.B. 16. CONTRACTOR SHALL INSTALL A (b" CONCRETE MON CURB AS PER C.O.B. 57ANDAR0)5 AT EACH PHASE LINE AND LIMIT OF CONSTRU07ION LINE. R007 BARRIER FOR EACH TREE VN17HIN OF ANY EXI57IN651 OR PROPOSED PAVING OR5TRUCTURE. Ie5. ALL PLANT MATERIAL SHALL BE APPROVED BY THE ONNER'5 RF-PRE5F-NTATI\/T=. lcf.. NO PLANTING SHALL BE PLANTED UNTIL THE INSTALLATION OF THE IRRIOA71ON 5Y57F=M 15 COMPLETED, FINAL GRADE -S HAVE BEEN F=57ABLISHAD, PLAN71N& ARE A5 HAVE BEEN FROFERLY'6RADED, AND 501L PREPARED AND THE WORK HAS BEEN APPROVED BY THE OWNER'S RF=FRF_5F=N7A71\/F=. 20.C.,ONTRAGTOR 5HALL.r;)f=MON5Tf;ZATt= TO THE OWNER'S REPRESENTATIVE THE TURN 15HIN6 AN01 IN57ALLA71ON OF THE 5FEOIFIF_D 501L AMENDMEN75 WHETHER 501L TEST 15 REOUIRED OR NOT. 21. CONTRACTOR 15 RESPONSIBLE FOR r-.,ARt= AND MAINTENANCE OF THE EXISTING LANDSCAPE AND IRR16A710N SYSTEM DURING CONSTRUCTION. 22.CONTRACTOR SHALL INDICATE IRRI&ATION SLEEVES E3**r CHI SEL IN& "IR" ON THE FACE OF CURB AT EACH , LOCA71 ON. 25.PRIOR 70 IN5TALLATION OF ANY 516NAGE, 5UE3DIVIDER SHALL SUBMIT TWO COPIES OF THE 5UBr;)I\/15ION IDENTIFICATION 516N PLANS TO THE BUILDIN6 RECTOR FOR REVIEW AND APPROVAL PURSUANT TO 5M0 SECTION 17.10.110N. ONE COPY OF THE 51&Nt=1:;) PLAN SHALL AL50 BE SUBMITTED 70 THE PARK5 DIY 1510N FOR Rt=\/It=N AND APPROVAL. 516N PLANS SHALL INCLUDE COPY, DIMENSIONS, COLOR MATERIAL, LI&HTING, ANCHORAGE ,ANDLOCATION OF 516N(5). SI&NA61= DE -516N AND PLANS WILL BE INCLUDED AS PART OF THEWALLPLANS SUBMITTED SEPARATELY. 24. UNIFORM DEVELOPMENT 15 Rf=0UIRSD FOR TH15 PROJECT. SHOULD ANY PORTION OF ANY PHASE OR 5U35F=aUF=NT PHASES BE CONSTRUCTED AT DIFFERENT INTF=R\/AL5 NHTHS PROJECTS, UTILITY POINT OF CONNECTIONS ARE LOCATED I AN AREA OTHER THAN THE CURRENT PROJECT AREA, THE D4=\/ELOPERSHALL BE RESPONSIBLE FOR ALL INCURRED C05T5 ASSOCIATED WITH THE AFFECTED AREAS UNTIL THE CURRENT PROJECT'S MAINTENANC.IF PERIOD HAS BEEN COMPLETED AND A WRITTEN FINAL ACCEPTANCE FROM THE 017'**r'S REFRESEN7ATIVE HAS BEEN A0HIf=\/E=r;). RLE NAME.• L:\Projects\2013\130205.02\ACAD\LS\130205.02CV.dwg - LAST SAVE. 311412016 10:31:35 AM PDT LAN, UNIT 2 BAKERSFiELD, CALiFORNIA I FUTURE TRAqT 6824 SUMP 17 18 iG ie 15 14 13 12 11 10 3 4 5 6 7 8 CITY OF BAKERSFIELD TRAFFIC ENGINEER 2 65 64 N 1711 NUN 2 00. 3 Q0 4 < 5 17 2 16 2 Cn -7 w 15 2 8 14 2 2 10 13 218% 12 26 22 21 24 25 26 27 28 UE _T 37 361 35 34 33 32 31 30 29 - UNIT L-5 DETAIL5 1 CITY OF BAKERSFIELD TRAFFIC ENGINEER APPROVED BY: 41 LL. Z DATE NICOLAS 0. FIDLER PUBLIC, INORK_5 DIRECTOR CL LU CITY OF BAKERSFItLp EL4 38 39 40 41 42 43 44 45 46 KEY MAP VICINITY MAP NTS BENCHMARK 6" CONCRETE MONUMENT WITH BRASS CAP STAMPED L.S. 5565 IN MONUMENT WELL AT THE INTERSECTION OF ALONDRA DRIVE AND MOUNTAIN VISTA DRIVE. . ELEVATION = 344.33 USGS DATUM -BASIS OF BEARING THE WEST LINE OF THE NORTHEAST QUARTER OF SECTION 30, TOWNSHIP 30 SOUTH, RANGE 27 EAST PER TRACT NO. 6328, UNIT TWO, AS RECORDED IN BOOK 58, OF MAPS, AT PAGE 3, K.C.R., TAKEN AS N00047'51 "E. I hereby certify that plans and specifications comply with City of Bakersfield ordinances, standards, and design criteria, and that they include, all improvement requirements of the, Advisory Agency or other review board. I am responsible for all calculations and drovqin,39 on these plans and any errors, Omissions, or violations of those, ordinances, standards, and design criteria shall be corrected during construction. REVIEWED By: COVER 5HEET L-1 LAND50APE PLAN DATE 011"r OF BAKER5FIELD RECREATION PAR KV5 DEPARTMENT L-5 IRR16ATION PLAN REVIEWED BY: IRRI COATI ON PLAN L-5 DETAIL5 DATE CITY OF BAKERSFIELD TRAFFIC ENGINEER APPROVED BY: 41 LL. Z DATE NICOLAS 0. FIDLER PUBLIC, INORK_5 DIRECTOR CL LU CITY OF BAKERSFItLp EL4 R.C.E. # 610641, EXP. 12-51-16 APPROVED BY CITY ENGINEER ONLY FOR AREAS OF PUBLIC, MAINTENANCE SHEET INDEX 05-1 COVER 5HEET L-1 LAND50APE PLAN L-22 LAND50APE PLAN L-5 IRR16ATION PLAN L-4 IRRI COATI ON PLAN L-5 DETAIL5 Know what's below, 0111 before you dig. 1.5-6916 Ph 2 0 Z Z 0 LL .j 0 U. 1 00 Uj W t5 0 UJI LL. Z 0 Ld z CL LU EL4 W F- z on) C*1 S (0 C* W61 �. > 0 z z z . ,* 0 z (.) UJI > UJI 0W01 U*) Imo j 0 1 -- PLOT DATE: Mar -15-2016 09:24AM JOB NO.: 130205.02 a_ 130205.02CV.DWG SCALE: N.T.S. SHEET NO.: OF 51 U) Uj Uj 0 Z Z 0 LL .j 0 U. 1 00 Uj W t5 0 UJI LL. Z 0 Ld z CL LU EL4 W F- z on) C*1 S (0 C* W61 �. > 0 z z z . ,* 0 z (.) UJI > UJI 0W01 U*) Imo j 00 Lei. lu') 1 -- PLOT DATE: Mar -15-2016 09:24AM JOB NO.: 130205.02 FILE NAME: 130205.02CV.DWG SCALE: N.T.S. SHEET NO.: OF 51 TREE MATERIAL LE6END SYM. BOTANICAL NAME COMMON NAME (iNATER USE) 51 ZE OTY. REMARK5 COMMENTS A P 15TAC I A ch inens is 'KEITH DA\/E-Y' CHI NESE P 15TACHE (L) 24" SOX 45 ® 20'-0" O.G. B PYRUS kawakomii EYER6REEN PEAR (M) 24" BOX6 ISO ® 201-011-0.0. G LAURUS nobi I is 'SARATO&A' 5ViEET BABY (L) 24" BOX 52 I' @ 20'-0." O.G. Q OUERGU5 ilex HOLLY OAK (L) 56" BOX 6 (9 EACH CORNER rA a"W x CONCRETE CURB TREE SYMBOL REFER TO DETAIL L -10/L-5 AMOUNT IN .GROUPING I� ---j SHRUB MATERIAL LEGEND D CALL15TEMON citrinus 'LITTLE JOHN' SOTTLE5RU5H (L) 5 &AL. 122 @ 4'-0" O.G. E PITT05FORUM tobiro 'TURNER'S VARIE64TED DWARF' (M) 5 &AL. a4 ® 4'-0" O.G. F 6RE\/ILLT=A x 'NOELL' GREVILLFA x 'NOELL' (L) 5 &ASL. ISO ® 5'-0" O.C. G HEMEROCALL15 x 'MOND' 5TARBUR5T RED DAYLILY (M) 5 &AL. 150 ® 5'-0" O.C. H NANDINA domestica 'SIENNA 5UNR15E' (L) 5 2AL. 6a ® 4'-0" O.G. J 05MANTHU5 frogrons SWEET OLIVE (M) 5 6AL. 72 @ 6'-0" O.G. K, L16U5TRUM japonicum JAPANESE PRIVIT (M) 5 &ASL. 107 ® 5'-0" O.G. L RHAPHIOLEP15 indica 'PINK L4D1" INDIA HAWTHORN (L) 5 6AL. ci0 e 6'-0" O.G. cr- M M a -co U Q XOul 4 m w 0 Q J X O m V) �i U') a- 5;Fes'- LQ 's Y Ld ZU U 0 z i.i O Y se � G'I >>cu Y m M O M Ld > m W (If CL 0 Z � U O V Z Z c O LL _1 Q V U. N O o W � Qz W o w a g O w CL r W 4 M 0 of 0 - CL V 0 Z 2i C; Vo uj 00 L2 Z — 0 u- v PLOT DATE: r-12-2016 08:19AM JOB NO.: 130205.02 FILE NAME: 130205.02 LS SCALE: 1 "=20'-0" SHEET NO.: L -I OF 5 TREE MATERIAL LEGEND 5YM. BOTANICAL NAME COMMON NAME (WATER U5E) 51 ZE QTY. REMARK5 COMMENTS A P15TACIA chinensis 'KEITH DAVE1" CHINESE P15TACHE (L) 24" BOX 45 0 20'-0" O.G. 8 PYPU5 kawakomii EVERGREEN PEAR (M) 24" BOX 6 @ 20'-0" O.G. G LAURU5 nobi I is 'SARAT06A' 51NEET SAY (L) 24" i:30X 32 ® 20'-0" O.G. 0 QUERCUS ilex HOLLY OAK (L) 156" BOXI 6 ® EACH CORNER TREE SYMBOL REFER TO DETAIL L -10/L-5 I ' ?AMOUNT IN GROUPING o SHRUB MATERIAL LEGEND D CALLI5TEMON citrinus 'LITTLE JOHN' 50TTLE5RU5H (L) 5 GAL. 122 o 4'-0" O.G. E PITT05FORUM tobira 'TURNER'S VARIEGATED DWARF' (M) 5 GAL. 14 @ 4'-0" O.G. 6REVILLEA x 'NOELL' 6REVILLEA x 'NOELL' (L) 5 GAL. I80 @ 5'-0" O.G. 6 HEMEROCALL 15 x 'MOND' STARBUR5T RED RAYL I LY (M) 5 &AL. 150 a 3'-0" O.G. H NANDINA domestics 'SIENNA SUNRISE' (L) 5 GAL. 6Q ® 4'-0" O.G. J 05MANTHU5 frogrons SWEET OLIVE (M) 5 GAL. '72 a 6'-0" O.G. K L16U5TRUM joponlaum JAPANESE PRIVIT (M) 5 GAL. 101 ® 3'-0" O.G. FT RHAPHIOLEP15 indica 'PINK LADY' INDIA HAWTHORN (L) 15 6AL. 1 110 1 ® 6'-0" O.G. W G ��� p0 l�1 I 00 _INE -SIGHT LINE 00 � I O�000• A o a 0 1/0 . . ... ..................... ..... 2 H J R SHRUB SYMBOL REFER TO DETAIL L -10/L-5 Z 10 15 4 CONCRETE GURB AMOUNT IN GROUPING I� BERKSHIRE ROAD 0 22 00 23 00 K O R T I3 G LANDS - CP"` P ALAN 1.5-6916 PH 2 FILE NAME. L: \Projects\2013\ 130205.02\ACRD\LS\ 130205.02 LS. dwg - LAST SAVE: 3/15/2016 9:59:40 AM PDT Q 0 W N 00 4 U o�p � m M M M d Q- C.0 0) r, h Z a - U M Q , , Y cW m 0 v to Lo Q n 'S m �� N m O � W X3:: O Q Lf)F— LL- 3: Y U Lu tV 0 z a z a m m o m oZ U L � © cio V Z Z O U. J Q U U. N O W V♦ W w N _Z o ? 0.� z olz �- _. Q n o W Mo W �QMmQ m ezU a�� //���� p zZ O IL W co 4 ' — J OD PLOT DATE: Mar -21-2016 11:05AM JOB NO.: 130205.02 FILE NAME: 130205.02 LS SCALE: 1 =20'-0p SHEET NO.: L-2 OF 5 , HYDROZONE PLANT FACTOR PF AREA HA PF x HA I 0.4 252 -12.8 2 0.4 5044 1217.6 5 0.4 2540 1016 4 0.4 "744 2-17.6 5 0.4 2560 1024 6 .0.4 400 160 7 0.4 4250 1700 8 0.4 2535 1014 -1 0.4 735 2-14 10 0.4 735 2-14 11 0.2 413 82.6 12 0.4 52 12.8 15 0.4 4-15 1018 80 BALL ON THE MAINLINE SIDE IN/ GLEAN I N6 FILTER. INSTALL N I TH TOTAL 18"7 15 "7403.4 KITH #PRF-100-RYB MANA = (ETo)(O.(62)[(0.7xLA)+(0.3x5LA)] MANA = (31.(o8)(0."7x 18715)+O 1 1/2" PRESSURE RE6ULATIN6 1 1/2 MAMA = 415,023.84 GALLONS 150-PEB-PR5-D N/ V I DY 4 50HED. FILTER, 200 MESS SELF- 50 BALL ON THE MA 1 NL I NE SIDE N/ ETNU = (ETo)(0.62)[(PFxHA/I E) + 5L.A] ETNU = (51.68)[1405.4/.80 + O] ETNU = 2-15,174.64 6ALLON5 VALVE. PRESSURE SET ® 40 PS I I niwru�r-ice a I II I I t I I I n I" 3/4" 3 F5 3/4'• 41 41 }_ Z NATER U5*=m" OALOULATION5 C) CONNECT NEN 2 MAIN LINE TO i EX 15T I N6 2 " STUB FROM PHASE I IN 3/4" i G i ( CONNECT NEN VALVES TO EXISTING CONTROLLER f FROM PHASE I f d i f l f f i 4 23 1 1 1/2" rl IRR (GATI ON NOTE5: 1) IRRIGATION 5OLID COPPER CONTROL WIRE DIRECT BURIAL (U.L. APPROVED) #14 AW& CONTROL WIRE5, #12 AW& COMMON WIRE, ROUTE WITH MAINLINE COLOR OF WIRES TO BE A5 FOLLOWS: A COMMON WIRE- WHITE ` CONTROL WIRE- BLACK SPARE KRE- RED MASTER VALVE WIRE- BLUE FLOW 5EN5OR- PAIGE IRRIGATION 5PE0#P'7162D-A-REVS, UNDERGROUND COMMUNICATION a GABLE SH I ELDER AND ARMOR 16 AN6/1 PAIR d 2) USE FOR ALL WIRE CONNECTIONS: DBR/Y-6 WIRE CONNECTORS iU a 3) ND5 PRO-5ERIE5 VALVE BOX WITH BOLT DOWN LID5. 14"xiQ" FOR MASTER VALVE, FLOW 5EN5OR } 14"xIQ" FOR MASTER VALVE, FLOW SENSOR AND REMOTE CONTROL VALVES. 10" ROUND FOR &ATE VALVE5 AND QUICK COUPLERS JUMBO 51ZE BOX FOR WIRE PULL BOX ALL BOLT DOWN LID5 TO BE HEAT ENGRAVED W/ PROPER STATION ID OR EQUIPMENT ID A5 I 25 DIRECTED BY THE G.O.B. �122 tSl 1 1 /4" } IRRIGATION LEGEND SYMBOL MANUFACTURER MODEL DE50RIPTION SIZE OUANT17Y RA I NB I RD - RNS-B-G- 140 I � . (2) PER TREE ®.25 GPM ROOT WATERING SYSTEM BUBBLER 278 RA I NB I RD 1804-SAM-PR5 N I TH 4" POP-UP SPRINKLER N I TH PRESSURE COMPEN5ATIN6 BUBBLER 0132 HUNTER PON -25 NOZZLE, .25 GPM FEATURE RA I NB 1 RD - 44 LRG/T5J- 15 OU i GK COUPLER, IN 10" ROUND BOX I " 5 PVC 50HEDULE 40 PIPE MAIN LINE 2" PVC, CLA55 200 PIPE LATERAL LINE 5EE PLAN PVC SCHEDULE 40 PIPE SLEEVE SEE PLAN RA I NB I RD PEB SERIES VALVE I" PRESSURE REGULATING 1� I 4 100-PEB-PR5-D N/ V I DY 4 SCHED. FILTER, 200 ME -55 SELF- 80 BALL ON THE MAINLINE SIDE IN/ GLEAN I N6 FILTER. INSTALL N I TH 5CHED. 50 UNION ON LATERAL SIDE IN THE SAME VALVE BOX AS KITH #PRF-100-RYB VALVE. PRESSURE SET o 40 P51 RAINBIRD PEB SERIES VALVE 1 1/2" PRESSURE RE6ULATIN6 1 1/2 8 150-PEB-PR5-D N/ V I DY 4 50HED. FILTER, 200 MESS SELF- 50 BALL ON THE MA 1 NL I NE SIDE N/ GLEAN I N6 FILTER. INSTALL N I TH 5CHED. 80 UNION ON LATERAL SIDE IN THE SAME VALVE BOX AS KITH #PRF-150-RY5 VALVE. PRESSURE SET ® 40 PS ® MODEL #EZOIO-HC 10 GALLON REPLACE EXI5T1N6 FROM PH. 1 "x24"x24" 10 GAL. i CAPACITY FERTILIZING SYSTEM INSTALL IN 56 BOX KGP LONCOMBO-100, COMBO INCLUDES: 2" RA I NB 1 RD PEB r v s MASTER CONTROL VALVE 4 MASTER VALVE $ I" RA I NB 1 PD FLON SENSOR 1 1=510OF FLOIN SENSOR. z F - z 0 © tU CIRCUIT jq NUMBER GALLONS PER5/4" 1- M I MUTE } Z 6 31 - a 1 1/2" z ti °natio an VALVE O SIZE a N O R T H H O R z H 5ERK5H I RE ROAD E3 IRRI&ATION PLAN A IRR16ATION PLAN FlE NAME: L: \Projects\2013\ 130205.02\ACRD\LS\ 130205.02LS.dwg - LAST SAVE. 3/14/2016 1:07.33 PM PDT 1.5-6916 Ph 2 Q co W d- � O OC � c ( 1 � Ma- to n- C.0 07 h r- z a' 0 Q r.^ Y tW m xx U 0) 1.0 Q Lo O m Q < � Imo- �+- 'S Y _ Ld U 0 Z Q L o V) Y c� m o Ld o a " m Z W O � a 0 U Z Z LL J Q V LL N o w WN = Z osm L 0. J z Q Z 4 M CZ W°'M (o ° w 'Q aU Q H C;.* z o S W00 120 hoc do J !- a, PLOT DATE: Mar -15-2016 09:28AM JOB NO.: 130205.02 FILE NAME: 130205.02 LS SCALE: 1"=20'-O" SHEET NO.: OF 5 lu > 12 26 Z < 00 0 0 0 A 4b 4 4 41 < -4 ZI 5/4 r5 F52� 5/4 :2-7 5:2 r-7 1 52 5 22a �/V rg I ] 10+00 1 1/2 /V —ji 11 +o0 12+,00 13t00 .14+00 15tOO 16 M 0 It Ir 3EX A I RR l 6AT I ON PLAN lu lu V UNION== -1 or 0 1111 11 11 -W . ..... 0 0 0 0 0-0 . ... .. .... 0 0 .. . ..... . . .... . . .... .. .. . ... ...... V -- A A 0 so see** a 0 0 0 0 0 0 0 0 a 0 0 0 No N w w v w 41 z 0 0 0 0 0 71 < A 4 A Y7r 5/4 5/41 1 1/211 211 a 32 5/411 N10 5;=Ri<5HI ROAD 16 00 17+,00 18tOO 19+00 to 0 21t00 C) C) I 22 00 T_ M 0 3M '3117 M RR 1 6AT I ON PLAN IRRIGATION LEGEND SYMBOL MANUFACTURER MODEL PE50RIPTION 51ZE QUANTITY RAINE31RD - RIN5-5-0-1401 ROOT WATERING SYSTEM BUBBLER 2,78 (2) PER TREE a .25 GPM RAIN51RD I804-5AM-FR5 WITH 4" POP-UP SPRINKLER WITHFRE55URE HUNTER PON -25 NOZZLE, .2-5 GPMFEATURE COMFEN5ATIN& BUBBLER C152 RAIN51RD - 44 LRC/T5J-Ia OUICK COUPLER IN'10" ROUND BOX 111 5 PVC, 5CHEDULE 40 PIPE MAIN LINE 211 FV0 CLA55 200 PIPE LATERAL LINE 5EE PLAN PVC SCHEDULE 40 PIPE SLEEVE SEE PLAN RAINBIRD FEB SER If=5 VALVE I" PRE55URE REGULATING 111 4 I00-PE5-PR5-D Vil VIDY 4 50HED. FILTER, 200 ME55 5ELF- 80 BALL ON THE MAINLINE 51 DE A/ GLEANING FILTER. IN5TALL NITH- 50HFD. aO UNION ON LATERAL 51VE. IN THE SAME VALVE E30X A5 WITH #PRF-IOO-R*-r5 VALVE. PRE55URE SET @ 40 P51 RAINS 1RD FEB 5ERlf=5 VALVE 1 1/2" PRE55URE RE6ULATINC7 1 150-PES-PR5-r,> N1 VIDY 4 50Hf=D. FILTER, 200 ME55 5f=LF- aO BALL ON THE MAINLINE 51 DE N1 GLEANING FILTER. IN5TALL NITH- 50HED. aO UNION ON LATERAL 51DE. IN THE SAME VALVE BOX A5 WITH #PRF-150-RYB VALVE. PRE55URE SET ® 40 P51 MODEL #EZOIO-HO 10 GALLON REPLACE r-X15TIN6 FROM PH. 1 10 GAL. OAPACITY FERTILIZING SYSTEM IN5TALL IN 56I'x:24"x:24" E30X K0PFLOhCOMBO-I00COMBO INCLUDES: 2" RAINBIRD FEB MASTER CONTROL VALVE MA5TER VALVE 4 1" RAINBIRV ................. FLOW 5EN50R F510OF FLON 5ENSOR. RLE NAME.• L:\Projects\2013\130205.02\ACAD\LS\130205.02 LS.dwg — LAST SAVE: 311412016 1:07.33 PM PDT CIRCUIT NUMBER GALLONS PER MINUTE lu 6 31 tu H.. VALVE SIZE z o 10 6 11 3 12 16 5t=RK5H I RE ROAD 22 00 too M 0 a '3117 M I SRI G TION PLAN 1.5-6916 Ph 2 0 U. U. 04 0 ui cl) uj < W 17) Z 0 < LLT 0. z 0 z CL CLQMo 43 Z F- zro 0 0- < > z 0 z z W cin to PLOT DATE: Mar -15-2016 09:28AM JOB NO.: 130205.02 FILE NAME: 130205.02 LS SCALE: 1'°=20'-0'° SHEET NO.: L-4 OF 5 TGIF HaNT STAINIX65CONTRMUR STEL OONTROLL.EK AIJTOMATIO o TOP MOW Gd ii1* OLLL :. 5T AI RM 1M - GSA)1Ti 1w., SIA 4 {BLV ENCL05we IEP5 WTH. I� FINISH MIN. F77. �. GWE'OL ARES SIDE VIE] VALVES. Ito -VOLT SERVICE IN GUNPUIT. PVC LOW SPEP ELL. - I ROW VISI 517..E AS 12Eaim. 255 (6TRON6 5OX'BY i AMTS) OR APPROVED EOUAL IRO*'.EC- &TION CiONTROLLER ENCLOWRE NOTES. 1. U5L» ��CA lE�t$.E d0 R'VC CORBXiti E+�TH ASS RS+iGLO I? 3. ALL MWATiON OTAUATK7R+i Sti U BE IN AM1iDMM INIM 2. CONSTLZUCT C,5' WhW mCK, Ca,A% T' C0Jt'.ft'M SL.AE AS a'CY STMOAM, M LATEST M)ITION OF TRE CAL IPt7 W !E'L1i2$m 001W TO WGELVI~ TILE P75TAL MdM11*16ATION C04M 0M, AND MANN PA.GTL 'S MMOMnOK SECTION 20 OF a.0M COWAGT Oa' (60* We TO WS f43.A TIV1E nE STANDARD SMIFICATIM AW A5 VM7M IN TRE D 3&w PRLOR To R'l.ACE14SET OF CONGiZERE SLAB. R' 'F ATION 40 PALS VMTM 3. ALL MWATION 4014Va.LM EvVAOS I ES SHAM BE TOP MOUKt', 6. ALL MATERI u 51LALL. BE m" ANE? MEE Mw D19,TS. OF A VMVAL. M WEA71fE3R RZLSESMAW NAWRIEl MANPACT1JIZg7 T OM APPROVE17 LWXAn / LR DATION PL" EktELtZEi.Y OF 304 6KAR.E STAINLESS SILEL. A147 Li6Bk7a FORiGIFiC MGR7g. �, •`, GdiANRETIISr 144VALT i MV FERPOO ANCE 4. POM COi ZME 54SE - 6" MR TH010 Ea6, DC18V0 COHGiM W MM3"iEft' LEYOHD XM VMSONS OF ENCM4M Willi I/2As 94M 6. ANY AND ALL C#IAtM ]FROM TMS STAWAFV SMALL BE POR APPROVW BY THE FMCMTION AND PAPS DW4TOR PRM TO ARMY rM OF C4WAftTION, CITY OF BAKERSFIELD REVISIONS DETAILS FOR TOP MOUNT, STAINLESS STEEL CONTROLLER ENCLOSURE STANDARD PLAN NO. SHE' 7 of _...L`l.. APPROVFE) RC:GXXXXX RATS L-7 GENERAL L AND5CAFE NOTE -5: 1. PREMIUM QUALITY PLANT MATERIAL IS REQUIRED FOR THIS PROJECT. NO PLANT MATERIAL WILL BE ACCEPTED FOR THIS PROJECT UNLESS IT MEETS OR EXCEEDS THE UPPER END OF THE INDUSTRIES STANDARDS FOR 517E5 SPECIFIED. ALL PLANT MATERIALS MUST BE OF EXCELLENT FORM, SIZE, HEALTH, AND GROWN DENSITY. ANY PLANTS THAT DO NOT MEET THIS STANDARD WILL BE REJECTED BY THE LANDSCAPE ARCHITECT OR THE CITY REPRESENTATIVE. 2. TREES SHALL BE 5TAKED AS PER THE DETAILS AND SPECIFICATION. 3. THERE SHALL BE NO SUBSTITUTIONS OR DELETIONS FROM ANY PLANT MATERIALS WITHOUT APPROVAL FROM THE. LANDSCAPE ARCHITECT, THE OWNER 4 G.O.B. 4. THE DEVELOPER SHALL CONFORM TO ALL CITY CODES 4 REQUIRE- MENTS, INCLUDING ALL INSPECTIONS PERTAINING TO THIS INSTALLATION. 5. ALL LANDSCAPE DETAILS SHALL BE IN ACCCORDANGE WITH C.OB. STANDARD DETAILS AND AS DIRECTED BY THE CITY ENGINEER. 6. ALL TREES SHALL BE PLACED BEHIND THE LINE OF SIGHT AS INDICATED ON THE PLANS. VERIFY WITH THE G.O.B. OR LANDSCAPE ARCHITECT PRIOR TO CONSTRUCTION OR TREE INSTALLATION. - 'T. PRIOR TO FINAL ACCEPTANCE, THE CONTRACTOR SHALL APPLY A PRE -EMERGENT WEED CONTROL AS RECOMMENDED BY A CERTIFIED PEST CONTROL ADVISOR AND APPLIED BY A CERTIFIED PEST CONTROL APPLICATOR. CONTACT 0.0.5. FOR VERIFICATION OF APPLICATION. S. LANDSCAPE AREAS WITHOUT AN ADJACENT WALL AT THE REAR OF THE LANDSCAPE AREA SHALL HAVE A CONCRETE MOW STRIP AT THE BACK OF THE LANDSCAPE AREA. REFER TO G.O.B. STANDARD DETAIL. a. CONTRACTOR SHALL INSTALL ON ALL LANDSCAPE AREAS A 2" LAYER OF MULCH: 2" REDWOOD BARK CHIPS SUPPLIED FROM A FRESH WATER MILL. MULCH SHALL BE UNIFORM IN COLOR AND FREE FROM WEEDS, SAWDUST, SEEDS, CONSTRUCTIVE MATERIALS AND SPLINTERS. ANY DYED PRODUCTS WILL NOT BE ACCEPTED. 10. QUANTITIES ON THE LANDSCAPE LEGEND MAY NOT BE ACCURATE; THE DEVELOPER SHALL BE RESPONSIBLE TO INSTALL ALL PLANT MATERIAL AS PER THE DESIGN. 11. ALL TREES UNDER UTILITY LINES ARE SUBJECT TO CHANGE PER O.O.B. 12. ALL PLANT MATERIAL SHALL BE INSPECTED BY G.O.B. PRIOR TO PLANTING. TOP OF VALVE }SOX 25` (O,"Ibw TIM (o,ST) MAIN (6m 1m 03 ON E'AN31ON loop OR Int. (6T) LiNE VS ~ter FC* ALL PU S. FI1��vkW 6ENERAL RECORD DRANING NOTE: 6RAtJE I. THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS AND I. THE CONTRACTOR SHALL PROVIDE AND KEEP UP TO DATE A COMPLETE "FIELD RECORD" L«KtCiA C�3NTiROL EQUIPMENT TO PERFORM WORK DURING THE POST -INSTALLATION SET OF PRINTS WHICH SHALL BE CORRECTED DAILY INDIGATIONG EVERY CHANGE FROM f .,rt WIRE: MAINTENANCE PERIOD, AS SPECIFIED HEREIN INCLUDING BUT NOT LIMITED RtEXEi.LAkiT TO: ADEQUATE WATERING OF PLANT MATERIAL AND CONTROLLING WEEDS, Imu WE J COMMON RODENTS AND OTHER PESTS FOR A MINIMUM PERIOD OF THREE HUNDRED E bo h W RE FEMALEAt7Afi AND SIXTY-FIVE (365) DAYS. Pur, - 40 0.1 PA6T NIPR E�.I. 2. THE CONTRACTOR SHALL MAINTAIN THE PROJECT ON A CONTINUOUS BASIS I rk OF THE OWNER, THEIR AGENT, AND/OR THE LANDSCAPE ARCHITECT. FROM THE FIRST DAY AFTER PLANTING IS COMPLETED, UNTIL FINAL THE WORK PROCEEDS, 5HOWING THE WORK AS ACTUALLY INSTALLED. THESE DRAWINGS Q ADD TiIREAM UNION- SHALL BE AVAILABLE AT ALL TIMES FOR INSPECTION AND SHALL BE KEPT IN A NEXT AVAILABLE UP-SIZED CONTAINER. ALL GROUND COVER SHALL HAVE PARKS DEPARTMENT. LOCATION DESIGNATED BY THE LANDSCAPE ARCHITECT OR THE OWNER'S .VALVES COVERAGE WITH MINIMUM OR NO OVERSPRAY. LANDSCAPE ARCHITECT f�, 5C� 8C1'/, % ABOVE ftfl ST 3. COST INCURRED DUE TO DAMAGE OR REPLACEMENT DURING THE POST- fi SM L�EI'AdL `W' EP! -AN VeL 15 PGR VALVE TANS SHEET mm" (T/II MAtVlFACTUIZm, AND R3OR4AI Z WAUfRMMEIM. INSTALLATION - EXTAIL V) MAIN % MAIN TREE BASES, SHRUBS, ETC... a" ONLY) LINE I5' MIK 4. ALL AREAS INCLUDING, BUT NOT LIMITED TO TURF, GROUNDCOVER AREAS, LIkE 5. ALL IRANSTION5 M016AL.VANI= P!t'RA TO PVC PLE'E %%ALL CONCRETE WALKS AND SLABS SHALL BE KEPT GLEAN AND FREE OF c. GATE VALVES AS INDICATED. BPJCI c d. ROUTING OF PRESSURE MAIN LINE PIPE 5. ALL 0JOA71ON CONTROL. Wft (C NI1?OI, AW COMW S FALL. IMMO-M CeQ1&2L vAL.%a BE 14 6 M LTL. 5E1K.E SIR" 0l'fi£i2 WIRE, TAM ANG "AS -BUILT" DRAWING. THE DRAWINGS SHALL INCLUDE ALL DEVIATIONS i3tilV#?L.£37 AT I& 04W IR> E NALS MV PLAID NEAR TfE NOTES O'POSITION. MWATIOT N MAis� U AT TRE O'CLOCK POSITION. -SM 01Y STAUDAtZDS .�W L-2 1. Me 7VI.ON ON ALL IHWA} JOINT'S. 6. ALL WIRE COiMT0 6 SWI BE WATEIZE'RXP MV AMMOVW i. PLANT MATERIAL SUBSTITUTION OR LAYOUT CHANGES BY TIE RWMATEON AND PADS D1iWM SPL•1Ca WILL NOT 2. ALL NIMUZ SE3ALi W SCMW W PVC. ALL f11TIkt6J BE ALLOW ME$ A ROVL37 BY THE FEMATION AILD SU.i.• 1E WRLXLA.ir 40 PVC, PARKS DIRT ICK TE•E AP'PRO' W 5P1.ECE514111. MW Tf E 4. BEFORE THE DATE OF THE FINAL INSPECTION, THE CONTRACTOR SHALL DELIVER THE LW OF A SPLICE" WX 3. ALL WWATION CONTROL. VAL.VM al#ALL BE RA= IN A Pi.AG114 CORRECTED "FIELD RECORD" SET TO THE LANDSCAPE ARCHITECT WHO WILL USE THE IWJ6A11LON CONTROL VALVE BOX WITIL VALVE IP TAO. TRE TOP OF `f. MAINTAIN 20 (0hW 9PARA" BEEN! RM4M THE VALVE BOX %IALL BE 20 E50rW MM FW.4W OtAM IN TURF CONI' OL VALVES (CMMOE TO CfStTi INIE,) PM MORE TION AND 20 (�OW ABOVE P1N15FW OtAM IN PLANTER Af'A THE ORE VALVI! 15 WTALLW IN TREE SA14E LOCATEOkL. PLASTIC FOI.La *46 VALVE SOM AND LZ* OR Af't'120V8 WJAL MST BE ABLE TO RB3'E.ACE VALVE WITIiOUR' W GIDS ARE VWlW ACGd3'fABLE, ANY L7IAVIATION FOR'i'FIE AV -W= BOXY IR CATION LINES OR MOVINE i3OX AND LOS FLOW HVST BE AMZO'VI BY THE W. -C ATION NO PARKS &. YViM PIOSr`BA L 4XAM VAL%O EN TIE RAM AREAS. iD FZT0m P'P:EVENTION OR CONTROL MEASURES TAKEN. SHOULD CITY, DURING THE 151A r%X VAINEST RO PRO 61;RIL'S 14"Xt14" 4. AL. IWJ6ATION IN5TAL.ATLONS SfRALL W IN ACCOR179a WV WFUWA7W VALVE Bax MTH BatT Donal WVM CIN SIAM w!R M L ATver MPRO VW mT1oN or *E UNTO• WICK WUPLEKs TM PRO SM ES 10' ROMV FLLIFli3 W 00D>r, M&VA(,T6IRER'3 MWATIONS, SIECTiON 20 OF 111E STMVAW WCIPICATIM, A)V AS DR6CIM BY TIE CoOPO cIeAT00 VALVE BOX NTH 1"L -T nGY+H,i COVER. PSMATION AV PARKS DMTOK KNITS PULL SOXe Iia PRO SEIRIES I5"`X20`.1Jt-W BAKERSFIELD AS THE OFFICIAL "RECORD. DRAWINGS" FOR THE PROJECT. VWT, NS& AR VAL Yr. Box NTH WLT To00m crow• 10. ALL MATBFIIAL& 1fvED STALL BE NEW AW PM MW WTZTS. 4. ENSTALLATEON OF EXTRA M&ATRAI COHYM LIRE IF 11. MY AND ALL UW61ra STALL M APF'iiLAtW BY TRE RCC;tZBATiON IRR16A?ION CONTROL CIM TO FEMME CO ?M L VALUE E5 M PAM DMTOR PRIOR TO IM�tI'ATIOK REitB1IRE'D I -OR EACH MANFO V (Elm OF V&VM). EM AFTER THE AREA HAS BEEN BROUGHT UP TO CITY STANDARD, THE CITY HIM SMALL. BE A VfPHMI COLOR III AN TIE ONE: W TO MSE E AP'PR0W LANr><3GAPM09A?ION nMp AV L1501.505 OPM79 VALVES. (ONE CaLAR FOR ALL VALVE WM 4 OTE COLOR FOR S T4111 C WM NIM 5, SM, dWAlTY, MA A07MtS FOR ALL Eft]RAt WMI AND PERPORMIANC,E RZEaCiPI11eeT15, CITY OF BAKERSFIELD REVISIONS CITY OF BAKER.SFIELD REVISIONS 11. BEFORE THE START OF THE MAINTENANCE PERIOD, THE CONTRACTOR DETAILS FOR REMOTE CONTROL VALVES o. PROVIDE ONE CONTROLLER CHART FOR EACH CONTROLLER SUPPLIED, ONE TO THE An CONSTRUCTION. LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE GIN'S REPRESENTATIVE AND ONE ELECTRONIC, COPY. 1. THE CONTRACTOR SHALL PROPERLY AND COMPLETELY MAINTAIN ALL STANDARD FOR FINAL CONNECTION. PARTS OF THE IRRIGATION SYSTEM. AND SHALL BE REDUCED IN SIZE TO I I NI"T" OF THE APPROVED "RECORD DRAWINGS". PLAN NO. S1 IT 6 OF 14 APPkOVI-.t) Rrf: xxxxx DATE L-6 a. POINTS OF CONNECTION SHALL BE TO EXISTING WATER LINE. SEE WATER LAYOUT PLANS AND PLUMBING PLANS FOR EXACT LOCATIONS. Q. CONTRACTOR SHALL INSTALL BACKFLOW PREVENTER IN ENGLOSUR -5. ENCLOSURES SHALL BE STRONG BOX SMOOTH TOUGH STAINLESS STEEL WITH A THERMAL FREEZE BLANKET. VERIFY WITH C.O.B. PRIOR TO INSTALLATION. INSTALL AS PER G.O.B. SPECIFICATIONS. I0.QUANTITIE5 ON THE IRRIGATION SCHEDULE MAY NOT BE ACCURATE. CONTRACTOR SHALL BE RESPONSIBLE TO INSTALL ALL MATERIAL AS PER PLANS. II. ALL IRRIGATION VALVES SHALL BE INSTALLED IN SQUARE STANDARD BOXES AND QUICK COUPLERS SHALL BE INSTALLED IN 10" ROUND BOXES, AMETEK OR APPROVED EQUAL (PER C.O.B.). 12. CONTRACTOR SHALL PROVIDE 4 INSTALL TWO HOT WIRES TO EACH VALVE. CONNECT ONE (BLACK) 4 THE SECOND (RED) WILL BE SPARE. VERIFY WITH G.O.S. 13. CONTRACTOR SHALL PROVIDE AND INSTALL TWO ROOT WATERING SYSTEMS PER TREE. VERIFY WITH G.O.B. FOR EXACT CONFIGURATION. 14. CONTRACTOR SHALL PROVIDE AND INSTALL A SCHEDULE 50 PVC UNION 4 BALL VALVE, THE SAME SIZE AS THE VALVE, AT EACH VALVE LOCATION. VERIFY WITH C.O.B. FOR EXACT CONFIGURATION. 15. CONTRACTOR SHALL PRESSURE TEST MAINLINE AT A MIN. OF 125 PSI FOR (2) HOURS. TO BE VERIFIED BY THE C.O.B. FILE NAME.• L: \Projects\2013\ 130205.02\ACRD\LS\ 130205.02DET dwq - LAST SAVE: 3/14/2016 10:31:27 AM PDT - BY. Dan Garver WATIM MOT%110N L NIT p 46 4 W MK (0 (03m) R OIRM ON ALL, CIES WNGRETE SLAB PLAIN fMOXM) PR SW E LO c:�>=iv>rt�f-cL i T�T<i C7t"c i 1 viN iNv i >_ZP: THE CONTRACTOR SHALL CONTACT THE CITY S REPRESENTATIVE TO MAINTENANCE PERIOD: 6ENERAL RECORD DRANING NOTE: 6RAtJE I. THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS AND I. THE CONTRACTOR SHALL PROVIDE AND KEEP UP TO DATE A COMPLETE "FIELD RECORD" I. NO GGR4OM WM R/JAVMYS 09 ANY OM fAW SCAM EQUIPMENT TO PERFORM WORK DURING THE POST -INSTALLATION SET OF PRINTS WHICH SHALL BE CORRECTED DAILY INDIGATIONG EVERY CHANGE FROM MATERIAL AS GALLED OUT IN DETAILS AND AS I. INSTALL ALL I MAINTENANCE PERIOD, AS SPECIFIED HEREIN INCLUDING BUT NOT LIMITED THE ORIGINAL DRAWINGS AND SPECIFICATIONS INCLUDING EXACT LOCATIONS, SIZES AND TO: ADEQUATE WATERING OF PLANT MATERIAL AND CONTROLLING WEEDS, KINDS OF EQUIPMENT. THESE DRAWINGS SHALL SERVE AS WORK IN PROGRESS SHEETS REPLACED WITH MATERIAL OF LIKE KIND AND SIZE AND IN A MANNER RODENTS AND OTHER PESTS FOR A MINIMUM PERIOD OF THREE HUNDRED AND SHALL BE THE BASIS FOR MEASUREMENT. THIS SET OF DRAWINGS SHALL BE KEPT AND SIXTY-FIVE (365) DAYS. ON THE 51TE AND SHALL BE USED ONLY AS A FIELD RECORD SET. PILL USE $ALE. 2. THE CONTRACTOR SHALL MAINTAIN THE PROJECT ON A CONTINUOUS BASIS 2. THE CONTRACTOR SHALL MAKE NEAT AND LEGIBLE ANNOTATIONS THEREON DAILY AS OF THE OWNER, THEIR AGENT, AND/OR THE LANDSCAPE ARCHITECT. FROM THE FIRST DAY AFTER PLANTING IS COMPLETED, UNTIL FINAL THE WORK PROCEEDS, 5HOWING THE WORK AS ACTUALLY INSTALLED. THESE DRAWINGS Q WRITTEN ACCEPTANCE BY THE CITY OF BAKERSFIELD RECREATION AND SHALL BE AVAILABLE AT ALL TIMES FOR INSPECTION AND SHALL BE KEPT IN A NEXT AVAILABLE UP-SIZED CONTAINER. ALL GROUND COVER SHALL HAVE PARKS DEPARTMENT. LOCATION DESIGNATED BY THE LANDSCAPE ARCHITECT OR THE OWNER'S .VALVES COVERAGE WITH MINIMUM OR NO OVERSPRAY. LANDSCAPE ARCHITECT REPRESENTATIVE. ABOVE ftfl ST 3. COST INCURRED DUE TO DAMAGE OR REPLACEMENT DURING THE POST- AiZE*. MW FM EJP WAM OWL BE AS FOLIt>M SHALL HAVE FINAL APPROVAL. INSTALLATION MAINTENANCE PERIOD SHALL BE THE RESPONSIBILITY OF 3. THE CONTRACTOR SHALL DIMENSION FROM TWO PERMANENT POINTS OF REFER=NCE MAtVlFACTUIZm, AND R3OR4AI Z WAUfRMMEIM. THE CONTRACTOR. THE LOCATION AND CHANGESOF THE FOLLOWING ITEMS INCLUDING BUT NOT LIMITED TO: TREE BASES, SHRUBS, ETC... a" ONLY) a. CONNECTIONS TO EXISTING WATER LINES I5' MIK 4. ALL AREAS INCLUDING, BUT NOT LIMITED TO TURF, GROUNDCOVER AREAS, b. CONNECTIONS TO EXISTING ELECTRICAL POWER 5. ALL IRANSTION5 M016AL.VANI= P!t'RA TO PVC PLE'E %%ALL CONCRETE WALKS AND SLABS SHALL BE KEPT GLEAN AND FREE OF c. GATE VALVES AS INDICATED. WEEDS, LITTER AND DEBRIS. d. ROUTING OF PRESSURE MAIN LINE PIPE EE 6MMZIW KM WH3XU 40 PW4M AVAPM 4R 5. BEFORE WEEDS EXCEED TWO (2'9 INCHES IN HEIGHT, THEY SHALL BE e. SPRINKLER CONTROL VALVES f. ROUTING OF CONTROL AND COMMON WIRE "AS -BUILT" DRAWING. THE DRAWINGS SHALL INCLUDE ALL DEVIATIONS REMOVED AND DISPOSED OF OFF-SITE. SERIOUS WEEDS PESTS ( I.E. g QUICK COUPLER VALVES APPRO'VE17 99K BY THE R604FAM AV FARM D WT0PL BLACKBERRY, NUT 5ED6E OR BIND WEEDS) SHALL BE SPOT SPRAYED n• IRRIGATION SLEEVE LOCATIONS , ,>;, • t ' �' i< , /.<�; % WITH A NON-SELECTIVE POST -EMERGENT HERBICIDE AS SPECIFIED BY A i. PLANT MATERIAL SUBSTITUTION OR LAYOUT CHANGES MINIMUM 2 TIMES LARGER THAN THE IRRIGATION LINE. ALL SLEEVES WEED ABATEMENT COMPANY, AND LEFT IN PLACE FOR (1) SEVEN DAYS. a NOW 6RA13E WM NOT MWATIGN AS R'OLRrO & AREAS SPRAYED SHALL REMAIN UNWATERED FOR A MINIMUM OF FORTY- 4. BEFORE THE DATE OF THE FINAL INSPECTION, THE CONTRACTOR SHALL DELIVER THE VALVES, QUICK -COUPLING VALVES, ALL SPRINKLER HEADS AND ALL EIGHT HOURS. DEAD WEEDS SHALL BE REMOVED SEVEN (7) DAYS AFTER CORRECTED "FIELD RECORD" SET TO THE LANDSCAPE ARCHITECT WHO WILL USE THE I - TAW MR I SAL» (ON L) APPLICATION AND DISPOSED OF OFF-SITE. INFORMATION TO CREATE A GLEAN SET OF "RECORD DRAWINGS". ALL WORK SHALL BE 4 S' APPRCM LMVWAPP.ARRI6A TON PLANS AV LEOM SUBJECT TO APPROVAL BY THE LANDSCAPE ARCHITECT OR THE OWNER'S METHOD AND TYPE. 6. CONSTANT DILIGENCE SHALL BE MAINTAINED FOR THE ADVENT OF REPRESENTATIVE AND IS SUBJECT TO VERIFICATION. DELIVERY OF THE "FIELD RECOR" D 4 - Tl1RM f'ER 20 (0011 BOX DISEASES, INSECTS, AND/OR RODENT INFESTATION AND PROPER SET WILL NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF FURNISHING NAME AND CATALOG NUMBERS. ALSO, A SET OF 11" X 11" LAMINATED P'P:EVENTION OR CONTROL MEASURES TAKEN. SHOULD CITY, DURING THE REQUIRED INFORMATION THAT MAY BE OMITTED FROM THE PRINTS COMPILED ON THE `�' MAINTENANCE PERIOD, DISCOVER THAT THE TERMS FOR THE MAINTENANCE SITE. THE LANDSCAPE ARCHITECT WILL USE THE INFORMATION TO PRODUCE: :' < *,"•;; PERIOD AS STATED HEREIN HAVE NOT BEEN STRICTLY ADHERED TO, THEN a. ,4 GLEAN SET OF RECORD DRAWINGS WHICH WILL BE SUBMITTED TO THE CITY OF 55 P51 PREF. THE DAYS ACCRUING TOWARD COMPLETION OF SAID MAINTENANCE PERIOD BAKERSFIELD AS THE OFFICIAL "RECORD. DRAWINGS" FOR THE PROJECT. : �vj:: ; " i; ,''..:`✓`✓ ��i`•f f ;�`�.:.�`•: WILL BE TERMINATED. THE MAINTENANCE PERIOD WILL BE EXTENDED ONE(I) b. THE CONTRACTOR SHALL STAMP AND 516N EACH SHEET TO INDICATE "RECORD COUPLER VALVE KEYS WITH GATE VALVE HOSE BIB ATTACHMENT, DAY FOR EACH DAY THE AREA IS OUT OF ITS MAINTENANCE PERIOD. DRAWING" AS PROVIDED BY THE CONTRACTOR'S REPRESENTATIVE. (2.O" (5C. wi m) and less) AFTER THE AREA HAS BEEN BROUGHT UP TO CITY STANDARD, THE CITY c. CONTROLLER CHARTS SHALL BE PRODUCED FROM THE FINAL APPROVED "RECORD WILL REQUIRE A RE -INSPECTION BY A CITY OF BAKERSFIELD RECREATION DRAWING". GONTROLERS LOCATION. CONTROLLER LOCATIONS ARE SHOWN AND PARKS REPRESENTATIVE. WHEN THE INSPECTION 15 COMPLETED, AND CITY OF BAKERSFIELD REVISIONS THE AREA IS IN SATISFACTORY CONDITION, THEN, AND ONLY THEN, WILL 5. CONTROLLER CHARTS: 11. BEFORE THE START OF THE MAINTENANCE PERIOD, THE CONTRACTOR THE CITY RE -ACCEPT THE AREA IN WRITING. o. PROVIDE ONE CONTROLLER CHART FOR EACH CONTROLLER SUPPLIED, ONE TO THE An CONSTRUCTION. LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE GIN'S REPRESENTATIVE AND ONE ELECTRONIC, COPY. 1. THE CONTRACTOR SHALL PROPERLY AND COMPLETELY MAINTAIN ALL b. THE CHART SHALL SHOW THE AREA CONTROLLED BY EACH AUTOMATIC, CONTROLLER FOR FINAL CONNECTION. PARTS OF THE IRRIGATION SYSTEM. AND SHALL BE REDUCED IN SIZE TO I I NI"T" OF THE APPROVED "RECORD DRAWINGS". SITT _i,..,, OF 14 5. THE CONTRACTOR SHALL PROVIDE FOR DELIVERY OF WATER IN SUFFICIENT c. THE CHART SHALL BE A CLEAR PRINT AND A DIFFERENT COLOR SHALL BE FOR THEIR MAXICOM DOLLAR FUND. QUANTITIES AND ADJUST WATER APPLICATION TO COMPENSATE FOR USED TO INDICATE THE AREA OF COVERAGE FOR EACH CONTROL VALVE STATION. 131Z" WIPPORTS SEASONAL CONDITIONS. d. WHEN COMPLETED AND APPROVED, THE CHARTS SHALL BE SEALED BY PLASTIC C'S LAMINATING PROCESS AND SPIRAL BOUND. THE PLASTIC, LAMINATING SHEETS SHALL TFC Q. (3) THREE WEEKS PRIOR TO THE CONCLUSION OF THE MAINTENANCE PERIOD, , BE A MINIMUM OF 10 MIL. THICKNESS EACH. a. POINTS OF CONNECTION SHALL BE TO EXISTING WATER LINE. SEE WATER LAYOUT PLANS AND PLUMBING PLANS FOR EXACT LOCATIONS. Q. CONTRACTOR SHALL INSTALL BACKFLOW PREVENTER IN ENGLOSUR -5. ENCLOSURES SHALL BE STRONG BOX SMOOTH TOUGH STAINLESS STEEL WITH A THERMAL FREEZE BLANKET. VERIFY WITH C.O.B. PRIOR TO INSTALLATION. INSTALL AS PER G.O.B. SPECIFICATIONS. I0.QUANTITIE5 ON THE IRRIGATION SCHEDULE MAY NOT BE ACCURATE. CONTRACTOR SHALL BE RESPONSIBLE TO INSTALL ALL MATERIAL AS PER PLANS. II. ALL IRRIGATION VALVES SHALL BE INSTALLED IN SQUARE STANDARD BOXES AND QUICK COUPLERS SHALL BE INSTALLED IN 10" ROUND BOXES, AMETEK OR APPROVED EQUAL (PER C.O.B.). 12. CONTRACTOR SHALL PROVIDE 4 INSTALL TWO HOT WIRES TO EACH VALVE. CONNECT ONE (BLACK) 4 THE SECOND (RED) WILL BE SPARE. VERIFY WITH G.O.S. 13. CONTRACTOR SHALL PROVIDE AND INSTALL TWO ROOT WATERING SYSTEMS PER TREE. VERIFY WITH G.O.B. FOR EXACT CONFIGURATION. 14. CONTRACTOR SHALL PROVIDE AND INSTALL A SCHEDULE 50 PVC UNION 4 BALL VALVE, THE SAME SIZE AS THE VALVE, AT EACH VALVE LOCATION. VERIFY WITH C.O.B. FOR EXACT CONFIGURATION. 15. CONTRACTOR SHALL PRESSURE TEST MAINLINE AT A MIN. OF 125 PSI FOR (2) HOURS. TO BE VERIFIED BY THE C.O.B. FILE NAME.• L: \Projects\2013\ 130205.02\ACRD\LS\ 130205.02DET dwq - LAST SAVE: 3/14/2016 10:31:27 AM PDT - BY. Dan Garver WATIM MOT%110N L NIT p 46 4 W MK (0 (03m) R OIRM ON ALL, CIES WNGRETE SLAB PLAIN fMOXM) PR SW E LO c:�>=iv>rt�f-cL i T�T<i C7t"c i 1 viN iNv i >_ZP: THE CONTRACTOR SHALL CONTACT THE CITY S REPRESENTATIVE TO S. All LAMW S SIBAU W aA% ZOO PWG OR AS $M11M ON RM, 6RAtJE NOTES: PERFORM A FINAL INSPECTION OF WORK. ANY REMOVED PLANTS NOT IN I. NO GGR4OM WM R/JAVMYS 09 ANY OM fAW SCAM 1.1~a62K AS H0'1'Ep, ALL FF* AW E: rTASS SWU W MATERIAL AS GALLED OUT IN DETAILS AND AS I. INSTALL ALL I SATISFACTORY AND HEALTHY CONDITION FROM THE SITE SHALL BE ALL ELGTRIMAL MM AM MIM LIM &AIL 19 NTAUM 2.5' fWAMAM AW PAM OWTOR PER SPECIFICATIONS. REPLACED WITH MATERIAL OF LIKE KIND AND SIZE AND IN A MANNER 2, liSE TVLOIL PU°E TALE ON ALL. TRV�4t7� .LOIN15 OR NOTSE NrJT FL.AI�, 2. THERE SHALL BE NO DELETIONS OR SUBSTITUTIONS WITHOUT APPROVAL SPECIFIED FOR ORIGINAL PLANTING. IF THE REPLACEMENT PLANTS DO NOT REPRESENT A SIMILAR FOLIAGE REPRESENTATION OF THE ORIGINAL PILL USE $ALE. APPR&O W BY TLE RsT OMATLON AW PAM MWLTOR PRIOR TO OF THE OWNER, THEIR AGENT, AND/OR THE LANDSCAPE ARCHITECT. PLANTED MATERIAL, THE CONTRACTOR SHALL REPLACE PLANTS WITH VOU MVE V HK CIh, E'ER 110 VOLTS MV T ISN, CIA. FOR LOW Q � S. ALL SPRINKLERS AND SHALL BE ADJUSTED FOR REQUIRED NEXT AVAILABLE UP-SIZED CONTAINER. ALL GROUND COVER SHALL HAVE 10 (¢3sr+} 4 5M APPROW TWN PLANO AW .VALVES COVERAGE WITH MINIMUM OR NO OVERSPRAY. LANDSCAPE ARCHITECT A TWELVE (12") INCH CLEARING FROM ALL STRUCTURES INCLUDING BUT NOT ABOVE ftfl ST Wsm FORepwiFG mmm Him-ws VM a1ARCTm, AiZE*. MW FM EJP WAM OWL BE AS FOLIt>M SHALL HAVE FINAL APPROVAL. LIMITED TO: 51DEWALK AREAS, WALLS, FENCES, MOW CURBS, VALVE BOXES, "WUR 61RADE MAtVlFACTUIZm, AND R3OR4AI Z WAUfRMMEIM. LL (Ts PLAM `;r�,` ; TREE BASES, SHRUBS, ETC... a" ONLY) ALL 105 R V IV N LAM AW.4, I5' MIK 4. ALL COMPONENTS LOCATIONS ARE APPROXIMATE 4 DIAGRAMMATIC 10. BEFORE THE START OF THE MAINTENANCE PERIOD. THE CONTRACTOR 5. ALL IRANSTION5 M016AL.VANI= P!t'RA TO PVC PLE'E %%ALL S. RdA T 610 IS W}Bl TRIE Tt` TR�JR>K I5 (a.4E9ni1 AS INDICATED. SHALL PREPARE AND SUBMIT ON A (NEW) SET OF BLUE LINE PRINTS AN w EE 6MMZIW KM WH3XU 40 PW4M AVAPM 4R 5. ALL IRRIGATION LINES RUNNING UNDER PAVED SURFACES SHALL BE "AS -BUILT" DRAWING. THE DRAWINGS SHALL INCLUDE ALL DEVIATIONS B VdK OF WMATLON REAM. PARAWL 94W TM WW OP K40 :WAS. APPRO'VE17 99K BY THE R604FAM AV FARM D WT0PL INSTALLED IN SCHEDULE 40 PVC 5LEEVE5. ALL SLEEVES SHALL BE A FROM THE ORIGINAL BID DOCUMENTS MADE DURING CONSTRUCTION THAT , ,>;, • t ' �' i< , /.<�; % 6. A 6:0' (O.i5W NIX R MW Gt'd37 UM E56. ,/.�✓ �,, ' MINIMUM 2 TIMES LARGER THAN THE IRRIGATION LINE. ALL SLEEVES AFFECT THE MAIN LINES, CONTROLLER LOCATIONS, REMOTE CONTROL a NOW 6RA13E WM NOT MWATIGN AS R'OLRrO & DEVICE AHD A6 VM1W BY TI'E RZ $?ZA71ON AND PAWS GROSSING LOCATIONS WILL BE INDICATED BY CHISELING "IR" ON THE VALVES, QUICK -COUPLING VALVES, ALL SPRINKLER HEADS AND ALL PMTOK SM aff STMAR D 4 SM L-4 I - TAW MR I SAL» (ON L) FACE OF CONCRETE CURB. VERIFY WITH C.O.S. FOR APPROVED PLANT MATERIAL. THE DRAWINGS SHALL ALSO INDICATE AND 5HOW 4 S' APPRCM LMVWAPP.ARRI6A TON PLANS AV LEOM ". J1 PG \ ' ' .:.. METHOD AND TYPE. APPROVED SUBSTITUTIONS OF SIZE MATERIAL AND MANUFACTURER'S 7. ALL lRWATIOkI rOTALATION STALL W IN AGGQlxRMAWX MV1I 4 - Tl1RM f'ER 20 (0011 BOX fiiSTALL PHOT &WMt_ ` NAME AND CATALOG NUMBERS. ALSO, A SET OF 11" X 11" LAMINATED 7. MY ARV ALL MIA3Tal15 R'ROI.4 IM STANIMAii17 91AI BE GIN STAWiAP a, TREE LAIMT ACMnW WITION OF M `�' 6. ALL SYSTEMS ARE DESIGNED FOR PERFORMANCE AT 50 AND "A5 -BUILT" WITH HIGHLIGHTED COLOR GORED IRRIGATION REFERENCE :' < *,"•;; �; LN31ow R'L INS cml� MAk>«IFALTUf IS R2EC*04SIL7AtTm 55 P51 PREF. CHART AND SCHEDULE, KEYS TO THE CONTROLLER, AND TWO QUICK �i�:' : : �vj:: ; " i; ,''..:`✓`✓ ��i`•f f ;�`�.:.�`•: MMOTIV BY nE WJMATM AIV PAWS OMTOK i�ii%'I COUPLER VALVE KEYS WITH GATE VALVE HOSE BIB ATTACHMENT, (2.O" (5C. wi m) and less) -T. DEVELOPER SHALL PROVIDE ELECTRICAL POWER TO THE SHALL BE SUBMITTED TO THE CITY. REGRiErATTON AIVD PARKS DIMTOR UT10M OfLi34WATIM MCK GOES KEY WITtE YAM LiO� L3 GiTk)ki A5 SRK3tiN, KEY Mi1�ST GE.iR VALVE BOX GONTROLERS LOCATION. CONTROLLER LOCATIONS ARE SHOWN CITY OF BAKERSFIELD REVISIONS DIAGRAMATICALLY.. FINAL LOCATION SHALL BE DECIDED AT 11. BEFORE THE START OF THE MAINTENANCE PERIOD, THE CONTRACTOR FINLSEW &RADE 01 S1f1ZfI8 ARS WATER PROTECTION An CONSTRUCTION. LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE SHALL SUBMIT ALL INEDITED INVOICES OF SAID RAIN BIRD EQUIPMENT STANDARD WIM? TTLRJ:LTiON FOR FINAL CONNECTION. TO THE CITY OF BAKERSFIELD RECREATION AND PARKS REPRESENTATIVE PLAN NO. SITT _i,..,, OF 14 APPROVED RCC, XXXXX 37•11: FOR THEIR MAXICOM DOLLAR FUND. a. POINTS OF CONNECTION SHALL BE TO EXISTING WATER LINE. SEE WATER LAYOUT PLANS AND PLUMBING PLANS FOR EXACT LOCATIONS. Q. CONTRACTOR SHALL INSTALL BACKFLOW PREVENTER IN ENGLOSUR -5. ENCLOSURES SHALL BE STRONG BOX SMOOTH TOUGH STAINLESS STEEL WITH A THERMAL FREEZE BLANKET. VERIFY WITH C.O.B. PRIOR TO INSTALLATION. INSTALL AS PER G.O.B. SPECIFICATIONS. I0.QUANTITIE5 ON THE IRRIGATION SCHEDULE MAY NOT BE ACCURATE. CONTRACTOR SHALL BE RESPONSIBLE TO INSTALL ALL MATERIAL AS PER PLANS. II. ALL IRRIGATION VALVES SHALL BE INSTALLED IN SQUARE STANDARD BOXES AND QUICK COUPLERS SHALL BE INSTALLED IN 10" ROUND BOXES, AMETEK OR APPROVED EQUAL (PER C.O.B.). 12. CONTRACTOR SHALL PROVIDE 4 INSTALL TWO HOT WIRES TO EACH VALVE. CONNECT ONE (BLACK) 4 THE SECOND (RED) WILL BE SPARE. VERIFY WITH G.O.S. 13. CONTRACTOR SHALL PROVIDE AND INSTALL TWO ROOT WATERING SYSTEMS PER TREE. VERIFY WITH G.O.B. FOR EXACT CONFIGURATION. 14. CONTRACTOR SHALL PROVIDE AND INSTALL A SCHEDULE 50 PVC UNION 4 BALL VALVE, THE SAME SIZE AS THE VALVE, AT EACH VALVE LOCATION. VERIFY WITH C.O.B. FOR EXACT CONFIGURATION. 15. CONTRACTOR SHALL PRESSURE TEST MAINLINE AT A MIN. OF 125 PSI FOR (2) HOURS. TO BE VERIFIED BY THE C.O.B. FILE NAME.• L: \Projects\2013\ 130205.02\ACRD\LS\ 130205.02DET dwq - LAST SAVE: 3/14/2016 10:31:27 AM PDT - BY. Dan Garver WATIM MOT%110N L NIT p 46 4 W MK (0 (03m) R OIRM ON ALL, CIES WNGRETE SLAB PLAIN fMOXM) PR SW E LO w. A Sft-MBLY (greater than 2.0" (30mm) Via) S. All LAMW S SIBAU W aA% ZOO PWG OR AS $M11M ON RM, 6RAtJE NOTES: I, APR'i.Y SOLI.: ATdC'k1>I�Rit AS � 9Ca. TBfi% I. NO GGR4OM WM R/JAVMYS 09 ANY OM fAW SCAM 1.1~a62K AS H0'1'Ep, ALL FF* AW E: rTASS SWU W „_ 6AL VARM UN Z5 AVFROVED BY IM ALL ELGTRIMAL MM AM MIM LIM &AIL 19 NTAUM 2.5' fWAMAM AW PAM OWTOR 2' IIIA. LMS LJ<VIORVS, MASS FRMN66 / NIPPLM 2, liSE TVLOIL PU°E TALE ON ALL. TRV�4t7� .LOIN15 OR NOTSE NrJT FL.AI�, Lr++'t8�4.1111E= �- AMOVW IMM 13Y IM i ATION Ate'? Pi* VMTM PILL USE $ALE. APPR&O W BY TLE RsT OMATLON AW PAM MWLTOR PRIOR TO 3 ALL MATHZIALS SKALL BE N54 MD MM FROM WM:WTIONS VALVm VOU MVE V HK CIh, E'ER 110 VOLTS MV T ISN, CIA. FOR LOW Q � BRA6619TMS / IUR'Pi.ES 3 COWSTMT lRrJiM'i ARS F100 TO 615M R.ANM STABi & 10 (¢3sr+} 4 5M APPROW TWN PLANO AW (62" AOaVE FA ?m FNSW ABOVE ftfl ST Wsm FORepwiFG mmm Him-ws VM a1ARCTm, AiZE*. MW FM EJP WAM OWL BE AS FOLIt>M pl,ac� fRR{6ATIaRi GO►ttRt4l. "WUR 61RADE MAtVlFACTUIZm, AND R3OR4AI Z WAUfRMMEIM. LL (Ts PLAM `;r�,` ; 4" 000nW a" ONLY) ALL 105 R V IV N LAM AW.4, I5' MIK IA' (ON POR 6R" CaVM IV MIN. 5. ALL IRANSTION5 M016AL.VANI= P!t'RA TO PVC PLE'E %%ALL S. RdA T 610 IS W}Bl TRIE Tt` TR�JR>K I5 (a.4E9ni1 171a1AEtCE loss) w EE 6MMZIW KM WH3XU 40 PW4M AVAPM 4R TRIPI E 5f4N& 301Rtr ;'; 1 •; '' "� B VdK OF WMATLON REAM. PARAWL 94W TM WW OP K40 :WAS. APPRO'VE17 99K BY THE R604FAM AV FARM D WT0PL f. ,'c 1. 7JPRZ SHN& .LOEItI' SIML M RA1E+13ER7M7 SA MIES OR A 1MW EMAL , ,>;, • t ' �' i< , /.<�; % 6. A 6:0' (O.i5W NIX R MW Gt'd37 UM E56. ,/.�✓ �,, ' � • �,,r�`?: Fa Al.E ApAF'f FEaM FOR ALL KkM PRr3TMY100 I>S&M, KIGMIM afARANX S O LL £E 15' (0:4W ON ALL SCLC OF TRE a NOW 6RA13E WM NOT MWATIGN AS R'OLRrO & DEVICE AHD A6 VM1W BY TI'E RZ $?ZA71ON AND PAWS BY APPROM BY IM FEBMATON AIV PAR"K5 t3MT'OR PMTOK SM aff STMAR D 4 SM L-4 I - TAW MR I SAL» (ON L) F_ 4 M 0 4 S' APPRCM LMVWAPP.ARRI6A TON PLANS AV LEOM ". J1 PG \ ' ' .:.. S - TABLETS MR 6 EAL (I6A U 6 - VOM PIR 5 OAL 060 U `'•�'.`l• '%` `s 7. ALL lRWATIOkI rOTALATION STALL W IN AGGQlxRMAWX MV1I 4 - Tl1RM f'ER 20 (0011 BOX fiiSTALL PHOT &WMt_ ` §%� 7. MY ARV ALL MIA3Tal15 R'ROI.4 IM STANIMAii17 91AI BE GIN STAWiAP a, TREE LAIMT ACMnW WITION OF M `�' APPP^W (3Y ?RE R JAM ATV PARKS MWOR $ ALL LAll75G n 0115TALLATION IN MRI , .'':< :' < *,"•;; �; LN31ow R'L INS cml� MAk>«IFALTUf IS R2EC*04SIL7AtTm VA?IIZ>33�` SECTION 20 OF TIE STANVAM 5RWA%AT1ON5, AV AS �i�:' : : �vj:: ; " i; ,''..:`✓`✓ ��i`•f f ;�`�.:.�`•: MMOTIV BY nE WJMATM AIV PAWS OMTOK i�ii%'I TO vAI.vm (2.O" (5C. wi m) and less) a. AtsY AMAMCHANT r SRiAIt BEApr av» BY 7W 71T LAT13�l�t REGRiErATTON AIVD PARKS DIMTOR UT10M OfLi34WATIM MCK GOES KEY WITtE YAM LiO� L3 GiTk)ki A5 SRK3tiN, KEY Mi1�ST GE.iR VALVE BOX CITY OF BAKERSFIELD REVISIONS DETAILS FOR. POTABLE 6Ft KJSM PAM" OR AP PROVW INUAL FINLSEW &RADE 01 S1f1ZfI8 ARS WATER PROTECTION An _____ PR'�YAILlN6 STANDARD WIM? TTLRJ:LTiON amm COA.E R VALVE PLAN NO. SITT _i,..,, OF 14 APPROVED RCC, XXXXX 37•11: 2x KE" OF ROOTMn.I M R001B LL KI TYPICAL SHIRLS LfffAroa 2VAL ELANTIM. RETAIL CITY OF BAKER.SFIELD REVISIONS DE'T'AIL FOR TREE AND SfIRUB PLANTING S14'r .__1,1,. OF t4 APPROVED xcE xxxxx DATE STANDARD PLATS NO. L-10 w. NOTES,$ S. All LAMW S SIBAU W aA% ZOO PWG OR AS $M11M ON RM, 6RAtJE I, APR'i.Y SOLI.: ATdC'k1>I�Rit AS � 9Ca. TBfi% I. NO GGR4OM WM R/JAVMYS 09 ANY OM fAW SCAM „_ �. ALL Thi f�}IALL }!B 87'Ait» WI7H taxi 20' l�Ol�Rwli tJlk. ALL ELGTRIMAL MM AM MIM LIM &AIL 19 NTAUM 2.5' A MM VALVIE OR C43ECK VALVE 16 WG M TO F'EZI W OWSION. EplO96M i'R'k'ATIW) LOW I= "E 05M WWW (O:T* 1EP, IN A WHIMUE.Lx 40 PVC, 5 41EVE, SL MME $HALL BE 2 ' Lr++'t8�4.1111E= �- TTS fTmw i'ROM AU. Rif. w mTERW.178.dVFw TD TIE IM NAWIM OF COW / PIF'iHtTi, ALL MZIRfGAl. COHR31ftT APPR&O W BY TLE RsT OMATLON AW PAM MWLTOR PRIOR TO Mt=T SECS AMP OV" WIN TTS STALes. VOU MVE V HK CIh, E'ER 110 VOLTS MV T ISN, CIA. FOR LOW Q � 5. AU. Fk�P IJP f�ApS aIE�L.i• 2Ci" (A51rii` GONGR£1k 3 COWSTMT lRrJiM'i ARS F100 TO 615M R.ANM STABi & VOLTA, SM CITY STANMAPVD5 S' L4, MAIL K AHD ASPI ftT ALAS. ALL LAM PAM IRRIGATION Wj" (PARI' (62" AOaVE FA ?m FNSW VIJpW 010iR1}JI'iTEON OWALLATM WALL TREM ALAS AiZE*. MW FM EJP WAM OWL BE AS FOLIt>M pl,ac� fRR{6ATIaRi GO►ttRt4l. 60 (0jw Fm LATA ARBA 4, NOM IM 010W OR APF0101V t3 ENAl.16 019W ARRa1W LL (Ts PLAM `;r�,` ; 4" 000nW ALL 105 R V IV N LAM AW.4, IA' (ON POR 6R" CaVM LL MI E we S. RdA T 610 IS W}Bl TRIE Tt` TR�JR>K I5 6. WFl E PART ME ERfWATION L.AM AJC AD44ZW TO A BUILID,7V6 171a1AEtCE VAI2tE9 w 50 tkAW OR LMC, MH AW KW SURFACE. R Ja SAWIR TRIPI E 5f4N& 301Rtr ;'; 1 •; '' "� B VdK OF WMATLON REAM. PARAWL 94W TM WW OP K40 :WAS. i'�i 1. 7JPRZ SHN& .LOEItI' SIML M RA1E+13ER7M7 SA MIES OR A 1MW EMAL � . b. Fi.ANTtRR9 TA1�7 5}IALI. � Pt•Af� 2A' (SIV BHAYi OO Lv a NOW 6RA13E WM NOT MWATIGN AS R'OLRrO & BY APPROM BY IM FEBMATON AIV PAR"K5 t3MT'OR (0 I - TAW MR I SAL» (ON L) F_ 4 M 0 4 S' APPRCM LMVWAPP.ARRI6A TON PLANS AV LEOM S - TABLETS MR 6 EAL (I6A U 6 - VOM PIR 5 OAL 060 U `'•�'.`l• '%` `s 4�'AOT ��1 4 - Tl1RM f'ER 20 (0011 BOX fiiSTALL PHOT &WMt_ ` §%� 7. MY ARV ALL MIA3Tal15 R'ROI.4 IM STANIMAii17 91AI BE R�ANth FM Gift#' � ;�C�'�`1 i � PLANTING TAEi APPP^W (3Y ?RE R JAM ATV PARKS MWOR $ ALL LAll75G n 0115TALLATION IN MRI Mi4Hlt'AGTl11 s ;; 5PlrGfFI'ATM� .�;;, � (SF.E Nd'tlw b) �ti ',\. `' SOU. BE AGGMAWf aff STATIOATms, 9WAGTU1M RtBGM410AVOR#, MV 9YOTiON FN%V ORAM IN TURF AREAS 20 Of IM SiAWA V 5RWA%A7iORr;3. }.{E AL ITHWT DOM SAT SWO "" 0100 LID. 4, ALL. HA►'iTRIRI. I= OWL W llbl AM tft MW MMTIO S. 10. SM APPWVW LJVVXAftMittCaATRON FM 71T LAT13�l�t IG MOM WM9tM BA M1W11"ACVAK AIV MCK GOES KEY WITtE YAM LiO� L3 GiTk)ki A5 SRK3tiN, KEY Mi1�ST GE.iR VALVE BOX r9vvIRKkw rdwAme . 11. AW 2' 4F VMU ON WXV OW YATHt,'A L MW OM 6Ft KJSM PAM" OR AP PROVW INUAL FINLSEW &RADE 01 S1f1ZfI8 ARS An _____ PR'�YAILlN6 WIM? TTLRJ:LTiON amm COA.E R VALVE :�{:s • %> r < �. _ STAINS STS. CLAW 131Z" WIPPORTS TFtC� C'S TFC I (r/0�-'� TR& STAKM TR1#'L I~ Sv�I .LrI1N1r NXIM TR1E" TLE W2404 OR APMMW MPFMT MAINLINE SWAL, 2 70 PM RAM (5 TO A5 ) STN(v) (51% NOTE $2 AW DETAIL X � TR1JRdG WARD 'TURP U64MAPE PABNO TICK MY YIATl+R FA CITY OF BArrER.SFIELD HATOt WIN HA61N 40 OM LANDSCAPE AND IRRIGATION DETAILS FOR 40 SM VARIOUS IRRIGATION HEADS STANDARD PLAN NO. 21T A OI' _ I: _ APPROWD RcE xxXxx DATF: IL - ORM OP Im TO BE ` .. Or (&mO AWVE F.6 (TiflCl�ilq�} ,• -:��tJ1Ki'IRt6 TAiil!~Ta ^ PLARttiN6 TAOLM Y{ NOTE 16) f �tctt� �Lt. �c 1�ar�t 2x KE" OF ROOTMn.I M R001B LL KI TYPICAL SHIRLS LfffAroa 2VAL ELANTIM. RETAIL CITY OF BAKER.SFIELD REVISIONS DE'T'AIL FOR TREE AND SfIRUB PLANTING S14'r .__1,1,. OF t4 APPROVED xcE xxxxx DATE STANDARD PLATS NO. L-10 Me" Im SWWO, TFL!~ MAXZN C MUST NOT C E WO CONI"ACT ATT IM u�.,au�c mm 4A2 m MAN WN TW POM SiJI'PL:Y OR VALVA: YEIfZlkE6. LOCATE 1lt MAMSWIM MV TAM - COM G,A REAR TIE MA1!! LINE AT A 9 O'CLOCK POTION. ,10 10' (604ma AT LOCATE 4W AT M S, F MOIL 11 N OW LN IS ENSTA+1120 MR TRIM, PROVIM 04= Poglym 05, (0.15w HORRLZo}il'AIL AM VWZAL SEPARATION, �U•.t, r�'% " 4. ALL PVC, SOLVBVi' (" SfALL W "I (R° MIM IS� MAIN � LI1rI� RON MAIN UWE ONLY). '� .� 5. LAk�GAR� AN3 ER3t16ATItlN IPP'ROVt543Vn WLTINit'RiLE 178 "7217 5T1E1' RM-OF44AY MAY F060EAN OPEN FOR ���I',P{I� n"T'. CW" MH CITY WI EEIM D AM14W EA' �d�t? MOW sum i 8115 iIREMIM. 6. NM OFB157'R%EY OM MM FEaMW TO 06TA I VARM{ :��• , : �,> � �`;% IMI&ATION LM A001014 Yom, ALL STIFF PATL}#N& MM � 1 TRE 0111f RIOW-OF40Y S AL L BE IN A=MAWZ WN GIN 5TA187MW ST -12 OR A5 DNftlB3? BY TIE C11Y ESV6IILE Z. MRAW 1 AL. Mt*A7'10N LAMAl. LINES MALL BE CLAS 2O0 PVC, TUliP t If A LA7MAL. L DE 19 LOCAIM WIM A HAM WWA:f,E, WRVAE 40 Pvc, I5 REL,RIIRL77. �* FOIt 34fAt�' TUlai° I�I�Dra y i'., &. YM THS If'i A C4WOE IN PLT'1W VWTEON, ALL H06ATIOIV �> MAIN LING LAROM 'LfM 2LY tOm} IN DIA11CM (FitESM � �'`"` LW) SIAJ.L BE SMUM WrM GC ZWE TROT BLOCKS IN y amu' ACEOPDANGE )<+RTYE MANFFA67MS Rte JVDATIOK AND %r �~ AS DMTE7 BY 7'YE RxI M&TION AND PAWS DIRECTOR SM CITY STAWARD %M L-3 FOR TifW}«eT BLOCK MTAPL a. ALL i NATION MAINLINES INES 2D" (tOrW IN VIAMM AND � .j-6 -_LINE LM SKI W SCRf'3lA.E 40 PVC. 106ATION MAINLINES SeATEFL �.:..� MAN 20 W* IN D11MVM SWU BE TETE RVG WWW 40 OR AP 74M EG1L1At. BY TE•E Rf:C,RIrA r1OX AND PAWS VMTOK 0 AW *0 ALL C+W46E S SWU RE APPR ViT1 BY M W5MATIOk AW PARKS DIRECTOR PRIOR TO EMIr'ii lE3TlAT10Pi. LI. ALL iFtRi5A710H IWX1.ATION 51LALL W M ACGM*a YM • MLAM •:,; CITY STAPVDA",1C E LAIMT Al?"OW W EDI'110N OF 711E EMIrM Tuan W.Aps M rr cpm S MVAW P'LUlNIM CORE, MAWAC+nMS tZE a+WATKINS, W471 ON �� • � �� 3T -G1. � GALiTtAt1, 20 OF TRE $TANL M SMnCATIOK AHD AS IOW1W BY .« C!' » " TTS+ r OR IMMATIOkL AM PARRS MfMTOR wwATm Atm PAM 12, ALL MATT Z1AL. LI<,a�i SFtAa BE 04 APVL7 RM PWM ffi3I WTlOLV'S. ,�< T7R6G1OR 13 SEE APROVW LAMSCAM MV 1W.16ATION FLA* AND LW9W LATwAI. FOR SPECm MODEt.. NVQ 5= Qimi#1Y, %w_1v1nW RACE II:RIGA" Comm AND R��GE� 1�1U1R 115. PLACE YAW4H YDS � <, Ri�Af V T ttAitt E4. No OiTfi�FL CONDUIT OR PI n* MAY Be AL LaW t�AtI04 ASS�l�TAlt�e As i'� � RINt� W�1. er . � iiJ t+��V Asli.N]%7W. MW MI&AVON PM OR 601MM LINE � AT TRS 4 dY,LO� � ' LOGAtl: WM AT CFE MULTIPLE LiNEa CITY OF BAKERSFIELD REVISIONS DETAILS FOR PIPING, TRENCHING, AND BACKFILL STANDARD PLAN NO. S1fT OF ___14_ APl'ROWT) MT. xxxxx DATE L-2 ON ES R� XXW.V�3 10" 50 mw 1, ESE VIA MV ON ALL TREAD "M (Q FOR glum 2. AL.L MM AW NI IKS STALL i3E SOH. W PVC. ALL PE7`IiN6S 4 �' '' . �� , ,•:� MALL, EE VA 40 FANG, ' 7777 ...� V S. All LAMW S SIBAU W aA% ZOO PWG OR AS $M11M ON RM, 6RAtJE I. NO GGR4OM WM R/JAVMYS 09 ANY OM fAW SCAM 4. W-I&ATa YF.Adx ALS 1160 11M WIrA B49ANIC%M, ALL ELGTRIMAL MM AM MIM LIM &AIL 19 NTAUM 2.5' A MM VALVIE OR C43ECK VALVE 16 WG M TO F'EZI W OWSION. , (O:T* 1EP, IN A WHIMUE.Lx 40 PVC, 5 41EVE, SL MME $HALL BE 2 ' Lr++'t8�4.1111E= �- AS i'IMMIA M BY I; EE :+M0100 t'AkltIItIONS ACRD *AL BE IM NAWIM OF COW / PIF'iHtTi, ALL MZIRfGAl. COHR31ftT APPR&O W BY TLE RsT OMATLON AW PAM MWLTOR PRIOR TO VOU MVE V HK CIh, E'ER 110 VOLTS MV T ISN, CIA. FOR LOW z� � 5. AU. Fk�P IJP f�ApS aIE�L.i• 2Ci" (A51rii` GONGR£1k LL VOLTA, SM CITY STANMAPVD5 S' L4, MAIL K AHD ASPI ftT ALAS. ALL LAM PAM IRRIGATION Wj" (PARI' (62" AOaVE FA ?m FNSW 2 Y Ritmo 7w itAiN x9m wA){ICOM VVI6ATION AW41mF! 15 t AiZE*. MW FM EJP WAM OWL BE AS FOLIt>M pl,ac� fRR{6ATIaRi GO►ttRt4l. Me" Im SWWO, TFL!~ MAXZN C MUST NOT C E WO CONI"ACT ATT IM u�.,au�c mm 4A2 m MAN WN TW POM SiJI'PL:Y OR VALVA: YEIfZlkE6. LOCATE 1lt MAMSWIM MV TAM - COM G,A REAR TIE MA1!! LINE AT A 9 O'CLOCK POTION. ,10 10' (604ma AT LOCATE 4W AT M S, F MOIL 11 N OW LN IS ENSTA+1120 MR TRIM, PROVIM 04= Poglym 05, (0.15w HORRLZo}il'AIL AM VWZAL SEPARATION, �U•.t, r�'% " 4. ALL PVC, SOLVBVi' (" SfALL W "I (R° MIM IS� MAIN � LI1rI� RON MAIN UWE ONLY). '� .� 5. LAk�GAR� AN3 ER3t16ATItlN IPP'ROVt543Vn WLTINit'RiLE 178 "7217 5T1E1' RM-OF44AY MAY F060EAN OPEN FOR ���I',P{I� n"T'. CW" MH CITY WI EEIM D AM14W EA' �d�t? MOW sum i 8115 iIREMIM. 6. NM OFB157'R%EY OM MM FEaMW TO 06TA I VARM{ :��• , : �,> � �`;% IMI&ATION LM A001014 Yom, ALL STIFF PATL}#N& MM � 1 TRE 0111f RIOW-OF40Y S AL L BE IN A=MAWZ WN GIN 5TA187MW ST -12 OR A5 DNftlB3? BY TIE C11Y ESV6IILE Z. MRAW 1 AL. Mt*A7'10N LAMAl. LINES MALL BE CLAS 2O0 PVC, TUliP t If A LA7MAL. L DE 19 LOCAIM WIM A HAM WWA:f,E, WRVAE 40 Pvc, I5 REL,RIIRL77. �* FOIt 34fAt�' TUlai° I�I�Dra y i'., &. YM THS If'i A C4WOE IN PLT'1W VWTEON, ALL H06ATIOIV �> MAIN LING LAROM 'LfM 2LY tOm} IN DIA11CM (FitESM � �'`"` LW) SIAJ.L BE SMUM WrM GC ZWE TROT BLOCKS IN y amu' ACEOPDANGE )<+RTYE MANFFA67MS Rte JVDATIOK AND %r �~ AS DMTE7 BY 7'YE RxI M&TION AND PAWS DIRECTOR SM CITY STAWARD %M L-3 FOR TifW}«eT BLOCK MTAPL a. ALL i NATION MAINLINES INES 2D" (tOrW IN VIAMM AND � .j-6 -_LINE LM SKI W SCRf'3lA.E 40 PVC. 106ATION MAINLINES SeATEFL �.:..� MAN 20 W* IN D11MVM SWU BE TETE RVG WWW 40 OR AP 74M EG1L1At. BY TE•E Rf:C,RIrA r1OX AND PAWS VMTOK 0 AW *0 ALL C+W46E S SWU RE APPR ViT1 BY M W5MATIOk AW PARKS DIRECTOR PRIOR TO EMIr'ii lE3TlAT10Pi. LI. ALL iFtRi5A710H IWX1.ATION 51LALL W M ACGM*a YM • MLAM •:,; CITY STAPVDA",1C E LAIMT Al?"OW W EDI'110N OF 711E EMIrM Tuan W.Aps M rr cpm S MVAW P'LUlNIM CORE, MAWAC+nMS tZE a+WATKINS, W471 ON �� • � �� 3T -G1. � GALiTtAt1, 20 OF TRE $TANL M SMnCATIOK AHD AS IOW1W BY .« C!' » " TTS+ r OR IMMATIOkL AM PARRS MfMTOR wwATm Atm PAM 12, ALL MATT Z1AL. LI<,a�i SFtAa BE 04 APVL7 RM PWM ffi3I WTlOLV'S. ,�< T7R6G1OR 13 SEE APROVW LAMSCAM MV 1W.16ATION FLA* AND LW9W LATwAI. FOR SPECm MODEt.. NVQ 5= Qimi#1Y, %w_1v1nW RACE II:RIGA" Comm AND R��GE� 1�1U1R 115. PLACE YAW4H YDS � <, Ri�Af V T ttAitt E4. No OiTfi�FL CONDUIT OR PI n* MAY Be AL LaW t�AtI04 ASS�l�TAlt�e As i'� � RINt� W�1. er . � iiJ t+��V Asli.N]%7W. MW MI&AVON PM OR 601MM LINE � AT TRS 4 dY,LO� � ' LOGAtl: WM AT CFE MULTIPLE LiNEa CITY OF BAKERSFIELD REVISIONS DETAILS FOR PIPING, TRENCHING, AND BACKFILL STANDARD PLAN NO. S1fT OF ___14_ APl'ROWT) MT. xxxxx DATE L-2 ON ES R� XXW.V�3 10" 50 mw 1, ESE VIA MV ON ALL TREAD "M (Q FOR glum 2. AL.L MM AW NI IKS STALL i3E SOH. W PVC. ALL PE7`IiN6S 4 �' '' . �� , ,•:� MALL, EE VA 40 FANG, ' 7777 ...� V S. All LAMW S SIBAU W aA% ZOO PWG OR AS $M11M ON RM, 6RAtJE 4. W-I&ATa YF.Adx ALS 1160 11M WIrA B49ANIC%M, A MM VALVIE OR C43ECK VALVE 16 WG M TO F'EZI W OWSION. z t CE a VALVES MIN VALVES SAL. It INSTALLW AT I XATIt * Lr++'t8�4.1111E= �- AS i'IMMIA M BY I; EE :+M0100 t'AkltIItIONS ACRD *AL BE APPR&O W BY TLE RsT OMATLON AW PAM MWLTOR PRIOR TO R.A40M AV USE. 5. AU. Fk�P IJP f�ApS aIE�L.i• 2Ci" (A51rii` GONGR£1k LL WALL T& OF MAD 0.0 AHD ASPI ftT ALAS. ALL LAM PAM IRRIGATION Wj" (PARI' (62" AOaVE FA ?m FNSW O{lZ20 %qL BE 40 (E"" EaROM COWAIVIE AND A5 ORKT PART =11 AR40+ �p AiZE*. MW FM EJP WAM OWL BE AS FOLIt>M Oco+mtY FOR f3u. LIAV 60 (0jw Fm LATA ARBA ...... `;r�,` ; i0 (OZW FOR VAM ,� IA' (ON POR 6R" CaVM LL MI E we 6. WFl E PART ME ERfWATION L.AM AJC AD44ZW TO A BUILID,7V6 O 0_ w 14414, LX)kT REAM Hk 4' 400ffW MMI FACE OF BIXI N6 WAIL. TO TRIPI E 5f4N& 301Rtr ;'; 1 •; '' "� B VdK OF WMATLON REAM. 1. 7JPRZ SHN& .LOEItI' SIML M RA1E+13ER7M7 SA MIES OR A 1MW EMAL OO Lv LA'1MAL IN " `"" a. ABLY AV ALL CHANCES F't TO $TA WAM MAL E SKI BY APPROM BY IM FEBMATON AIV PAR"K5 t3MT'OR (0 F_ 4 M 0 4 S' APPRCM LMVWAPP.ARRI6A TON PLANS AV LEOM FM SROGIFIC MfX?EZ• NIHM, 92, QUARt117'Y, MWACTLPM, A7t0 P 'ORI�IAIiGE t IE 15. Fmphw $PAM w ZZ cL Eli o W U W FN%V ORAM IN TURF AREAS 51 OR (ilis°rrY . \�5 f AL ITHWT DOM SAT SWO "" 0100 LID. 71T LAT13�l�t MCK GOES KEY WITtE YAM LiO� L3 GiTk)ki A5 SRK3tiN, KEY Mi1�ST GE.iR VALVE BOX FINLSEW &RADE 01 S1f1ZfI8 ARS An KK' amm COA.E R VALVE :�{:s • %> r < �. _ STAINS STS. CLAW 131Z" WIPPORTS I (r/0�-'� TR1#'L I~ Sv�I .LrI1N1r MAINLINE SrA 2 R FW'a, U64MAPE PABNO (S3 OttOM MOWbod) CITY OF BArrER.SFIELD REVISIONS LANDSCAPE AND IRRIGATION DETAILS FOR VARIOUS IRRIGATION HEADS STANDARD PLAN NO. 21T A OI' _ I: _ APPROWD RcE xxXxx DATF: IL - Li d- 00 O � U) 00 o i m ti Z LJ CNV) c M M d a-C.0°'r'z �- XO U LO � Q m m , o 0 --' o 0 nn->�U-� Y LIJ z O4; o Y V) Or m m O Lij m Z a. �O Q ® o PLOT DATE: Mar -15-2016 09:23AM JOB NO.: 130205.02 FILE NAME: 130205.02DET.DWG SCALE: wS 1.5-6916 Ph 2 SHE NO.: OF 3 f V z ixO LL Q V LL 04 O 0_ w V.r W ~♦ W t; OO Lv 0. z 0 z (0 F_ 4 M 0 Qi w ZZ cL Eli o W U W ,.1 00 PLOT DATE: Mar -15-2016 09:23AM JOB NO.: 130205.02 FILE NAME: 130205.02DET.DWG SCALE: wS 1.5-6916 Ph 2 SHE NO.: OF 3 f