HomeMy WebLinkAbout10.3-106 Record DrawingFAN COIL SCHEDULE
ABBR.
DESIGNATION
FC -3
DESIGNATION ET 1
ET 2
SUPPLY FAN
BT 2
SUPPLY AIR FLOW (CFM)
2200
EXT: SP, SUPPLY (IN. WC)
1.8
EXT SP, RETURN (IN. WC)
0.80
T.S.P, (IN WC)
3.75
MIN. O. S.A. (CFM)
300
HP/BRAKE HP
3.0 /2.1
VOLTSIPHASE
20813
FAN TYPE
PLENUM
OPERATING RPM
3,412
CAPACITY CONTROL (%)
0 -13.9 - 43.0 57.0 - 86.1-100
EER 1 C.O.P. l IPLV (ATARI)
10.21 3.x.0115.4
COOLING COIL
BUFFER
SENSIBLE (MBH)
70.7
TOTAL (MBH)
81.5
COIL SIZE (FT2)
4.10
NUMBER OF ROWS
8
AIR PD (IN. WC)
0.75
EADBIEAWB (OF)
80163
LADBAAWB (OF)
52.4149.8
EWT ILWT (OF)
44153.1
GPM/PD (FT)
18/2.7
VALVE TYPE
2 -WAY
626.0
376.3
HEATING COIL
YORK
CAPACITY (MBM
82.3
EADBAAWB (OF)
60194.6
COIL SIZE (FT.2)
4.10
AIR PD (IN. WC)
0.10
EWT IL WT (OF)
1801145
GPMIPD (FT,)
4.91.6
VALVE TYPE
3 -WAY
45155.7
45155
FILTER
11713.1
AREA (SQ. FT.) X DEPTH (IN.)
8.8X 1" DEEP
MANUFACTURER
CAMFIL
TYPE
MERV 8
Conthuatl n
HEATING COIL
MANUFACTURER
SEASONS
TYPE
SINGLE ZONE
LOCATION
BASEMENT -SUSPENDED
OPER. WT (LBS)
900
ACCESSORIES
1 THRU 9
1. SINGLE PUIN I PUWEK CONNt(; I IVH.
Z BOTTOM SERVICE ACCESS.
3. 1 " SPRING DEFLECTION ON FAN MOUNTINGS.
4. INSULATED DOUBLE WALL WITH ALUMINUM LINER.
5. UNIT MANUFACTURED AS DIRECT REPLACEMENT
UNITS FOR EXISTING FAN COIL.
6. LENGTH CAN BE INCREASED AS REQUIRED TO
ACCOMMODATE SERVICE AND ACCESS.
7. WIDTH, HEIGHT, AND DUCT CONNECTIONS SHALL BE
COORDINATED TO ACCOMMODATE EXISTING CONDITIONS.
8. CAREFULLY COORDINATE WITH FIELD CONDITIONS
PRIOR TO SUBMITTING BID.
9. BOTTOM ACCESS FILTER AND FAN SECTIONS.
AIR COOLED CHILLER SCHEDULE
ABBR.
DESIGNATION
CH 1 „
DESIGNATION ET 1
ET 2
GENERAL
BT 2
CAPACITY (TONS) ATARI
98.3
CAPACITY (TONS) OPERATING
872
AMBIENT (F)
110
ELEVATION
350
ACCEPTANCE VOLUME (GALLONS) 12
19
COMPRESSOR
1.27
QUANTITY
2
REFRIGERANT
R -410A
SCALE FACTOR
611,0001
CAPACITY CONTROL (%)
0 -13.9 - 43.0 57.0 - 86.1-100
EER 1 C.O.P. l IPLV (ATARI)
10.21 3.x.0115.4
BUFFER
BUFFER
EVAPORATOR
GPM OPERA77NG
212
EWT I LWT(OF)
53.8144
FLUID
WATER
PRESSURE DROP
10 FT. HEAD
MINIMUM FLOW RATE, GPM
117
2,070
2288
ELECTRICAL
1, 2, 3, 4, 5
VOLTSIPHASE
20813
FLA / MCA / MOCP
432.214601500
SYSTEM POWER (Kw - TOTAL)
122.3
626.0
376.3
MANUFACTURER (SEE NOTE 4)
YORK
TYPE
AIR COOLED -
MODEL NUMBER
YLAA0101 HE17
OPER. WT (LBS)
5026
ACCESSORIES
1 THRU 7
1. MICROPROCESSOR CONTROL CENTER WITH REMOTE CHILLED WA TEN Kb-`& I VP 1lvrr,
ALARM CONTACTS, Lon Works COMMUNICATIONS PORT TO SITE EMS SYSTEM,
HI AMBIENT KIT, 0-1Ov INPUT SIGNAL FROM BMS FOR CHILLED WATER RESET
2. SUCTION SERVICE ISOLATION VALVE OPTION.
3. FLOW SWITCH, FIELD MOUNTED AND WIRED.
4. LOW SOUND FAN OPTION.
5. COMPRESSOR LOW SOUND KIT.
6. VIBRATIOJN ISOLATORS, 2" DEFLECTION.
7, CHILLER SHALL BE COMPATIBLE WITH VARIABLE PRIMARY FLOW ARRANGEMENT.
117 - 212 GPM FLOW RATES THRU CHILLER.
EXPANSION AND BUFFER TANK SCHEDULE
ABBR.
DESIGNATION
DESIGNATION
DESIGNATION ET 1
ET 2
BT 1
BT 2
CAPACITY OUTPUT (MBH)
SUPPLY FAN
1.5
5
TANK VOLUME (GALLONS) 22
34
180
200
ACCEPTANCE VOLUME (GALLONS) 12
19
--
1.27
TANK DIAMETER (INCHES) 12
16
30
30
MANUFACTURER TACO
TACO
TACO
TACO
TYPE BLADDER
BLADDER
BUFFER
BUFFER
MODEL NUMBER CBX-84-125B
CX -130-125
BTH018OF02-125N
STH020OF03-125N
LOCATION BASEMENT
BASEMENT
BASEMENT
BASEMENT
OPER WT, (LBS) 250
400
2,070
2288
ACCESSORIES 1, 2, 3, 4, 5
1, 2, 3, 4, 5
2, 3, 5, 6, 7
2, 3, 5, 6, 8
1. REPLACEABLE BLADDER.
2. INTEGRAL FLOOR STAND.
3.125 PSI WORKING PRESSURE.
4. GAUGE GLASS.
5. AIR VENT CONNECTION WITH FIELD PROVIDED HIGH CAPACITYAUTOMATIC AIR VENT.
6. INTERNAL BAFFLE.
7. HEATING HOT WATER APPLICATION -1 " INSULATING BLANKET
8. CHILLED WATER APPLICATION -1 "ARMAFLEX INSULATION.
AIR HANDLER SCHEDULE
ABBR.
DESIGNATION
DESIGNATION
A11-1
AH -2
HEATING INPUT (MBH)
1,250.0
CAPACITY OUTPUT (MBH)
SUPPLY FAN
1.5
5
SUPPLYAIR FLOW (CFM)
18,500 TOTAL 3 x 6,167 CFM
11,500 TOTAL (3 x 3,833 CFM)
EXT. SP, SUPPLY (IN. WC)
1.80
1.8
EXT. SP, RETURN IN. WC
1.27
1.14
T.S.P. IN, WC
4.05
4.00
MIN. O.S.A. (CFM)
1,850
1,000
HP/BRAKE HP
22.5 (3 X 7.5 HP) /3 X 5.69
15.0 3 X 5 HP /3 X 4.27
VOLTS/PHASE
208/3
20813
FAN TYPE/ QTY.
PLENUM I3
PLENUM l 3
OPERATING RPM
2,010
3,613
ACCESSORIES
1,2,3,4,5,7,8,9
1,2,3,4,5,6,8,9
OPTIONS
1 THRU 9
Condensate Droln
COOLING COIL
N.G.
Normally Closed
SENSIBLE (MBH)
570.5
341.4
TOTAL MBH
626.0
376.3
COIL SIZE FT 2)
35.5
22.8
NUMBER OF ROWS
8
8
AIR PD IN. INC)
0.77
0.45
EADB/EAWB OF)
80163
80163
LADBA.AWB (OF)
51.5151.1
52.5151.5
EWT /LWT O
45155.7
45155
GPMIPD (FT)
11713.1
75.317
VALVE TYPE
3 -WAY
2 -WAY
GOVT.
Conthuatl n
HEATING COIL
P.P
Peter Plug
CAPACITY (MBH)
647.1
411.9
EADBILAWB aF
60/9Z4
60193.1
COIL SIZE (FT.2)
16.60
11.40
AIR PD (IN. WC)
0.56
0.56
EWT 1LWT OF
1801145
1801145
GPMIPD IFT.
38.2111.3
24.314.80
VALVE TYPE
SWAY
3 -WAY
-- A5FD.
S.F.D.
w/ / � e Damper
FILTER
D.C.H.
DomestG
ic old Harter
AREA (SQ. FT.) X DEPTH (IN.)
46.7X 4" DEEP
35.OX 4"DEEP
MANUFACTURER
CAMFIL
CAMFIL
TYPE
MERV 8
MERV 8
W
P.L.
Door. Lower
MANUFACTURER
SEASONS 4
SEASONS 4
TYPE
MULTI ZONE
MULT!-ZONE
LOCAT70N
BASEMENT- GRADE
BASEMENT - GRADE
OPER. WT (LBS)
6,450
4,650
ACCESSORIES
1 THRU,9
i THRU 9
1, SINGLE PVIN I YVWI=K UV/V/Vt:U IMV.
2. EXTERNAL FILTER GAUGE
3. 2" SPRING DEFLECTION ON PLENUM FAN MOUNTINGS.
4. (3) VFD`S PER AIR HANDLER CONTROLLING (3) SUPPLY FANS.
5. UNITS ARE MANUFACTURED AS DIRECT REPLACEMNT UNITS FOR EXISTING MZ AIR HANDLERS.
6. LENGTH CAN BE INCREASED A MAXIMUM OF 12" FOR EACH AIR HANDLER
TO ACCOM P IODATE SERVICE AND ACCESS.
7. WIDTH, HEJ_�HT, AND DUCT CONNECTIONS SHALL BE COORDINATED
TO ACCOMMODATE EXISTING CONDITIONS AND ZONE AIRFLOWS.
8. ENTIRE AIR HANDLER MUST BE SHIPPED KNOCKED DOWN AND ASSEMBLED IN PLACE
AS REQUIRED TO BRING MATERIAL INTO BASEMENT INTACT
9. CAREFULLY COORDINATE WITH FIELD CONDITIONS PRIOR TO SUBMITTING BID.
PUMP SCHEDULE
ABBR.
DESIGNATION
DESIGNATION
HWP-1
CWP -1
HEATING INPUT (MBH)
1,250.0
CAPACITY OUTPUT (MBH)
HORSEPOWER
1.5
5
VOLTSIPHASE
208/3
20813
RPM
1760
1760
GPMITDH (FT.)
63130
220145
EFFICIENCY (%)
61
77
MANUFACTURER
TACO
TACO
TYPE
IN-LINE
IN-LINE
MODEL NUMBER
SKV-2006-1.5
SKV-3007-5
LOCATION
BASEMENT
BASEMENT
OPER. WE (LBS)
100
152
ACCESSORIES
1,2,3,4,5,7,8,9
1,2,3,4,5,6,8,9
7. S 1ANUH/VN PLA I E.'?. Z&L;UKC I U I✓VIVt;KG r c rHN VVI r r7 vo n/Vvnvr- vva- I Q-
2. BRONZE FITTED
3. GAUGE TAPS
4. FIELD INSTALLED SUCTION DIFFUSER AND MULTI-PURPOSE VALVE ON OUTLET,
5. FACTORY INSTALLED AND WIRED VFD AND CONTROLS
6. SET UP FOR SELF SENSING CONSTANT PRESSURE VARIABLE FLOW 117 - 200 GPM FLOW.
7. SET UP FOR SELF SENSING VARIABLE PRESSURE CONSTANT FLOW.
8. MODBUS PROTOCOL.
9. 6 DI12 DO11 AI11 AO
BOILER SCHEDULE
ABBR.
DESIGNATION
B-1
ABBR.
ITEM
HEATING INPUT (MBH)
1,250.0
CAPACITY OUTPUT (MBH)
1,088.0
FUEL
NAT. GAS
TURN DOWN
7:1
Access Door
VOLTSIPHASE
115/1
FLA WITH PUMP OPTION
15.5
Above Finished Floor
PRESSURE RELIEF (PSIG)
60
GPM
63.0
PD (FT.)
6.9
EWT (OF)
145
LWT (OF)
180
MANUFACTURER
RAYPAK
TYPE
MVB
MODEL NUMBER
H7 -153A
LOCATION
BASEMENT - GRADE
OPER. WT. (LBS)
780
OPTIONS
1 THRU 9
1. FACTORY START-UP
2. 8" VERTICAL STAINLESS STEEL VENT, CATEGORYIV,
AL -294C, TO VENT CAP ABOVE ROOF.
3. MODULATING FIRE, 7:1 TURNDOWN, CUPRO-NICKEL HTX.
4. CALIFORNIA CODE, PUMP DELAY, LOW NOX
5. VENT PIPE CONDENSATE CONNECTION
AND DRAIN TO FLOOR SINK
6. COMBUSTION AIR INTAKE FROM MECHANICAL ROOM.
MAINTAIN EXISTING COMBUSTION AIR LOUVERS.
7. LOW WATER TEMP VALVE. FIELD PIPED.
8. IN-LINE CIRCULATOR PUMP FURNISHED WITH
BOILER PACKAGE, FIELD INSTALLED AND WIRED.
Air Conditioning Legend
SYMBOL
ABBR.
ITEM
SYMBOL
ABBR.
ITEM
A.G.
Air Conditioning
H.W.R.
Heating hater Return
®
A.D.
Access Door
ti.HS.
Heating Water Supply
AFF.
Above Finished Floor
INT.
Internal
A H.
Air Handler
co
N
LOG.
Location
■
H.T.
Huss Tyner
H
M.O.
Motor Operated
13.V.
Hutterf ly Valve
0)
(W
New
en Ljj
CD.
Condensate Droln
0
N.G.
Normally Closed
Ills
C.E.
Gelling Exhaust Register
N.I.G.
Not in Contract
G.W.R.
ChilledMot Water Return
O
N.O.
Normally Open
CIY45.
Ghll lod[44ot Water Supply
i`.
05•A•
Outside Air
C.OhiB.
Gombustlon
.4
O.B.D.
Blade Damper
Exp.. 9-34---144
CONN.
Connection
- -*-
PDJCO.
Point of Connection
GOVT.
Conthuatl n
�-�"
P.P
Peter Plug
G.R.
Gelling Return Register
PROV.
Provide
CA.6.
colling
P.R.V.
Pressure Reduchg Volvo
®
6.5.
Catling Supply Ragistor
SIM.
51mllor
--
C.V.
Check Volvo
-- A5FD.
S.F.D.
w/ / � e Damper
---
D.C.H.
DomestG
ic old Harter
�.
.»• ,
'' 1r r
'14/1 /�.M 0
DIA.
Diameter
S.M.
Sheat Metal
W
P.L.
Door. Lower
-��
5.0 V.
shut Off Valva
DN.
Down
5.P5.T.
Single Pale Single Throw
MECHANICAL
D.PD.T.
Double Pole Double Throw
8
STAT
Thermostat
D.T.R.
Duct Thru Roof
Designer:
`-LRF.
Surface
(E)
Existing
(TYP)
Twk-ol
M-1
Fan
U.G.
U.6'.
Under ound
E.MS.
gy 5ystom
U.N.O.
Unless Noted Otherwise
EXH.
Exhaust
-�
Y.D.
Volume Damper
---AFD.
FD.
Fire Damper r1/ acc. panel
H/
With
Donn
Gornectton
FlexibFloor
Hall Return Register
FLR
Wall Supply Register
Hall
F.T.R.
Flue Thru Roof
Duct w/ Acoustic Uning
Furn.
Fvrnace
} } } }
T.V.
Turning Vales
GA.
Gauge
Extractor
GAL.
Galion
&ALV.
6ahranized
G.P.M.
Gallons per Minute
602 SENSOR
GRD.
Grade
ca
6 V.
601te Valve
Union
Reducer or Increaser
U
1715 CHESTER AVE. BAKERSFIELD, CA 93301
LOCATION PLAN: NO
SCALE
General Pro iect mote:
1. Coordination of work: Layout of materials, equipment and systems is
generally diagrammatic unless specifically dimensioned. Some work may be
shown offset for clarity. The actual location of all materials, piping,
ductwork, fixtures, equipment, supports, etc. shall be carefully planned,
prior to installation of any work to avoid all interferences with each other,
or with structural, electrical, architectural or other elements. Verify the
proper voltage and phase of all equipment with the electrical plans. All
conflicts shall be called to the attention of the architect and the engineer
prior to the installation of any work or the ordering of any equipment.
2. All penetrations of surfaces by piping and conduit shall be caulked.
3. Any and all surfaces affected by the demolition and installation of the
mechanical, electrical, and related components shall be patched back and
restored to original condition. Patch and paint with materials, colors, and
textures to match existing. Carefully coordinate demolition and restoration
scope of work prior to submitting bid.
4 Demolition of any component shall include all hangers, supports, bracing,
wiring, etc. All sub systems related to component slated for demolition
shall be removed and the affected surface patched back to match existing.
5. All piping, equipment, conduit, etc. shall be supported and braced in
accordance with the 2010 California Building Code.
6. No roof joists or other structural members are to be cut. Use existing
roof openings and/or fit ducts between existing joists. Any modifications
to structural members require approval from the architect and DSA prior
to performing any work.
MEP Component Anchorage Notes:
All mechanical, plumbing and electrical components shall be anchored and
installed per the details on the approved construction documents. Where no
detail is indicated, the following components shall be anchored or braced to
mees the force and displacement requirements prescribed in the 2010 CBC,
Sections 1615A.1.12 through 1615A.1.22 and ASCE 7-05 Chapter 6 and 13.
1. All permanent equipment and components.
2. Tel: porary or movat: , equipment that is permanently attached (e.g. hard
wire, i) to the build: g utility services such as electricity, gas or water.
3. MOV ble equipment w 'ch is stationed in one place for more than 8 hours
and heavier than 4 ) pounds are required to be anchored with
tern; <orory attachmf, t s.
Piping, Ductwork, &
Electrical Distribution Svstem Bracina Note:
Piping, ductwork, and electrical distribution systems shall be braced to resist
the forces prescribed in ASCE 7-05, Section 13.3 as defined in ASCE 7-05,
Section 13.6.8, 13.6.7, 13.6.5.6, and 2010 CBC Sections 1615A.1.20,
1615A.1.21 and 1615A.1.22.
AS -BUILT
11-29-14 10.3' /04
Sheet Index:
M-1
M-2
M-3
M-4
M-5
M-6
M-7
M-8
M-9
M-10
M-11
M-12
E-1
E-2
E-3
Mechanical Schedules and Notes
Mechanical Basement Plan - Demolition
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Title 24
Title 24
Title 24
Electrical
Electrical
Electrical
Basement Plan - New Work
Plan - 1st Floor
Plan - 2nd Floor
Roof Plan
Details
Details
Notes
REVISIONS
BY
s -s-2014
1 FIELD REVISION
0
i
t+
J
co
N
U
0))
Ln
LOW
H
+"
z+f"".
.....
0)
' W
en Ljj
U
0
�
ill
ti
Ills
41-1
O
U7
i`.
No. M26578
m
Exp.. 9-34---144
z
J m �
LIJ z
�w
W o
c�
M r , r,
LL *L..1, W Q rn
LtJ > v
w
W Q.. W W
'17=
U)
W � �
LL ~ �' L0 W
W
r' x
�.
.»• ,
'' 1r r
'14/1 /�.M 0
U J
W
W
MECHANICAL
SCHEDULES
AND NOTES
,N
6-5-2014
AS NOTED
Designer:
M.B.
Joh: _ 13025
Sheet:
M-1
❑O
0
V
r
I
}-----------{-----------
�I
/I I
I I
I I
I I
j I
J10
MTM
X
I
KEY NOTES:
1. Remove existing air handler, all related
supply ductwork back to elbow at riser(s),
return duct from air handler connections
to connection at duct main, all related
piping, supports, controls, etc. See new
work plan for points of connection of new
work to existing. Field determine exact
demolition scope for existing ductwork as
required to install new air handler and
re—connect.
2. Remove existing fan coil and duct work as
required to install and re—connect new
fan coil. See new work plan. Re—use
existing return filter bank.
I Remove existing R-22 refrigeration
compressors, all related piping between
compressors and air handlers, hot gas
=yid liquid lines back to evaporative
c,)ndenser on roof, supports, piping,
c >ntrols, e -,u.
4. F"13move exi..ting boiler, all related piping,
c<- mo back jas past shut—off valve, flue,
c- controls etc.
5. R. move e, -sting hot water circulation
v. np, all . elated piping, controls, etc.
6. Re and airflow at this grille prior to
det olition and re --set to match air flow
wit new system.
7. Any ind all mechanical items, electrical
item related piping, conduits, supports,
etc )t used for the new mechanical
cyst n shall be removed from basement.
All : rfaces shall be cleaned prior to
instc, ation of new work. Coordinate exact
dem, scope in field.
8. Refrigerant shall be evacuated and
- -- recovered prior to demolition and delivered
to the owner for their use.
! ! 9. Cap duct and remove duct to (E) floor
grille
(E) floor grille has been obaondoned
t
�. (7D
MECHANICAL BASEMENT PLAN - DEMOLITION.
AS -BUILT
11-29-14 /D. -/0
1. New air handler installed in same location as existing.
Air handler shall be built in sections and knocked down
as required to move thru standard 32"x 78"door, down
existing stairwell into basement, and assembled in place.
Modify existing zone and return ductwork as required to
make connection, allow for free movement of all
dampers, and to seal ductwork to air handler. See
detail A/M-7 for air handler anchorage detail.
2. New boiler with flue piping routed thru existing chimney
to rooftop termination above top of chimney opening.
Paint roof cap to match building wall color. Demo and
patch / seal chimney as required to install and secure
piping. See boiler schedule for piping materials required.
See boiler detail D/M-8 .
3. Point of connection, new gas piping to existing. Confirm
exact location in field. Rise to boiler connection and
►►►`\`\`\"'�����///JJJ///
REVISIONS
BY
6-5-2014
21 TYPICAL — 5 ZONES.
FIELD REVISION
(E) ZONE 7 S.A. RISER.
_
(E) ZONE 5 S.A. RISER.
`,ID
M
0
(E) ZONE
�J
L0
S.A.
`
.
�-�- � Z
/
(E) ZONE 3 S.A. RISER.
U
LLJ LL
o
(E) ZONE 4 S.A. RISER.
c�
a�
T�
0
L:
TO T.I. ROOM
RE—BALANCE GRILLE
TO MATCH PRE—TEST
FU S10
AIRFLOW.
l�
(E) BELOW GR> DE
RETURN DUCT °CAIN.
AH
2
1
1
21 (E) ZONE 1 S.* -.— —
RISER.
21 (E) ZONE 2 S.A. RISER. —
(E) O.S.A. DUCT DROP. —
r (E) R.A. DROP FROM 2ND FLOOR. --
1
connect gas piping with new plug valve and dirt leg.
4. Boiler low water temperature valve. Provided with boiler
package. Field installed.
5. Boiler circulating pump. Furnished with boiler package,
field installed and wired back to boiler control terminals.
6. New hot water circulating pump. See detail E/M-8 for
pump trim and anchorage.
7. New hot water buffer tank. Refer to detail H/M-7 for
anchorage.
8. New hot water loop expansion tank. Refer to detail
G/M-7 . Field determine point of connection for
make—up—water and pipe to tank connection with 12 psi
PRV (adjustable) and reduced pressure backflow
preventer.
9. Hot water coil connection to air handler hot deck coil,
typical. Refer to detail B/M-8 for 3—way valve
connection (AH -1) and detail C/M-8 for 2—way valve
F 3
10. New chilled water circulating pump. See detail E/M-8
for pump trim and anchorage.
11. New chilled water buffer tank. Refer to detail H/M-7
for anchorage.
12. New chilled water loop expansion tank. Refer to detail
G/M-7 . Field insulate with 1 "Armaflex insulation. Field
determine point of connection for make—up—water and
pipe to tank connection with 15 psi PRV (adjustable)
and reduced pressure backflow preventer.
13. 1-1 /2" chilled water supply and return drop to AH -2.
See 2—way coil connection detail A/M-8 .
14. 3"chilled water supply and return drop to AH -1. See
3—way coil connection detail A/M-8 .
15. CWS&R and HWS&R piping to FC -3 fan coil 2—way
valve connections.
16. New FC -3 to be installed in same location as existing
cull connection (AH -2 & C— ). ,-
(E) BELOW GRADE
RETURN DUCT MAIN.
--------------------------------
r--l= -1 F--,_�1
I1<==---i Le
L— — — — — — — — — — — — — — — — — — — — — — — — — — — — — — —•— — —
4" C.W. S&R
ROUTED TO ROOF.
--------------------------i
I
(E) ELECTRIC STORAGE
WATER HEATER.
CAP UNUSED DUCT
2-1/2" H.W.S.
ROUTED OVER HEAD.
to be removed. Suspend from structure above with (4)
1 "deflection spring isolators. Install with flex
connections at connections to existing duct systems.
Field modify duct systems as required for installation.
17. Existing outside air grille in fan coil ductwork. Balance
to 300 CFM.
18. Duct smoke detector located in both the hot and cold
deck supply plenums, two per air handler. See detail
F/M-8 .
19. Install motorized O.A. / economizer damper in outside
air duct and balance outside air total (for both air
handlers) to 2,850 CFM, minimum. Provide D.B.
controls to go full open for first stage cooling.
20. New EMS panel. See control notes . 115 power
connection provided under electrical scope. Power
distribution to control items beyond point of
connection of 115v power is to be provided under the
scope of the EMS contractor. 115/24v transformer
and all control wiring provided under the scope of the
EMS contractor.
21. Provide motorized modulating damper in duct horizontal
run (or riser). As req'd to modulate zone air flow from
100% to 20% in relation to zone demand. Field
commission air flow at high and low set—points in
conjunction with air balance contractor.
,..rte..' ,
I I i1 11/I I I
MECHANICAL BASEMENT PLAN NEW WORK
I 11 /l
IVI
I 111
I
I
I
I
I
I
I
I
I
�-- (E) FILTER BA'.
PROVIDE CLEA
FILTERS PRIOR
SYSTEM AIR
BALANCE.
(E) R.A. RISER
THRU FLOOR.
(E) S.A. RISER'
THRU FLOOR. T
' AS -BUILT
11-29-14
w
REVISIONS
BY
6-5-2014
FIELD REVISION
`,ID
M
0
m
N
�J
L0
0
Z
.
�-�- � Z
r -ca
< W
U
LLJ LL
o
c�
a�
U)
0
FU S10
No. M26578ri n
Exp. 9-30-14 /*
c4'OF r\� i
k.\
0
_Z
0
0 J
J D
W M Z
I U) W
,>)
cc
W Qa
W > 0 �c
w
� W J Wo
w
m W L)i
Ll.. ~ � w
Z ;'
<
O WOm
>
CL
C.7 J
W
W
0
MECHANICAL
BASEMENT PLAN -
NEW WORK
Date: 6_5-2014
Scale:
AS NOTED
Designer:
M.B.
Job: 13025
Sheet:
M-3
05
150
KA
400 STORAGE
.4 MECHANICAL PLAN - 1S1
80
_UG
m n
u
AS—BUILT
11-29-14 /0
REVISIONS BY
&5-2014
Ai FIELD REVISION
QEtQFESSf0,
No. M26578
rn
(D
6-5-2014
Scale:
CY)
AS NOTED
(Y)
J
C14
C)
U)
0)
Lr)
0
WD
LO
Z
W
z
w
Z
C1
<Wz
Cl()
0)
15;
W
uj 'C")
> 0)
Lij
>
0
<
seo
iii
00
W
n
Lj_
0)
Lu w
m U-
0
LL
w
X
ry0
0
z
W
�uej
<
<
>
Lr)
0
r
QEtQFESSf0,
No. M26578
rn
MECHANICAL
PLAN -
1 ST
1ST FLOOR
Date:
(D
6-5-2014
Scale:
z
AS NOTED
Designer:
K13,
C)
13025
WD
M
z
u)w
W
15;
W
uj 'C")
> 0)
Lij
>
U
<
seo
00
W
n
Lj_
0)
Lu w
m U-
0
LL
w
X
C/)
X
0
z
W
�uej
<
<
>
co
0
r
w
w
0
MECHANICAL
PLAN -
1 ST
1ST FLOOR
Date:
6-5-2014
Scale:
AS NOTED
Designer:
K13,
Job:
13025
Sheet:
M-4
2 3 4 5
A
MECHANICAL PLAN 2ND FLOOR
SCALL' 118--f—W A
AS -BUILT
11-29-14 /0,3,
REVISIONS BY
6-5-2014
Ai FIELD REVISION
FESS11
co No.
M26678
to
Exp, 9-30-14
CAO
(D
co
Scale:
z
0
t4i
Designer:
J
ce)
Cq
Job:
13025
0
U)
W
z
w
Z
U)
W
W
z
now"
CN
CN
t -
U)0
<
w
co
0)
ca
z
LLJ
0
w
LLJLu
LL
LL
w
Lo
LLJ
0
z
w
0
<
>
CL
0
r
w
Lr)
t.. -
r_1
FESS11
co No.
M26678
to
Exp, 9-30-14
CAO
MECHANICAL
DETAILS -
2ND FLOOR
Date:
(D
6-5-2014
Scale:
z
AS NOTED
Designer:
M.B.
Job:
13025
mF_
W
Z
FL
U)
w
W
;E
W
.
LLJ
>
wU
MOM -
w
LLJLu
LL
LL
w
Lo
LLJ
0
z
w
0
<
>
CL
0
r
w
MECHANICAL
DETAILS -
2ND FLOOR
Date:
6-5-2014
Scale:
AS NOTED
Designer:
M.B.
Job:
13025
Sheet:
M-5
1
--------------------- - - --- --
i
((I
l�
MECHANICAL ROOF PLAN - REMODEL
SCALE. 1/8.4-0'
�5
I
U
MECHANICAL ROOF PLAN - DEMOLITION
SCALE:- 1118*4-e
i
I; I
I
1 !
1
I I I!
li
� FJ
Key Notes
1. Remove existing evaporative condenser,
BAC Model VCL-108, 6,770 lb. operating
weight. Existing concrete support pads
and steel support beams to remain.
Demo existing drain piping.
2. Remove existing chemical controller, tank,
and related items.
3. Remove existing refrigerant piping system
in it's' entirety including above roof back
to basement. Remove all un—used
pipe supports and hot mop patch roof to
match existing.
4. Demo existing make—up—water pipe to
downstream of existing hose bibb.
5. New air cooled chiller, 5,026 lbs.
operating weight.
6. Existing steel support rails over concrete
columns.
7. Existing concrete column, typical of six.
S. New steel beams to line up with isolator
support points on chiller. Six point
isolation with 2? spring deflection. See
detail C/M-7.
9. X = spring isolator location, typical.
1 4? chilled water supply and return piping
routed above roof on Dura—Blok D13-6
pipe supports. Connect to chiller w/
butterfly isolation valves, instrument wells,
and Pete's plugs.
11. Extend piping thru roof. Provide new roof
opening and new roof flashing installed
with hot mop patch. Route down
existing chase to basement.
AS -BUILT
11-29-14
REVISIONS
BY
6-5-2014
1 FIELD REVISION
W
J
0
Lr)
W
W
U
0
t
.,Bit
q
t�
FE SS
1110 ESS
No. M2657£i
m
Exp. 9-30-14
q
OF CA1.NF
0
Z_
O
C) J
W m
Z
LL„ V) W
Cf) M
rn
L.L. .� W Q
> C) W
�W/
3..W o
�.. Lij
U u,
LL ~ W (1)
V- w
x
QW
15; <
>
CL
0 r
W
W
MECHANICAL
ROOF PLAN
Date: 6-5-2014
Scale:
AS NOTED
Designer:
M.B.
Job: 13025
Sheet:
M-6
4:
COMBINATION REDUCING/
RELIEF VALVE, TO PROVIDE.
12 P.5.1. MAKE-UP WATER
FOR H.W. AND 15 P.5.1. FOR G.W.
(E) MAKEUP WATER
FIELD DET. POG.
FEBGO 525Y BACKFLOW
PREVENTER. W/FUNNEL DRAIN,
ROUTE P DRAIN TO (E) F5.
GLOBE VALVE. '
NOTE i
I. MAX WEIGHT FOR EXPAN51ON
TANK DETAIL = 400 Ib.
TO SYSTEM RETURN LINE
CLOSE TO PUMP SUCTION,
SAME 517E AS MAKEUP LINE.
TACO HY-VENT
AUTOMATIC AIR
BLEED VALVE. -
MAKEUP WATER -EXPANSION TANK, ET -1, ET -2
�
rw Aa"
1 .g r+ w <t
CHILDWWT
.:
DUCT SMOKE DETECTOR COMPLETE
WITH PILOT AND ALARM VISUAL
INDICATORS ON THE HOU5ING
FRONT PANEL. MANUAL RESET
SWITCH, AND (2) FORM "C" ALARM
CONTACTS TO FUNCTION AS FOLLOWS
UPON DETECTION
ONE N.G. CONTACT SHALL OPEN
AND BREAK THE SUPPLY FAN
ONE N.O. CONTACT SHALL CL05E
AND 516NAL THE BUILDING FIRE
ALARM PANEL
FAN INTERLOCK WIRING BY
EMS CONTRACTOR.
DUCT
DIAMA"M
n.
FIRE ALARM PANEL
INTERLOCK WIRING BY
ELECTRICAL CONTRACTOR
(WHERE APPLICABLE)
NOTES:
I. DETECTOR PROVIDED BY EMS CONTRACTOR.
2. DETECTOR SHALL BE C5FM AND U.L. LISTED.
SMOKE DETECTOR
SIDE VIEW
-ow.'OILER PIPINGAND
FETE'S PLUG, (TYR)
REDUCER, (TYP)
FLEX CONNECTION,
(TYPICAU.
GATE VALVE,
(TYPICAL) —
STRAINER WITH
BLOWDOWN VALVE
4 HOSE THREAD. —
5ECURE BASE TO
CONCRETE WITH 5/8"0x5"
EMBEDMENT CONCRETE
ANCHORS. (TYP. OF 4) —
IN -LIME PUMP
SCALE: N.T.S.
NON -SLAM
GHECK VALVE.
BYPASS FEEDER
CONNECTION SEE
DETAIL 5/M-1.
FIN15H FLOOR.
1/4" 6A6ECOGK AIR
VENT AT HIGH POINT.
PROVIDE 6" L
4
2 -WAY CONTROL VALVE.
AIR
FLOW
PETE'S PLUG,
(TYPICAL)
UNION, (TYP)
1/2" H05E BIBS.
BALANCING COCK.
PLUG VALVE.
VALVE,
.,AL)
Qi--�--�
NOTES:
I. 344AY CONTROL VALVE PIPING 5HOWN DASHED.
2. SEE PLANS FOR PIPE 51 ZE5.
COIL - TWO WAY/THREE WAY COOLING
SCALE: N.T.S.
COIL
SCS _ N.T.S.
1/4" 6AGECOCK AIR VENT
AT HIGH POINT. PROVIDE
6" LONG TUBE.
3 -WAY CONTROL VALVE.
PETE'S PLUG.
(TYPICAL)
THREE WAY
1/4" 6AGECOCI•'. AIR VENT
AT HIGH POINT- e"ROVIDE
6" LONG TUBE.
�a
— BALANCING COCK.
I o
GATE VALVE.
(TYPICAL)
:LOW < PLUG
VALVE.
UNION, (TYP)
1/2" H05E BI BB.
NOTES:
1. 5EE PLAN5 FOR PIPE 51ZE5.
HEATING
Z_l
BALANGING GOGK.
2 -WAY CONTROL VALVE. r � GATE VALVE,
(TYPICAL)
HeZ-11 F-----
_ COIL.
<AIR
FLOW
C I ---I ol----*---�
y 1/2" H05E BIBB.
PETE'S PLUG.
(TYPICAL) t//
UNION. (TYP)
COIL - TWO WAY HEATING
SCALE: KT.S.
NOTES:
I. 5EE PLAN5 FOR PIPE 51ZE5.
AS -BUILT
11-29-14
PANEL
i ItiL s
1fLOC.: SEEP
kvi
�� i•i �
CONDUIT CONCEALED UNDER FLOOR OR PEL.OW GRADE
-.
CONDUIT STUPPED OUT APP GAPPED
•MININNI
t fi ii : If
GOt+PUIT TURNED DOWN
NATO MARKS Iff"TE NO. OF & WIRES N CURE 61U
• i *• i
A-3
(S) MAX. IN iG., NO MARKS = 2#12
i f ROOF
GIRGUIr(S).
__-----__=
SAWCIJT
�-
♦ • Y _ mmoomNONE
mono
_
1000 DATA
8 • �����,�■
SIGNAL TERMINAL CAPIPET, SURFACE & MIJ6H
IM.10„■01
FLUORESCENT FIXTURE
2
OUTLET DATA: PAR IND�ATE5 WALL MOUNT, LETTER W"TES
a�
SWITCH CONTROL, NO. INDICATES CIRCUIT.
Q
SURFACE FIXTURE ON FLUSH aJTLET.
®
RECE55EP Ftxr zE WITH jjwrION Da FOR nn Wm
®
EXIT LIGHT WITH ARROWS AS SHOWN ON PLANS, WALL AND
6ELIW_1 MOUNT.
®
LOW LEVET. EXIT 516N, +6" AFF, +k" FROM DOOR 4WI5
A
L16HT FIXTURE DE.516NADON, LETTER INDICATES TYPE,
100
NO. INDICATES WATTAGE. SEE FIXrU ZE SCHERI E.
FG
ME6-HANGAL EQUIPMENT DESIeNATION.
I
SEE MELHIANIGAL DRAWINGS.
SPECIAL RECEPTACLE - SEE PLAN
METER
(D
FU19H FLOOR RECEPTAaE
MMENSE
IIMINSIONOW
RECEf r&L.E, DUPLEX, I5A, 125V, NEMA 5-1* +IS° UNO
1100111001pow
AFLEX RECEPTACLE MTD. APOVE PA(K6PLA6H
fkJT'L.EX RECEPTACLE W/LOWER HALF SWITCHED
GFI
1100111001
=
i 7UPL-E DUPLEX CZE EPTAaL
BILIN& REC&PI-ACLE
-
RE Aff`T&4f, DIE EX, 20A, (25V, NEMA 5 -UR +lr UNP.
(.
IM=0_0�°
1
d"11001Im
k"11 -OR, NO. INDICATES HORSEPOWER
0
0104 a
NO 11001
MAINE 0110101=0
9:� } ,-i
-".MENS
€
NOTEC a
L T
COMPMTIONI t ACU- 6 STARTER MTH DISCONNECT 51VI W AND
FUSE.
MAK"FIG MOTOR STARTER W/00UADS IN EACti PHASE
;]
DIMMER W/INTEGRAL "ON-OFF" SW.
W-11=1100110100101
im
IMMENSE
' tOT06ELL
1100M
MCKE DETECTOR
LEPHONE/COMPUTER/DATA OUTLET, TWO 6ANEv PDX W/I GANG
c A ERPLATE & GROMMETED OPENING +IS" U.NO.
Q
PLE TV OUTLET +IV' U.N.O.
1 .7TION SENSOR
L I ;STING SWITCH
S
4:.16LE POLE SWITCH
S2
'SLE POLE 6NiT(,h QIP TOWL TYPE RATED AT
20A (20/ZTN AG. +42" UND.
S3
HiRi=E WAY SWITCH
e
�VIT641 W/PILOT LT.
MINIMUM BKR
1-,
10,OOOAMPS
I
208V3m
46OA
i
P15CONNEC , (E)EVAPORATIVE
CONDEN5EF, TO BE REMOVED
_ —r
E—ON UN15TRUT
= 6OOA5
500AF
3P, INP
1 I L:1
,H, �I
(;,_3"G. LM/ 3#300MCM,1#3/0 EAC.
INSTALL ABOVE R00F G. '
DURA -BLOCK 5UPPORT•.:rt ,
T-4
PROVIDE PULL13OX COVER OPENING
W/KELLON5 6RIP5 ON GABLE
DOWN TO BASEMENT.
llCOORDINATE EXACT
�-- _ ROUTING IN FIELD
ELECTRICAL ROOF PLAN
SCALE:
GENERAL NOTES
I. VISIT JOP SITE APP VERIFY EX16rIN6 GOWITIONS PRIOR TO 151D.
2. THE ELECTRICAL WORK SHALL PE INSTALLED IN ACCORDANCE WITH THE
CALIFORNIA ELECTRICAL CODE AND ALL APPL16APL.E LOCAL ORDINANCES,
WHERE PIANS CALL FOR A HIGHER STANDARD THAN APPLICAPI..E GORES,
THE PLANS SHALL 6CNERN.
3. CONDUIT RUNS ARE SHOWN DIA6RAMMATI6ALLY. EXACT LOCATIONS
5H1ALL PE DETERMINED IN THE FIELD TO SUIT FIELD GOPPITIONS.
4. ALL ELEGTRVAL EQUIPMENT, APPLIANCES AND LIGHTING FIXTURES
SHALL 15E LISTED PY A RECOGNIZED TEST LAP AND BEAR THAT LAPEL
GP APPROVAL.
5. CONTRACTOR SHALL FURNISH, INSTALL AND CONNECT ALL MATERIAL
APP EQUIPIVENT FOR THIS WORK UNLESS OTHERWISE NOW.
6. FURNISH DISCONNECT SWITCHES AT REMOTE MOTORS.
7. ALL SPACES AS INDICATED ON PANELS OR 6WTCHWARDS SHALL PE
COMPLETE WITH HARPWARE ANP PIJ551N6 FOR P rURE PREAKF-R. OR
SWITCH.
5. 6RO.WIN6 APP POPDINC1 SHALL 15E PER GORE PL.U5 ANY ADDITIONAL
PROVISIONS SPECEIED OR SHOWN ON DRAWINGS.
9. ALL GIJNDUIT RUNS SHALL CONTAIN A GORE SIZEP G(ZEEN 6R01M WIRE.
10 THESE PLANS ARE NOT COMPLETE UNrL APPROVED PY THE AUTHORITY
HAVING a R15DICTION.
11. ALL CONDUCTORS SHALL PE IN CONDUIT.
P. ALL CONDUCTORS SHALL PE COPPER WITH TYPE THHN/THWN INSULATION.
:
_LJ
EL-EGTf `.IGAL NOTE.
I. SEAL ALL ROOF PENETI4 ATION5
1NATE.T1 GHT
2. GOOF -:.D 1 NATE EXACT EGF I I PMENT
LOG/`.TIONS AND REG2U I R MENTS
WITI-£ 11115TALLER
AS -BUILT
11-29-14
—
C-a"IT EXISTIN&
Ca"IT CONCEALED IN WALL OR CEILING
— —
CONDUIT CONCEALED UNDER FLOOR OR PEL.OW GRADE
CONDUIT STUPPED OUT APP GAPPED
C�---
CONDUIT TURNED UP
GOt+PUIT TURNED DOWN
NATO MARKS Iff"TE NO. OF & WIRES N CURE 61U
6aRIT (3) MAX. IN l/2" C., (5) MAX. N 3/4" G.,
A-3
(S) MAX. IN iG., NO MARKS = 2#12
Hak RUN: LETTER tV"TES MEL, L+LMER(S) SATES
GIRGUIr(S).
__-----__=
SAWCIJT
�-
6ROUPP GONNF. ,TION
P16TRINUTM SWITC WARD OR PANEL
_
PANEL, PRANCH CIRCUIT TYPE, SURFACE ANP H-USH
®�
SIGNAL TERMINAL CAPIPET, SURFACE & MIJ6H
FLUORESCENT FIXTURE
2
OUTLET DATA: PAR IND�ATE5 WALL MOUNT, LETTER W"TES
a�
SWITCH CONTROL, NO. INDICATES CIRCUIT.
Q
SURFACE FIXTURE ON FLUSH aJTLET.
®
RECE55EP Ftxr zE WITH jjwrION Da FOR nn Wm
®
EXIT LIGHT WITH ARROWS AS SHOWN ON PLANS, WALL AND
6ELIW_1 MOUNT.
®
LOW LEVET. EXIT 516N, +6" AFF, +k" FROM DOOR 4WI5
A
L16HT FIXTURE DE.516NADON, LETTER INDICATES TYPE,
100
NO. INDICATES WATTAGE. SEE FIXrU ZE SCHERI E.
FG
ME6-HANGAL EQUIPMENT DESIeNATION.
I
SEE MELHIANIGAL DRAWINGS.
SPECIAL RECEPTACLE - SEE PLAN
METER
(D
FU19H FLOOR RECEPTAaE
RECEf r&L.E, DUPLEX, I5A, 125V, NEMA 5-1* +IS° UNO
AFLEX RECEPTACLE MTD. APOVE PA(K6PLA6H
fkJT'L.EX RECEPTACLE W/LOWER HALF SWITCHED
GFI
,.�0(� FAULT CIRCUIT INTERRUPTING REGEPTAaE
=
i 7UPL-E DUPLEX CZE EPTAaL
BILIN& REC&PI-ACLE
-
RE Aff`T&4f, DIE EX, 20A, (25V, NEMA 5 -UR +lr UNP.
(.
U<_ -TION PDX 4" SQUARE, 1-1/2" DEEP U.N.O.
Ti � RNMTAT F.P.O. +48"
k"11 -OR, NO. INDICATES HORSEPOWER
CL,,, %K OUTLET +7-6" UN.O.
DIS ..QCT SWITCH, NON-FU6EU
9:� } ,-i
D156{ -T.CT 5WITGt1 1115W HORSEPONER RATED OR SIZED AS
€
NOTEC a
L T
COMPMTIONI t ACU- 6 STARTER MTH DISCONNECT 51VI W AND
FUSE.
MAK"FIG MOTOR STARTER W/00UADS IN EACti PHASE
;]
DIMMER W/INTEGRAL "ON-OFF" SW.
(D
'FAKER
ac
' tOT06ELL
MCKE DETECTOR
LEPHONE/COMPUTER/DATA OUTLET, TWO 6ANEv PDX W/I GANG
c A ERPLATE & GROMMETED OPENING +IS" U.NO.
Q
PLE TV OUTLET +IV' U.N.O.
1 .7TION SENSOR
L I ;STING SWITCH
S
4:.16LE POLE SWITCH
S2
'SLE POLE 6NiT(,h QIP TOWL TYPE RATED AT
20A (20/ZTN AG. +42" UND.
S3
HiRi=E WAY SWITCH
e
�VIT641 W/PILOT LT.
SN
A UJAL MOTOR STARTER
=AGN
IRE ALARM CONTROL PANEL
(51`1
ZaM FAULT CIRCUIT INTERRUPTING
LST
L _AOR SaviNG rANDr=M
MLO
; IN LUGS ONLY
��
W/:
j
H
G.O.O
ELM E1�1cx1:g07uda
( NUT ONLY
LlGH ea D98 lax
W.P.
V=:THE.RPROOF CAR ole NO I==
FYB♦O.
P! 4iSHEP PY OTHERS, INSTALL & CONNECT 13369
U.N.O.
u ESS NoTFD orHERmee
N.E.G.
w I IONAL ELEGTRIGAL CODE 158 M. ALAMM AVE.
SUITE 8
N
NO1 IN 6aZ`RAGT SANTA BARBARA CA 89105
• •G •
(805) 589-9218
(E)
FAX (805) 589-2405
ExK� IN6 email : malcneyQjmpe.net
lwww.jmpe.net
(�I
REMOVE FES/
(RL)
l
LDS
REL06ATE
`�o/M
No. E0130a3
SURFACE MOUNT EXP. 06/30/2015
U/G
UNDI=REGROUND
qr� F cT R\G�`
GWP
GOLD WATER PIPE F OF CALF
AFF
A15XE FINISHED FLOOR
HAGR
HEATING AND AIR CONDITIONING RATED CIRCUIT PREAKER
N.L.
N16HT LIGHT
NOTE: NOT
ALL SYMPa.S SHOWN ARE USED ON THIS PROJECT.
/DY 3 . /0&_
REVISIONS BY
6-5-2014
FIELD REVISION
co
0
L�
co
J N
Lr)
to
U V)
zIdH
z'
LCq
Cs1
w
�L
W
w
N
U�
I�
- o
tl)
t`...
10,
N0. M26578+
rn
Exp. 9-30-14
�rOF CAOF%
0
z
0
0 �
W 1013 Z
LL (n W
W
U W
W `„jU Q
Q WCL
ww
LL z fL W
z
Q W U r
V
W
W
NOTES, SYMBOLS,
SCHEDULES
& DETAILS,
ROOF PLAN
Date: 6-5-2014
Scale:
AS NOTED
Designer:
M.B.
Job: 13025
Sheet:
E-1
v - -
COLD BLDG. GROUND
WATER 5TEEL ROD
5/0
• r it.
-ter
(2)3"C.YV3#300M0M,I #3/0 E
� " I
-�I
G ) i�boor3 �
(N)(5) 4"G. VV4#350MGM
(N) PANEL "DP" 1#4/0 6ND EACH
I 1600A BU5
)6001-3 ) W/5 ) e01-3 )15/-3 )20/'3
b00A5
bOOAF
GH -1
AHI AH2 Hll P GWP
51 NGL E LINE D I A61RAM
5QUARE D 1 LINE
Z GUTTER AND D150ONNECT5
7
ELEGTRIGAL NOTES
(DI PUMPS HAVE INTEGRAL, FACTORY -MOUNTED \/FDS
(2 CONNECT (2) DUCT 51-10KE DETEGTOR5
Q 5G2UARE D GOMBINATION STARTER:
H321N 5WITGH 51NITGH WI 115,4 D.E. FU5E5,
556-2 STARTER W! 515.5 OVERLOADS ON WALL BELOW
----------- ________ ----------
------
_------------- T------------------------------ ------------------------------------------------------ ---_-------_---___-_________-
--- - - ----- - -- - ---- -- ------ - -- ---- I -
1 r___.� - - -- -- - --�
DOWN FROM ROOF. -� . u s ► Ln f�L1 1 LIQ..
I i ! CONNECT NEW BOILER B 120V, 15.5A I
4
i
i
I �
I
I i �
i
5 C) 7
ELECTRICAL BASEMENT PLAN -NEW WORK
MEC CAL
AS -BUILT
11-29-14
L10R
CA REG
M -D
>EPIGBiBSRiNG
G D8810l1
[ON so 8180&9
1369
LAMAR AVE.
1RBARA CA 83105
6-8218
) 588-2408
7ieloney5jmpe.net
>.net
No. E013083
EXP. 06/30/2015
CTR\
I a AIR HANDLERS HAVE INTEGRAL VFDS
6
7
8
q
I
)20/3
)
1100
loam
3
(E)
(N)
SPARE
PK6
PANEL
WT
"KT"
r
----------- ________ ----------
------
_------------- T------------------------------ ------------------------------------------------------ ---_-------_---___-_________-
--- - - ----- - -- - ---- -- ------ - -- ---- I -
1 r___.� - - -- -- - --�
DOWN FROM ROOF. -� . u s ► Ln f�L1 1 LIQ..
I i ! CONNECT NEW BOILER B 120V, 15.5A I
4
i
i
I �
I
I i �
i
5 C) 7
ELECTRICAL BASEMENT PLAN -NEW WORK
MEC CAL
AS -BUILT
11-29-14
L10R
CA REG
M -D
>EPIGBiBSRiNG
G D8810l1
[ON so 8180&9
1369
LAMAR AVE.
1RBARA CA 83105
6-8218
) 588-2408
7ieloney5jmpe.net
>.net
No. E013083
EXP. 06/30/2015
CTR\