Loading...
HomeMy WebLinkAboutSB989 RETEST 3-2-17SWRCB, January 2002 Page ____ of ____ Secondary Containment Testing Report Form This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. 1.FACILITY INFORMATION Facility Name: Date of Testing: Facility Address: Facility Contact: Phone: Date Local Agency Was Notified of Testing : Name of Local Agency Inspector (if present during testing): 2.TESTING CONTRACTOR INFORMATION Company Name: Technician Conducting Test: Credentials: CSLB Licensed Contractor SWRCB Licensed Tank Tester License Type: License Number: Manufacturer Training ManufacturerComponent(s)Date TrainingExpires 3.SUMMARY OF TEST RESULTS ComponentPassFail Not Tested Repairs Made ComponentPassFail Not Tested Repairs Made If hydrostatic testing was performed, describe what was done with the water after completion of tests: CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements Technician’s Signature:________________________________________________ Date:_________________________ $POGJEFODF6454FSWJDFT *OD ")B[ $% 1 #7705/Fastrip#641 03/02/2017 1200CoffeeRoad Bakersfield,CA93308 OmeroGarcia(661)393-7000 11/15/2016 Chris karns KyleSelf ✔ ICC CAUSTServiceTechnician 10/28/2018 INCON TS-STS 11/08/2018 91FillSpillBucket ✔ DieselVaporSecondary ✔ DieselStpSump ✔ 03/02/2017 SWRCB, January 2002 Page ____ of ____ 5.SECONDARY PIPE TESTING Test Method Developed By: Piping Manufacturer Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure Vacuum Hydrostatic Other (Specify) Test Equipment Used: Equipment Resolution: Piping Run # Piping Run # Piping Run # Piping Run # PipingMaterial: Piping Manufacturer: PipingDiameter: Length of Piping Run: ProductStored: Method and location of piping-run isolation: Wait time between applying pressure/vacuum/water and starting test: Test Start Time: Initial Reading (RI): Test End Time: Final Reading (RF): TestDuration: Change in Reading (RF-RI): Pass/Fail Threshold or Criteria: Test Result: Pass Fail Pass Fail Pass Fail Pass Fail Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests) 412 ✔ ✔ CalibratedGauges 0.00" DSLSecon Fiberglass Smith 4.00" 150.00' Diesel Test boot 5min 9:30am 5.00psi 10:30am 5.00psi 1 hour 0.00" 0.00" ✔ SWRCB, January 2002 Page ____ of ____ 6.PIPING SUMP TESTING Test Method Developed By: Sump Manufacturer Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure Vacuum Hydrostatic Other (Specify) Test Equipment Used: Equipment Resolution: Sump # Sump # Sump #Sump # Sump Diameter: Sump Depth: Sump Material: Height from Tank Top to Top of Highest Piping Penetration: Height from Tank Top to Lowest Electrical Penetration: Condition of sump prior to testing: Portion of Sump Tested1 Does turbine shut down when sump sensor detects liquid (both product and water)?* Yes No NA Yes No NA Yes No NA Yes No NA Turbine shutdown response time Is system programmed for fail-safe shutdown?* Yes No NA Yes No NA Yes No NA Yes No NA Was fail-safe verified to be operational?* Yes No NA Yes No NA Yes No NA Yes No NA Wait time between applying pressure/vacuum/water and starting test: Test Start Time: Initial Reading (RI): Test End Time: Final Reading (RF): Test Duration: Change in Reading (RF-RI): Pass/Fail Threshold or Criteria: Test Result: Pass Fail Pass Fail Pass Fail Pass Fail Was sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA Was sensor properly replaced and verified functional after testing? Yes No NA Yes No NA Yes No NA Yes No NA Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests) 1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an asterisk (*) is “NO” or “NA”, the entire sump must be tested. (See SWRCB LG-160) Please see Incon results: 7 ✔ ✔ TS-STS 0.00" Diesel stp 43.00" 51.00" Fiberglass 38.00" 22.00" Clean dry Highest penetration ✔ N/A ✔ ✔ 5min 15 min 0.002" ✔ ✔ ✔ SWRCB, January 2002 Page ____ of ____ 9.SPILL/OVERFILL CONTAINMENT BOXES Facility is Not Equipped With Spill/Overfill Containment Boxes Spill/Overfill Containment Boxes are Present, but were Not Tested Test Method Developed By: Spill Bucket Manufacturer Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure Vacuum Hydrostatic Other (Specify) Test Equipment Used: Equipment Resolution: Spill Box # Spill Box # Spill Box # Spill Box # BucketDiameter: BucketDepth: Wait time between applying pressure/vacuum/water and starting test: Test Start Time: Initial Reading (RI): Test End Time: Final Reading (RF): TestDuration: Change in Reading (RF-RI): Pass/Fail Threshold or Criteria: Test Result: Pass Fail Pass Fail Pass Fail Pass Fail Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests) 11 ✔ ✔ TS-STS 0.00" 91 F 12.00" 14.00" 5min 10:00am 11.00" 11:00am 11.00" 1 hour 0.00" 0.0625" ✔ Changed 91 fill bucket from 3.5 gallon to 5gallon spill bucket test then passed with holding 5 gallons