Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
1.7-7253 Ph 1 & 2
OWNER: CLEAR CREEK HOMES NAME 11202 VISTA RIDGE DRIVE ADDRESS BAKERSFIELD, CA. 93311 CITY, STATE, ZIP (661) 865-2945 PHONE # GEOTECHNICAL ENGINEER: KRAZAN & ASSOCIATES, INC COMPANY NAME DAVID R. JAROSZ, RGE No. 2698/RCE No. 60185 ENGINEERS NAME & LICENSE # 2205 COY AVENUE ADDRESS BAKERSFIELD, CA. 93307 CITY, STATE, ZIP (661) 837-9200 PHONE # GRADING CONTRACTOR: COMPANY NAME CONTRACTORS NAME ADDRESS CITY, STATE, ZIP PHONE # k qk "AAK 6 40� I PHASES 1 AND 2 BAKERSFIELD, CALIFORNIA BENCHMARK USED: TOP OF BRASS DISK ON TOP OF HEADWALL AT SOUTHEAST CORNER OF PANAMA LANE AND SOUTH "H" STREET NATIONAL GEODETIC SURVEY BENCHMARK DESIGNATION X 364 PID FU1624 ELEVATION = 349.00 (U.S.G.S. DATUM) BASIS OF BEARINGS: THE BEARING SOUTH 89'32'17" EAST SHOWN FOR THE NORTH LINE OF THE NORTHWEST QUARTER OF SECTION 6, TOWNSHIP 31 SOUTH, RANGE 28 EAST, MOUNT DIABLO BASE AND MERIDIAN (ALSO BEING THE CENTERLINE OF TAFT HIGHWAY - COUNTY RD NO. 25 & 2387) AS SHOWN ON LOT LINE ADJUSTMENT NO. 56-94 WAS USED AS THE BASIS OF BEARINGS SHOWN HEREON. LEGAL DESCRIPTION BEING A DIVISION OF PARCEL 1 OF PARCEL MAP NO. 12182, AS PER MAP RECORDED NOVEMBER 15, 2016 IN BOOK 60 OF PARCEL MAPS AT PAGES 138-139 IN THE OFFICE OF THE KERN COUNTY RECORDER, ALSO BEING A PORTION OF THE NORTHWEST QUARTER OF FRACTIONAL SECTION 6, TOWNSHIP 31 SOUTH, RANGE 28 EAST, MOUNT DIABLO BASE AND MERIDIAN, IN THE CITY OF BAKERSFIELD, COUNTY OF KERN, STATE OF CALIFORNIA. I i EAST HOSKING AVENUE w I N McKEE ROAD McKEE ROAD 36 ! 31 wf z o ¢i 0 PROJECT ,Si ITE '- - TAFT __ _ __ HIGHWAY i `i f Uj oU) 0 o Ln 1 ROAD 6 i Of W = J a -N Z w � v I U VICINITY MAP NO SCALE GRADING QUANTITIES THE QUANTITIES SHOWN BELOW ARE FOR GRADING PERMIT PURPOSES ONLY, AND SHALL NOT BE USED FOR BIDDING PURPOSES. THE CONTRACTOR SHALL MAKE HIS/HER OWN ESTIMATE OF QUANTITIES FOR BIDDING THIS PROJECT. ALL QUANTITIES WERE CALCULATED BY AVERAGE END AREA METHOD ANC: ARE BASED ON A 0.20' FT LOSS DUE TO CLEARING AND GRUBBING OF THE SITE. THE ENGINEER MAKES NO WARRANTY AS TO THE ANTICIPATED SHRINKAGE FACTOR. CUT 42,196 CY t OVER -EXCAVATION 20,100 CY t FILL* (INCLUDES OVER -EX.) 41,550 CY f EXPORT** 646 CY t COMPACTION FACTOR 130% TRACT BOUNDARY (DISTURBED AREA) 20.14 GROSS ACRES OFF-SITE (DISTURBED AREA) 0.84 GROSS ACRES TOTAL (DISTURBED AREA) 20.98 GROSS ACRES TOTAL NUMBER OF LOTS 79 BUILDABLE AB 1 SUMP LOT *FILL QUANTITIES ARE "COMPACTED IN-PLACE" VOLUMES. ** EXPORT MATERIAL TO BE "SPOILED" ALONG PROPOSED REAR LOT AREAS (NON-STRUCTURAL AREAS). DWY or D/A SHEET INDEX FL 01 TITLE SHEET GB CO NOTES AND DETAIL TOG TEMPORARY BASIN DETAIL TOC © PHASE 1 GRADING PLAN CONC ® PHASE 2 GRADING PLAN BW 05 DRAINAGE BASIN DETAIL TC TYPICAL SECTIONS—DETAILS BCR OFF—SITE HCP AREA DETAIL ECR ABBREVIATIONS TYPICAL ALL SHEETS UNLESS SUPERSEDED BY SHEET CEFINITION EX EXISTING FUT FUTURE FG FINISHED GROUND FS FINISHED SURFACE FP FINISHED PAD FF FINISHED FLOOR NG or OG NATURAL/ORIGINAL GROUND EP EDGE OF ASPHALT CONCRETE PAVEMENT AC TOP OF ASPHALT CONCRETE PAVEMENT AB AGGREGATE BASE ASB AGGREGATE SUB -BASE CL CENTERLINE DWY or D/A DRIVEWAY OR DRIVE APPROACH FL FLOWLINE GB GRADE BREAK TOG TOP OF GRATE/CATCH BASIN INLET TOC TOP OF CONCRETE CONC CONCRETE BW BACK OF SIDEWALK TC TOP OF CURB BCR BEGIN CURB RETURN ECR END CURB RETURN PI POINT OF INTERSECTION EC END CURVE BC BEGIN CURVE PIVC VERTICAL CURVE POINT OF INTERSECTION POVC POINT ON VERTICAL CURVE VC VERTICAL CURVE BVC BEGIN VERTICAL CURVE EVC END VERTICAL CURVE PRC POINT OF REVERSE CURVE PCC POINT OF COMPOUND CURVE ^• ON THIS SHEET MAX MAXIMUM MIN MINIMUM TYP TYPICAL EL or ELEV ELEVATION BDRY BOUNDARY R RADIUS L LENGTH AF ACRE-FEET SF SQUARE FEET LF LINEAR FEET EA EACH CY CUBIC YARDS ESMT EASEMENT RW RIGHT-OF-WAY SD STORM DRAIN CB CATCH BASIN SWR SANITARY SEWER MH MANHOLE WTR WTR G GAS REQ'D REQUIRED ALL CONSTRUCTION ACTIVITY, INCLUDING STAGING, SHALL BE WITHIN THE LIMITS SHOWN ON THIS PLAN. CONTRACTOR SHALL OBTAIN A COPY OF THE BIOLOGICAL CLEARANCE SURVEY FOR THIS PROJECT. CONTRACTOR SHALL BE SOLELY LIABLE AND RESPONSIBLE FOR FOLLOWING THE RECOMMENDATIONS OF THE BIOLOGICAL CLEARANCE SURVEY. NO STAGING, GRADING, OR OTHER DISTURBANCE SHALL OCCUR OUTSIDE THE LIMITS SHOWN ON THIS PLAN. 061M IF THE PROJECT IS SUBJECT TO THE PROVISIONS OF THE NATIONAL POLLUTANT DISCHARGE EUMINATION SYSTEM (NPDES), A "NOTICE OF INTENT" (N01) TO COMPLY WITH THE TERMS OF THE GENERAL PERMIT TO DISCHARGE STORM WATER ASSOCIATED WITH CONSTRUCTION ACTIVITY (SWRCB ORDER NO. 2009-009-DWQ AS AMENDED BY ORDER 2010-0014-DWQ AND ORDER 2012-0006-DWQ) MUST BE FILED WITH STATE WATER RESOURCES CONTROL BOARD IN SACRAMENTO BEFORE THE BEGINNING OF ANY CONSTRUCTION ACTIVITY. COMPLIANCE WITH THE GENERAL PERMIT REQUIRES THAT A STORM WATER POLLUTION PREVENTION PLAN (SWPPP) BE PREPARED, CONTINUOUSLY CARRIED OUT, AND ALWAYS BE AVAILABLE FOR PUBLIC INSPECTION DURING NORMAL CONSTRUCTION HOURS. WASTE DISCHARGE IDENTIFICATION (WDID) NUMBER 5F15C378989 HAS BEEN ISSUED BY THE STATE WATER RESOURCES BOARD FOR THIS PROJECT. NOTES: AN OPEN STREET PERMIT SHALL BE OBTAINED FROM THE CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT FOR ANY WORK PERFORMED WITHIN EXISTING ACCEPTED STREET RIGHT OF WAY. UNLESS SECURED BY A SUBDIVISION AGREEMENT, SECURITY BASED ON AN APPROVED ENGINEER'S ESTIMATE FOR THE WORK PERFORMED WITHIN RIGHT OF WAY AND INSURANCE AS REQUIRED SHALL BE PROVIDED PRIOR TO ISSUANCE OF A PERMIT. MAXIMUM SLOPE RATIO FROM BACK OF SIDEWALK TO FACE OF WALL OR STRUCTURE SHALL BE 4:1, EXCEPT FOR TWO FEET BEHIND SIDEWALK WHERE THE MAXIMUM SLOPE SHALL BE 2%. ALTERNATIVELY, THE CITY ENGINEER MAY APPROVE CURBING BEHIND THE SIDEWALK OR OTHER METHOD TO PREVENT EROSION ONTO SIDEWALK. ANY ITEMS IN PUBLIC RIGHT-OF-WAY THAT ARE DAMAGED OR DO NOT MEET CURRENT STANDARDS SET BY PUBLIC WORKS WILL REQUIRE REPAIRING AND/OR UPGRADING AS PER CITY ENGINEER. COMPACTION TEST SHALL BE THE RESPONSIBILITY OF THE DEVELOPER/SUBDIVIDER/CONTRACTOR. THE NUMBER AND LOCATION OF REQUIRED TESTS SHALL BE DETERMINED BY THE CITY ENGINEER. KERN DELTA WATER DISTRICT NOTE PRIOR TO CONSTRUCTION, KERN DELTA WATER STORAGE DISTRICT (661) 834-4656 SHALL BE NOTIFIED TO ENSURE THAT PROPOSED CONSTRUCTION WILL NOT INTERFERE WITH KERN DELTA'S ABILITY TO MAINTAIN WATER DELIVERY TO PROPERTIES EAST OF SUBJECT PROPERTY. NOTE: ENTIRE TRACT SHALL BE GRADED AT THE SAME TIME 0acUO wOm W O w F m p J 27698 X Z V� W w Z W U) [O ww-O<--.w _ r_� Q s I wJ=z-x}0� "F— 00 �� ce) - aJazdUGHF-'izaz LuMto --X89'32'1 Xr=SWtno Z P-owrQzJww`= 9;; CDo --204.C5'-, W O LIJ Z zwwE z cc w=OwQumCOL.0 :' ¢ E Q ti )" N O 0 F -F VSSCrOL- = O Ch zq1 0 co a 00 LE !LQ'�� ZU w o z C7 Z w �— The GRADING PLAN as shown on this drawing w = W z a CL = oz°-~QWZ~HG 28 - subis hereby approved t ani indicated corrections z ¢ o LL o a m � 8 0 X oradditu;ns. Approval b t INcr`,y DeparlmE n± and Builcr,n > .he Public I y DePartment indicates z z of w w z C6 CO z C 1 Q �i� ; LL x OPsi n l aPP'cval cnly 9 cn,Er.a used ane c,., ,t,n'an-e to City Stan;yards. ane; Srdinances. o a z o- o w w� v 0 w 0 w OFF-SITE STREET (3 CI? En 1i' eer for the ;,; Cedes responsible for accur tc t dro der jr ilevr Toper shall to Cy of calcu.ations LU o— z x rn o z o `" � w '-- z cu w M N for this plan an shall submit a certified "as -gra 'ect";, lan al'er completion ,g LL = o Z w o o � W W m CO of the grad:, Ig. APPR }~ q� Z 0 O 5 zoo�zd�wWooa w w= U p U x r 3 uor �� �� F- rn a zit oZWWaW0Z< �a. 1_M � :tf 1 r;- t arment W0zx0pocno ¢wc�WFs--zwQp" N CO Date "zZm�Lzzzv 4 CO II� I w w Ow > U � J 0 C �- �Y I 3uilcirr; _nt Date cower=1¢-UUZOC w z ¢ www— wCate ZJOWc0i0=a-== � ►� 0inwx3z0 z O S O D w= w I Ii ,?�0T > j_jO pw�IrWw=wOm _ I r 04 M 6 O w W w 9 D- LU OwZ>-Um w g z to 000toF-C9UOwxw Z ) ¢ w w W U O j m w w U O w z W} v~i S=DS=O�wz=) 7 -N N89-32'1 7-W i 718.00' ALL CONSTRUCTION ACTIVITY, INCLUDING STAGING, SHALL BE WITHIN THE LIMITS SHOWN ON THIS PLAN. CONTRACTOR SHALL OBTAIN A COPY OF THE BIOLOGICAL CLEARANCE SURVEY FOR THIS PROJECT. CONTRACTOR SHALL BE SOLELY LIABLE AND RESPONSIBLE FOR FOLLOWING THE RECOMMENDATIONS OF THE BIOLOGICAL CLEARANCE SURVEY. NO STAGING, GRADING, OR OTHER DISTURBANCE SHALL OCCUR OUTSIDE THE LIMITS SHOWN ON THIS PLAN. 061M IF THE PROJECT IS SUBJECT TO THE PROVISIONS OF THE NATIONAL POLLUTANT DISCHARGE EUMINATION SYSTEM (NPDES), A "NOTICE OF INTENT" (N01) TO COMPLY WITH THE TERMS OF THE GENERAL PERMIT TO DISCHARGE STORM WATER ASSOCIATED WITH CONSTRUCTION ACTIVITY (SWRCB ORDER NO. 2009-009-DWQ AS AMENDED BY ORDER 2010-0014-DWQ AND ORDER 2012-0006-DWQ) MUST BE FILED WITH STATE WATER RESOURCES CONTROL BOARD IN SACRAMENTO BEFORE THE BEGINNING OF ANY CONSTRUCTION ACTIVITY. COMPLIANCE WITH THE GENERAL PERMIT REQUIRES THAT A STORM WATER POLLUTION PREVENTION PLAN (SWPPP) BE PREPARED, CONTINUOUSLY CARRIED OUT, AND ALWAYS BE AVAILABLE FOR PUBLIC INSPECTION DURING NORMAL CONSTRUCTION HOURS. WASTE DISCHARGE IDENTIFICATION (WDID) NUMBER 5F15C378989 HAS BEEN ISSUED BY THE STATE WATER RESOURCES BOARD FOR THIS PROJECT. NOTES: AN OPEN STREET PERMIT SHALL BE OBTAINED FROM THE CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT FOR ANY WORK PERFORMED WITHIN EXISTING ACCEPTED STREET RIGHT OF WAY. UNLESS SECURED BY A SUBDIVISION AGREEMENT, SECURITY BASED ON AN APPROVED ENGINEER'S ESTIMATE FOR THE WORK PERFORMED WITHIN RIGHT OF WAY AND INSURANCE AS REQUIRED SHALL BE PROVIDED PRIOR TO ISSUANCE OF A PERMIT. MAXIMUM SLOPE RATIO FROM BACK OF SIDEWALK TO FACE OF WALL OR STRUCTURE SHALL BE 4:1, EXCEPT FOR TWO FEET BEHIND SIDEWALK WHERE THE MAXIMUM SLOPE SHALL BE 2%. ALTERNATIVELY, THE CITY ENGINEER MAY APPROVE CURBING BEHIND THE SIDEWALK OR OTHER METHOD TO PREVENT EROSION ONTO SIDEWALK. ANY ITEMS IN PUBLIC RIGHT-OF-WAY THAT ARE DAMAGED OR DO NOT MEET CURRENT STANDARDS SET BY PUBLIC WORKS WILL REQUIRE REPAIRING AND/OR UPGRADING AS PER CITY ENGINEER. COMPACTION TEST SHALL BE THE RESPONSIBILITY OF THE DEVELOPER/SUBDIVIDER/CONTRACTOR. THE NUMBER AND LOCATION OF REQUIRED TESTS SHALL BE DETERMINED BY THE CITY ENGINEER. KERN DELTA WATER DISTRICT NOTE PRIOR TO CONSTRUCTION, KERN DELTA WATER STORAGE DISTRICT (661) 834-4656 SHALL BE NOTIFIED TO ENSURE THAT PROPOSED CONSTRUCTION WILL NOT INTERFERE WITH KERN DELTA'S ABILITY TO MAINTAIN WATER DELIVERY TO PROPERTIES EAST OF SUBJECT PROPERTY. NOTE: ENTIRE TRACT SHALL BE GRADED AT THE SAME TIME 0 27698 X w _ r_� --- s I -JAMES "F— - - --X89'32'1 --204.C5'-, G O w w = O n" z C7 Z C) O 25 26 27 28 f29 30 ii 2 7 8 LtJ 1 J 12 1 ` lei a OFF-SITE STREET DISTURBED AREAJ 33 , 2 � � (SEE SHEET 5 FOR AREA DETAIL)) 6 5 - r 3 0:: 0 i — I � I 4 II� I 0)x�. x J ix --- � ►� O I Ii 5 _ I r 04 M 6 w g z I I, 7 -N N89-32'1 7-W i 718.00' fl 8 w 32 31 30 29 28 27 1 26 25 24 23 22 I 10 '=LIBER TY - IDGE �--COURT I 3 12 13 H 14 15 Q 16 1 7 18 19 20 I 21 ® 1 PHASE 2 I,' o I aHAS PHASE 1 2 ® t 100 24 23 22 21 20 19 >' 18 1, 15 15 13 UNDERGROJND SERVICE ALERT OF SOUTHERN CALIFORNIA QEF ORE YO o`c9 P 0 p�OUNSER0Fc� e� S - �� I I i DIAL TOLL FREE 1.800-227-2600 5 37 38 39 4-0 41 42 43 44 45 46 47 11 , AT LEAST TWO DAYS BEFORE YOU DIG Imuv 01 J't n VZ3.04 KEY MAP SCALE: 1'=200' (��as`2 Pyr COB RECORDS No. N N�' oC) OP0 OC CD C0 m rn qt - c° N co i c Oa - 0) a I - z 4/2512017 0 27698 X w _ r_� w a s I -JAMES - VALLEY--- -COURT— COURT n_ O w w = O n" z C7 Z C) O 25 26 27 28 f29 30 ii 2 7 8 LtJ u 12 ` lei a 36 35 34 33 32 31 a m w 6 5 4 3 2 1 J _-PITCHER --- O -VIEW - --COURT -N UNDERGROJND SERVICE ALERT OF SOUTHERN CALIFORNIA QEF ORE YO o`c9 P 0 p�OUNSER0Fc� e� S - �� I I i DIAL TOLL FREE 1.800-227-2600 5 37 38 39 4-0 41 42 43 44 45 46 47 11 , AT LEAST TWO DAYS BEFORE YOU DIG Imuv 01 J't n VZ3.04 KEY MAP SCALE: 1'=200' (��as`2 Pyr COB RECORDS No. N N�' oC) OP0 OC CD C0 m rn qt - c° N co i c Oa - 0) NEER oo cn a w 3 > U 0- d cr �J I I 1, a I - z 4/2512017 0 27698 X w _ r_� w a n_ O w w = O n" z C7 Z J w m 3 1— 2 w LtJ u U_ ` lei a a NEER oo cn a w 3 > U 0- d cr �J I I 1, a I - z 4/2512017 0 27698 L c w _ r_� Lam; Z �_• a ----- DATE 4/2512017 PA JOB No. 27698 L c _ r_� Lam; OF. 5 SHEET GENERAL NOTES 1. ALL CONSTRUCTION SHALL CONFORM TO THIS PLAN, THE CALIFORNIA BUILDING CODE, CITY OF BAKERSFIELD ORDINANCE, LATEST EDITION AND STANDARDS PERTAINING THERETO. THESE DOCUMENTS SHALL BE MADE A PART HEREOF. 2. ALL CONSTRUCTION WITHIN THE CITY RIGHT-OF-WAY OR CITY EASEMENTS SHALL BE IN ACCORDANCE WITH CITY OF BAKERSFIELD STANDARDS AND STATE OF CALIFORNIA, DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS DATED 2010. THESE STANDARDS, DRAWINGS AND DETAILS SHALL BE CONSIDERED A PART OF THESE PLANS AND THE CONTRACTOR SHALL OBTAIN A COPY FOR HIS USE. 3. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL NECESSARY PERMITS BEFORE START OF CONSTRUCTION. AN OPEN STREET PERMIT SHALL BE OBTAINED FROM THE CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT FOR ANY WORK TO BE PERFORMED IN THE EXISTING, ACCEPTED STREET RIGHT-OF-WAY. UNLESS SECURED BY AN IMPROVEMENT AGREEMENT, APPROVED INSURANCE AND SECURITY BASED ON AN APPROVED ENGINEER'S ESTIMATE FOR THE WORK PERFORMED WITHIN THE STREET RIGHT-OF-WAY SHALL BE POSTED PRIOR TO ISSUANCE OF A PERMIT. 4. 24 HOUR NOTICE: PRIOR TO THE START OF ANY PHASE OF CONSTRUCTION, THE CITY CONSTRUCTION INSPECTION SECTION SHALL BE GIVEN AT LEAST 24 HOURS NOTICE. THE SECTION MAY BE NOTIFIED AT (661) 326-3049. 5. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING DIMENSIONS, DATA AND MEASUREMENTS AT THE BUILDING SITE PRIOR TO CONSTRUCTION. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS ON THESE DRAWINGS SHALL HAVE PRECEDENCE OVER SCALED DIMENSIONS. PORTER & ASSOCIATES, INC. MUST BE NOTIFIED OF ANY VARIATIONS FROM THE DIMENSIONS AND CONDITIONS SHOWN BY THESE DRAWINGS. 6. EXISTING UTILITY AND UNDERGROUND LINES HAVE BEEN SHOWN ON THIS PLAN ACCORDING TO AVAILABLE RECORDS. THE ENGINEER IS NOT RESPONSIBLE FOR POSSIBLE ERRORS OR OMISSIONS. THE CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF THE LOCATION AND DEPTH OF ALL UTILITIES PRIOR TO BEGINNING OF ANY WORK. SERVICE ALERT U.S.A.: 1-800- 227-2600 SHALL BE CONTACTED AT LEAST TWO WORKING DAYS PRIOR TO ANY CONSTRUCTION OR EXCAVATION. 7. ANY EXISTING IMPROVEMENTS OR UTILITIES THAT ARE REMOVED, DAMAGED OR UNDERCUT BY CONTRACTOR'S OPERATIONS SHALL BE REPAIRED OR REPLACED AT THE CONTRACTOR'S EXPENSE, AS DIRECTED BY THE ENGINEER AND APPROVED BY THE GOVERNING AUTHORITY. 8. IF A PROBLEM OR CONFLICT SHOULD ARISE DURING THE COURSE OF THE PROJECT, IT IS THE RESPONSIBILITY OF THE OWNER OR THE CONTRACTOR TO NOTIFY THE ENGINEER IMMEDIATELY PRIOR TO ANY FURTHER WORK. 9. THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, TOOLS, EQUIPMENT AND SUPERVISION NECESSARY FOR A COMPLETE AND FUNCTIONAL PRODUCT. 10. ALL WORK WHICH IS DEFECTIVE IN ITS CONSTRUCTION OR DEFICIENT IN ANY OF THE REQUIREMENTS OF THESE DRAWINGS AND SPECIFICATIONS SHALL BE REMEDIED, OR REMOVED AND REPLACED BY THE CONTRACTOR IN AN ACCEPTABLE MANNER, AND NO COMPENSATION WILL BE ALLOWED FOR SUCH CORRECTION. 11. IN THE EVENT CONSTRUCTION STAKING BASED ON THE CONSULTANT'S PLANS, DRAWINGS OR OTHER DOCUMENTS IS ACCOMPLISHED BY ANYONE OTHER THAN THE CONSULTANT, THE OWNER OR CONTRACTOR SHALL NOTIFY THE BUILDING OFFICIAL IN WRITING AS TO THE CHANGE OF ENGINEER IN RESPONSIBLE CHARGE. 12. THE CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT; INCLUDING EROSION, SEDIMENTATION & DUST CONTROL PLAN AND STORM WATER POLLUTION PREVENTION PLAN IMPLEMENTATION AND THE SAFETY OF ALL PERSONS AND PROPERTY, THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKINGHOURS; 0 UR S, AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER. 13. IF THE CONTRACTOR IS IN DOUBT AS TO THE MEANING OF ANY PART OF THE DRAWINGS AND SPECIFICATIONS OR FINDS DISCREPANCIES IN OR OMISSIONS FROM THE DRAWINGS, HE SHALL SUBMIT A WRITTEN REQUEST FOR AN INTERPRETATION OR A CORRECTION THEREOF, PRIOR TO FILING HIS BID PRICE FOR THE PROJECT. 14. PORTER & ASSOCIATES, INC. WILL NOT BE RESPONSIBLE OR LIABLE FOR UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS. ANY AND ALL CHANGES TO THESE PLANS MUST BE APPROVED IN WRITING BY PORTER & ASSOCIATES, INC. 15. NORMAL STAKING AND MARKING OF THE PROJECT WILL BE SUPPLIED ONLY ONCE. ALL RESTAKING OR REMARKING SHALL BE AT THE EXPENSE OF THE CONTRACTOR. GRADING NOTES 1. ALL GRADING AND SITE PREPARATION SHALL CONFORM TO THIS PLAN, APPENDIX J OF CALIFORNIA BUILDING CODE AS MODIFIED BY CITY OF BAKERSFIELD ORDINANCE, AND THE GEOTECHNICAL INVESTIGATION PREPARED BY KRAZAN & ASSOCIATES, INC JOB No. 022-16004, DATED MARCH 9, 2016, AND ANY ADDENDUM THERETO. THESE DOCUMENTS SHALL BE MADE A PART HEREOF. THE CONTRACTOR SHALL OBTAIN A COMPLETE COPY OF EACH. 2. ALL DESIGN ELEVATIONS SHOWN ARE TO FINISHED GRADE, UNLESS OTHERWISE NOTED. 3. THE GEOTECHNICAL ENGINEER, DESIGN ENGINEER, AND BUILDING OFFICIAL SHALL BE NOTIFIED AT LEAST 2 DAYS BEFORE THE START OF ANY WORK AND PRIOR TO PLACING ANY FILL MATERIAL. 4• ALL GRADING WORK SHALL BE SUPERVISED AS "ENGINEERED GRADING" IN ACCORDANCE WITH THE BUILDING CODE. THE DESIGN ENGINEER SHALL EXERCISE SUFFICIENT SUPERVISORY CONTROL DURING GRADING AND CONSTRUCTION TO INSURE COMPLIANCE WITH THE PLANS, SPECIFICATIONS AND CODES WITHIN HIS PURVIEW. 5. ANY TRENCHING TO BE DONE WITHIN THE PROJECT SHALL BE BACKFILLED AND COMPACTED IN ACCORDANCE WITH THE CITY OF BAKERSFIELD STANDARD DETAIL ST -22. 6. SITE PREPARATION AND GRADING SHALL BE DONE UNDER THE SUPERVISION OF THE GEOTECHNICAL ENGINEER. THE GEOTECHNICAL ENGINEER SHALL PROVIDE SUFFICIENT INSPECTIONS DURING THE PREPARATION OF THE NATURAL GROUND AND THE PLACEMENT AND COMPACTION OF THE FILL TO BE SATISFIED THAT THE WORK IS BEING PERFORMED IN ACCORDANCE WITH THE PLAN AND APPLICABLE CODES. 7. PURSUANT TO SEC11ON J104.6 OF THE CALIFORNIA BUILDING CODE AS MODIFIED BY CITY OF BAKERSFIELD ORDINANCE, SECTION J104.6 PARAGRAPH 12, IF THE CIVIL ENGINEER, THE GEOTECHNICAL ENGINEER, OR THE ENGINEERING GEOLOGIST OF RECORD IS CHANGED DURING GRADING, THE WORK SHALL BE STOPPED UNTIL THE REPLACEMENT HAS AGREED IN WRITING TO ACCEPT THEIR AREA OF TECHNICAL COMPETENCE FOR APPROVAL UPON COMPLETION OF THE WORK. IT SHALL BE THE DUTY OF THE PERMITTEE TO NOTIFY THE BUILDING OFFICIAL IN WRITING WITHIN 48 HOURS OF SUCH CHANGE AND PRIOR TO THE RECOMMENCEMENT OF GRADING. 8. THE CONTRACTOR SHALL PREVENT A DUST NUISANCE FROM ORIGINATING FROM THE SITE OF WORK AS A RESULT OF HIS OPERATIONS DURING THE EFFECTIVE PERIOD OF THIS CONTRACT. PREVENTATIVE MEASURES SHALL BE TAKEN BY THE CONTRACTOR TO MITIGATE THE IMPACT OF DUST AND PM10 EMISSIONS ACCORDING TO THE SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT REGULATION VIII (8). IN ADDITION TO ANY DUST CONTROL PLAN, THESE MEASURES SHALL INCLUDE, BUT NOT BE LIMITED TO THE FOLLOWING: A. PRE -ACTIVITY: A- PRE -WATER SITE SUFFICIENT TO LIMIT VISIBLE DUST EMISSIONS (VDE) TO 20% OPACITY. B. PHASE WORK TO REDUCE THE AMOUNT OF DISTURBED SURFACE AREA AT ANY ONE TIME. B. DURING ACTIVE OPERATIONS: A. APPLY WATER OR OTHER APPROVED SUBSTANCE SUFFICIENT TO LIMIT VDE TO 20% OPACITY B. LIMIT ACTIVITY TO PERIODS OF LOW OR NO WIND, OR CONSTRUCT AND MAINTAIN WIND BARRIERS SUFFICIENT TO LIMIT VDE TO 20% OPACITY. C. APPLY WATER OR OTHER APPROVED SUBSTANCE TO UNPAVED HAUL/ACCESS ROADS AND UNPAVED VEHICLE/EQUIPMENT TRAFFIC AREAS SUFFICIENT TO LIMIT VDE TO 20% OPACITY AND MEET THE CONDITIONS OF A STABILIZED UNPAVED ROAD SURFACE. C. TEMPORARY STABILIZATION DURING PERIODS OF INACTIVITY: A. RESTRICT VEHICULAR ACCESS TO THE AREA. B. APPLY WATER OR OTHER APPROVED SUBSTANCE SUFFICIENT TO COMPLY WITH THE CONDITIONS OF A STABILIZED SURFACE. IF ANY AREA HAVING 0.5 ACRES OR MORE OF DISTURBED SURFACE AREA REMAINS UNUSED FOR SEVEN OR MORE DAYS, THE AREA MUST COMPLY WITH THE CONDITIONS FOR A STABILIZED SURFACE AREA AS DEFINED IN RULE 8011. D. CARRYOUT AND TRACKOUT ON PUBLIC ROADS: A. ALL VISIBLE CARRYOUT AND TRACKOUT WITHIN 50 FEET OF THE SITE SHALL BE REMOVED AT THE END OF EACH WORKDAY. TRACKOUT BEYOND 50 FEET OF THE SITE SHALL BE REMOVED IMMEDIATELY. B. CLEANUP SHALL BE ACCOMPLISHED BY MANUAL SWEEPING OR APPROVED EQUIPMENT AND METHOD AS SPECIFIED BY THE SJVUAPCD. C. THE USE OF BLOWER DEVICES OR DRY ROTARY BRUSHES OR BROOMS, FOR REMOVAL OF CARRYOUT AND TRACKOUT ON PUBLIC ROADS IS EXPRESSLY PROHIBITED. GRADING NOTES CONTINUED D. ANY PERMITS REQUIRED FOR MUD AND DIRT CLEANUP SHALL BE OBTAINED BY THE CONTRACTOR. 9. IF DURING GRADING OR CONSTRUCTION, ANY PLUGGED, ABANDONED OR UNRECORDED WELLS ARE UNCOVERED OR DAMAGED, THE DEPARTMENT OF CONSERVATION/ DIVISION OF OIL GAS AND GEOTHERMAL RESOURCES SHALL BE CONTACTED TO INSPECT AND APPROVE ANY REMEDIATION. 10. IF DURING CONSTRUCTION ACTIVITIES OR GROUND DISTURBANCE, CULTURAL RESOURCES ARE UNCOVERED, THE CONTRACTOR SHALL STOP WORK AND RETAIN A QUALIFIED ARCHEOLOGIST FOR FURTHER STUDY. THE CONTRACTOR SHALL NOTIFY THE PROPER AUTHORITIES AND BE SUBJECT TO ANY MITIGATION MEASURES REQUIRED BY THE ARCHAEOLOGIST. 11. DURING GRADING, REASONABLE SEARCHING SHOULD BE PERFORMED FOR CONCEALED SUBSURFACE OBSTRUCTIONS. ALL ABANDONED SUBSURFACE OBSTRUCTIONS SHOULD BE REMOVED. IF THE TERMINUS OF ANY ABANDONED PIPING IS OUTSIDE THE PROJECT LIMITS, THE PIPING SHOULD BE REMOVED WITHIN THE PROJECT AND PROPERLY CAPPED AT THE PROJECT BOUNDARY. 12. ALL ONSITE OR OFFSITE OBSTRUCTIONS SHALL BE REMOVED BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE. 13. THE SITE SHALL BE CLEARED AND GRUBBED OF ALL VEGETATION, INCLUDING ROOTS, LOOSE FILL, TRASH AND OTHER DELETERIOUS MATERIALS ACCORDING TO THE RECOMMENDATIONS OF THE GEOTECHNICAL INVESTIGATION. ANY HOLE OR VOIDS LEFT AFTER THE REMOVAL OF TREES, ROOTS, SEPTIC TANKS, ABANDONED FOUNDATIONS, PIPELINES OR THE LIKE, SHALL BE FILLED AS REQUIRED BY THE GEOTECHNICAL ENGINEER. 14. GROUND SURFACES TO RECEIVE CONCRETE DRIVEWAYS AND BITUMINOUS PAVEMENTS SHOULD BE SCARIFIED AND COMPACTED TO A MINIMUM DEPTH OF 12 INCHES BELOW THE EXISTING GROUND SURFACE IN AREAS TO BE FILLED, UNLESS OTHERWISE SPECIFIED IN THE GEOTECHNICAL INVESTIGATION OR DIRECTED BY THE GEOTECHNICAL ENGINEER. M E COMPACTION IN PROPOSED PAVEMENT AREAS SHOULD BE TO A MINIMUM OF 95.0>0 OF THE MAXIMUM DENSITY AS OBTAINED BY ASTM TEST METHOD D1557-78, AND SHOULD EXTEND TO A MINIMUM DISTANCE OF 2 FEET BEYOND THE OUTSIDE EDGES OF PAVEMENTS. SURFACES TO RECEIVE CURBS, GUTTERS AND SIDEWALKS SHALL BE SCARIFIED AND COMPACTED TO A MINIMUM OF 90% OF THE MAXIMUM DENSITY TO A MIMIMUM DEPTH OF 6 INCHES BELOW GROUND SURFACE. 15. PAD AREAS SHALL BE CLEARED OF ALL VEGETATION AND OTHER UNSUITABLE MATERIAL, SCARIFIED AND COMPACTED TO A MINIMUM DEPTH OF 12 INCHES BELOW THE EXISTING GROUND SURFACE IN AREAS TO BE FILLED OR 12 INCHES BELOW FINISH PAD IN CUT AREAS, UNLESS OTHERWISE SPECIFIED IN THE GEOTECHNICAL INVESTIGATION OR DIRECTED BY THE GEOTECHNICAL ENGINEER. COMPACTION IN PROPOSED AREAS ON THE SITE ON WHICH STRUCTURES ARE TO BE PLACED MUST BE COMPACTED TO 90% DENSITY FOR A MINIMUM DISTANCE OF 5 FEET BEYOND THE OUTSIDE EDGES OF THE FOUNDATIONS OF THE STRUCTURES. THE DEPTH OF OVEREXCAVATION AND COMPACTION IN PAD AREAS SHALL CONFORM TO THE RECOMMENDATION OF THE GEOTECHNICAL ENGINEERING INVESTIGATION. RE -COMPACTION OF OVER -EXCAVATED MATERIAL SHALL BE TO AT LEAST 90% OF MAXIMUM DRY DENSITY. 16. FLOODING, JETTING, OR SIMILAR CONSOLIDATION METHODS OF COMPACTION SHALL NOT BE PERMITTED. 17. THE GRADING CONTRACTOR SHALL GRADE THE PAVING AREAS TO WITHIN 0.1 FOOT OF SUBGRADE. IF SUCH AREAS SHOULD BE FOUND TO BE MORE THAN 0.1 FOOT FROM THE DESIGN SUBGRADE ELEVATION AFTER COMPLETION OF GRADING, THE GRADING CONTRACTOR SHALL RETURN AND CORRECT THE GRADING AT NO COST TO THE OWNER. 18. SURFACE DRAINAGE SHALL BE 1% MINIMUM, EXCEPT AS WAIVED BY THE BUILDING OFFICIAL. 19. ALL CUT AND FILL SLOPES SHALL BE 2:1 (2 HORIZONTAL TO 1 VERTICAL) OR FLATTER, UNLESS OTHERWISE NOTED AND APPROVED BY THE GEOTECHNICAL ENGINEER. 20. FILL AREAS SLOPING STEEPER THAN 5:1 SHALL BE KEYED AND BENCHED TO SUPPORT FILL. 21. FILL SLOPES SHALL NOT TOE OUT WITHIN 12 FEET HORIZONTALLY OF THE TOP OF EXISTING OR PLANNED CUT SLOPES. 22. ALL SLOPES IN EXCESS OF 3 FEET IN VERTICAL HEIGHT SHALL BE PREPARED AND MAINTAINED TO CONTROL AGAINST EROSION. 23. FOR HILL -SIDE DEVELOPMENT, A BERM OR DRAINAGE SWALE SHALL BE CONSTRUCTED ALONG THE TOP OF ALL CUT AND FILL HILL -SIDE SLOPES TO PREVENT RUNOFF FROM GOING OVER THE SLOPE. 24. FILL MATERIAL SHALL BE SUBJECT TO THE GEOTECHNICAL ENGINEERS APPROVAL. 25. ENGINEERED FILL MATERIALS SHOULD BE PLACED IN ACCORDANCE WITH THE GEOTECHNICAL ENGINEER'S RECOMMENDATIONS. IF NO RECOMMENDATION EXISTS, FILL SHALL BE PLACED IN THIN LAYERS LESS THAN 6 INCHES IN UNCOMPACTED THICKNESS AND COMPACTED AT OPTIMUM MOISTURE CONTENT (OR A MOISTURE CONTENT COMMENSURATE WITH EFFECTIVE COMPACTING AND SOIL STABILITY). ENGINEERED FILL MATERIALS SHOULD BE COMPACTED TO A MINIMUM OF 90% MAXIMUM DENSITY AS DETERMINED BY APPROVED METHOD THE CURRENT CALIFORNIA BUILDING CODE AND CERTIFIED BY TESTS AND REPORTS FROM THE GEOTECHNICAL ENGINEER. 26. ANY CUT AND FILL QUANTITIES SHOWN ON THIS PLAN ARE FOR PERMIT PURPOSES ONLY. THE ENGINEER MAKES NO WARRANTY EITHER DIRECT OR IMPLIED THAT THIS WILL BE THE ACTUAL COMPACTION FACTOR. THE CONTRACTOR SHALL, AFTER EXAMINING THE PLAN, GEOTECHNICAL INVESTIGATION AND THE SITE TERRAIN, PREPARE HIS BID PRICE FOR THE PROJECT, BASED ON HIS OWN EARTHWORK CALCULATIONS. IF A DEFICIENCY OR AN EXCESS OF SOIL ARISES DURING GRADING, THE GRADING CONTRACTOR SHALL IMMEDIATELY CONTACT THE ENGINEER, WHO SHALL DETERMINE IF ADJUSTMENTS CAN BE MADE TO IMPROVE THE BALANCE BETWEEN CUT AND FILL. 27. THE CONTRACTOR SHALL COORDINATE THE LOCATION OF THE BORROW SITE WITH THE BUILDING OFFICIAL AND THE SOILS ENGINEER PRIOR TO PULLING THE GRADING PERMIT. 28. EXPORT MATERIAL SHALL BE DISPOSED OF AT AN APPROVED SITE THAT IS COORDINATED WITH THE BUILDING OFFICIAL PRIOR TO PULLING THE GRADING PERMIT. 29. IT IS THE RESPONSIBILITY OF THE DEVELOPER AND THE CONTRACTOR TO (A) FAMILIARIZE THEMSELVES WITH THE FOREGOING RECOMMENDATIONS, (B) NOTIFY THE ENGINEER WHEN SITE PREPARATION BEGINS AND BEFORE THE PLACEMENT OF FILLS, AND (C) INFORM THE ENGINEER OF ITEMS ENCOUNTERED DURING EARTHWORK OPERATIONS WHICH MIGHT EFFECT FOUNDATION STABILITY, SO THAT THE ITEMS MAY BE TREATED UNDER THE ENGINEER'S DIRECTION. (THESE ITEMS MIGHT INCLUDE BURIED TRASH OR VEGETATION, PIPELINES, ABANDONED WELLS, OLD FILLS, ETC.) 30. UPON COMPLETION OF GRADING AND BEFORE THE START OF CONSTRUCTION, A FINAL GEOTECHNICAL INVESTIGATION COVERING THE SITE PREPARATION AND GRADING SHALL BE SUBMITTED TO THE ENGINEER AND BUILDING DEPARTMENT BY THE GEOTECHNICAL ENGINEER. AFTER COMPLETION OF THE GRADING, THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER, ON A FORM PRESCRIBED BY THE ENGINEER, A STATEMENT THAT THE GRADING HAS BEEN COMPLETED IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS FOR THE PROJECT, INCLUDING ALL RECOMMENDA11ONS AND REQUIREMENTS OF THE GEOTECHNICAL INVESTIGATION FOR THE PROJECT, IF ANY. 31. SITE INSPECTIONS: THE BUILDING OFFICIAL SHALL INSPECT THE PROJECT AT THE FOLLOWING STAGES OF WORK: A. INITIAL - WHEN THE SITE HAS BEEN CLEARED OF VEGETATION AND UNAPPROVED FILL AND IT HAS BEEN SCARIFIED OR OTHERWISE PREPARED FOR FILL. NO FILL SHALL HAVE BEEN PLACED PRIOR TO THIS INSPECTION. B. ROUGH -WHEN APPROXIMATE FINAL ELEVATIONS HAVE BEEN ESTABLISHED; DRAINAGE TERRACES; SWALES AND OTHER DRAINAGE DEVICES NECESSARY FOR THE PROTECTION OF THE BUILDING SITE FROM FLOODING ARE INSTALLED; BERMS ARE INSTALLED AT TOPS OF SLOPES; AND THE STATEMENTS REQUIRED FROM THE CIVIL ENGINEER, GEOTECHNICAL ENGINEER, ENGINEERING GEOLOGIST (IF ANY) AND GRADING CONTRACTOR HAVE BEEN RECEIVED. C. FINAL - WHEN GRADING IS COMPLETED; ALL DRAINAGE DEVICES NECESSARY TO DRAIN THE BUILDING PAD HAVE BEEN INSTALLED, SLOPE PLANTING ESTABLISHED, IRRIGATION SYSTEMS INSTALLED AND THE AS -GRADED PLANS AND REQUIRED STATEMENTS HAVE BEEN SUBMITTED. 32.ITY I SECUR N A FORM ACCEPTABLE TO THE CITY SHALL BE PROVIDED BY THE OWNER FOR GRADING INVOLVING MORE THAN 1,000 CUBIC YARDS PRIOR TO ISSUANCE OF A GRADING PERMIT. ACCEPTABLE FORMS OF SECURITY INCLUDE A BOND FURNISHED BY A CORPORATE SURETY AUTHORIZED TO DO BUSINESS IN THE STATE OF CALIFORNIA, A CASH BOND, OR AN INSTRUMENT OF CREDIT FROM A FINANCIAL INSTITUTION SUBJECT TO REGULATION BY THE STATE OF CALIFORNIA OR FEDERAL GOVERNMENT. THE BUILDING OFFICIAL MAY WAIVE THE REQUIREMENT FOR SECURITY IF THE GRADING DOES NOT EXCEED A SLOPE OF THREE HORIZONTAL TO ONE VERTICAL PROVIDED SUCH GRADING WILL NOT AFFECT DRAINAGE FROM OR TO ADJACENT PROPERTIES. SOILS REPORT RECOMMENDATIONS THE FOLLOWING IS AN EXCERPT FROM THE SOILS REPORT PREPARED BY KRAZAN & ASSOCIATES, INC. KA PROJECT NO. 022-16004, DATED MARCH 9, 2016 FOR THIS PROJECT. THE CONTRACTOR SHALL OBTAIN A COMPLETE COPY OF THE SOILS REPORT. CONCLUSIONS AND RECOMMENDATIONS BASED ON THE FINDINGS OF OUR FIELD AND LABORATORY INVESTIGATIONS, ALONG WITH PREVIOUS GEOTECHNICAL EXPERIENCE IN THE PROJECT AREA, THE FOLLOWING IS A SUMMARY OF OUR EVALUATIONS, CONCLUSIONS, AND RECOMMENDATIONS. ADMINISTRATIVE SUMMARY IN BRIEF, THE SUBJECT SITE AND SOIL CONDITIONS, WITH THE EXCEPTION OF THE LOOSE SURFACE SOILS, MODERATELY COMPRESSIBLE UPPER NATIVE SOILS, FILL MATERIAL AND PREVIOUS DEVELOPMENT, APPEAR TO BE CONDUCIVE TO THE DEVELOPMENT OF THE PROJECT. OF' PRIMARY IMPORTANCE IN THE DEVELOPMENT OF THIS SITE IS THE REMOVAL OF THE UPPER MOISTURE SENSITIVE SOILS FROM THE AREAS OF PROPOSED DEVELOPMENT. THESE SOILS ARE MODERATELY COMPRESSIBLE AND/OR COLLAPSIBLE UNDER SATURATED CONDITIONS. STRUCTURES WITHIN THE GENERAL VICINITY HAVE EXPERIENCED EXCESSIVE POST -CONSTRUCTION SETTLEMENT WHEN THE FOUNDATION SOILS BECOME NEAR -SATURATED. ACCORDINGLY, MITIGATION MEASURES ARE RECOMMENDED TO REDUCE THE POTENTIAL OF EXCESSIVE SOIL SETTLEMENT. IT IS RECOMMENDED FOLLOWING STRIPPING OPERATIONS, THE UPPER 2 FEET OF NATIVE SOIL WITHIN PROPOSED BUILDING AREAS BE EXCAVATED, WORKED UNTIL UNIFORM AND FREE FROM LARGE CLODS, MOISTURE -CONDITIONED AS NECESSARY, AND RECOMPACTED TOA MINIMUM OF 90 PERCENT OF DENSITY BASED ON ASTM TEST METHOD D1557. IT IS RECOMMENDED THAT THE EXPOSED SUBGRADE BE MOISTJRE-CONDITIONED, PROOF -ROLLED AND OBSERVED BY KRAZAN& ASSOCIATES, INC. TO IDENTIFY UNSTABLE AREAS PRIOR TO FILL PLACEMENT. UNSTABLE AREAS SHOULD BE EXCAVATED TO FIRM NATIVE GROUND PRIOR TO PLACEMENT OF ENGINEERED FILL. LIMITS OF REMOVAL AND RECOMPACTION SHOULD EXTEND A MINIMUM OF 5 FEET BEYOND STRUCTURAL ELEMENTS. APPROXIMATELY 6 TO 12 INCHES OF FILL MATERIAL WAS ENCOUNTERED ALONG THE EDGES OF THE SITE ASSOCIATED WITH SOME PREVIOUS GRADING ACTIVITIES AND THE IRRIGATION DITCH. THE FILL MATERIAL PREDOMINATELY CONSISTED OF SILTY SAND AND SANDY SILT. THE THICKNESS AND EXTENT OF FILL MATERIAL WAS BASED ON LIMITED TEST BORINGS AND VISUAL OBSERVATION. THICKER FILL MAY BE PRESENT AT THE SITE. LIMITED TESTING WAS PERFORMED ON THE FILL SOLS DURING THE TIME OF OUR FIELD AND LABORATORY INVESTIGATIONS. THE LIMITED TESTING INDICATES THE FILL SOIL HAD VARYING STRENGTH CHARACTERISTICS RANGING FROM LOOSELY PLACED TO COMPACTED. THEREFORE, IT IS RECOMMENDED THAT THE FILL SOILS BE EXCAVATED AND STOCKPILED SO THAT THE NATIVE SOILS CAN BE PROPERLY PREPARED. THESE SOILS WILL BE SUITABLE FOR REUSE AS ENGINEERED FILL PROVIDED THEY ARE CLEANSED OF EXCESSIVE ORGANICS AND DEBRIS. MOR TO BACKFILLING, KRAZAN& ASSOCIATES, INC. SHOULD INSPECT THE BOTTOM OF THE EXCAVATION TO VERIFY NO ADDITIONAL REMOVAL IS REQUIRED. WITHIN PROPOSED PAVEMENT AND EXTERIOR FLATWORK AREAS, IT IS RECOMMENDED FOLLOWING STRIPPING, FILL REMOVAL OPERATIONS AND DEMOLITION ACTIVITIES, THE EXPOSED SUBGRADE BE EXCAVATED TO A DEPTH OF 12 INCHES, WORKED UNTIL UNIFORM AND FREE FROM LARGE CLODS, MOISTURE -CONDITIONED AS NECESSARY, AND RECOMPACTED TO A MINIMUM OF 90 PERCENT OF MAXIMUM DENSITY BASED ON ASTM TEST METHOD D1557. THE ON-SITE, NATIVE SILTY AND SANDY SOILS WILL BE SUITABLE FOR REUSE AS ENGINEERED FILL, PROVIDED THEY ARE CLEANSED OF EXCESSIVE ORGANICS AND DE31RIS. PRIOR TO BACKFILLING, THE BOTTOM OF THE EXCAVATION SHOULD BE PROOF -ROLLED AND OBSERVED BY KRAZAN& ASSOCIATES, INC. TO VERIFY STABILITY. THIS COMPACTION EFFORT SHOULD STABILIZE THE SURFACE SOILS AND LOCATE ANY UNSUITABLE OR PLIANT AREAS NOT FOUND DURING OUR FELD INVESTIGATION. FILL MATERIAL SHOULD BE COMPACTED TO A MINIMUM OF 90 PERCENT OF MAXIMUM DENS TY BASED ON ASTM TEST METHOD D1557. THE SITE WAS UTILIZED FOR AGRICULTURAL PURPOSES. ASSOCIATED WITH THIS DEVELOPMENT MAY BE BURIED STRUCTURES SUCH, AS UTILITIES, RRIGAT10NLINES, STANDPIPES, AND WATER WELLS THAT MAY EXTEND INTO THE PROJECT SITE. ANY SURFACE URFACE OR BURI E=D STRUCTURES ENCOUNTERED DURING CONSTRUCTION SHOULD BE PROPERLY REMOVED AND/OR RELOCATED. THE RESULTING EXCAVATIONS SHOULD BE CLEANED TO FIRM NATIVE GROUND AND BACKFILLED WITH ENGINEERED FILL, COMPACTED TO A MINIMUM OF 90 PERCENT OF MAXIMUM DENSITY BASED ON ASTM TEST METHOD D1557. DISTUREED AREAS CAUSED BY DEMOLITION ACTIVITIES SHOULD BE REMOVED AND/OR RECOMPAC-ED. WATER WELLS SHOULD BE ABANDONED IN ACCORDANCE WITH THE COUNTY STANDARDS, SANDY SOIL CONDITIONS WERE ENCOUNTERED AT THE SITE. THESE COHESIONLESS SOILS HAVE A TENDENCY TO CAVE IN TRENCH WALL EXCAVATIONS. SHORING OR SLOPING BACK TRENCH SIDEWALLS MAY BE REQUIRED WITHIN THESE SANDY SOILS. IN ADDITION, IT IS RECOMMENDED THE SAND SOILS THAT WILL BE PLACED WITHIN THE UPPER 3 FEET OF PROPOSED BUILDING PADS BE BLENDED WITH THE ON-SITE SILTY SAND SOILS TO INCREASE THE FINES CONTENT TO AT LEAST 20 PERCENT. OTHERWISE, CAVING OF FOOTING EXCAVATIONS COULD OCCUR WHICH MAY REQUIRE FORMING OF FOUNDAT ONS. AFTER COMPLETION OF THE RECOMMENDED SITE PREPARATION, THE SITE SHOULD BE SUITABLE FOR SHALLOW FOOTING SUPPORTS. THE PROPOSED STRUCTURE FOCTINGS MAY BE DESIGNED UTILIZING AN ALLOWABLE BEARING PRESSURE OF 2,000 PSF FOR DEAD -PLUS -LIVE LOADS. FOOTINGS SHOULD HAVE A MINIMUM EMBEDMENT OF 12 INCHES. SITE PREPARA-ION GENERAL SITE CLEARING SHOULD INCLUDE REMOVAL OF VEGETATION; EXISTING UTILITIES; STRUCTURES INCLUDING FOUNDATIONS, BASEMENT WALLS AND FLOORS; TREES ANC ASSOCIATED ROOT SYSTEMS; RUBBLE; RUBBISH; AND ANY LOOSE AND/OR SATURATED MATERIALS. SITE STRIP-ING SHOULD EXTEND TO A MINIMUM DEPTH OF 2 TO 4 INCHES, OR UNTIL ALL ORGANICS IN EXCESS OF 3 PEFCENT BY VOLUME ARE REMOVED. DEEPER STRIPPING MAY BE REQUIRED IN LOCALIZED AREAS. THESE MATERIALS WILL NOT BE SUITABLE FOR USE AS ENGINEERED FILL. HOWEVER, STRIPPED TOPSOIL MAY BE STOCKPILED AND REUSED IN LANDSCAPE OR NON-STRUCTURAL AREAS. APPROXIMATELY 6 TO 12 INCHES OF FILL MATERIAL WAS ENCOUNTERED ALONG THE EDGES OF THE SITE ASSOCIATED WITH SOME PREVIOUS GRADING ACTIVITIES AND THE IRRIGATION DITCH. THE FILL MATERIAL PREDOMINATELY CONSISTED OF SILTY SAND AND SANDY SILT. THE THICKNESS AND EXTENT OF FILL MATERIAL WAS BASED ON LIMITED TEST BORINGS AND VISUAL OBSERVATION. THICKER FILL MAY BE PRESENT AT THE SITE. LIMITED TESTING WAS PERFORMED ON THE FILL SOILS DURING THE TIME OF OUR FIELD AND LABORATORY INVESTIGATIONS. THE LIMITED TESTING INDICATES THE FILL SOIL HAD VARYING STRENGTH CHARACTERISTICS RANGING FROM LOOSELY PLACED TO COMPACTED. THEREFORE, IT IS RECOMMENDED THAT THE FILL SOILS BE EXCAVATED AND STOCKPILED SO THAT THE NATIVE SOILS CAN BE PROPERLY PREPARED. THESE SOILS WILL BE SUITABLE FOR REUSE AS ENGINEERED FILL PROVIDED THEY ARE CLEANSED OF EXCESSIVE ORGANICS AND DEBRIS. PRIOR TO BACKFILLING, KRAZAN& ASSOCIATES, INC. SHOULD INSPECT THE BOTTOM OF THE EXCAVATION TO VERIFY NO ADDITIONAL REMOVAL IS REQUIRED. � zow I Ld > tiS`=_L RIP-RAP I I I w Q� ---,L BOTH SIDES) I ./ v % PHASE 1 1 'd� IIIIIIIIIIIIi'�Y I PHASE 2 � �' I a I I I \ ' m / I TEMPORARY DRAINAGE BASIN I VOLUME REQUIRED=0.57 AC -FT �Q 0.5% 0.59\ 1c I I MIN ® MIN MIN I _ _ _ _ X I II - VOLUME PROVIDED=0.64 AC -FT Of IX 11 BASIN BOTTOM ELEV.=37.2 I AIN SYSTEM TO BE INSTALLED AND SWALE) 11 I �� I HIGH WATER ELEV.=41.2 I o I ��. I C TO BE INSPECTED BY THE CITY BUILDINS INLET DRAIN, TYP- I f- I I I i i i DETAIL 2 °� I 1 III I � zLjj � J I I 00 3r I I I _Z 2 � I X I I Lia � aE O I 11 " 1 F- -10 w a I 0 I I I w� 1d Of I I I I 0 1 3' DRAINPIPE, TYP � I _jI II Qz�Q 2111 I .; 1 J I Li J U O U) U AX x Q 0< I `� I N I J I >_ I 1 . Q � � NSTALL 6' CHAIN-LINK FENCE (NO 1 I x I Q w w� I 1 x 1 I m I, SLATS OR CURBING PER C.O.B. STD. I _z`Ln - � � gm ;� � DWG. D-11 & 0-12. I 3" OUTLET _ DRAINPIPE, TYP- I I I I 1 3" MITERED DRAIN. TYP' I I DETAIL B ix I i � I j xl JAMES VALLEY I I I I �, �� ., II ! I COURT I - - II 1 �--� FG x N Q 14, 1 ( -- S LZ I -x -x - ^ i J I NOTE: YARD DR -' a � TO BE GRADED g2' J HOUSE CONSTRU �-----------------------------� NOTE: THE TEMPORARY SUMP SHALL BE PRIVATELY MAINTAINED YARD DRAINS A DEPT WHILE THE AND THE CITY OF BAKERSFIELD SHALL NOT ASSUME RESPONSIBILITY 0.59 MINIMUM G OVER THE MAINTENANCE. THE TEMPORARY SUMP IS NOT REQUIRED BUILDING DEPT TO BE OVER -EXCAVATED. HOUSE coNSTRu TEMPORARY BASIN T FINISH L n+ N.T.S. THE SITE WAS UTILIZED FOR AGRICULTURAL PURPOSES. ASSOCIATED WITH THIS DEVELOPMENT WERE LIKELY BURIED STRUCTURES SUCH AS UTILITIES, IRRIGATION LINES, STANDPIPES, AND WATER WELLS THAT MAY HAVE EXTENDED INTO THE PROJECT SITE. ANY SURFACE OR BURIED STRUCTURES ENCOUNTERED DURING CONSTRUCTION SHOULD BE PROPERLY REMOVED AND/OR RELOCATED. THE RESULTING EXCAVATIONS SHOULD BE BACKFILLED WITH ENGINEERED FILL, COMPACTED TO A MINIMUM OF 90 PERCENT OF MAXIMUM DENSITY BASED ON ASTM TEST METHOD C1557. DISTURBED AREAS CAUSED BY DEMOLITION ACTIVITIES SHOULD BE REMOVEC AND/OR RECOMPACTED. EXCAVATIONS, DEPRESSIONS, OR SOFT AND PLIANT AREAS EXTENDING BELOW PLANNEC FINISH SUBGRADE LEVEL SHOULD BE CLEANED TO FIRM UNDISTURBED SOIL, AND BACKFILLED WITH ENGINEERED FILL. IN GENERAL, ANY SEPTIC TANKS, DEBRIS PITS, CESSPOOLS, OR SIMILAR STRUCTURES SHOULD BE ENTIRELY REMOVED. CONCRETE FOOTINGS SHOULD BE REMOVED TO AN EQUIVALENT DEPTH OF AT LEAST 3 FEET BELOW PROPOSED FOOTING ELEVATIONS OR AS RECOMMENDED BY THE SOILS ENGINEER. IF NOT UTILIZED FOR THE NEW DEVELOPMENT, WATER WELLS SHOULD BE ABANDONED IN ACCORDANCE WITH THE COUNTY STANDARDS. ANY OTHER BURIED STRUCTURES SHOULD BE REMOVED IN ACCORDANCE WITH THE RECOMMENDATIONS OF THE SOILS ENGINEER. THE RESULTING EXCAVATIONS SHOULD BE BACKFILLED WITH ENGINEERED FILL. IT IS RECOMMENDED ) C ENDED FC IJ_OWING STRIPPING, PPING, FILL REMOVAL OPERATIONS, AND PRIOR TO FILL PLACEMENT, THE UPPER 2 FEET OF NATI'JE SOIL WITHIN PROPOSED BUILDING AREAS BE EXCAVATED, WORKED UNTIL UNIFORM AND FREE FROM LARGE CLOCS, MOISTURE -CONDITIONED AS NECESSARY, AND RECOMPACTED TO A MINIMUM OF 90 PERCENT OF DENSITY BASED ON ASTM TEST METHOD D1557. IN ADDITION, IT IS RECOMMENDED THAT THE EXPOSED SUBGRADE BE !MOISTURE -CONDITIONED, PROOF -ROLLED AND OBSERVED BY KRAZAN& ASSOCIATES, INC. TO IDENTIFY ANY UNSTABLE AREAS PRIOR TO FILL PLACEMENT. UNSTABLE AREAS SHOULD BE EXCAVATED TO FIRM NATIVE GROUND PRIOR TO FILL PLACEMENT. LIMITS OF REMOVAL AND RECOMPACTION SHOULD EXTEND A MINIMUM OF 5 FEET BE"OND STRUCTURAL ELEMENTS. WITHIN PROPOSED PAVEMENT AND EXTERIOR FLATWORK AREAS, IT IS RECOMMENDED THE EXPOSED SJBGRADE BE EXCAVATED TO A DEPTH OF 12 INCHES, WORKED UNTIL UNIFORM AND FREE FROM LARGE CLODS, MOISTURE -CONDITIONED AS NECESSARY, AND RECOMPACTED TO A MINIMUM OF 90 PERCENT C ERC_NT OF MAXIM DENSITY UM STY BA., ED ON ASTM TEST METHOD - S E HOD D1557. THE ON-SITE, NATIVE SILTY AND SANDY SOILS WILL BE SUITABLE FOR REUSE AS ENGINEERED FILL, PROVIDED THEY ARE CLEANSED OF EXCESSIVE ORGANICS AND DEBRIS. THE UPPER SOILS, DURING WET WINTER MONTHS, BECOME VERY MOIST DUE TO THE ABSORPTIVE CHARACTERISTICS OF TFE SOIL. EARTHWORK OPERA11ONS PERFORMED DURING WINTER MONTHS MAY ENCOUNTER VERY MOIST UNSTABLE SOILS, WHICH MAY REQUIRE REMOVAL TO GRADE A STABLE BUILDING FOUNDATION. PROJECT SITE WINTERIZATION CONSISTING OF PLACEMENT OF AGGREGATE BASE AND PROTECTING EXPOSED SOILS DURING THE CONSTRUCTION PHASE SHOULD BE PERFORMED. A REPRESENTATIVE OF OUR FIRM SHOULD BE PRESENT DURING ALL SITE CLEARING AND GRADING OPERATIONS TO TEST AND OBSERVE EARTHWORK CONSTRUCTION. THIS 7STTNG AND OBSERVATION IS AN INTEGRAL PART OF OUR SERVICE AS ACCEPTANCE OF EARTHWORK CONSTR.'CTON IS DEPENDENT UPON COMPACTION OF THE MATERIAL AND THE STAEILITY OF THE MATERIAL. THE SOILS ENGINEER MAY REJECT ANY MATERIAL THAT DOES NOT MEET COMPACTION AND STABILITY REQUIREMENTS. FURTHER RECOMMENDATIONS OF THIS REPORT ARE PREDICATED UPON THE ASSUMPTION THAT EARTHWORK CONSTRUCTION WILL CONFORM TO RECOMMENDATIONS SET FORTH IN THIS SECTION AND THE ENGINEERED FILL SECTION. ENGINEERED FILL THE ON-SITE UPPER NATIVE AND FILL SOILS ARE PREDOMINATELY SILTY SANDS, SANDY SILTS, AND SANDS. THESE SOILS WILL BE SLITABLE AS ENGINEERED FILL, PROVIDED THEY ARE CLEANSED OF EXCESSIVE ORGANICS AND DEBRIS. THE PREFERRED MATERIALS SPECIFIED FOR ENGINEERED FILL IS SUITABLE FOR MOST APPLICATIONS WITH THE EXCEPTION OF EXPOSURE TO EROSION. PROJECT SITE WINTERIZATION AND PROTECTION OF EXPOSED SOILS DURING THE CONSTRUCTION PHASE SHOULD BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR, SINCE HE HAS COMPLETE CONTROL OF THE PROJECT SITE AT THAT TIME. IMPORTED FILL MATERIAL. SHOULD BE PREDOMINATELY NON -EXPANSIVE GRANULAR MATERIAL WITH A PLASTICITY INDEX LESS THAN 10 AND A UBC EXPANSION INDEX LESS THAN 15. IMPORTED FILL SHOULD BE FREE FROM ROCKS AND LUMPS GREATER THAN 4 INCHES IN DIAMETER. ALL IMPORTED FILL MATERIAL SHOULD BE SUBMITTED FOR APPROVAL TO THE SOILS ENGINEER AT LEAST 48 HOURS PRIOR TO DELIVERY TO THE SITE. FILL SOILS SHOULD BE PLACED IN LIFTS APPROXIMATELY 6 INCHES THICK, MOISTURE -CONDITIONED AS NECESSARY, AND COMPACTED TO ACHIEVE AT LEAST 90 PERCENT MAXIMUM DENSITY BASED ON ASTM TEST METHOD D1557. ADDITIONAL LIFTS SHOULD NOT BE PLACED IF THE PREVIOUS LIFT DID NOT MEET THE REQUIRED DRY DENSITY OR IF SOIL CONDITIONS ARE NOT STABLE. O. MIN 6" ''ARD DRAIN z01 �� 3" R SER _ ��, in U 0.5% MIN SLOPE 3' TYP I- x w DAYLIGHT 3"-, o z MITERED DRAIN `I x I w 2 MIN I 3" DRAINPIPE, TYP o� 3" ELBOW) �- 3" 1DPE OR PVC 0.t% MINMIN OR TEE DRAIN PIPE i �Al YARD DRAIN INLET SECTION -_= 2'-� I N N.T.S. 10' PERFORATED PIPE z MIN �? 0? ' 0 ,y, ole 0.5% 0.59\ 0.59. MIN ® MIN MIN REAR SLOPE Vh FINISHED PAD HINGE z---- z >.- r- - FRONT SLOPE -P 11 U) w (Y Q > PARKWAY SLOPE ST RE AT N ' F j SIDEWALK 1% MIN REAR SWALE N t Of f CURB & GUTTER w Of CENTERLINE Q - AIN SYSTEM TO BE INSTALLED AND SWALE) BY BUILDING CONTRACTOR AT THE TIME OF o CTION. W I- TO BE INSPECTED BY THE CITY BUILDINS 0 TRENCH IS OPEN. RADE TO INLETS TO BE INSPECTED BY == FINAL STAGE OF FINE GRADING DURING CTION. 3r OT GRADING AND DRAINAGE N_T_S_ ---45- ELBOW GRAVEL U OdUO WOvo w O W, m J ZUwiz WZwI uwim=zfW-wQ�o d Q~ OU ~~ .>- Z O Z w(D=�-z�wx0 wZ�>Fcn� �w U V wi0WQw`nw�u- 0I-F fxuxj�wLU-�� xd 0 z Z O W OwUwcn ¢pa=Q�F Zzx�vwz0F-n ¢ccO LL�Ozmw �W,WW-0mZ`? zzoaazzo0x �wi 1w�WOiz*x-ai2 x�0���zz� oo�¢�wWzo33 � Z�owoW��o� x 2 U x w o< ow Oaza►z-W>oyx awcO�z�zwz¢o `1 ?m3:i- -z zz- a��>Q0win�O cn W 0=F-< Lu0;2 a x>-0OaMLu =,- C7aiwx�ZQQJO� Z p x U U W i� LL I ga03.=>�JOU'- 0 x� x W W x .w. i g 1 W Ow >a�� Z�co0- n >-W H-cn U' zn ¢WOWW�Z0� a. ww00wz�cco> _t, ==:wwm qa I-f-oaf-00�Q s VARIES BARD DRAIN OUTLET SECTION "' N.T.S. ��FJ ��� Z z C, Z O a�_ Li Q --cam 0E-Qw W - Z m � G w �<_ zLij o w w C cn U � w Q O L_ 0 N _j;z in - :2 N - N ccG O C- HINGE, -- I ----- FRONT SLOPE PARKWAY --LOPE U) Lu > 0 N SIDEWA_K T CU:?B Sc GUTTER w E c:-;:) EE- C=NTERLINE� > NOTE: TO BE FINE GRADED BY BUILDING CONTRACTOR AT THE TIME OF HOUSE CONSTRUCTION. TYP LOT -ROUGH GRADING !►11III&I L F��✓ �lM REAR SLOPE N ' F j 1% MIN,5, ° 1% MIN REAR SWALE N t X\� REAF SLOPE f' w > cn _w E Q > r 1 LO(N O It N O 3 PARKWAY SLOPE o M SIDEWALK c) I T � j 0 CURB &GUTTER w m STREET CENTERLINE > j O NOTE: SWALES TO BE -o - cn GRADED BY BUILDING a CONTRACTOR AT THE o) _ TIME OF HOUSEc -_ CONSTRUCTION. o DATE 4/25/2017 TYP LOT - FINISH GRADING PA JOB No. _27698 N.T.S. E SHEET 'o C_ E t. i m j '}( �* j L✓ 1 n C [i Cfl 1 r - COB RECORDS No. -4 OF 5 SHEETS b "01- ^I cl 01) Inw U) 0 .0 0 UJI z E7 W v- M ._ W C} oco L):5-0 Co 0 Q 4= 06 pU) 0 v J Z fYO w m 04 UJ W (D M _Z CDo � c3 U) ti wW N ch �. Irl - N to co w 0 It - N 000L �\ -- z N t f f' o O __ ch �= w� Es o `. ��� W I- �� 0 z == �- < ` ` 3r LJ - Z m _Z 2 6� C] U awe w a J m a CL Ouj Li J U O U) U )Ef � w Q . f- M U) ; U _z`Ln - '4 N w N r' C HINGE O � 0 0 `� w > cn _w E Q > r 1 LO(N O It N O 3 PARKWAY SLOPE o M SIDEWALK c) I T � j 0 CURB &GUTTER w m STREET CENTERLINE > j O NOTE: SWALES TO BE -o - cn GRADED BY BUILDING a CONTRACTOR AT THE o) _ TIME OF HOUSEc -_ CONSTRUCTION. o DATE 4/25/2017 TYP LOT - FINISH GRADING PA JOB No. _27698 N.T.S. E SHEET 'o C_ E t. i m j '}( �* j L✓ 1 n C [i Cfl 1 r - COB RECORDS No. -4 OF 5 SHEETS b "01- ^I cl 01) Inw U) 0 .0 0 UJI z E7 W v- M ._ W C} oco L):5-0 Co 0 Q 4= 06 pU) 0 v J Z fYO w m 04 UJ W (D M _Z CDo � c3 U) ti wW N ch �. Irl - N to co w 0 It - N 000L �\ -- N t w� o `. ��� W I- IL 0 D" a _w z � J ` ` 3r 0 z w W m w W LL a u- w a ��NEER b I� o� R y� cn a rn - Q W 3 M > U d o� w V O d af � ^� 'I,/03i * _ N I T, am 10 t �(J y �- ��p✓ _-,-__ -�✓ -- --- r�-- --°--- -- -_ __ _- _- -- -- -- -- -- -- -- __-- -- -- -- -- -- ' I \ `-- -- -- - --- Oct I o a U O w O In V Z w w zM. F x W k, t 347.63 x� W347.46 �G W -- - -- -W � W W W- w I \ w J x z? x z x <:. x47.35 a o W W �'� I W Vf W co m F- O LL ~ a --E E x -- 3 7.43x x�` x� d=z0~ _zpz: - - -- -- - - - - - - -- P SEE STREET PLANS FOR TRACT 7253 FOR DETAILS AND DIMENSIONS W ; o > m w o --- -------- ---- ---------- ------ --- --- --------�c----- �p------- ------sc----- ----__-_-_s,======------________________--a---_= co u O Z � ci o rr 30 347.64/ 347.54/ 347.63 R �r-- -- ------ ------ -__� --- _ _ ------------ --- -�-------------------------------------------- z w w w U O JQ p c7 347.66 --- ,�----�r-------.�-------n--------------�---�_�__-- ------ 1�-------------- ------ ------ ---------------------.�---- -�y- w =P EP ---- EP EP EP 34733 347.25 i - I -- - w x in x z m TRACT BOUNDARY EP EP PROPOSED EDGE OF FAVEMENT ----_ 346.71346.53 = w ®� - - _ - -'.� _ -�= TAFT HIGHWAY (SEE STREET PLANS) \` - _ EP PROPOSED EDGE OF PAVEMENT EP I w x o = w In v MT1 zcow - - _ -, - / _ = - (SEE STREET PLANS) Z346 O~w 0 0 _ --EXISTING POWER POLES TO BE�_ - X. 002Wv cow-- - - 347.25 EXISTING IRRIGATION DITCH 347.17 347.03 1 346.86 EXISTING IRRIGATION DITCH 34 70 2 3 6.30¢xs wz--- RELOCATED SEE STREET PLANS . °� 34E.`_ a 1- a f P (TO REMAIN IN PLACE). SEP EP ( P P �,z z-- (TO REMAIN IN PLACE). E� EF z _ o E ---- ----- -----------------� -----------&---------&---- -- '----At-------A--- -�- ---�-------'g-----�� - -- �-- ---�------�--- --�- - -�34�� ¢ IY O LL ?s z LL 347..3a �4f.�4 --- --- -- --- --- -- -- ---- - -� 4 06 ,b .F- ------------------- ------ . u Q m . F- - EP __ --- -------- - ----- - ---3 6. 346.09 I vi w w a m z C SEE NOTE ..B., - - ---- -------�-- - --- --- Y SEE NOTE "B" _ _ ��----1�-- �1--- _ EP 3 x z� -_-�-- - - - - -- -- -- -- -- ^- -- -- -- OHE-- -- tiE OHE 0HE - EF, N z0 co_ O' -- -- -- - r O .,q, -- ----------- - -- ---- "�'�, - In 347.17/ -- - I �� \ 1 "� co w�F-cowx0w HE OHE �i _k_- � ------------ - - --cp - -- ---- - , SJ / -- - - - - --_ -- =- == - - ---- - = =-- = =-- -_-� _= _ -_ -'� -- - _ _ = = - = = -4- __� � 4 345:-a3, w w >- > p v z s u� ac - 31L z Z LL - I I Ik EP OHE -- -------�- - - - _ -. _ - -� - ^ m - \F i 5.4$ w Z w r w co G _ - -- - __ _ ---- 345.2($45.69 - ---- - - - - - -- - - -�` - - - - - - - - - - - - - - - - - - - \N J\ �l° ------ __ _- �� pc b ,�`S`\ 1 1. 33.63, oO�Q�WWzo¢ �-'1•r - - �- - -i{--f - - - - - --- �LGg- - T�- o'er - --- - - -- --- - - --� _ _ - -- - - - - -- - - -- - - - _ --- -tel - ----- ------------- -- - -- - -- --------- ` r, . o z y 3 F o z> mil- -- -- - o _ / e 45.1E5 � - - - - -- - - - - - - - - - - - - - _ _ _ --' -�-_ - �' ` - -- - - - - - - - - - - - - - - - -0 -\` \\t,f I`E I t p je ►- O C� - - x NO '`�9p /` I - - - -- - 345.65 345.50/ 345.57 345.52 a,� - _�_, - - - �•T$jT - �`-_ r- \y 34 47 ' f c a c~i a uwi z o a -1 _ _{ I NG SEE NOTE C ^ - / I `'� _----- -- �'-----�6E---- 4t1'I, I EPS 11: ZOwwwtw �- TOE TOE TOE TOE TOE - - - - - - - - - - - \ I I p w z W F O v x I I ( I 5.919= _ _ - - - - - - - - ED FUTURE STREET DEDICATION I `� - -I -I - I i� w W F Q w zd o LL; -. -I- - 1= w o co C ---- - I (BY OTHERS) I I �itzw3 co65 6'I Q �1• ,� PROPOSED IRRIGATION MAIN ( ) \ 134. 6 z - z z - FUTURE IMPROVEMENTS BY OTHERS - m z \ i G -� \� SEPARATE INSTRUMENT E.P I W¢ w Q 9 U o z w LL PROPOSED STREET DEDICATION BY U , I I v- o w u_ C 4 I (BY SEPARATE PLANS) I , I I �J a i m>¢ v w �n G 346.60 PRIVATE IRRIGATION MAIN EASEMENT ' G I I m w = z¢ w w �' I I FENCE OINK E�D 1FT W I I I e� c SEE NOTE "D° SEE NGTE "D" I I o w o a _ TO BE DEDICATED BY SEPARATE i I I I INSTRUMENT. �' I I n t cn X: � OW J� F d I II tir i5 b �I I c co w- Om 3-z > HOZ �zI-x>o� �w =wO Od1�G LIMITS OF OVER -EX '\� �4�'Tj ' _ 1\ 11' I 38' I I I I o w o d J - (PAD AREA) pct` �c�'I r I w � LL Z - v� m ¢ v. / I NOTE: SEE IRRIGATION MAIN PLANS FOR D4TAILS AND DIMENSIONS NOT SHOWN HEREON. I I I I 20 20 m W o W Z z o a / I II EXISTING R/W 1 < - w c� 3 CL -----------� 20' 4j I = U I II I/ I I I N sxLnit=Owz- h w w V O w z co r a: I I~` �G 1 I I Z F F O a I- U D Q III I I�I W 1 MF 2LdLo cr C --------------- - - -- ----------- I I II Y C.3g X11 Y3411 9SJ I o+,`0" o \ �\��\ - -- - - .\ i F I� 0 2f 0 I ' > N CL LLJ LLI -0- M J J 2 0 - 346.23 FENCE CLINK li 346. 6 I 1 KEN CLINK I 344.89 TOEI I V I ' II II 11 11 I 11 I I I I � II I I I I I I I I! I I I ;y iPAr;, I i 1 34 74 TO �I I III! Q Z I m CO -c Q 3 4 5 7 'v LIMITS OF (PAD .9 II I I I II 344.-'9 +,1T0E j 346.02/)YI FENCE CLINK 20' 10 I I I II I II - I I II I II IIII I I I II o I - II I L- . r��Tyi F� r 344.75 NG 'b� � I � I✓il 2.341 a� G +��� LAjc � W xC x �344. C oy� , I Iwo IIIA I I , G �M wI I ,o LO Of I , I zj ^� LEGEND w� I Q / I I'J I i 1 XD S of DESIGN ELEVATION ---------- I i OHE ow % FLOWLINE GRADE / I OHE ' z - - LIMITS OF PAD PREPARATION I OHE / OHE OHE III I I I Q o < I I{ I �, i i I ® STORM DRAIN MANHOLE o --------J . ' hl ` I '.< + ~ v� STORM DRAIN CATCH BASIN z �� '`< ----- w LJ O wJ I Ili i ' I N - - - - - = STORM DRAIN MAIN m LJ I II, rl� 1 I W EXISTING GROUND CONTOUR F- w LJ I I I W ' Q r___- ' -'1 I Illi II - - PROPOSED RIGHT-OF-WAY 13- t I I a i I I( - 11�li �'� i i i } - EXISTING EDGE OF PAVEMENT ( I (I I i i ��� PROPOSED EDGE OF PAVEMENT �/ 1 W I <' `� r-- ,�i II I III, t, '� '10 I - -OHE- - OVERHEAD ELECTRICAL LINES 1 i 1 o ( I I i i ` �=' i i � UTILITY OR ELECTRICAL POLE 1 EXISTING ELEVATION - EXISTING RESIDENTIAL Z NOT A PAR\\T G W x 344.Jj G Ii 'iIIiII I IFUTURE COMMERCIAL - ' - I'1 � NOTE(BY OTHERS) I C ------- NOT A PART 1. ADD 300 TO ALL DESIGN ELEVATIONS 2. ENTIRE TRACT WILL BE GRADED AT THE SAME TIME h T-41 RACT BOUNDARY PROPOSED 5' WIDE TEMPORARY WALL EASEMENT k I I Ill I I I I (BY SEPARATE INSTRUMENT) NOTES _ _ I NOTE "A": PROPOSED PEDESTRIAN ACCESS EASEMENT TO BE DEDICATED ON FINAL MAP (SEE STREET PLANS FOR DE -AILS AND DIMENSIONS). NOTE "B": EXISTING DRAINAGE DITCH TO BE BACKFILLED AND COMPACTED x w I , PER SOILS REPORT RECOMMENDATIONS ANC PER KERN DELTA'S SCHEDULING jp-I I I F I 11 REQUIREMENTS. (SEE IRRIGATION MAIN PLANS FOR DETAILS AND DIMENSIONS) 32 31 > 30 29 28 27 , 26 25 241 23 22 1 k o c o Q I I I I NOTE "C: PROPOSED LANDSCAPE LOT TO THE CITY OF BAKERSFIELD TO BE u- o u- .y I j l' I I DEDICATED ON FINAL MAP. --- - - - o e� w i i i NOTE "D": AN ENCROACHMENT PERMIT FOR RRIGATION CROSSING IS REQUIRED ro UNLESS WAIVED BY PUBLIC WORKS DIRECTCF. a°`�� �v °P`•�v >- N X� 4$•? -- -- •-- -- -o - - ,2�0 III L I o +II I i Z ZD �Ec yro Ok 0.20% g`ti �O 1� �� 00 �`L h° 0.20% �0 0 u ' ,� e.�P� I �{ O N ,� kk ��. LIBERTY ��. ��: , 1 �ti" y RI DGE ,• ,�• �� � ,�`� COURT ,�� ���,�� SEE NOTE „A„ I +) ,> F� (��' x ��' c!�' ��' (��' II a I CWJO N , 44181; 1 I Q A �y`D �1 �`� Ml 1� �� O1 �0 ,ti -a 5 I 2 r I v m 'Ij 'S 344.54] 359' 0 20% s o�� cam' e`l' �\' o� �� 0.21 X �� �� �`�, S �y� E I , `�� / II pQ �.• O I VARI s, I 11' VARIES N Z I � N = N �s / I ' i I' 20' 20' EXISTING R/W T I N (- `G `-G !G x (G �` `G !�G `G x �`�!-G �`�/!"C� \ / - V III m 1 �i ' W ` Z t^a ` ` ` W �¢ a �Q h� �k N W 13 14 <15 I U so' I Q Z o Q (10' 20' 1 20' 101 16 17 18 ' w �a 19 20 I I' �'•; _N_ 3: N_� 21 e I o 0 N J lO d J U 1 I I ! ' rn CD 11 12 �C A ti �. 0 D�` �G p� �G D� �v pkv G m PHASE 1 I _-- I PHASE 1 T PHASE 2 h Yt�u- �� ,_ - ,� � �� �� PHASE 2�� �a - - °`� - °` I W °`�, I ,9 � oP` - _ - Oc�_ rk SCALE : 1 " = 40' I I I %. Q ! I U o 20 40 80 a DATE 0 1,� r ..� co cn 0) In p LLJ Z E W Q ffiM LL Z -Cleo r= DC m N LU W N M Z a) O Z M ILJ W ..� N t0 t0 cc::)) i Z 0 w w \ w Z = 1 °- Zm J w W w Q LL U u: co I-- LL a o a Z (n Q Q d w zQ � M = L0 d N ti U U F - SEE SHEET 4 PA JOB No. SHEET 4/25/2017 27698 0 L a E m COB RECORDS No. OF 5 SHEETS Z 0 SEE SHEET 4 PA JOB No. SHEET 4/25/2017 27698 0 L a E m COB RECORDS No. OF 5 SHEETS SEE SHEET 3 345.72 FENCE CLINK Q Z Y ::D r m C U W m L —_ — W J O F 345.55 FENCE CLINK 345.1 ENCE CLINk 344.97 'LINK 1FT\W 344.47,,'4,-TENC,'>a- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --- -Lu =""-----------------_--------------3A-.1i,--*-341-d7- Ii --- - I K_A_L_ I bk NG V-------- ------ 343) 342.86 342.71 NG NG NG -----------------------------------------\ 3 84 ----------_--_-- Nb ------------- 344----------NG4 64 NG - - \342.4 7 \342.51 - - - - NG NG 344.46 NG N \3'44.7 NG LEGE -ND U o_ pa VO worn DESIGN ELEVATION WOw� mom zowaZW Wow¢ IWi w c W W Q o w�'tOa a� U�z�Wop I 0.20% FLOWLINE GRADE I W z 0> �' a —— LIMITS OF PAD PREPARATION z w w 2 o:;� 5 0 Fnxmzwm ® STORM DRAIN MANHOLE �WFWQZ10ui W x o = W m re=v STORM DRAIN CATCH BASIN ¢ rn o o W - j Z Z V O W a 0 0 0 W T W O ___--- STORM DRAIN MAIN ga'-c¢iWz'-�� z ._a'_ O w ¢&O LLgoz�mw EXISTING GROUND CONTOUR z z"' a WL) z (6 m c9-OOmozZo' a - - PROPOSED RIGHT-OF-WAY C9 � -1 p: O O WW >- g! o �' z W r=" w owzwmawF-v�C - -- - EXISTING EDGE OF PAVEMENT rn=¢O Vr co�ZZLL 6,= z z m o 0 o x w rn> w MOM: W zoa o o c o W W LL. PROPOSED EDGE OF PAVEMENT �,X o W a — —OHE— — OVERHEAD ELECTRICAL LINES ujWva� coZOR z0 $Www W o z Q Eza�W�c�¢a U11UTY OR ELECTRICAL POLE _ W �Z W 0 o 0 CO E F-ZW aZo "' W, ZZ9 EXISTING ELEVATION a w Q Q v o N 2 e oma=zaL) Zw W� z i O= S O E. H ¢¢to � W C to=a'F-QU> JMF- C7tnW2WZ¢QOC Z~=>o�0 NOTE O U) F- �wOwmw=W�2 1. ADD 300 TO ALL DESIGN ELEVATIONS ~ W w W J - m j¢ W m Z W O m 4 m > mwsoz-jzpQm 2. ENTIRE TRACT WILL BE GRADED AT THE ¢ I W w 0 a > SAME TIME ==0m=o0�z1 ►-roaF-6o?2¢1 r NOTES _ - NOTE "A": PROPOSED LANDSCAPE LOT TO THE CITY OF BAKERSFIELD TO BE DEDICATED ON FINAL MAP. NOTE "E": EXISTING DRAINAGE DITCH TO BE BACKFILLED AND COMPACTED PER SOILS REPORT RECOMMENDATIONS AND PER KERN DELTA'S SCHEDULING REQUIREMENTS. (SEE IRRIGATION MAIN PLANS FOR DETAILS AND DIMENSIONS) NOTE "C": PROPOSED STORM DRAIN EASEMENT TO THE CITY OF BAKERSFIELD TO BE DEDICATED ON FINAL MAP. N- N(DRTH SCALE: 1 "= 40' 0 20 40 80 r N O 0) 3 v M U I c� I m N c 0 a 0) c =o 0 / a) E 0 w CD �} r E r r COB RECORDS No. 0 M LO . a aN W M (, r co -0 co m N 0 u? N M N co o co a N r z Q J N I 0 N m U) z O � ¢ O Lu w O z 5 0 Z LU F- w rn> w W LL. a U. o W a z Q J N I 0 N m U) z O Lu DATE 4/25/2017 PA JOB No. 2769B SHEET 4 OF 5 SHEETS EXISTING MOBILE HOME PARK OR I AG ZONED cO PROPERTY m Cl x PROPOSED 6' HIGH CHAIN-LINK FENCE WITH REDWOOD SLATS PER C.O.B. STD. DWG. D-12. S m) (TYPICAL ALONG NORTH, WEST, SOUTH AND A - I PORTION OF EAST SIDE) - UI x J�'I c '- U---- 13' o PROPOSED 3 6=; I 12.5' i DRAINAGE BASIN Ix O I CL C I I 6" o --I rF- x �9 + PROPOSED BLOCK WALL (BY SEPARATE PLANS) TRACT 7253 GRADE 0 2:1 FINISHED PA[ FL wlz JI �I O J PROPOSED BLOCK WALL Q (BY SEPARATE PLANS) t\ � � Z w ST RW 45' RIGHT-OF-WAY 1 1 I 20' 8' LANDSCAPED AREA_j W. XI _ = 11' FIL w , 34' 6" TYPE "B" CURB & GUTTER w 4 2'W/ 5.5' WIDE SIDEWA-K w MAX GRADE LINE ST COMPACT UNDER CURB, GUTTER-` * SEE C.O.B. 3TD. DWG. ST -11 AND SIDEWALK (TYP.) 6" MIN. TO FOR SLOPE PNRAMETERS 90% MAX. DENSITY. CONSTRUCT MIN. 0.30' A.C. PAVING OVER MIN. 0.50' CRUSHED AGGREGATE BASE OVER MIN. 1.00' NAT. GRD. COMPACTED TO 95% MAX. DENSITY 11=6.0 R=35 (FOR GRADING PURPOSES ONLY) 90' RIGHT-OF-WAY (COLLECTOR tS"'*N TYPICAL CHEVALIER ROAD SECTI N NOT TO SCALE w O 0 12.5' p N 12 `n PROPOSED ca O DRAINAGE BASIN 1p�r_ Cm+�r:..JL PROPOSED BLOCK WALL ST,� ST Pl�i� R (BY SEPARATE PLANS) CL RW w w m= z F w Q F-0 0: 0� F- LL z a z U uj O I RIGHT-OF-WAY ( 6' W I �Z W W 0: J-=dzw ~O w CL O w W d O VARIES 55-65' FL ' w 1 CL 0� I LANDSCAPE LOT Pe) aoo0w ,Fo VARIES o0Ei-< z _z3LLmzOo}w 10' ¢wOo-��7d"m� Wz z ` Cull U'l z Oo00y00wxw 45.4'-55' 1 z 10' LANDSCAPE AREA ? _j O w w o J w o 10 VARIES CONSTRUCT MIN. 0.45' A.C. PAVING OVER CL z o w w w LL CO o z! U Q z O a z a F w W O = U o z O LL m H 0- 19't -30'f Li a 3 IU X OW U Q 7'** 7'** w FACE, W Z owowwwmozm = 2'2 I Lco N Q w LANDSCAPE MEDIAN SAWCUT 2' TO NEAT VERTICAL OR AS DIRECTED BY CITY ENGINEER wwUOwZ 53; I I r - MpX 2--1-, GRADE 0 2:1 J FINISHED PADS 29 2 6" Q ELEVATION *1.5%-3.4% MAX RETAINED HEIGHT=12" MAX ; FINISHED PAD EXISTING GROUND L10 TYPE M-1 MEDIAN CURB 7(TEMPORARY) 6" TYPE "B" CURB &GUTTER GRADE ®8:1 ,' W/ 5.5' WIDE SIDEWALK NOTE: EXACT LIMITS OF PAVEMENT f' - tRADE LINE �?''�✓ COMPACT UNDER CURB, GUTTER REMOVAL SHALL BE DETERMINED BY g 5 CITY ENGINEER/INSPECTOR WITH STREET �x�f'ZvX�+nAiESEE C.O.B. STD. DWG. ST -11 AND SIDEWALK TY. 6" MIN. TO 90% MAX. DENSITY. PLAN APPROVAL. FOR SLOPE PARAMETERS ** SEE STREET PLANS FOR MEDIAN DESIGN CONSTRUCT MIN. 0.45' A.C. PAVING OVER MIN. 0.95' CRUSHED AGGREGATE BASE OVER MIN. 1.10' NAT. GRD. COMPACTED TO 95% MAX. DENSITY TI=9.0 R=35 (FOR GRADING PURPOSES ONLY) 110' RIGHT-OF-WAY (ARTERIAL) TYPICAL TAFT HIGHWAY SECTION ry I NOT TO SCALE EXISTING MOBILE HOME PARK OR I AG ZONED cO PROPERTY m Cl x PROPOSED 6' HIGH CHAIN-LINK FENCE WITH REDWOOD SLATS PER C.O.B. STD. DWG. D-12. S m) (TYPICAL ALONG NORTH, WEST, SOUTH AND A - I PORTION OF EAST SIDE) - UI x J�'I c '- U---- 13' o PROPOSED 3 6=; I 12.5' i DRAINAGE BASIN Ix O I CL C I I 6" o --I rF- x �9 + PROPOSED BLOCK WALL (BY SEPARATE PLANS) TRACT 7253 GRADE 0 2:1 FINISHED PA[ FL wlz JI �I O J PROPOSED BLOCK WALL Q (BY SEPARATE PLANS) t\ � � Z w ST RW 45' RIGHT-OF-WAY 1 1 I 20' 8' LANDSCAPED AREA_j W. XI _ = 11' FIL w , 34' 6" TYPE "B" CURB & GUTTER w 4 2'W/ 5.5' WIDE SIDEWA-K w MAX GRADE LINE ST COMPACT UNDER CURB, GUTTER-` * SEE C.O.B. 3TD. DWG. ST -11 AND SIDEWALK (TYP.) 6" MIN. TO FOR SLOPE PNRAMETERS 90% MAX. DENSITY. CONSTRUCT MIN. 0.30' A.C. PAVING OVER MIN. 0.50' CRUSHED AGGREGATE BASE OVER MIN. 1.00' NAT. GRD. COMPACTED TO 95% MAX. DENSITY 11=6.0 R=35 (FOR GRADING PURPOSES ONLY) 90' RIGHT-OF-WAY (COLLECTOR tS"'*N TYPICAL CHEVALIER ROAD SECTI N NOT TO SCALE w O 0 12.5' p N 12 `n PROPOSED ca O DRAINAGE BASIN EF BOTTOM OF SUMP ELEVATION Kr*\ TYPICAL SECTION 1"n TYPICAL SECTION vNOT TO SCALE NOT TO SCALE _ , - PROPOSED 5' WIDE TEMPORARY WALL EASEMENT PROPOSED I rl I > BOTTOM OF SUMP ELEVATION FJTURE RW (FUTURE) 45' RIGHT-OF-WAY PROPOSED BLOCK WALL U � - RW (BY SEPARATE: PLANS)}- zmW WZW< w w m= z F w Q F-0 0: 0� F- LL z a z U uj O I O o tJn WV 0 t-- W I �Z W W 0: J-=dzw ~O w CL O w W d O I ' w 1 CL 0� W Pe) EF BOTTOM OF SUMP ELEVATION Kr*\ TYPICAL SECTION 1"n TYPICAL SECTION vNOT TO SCALE NOT TO SCALE _ , - PROPOSED 5' WIDE TEMPORARY WALL EASEMENT PROPOSED I rl I > BOTTOM OF SUMP ELEVATION FJTURE RW (FUTURE) 45' RIGHT-OF-WAY PROPOSED BLOCK WALL U � - RW (BY SEPARATE: PLANS)}- zmW WZW< w w m= z F w Q F-0 0: 0� F- LL z a z U uj O I n.;Z�z- � W p �ai�iwZuoi>m`�¢ o tJn WV 0 t-- W I �Z W W 0: J-=dzw ~O w CL O w W d O I ' w 1 CL 0� W Pe) aoo0w ,Fo � -uj mQCL o0Ei-< z _z3LLmzOo}w VARIES ¢wOo-��7d"m� Wz t1D ` Cull U'l z Oo00y00wxw - 1 z O O N ? _j O w w o J w o 10 Z (If CONSTRUCT MIN. 0.45' A.C. PAVING OVER CL z o w w w LL CO o z! U Q z O a z a F w W O = U o z O LL m H 0- TI=9.0 R=35 O a m w � _ , c< U z 0 CO IU X OW U Q l a IQ W Z owowwwmozm 255.79' cn N Q w =-'w3gz >w 0�, wwUOwZ 53; I I r - �a=za2�ot-0 J FINISHED PADS 2 6" Q ELEVATION F MAX RETAINED HEIGHT=12" ,Q,, EXISTING GROUND L10 ELEVATION TYPICAL SLOPE r_� NOT TO SCALE WOOD FENCE FUTURE 11 1 Q o BLOCK WALL" � , I I z RAW C R/W \III o F_ r 30' 30' TRACT 7253 1 I l l m Q FUTURE ' I ' Q o Q COMMERCIAL 10' 20' 20' 10' I I I 1 FINISHED PAD � � FINISHED PAD ?. I I I co N M 2' TYP. i 2' TYP. ��P* 41 I 9I 29I 2% �6„ = r MA. *1.5 % *1.5-.-,3.4 % rX_ �. FINISHED PAD ,/ ELEVATION 1 I I 2 �, /�/ / 6" TYPE "B" CURB 6: GUTTER EXISTING GROUND SEE C.O.B. STD. DWG. ST -1t,< GRADE LINE FOR SLOPE PARAMETERS W/ 4.5' WIDE SIDEWALK ELEVATION \\\�`/ CONSTRUCT MIN. 0.20' A.C. PAVING OVER COMPACT UNDER CURB, GUTTER AND I h MAY BE REDUCED TO 1' IF "H" IS MIN. 0.40' CRUSHED AGGREGATE BASE OVER MIN. 1.00' NAT. GRD. SIDEWALK (TYP.) 6" MIN TO 90% MAX. LESS THAN ONE FOOT VERTICAL COMPACTED TO 95% MAX. DENSITY DENSITY. T1=4.5 R=35 **= PROPOSED BLOCK WALL TO BE DONE BY FUTURE COMMERCIAL (FOR GRADING PURPOSES ONLY) DEVELOPMENT, TEMPORARY WALL EASEMENT TO BE ABANDONED 60' RIGHT-OF-WAY AFTER COMPLETION OF WALL IMPROVEMENTS (BY OTHERS). TYPICAL CA ET SECTIO TYPICAL SECTION NOT TO SCALE NOT TO SCALE PITCHER VIEW COURT j lot PROPOSED 16' WIDE DOUBLE GATE HA2 �cro PER C.O.B. STD. DWG. D-13. E6, 0� - I iw j o 2S-9.. gtIx `L` _ 92.35' Fv O 43.0 - - - - - - /- w 'L/ R=63' Li �� I - - - - l / AO o D ' �i/ � Z / 52.40 l INSTALL OU ET STRUCTUREI O 1 I ,% A W I / PER C.O.B. STD. DWG. D-11 O W/ 24" CUT OFF P INSTALL RIPRA �. AROUND OUTLET BOX ml Q 2i � - --I C� FOR EROSION CONTROL. MA;< I' I DRAINAGE BASIN i / r 2% 1- I I I I / / MAX LO BOTTOM OF BASIN=331.4 06 HIGH WATER ELEVATION=339.4 / / 12.5' 1 I I VOLUME REQUIRED=2.05 AC -FT X12 0 12 5' %K VOLUME PROVIDED=2.06 AC -FT I , t 138.88' G I I --��------1-----z -----r - �� �/ I PROPOSED 6HIGH CHAIN-LINK FENCE WITH 1 REDWOOD SLATS PER C.O.B. STD. DWG. D-12. / I I (TYPICAL ALONG NORTH, WEST, SOUTH AND A -HWM PORTION OF EAST SIDE) _A/00 ro lx 161.08' tr, I TRACT-BOtJ1ctDARY--------- -- ---------- ------ I --------------------------------------------------------------------------------------- DRAINAGE BASIN DETAIL SCALE: 1"= 30' DRAINAGE BASIN MITIGATION OVEREXCAVATE TO A DEPTH OF 18 FEET BELOW EXISTING GRADE (ELEVATION 344.5) AND BACKFILL TO ELEVATION OF 331.40 WITH CLEAN COHESIONLESS SAND CLASSIFIED AS SP OR SW IN THE UNIFIED SOILS CLASSIFICATION SYSTEM TO ENSURE ,ADEQUATE PERMEABILITY FOR WATER TO DRAIN IN SEVEN DAYS OR LESS. A SOILS ENGINEER IS REQUIRED TO BE ON SITE DURING CONSTRUCTION OF THE SUMP. 20' IX Iw 8't w I w 1 i - wR zl J OI MAY B_ REDUCED TO V IF "H" IS -J LESS THAN ONE FOOT VERTICAL I� I FINISH PAD ELEVATION FINISHED P� ELEVA-ION TYPICAL SLOPE NOT TO SCALE FL BW BW 5' - 18' 6' - R/W R/W PROPOSED PEDESTRIAN ACCESS EASEMENT LIBERTY 3' 1C' 5' RIDGE COURT 2% 2%I M xMAX MAX � 7 PEDESTRIAN ACCESS SECTION n+ N.T.S. R EXISTING Q CHAIN-LINK FENCE c I PROTECT IN PLACE) P-4 TRACT 7253 m EXISTING MOBILE HOME PARK MAY BE REDUCED TD 1' IF "H" IS ~ LESS THAN ONE FDOT VERTICAL I� I EXISTING GROUND I- 2 ELEVA.-"ION FINISHED Pf ELEVATION FL I TYPICAL SLOPE ,_, NOT TO EC,-1iLE CHEVALIER; ROAD 7 PROPOSED o I WOOD FENCE zl O TRACT 7253 m EXISTING RESIDENCE Q, ELEVATION DIFFERENCE IS LESS THAN ?" FINISHED PAD I EXI STING GROUND ELEVAT'CN LEVATION TYPICAL SLOPE NOT TO SCALE U � - RW W UO m0� LENGTH zmW WZW< w w m= z F w Q F-0 0: 0� F- LL z a z U uj O I n.;Z�z- � W p �ai�iwZuoi>m`�¢ o tJn WV 0 L3 W I �Z W W 0: J-=dzw ~O w CL O w W d O w a W= w c�F��w2oro� ' w 1 CL 0� s22 -OWE Q) co F aoo0w ,Fo VARIES 0'-5' o0Ei-< z _z3LLmzOo}w VARIES ¢wOo-��7d"m� Wz *1.5%-3.4% , 6.4 -12.4 **V ` Cull U'l z Oo00y00wxw - w W>- w U U= U)_ Lt Lu a)0 _ �_ SAWCUT 2' TO NEAT-':. s _ A� i , . mQQ o O w g z z �' u7� ozw�ocl) VERTICAL FACE, OR AS **=8:1 MAX � N `` DITCH DEPTH=2'-3' DEEP _j O w w o J w o DIRECTED BY CITY ENGINEER (GRADE TO DRAIN) z lr o wwm 6 tzo CONSTRUCT MIN. 0.45' A.C. PAVING OVER CL z o w w w LL CO o z! U Q MIN. 0.95' CRUSHED AGGREGATE BASE OVER MIN. 1.10' NAT. GRD. O a z a F w W O = U o z O LL COMPACTED TO 95% MAX. DENSITY Z w� F z U) 05 o CO TI=9.0 R=35 agu�wiW¢wwao-iwo (FOR GRADING PURPOSES ONLY) m w � _ , c< U z 0 CO (OUTSIDE OF TRACT BOUNDARY) ¢ < C6 _ a 255.79' 9 TYPICAL TAFT HIGHWAY SECTION 0 w 2= z < W o Z �= =2 S2 w Q �.+ NOT TO SCALE owowwwmozm 255.79' Wa0wz?vi°J-°QD cn _awOU O}twi� mOQ Q w =-'w3gz >w 0�, wwUOwZ 53; I I r - �a=za2�ot-0 wR zl J OI MAY B_ REDUCED TO V IF "H" IS -J LESS THAN ONE FOOT VERTICAL I� I FINISH PAD ELEVATION FINISHED P� ELEVA-ION TYPICAL SLOPE NOT TO SCALE FL BW BW 5' - 18' 6' - R/W R/W PROPOSED PEDESTRIAN ACCESS EASEMENT LIBERTY 3' 1C' 5' RIDGE COURT 2% 2%I M xMAX MAX � 7 PEDESTRIAN ACCESS SECTION n+ N.T.S. R EXISTING Q CHAIN-LINK FENCE c I PROTECT IN PLACE) P-4 TRACT 7253 m EXISTING MOBILE HOME PARK MAY BE REDUCED TD 1' IF "H" IS ~ LESS THAN ONE FDOT VERTICAL I� I EXISTING GROUND I- 2 ELEVA.-"ION FINISHED Pf ELEVATION FL I TYPICAL SLOPE ,_, NOT TO EC,-1iLE CHEVALIER; ROAD 7 PROPOSED o I WOOD FENCE zl O TRACT 7253 m EXISTING RESIDENCE Q, ELEVATION DIFFERENCE IS LESS THAN ?" FINISHED PAD I EXI STING GROUND ELEVAT'CN LEVATION TYPICAL SLOPE NOT TO SCALE 15 OFF-SITE (DISTURBED AREA) MAP SCALE: 1'=200' _j IAF I HIL;HWAY BEARING LENGTH L1 N00'39'39"E 223.91' L2 N4533'41"E 21.25' L3 S89'32'1'"E 11.00' L4 N00'39'39"E 10.00' L5 L3 764.00' L6 SOO.39'39"W 17.00' L7 - L8� L2 _ J S44'26"9"E 28.24' 1_9 OFF-SITE STREET (DISTURBED L10 I 32.00' L11 N0o'39'39"E AREA)=0.84 ACRES S89'20'21 "E 20.00' L13 S89'20'2' "E 20.00' L14 SOO'39'39"W 255.79' l N89'20'2'"W 20.00' L16 N0039'39"E 255.79' L12 II y I Q w I I r - II J uj F I ,Q,, r L10 IBERTYIDGE - ---COURT-- \ I JAMES -VALLEY- _COURT---- -- a L13 w I Q w U ITCHER - -VIEW --COURT I 15 OFF-SITE (DISTURBED AREA) MAP SCALE: 1'=200' r N (D a) 3 a 0 11)U I 0 I m rn N i 0 i DATE 4/25/2017 PA JOB No. 2769B SHEET O Q E co �3 �. I N COB RECORDS No. OF 5 SHEETS b M V)(, cc O LLJ Z W o m _.. W U co N 9 06 U) (3 Z Y m c„ LU W a) M Z m o Z M uj W ' �- N CD �s O (0 O 0 N L LINE TABLE LINE BEARING LENGTH L1 N00'39'39"E 223.91' L2 N4533'41"E 21.25' L3 S89'32'1'"E 11.00' L4 N00'39'39"E 10.00' L5 N89'32''7 "W 764.00' L6 SOO.39'39"W 17.00' L7 S89'32'"_'.E 666.00' L8 S44'26"9"E 28.24' 1_9 SOO'39'39"W 429.73' L10 S89'32'17"E 32.00' L11 N0o'39'39"E 217.90' L12 S89'20'21 "E 20.00' L13 S89'20'2' "E 20.00' L14 SOO'39'39"W 255.79' L15 N89'20'2'"W 20.00' L16 N0039'39"E 255.79' r N (D a) 3 a 0 11)U I 0 I m rn N i 0 i DATE 4/25/2017 PA JOB No. 2769B SHEET O Q E co �3 �. I N COB RECORDS No. OF 5 SHEETS b M V)(, cc O LLJ Z W o m _.. W U co N 9 06 U) (3 Z Y m c„ LU W a) M Z m o Z M uj W ' �- N CD �s O (0 O 0 N L m 'i z w o e a` I a. LiJ I-- � rY 0 z 3 m 0J Z wc 3 ® w W_ �i o L { LL a 0 (L m 'i z 0