Loading...
HomeMy WebLinkAbout10.3-106 Record DrawingFAN COIL SCHEDULE ABBR. DESIGNATION FC -3 DESIGNATION ET 1 ET 2 SUPPLY FAN BT 2 SUPPLY AIR FLOW (CFM) 2200 EXT: SP, SUPPLY (IN. WC) 1.8 EXT SP, RETURN (IN. WC) 0.80 T.S.P, (IN WC) 3.75 MIN. O. S.A. (CFM) 300 HP/BRAKE HP 3.0 /2.1 VOLTSIPHASE 20813 FAN TYPE PLENUM OPERATING RPM 3,412 CAPACITY CONTROL (%) 0 -13.9 - 43.0 57.0 - 86.1-100 EER 1 C.O.P. l IPLV (ATARI) 10.21 3.x.0115.4 COOLING COIL BUFFER SENSIBLE (MBH) 70.7 TOTAL (MBH) 81.5 COIL SIZE (FT2) 4.10 NUMBER OF ROWS 8 AIR PD (IN. WC) 0.75 EADBIEAWB (OF) 80163 LADBAAWB (OF) 52.4149.8 EWT ILWT (OF) 44153.1 GPM/PD (FT) 18/2.7 VALVE TYPE 2 -WAY 626.0 376.3 HEATING COIL YORK CAPACITY (MBM 82.3 EADBAAWB (OF) 60194.6 COIL SIZE (FT.2) 4.10 AIR PD (IN. WC) 0.10 EWT IL WT (OF) 1801145 GPMIPD (FT,) 4.91.6 VALVE TYPE 3 -WAY 45155.7 45155 FILTER 11713.1 AREA (SQ. FT.) X DEPTH (IN.) 8.8X 1" DEEP MANUFACTURER CAMFIL TYPE MERV 8 Conthuatl n HEATING COIL MANUFACTURER SEASONS TYPE SINGLE ZONE LOCATION BASEMENT -SUSPENDED OPER. WT (LBS) 900 ACCESSORIES 1 THRU 9 1. SINGLE PUIN I PUWEK CONNt(; I IVH. Z BOTTOM SERVICE ACCESS. 3. 1 " SPRING DEFLECTION ON FAN MOUNTINGS. 4. INSULATED DOUBLE WALL WITH ALUMINUM LINER. 5. UNIT MANUFACTURED AS DIRECT REPLACEMENT UNITS FOR EXISTING FAN COIL. 6. LENGTH CAN BE INCREASED AS REQUIRED TO ACCOMMODATE SERVICE AND ACCESS. 7. WIDTH, HEIGHT, AND DUCT CONNECTIONS SHALL BE COORDINATED TO ACCOMMODATE EXISTING CONDITIONS. 8. CAREFULLY COORDINATE WITH FIELD CONDITIONS PRIOR TO SUBMITTING BID. 9. BOTTOM ACCESS FILTER AND FAN SECTIONS. AIR COOLED CHILLER SCHEDULE ABBR. DESIGNATION CH 1 „ DESIGNATION ET 1 ET 2 GENERAL BT 2 CAPACITY (TONS) ATARI 98.3 CAPACITY (TONS) OPERATING 872 AMBIENT (F) 110 ELEVATION 350 ACCEPTANCE VOLUME (GALLONS) 12 19 COMPRESSOR 1.27 QUANTITY 2 REFRIGERANT R -410A SCALE FACTOR 611,0001 CAPACITY CONTROL (%) 0 -13.9 - 43.0 57.0 - 86.1-100 EER 1 C.O.P. l IPLV (ATARI) 10.21 3.x.0115.4 BUFFER BUFFER EVAPORATOR GPM OPERA77NG 212 EWT I LWT(OF) 53.8144 FLUID WATER PRESSURE DROP 10 FT. HEAD MINIMUM FLOW RATE, GPM 117 2,070 2288 ELECTRICAL 1, 2, 3, 4, 5 VOLTSIPHASE 20813 FLA / MCA / MOCP 432.214601500 SYSTEM POWER (Kw - TOTAL) 122.3 626.0 376.3 MANUFACTURER (SEE NOTE 4) YORK TYPE AIR COOLED - MODEL NUMBER YLAA0101 HE17 OPER. WT (LBS) 5026 ACCESSORIES 1 THRU 7 1. MICROPROCESSOR CONTROL CENTER WITH REMOTE CHILLED WA TEN Kb-`& I VP 1lvrr, ALARM CONTACTS, Lon Works COMMUNICATIONS PORT TO SITE EMS SYSTEM, HI AMBIENT KIT, 0-1Ov INPUT SIGNAL FROM BMS FOR CHILLED WATER RESET 2. SUCTION SERVICE ISOLATION VALVE OPTION. 3. FLOW SWITCH, FIELD MOUNTED AND WIRED. 4. LOW SOUND FAN OPTION. 5. COMPRESSOR LOW SOUND KIT. 6. VIBRATIOJN ISOLATORS, 2" DEFLECTION. 7, CHILLER SHALL BE COMPATIBLE WITH VARIABLE PRIMARY FLOW ARRANGEMENT. 117 - 212 GPM FLOW RATES THRU CHILLER. EXPANSION AND BUFFER TANK SCHEDULE ABBR. DESIGNATION DESIGNATION DESIGNATION ET 1 ET 2 BT 1 BT 2 CAPACITY OUTPUT (MBH) SUPPLY FAN 1.5 5 TANK VOLUME (GALLONS) 22 34 180 200 ACCEPTANCE VOLUME (GALLONS) 12 19 -- 1.27 TANK DIAMETER (INCHES) 12 16 30 30 MANUFACTURER TACO TACO TACO TACO TYPE BLADDER BLADDER BUFFER BUFFER MODEL NUMBER CBX-84-125B CX -130-125 BTH018OF02-125N STH020OF03-125N LOCATION BASEMENT BASEMENT BASEMENT BASEMENT OPER WT, (LBS) 250 400 2,070 2288 ACCESSORIES 1, 2, 3, 4, 5 1, 2, 3, 4, 5 2, 3, 5, 6, 7 2, 3, 5, 6, 8 1. REPLACEABLE BLADDER. 2. INTEGRAL FLOOR STAND. 3.125 PSI WORKING PRESSURE. 4. GAUGE GLASS. 5. AIR VENT CONNECTION WITH FIELD PROVIDED HIGH CAPACITYAUTOMATIC AIR VENT. 6. INTERNAL BAFFLE. 7. HEATING HOT WATER APPLICATION -1 " INSULATING BLANKET 8. CHILLED WATER APPLICATION -1 "ARMAFLEX INSULATION. AIR HANDLER SCHEDULE ABBR. DESIGNATION DESIGNATION A11-1 AH -2 HEATING INPUT (MBH) 1,250.0 CAPACITY OUTPUT (MBH) SUPPLY FAN 1.5 5 SUPPLYAIR FLOW (CFM) 18,500 TOTAL 3 x 6,167 CFM 11,500 TOTAL (3 x 3,833 CFM) EXT. SP, SUPPLY (IN. WC) 1.80 1.8 EXT. SP, RETURN IN. WC 1.27 1.14 T.S.P. IN, WC 4.05 4.00 MIN. O.S.A. (CFM) 1,850 1,000 HP/BRAKE HP 22.5 (3 X 7.5 HP) /3 X 5.69 15.0 3 X 5 HP /3 X 4.27 VOLTS/PHASE 208/3 20813 FAN TYPE/ QTY. PLENUM I3 PLENUM l 3 OPERATING RPM 2,010 3,613 ACCESSORIES 1,2,3,4,5,7,8,9 1,2,3,4,5,6,8,9 OPTIONS 1 THRU 9 Condensate Droln COOLING COIL N.G. Normally Closed SENSIBLE (MBH) 570.5 341.4 TOTAL MBH 626.0 376.3 COIL SIZE FT 2) 35.5 22.8 NUMBER OF ROWS 8 8 AIR PD IN. INC) 0.77 0.45 EADB/EAWB OF) 80163 80163 LADBA.AWB (OF) 51.5151.1 52.5151.5 EWT /LWT O 45155.7 45155 GPMIPD (FT) 11713.1 75.317 VALVE TYPE 3 -WAY 2 -WAY GOVT. Conthuatl n HEATING COIL P.P Peter Plug CAPACITY (MBH) 647.1 411.9 EADBILAWB aF 60/9Z4 60193.1 COIL SIZE (FT.2) 16.60 11.40 AIR PD (IN. WC) 0.56 0.56 EWT 1LWT OF 1801145 1801145 GPMIPD IFT. 38.2111.3 24.314.80 VALVE TYPE SWAY 3 -WAY -- A5FD. S.F.D. w/ / � e Damper FILTER D.C.H. DomestG ic old Harter AREA (SQ. FT.) X DEPTH (IN.) 46.7X 4" DEEP 35.OX 4"DEEP MANUFACTURER CAMFIL CAMFIL TYPE MERV 8 MERV 8 W P.L. Door. Lower MANUFACTURER SEASONS 4 SEASONS 4 TYPE MULTI ZONE MULT!-ZONE LOCAT70N BASEMENT- GRADE BASEMENT - GRADE OPER. WT (LBS) 6,450 4,650 ACCESSORIES 1 THRU,9 i THRU 9 1, SINGLE PVIN I YVWI=K UV/V/Vt:U IMV. 2. EXTERNAL FILTER GAUGE 3. 2" SPRING DEFLECTION ON PLENUM FAN MOUNTINGS. 4. (3) VFD`S PER AIR HANDLER CONTROLLING (3) SUPPLY FANS. 5. UNITS ARE MANUFACTURED AS DIRECT REPLACEMNT UNITS FOR EXISTING MZ AIR HANDLERS. 6. LENGTH CAN BE INCREASED A MAXIMUM OF 12" FOR EACH AIR HANDLER TO ACCOM P IODATE SERVICE AND ACCESS. 7. WIDTH, HEJ_�HT, AND DUCT CONNECTIONS SHALL BE COORDINATED TO ACCOMMODATE EXISTING CONDITIONS AND ZONE AIRFLOWS. 8. ENTIRE AIR HANDLER MUST BE SHIPPED KNOCKED DOWN AND ASSEMBLED IN PLACE AS REQUIRED TO BRING MATERIAL INTO BASEMENT INTACT 9. CAREFULLY COORDINATE WITH FIELD CONDITIONS PRIOR TO SUBMITTING BID. PUMP SCHEDULE ABBR. DESIGNATION DESIGNATION HWP-1 CWP -1 HEATING INPUT (MBH) 1,250.0 CAPACITY OUTPUT (MBH) HORSEPOWER 1.5 5 VOLTSIPHASE 208/3 20813 RPM 1760 1760 GPMITDH (FT.) 63130 220145 EFFICIENCY (%) 61 77 MANUFACTURER TACO TACO TYPE IN-LINE IN-LINE MODEL NUMBER SKV-2006-1.5 SKV-3007-5 LOCATION BASEMENT BASEMENT OPER. WE (LBS) 100 152 ACCESSORIES 1,2,3,4,5,7,8,9 1,2,3,4,5,6,8,9 7. S 1ANUH/VN PLA I E.'?. Z&L;UKC I U I✓VIVt;KG r c rHN VVI r r7 vo n/Vvnvr- vva- I Q- 2. BRONZE FITTED 3. GAUGE TAPS 4. FIELD INSTALLED SUCTION DIFFUSER AND MULTI-PURPOSE VALVE ON OUTLET, 5. FACTORY INSTALLED AND WIRED VFD AND CONTROLS 6. SET UP FOR SELF SENSING CONSTANT PRESSURE VARIABLE FLOW 117 - 200 GPM FLOW. 7. SET UP FOR SELF SENSING VARIABLE PRESSURE CONSTANT FLOW. 8. MODBUS PROTOCOL. 9. 6 DI12 DO11 AI11 AO BOILER SCHEDULE ABBR. DESIGNATION B-1 ABBR. ITEM HEATING INPUT (MBH) 1,250.0 CAPACITY OUTPUT (MBH) 1,088.0 FUEL NAT. GAS TURN DOWN 7:1 Access Door VOLTSIPHASE 115/1 FLA WITH PUMP OPTION 15.5 Above Finished Floor PRESSURE RELIEF (PSIG) 60 GPM 63.0 PD (FT.) 6.9 EWT (OF) 145 LWT (OF) 180 MANUFACTURER RAYPAK TYPE MVB MODEL NUMBER H7 -153A LOCATION BASEMENT - GRADE OPER. WT. (LBS) 780 OPTIONS 1 THRU 9 1. FACTORY START-UP 2. 8" VERTICAL STAINLESS STEEL VENT, CATEGORYIV, AL -294C, TO VENT CAP ABOVE ROOF. 3. MODULATING FIRE, 7:1 TURNDOWN, CUPRO-NICKEL HTX. 4. CALIFORNIA CODE, PUMP DELAY, LOW NOX 5. VENT PIPE CONDENSATE CONNECTION AND DRAIN TO FLOOR SINK 6. COMBUSTION AIR INTAKE FROM MECHANICAL ROOM. MAINTAIN EXISTING COMBUSTION AIR LOUVERS. 7. LOW WATER TEMP VALVE. FIELD PIPED. 8. IN-LINE CIRCULATOR PUMP FURNISHED WITH BOILER PACKAGE, FIELD INSTALLED AND WIRED. Air Conditioning Legend SYMBOL ABBR. ITEM SYMBOL ABBR. ITEM A.G. Air Conditioning H.W.R. Heating hater Return ® A.D. Access Door ti.HS. Heating Water Supply AFF. Above Finished Floor INT. Internal A H. Air Handler co N LOG. Location ■ H.T. Huss Tyner H M.O. Motor Operated 13.V. Hutterf ly Valve 0) (W New en Ljj CD. Condensate Droln 0 N.G. Normally Closed Ills C.E. Gelling Exhaust Register N.I.G. Not in Contract G.W.R. ChilledMot Water Return O N.O. Normally Open CIY45. Ghll lod[44ot Water Supply i`. 05•A• Outside Air C.OhiB. Gombustlon .4 O.B.D. Blade Damper Exp.. 9-34---144 CONN. Connection - -*- PDJCO. Point of Connection GOVT. Conthuatl n �-�" P.P Peter Plug G.R. Gelling Return Register PROV. Provide CA.6. colling P.R.V. Pressure Reduchg Volvo ® 6.5. Catling Supply Ragistor SIM. 51mllor -- C.V. Check Volvo -- A5FD. S.F.D. w/ / � e Damper --- D.C.H. DomestG ic old Harter �. .»• , '' 1r r '14/1 /�.M 0 DIA. Diameter S.M. Sheat Metal W P.L. Door. Lower -�� 5.0 V. shut Off Valva DN. Down 5.P5.T. Single Pale Single Throw MECHANICAL D.PD.T. Double Pole Double Throw 8 STAT Thermostat D.T.R. Duct Thru Roof Designer: `-LRF. Surface (E) Existing (TYP) Twk-ol M-1 Fan U.G. U.6'. Under ound E.MS. gy 5ystom U.N.O. Unless Noted Otherwise EXH. Exhaust -� Y.D. Volume Damper ---AFD. FD. Fire Damper r1/ acc. panel H/ With Donn Gornectton FlexibFloor Hall Return Register FLR Wall Supply Register Hall F.T.R. Flue Thru Roof Duct w/ Acoustic Uning Furn. Fvrnace } } } } T.V. Turning Vales GA. Gauge Extractor GAL. Galion &ALV. 6ahranized G.P.M. Gallons per Minute 602 SENSOR GRD. Grade ca 6 V. 601te Valve Union Reducer or Increaser U 1715 CHESTER AVE. BAKERSFIELD, CA 93301 LOCATION PLAN: NO SCALE General Pro iect mote: 1. Coordination of work: Layout of materials, equipment and systems is generally diagrammatic unless specifically dimensioned. Some work may be shown offset for clarity. The actual location of all materials, piping, ductwork, fixtures, equipment, supports, etc. shall be carefully planned, prior to installation of any work to avoid all interferences with each other, or with structural, electrical, architectural or other elements. Verify the proper voltage and phase of all equipment with the electrical plans. All conflicts shall be called to the attention of the architect and the engineer prior to the installation of any work or the ordering of any equipment. 2. All penetrations of surfaces by piping and conduit shall be caulked. 3. Any and all surfaces affected by the demolition and installation of the mechanical, electrical, and related components shall be patched back and restored to original condition. Patch and paint with materials, colors, and textures to match existing. Carefully coordinate demolition and restoration scope of work prior to submitting bid. 4 Demolition of any component shall include all hangers, supports, bracing, wiring, etc. All sub systems related to component slated for demolition shall be removed and the affected surface patched back to match existing. 5. All piping, equipment, conduit, etc. shall be supported and braced in accordance with the 2010 California Building Code. 6. No roof joists or other structural members are to be cut. Use existing roof openings and/or fit ducts between existing joists. Any modifications to structural members require approval from the architect and DSA prior to performing any work. MEP Component Anchorage Notes: All mechanical, plumbing and electrical components shall be anchored and installed per the details on the approved construction documents. Where no detail is indicated, the following components shall be anchored or braced to mees the force and displacement requirements prescribed in the 2010 CBC, Sections 1615A.1.12 through 1615A.1.22 and ASCE 7-05 Chapter 6 and 13. 1. All permanent equipment and components. 2. Tel: porary or movat: , equipment that is permanently attached (e.g. hard wire, i) to the build: g utility services such as electricity, gas or water. 3. MOV ble equipment w 'ch is stationed in one place for more than 8 hours and heavier than 4 ) pounds are required to be anchored with tern; <orory attachmf, t s. Piping, Ductwork, & Electrical Distribution Svstem Bracina Note: Piping, ductwork, and electrical distribution systems shall be braced to resist the forces prescribed in ASCE 7-05, Section 13.3 as defined in ASCE 7-05, Section 13.6.8, 13.6.7, 13.6.5.6, and 2010 CBC Sections 1615A.1.20, 1615A.1.21 and 1615A.1.22. AS -BUILT 11-29-14 10.3' /04 Sheet Index: M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 E-1 E-2 E-3 Mechanical Schedules and Notes Mechanical Basement Plan - Demolition Mechanical Mechanical Mechanical Mechanical Mechanical Mechanical Mechanical Title 24 Title 24 Title 24 Electrical Electrical Electrical Basement Plan - New Work Plan - 1st Floor Plan - 2nd Floor Roof Plan Details Details Notes REVISIONS BY s -s-2014 1 FIELD REVISION 0 i t+ J co N U 0)) Ln LOW H +" z+f"". ..... 0) ' W en Ljj U 0 � ill ti Ills 41-1 O U7 i`. No. M26578 m Exp.. 9-34---144 z J m � LIJ z �w W o c� M r , r, LL *L..1, W Q rn LtJ > v w W Q.. W W '17= U) W � � LL ~ �' L0 W W r' x �. .»• , '' 1r r '14/1 /�.M 0 U J W W MECHANICAL SCHEDULES AND NOTES ,N 6-5-2014 AS NOTED Designer: M.B. Joh: _ 13025 Sheet: M-1 ❑O 0 V r I }-----------{----------- �I /I I I I I I I I j I J10 MTM X I KEY NOTES: 1. Remove existing air handler, all related supply ductwork back to elbow at riser(s), return duct from air handler connections to connection at duct main, all related piping, supports, controls, etc. See new work plan for points of connection of new work to existing. Field determine exact demolition scope for existing ductwork as required to install new air handler and re—connect. 2. Remove existing fan coil and duct work as required to install and re—connect new fan coil. See new work plan. Re—use existing return filter bank. I Remove existing R-22 refrigeration compressors, all related piping between compressors and air handlers, hot gas =yid liquid lines back to evaporative c,)ndenser on roof, supports, piping, c >ntrols, e -,u. 4. F"13move exi..ting boiler, all related piping, c<- mo back jas past shut—off valve, flue, c- controls etc. 5. R. move e, -sting hot water circulation v. np, all . elated piping, controls, etc. 6. Re and airflow at this grille prior to det olition and re --set to match air flow wit new system. 7. Any ind all mechanical items, electrical item related piping, conduits, supports, etc )t used for the new mechanical cyst n shall be removed from basement. All : rfaces shall be cleaned prior to instc, ation of new work. Coordinate exact dem, scope in field. 8. Refrigerant shall be evacuated and - -- recovered prior to demolition and delivered to the owner for their use. ! ! 9. Cap duct and remove duct to (E) floor grille (E) floor grille has been obaondoned t �. (7D MECHANICAL BASEMENT PLAN - DEMOLITION. AS -BUILT 11-29-14 /D. -/0 1. New air handler installed in same location as existing. Air handler shall be built in sections and knocked down as required to move thru standard 32"x 78"door, down existing stairwell into basement, and assembled in place. Modify existing zone and return ductwork as required to make connection, allow for free movement of all dampers, and to seal ductwork to air handler. See detail A/M-7 for air handler anchorage detail. 2. New boiler with flue piping routed thru existing chimney to rooftop termination above top of chimney opening. Paint roof cap to match building wall color. Demo and patch / seal chimney as required to install and secure piping. See boiler schedule for piping materials required. See boiler detail D/M-8 . 3. Point of connection, new gas piping to existing. Confirm exact location in field. Rise to boiler connection and ►►►`\`\`\"'�����///JJJ/// REVISIONS BY 6-5-2014 21 TYPICAL — 5 ZONES. FIELD REVISION (E) ZONE 7 S.A. RISER. _ (E) ZONE 5 S.A. RISER. `,ID M 0 (E) ZONE �J L0 S.A. ` . �-�- � Z / (E) ZONE 3 S.A. RISER. U LLJ LL o (E) ZONE 4 S.A. RISER. c� a� T� 0 L: TO T.I. ROOM RE—BALANCE GRILLE TO MATCH PRE—TEST FU S10 AIRFLOW. l� (E) BELOW GR> DE RETURN DUCT °CAIN. AH 2 1 1 21 (E) ZONE 1 S.* -.— — RISER. 21 (E) ZONE 2 S.A. RISER. — (E) O.S.A. DUCT DROP. — r (E) R.A. DROP FROM 2ND FLOOR. -- 1 connect gas piping with new plug valve and dirt leg. 4. Boiler low water temperature valve. Provided with boiler package. Field installed. 5. Boiler circulating pump. Furnished with boiler package, field installed and wired back to boiler control terminals. 6. New hot water circulating pump. See detail E/M-8 for pump trim and anchorage. 7. New hot water buffer tank. Refer to detail H/M-7 for anchorage. 8. New hot water loop expansion tank. Refer to detail G/M-7 . Field determine point of connection for make—up—water and pipe to tank connection with 12 psi PRV (adjustable) and reduced pressure backflow preventer. 9. Hot water coil connection to air handler hot deck coil, typical. Refer to detail B/M-8 for 3—way valve connection (AH -1) and detail C/M-8 for 2—way valve F 3 10. New chilled water circulating pump. See detail E/M-8 for pump trim and anchorage. 11. New chilled water buffer tank. Refer to detail H/M-7 for anchorage. 12. New chilled water loop expansion tank. Refer to detail G/M-7 . Field insulate with 1 "Armaflex insulation. Field determine point of connection for make—up—water and pipe to tank connection with 15 psi PRV (adjustable) and reduced pressure backflow preventer. 13. 1-1 /2" chilled water supply and return drop to AH -2. See 2—way coil connection detail A/M-8 . 14. 3"chilled water supply and return drop to AH -1. See 3—way coil connection detail A/M-8 . 15. CWS&R and HWS&R piping to FC -3 fan coil 2—way valve connections. 16. New FC -3 to be installed in same location as existing cull connection (AH -2 & C— ). ,- (E) BELOW GRADE RETURN DUCT MAIN. -------------------------------- r--l= -1 F--,_�1 I1<==---i Le L— — — — — — — — — — — — — — — — — — — — — — — — — — — — — — —•— — — 4" C.W. S&R ROUTED TO ROOF. --------------------------i I (E) ELECTRIC STORAGE WATER HEATER. CAP UNUSED DUCT 2-1/2" H.W.S. ROUTED OVER HEAD. to be removed. Suspend from structure above with (4) 1 "deflection spring isolators. Install with flex connections at connections to existing duct systems. Field modify duct systems as required for installation. 17. Existing outside air grille in fan coil ductwork. Balance to 300 CFM. 18. Duct smoke detector located in both the hot and cold deck supply plenums, two per air handler. See detail F/M-8 . 19. Install motorized O.A. / economizer damper in outside air duct and balance outside air total (for both air handlers) to 2,850 CFM, minimum. Provide D.B. controls to go full open for first stage cooling. 20. New EMS panel. See control notes . 115 power connection provided under electrical scope. Power distribution to control items beyond point of connection of 115v power is to be provided under the scope of the EMS contractor. 115/24v transformer and all control wiring provided under the scope of the EMS contractor. 21. Provide motorized modulating damper in duct horizontal run (or riser). As req'd to modulate zone air flow from 100% to 20% in relation to zone demand. Field commission air flow at high and low set—points in conjunction with air balance contractor. ,..rte..' , I I i1 11/I I I MECHANICAL BASEMENT PLAN NEW WORK I 11 /l IVI I 111 I I I I I I I I I �-- (E) FILTER BA'. PROVIDE CLEA FILTERS PRIOR SYSTEM AIR BALANCE. (E) R.A. RISER THRU FLOOR. (E) S.A. RISER' THRU FLOOR. T ' AS -BUILT 11-29-14 w REVISIONS BY 6-5-2014 FIELD REVISION `,ID M 0 m N �J L0 0 Z . �-�- � Z r -ca < W U LLJ LL o c� a� U) 0 FU S10 No. M26578ri n Exp. 9-30-14 /* c4'OF r\� i k.\ 0 _Z 0 0 J J D W M Z I U) W ,>) cc W Qa W > 0 �c w � W J Wo w m W L)i Ll.. ~ � w Z ;' < O WOm > CL C.7 J W W 0 MECHANICAL BASEMENT PLAN - NEW WORK Date: 6_5-2014 Scale: AS NOTED Designer: M.B. Job: 13025 Sheet: M-3 05 150 KA 400 STORAGE .4 MECHANICAL PLAN - 1S1 80 _UG m n u AS—BUILT 11-29-14 /0 REVISIONS BY &5-2014 Ai FIELD REVISION QEtQFESSf0, No. M26578 rn (D 6-5-2014 Scale: CY) AS NOTED (Y) J C14 C) U) 0) Lr) 0 WD LO Z W z w Z C1 <Wz Cl() 0) 15; W uj 'C") > 0) Lij > 0 < seo iii 00 W n Lj_ 0) Lu w m U- 0 LL w X ry0 0 z W �uej < < > Lr) 0 r QEtQFESSf0, No. M26578 rn MECHANICAL PLAN - 1 ST 1ST FLOOR Date: (D 6-5-2014 Scale: z AS NOTED Designer: K13, C) 13025 WD M z u)w W 15; W uj 'C") > 0) Lij > U < seo 00 W n Lj_ 0) Lu w m U- 0 LL w X C/) X 0 z W �uej < < > co 0 r w w 0 MECHANICAL PLAN - 1 ST 1ST FLOOR Date: 6-5-2014 Scale: AS NOTED Designer: K13, Job: 13025 Sheet: M-4 2 3 4 5 A MECHANICAL PLAN 2ND FLOOR SCALL' 118--f—W A AS -BUILT 11-29-14 /0,3, REVISIONS BY 6-5-2014 Ai FIELD REVISION FESS11 co No. M26678 to Exp, 9-30-14 CAO (D co Scale: z 0 t4i Designer: J ce) Cq Job: 13025 0 U) W z w Z U) W W z now" CN CN t - U)0 < w co 0) ca z LLJ 0 w LLJLu LL LL w Lo LLJ 0 z w 0 < > CL 0 r w Lr) t.. - r_1 FESS11 co No. M26678 to Exp, 9-30-14 CAO MECHANICAL DETAILS - 2ND FLOOR Date: (D 6-5-2014 Scale: z AS NOTED Designer: M.B. Job: 13025 mF_ W Z FL U) w W ;E W . LLJ > wU MOM - w LLJLu LL LL w Lo LLJ 0 z w 0 < > CL 0 r w MECHANICAL DETAILS - 2ND FLOOR Date: 6-5-2014 Scale: AS NOTED Designer: M.B. Job: 13025 Sheet: M-5 1 --------------------- - - --- -- i ((I l� MECHANICAL ROOF PLAN - REMODEL SCALE. 1/8.4-0' �5 I U MECHANICAL ROOF PLAN - DEMOLITION SCALE:- 1118*4-e i I; I I 1 ! 1 I I I! li � FJ Key Notes 1. Remove existing evaporative condenser, BAC Model VCL-108, 6,770 lb. operating weight. Existing concrete support pads and steel support beams to remain. Demo existing drain piping. 2. Remove existing chemical controller, tank, and related items. 3. Remove existing refrigerant piping system in it's' entirety including above roof back to basement. Remove all un—used pipe supports and hot mop patch roof to match existing. 4. Demo existing make—up—water pipe to downstream of existing hose bibb. 5. New air cooled chiller, 5,026 lbs. operating weight. 6. Existing steel support rails over concrete columns. 7. Existing concrete column, typical of six. S. New steel beams to line up with isolator support points on chiller. Six point isolation with 2? spring deflection. See detail C/M-7. 9. X = spring isolator location, typical. 1 4? chilled water supply and return piping routed above roof on Dura—Blok D13-6 pipe supports. Connect to chiller w/ butterfly isolation valves, instrument wells, and Pete's plugs. 11. Extend piping thru roof. Provide new roof opening and new roof flashing installed with hot mop patch. Route down existing chase to basement. AS -BUILT 11-29-14 REVISIONS BY 6-5-2014 1 FIELD REVISION W J 0 Lr) W W U 0 t .,Bit q t� FE SS 1110 ESS No. M2657£i m Exp. 9-30-14 q OF CA1.NF 0 Z_ O C) J W m Z LL„ V) W Cf) M rn L.L. .� W Q > C) W �W/ 3..W o �.. Lij U u, LL ~ W (1) V- w x QW 15; < > CL 0 r W W MECHANICAL ROOF PLAN Date: 6-5-2014 Scale: AS NOTED Designer: M.B. Job: 13025 Sheet: M-6 4: COMBINATION REDUCING/ RELIEF VALVE, TO PROVIDE. 12 P.5.1. MAKE-UP WATER FOR H.W. AND 15 P.5.1. FOR G.W. (E) MAKEUP WATER FIELD DET. POG. FEBGO 525Y BACKFLOW PREVENTER. W/FUNNEL DRAIN, ROUTE P DRAIN TO (E) F5. GLOBE VALVE. ' NOTE i I. MAX WEIGHT FOR EXPAN51ON TANK DETAIL = 400 Ib. TO SYSTEM RETURN LINE CLOSE TO PUMP SUCTION, SAME 517E AS MAKEUP LINE. TACO HY-VENT AUTOMATIC AIR BLEED VALVE. - MAKEUP WATER -EXPANSION TANK, ET -1, ET -2 � rw Aa" 1 .g r+ w <t CHILDWWT .: DUCT SMOKE DETECTOR COMPLETE WITH PILOT AND ALARM VISUAL INDICATORS ON THE HOU5ING FRONT PANEL. MANUAL RESET SWITCH, AND (2) FORM "C" ALARM CONTACTS TO FUNCTION AS FOLLOWS UPON DETECTION ONE N.G. CONTACT SHALL OPEN AND BREAK THE SUPPLY FAN ONE N.O. CONTACT SHALL CL05E AND 516NAL THE BUILDING FIRE ALARM PANEL FAN INTERLOCK WIRING BY EMS CONTRACTOR. DUCT DIAMA"M n. FIRE ALARM PANEL INTERLOCK WIRING BY ELECTRICAL CONTRACTOR (WHERE APPLICABLE) NOTES: I. DETECTOR PROVIDED BY EMS CONTRACTOR. 2. DETECTOR SHALL BE C5FM AND U.L. LISTED. SMOKE DETECTOR SIDE VIEW -ow.'OILER PIPINGAND FETE'S PLUG, (TYR) REDUCER, (TYP) FLEX CONNECTION, (TYPICAU. GATE VALVE, (TYPICAL) — STRAINER WITH BLOWDOWN VALVE 4 HOSE THREAD. — 5ECURE BASE TO CONCRETE WITH 5/8"0x5" EMBEDMENT CONCRETE ANCHORS. (TYP. OF 4) — IN -LIME PUMP SCALE: N.T.S. NON -SLAM GHECK VALVE. BYPASS FEEDER CONNECTION SEE DETAIL 5/M-1. FIN15H FLOOR. 1/4" 6A6ECOGK AIR VENT AT HIGH POINT. PROVIDE 6" L 4 2 -WAY CONTROL VALVE. AIR FLOW PETE'S PLUG, (TYPICAL) UNION, (TYP) 1/2" H05E BIBS. BALANCING COCK. PLUG VALVE. VALVE, .,AL) Qi--�--� NOTES: I. 344AY CONTROL VALVE PIPING 5HOWN DASHED. 2. SEE PLANS FOR PIPE 51 ZE5. COIL - TWO WAY/THREE WAY COOLING SCALE: N.T.S. COIL SCS _ N.T.S. 1/4" 6AGECOCK AIR VENT AT HIGH POINT. PROVIDE 6" LONG TUBE. 3 -WAY CONTROL VALVE. PETE'S PLUG. (TYPICAL) THREE WAY 1/4" 6AGECOCI•'. AIR VENT AT HIGH POINT- e"ROVIDE 6" LONG TUBE. �a — BALANCING COCK. I o GATE VALVE. (TYPICAL) :LOW < PLUG VALVE. UNION, (TYP) 1/2" H05E BI BB. NOTES: 1. 5EE PLAN5 FOR PIPE 51ZE5. HEATING Z_l BALANGING GOGK. 2 -WAY CONTROL VALVE. r � GATE VALVE, (TYPICAL) HeZ-11 F----- _ COIL. <AIR FLOW C I ---I ol----*---� y 1/2" H05E BIBB. PETE'S PLUG. (TYPICAL) t// UNION. (TYP) COIL - TWO WAY HEATING SCALE: KT.S. NOTES: I. 5EE PLAN5 FOR PIPE 51ZE5. AS -BUILT 11-29-14 PANEL i ItiL s 1fLOC.: SEEP kvi �� i•i � CONDUIT CONCEALED UNDER FLOOR OR PEL.OW GRADE -. CONDUIT STUPPED OUT APP GAPPED •MININNI t fi ii : If GOt+PUIT TURNED DOWN NATO MARKS Iff"TE NO. OF & WIRES N CURE 61U • i *• i A-3 (S) MAX. IN iG., NO MARKS = 2#12 i f ROOF GIRGUIr(S). __-----__= SAWCIJT �- ♦ • Y _ mmoomNONE mono _ 1000 DATA 8 • �����,�■ SIGNAL TERMINAL CAPIPET, SURFACE & MIJ6H IM.10„■01 FLUORESCENT FIXTURE 2 OUTLET DATA: PAR IND�ATE5 WALL MOUNT, LETTER W"TES a� SWITCH CONTROL, NO. INDICATES CIRCUIT. Q SURFACE FIXTURE ON FLUSH aJTLET. ® RECE55EP Ftxr zE WITH jjwrION Da FOR nn Wm ® EXIT LIGHT WITH ARROWS AS SHOWN ON PLANS, WALL AND 6ELIW_1 MOUNT. ® LOW LEVET. EXIT 516N, +6" AFF, +k" FROM DOOR 4WI5 A L16HT FIXTURE DE.516NADON, LETTER INDICATES TYPE, 100 NO. INDICATES WATTAGE. SEE FIXrU ZE SCHERI E. FG ME6-HANGAL EQUIPMENT DESIeNATION. I SEE MELHIANIGAL DRAWINGS. SPECIAL RECEPTACLE - SEE PLAN METER (D FU19H FLOOR RECEPTAaE MMENSE IIMINSIONOW RECEf r&L.E, DUPLEX, I5A, 125V, NEMA 5-1* +IS° UNO 1100111001pow AFLEX RECEPTACLE MTD. APOVE PA(K6PLA6H fkJT'L.EX RECEPTACLE W/LOWER HALF SWITCHED GFI 1100111001 = i 7UPL-E DUPLEX CZE EPTAaL BILIN& REC&PI-ACLE - RE Aff`T&4f, DIE EX, 20A, (25V, NEMA 5 -UR +lr UNP. (. IM=0_0�° 1 d"11001Im k"11 -OR, NO. INDICATES HORSEPOWER 0 0104 a NO 11001 MAINE 0110101=0 9:� } ,-i -".MENS € NOTEC a L T COMPMTIONI t ACU- 6 STARTER MTH DISCONNECT 51VI W AND FUSE. MAK"FIG MOTOR STARTER W/00UADS IN EACti PHASE ;] DIMMER W/INTEGRAL "ON-OFF" SW. W-11=1100110100101 im IMMENSE ' tOT06ELL 1100M MCKE DETECTOR LEPHONE/COMPUTER/DATA OUTLET, TWO 6ANEv PDX W/I GANG c A ERPLATE & GROMMETED OPENING +IS" U.NO. Q PLE TV OUTLET +IV' U.N.O. 1 .7TION SENSOR L I ;STING SWITCH S 4:.16LE POLE SWITCH S2 'SLE POLE 6NiT(,h QIP TOWL TYPE RATED AT 20A (20/ZTN AG. +42" UND. S3 HiRi=E WAY SWITCH e �VIT641 W/PILOT LT. MINIMUM BKR 1-, 10,OOOAMPS I 208V3m 46OA i P15CONNEC , (E)EVAPORATIVE CONDEN5EF, TO BE REMOVED _ —r E—ON UN15TRUT = 6OOA5 500AF 3P, INP 1 I L:1 ,H, �I (;,_3"G. LM/ 3#300MCM,1#3/0 EAC. INSTALL ABOVE R00F G. ' DURA -BLOCK 5UPPORT•.:rt , T-4 PROVIDE PULL13OX COVER OPENING W/KELLON5 6RIP5 ON GABLE DOWN TO BASEMENT. llCOORDINATE EXACT �-- _ ROUTING IN FIELD ELECTRICAL ROOF PLAN SCALE: GENERAL NOTES I. VISIT JOP SITE APP VERIFY EX16rIN6 GOWITIONS PRIOR TO 151D. 2. THE ELECTRICAL WORK SHALL PE INSTALLED IN ACCORDANCE WITH THE CALIFORNIA ELECTRICAL CODE AND ALL APPL16APL.E LOCAL ORDINANCES, WHERE PIANS CALL FOR A HIGHER STANDARD THAN APPLICAPI..E GORES, THE PLANS SHALL 6CNERN. 3. CONDUIT RUNS ARE SHOWN DIA6RAMMATI6ALLY. EXACT LOCATIONS 5H1ALL PE DETERMINED IN THE FIELD TO SUIT FIELD GOPPITIONS. 4. ALL ELEGTRVAL EQUIPMENT, APPLIANCES AND LIGHTING FIXTURES SHALL 15E LISTED PY A RECOGNIZED TEST LAP AND BEAR THAT LAPEL GP APPROVAL. 5. CONTRACTOR SHALL FURNISH, INSTALL AND CONNECT ALL MATERIAL APP EQUIPIVENT FOR THIS WORK UNLESS OTHERWISE NOW. 6. FURNISH DISCONNECT SWITCHES AT REMOTE MOTORS. 7. ALL SPACES AS INDICATED ON PANELS OR 6WTCHWARDS SHALL PE COMPLETE WITH HARPWARE ANP PIJ551N6 FOR P rURE PREAKF-R. OR SWITCH. 5. 6RO.WIN6 APP POPDINC1 SHALL 15E PER GORE PL.U5 ANY ADDITIONAL PROVISIONS SPECEIED OR SHOWN ON DRAWINGS. 9. ALL GIJNDUIT RUNS SHALL CONTAIN A GORE SIZEP G(ZEEN 6R01M WIRE. 10 THESE PLANS ARE NOT COMPLETE UNrL APPROVED PY THE AUTHORITY HAVING a R15DICTION. 11. ALL CONDUCTORS SHALL PE IN CONDUIT. P. ALL CONDUCTORS SHALL PE COPPER WITH TYPE THHN/THWN INSULATION. : _LJ EL-EGTf `.IGAL NOTE. I. SEAL ALL ROOF PENETI4 ATION5 1NATE.T1 GHT 2. GOOF -:.D 1 NATE EXACT EGF I I PMENT LOG/`.TIONS AND REG2U I R MENTS WITI-£ 11115TALLER AS -BUILT 11-29-14 — C-a"IT EXISTIN& Ca"IT CONCEALED IN WALL OR CEILING — — CONDUIT CONCEALED UNDER FLOOR OR PEL.OW GRADE CONDUIT STUPPED OUT APP GAPPED C�--- CONDUIT TURNED UP GOt+PUIT TURNED DOWN NATO MARKS Iff"TE NO. OF & WIRES N CURE 61U 6aRIT (3) MAX. IN l/2" C., (5) MAX. N 3/4" G., A-3 (S) MAX. IN iG., NO MARKS = 2#12 Hak RUN: LETTER tV"TES MEL, L+LMER(S) SATES GIRGUIr(S). __-----__= SAWCIJT �- 6ROUPP GONNF. ,TION P16TRINUTM SWITC WARD OR PANEL _ PANEL, PRANCH CIRCUIT TYPE, SURFACE ANP H-USH ®� SIGNAL TERMINAL CAPIPET, SURFACE & MIJ6H FLUORESCENT FIXTURE 2 OUTLET DATA: PAR IND�ATE5 WALL MOUNT, LETTER W"TES a� SWITCH CONTROL, NO. INDICATES CIRCUIT. Q SURFACE FIXTURE ON FLUSH aJTLET. ® RECE55EP Ftxr zE WITH jjwrION Da FOR nn Wm ® EXIT LIGHT WITH ARROWS AS SHOWN ON PLANS, WALL AND 6ELIW_1 MOUNT. ® LOW LEVET. EXIT 516N, +6" AFF, +k" FROM DOOR 4WI5 A L16HT FIXTURE DE.516NADON, LETTER INDICATES TYPE, 100 NO. INDICATES WATTAGE. SEE FIXrU ZE SCHERI E. FG ME6-HANGAL EQUIPMENT DESIeNATION. I SEE MELHIANIGAL DRAWINGS. SPECIAL RECEPTACLE - SEE PLAN METER (D FU19H FLOOR RECEPTAaE RECEf r&L.E, DUPLEX, I5A, 125V, NEMA 5-1* +IS° UNO AFLEX RECEPTACLE MTD. APOVE PA(K6PLA6H fkJT'L.EX RECEPTACLE W/LOWER HALF SWITCHED GFI ,.�0(� FAULT CIRCUIT INTERRUPTING REGEPTAaE = i 7UPL-E DUPLEX CZE EPTAaL BILIN& REC&PI-ACLE - RE Aff`T&4f, DIE EX, 20A, (25V, NEMA 5 -UR +lr UNP. (. U<_ -TION PDX 4" SQUARE, 1-1/2" DEEP U.N.O. Ti � RNMTAT F.P.O. +48" k"11 -OR, NO. INDICATES HORSEPOWER CL,,, %K OUTLET +7-6" UN.O. DIS ..QCT SWITCH, NON-­FU6EU 9:� } ,-i D156{ -T.CT 5WITGt1 1115W HORSEPONER RATED OR SIZED AS € NOTEC a L T COMPMTIONI t ACU- 6 STARTER MTH DISCONNECT 51VI W AND FUSE. MAK"FIG MOTOR STARTER W/00UADS IN EACti PHASE ;] DIMMER W/INTEGRAL "ON-OFF" SW. (D 'FAKER ac ' tOT06ELL MCKE DETECTOR LEPHONE/COMPUTER/DATA OUTLET, TWO 6ANEv PDX W/I GANG c A ERPLATE & GROMMETED OPENING +IS" U.NO. Q PLE TV OUTLET +IV' U.N.O. 1 .7TION SENSOR L I ;STING SWITCH S 4:.16LE POLE SWITCH S2 'SLE POLE 6NiT(,h QIP TOWL TYPE RATED AT 20A (20/ZTN AG. +42" UND. S3 HiRi=E WAY SWITCH e �VIT641 W/PILOT LT. SN A UJAL MOTOR STARTER =AGN IRE ALARM CONTROL PANEL (51`1 ZaM FAULT CIRCUIT INTERRUPTING LST L _AOR SaviNG rANDr=M MLO ; IN LUGS ONLY �� W/: j H G.O.O ELM E1�1cx1:g07uda ( NUT ONLY LlGH ea D98 lax W.P. V=:THE.RPROOF CAR ole NO I== FYB♦O. P! 4iSHEP PY OTHERS, INSTALL & CONNECT 13369 U.N.O. u ESS NoTFD orHERmee N.E.G. w I IONAL ELEGTRIGAL CODE 158 M. ALAMM AVE. SUITE 8 N NO1 IN 6aZ`RAGT SANTA BARBARA CA 89105 • •G • (805) 589-9218 (E) FAX (805) 589-2405 ExK� IN6 email : malcneyQjmpe.net lwww.jmpe.net (�I REMOVE FES/ (RL) l LDS REL06ATE `�o/M No. E0130a3 SURFACE MOUNT EXP. 06/30/2015 U/G UNDI=REGROUND qr� F cT R\G�` GWP GOLD WATER PIPE F OF CALF AFF A15XE FINISHED FLOOR HAGR HEATING AND AIR CONDITIONING RATED CIRCUIT PREAKER N.L. N16HT LIGHT NOTE: NOT ALL SYMPa.S SHOWN ARE USED ON THIS PROJECT. /DY 3 . /0&_ REVISIONS BY 6-5-2014 FIELD REVISION co 0 L� co J N Lr) to U V) zIdH z' LCq Cs1 w �L W w N U� I� - o tl) t`... 10, N0. M26578+ rn Exp. 9-30-14 �rOF CAOF% 0 z 0 0 � W 1013 Z LL (n W W U W W `„jU Q Q WCL ww LL z fL W z Q W U r V W W NOTES, SYMBOLS, SCHEDULES & DETAILS, ROOF PLAN Date: 6-5-2014 Scale: AS NOTED Designer: M.B. Job: 13025 Sheet: E-1 v - - COLD BLDG. GROUND WATER 5TEEL ROD 5/0 • r it. -ter (2)3"C.YV3#300M0M,I #3/0 E � " I -�I G ) i�boor3 � (N)(5) 4"G. VV4#350MGM (N) PANEL "DP" 1#4/0 6ND EACH I 1600A BU5 )6001-3 ) W/5 ) e01-3 )15/-3 )20/'3 b00A5 bOOAF GH -1 AHI AH2 Hll P GWP 51 NGL E LINE D I A61RAM 5QUARE D 1 LINE Z GUTTER AND D150ONNECT5 7 ELEGTRIGAL NOTES (DI PUMPS HAVE INTEGRAL, FACTORY -MOUNTED \/FDS (2 CONNECT (2) DUCT 51-10KE DETEGTOR5 Q 5G2UARE D GOMBINATION STARTER: H321N 5WITGH 51NITGH WI 115,4 D.E. FU5E5, 556-2 STARTER W! 515.5 OVERLOADS ON WALL BELOW ----------- ________ ---------- ------ _------------- T------------------------------ ------------------------------------------------------ ---_-------_---___-_________- --- - - ----- - -- - ---- -- ------ - -- ---- I - 1 r___.� - - -- -- - --� DOWN FROM ROOF. -� . u s ► Ln f�L1 1 LIQ.. I i ! CONNECT NEW BOILER B 120V, 15.5A I 4 i i I � I I i � i 5 C) 7 ELECTRICAL BASEMENT PLAN -NEW WORK MEC CAL AS -BUILT 11-29-14 L10R CA REG M -D >EPIGBiBSRiNG G D8810l1 [ON so 8180&9 1369 LAMAR AVE. 1RBARA CA 83105 6-8218 ) 588-2408 7ieloney5jmpe.net >.net No. E013083 EXP. 06/30/2015 CTR\ I a AIR HANDLERS HAVE INTEGRAL VFDS 6 7 8 q I )20/3 ) 1100 loam 3 (E) (N) SPARE PK6 PANEL WT "KT" r ----------- ________ ---------- ------ _------------- T------------------------------ ------------------------------------------------------ ---_-------_---___-_________- --- - - ----- - -- - ---- -- ------ - -- ---- I - 1 r___.� - - -- -- - --� DOWN FROM ROOF. -� . u s ► Ln f�L1 1 LIQ.. I i ! CONNECT NEW BOILER B 120V, 15.5A I 4 i i I � I I i � i 5 C) 7 ELECTRICAL BASEMENT PLAN -NEW WORK MEC CAL AS -BUILT 11-29-14 L10R CA REG M -D >EPIGBiBSRiNG G D8810l1 [ON so 8180&9 1369 LAMAR AVE. 1RBARA CA 83105 6-8218 ) 588-2408 7ieloney5jmpe.net >.net No. E013083 EXP. 06/30/2015 CTR\