HomeMy WebLinkAbout6.3-474 Record Drawing�NGINEER' S ISTATEM EN T THESE PLANS AND SPECIFICATIONS WERE PREPARED BY ME OR UNDER MY DIRECTION AND TO THE BEST OF MY KNOWLEDGE AND BELIEF COMPLY WITH CITY OF BAKERSFIELD ORDINANCES, STANDARDS, AND DESIGN CRITERIA, AND INCLUDE ALL IMPROVEMENT REQUIREMENTS OF THE ADVISORY AGENCY OR OTHER REVIEW BOARD. AM RESPONSIBLE FOR I ALL CALCULATIONS AND DRAWINGS ON THESE PLANS ND ANY ERRORS, OMISSIONS, OR VIOLATIONS OF THOSE ORDINANCES, STANDARDS—AND DESIGN CRITERIA SHALL BRORRECTED DURING CONSTRUCTION. 3-6-1 APPROVED BY: ROGER A. McINTOSH, R.C.E. NO. 33322 DATE I� ACCORDANCE WITH THE CONDITIONS OF THE VESTING TENTATIVE MAP, THE IMPROVEMENT PLANS HAVE BEEN REVIEWED BY THE CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT. ALL IMPROVEMENTS INDICATED AS "PRIVATE" HEREIN, ARE PRIVATE AND ARE TO BE PRIVATELY MAINTAINED. BY. RAUL M. ROJAS PUBLIC WORKS DIRECTOR DATE R.C.E. NO. 39880, EXP. 12/31/15 REVIEWED BY. ASSISTANT PUBLIC WORKS DIRECTOR "til DATE NOTE: 1. PRIOR TO THE START OF ANY UNIT OF CONSTRUCTION, THE CITY CONSTRUCTION INSPECTION DEPARTMENT SHALL BE GIVEN 24 HOURS NOTICE. TELEPHONE 326-3049 1 2. ALL MATERIALS SUPPLIED FOR THIS PROJECT WILL REQUIRE A CERTIFICATE OF COMPLIANCE STATING' T HAT THE REQUIREMENTS & STANDARDS SET FORTH BY THE CITY OF BAKERSFIELD HAVE BEEN MET. . . ............ CITY OF BAKERSFIELD KERN COUNTY CALIFORNIA STORM DRAIN CONSTRUCTION PLANS FOR KIRKCALDY DRIVE EXTENSION PM 11894 LEGEND: ABBREVIATIONS C.L. CENTERLINE S.C.O. SEWER CLEANOUT INV. INVERT D.M.H. STORM DRAIN MANHOLE S.D. STORM DRAIN (E) EXIST. EXISTING C.B. CATCH BASIN ELEV. ELEVATION J.B. JUNCTION BOX PROPERTY LINE PA S.M.H. SEWER MANHOLE R/W RIGHT—OF—WAY ----------- 7 =Z EX -24- DRAIN LINE ------ IGHH TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION CONSTRUCT STORM DRAIN PER CITY STANDARDS 0 CONSTRUCT STORM DRAIN MANHOLE TYPE "A" PER C.O.B. STD. SW -4. CONSTRUCT CATCH BASIN t TYPE "A" PER C.O.B. STD. D-14. "'Z ----- J N. f 261 f� .7 1N D KNOLLS RI DW- - j KEY MAP 1 "=200' INDEX OF SHEETS SHEET TITLE 1. TITLE SHEET 2. NOTES & SPECIFICATIONS 3. STORM DRAIN PLAN & PROFILE 4. CROSS SECTIONS [70 MAMb"KelmoolwWARIBLe-W THE BEARING OF N8947'54ffW SHOWN FOR THE NORTH LINE IF THE NORTHWEST Y4 OF SECTION 30 AS SHOWN ON RECORD OF SURVEY RECORDED IN BOOK 15 OF RECORD OF SURVEYS AT PAGE 192 nLED JUNE 28, 1990 IN THE OFFICE OF THE KERN COUNTY RECORDERARINGS HEREON BENCHMARK: TOP OF CONCRETE MONUMENT IN LAMPHOLE AT THE INTERSECTION OF MORNING DRIVE AND COLLEGE AVENUE. ELEVATION = 673.40' PER TRACT NO. 4519 MONUMENT ELEVATION MAP AT THE CITY OF BAKERSFIELD. SOILS REPORT: ADDENDUM NO. 2 PREPARED BY KRAZAN & ASSOCIATES, PROJECT NO. 022-07116, DATED APRIL 19, 2013. SUMMARY OF IMPROVEMENTS STORM DRAIN IMPROVEMENTS 24" RCP 1388 LF STORM DRAIN MANHOLE 5 PROPOSED EARTHWORK QUANTITIES CUT 15,930 CU YDS FILL 12,696 CU YDS lUmwtsny MEME Z w PA zo man sipm FREEWAY 178 HOtM M= PROJECT SITE X LULu Lu 0 Lu to o RIM V) cc CMIEW A%8ff CmLm mews > UJI 0 cf) z 0 CL 00 0 QQo 10L 04 LU -c 5; C> mmm OR Ui m VICINITY MAP NO SCALE DIG Call: TOL FRE 1-800-227-2600 AT LEAST M DAYS SOMM YOU DIG UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA 3-14-7 < o z 0@ z < 00 Lu to Q LL co C'j m 4 Z w zo Zn cr) Z Z w zo W cr) Z LLJ X LULu Lu 0 Lu to V) cc LLJ > UJI 0 cf) z 0 CL 00 0 QQo 10L 04 LU -c 5; C> Ui m o c) cn C) of Lu uj O Lnuj Lu in La IX M -4C co .,c c I C:> Z w zo W cr) Z LLJ X LULu Lu 0 Lu to co cc LLJ > UJI 0 cf) 0 CL 00 QQo 10L 04 -c w W STANDARD NOTES � I 1. GENER&- 1 ' CONTRACTOR WILL FURNISH ALL MATERIALS, TOOLS, LABOR, EQUIPMENT AND SUPERVISION NECESSARY TO COMPLETE INSTALLATION. . UNDERGROUND SERVICE ALERT (USA) SHALL BE NOTIFIED AT LEAST 2 WORKING DAYS BEFORE CONSTRUCTION. TELEPHONE 1-800-227-2600. CONTRACTOR TO CALL FOR USA LOCATE AND POTHOLE ALL MARKED UTILITIES THAT CROSS OR ARE WITHIN 5' HORIZONTAL DISTANCE OF SEWER AND STORM DRAIN LINES. VERTICAL AND HORIZONTAL LOCATION SHALL BE ASCERTAINED BY THE CONTRACTOR AHEAD OF ANY EXCAVATIONS TO VERIFY THAT THE PROPOSED DESIGN DOES NOT CONFLICT WITH ANY UTILITIES. IN THE EVENT A CONFLICT EXISTS THE ENGINEER SHALL BE NOTIFIED IN ORDER TO REDESIGN THE ALIGNMENT. IF RELOCATION OF EXISTING UTILITIES IS DEEMED NECESSARY THE CONTRACTOR SHALL BE COMPENSATED FOR INSTRUCTED RELOCATION. IF REDESIGN OF THE ALIGNMENT REQUIRES ADDITIONAL FITTINGS, PIPE OR EXCAVATION THE CONTRACTOR SHALL BE COMPENSATED FOR REVISION. i IN THE EVENT A UTILITY IS DAMAGED THE CONTRACTOR SHALL BE WHOLLY RESPONSIBLE FOR ITS REPAIR. I CONTRA TOR SHALL VERIFY LOCATIONS AND ELEVATIONS OF EXISTING SEWER LINES THAT THE NEW SYSTEM TIES INTO PRIOR TO TRENCHING. ANY DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER SO THAT ANY NECESSARY ADJUSTMENTS MAY BE MADE. UTILITIES SHALL BE THOROUGHLY RESEARCHED AND LOCATED BY CONTRACTOR PRIOR TO TRENCHING. CROSSING UTILITIES SHALL BE DAYUGHTED AND CHECKED FOR GRADE. BY CONTRACTOR PRIOR TO TRENCHING. I ALL EXISTING IMPROVEMENTS, (CURB, GUTTER. SIDEWALK, CROSS GUTTER, FENCES, ETC.) THAT ARE REMOVED. DAMAGED OR UNDERCUT SHALL BE REPAIRED OR REPLACED AS DIRE:TED BY THE CITY ENGINEER. i ALL EXI TING PAVING AND SURFACING REMOVED, DAMAGED OR UNDERCUT SHALL BE REPLACED IN ACCORDANCE WITH THE CITY OF BAKERSFIELD STANDARD DRAWING ST -6, EXCEPT AS NOTED ON PLANS. 2. STANDARD DETAILS THE FOLLOWING CITY OF BAKERSFIEL-D STANDARDS SHALL BE CONSIDERED PART OF THESE PLANS - S -7. S-8, S-9, S-10, S-11, S-2% S-21. ST -6, ST -22. 3. MATERIALS : THE PIPE AND FITTINGS SHALL BE EXTRA STRENGTH VITRIFIED CLAY CONFORMING TO CURRENT ASTM SPECIFICATION C-700 AND SHALL BE INSTALLED IN CONFORMANCE WITH THE PROVISIONS OF SECTION 71 OF THE STANDARD SPECIFICATIONS OF THE STATE OF CALIFORNIA, DEPARTMENT OF TRANSPORTATION, CURRENT EDITION AND TH CURRENT ASTM SPECIFICATIONS C-12. JOINTS THE PIPE AND FITTINGS SHALL HAVE A SOCKET END AND A SPIGOT END WITH COMPRESSION JOINTS CONFORMING WITH THE CURRENT ASTM SPECIFICATION C-425. i THE PIP ANO FITTINGS FOR 6', 8". 10', AND 12" SANITARY SEWER MAINS MAY BE PLAIN -END WITH COMPRESSION COUPLINGS CONFORMING WITH THE CURRENT ASTM SPECIFICATION C-425. EXCEPTING THAT A STAINLESS STEEL SHEAR RING AS MANUFACTURED BY MISSION CLAY PRODUCTS CORPORATION FOR THEIR "MAINLINE" BANDSEIAL COMPRESSION COUPLING, OR APPROVED EQUAL, SHALL BE REQUIRED. THE PIPE AND FITTINGS FOR PRIVATE SANITARY SEWER HOUSE OR BUILDING LATERALS MAY BE PLAIN -END WITH COMPRESSION COUPLINGS CONFORMING WITH THE CURRENT ASTM SPECIFICATION C-425. (STAINLESS STEEL SHEAR RINGS ARE NOT REQUIRED) 4. ABS PIPE INSTALLATION 1 S MATERI : PIPE AND FITTINGS SHALL MEET THE REQUIREMENTS OF THE CURRENT ASTM SPECIFICATIONS D-2680 AND D-2751. PIPE AND FITTINGS SHALL BE HOMOGENEOUS THROUGH OUT AND FREE FROM CRACKS, HOLES, FOREIGN INCLUSIONS OR OTHER INJURIOUS DEFECTS. FITTINGS SHALL BE INJECTION MOLDED AND SHALL BE INSTALLED IN UNE ON NEW PIPELINES; CUT -IN FITTINGS ARE NOT PERMITTED. JOINTS USE ONLY SOLVENT WELDED JOINTS. THE ASSEMBLY OF JOINTS SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. WHERE ABS PIPE CONNECTS TO VCP, USE COUPLINGS APPROVED BY THE CITY OF BAKERSFlELD. INSTALLATION : PIPE AND FITTINGS SHALL BE INSTALLED IN ACCORDANCE WITH THE CURRENT ASTM SPECIFICATION D-2321. ONLY CLASS 1, 11, AND III EMBEDMENT MATERIALS WILL BE CONSIDERED SUITABLE 5, PVC PIPE INSTALLATION I I FITTINGS SHALL MATERIALS : PIPE AND FITMEET THE REQUIREMENTS OF THE CURRENT ASTM SPECIFICATION 0-3034 FOR SDR35. PIPE AND FITTINGS SHALL BE HOMOGENEOUS THROUGHOUT AND FREE FROM CRACKS, HOLES, FOREIGN INCLUSIONS OR OTHER INJURIOUS DEFECTS. FITTINGS SHALL BE INJECTION MOLDED AND SHALL BE INSTALLED IN UNE ON NEW PIPELINES. CUT -IN FITTINGS ARE NOT PERMITTED. JOINTS USE ONLY ELASTOMERIC GASKET JOINTS. THE ASSEMBLY OF JOINTS SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS WHERE PVC PIPE CONNEC TO VCP PIPE, USE COUPLINGS APPROVED BY THE CITY OF BAKERSFIELD. ,I (NST TION : PIPE AND FITTINGS SHALL BE INSTALLED IN ACCORDANCE WITH THE CURRENT ASTM SPECIFICATION D-2321. ONLY CLASS I. 11, AND III EMBEDMENT MATERIALS WILL BE CONSIDERED SUITABLE. 6, REINFORCED CONCRETE PIPE WITH PVC LINING. REINFORCED CONCRETE PIPE WITH PVC UNING SHALL MEET THE FOLLOWING REQUIREMENTS: 1.A. MATERIALS. REINFORCED CONCRETE PIPE (RCP) SHALL BE EITHER CLASS IV OR CLASS V WITH WALLS "B' OR "C RCP SHALL MEET ASTM C 76 FOR STRENGTH, ASTM C:361 OR AWWA C302 EXCEPT TEST PRESSURE SHALL BE 5 PSI FOR RUBBER GASKETS, AND LINER TESTS IN ACCORDANCE WITH THE FOLLOWING PARAGRAPHS. PIPE SHALL BE WET CAST, VIBRATED AND STEAM OR WATER CURED. JOINTS SHALL BE BELL AND SPIGOT DESIGN WITH A CONTAINED 0 -RING GASKET. PVC LINER SHALL BE CAST INTO THE WALL OF THE RCP AND SHALL COVER 360' OF THE 31PE. ALL WORK FOR AND IN CONNECTION WITH THE INSTALLA11ON OF THE LINING It CONCRETE PIPE AND FIELD SEALING AND WELDING OF JOINTS SHALL BE DONE IN sTRicr CONFORMITY WITH ALL APPLICABLE SPECIFICATIONS, INSTRUCTIONS AND RECOMMENDATIONS OF THE UNING MANUFACTURER. UNER SHALL MEET THE FOLLOWING 1.B. I PHYSICAL PROPERTIES OF LINER. ALL PLASTIC LINER PLATE SHEETS, WELDING STRIPS AND OTHER ACCESSORY ITEMS, SHALL HAVE THE FOLLOWING PHYSICAL PROPERTIES WHEN TESTED AT 77F t5 (25T t3 ). I TENSILE INITIAL (PAR. 2200 PS MIN. 2100 PSI MIN. (15 MPA MIN.) (14.5 MPA MIN.) ELONGATION AT BREAK I 20OX MIN. 200% MIN. SHORE UROMETER, TYPE 0 1 1 -SEC. 50-60 t5 (WITH RESPECT TO INITIAL TEST RESULT) 10 -SEC. 35-50 t5 WEIGHT CHANGE 11.5 TENSILE SPECIMENS SHALL BE PREPARED AND TESTED IN ACCORDANCE WITH ASTM 0412 USING DIE B. WEIGHT CHANGE SPECIMENS SHALL BE 1 -INCH (25 -MM) BY 3 -INCH � (75 -MM) SAMPLES. SPECIMENS FOR TESTING OF IN111AL PHYSICAL PROPERTIES MAY BE TAKEN FROM LINER PLATE SHEET AND WELDING STRIP AT ANY TIME PRIOR TO FINAL ACCEPTANCE OF THE WORK. i UN PLATE LOCKING EXTENSIONS EMBEDDED IN CONCRETE SHALL WITHSTAND A TEST PULL OF AT LEAST 100 POUNDS PER LINEAR INCH (1800 KG/M), APPLIED PERPENDICULARLY TO THE CONCRETE SURFACE FOR A PERIOD OF ONE MINUTE, WITHOUT RUPTURE OF THE LOCKING EXTENSIONS OR WITHDRAWAL FROM EMBEDMENT. THIS TEST SHALL BE MADE AT A TEMPERATURE OF 70' - 80' F(21- - 27' C) INCLUSIVE. I PLASTIC LINER PLATE SHEETS, INCLUDING LOCKING EXTENSIONS, ALL JOINT, CORNER AND WELDING STRIPS SHALL BE FREE OF CRACKS, CLEAVAGES OR OTHER DEFECTS ADVERSELY AFFECTING THE PROTECTIVE CHARACTERISTICS OF THE MATERIAL THE ENGINEER MAY AUTHORIZE THE REPAIR OF SUCH DEFECTS BY APPROVED METHODS. THE LINING SHALL HAVE GOOD IMPACT RESISTANCE, SHALL BE FLEXIBLE AND SHALL HAVE ANI ELONGATION SUFFICIENT TO BRIDGE UP TO 1/4 -INCH (6 MM) SETTLING CRACKS, WHICH MAY OCCUR IN THE PIPE OR IN THE JOINT AFTER INSTALLATIONS, WITHOUT DAMAGE TO THE LINING. i 1.0 CHEMICAL RESISTANCE OF UNER.* AFTER CONDITIONING TO CONSTANT WEIGHT AT 110 F(43 C), TENSILE SPECIMENS AND WEIGHT CHANGE SPECIMENS SHALL BE EXPOSED TO THE FOLLOWING SOLUTIONS FOR A PERIOD OF 112 DAYS AT 77' F t5 (25' C ±3 ). AT 28 -DAY INTERVALS, TENSILE SPECIMENS AND WEIGHT CHANCE SPECIMENS SHAD. BE REMOVED FROM EACH OF THE CHEMICAL SOLU11ONS AND TESTED IN ACCORDANCE WITH SECTION 7-2.03(1.B) PARA. 2 ABOVE IF ANY SPECIMEN FAILS TO MEET THE 112 -DAY REQUIREMENTS BEFORE COMPLETION OF THE 112 -DAY EXPOSURE, THE MATERIAL WILL BE SUBJECT TO REJECTION. CHEMICAL SOLUTION SULFURIC ACID SODIUM HYDROXIDE AMMONIUM HYDROXIDE NITRIC ACID FERRIC CHLORIDE 1% SOAP DETERGENT (LINEAR ALKYL BENZYL SULFONATE OR LAS BACTERIOLOGICAL CONCENTRATION 20%** 5% 5%** 1 %** 1X 0.1% 0.1% BOO NOT LESS THAN 700 PPM *THIS IS TO BE USED AS A PRE -QUALIFICATION TEST AND WHEN MATERIAL FORMULATIONS ARE CHANGED. **VOLUMETRIC PERCENTAGES OF CONCENTRATED C.P. GRADE REAGENTS. I.D. DETAILS AND DIMENSIONS OF LINER SHEETS. LINER SHEETS SHALL BE A MINIMUM OF 0.065 INCH (1.65 MM) IN THICKNESS. LOCKING EXTENSIONS OF THE SAME MATERIAL AS THAT OF THE LINER SHALL BE INTEGRALLY EXTRUDED WITH THE SHEET. I.E. INSTALLATION OF LINING. INSTALLATION OF THE LINING, INCLUDING PREHEATING OF SHEETS IN COLD WEATHER AND THE WELDING OF ALL JOINTS, SHALL BE DONE IN ACCORDANCE WITH THE RECOMMENDATIONS OF THE LINER MANUFACTURER. COVERAGE OF THE LINING SHALL NOT BE LESS THAN THE MINIMUM SHOWN ON THE PLANS. THE LINING SHALL BE INSTALLED WITH THE LOCKING EXTENSIONS RUNNING PARALLEL WITH THE LONGITUDINAL AXIS OF THE PIPE. THE LINING SHALL BE HELI) SNUGLY IN PLACE AGAINST INNER FORMS. LOCKING EXTENSION SHALL TERMINATE NOT MORE THAN 1-1/2 INCHES (38 MM) FROM THE END OF THE INSIDE SURFACE OF THE PIPE SECTION. JOINT FLAPS WHEN USED SHALL EXTEND APPROXIMATELY 4 INCHES (100 .MM) BEYOND THE END OF THE INSIDE SURFACE. CONCRETE POURED AGAINST LINING SHALL BE VIBRATED, SPADED OR COMPACTED IN A CAREFUL MANNER SO AS TO PROTECT THE LINING AND PRODUCE A DENSE, HOMOGENOUS CONCRETE, SECURELY ANCHORING THE LOCKING EXTENSIONS INTO THE CONCRETE. IN REMOVING FORMS, CARE SHOULD BE TAKEN TO PROTECT THE LINING FROM DAMAGE. SHARP INSTRUMENTS SHALL NOT BE USED TO PRY FORMS FROM LINED SURFACES. WHEN FORMS ARE REMOVED, ANY NAILS THAT REMAIN IN THE LINING SHALL BE PULLED, WITHOUT TEARING THE UNING, AND THE RESULTING HOLES CLEARLY MARKED. ALL NAIL AND TIE HOLES AND ALL CUT, TORN AND SERIOUSLY ABRADED AREAS IN THE UNING SHALL BE PATCHED. PATCHES MADE ENTIRELY WITH WELDING STRIP SHALL BE FUSED TO THE LINER OVER THE ENTIRE PATCH AREA. LARGER PATCHES MAY CONSIST OF SMOOTH LINER SHEET APPLIED OVER THE DAMAGED AREA WITH ADHESIVE. ALL EDGES MUST BE COVERED WITH WELDING STRIP FUSED TO THE PATCH AND THE SOUND UNING ADJOINING THE DAMAGED AREA. HOT JOINT COMPOUNDS, SUCH AS COAL TAR, SHALL NOT BE POURED OR APPLIED TO THE UNING. THE CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO PREVENT DAMAGE TO INSTALLED LINING FROM EQUIPMENT AND MATERIALS USED IN OR TAKEN THROUGH THE WORK. 11 APPLICATION TO CONCRETE PIPE - SPECIAL REQUIREMENTS. THE LINING SHALL BE SET FLUSH WITH THE INNER EDGE OF THE BELL OR SPIGOT END OF A PIPE SECTION AND SHALL EXTEND TO THE OPPOSITE END OR TO APPROXIMATELY 4 INCHES (100 MM) BEYOND THE OPPOSITE END DEPENDING UPON THE TYPE OF UNING JOINT TO BE MADE WITH THE ADJOINING CONCRETE PIPE. WHEREVER CONCRETE PIPE OR CAST -IN-PLACE STRUCTURES PROTECTED WITH LINING, JOIN STRUCTURES NOT SO LINED (SUCH AS BRICK STRUCTURES, CONCRETE PIPE OR CAST -IN-PLACE STRUCTURES WITH CLAY UNING OR CLAY PIPE), THE UNING SHALL BE EXTENDED OVER AND AROUND THE END OF THE PIPE AND BACK INTO THE STRUCTURE FOR NOT LESS THAN 4 INCHES (100 MM). THIS PROTECTING CAP MAY BE MOLDED OR FABRICATED FROM THE UNING MATERIAL BUT NEED NOT BE LOCKED INTO THE PIPE. WHERE A PIPE LATERAL (NOT OF PLASTIC LINED CONCRETE) IS INSTALLED THROUGH LINED CONCRETE PIPE. THE SEAL BETWEEN THE LINED PORTION AND THE LATERAL SHALL BE PER THE MANUFACTURER'S RECOMMENDATIONS. LINED CONCRETE PIPE MAY BE CURED BY STANDARD CURING METHODS. CARE SHALL BE EXERCISED IN HANDLING, TRANSPORTING AND PLACING LINED PIPE TO PREVENT DAMAGE TO THE UNING. NO INTERIOR HOOKS OR SLINGS SHALL BE USED IN LIFTING PIPE. ALL HANDLING OPERATION SHALL BE DONE WITH AN EXTERIOR SUNG OR WITH A SUITABLE FORK UFT. ON PIPE HAVING A 360' LINER COVERAGE, THE LONGITUDINAL EDGES OF THE SHEET SHALL BE BUTT WELDED. WHEN PIPE TUBES ARE FURNISHED, THESE ARE SHOP -WELDED JOINTS. NO PIPE WITH DAMAGED UNING WILL BE ACCEPTED UNTIL THE DAMAGE HAS BEEN REPAIRED TO THE SATISFACTION OF THE ENGINEER. 1.G. FIELD JOINTS IN UNING FOR CONCRETE PIPE. THE JOINT BETWEEN SECTIONS OF LINED PIPE SHALL BE PREPARED IN THE FOLLOWING MANNER: IF REQUIRED, THE INSIDE JOINT SHALL BE FILLED AND CAREFULLY POINTED WITH CEMENT MORTAR IN SUCH A MANNER THAT THE MORTAR SHALL NOT, AT ANY PONT, EXTEND INTO THE PIPE BEYOND THE STRAIGHT UNE CONNECTING THE SURFACES OF THE ADJACENT PIPE SECTIONS. PIPE JOINTS MUST BE DRY BEFORE UNING JOINTS ARE MADE ALL MORTAR AND OTHER FOREIGN MATERIAL SHALL BE REMOVED FROM LINING SURFACES ADJACENT TO THE PIPE JOINT, LEAVING THEM CLEAN AND DRY. FIELD JOINTS IN THE UNING AT PIPE JOINTS MAY BE EITHER OF THE FOLLOWING DESCRIBED TYPES: TYPE P-1: THE JOINT SHALL BE MADE WITH A SEPARATE 4 -INCH (100 -MM) JOINT STRIP AND TWO WELDING STRIPS. THE 4 -INCH (100 -MM) JOINT STRIP SHALL BE CENTERED OVER THE JOINT, HEAT -SEALED TO THE UNING, THEN WELDED ALONG EACH EDGE TO ADJACENT LINER SHEETS WITH A 1 -INCH (25 -MM) WI=LD STRIP. THE 4 -INCH (100 -MM) JOINT STRIP SHALL LAP OVER EACH SHEET A MINIMUM OF 1/2 INCH (13 MM). TYPE P-2 THE JOINT SHALL BE MADE WITH A JOINT FLAP WITH LOCKING EXTENSIONS REMOVED AND EXTENDING APPROXIMATELY 4 INCHES (100 MM) BEYOND THE PIPE END. THE JOINT FLAP SHALL OVERLAP THE UNING IN THE ADJACENT PIPE SECTION A MINIMUM OF 1/2 INCH (13 MM) AND BE HEAT -SEALED IN PLACE PRIOR TO WELDING. THE FIELD JOINT SHALL BE COMPLETED BY WELDING THE FLAP TO THE UNING OF THE ADJACENT PIPE USING 1 -INCH (25 -MM) WELD STRIP. CARE SHALL BE TAKEN TO PROTECT THE FLAP FROM DAMAGE. EXCESSIVE TENSION AND DISTORTION IN BENDING BACK THE FLAP TO EXPOSE THE PIPE JOINT DURING LAYING AND JOINT MORTARING SHALL BE AVOIDED. AT TEMPERATURES BELOW 50 F(10 C), HEATING OF THE LINER MAY BE REQUIRED TO AVOID DAMAGE. THE JOINT FLAP OR STRIP ON BEVELED PIPE SHALL BE TRIMMED TO A WIDTH (MEASURED FROM THE ENO OF THE SPIGOT) OF APPROXIMATELY 4 INCHES (100 MM) FOR THE ENTIRE CIRCUMFERENTIAL LENGTH OF THE UNING. ALL WELDING OF JOINTS IS TO BE IN STRICT CONFORMANCE WITH THE SPECIFICATIONS AND INSTRUCTIONS OF THE UNING MANUFACTURER. WELDING SHALL FUSE BOTH SHEETS AND WELD STRIP TOGETHER TO PROVIDE A CONTINUOUS JOINT EQUAL IN CORROSION RESISTANCE AND IMPERMEABILITY TO THE LINER PLATE. HOT-AIR WELDING TOOLS SHALL PROVIDE EFFLUENT AIR TO THE SHEETS TO BE JOINED AT A TEMPERATURE BETWEEN 500 AND 600 F (260 AND 316 C). WELDING TOOLS SHALL BE HELD APPROXIMATELY 1/2 INCH (13 MM) FROM AND MOVED BACK AND FORTH OVER THE JUNCTION OF THE TWO MATERIALS TO BE JOINED. THE WIELDING TOOL SHALL BE MOVED SLOWLY ENOUGH AS THE WEU) PROGRESSES TO CAUSE A SMALL. BEAD OF MOLTEN MATERIAL TO BE VISIBLE ALONG BOTH EDGES AND IN FRONT OF THE WELD STRIP. THE FOLLOWING SPECIAL REQUIREMENT SHALL APPLY WHEN THE LINER COVERAGE IS 360 DEGREES: WHEN GROUNDWATER IS ENCOUNTERED THE UNING JOINT SHALL NOT BE MADE UNTIL PUMPING OF GROUNDWATER HAS BEEN DISCONTINUED FOR AT LEAST THREE DAYS AND NO VISIBLE LEAKAGE IS EVIDENT AT THE JOINT. WHEN WELDING THE DOWNSTREAM SIDE OF A JOINT STRIP OR FLAP, DO NOT WELD 6 TO 8 INCHES (150 TO 200 MM) AT THE PIPE INVERT TO PROVIDE RELIEF OF POTENTIAL FUTURE GROUNDWATER BUIL)-UP. 1.H. APPLICATION TO CAST -IN-PLACE CONCRETE STRUCTURES - SPECIAL REQUIREMENTS. LINER SHEETS SHALL BE CLOSELY FITTED AND PROPERLY SECURED TO THE INNER FORMS. SHEETS SHALL BE CUT TO FIT CURVED AND WARPED SURFACES USING A MINIMUM NUMBER OF SEPARATE PIECES. UNLESS OTHERWISE SHOWN ON THE PLANS„ THE UNING SHALL BE RETURNED AT LEAST 3 INCHES (75 MM) AT THE SURFACES OF CONTACT BETWEEN THE CONCRETE STRUCTURE AND ITEMS NOT OF CONCRETE (INCLUDING MANHOLE FRAMES, GATE GUIDES, CLAY PIPE OR BRICK MANHOLES AND CLAY OR CAST IRON PIPES). THE SAME PROCEDURE SHALL BE FOLLOWED AT JOINTS WHERE THE TYPE OF PROTECTIVE UNING IS CHANCED OR THE NEW WORK IS BUILT TO JOIN EXISTING UNLINED CONCRETE. AT EACH RETURN, THE RETURNED LINER SHALL BE SEALED TO THE ITEM IN CONTACT WITH THE PLASTIC -LINED CONCRETE. IF THE LINER CANNOT BE SEALED WITH ADHESIVE BECAUSE OF THE JOINT AT THE RETURN BEING TOO WIDE OR ROUGH OR BECAUSE OF SAFETY REGULATIONS, THE JOINT SPACE SHALL BE DENSELY CAULKED WITH LEAD WOOL OR OTHER APPROVED CAULKING MATERIAL TO A DEPTH OF 2 INCHES (50 MM) AND FINISHED WITH A MINIMUM OF 1 INCH 925 MM) OF AN APPROVED CORROSION RESISTANT MATERIAL I.I. TESTING AND REPAIRING DAMAGED SURFACES. AFTER THE PIPE IS INSTALLED IN THE TRENCH, ALL SURFACES COVERED WITH LINING, INCLUDING WELDS, SHALL BE TESTED WITH AN APPROVED, CONTRACTOR SUPPUED, ELECTRICAL HOLIDAY DETECTOR (TINKER & RASOR MODEL NO. AP -W WITH POWER PACK OR APPROVED EQUAL) WITH THE INSTRUMENT SET BETWEEN 18,000 AND 22.000 VOLTS. ALL WIELDS SHALL BE PHYSICALLY TESTED BY A NONDESTRUCTIVE PROBING METHOD. ALL PATCHES OVER HOLES, OR REPAIRS TO THE LINER WHEREVER DAMAGE HAS OCCURRED, SHALL BE ACCOMPLISHED IN ACCORDANCE WITH SECTION 7-2.03(1.E) PARA. 8 ABOVE. EACH TRANSVERSE WELDING STRIP WHICH EXTENDS TO A LOWER EDGE OF THE LINER WILL BE TESTED BY THE PURCHASING AGENCY. THE WELDING STRIPS SHALL EXTEND 2 INCHES (50 MM) BELOW THE LINER TO PROVIDE A TAB. A 10 -POUND (5 KG) PULL WILL BE APPLIED TO EACH TAB. THE FORCE WILL BE APPLIED NORMAL TO THE FACE OF THE STRUCTURE BY MEANS OF A SPRING BALANCE. LINER ADJOINING THE WELDING STRIP WILL BE HELD AGAINST THE CONCRETE DURING APPLICATION OF THE FORCE. THE 10-POUND5 KG PULL WILL BE MAINTAINED IF A WELD FAILURE DEVELOPS UNTIL NO FURTHER SEPARATION OCCURS. DEFECTIVE WELDS WILL BE RETESTED AFTER REPAIRS HAVE BEEN MADE. TABS SHALL BE TRIMMED AWAY NEATLY BY THE INSTALLER OF THE LINER AFTER THE WELDING STRIP HAS PASSED INSPECTION. INSPECTION SHALL BE MADE WITHIN 2 DAYS AFTER THE JOINT HAS BEEN COMPLETED IN ORDER TO PREVENT TEARING THE PROJECTING WELD STRIP AND CONSEQUENT DAMAGE TO THE LINER FROM EQUIPMENT AND MATERIALS USED IN OR TAKEN THROUGH THE WORK. SHOP DRAWINGS. CONTRACTOR SHALL SUBMIT MANUFACTURER INFORMATION SHOWING DIMENSIONAL, MATERIAL AND JOINT CRITERIA TO THE ENGINEER FOR REVIEW. PIPE TRENCH CLASSIFICATION. RCP CLASS IV SHALL BE INSTALLED PER ASTM TRENCH DESIGNATION "C". RCP CLASS V SHALL BE INSTALLED PER ASTM TRENCH DESIGNATION V. PVC FOR PIPE SIZES 18" AND LESS. POLY VINYL CHLORIDE PIPE SHALL MEET THE FOLLOWING REQUIREMENTS: 1. MATERIAL. PVC PIPE SHALL MEET OR EXCEED ALL REQUIREMENTS SET FORTH IN ASTM D 3034 WITH SDR OF 35. ELASTOMERIC SEALS AND JOINTS SHALL CONFORM TO ASTM D 3212 AND ASTM F 477. 2. TESTING. MANUFACTURING TESTING METHODS SHALL CONFORM TO ASTM F-679 (T -WALL). CERTIFICATES OF COMPLIANCE SHALL BE MADE AVAILABLE TO THE ENGINEER. 3. INSTALLATION. INSTALLATION OF PIPE SHALL FOLLOW MANUFACTURER'S GUIDELINES, THESE SPECIFICATIONS AND ASTM D 2321 "UNDERGROUND INSTALLATION OF FLEXIBLE THERMOPLASTIC SEWER PIPE.". 4. FIELD TESTS. IN -FIELD PRESSURE TESTS SHALL CONFORM TO THESE SPECIFICATIONS AND THE FOLLOWING: DEFLECTION MEASUREMENT OF PVC PIPE. AFTER 30 DAYS OF INSTALLATION THE CONTRACTOR SHALL MEASURE PIPE DEFLECTION BY PULLING A GO -NO-GO 5% MANDREL THE MANDREL SHALL BE PULLED THROUGH THE PIPE WITH ROPE BY ONE PERSON WITHOUT MECHANICAL ADVANTAGE. THE MANDREL SHALL HAVE VANES AT LEAST AS LONG AS THE PIPE DIAMETER. THE MANDREL SHALL BE USED IN STRICT CONFORMANCE WITH PIPE AND MANDREL MANUFACTURER'S RECOMMENDATIONS. THE MANDREL DIAMETER WILL BE CALCULATED USING THE FOLLOWING FORMULA: MANDREL DIAMETER = BASE PIPE I.D. -(Y/100 X BASE PIPE I.D.) WHERE Y = ALLOWABLE DEFLECTION IN X (5X) BASE I.D. = ACTUAL INSIDE PIPE DIAMETER (PROVIDED BY PIPE MANUFACTURER) THE MANDREL SHALL HAVE AN ODD NUMBER OF VANES WITH SEVEN (7) MINIMUM. THE MINIMUM LENGTH OF THE CIRCULAR PORTION OF THE MANDREL SHALL BE EQUAL TO THE NOMINAL DIAMETER OF THE PIPE. ANY SECTION OF INSTALLED PIPE THAT FAILS THE MANDREL TEST SHALL BE EXCAVATED, RE -BACKFILLED, RECOMPACTED AND RETESTED UNTIL THE MANDREL TEST CAN BE PASSED. RE -ROUNDING WILL NOT BE ALLOWED. PIPE TRENCH CLASSIFICATION. PVC PIPE SHALL BE INSTALLED PER CITY STANDARD S-39, AS MODIFIED ON THE CONTRACT PLANS. COMPACTION ABOVE THE PIPE ZONE SHALL BE AS SHOWN ON THE PLANS. 7. TRENCH EXCAVATION THE EXCAVATION OF TRENCHES FOR PIPING LAID IN THE GROUND SHALL BE IN OPEN -CUT FROM THE SURFACE OF THE GROUND EXCEPT WHERE BORING IS REQUIRED. THE TRENCHES SHALL BE OF WIDTH AS SHOWN ON STANDARD S-39 AND DETAILED SECTIONS ON THE PLANS FOR PROPER PIPE INSTALLATION. THE HOLES FOR BELLS AND FITTINGS SHALL BE EXCAVATED BY HAND, TO A WIDTH PROVIDING UNIFORM BEARING ALONG THE LENGTH OF THE PIPE. IT IS THE INTENTION OF THESE REQUIREMENTS TO PROVIDE FIRM, UNIFORM BEARING FOR THE PIPE. CONTRACTOR SHALL PROVIDE TRENCHING IN ACCORDANCE WITH THE DETAILED SECTIONS PROVIDED IN THE PLANS. SELECTION OF TRENCH TYPES WILL BE AS REQUIRED BY THE TYPES OF PIPE SELECTED FOR CONSTRUCTION. STORM DRAIN AND UTILITY CONDUIT INSTALLATIONS SHALL MEET CITY STANDARD S-39. TRENCH LINES SHALL MEET ALL FEDERAL AND STATE SAFETY REQUIREMENTS. 8. BRACING AND SHORING EXCAVATION SHALL BE SUPPORTED AS SET FORTH IN THE RULES, ORDERS, AND REGULATIONS OF THE STATE DIVISION OF INDUSTRIAL SAFETY. IF THE CONTRACTOR DESIRES TO DEVIATE FROM THE SAFETY ORDERS, HE SHALL SUBMIT DATA BY A REGISTERED CIVIL ENGINEER TO THE STATE DIVISION OF INDUSTRIAL SAFETY. JUSTIFYING THE ALTERNATE PROCEDURES TO BE USED. FAILURE TO COMPLY WITH ANY OF THESE RULES, ORDERS AND REGULATIONS SHALL BE SUFFICIENT CAUSE FOR THE STATE DIVISION TO IMMEDIATELY SUSPEND ALL WORK. COMPENSATION FOR LOSSES INCURRED BY THE CONTRACTOR BY SUCH AN EMERGENCY SUSPENSION SHALL NOT BE ALLOWED. DURING BACKFILLING, THE BOTTOM OF THE SHORING SHALL BE KEPT ABOVE THE LEVEL OF THE BACKFILL AT ALL TIMES. SECTION 6422 OF THE CALIFORNIA LABOR CODE REQUIRES THE CONTRACTOR TO SUBMIT TO THE ENGINEER A DETAILED PLAN, DRAWING THE DESIGN OF SHORING, BRACING, SLOPING OR OTHER PROVISIONS TO BE MADE BY THE CONTRACTOR FOR THE PURPOSE OF WORKER PROTECTION FROM THE HAZARD OF CAVING GROUND DURING THE EXCAVATION OF TRENCHES NECESSARY FOR THE CONSTRUCTION OF THE PROJECT. IF SUCH PLAN VARIES FROM THE SHORING SYSTEM STANDARD ESTABLISHED BY THE CONSTRUCTION SAFETY ORDERS, THE PLANS SHALL BE PREPARED AND CERTIFIED BY A REGISTERED CIVIL OR STRUCTURAL ENGINEER; HOWEVER, USE OF SYSTEMS THAT ARE LESS EFFECTIVE THEN THOSE REQUIRED BY THE CONSTRUCTION SAFETY ORDERS IS PROHIBITTEO ON THIS PROJECT. 9. TRENCH BACKFILL TRENCHES SHALL NOT BE LEFT OPEN FARTHER THAN THREE HUNDRED (300) FEET IN ADVANCE OF PIPE LAYING OPERATIONS OR TWO HUNDRED (200) FEET TO THE REAR THEREOF, UNLESS OTHERWISE PERMITTED BY THE ENGINEER. ALL WORK SHALL CONFORM TO THE APPLICABLE SECTIONS OF THE STANDARD SPECIFICATIONS, DATED JULY, 1992. BEDDING CLASS SHALL BE AS SPECIFIED IN THE PIPE OPTIONS. STORM DRAIN AND UTILITY CONDUIT INSTALLATIONS SHALL BE IN ACCORDANCE WITH CITY STANDARD ST -22, EXCEPT THAT COMPACTION SHALL BE NO LESS THAN NINETY PERCENT (90%) UP TO THIRTY INCHES (30") FROM FINISHED GRADE. BACKFILL MATERIALS IN THE PIPE ZONE SHALL BE PLACED IN LAYERS NOT TO EXCEED TWELVE (12) INCHES SIMULTANEOUSLY, ON EACH SIDE OF THE PIPE, IN SUCH A MANNER AS NOT TO DAMAGE OR DISTURB THE PIPE OR ITS ALIGNMENT AND GRADE. BACKFILL MATERIAL ABOVE THE PIPE ZONE SHALL BE FREE OF DELETERIOUS MATERIALS AND LUMPS OR STONES EXCEEDING THREE (3) INCHES IN GREATEST DIMENSION AND SHALL BE PLACED IN LAYERS NOT EXCEEDING EIGHTEEN (18) INCHES. EACH LAYER SHALL BE THOROUGHLY COMPACTED BY VIBRATORY OR MECHANICAL TAMPING, OR BY A COMBINATION OF THESE METHODS. FLOODING AND JETTING SHALL NOT BE ALLOWED. THERE MUST BE AT LEAST ONE FOOT OF COVER OVER THE PIPE BEFORE COMPACTION ABOVE THE PIPE ZONE WILL BE ALLOWED. IMPORTED BEDDING AND BACKFILL MATERIAL SHALL BE OBTAINED, AND ANY EXCESS BEDDING AND BACKFILL MATERIAL SHALL BE DISPOSED, BY ANY LEGAL MEANS AT THE DISPOSAL OF THE CONTRACTOR. THE CONTRACTOR MAY SUBMIT TO THE ENGINEER SIEVE ANALYSIS FOR UTILIZATION OF IN-STU MATERIALS. ACHIEVING FIRM BEDDING BELOW PIPE SPRINGLINE, CONTRACTOR SHALL PROVIDE 'FIRM BEDDING' SUPPORT FOR THE PIPE BELOW THE SPRINGUNE. FIRM BEDDING MEANS THAT THE PIPE MUST REST CMV THE GRANULAR MATERIAL SPECIFIED PREVIOUSLY IN THE SPECIFICATIONS. BELL OR COUPLING HOES SHALL BE CAREFULLY EXCAVATED AT PROPER INTERVALS, SO THAT NO PART OF THE LOAD IS SUPPORTED BY THE BEU.S OR COUPLINGS. DURING BEDDING AND BACKFILUNG, CONSOLIDATION OF MATERIAL AROUND AND UNDER BELLS AND COUPLINGS SHALL BE AVOIDED. CONTRACTOR SHALL SHOVEL -SLICE OR HAND TAMP BEDDING IN THE HAUNCH AREAS, AS THIS WILL MINIMIZE VOIDS BENEATH THE PIPE AND IN THE HAUNCH AREAS. SHOVEL-SUCING OR HAND TAMPING SHALL BE DONE BEFORE THE BEDDING IS BROUGHT UP TO THE QUARTER POINT OF THE PIPE. INITIAL BACKFILL 'BEDDING MATERIAL" AS SPECIFIED BY ASTM 2321-8 SHALL BE USED IN THE PIPE ZONE FOR INITIAL BACKFILL AFTER THE PIPE HAS BEEN PROPERLY LAID AND INSPECTED, INITIAL BACKFILL SHALL BE PLACED ON BOTH SIDES AND OVER THE PIPE TO SUCH A DEPTH THAT, AFTER THOROUGH CONSOUDATION, THE FINAL DEPTH SHALL BE AT LEAST TO THE ELEVATION SHOWN ON THE PLANS. THE MATERIAL SHALL BE CONSOLIDATED BY VIBRATORY OR MECHANICAL TAMPING AND THE EQUIPMENT AND MANNER OF TAMPING MUST BE APPROVED IN WRITING BY THE ENGINEER PRIOR TO COMMENCING OPERATION. IMPACT EQUIPMENT MAY BE ALLOWED UNDER THE DIRECTION OF THE ENGINEER. HOWEVER, THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE RESULTING FROM THE USE OF THIS EQUIPMENT. HYDRA -HAMMER WILL NOT BE PERMITTED. SUBSEQUENT BACKFILL ABOVE THE LEVEL OF INITIAL BACKFILL, THE TRENCH MAY BE BACKFILLED WITH NATIVE MATERIAL RESULTING FROM TRENCH EXCAVATION, OR AT THE OPTION OF THE CONTRACTOR, SELECT IMPORTED MATERIALS MAY BE USED. NATIVE MATERIAL OR IMPORTED MATERIAL MAY BE COMPACTED BY TAMPING AND/OR ROLLING, USING EQUIPMENT AND METHODS APPROVED BY THE ENGINEER. WHEN THE CONTRACTOR COMPACTS BY TAMPING AND/OR ROILING, THE BACKFILL MATERIAL SHALL BE PLACED IN LAYERS NOT EXCEEDING EIGHTEEN (18) INCHES IN LOOSE DEPTH, EACH LAYER BEING THOROUGHLY COMPACTED BY TAMPING AND/OR ROLLING BEFORE SUCCEEDING LAYERS ARE PLACED. COMPACTION OF SUBSEQUENT BACKFILL WITHIN TWO AND ONE-HALF (2-1/2) FEET OF FINISHED PERMANENT SURFACING GRADE SHALL BE ACCOMPLISHED BY TAMPING AND/OR ROLLING AS SPECIFIED ABOVE. WHERE THE TRENCH IS WITHIN THE PAVEMENT ON STREETS, THE BACKFILL WITHIN TWO AND ONE-HALF (2-1/2) FEET OF FINISHED PERMANENT GRADE SHALL BE COMPACTED TO NINETY PERCENT (90X) RELATIVE COMPACTION. SUBSEQUENT BACKFILL PLACED BY TAMPING AND/OR ROLLING SHALL BE FREE FROM STONES OR LUMPS EXCEEDING THREE (3) INCHES IN GREATEST DIMENSIONS, VEGETABLE MATTER, OR OTHER UNSATISFACTORY MATERIALS. IN NO CASE SHALL JETTING BE ALLOWED FOR BACKFILL COMPACTION WITHIN THE STREET. WHEN APPROVED BY THE ENGINEER, JETTING MAY BE USED IN NON -STREET AREAS. BACKFILL TESTING AND COMPACTION. TESTING OF BACKFILL MATERIALS AND COMPACTION SHALT. BE IN ACCORDANCE WITH SECTION 19, "EARTHWORK" AND SECTION 6-3, "TESTING% OF THE STANDARD SPECIFICATIONS, STATE OF CALIFORNIA, DEPARTMENT OF PUBLIC WORKS, DIVISION OF HIGHWAYS. EACH LAYER OF BACKFILL MATERIAL SHALL MEET THE COMPACTION, SAND EQUIVALENT. AND GRADATION REQUIREMENTS BEFORE THE NEXT LAYER IS PLACED. EACH LAYER OF BACKFILL SHALL BE THOROUGHLY COMPACTED TO THE RELATIVE COMPACTION OF NOT LESS THAN IS SHOWN ON CITY OF BAKERSFIELD STANDARD S-39 AS MODIFIED ON THE CONTRACT PLANS, EXCEPT THAT COMPACTION WITHIN THE ROADWAY STRUCTURAL SECTION SHALL BE NO LESS THAN NINETY PERCENT (90%) RELATIVE COMPACTION FOR THE TOP FINISHED 30", AND SHALL BE DETERMINED BY CALIFORNIA TEST METHODS 216 OR 231, OR ASTM (CURRENT EDITION) D1557 AND ONE OF THE FOLLOWING D2922 OR D1556. IF THE RELATIVE COMPACTION, AS DETERMINED BY TESTING, FAILS TO MEET THE SPECIFIED PERCENTAGE, THE TRENCH SHALL BE RE -EXCAVATED AND RE -COMPACTED. COMPACTION TESTS WILL BE THE SUBDIVIDERS RESPONSIBILITY. THE NUMBER AND LOCATIONS OF THE TESTS SHALL BE DETERMINED BY THE CITY ENGINEER. 10. STORM DRAIN PIPE STORM DRAIN PIPE. CONTRACTOR SHALL UTIUZE RCP PIPE, CLASS III WITH RUBBER GASKET JOINTS PER ASTM SPECIFICATION C-76, UNLESS OTHERWISE NOTED ON THE CONTRACT PLANS. 11. REINFORCED CONCRETE PIPE. REINFORCED CONCRETE PIPE SHALL CONFORM TO THE PROVISIONS IN SECTION 65, "REINFORCED CONCRETE PIPE', OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS. EXCEPT AS OTHERWISE DESIGNATED BY CLASSIFICATION ON THE PLANS OR IN THE SPECIFICATIONS, JOINTS FOR CULVERT AND DRAINAGE PIPES SHALL CONFORM TO THE PLANS OR SPECIFICATIONS FOR STANDARD JOINTS. HYDROSTATIC TESTS SPECIFIED BY SECTION 65-1.08 "LAYING SIPHON AND PRESSURE PIPE", OF THE STANDARD SPECIFICATIONS WILL NOT BE REQUIRED. REINFORCED CONCRETE PIPE SHALL HAVE RUBBER GASKETED JOINTS CONFORMING TO SECTION 65-1.06B, "RUBBER GASKETED JOINTS% OF THE STANDARD SPECIFICATIONS. HANDLING OF MATERIALS. ALL PIPE, FITTINGS, SPECIALS AND CASTINGS MUST BE CAREFULLY HANDLED AT ALL TIMES. ONLY SUITABLE AND PROPER EQUIPMENT AND APPLIANCES SHALL BE USED FOR THE SAFE LOADING, HAULING, UNLOADING, HANDLING AND PLACING OF MATERIALS, SPECIAL CARE SHALL BE EXERCISED SO THAT PREFORMED RESILIENT JOINTS ON PIPE AND FITTINGS WILL NOT BE DAMAGED. ANY PIPE OR FITTING WITH A JOINT DAMAGED OR FLATTENED WILL CAUSE THAT PIPE OR FITTING TO BE REJECTED. PIPE LAYING. NO PIPE SHALL BE LAID UNTIL THE ENGINEER INSPECTS AND APPROVES THE CONDITION OF THE BOTTOM OF THE TRENCH. PIPE SHALL BE INSTALLED IN STRICT ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. PIPE LAYING SHALL BEGIN FROM THE DOWNSTREAM END OF THE STORM DRAIN OR AS DIRECTED BY THE ENGINEER. PIPE LAYING SHALL PROCEED WITH EACH PIECE LAID TRUE TO UNE AND GRADE, AND IN SUCH A MANNER AS TO FORM A CLOSE CONCENTRIC JOINT WITH THE ADJOINING PIPE AND TO PREVENT SUDDEN OFFSETS IN THE FLOW LINE. AS THE WORK PROGRESSES, THE INTERIOR OF THE PIPE SHALL BE CLEARED OF ALL DIRT AND DEBRIS OF EVERY DESCRIPTION. PIPE SHALL NOT BE LAID WHEN THE CONDITION OF THE TRENCH OR THE WEATHER IS UNSUITABLE. AT TIMES WHEN WORK IS NOT IN PROGRESS, OPEN ENDS OF PIPE AND FITTINGS SHALL BE CLOSED. WITH BELLED END PIPE, BELL HOLES SHALL THEN BE EXCAVATED AT EACH JOINT TO FACILITATE THE JOINT OPERATIONS, AND SHALL BE ONLY OF SUFFICIENT SZE FOR THAT PURPOSE. IN ORDER THAT BELL HOLES MAY BE PROPERLY LOCATED, NOT MORE THAN SIX (6) HOLES SHALL BE EXCAVATED AHEAD OF ACTUAL PIPE LAYING, ON ACCOUNT OF THE VARIATIONS IN JOINT CONSTRUCTION OPERATIONS. THE CONTRACTOR SHALL MAKE PROVISIONS FOR PREVENTING FOREIGN MATERIAL FROM BEING FLUSHED INTO AN EXISTING STORM DRAIN UNE. CUTTING PIPE. THE CONTRACTOR SHALL PERFORM ALL WORK OF CUTTING PIPE AND SPECIAL CASTING NECESSARY TO THE ASSEMBLY, ERECTION, AND COMPLETION OF THE WORK. ALL PIPE SHALL BE CUT TO FIT ACCURATELY, WITH SMOOTH EDGES AND FACES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CORRECTNESS OF CUTTING AND NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR ANY MATERIALS WHICH ARE DAMAGED OR INCORRECTLY CUT. MINOR STRUCTURES. PORTLAND CEMENT CONCRETE MINOR STRUCTURES SHALL CONFORM, IN DESIGN, MATERIALS, AND CONSTRUCTION, TO THE PROVISIONS OF SECTIONS 70-1.02 H OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS. MANHOLES SHALL CONFORM TO THE CITY OF BAKERSFIELD STANDARDS S-7 AND S-8. DROP INLETS SHALL CONFORM TO THE CITY OF BAKERSFIELD STANDARD S-12. TEMPORARY INLET GRATES SHALL CONFORM TO DETAILS ON THE PLANS. THE PRECAST CYLINDER, TAPER, AND ECCENTRIC FLAT TOP SECTIONS SHALL MEET THE STRENGTH REQUIREMENT OF ASTM. C-478. EACH SUCCESSIVE MANHOLE SECTION SHALL BE SET ON A BED OF PORTLAND CEMENT GROUT OR 'KENT SEAL" TO MAKE A WATERTIGHT JOINT. SHALL BE NEATLY POINTED ON THE INSIDE, AND SHALL BE SET PLUMB. 12. THE SITZ: IS LOCATED WITHIN A HILLY TOPOGRAPHY. THE FOLLOWING RECOMMENDED SLOPE AND FILL CONSTRUCTION WILL CREATE STABLE SLOPES WHICH ARE NOT PRONE TO SLOPE INSTABILITY. THE PROPOSED SUBSURFACE DRAINS (SUBDRAINS) WITHIN THE FILL AREAS WILL DISPOSE OF ANY NUISANCE SUBSURFACE WATER WHICH MAY DEVELOP AFTER FILL PLACEMENT. THESE SUBDRAINS WILL INCREASE THE STABILITY OF THE FILL SLOPES AND MINIMIZE THE DEVELOPMENT OF HYDROSTATIC PRESSURES WITHIN THE FILL SLOPES. THE PROPOSED KEYWAYS WITHIN THE DEEPER FILL AND THE BENCHING OF THE FILL INTO THE EXISTING NATIVE SLOPES WILL ELIMINATE SOIL WEAK ZONES BETWEEN THE NATIVE SOIL AND THE FILL AND WILL INCREASE THE SLOPE STABILITY. IT IS RECOMMENDED THAT PROPOSED FILL SLOPES BE CONSTRUCTED TO 2:1 (HORIZONTAL TO VERTICAL) OR FLATTER. THE PROPOSED SLOPES OF 2:1 (HORIZONTAL TO VERTICAL) HAVE PROVEN TO BE VERY STABLE AND ARE THE STANDARD ENGINEERING PRACTICE FILL SLOPES MAY BE REVISED AS RECOMMENDED BY THE SOLS ENGINEER UPON HIS REVIEW OF A MORE DEFINITE SITE PLAN. IF PROPOSED FILL SLOPES WILL EXCEED 2:1, A SLOPE STABILITY ANALYSIS SHOULD BE PERFORMED TO CONFIRM THE PROPOSED SLOPE WILL BE STABLE UNDER STATIC AND SEISMIC CONDITIONS. WHERE FILLS GREATER THAN 8 FEET ARE TO BE CONSTRUCTED ON ORIGINAL GROUND THAT SLOPES AT INCLINATIONS EXCEEDING 6:1 (HORIZONTAL TO VERTICAL). BENCHES SHOULD BE CUT INTO THE NATURAL SLOPE AS THE FILLING OPERATIONS PROCEED. EACH BENCH SHOULD CONSISTS OF A LEVEL TERRACE A MINIMUM OF 8 FEET WIDE. WITH THE RISE TO THE NEXT BENCH HELD FOR 4 FEET OR LESS. WHERE FILLS OF COMPARABIF HEIGHT WILL BE CONSTRUCTED ON GROUND THAT SLOPES AT AN INCUNATION EXCEEDING 4: 1 (HORIZONTAL TO VERTICAL). A KEYWAY SHOULD BE PROVIDED IN ADDITION TO THE BENCHES. EACH KEYWAY SHOULD CONSIST OF LEVEL TRENCH AT LEAST 15 FEET WIDE AND AT LEAST 2 FEET DEEP, WITH SIDE SLOPES NOT EXCEEDING 1:1 (HORIZONTAL TO VERTICAL), CUT INTO THE NATURAL SLOPE. A CANYON SUBDRAIN SHOULD BE CONSTRUCTED IN THE BOTTOM OF THE EXISTING RAVINE AS SHOWN ON THE ATTACHED DETAILS, WITH A MINIMUM OF 24 INCHES OF COVER BETWEEN THE TOP OF THE SUBDRAIN AND THE BOTTOM OF THE PROPOSED STORM DRAIN PIPE. SUBDRAIN FILTER MATERIAL SHOULD CONSIST OF EITHER CLASS 2 PERMEABLE MATERIAL (ALTERNATE A) OR 1 1/2 -INCH GRAVEL WRAPPED IN FILTER FABRIC (ALTERNATE B). THE PERMEABLE MATERIAL OR GRAVEL FOR THE SUBDRAIN SHOULD BE PLACED AT A MINIMUM VOLUMETRIC RATE OF 4 FT3 PER FOOT IN THE SUBDRAIN TRENCH. WE RECOMMEND THE OVERALL WIDTH OF THE BOTTOM OF THE SUBDRAIN BE A MINIMUM OF 15 FEET FOR EASE OF CONSTRUCTION. WITH THE TRENCH SIDE BEING SLOPED AT APPROXIMATELY 2:1. SUBDRAINAGE DEVICES SHALL BE CONSTRUCTED IN COMPLIANCE WITH THE ORDINANCES OF THE CONTROLLING GOVERNMENTAL AGENCY. OR WITH THE RECOMMENDATIONS OF THE SOLS ENGINEER OR ENGINEERING GEOLOGST. 05-002-'16 ,q. traE eta .. ; h., sa t; x L sr tyy � I DIG ALERT Call: TOLL FREE 1-800-227-2600 AT LEAST TWO DAYS BEFORE YOU DIG UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA /_ �_ Li�L rn 0 M M F_ rn � Q 14, 0 O It Z Li I Q J W U M m m 3 0 ,wcfl Qp N `D N M Li Y Q m \I s •r: - '• �� ,►�► 0 a 0 Z O M '' 0 Q M N p4l W o 2Xw W Cc W 0 W co V) rc W 0 m w w�O t!) Z 0.i o m Q m 00 a p Y i ii cr. R o 5 \I s •r: - '• �� ,►�► 0 a 0 9 W i w N m 1* W 0 Z O Z Q M c 6 W o 2Xw W Cc W 0 W co V) rc W 0 0 ~ w�O t!) Z 0.i o CL Q 00 a CC Y I CL cr. R 9 < ` rn ,W 15 < wz = a z �C3 o0 I- U W af LU CCl.J N it t2 I i� 0 0 0 N M C> 9 W i w N m 1* W 0 Z O Z Q 0) Z CC W o 2Xw W Cc W 0 W co cf) rc W 0 0 ~ w�O t!) Z 0.i 0 CL Q 00 a CC Y I CL cr. R 9 < ` 15 < 9 W i w N m 1* W 0 �` —'-� , �` 0101'' % z Ok U_ 2 < 0 -.---C/) to LLJ_ _0101f 0101 2:1 -- ----- --- .r ; � � � (� � oo/ N 0101 1� �EX 24V'tORM14 i P-56% x 21 X\ t, MA, EX - N." + WIDLSTOW DRAIN EASEME E OCUMENTNO.'�025 IN 021 197_;_� co C1 00i I Ck �.. � ( ;� W 2:1 4 ____ 0101-- �'`� `�, a0 -\, w 04 c1d 0) X co > > zz Cr) C*4 4N w z > > _j cli x zz. U.1 w -4t c! 30'WIDE STORM DRAIN EASEMENT PER C-4 c; 7 7 I- 0 co N + M to Ln 0.00, MOOD DOCUMENT NO. 0214025197. co C) 00 0,1 AoV C� + < t a M co I I ,y c$ ( 1- 0 00 5.W i5 -A_ < (o (n w w 0 W Lu X F - 71i r 21 I ' 0101 i I /� \r < _,J C14 KIRKCALDY T STORM DRAIN DRIVE EXTENSION - i t-- I I I �-�1--t--I---1='-� - i LEGEND: ABBREVIATIONS F.L. FLOWUNE P.O.V.C. POINT ON VERTICAL CURVE 0 C.L. CENTERUNE B.V.C. BEGIN VERTICAL CURVE N ELEV. ELEVATION E.V.C. END VERTICAL CURVE 0 cn V; > E.C.R. END CURB RETURN T.O.M. TOP OF MANHOLE to B.C. BEGIN CURVE EX. EXISTING iz; z z a-<) %n P.LVI POINT OF INTERSECTION E.P. EDGE OF PAVEMENT OF VERTICAL CURVE INV. INVERT QJJ ULI %u uj ME _j --0&26• zkr RI -1 FURNISH & INSTALL TRAFFIC *SMP' SIGNS PER C.O.S. SM. T-19. 11 SIGN NUMBERS ARE FEDERAL CODES UNLESS OTHERWISE am INDICATED BY (CA). (CA) INDICATES CALIFORNIA CODES. 7 0 FURNISH & INSTALL STORM DRAIN MANHOLE TYPE -B- PERaTy OF co BAKERSFIELD STANDARD DETAIL 0-18 AND SW -5 FOR COVER. FURNISH & INSTALL SEWER MANHOLE TYPE 'A" PER CITY OF BAKERSFIELD STANDARD DETAIL SW -4 AND SW-& 2. OL% C) 10�` FURNISH & INSTALL CATCH BASIN TYPE 'A! PER CITY OF =ggOO BAKERSFIELD STANDARD DETAIL 0-14. ♦ ---- ­00,­� --------- 00 LEGEND: (CONT.) 0 2116 CC —S — FURNISH & INSTALL SEWER PER CITY OF BAKERSFIELD STANDARDS C-4 ---D— FURNISH & INSTALL STORM DRAIN PER MAINE- C5 -------------------- PROPOSED SAWCUT UNIT LINE , — - — - — - — CENTERLINE -------- — ---- -- 0101 0101 BOUNDARY ,' — 0101 w WATER UNE -SEE SEPARATE PLANS I "SME: 1C FURNISH & INSTALL INTERCONNECT CONDUIT 5; 43 TR5 W FURNISH & INSTALL SPLICE BOX FOR o° ju TR5-Na 5 SIZE TR6=N0. 6 SIZE CURVE NUMBER FOR CURVE DESCRIPTION 34, 3' NO*40'51 `E ITEM OF WORK - SEE SCHEDULE 2.05% -2�k ---N(r 40'51"E SECTION DESIGNATION: SECTION LEM Call: TOLL FREE 2 SHEET WHERE SECTION IS SHOWN 1-800-227-2600 20+00 :!S ci 19+024- RCP : 0101 18+00 7 174-oOI 16�00 T4_4­'Rk� 15+00 762 BEFORE You IM UNDERGROUND SERVICE ALERT 9+50 OF SOUTHERN CALIFORNIA 1400NNN X 0101 0101- PROP m 0, uiw d to 1 �` �\ `\ � i J�iaz\\�_ �,�------__0101_-..�_�-_ _ Lu M_ 7t - i t-- I I I �-�1--t--I---1='-� - i VIC 77 NNINEENINNINHI �PNF 244-00 23+00 i 224-00 21 lox KIRKCALDY DRIVE STORM DRAIN SCALE: 1" = 50' HORIZONTAL 1" = 5' VERTICAL 399-14 LF OF T_ 19-00 18+00 G GROUND M�imm aminmMoomm.- mmum mmalm 010101m 1001,630 100011" NOW M NOWNIF. WWW�_ ww wdm 17 MINE 16+00 15+00 IMENNIMEN1 m 110011 BUNIONS MI mime lf-k­m� i 144-00 LEGEND: ABBREVIATIONS F.L. FLOWUNE P.O.V.C. POINT ON VERTICAL CURVE 0 C.L. CENTERUNE B.V.C. BEGIN VERTICAL CURVE N ELEV. ELEVATION E.V.C. END VERTICAL CURVE 0 cn V; > E.C.R. END CURB RETURN T.O.M. TOP OF MANHOLE to B.C. BEGIN CURVE EX. EXISTING iz; z z a-<) %n P.LVI POINT OF INTERSECTION E.P. EDGE OF PAVEMENT OF VERTICAL CURVE INV. INVERT QJJ ULI %u uj ME VIC 77 NNINEENINNINHI �PNF 244-00 23+00 i 224-00 21 lox KIRKCALDY DRIVE STORM DRAIN SCALE: 1" = 50' HORIZONTAL 1" = 5' VERTICAL 399-14 LF OF T_ 19-00 18+00 G GROUND M�imm aminmMoomm.- mmum mmalm 010101m 1001,630 100011" NOW M NOWNIF. WWW�_ ww wdm 17 MINE 16+00 15+00 IMENNIMEN1 m 110011 BUNIONS MI mime lf-k­m� i 144-00 13+00 LEGEND: ABBREVIATIONS F.L. FLOWUNE P.O.V.C. POINT ON VERTICAL CURVE 0 C.L. CENTERUNE B.V.C. BEGIN VERTICAL CURVE N ELEV. ELEVATION E.V.C. END VERTICAL CURVE 0 cn V; > E.C.R. END CURB RETURN T.O.M. TOP OF MANHOLE to B.C. BEGIN CURVE EX. EXISTING iz; z z a-<) %n P.LVI POINT OF INTERSECTION E.P. EDGE OF PAVEMENT OF VERTICAL CURVE INV. INVERT QJJ ULI %u uj @ EXISTING SURVEY MONUMENT _j --0&26• zkr RI -1 FURNISH & INSTALL TRAFFIC *SMP' SIGNS PER C.O.S. SM. T-19. 13+00 LEGEND: ABBREVIATIONS F.L. FLOWUNE P.O.V.C. POINT ON VERTICAL CURVE 0 C.L. CENTERUNE B.V.C. BEGIN VERTICAL CURVE N ELEV. ELEVATION E.V.C. END VERTICAL CURVE 0 4f > E.C.R. END CURB RETURN T.O.M. TOP OF MANHOLE to B.C. BEGIN CURVE EX. EXISTING (n E.C. END CURVE TC TOP OF CURB z P.LVI POINT OF INTERSECTION E.P. EDGE OF PAVEMENT OF VERTICAL CURVE INV. INVERT M.H. MANHOLE ELEV. ELEVATION 00 @ EXISTING SURVEY MONUMENT mi --0&26• RI -1 FURNISH & INSTALL TRAFFIC *SMP' SIGNS PER C.O.S. SM. T-19. 11 SIGN NUMBERS ARE FEDERAL CODES UNLESS OTHERWISE am INDICATED BY (CA). (CA) INDICATES CALIFORNIA CODES. m 0 FURNISH & INSTALL STORM DRAIN MANHOLE TYPE -B- PERaTy OF co BAKERSFIELD STANDARD DETAIL 0-18 AND SW -5 FOR COVER. FURNISH & INSTALL SEWER MANHOLE TYPE 'A" PER CITY OF BAKERSFIELD STANDARD DETAIL SW -4 AND SW-& z FURNISH & INSTALL CATCH BASIN TYPE 'A! PER CITY OF =ggOO BAKERSFIELD STANDARD DETAIL 0-14. ♦ 6* FIRE HYDRANT ASSEMBLY -1 00 LEGEND: (CONT.) 0 2116 CC —S — FURNISH & INSTALL SEWER PER CITY OF BAKERSFIELD STANDARDS WIIILI_11�!i " " 13+00 00 LEGEND: ABBREVIATIONS F.L. FLOWUNE P.O.V.C. POINT ON VERTICAL CURVE 0 C.L. CENTERUNE B.V.C. BEGIN VERTICAL CURVE — 11111, ELEV. ELEVATION E.V.C. END VERTICAL CURVE 0 B.C.R. BEGIN CURB RETURN P.I. POINT OF INTERSECTION > E.C.R. END CURB RETURN T.O.M. TOP OF MANHOLE to B.C. BEGIN CURVE EX. EXISTING (n E.C. END CURVE TC TOP OF CURB z P.LVI POINT OF INTERSECTION E.P. EDGE OF PAVEMENT OF VERTICAL CURVE INV. INVERT M.H. MANHOLE ELEV. ELEVATION 00 @ EXISTING SURVEY MONUMENT mi --0&26• RI -1 FURNISH & INSTALL TRAFFIC *SMP' SIGNS PER C.O.S. SM. T-19. 11 SIGN NUMBERS ARE FEDERAL CODES UNLESS OTHERWISE am INDICATED BY (CA). (CA) INDICATES CALIFORNIA CODES. m 0 FURNISH & INSTALL STORM DRAIN MANHOLE TYPE -B- PERaTy OF co BAKERSFIELD STANDARD DETAIL 0-18 AND SW -5 FOR COVER. FURNISH & INSTALL SEWER MANHOLE TYPE 'A" PER CITY OF BAKERSFIELD STANDARD DETAIL SW -4 AND SW-& z FURNISH & INSTALL CATCH BASIN TYPE 'A! PER CITY OF =ggOO BAKERSFIELD STANDARD DETAIL 0-14. ♦ 6* FIRE HYDRANT ASSEMBLY -1 00 LEGEND: (CONT.) 0 2116 CC —S — FURNISH & INSTALL SEWER PER CITY OF BAKERSFIELD STANDARDS WIIILI_11�!i " " ---D— FURNISH & INSTALL STORM DRAIN PER MAINE- CITY OF BAKERSFIELD STANDARDS -------------------- PROPOSED SAWCUT UNIT LINE i — - — - — - — CENTERLINE 0101 0101 BOUNDARY ,' — 0101 w WATER UNE -SEE SEPARATE PLANS I "SME: 1C FURNISH & INSTALL INTERCONNECT CONDUIT 5; 43 TR5 W FURNISH & INSTALL SPLICE BOX FOR INTERCONNECT TR3=N0. 3 1/2 SIZE TR5-Na 5 SIZE TR6=N0. 6 SIZE CURVE NUMBER FOR CURVE DESCRIPTION ITEM OF WORK - SEE SCHEDULE ui SECTION DESIGNATION: SECTION LEM Call: TOLL FREE 2 SHEET WHERE SECTION IS SHOWN 00 0 rn — 11111, 06 0 > 04 to (n - �128 z -802 00 z mi --0&26• 798 ESS UJ am ams m Mc co v 20 z o. 32 =ggOO 18 -1 00 0 2116 CC � W-5,1021MENE WA =IN MAU IN 10mift,46 MONA IN 11001 11001 100100010001100MM 1 11001 MEEMI RON __ 1MOCICR, RON 014NOM 124-00 114-00 1 - 1008 u 0 -832 30 06 > mQQ (n - �128 z -802 00 mi --0&26• 798 ESS UJ am ams to Mc co v 20 z o. 32 =ggOO 18 -1 00 0 2116 CC � 784 WIIILI_11�!i " " CL MAINE- I -• 1814 i I "SME: 5; -112 EX 0 772 77oDIG ALERT ui 768 766 Call: TOLL FREE 1-800-227-2600 :!S ci AT LE*Sr 71110 DAYS w 762 BEFORE You IM UNDERGROUND SERVICE ALERT 9+50 OF SOUTHERN CALIFORNIA O m 0, uiw d to Lu M_ 7t 0101 O W-5,1021MENE WA =IN MAU IN 10mift,46 MONA IN 11001 11001 100100010001100MM 1 11001 MEEMI RON __ 1MOCICR, RON 014NOM 124-00 114-00 1 - 1008 u 0 -832 30 06 > 04 (n - �128 z -802 00 mi --0&26• 798 ESS UJ am ams 24 22 Mc co v 20 790 o. 32 =ggOO 18 -1 00 78fi 2116 CC � 784 WIIILI_11�!i " " CL MAINE- I -• 1814 i I "SME: -112 EX 0 W-5,1021MENE WA =IN MAU IN 10mift,46 MONA IN 11001 11001 100100010001100MM 1 11001 MEEMI RON __ 1MOCICR, RON 014NOM 124-00 114-00 1 - 1008 u 0 06 > 04 (n F= z -802 00 798 ESS UJ >. CL 796 Mc co ,K.-- 794 0 790 o. 32 0. -1 00 78fi s, IVI\- CC � 784 F C AoF CL 772 77oDIG ALERT 768 766 Call: TOLL FREE 1-800-227-2600 764 AT LE*Sr 71110 DAYS w 762 BEFORE You IM UNDERGROUND SERVICE ALERT 9+50 OF SOUTHERN CALIFORNIA PROPOSED STORM DRAIN KIRKCALDY DRIVE EXTENSION EX GROUND -- �,-, -- ------------------------ ---- ------------------- III I I DESIGN GRADE ( I 24"RCP z INV 829.10' SECTION A— 4 NOT TO SCALE 5.56% FILL EX GROUND SECTION D— 4 NOT TO SCALE EX GROUND --- --- DESIGN GRADE 24" RCP INV 832.48' FILTER MATERIAL IN 4n MIN BEDDING — -- -_ J- -- — - •- 0 SECTION B— 4 NOT TO SCALE SUBDRAIN ALTERNATE A w c,RP ��R PEO ORIC (MIRAF' APPROVED VALENT) i„„ JC. GRAVEL Off. APPROVED EQUIVALENT 2.0% 1-1/2" GRAVEL WRAPPED IN FILTER FABRIC. 6" MIN OVERLAP FILL m EX GROUND 2.0% ol SUBDRAIN TRENCH SEE CANYON SUBDRAIN DETAILS BELOW SECTION C— 4 SUBDRAIN ALTERNATE B TER FABRIC (MIRAFI 140 APPROVED EQUIVALENT) 15" MAX OPEN GRADED GRAVEL OR APPROVED EQUIVALENT CANYON SUBDRAIN TERMINAL CANYON SUBDRAIN DETAILS NOT TO SCALE i NOT TO SCALE O M M H 0) cr =� Q U i .0 0 1 W U M � co j sEto N i v w Y Q m O.S-46A-`6 DIG ALERT Call: TOLL FREE 1-800-227-2600 AT LEAST TWO DAYS BEFORE YOU DIG UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA z 0 Z _cf) �zLLJ I 4 cf) a l.- x 0 93C I FILTER MATERIAL F- 0 w W FILTER MATERIAL SHALL BE CLASS 2 PERMEABLE V) o w 0 0 in cc CL �V Q MATERIAL PER STATE OF CALIFORNIA STANDARDuj 00 93C Y s CL CC M N SPECIFICATIONS, OR APPROVED ALTERNATE.W:5 W 0 CLASS 2 GRADING AS FOLLOWS: C5 Z N9 m o SIEVE SIZE PERCENT PASSING w 1" 100 a Q 3/4" 90-100 W W 3/8" 40-100 5-- Q #4 24-40 18-33 #30 5-15 <oo � #50 0-7 N - M o #200 0-3 O.S-46A-`6 DIG ALERT Call: TOLL FREE 1-800-227-2600 AT LEAST TWO DAYS BEFORE YOU DIG UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA z 0 Z _cf) �zLLJ cf) a l.- x 0 93C w F- 0 w W w 0 0 in cc CL �V Q 00 93C Y s CL CC M N _ W 0