Loading...
HomeMy WebLinkAboutSB989 2-2017SWRCB, January 2002 Page ____ of ____ Secondary Containment Testing Report Form This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. 1.FACILITY INFORMATION Facility Name: Date of Testing: Facility Address: Facility Contact: Phone: Date Local Agency Was Notified of Testing : Name of Local Agency Inspector (if present during testing): 2.TESTING CONTRACTOR INFORMATION Company Name: Technician Conducting Test: Credentials: CSLB Licensed Contractor SWRCB Licensed Tank Tester License Type: License Number: Manufacturer Training ManufacturerComponent(s)Date TrainingExpires 3.SUMMARY OF TEST RESULTS ComponentPassFail Not Tested Repairs Made ComponentPassFail Not Tested Repairs Made If hydrostatic testing was performed, describe what was done with the water after completion of tests: CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements Technician’s Signature:________________________________________________ Date:_________________________ $POGJEFODF6454FSWJDFT *OD ")B[ $% 1 Valero 02/10/2017 2601WhiteLane Bakersfield,CA93304 Bassem(805)217-0610 KyleSelf ✔ ICC CAUSTServiceTechnician 10/28/2018 INCON TS-STS 11/08/2018 87 stp sump ✔UDC 7-8 87-fill sump ✔ 87- fill bucket ✔ 87- product secondary ✔ 91-stp sump ✔ 91-fill sump ✔ 91-fill bucket ✔ Annular ✔ UDC 1-2 ✔ UDC 3-4 ✔ UDC 5-6 ✔ 91-product secondary ✔ ✔ 02/10/2017 Water was hauled off by Confidence UST SERVICES. SWRCB, January 2002 Page ____ of ____ 4.TANK ANNULAR TESTING Test Method Developed By: Tank Manufacturer Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure Vacuum Hydrostatic Other (Specify) Test Equipment Used: Equipment Resolution: Tank # Tank # Tank # Tank # Is Tank Exempt From Testing?1 Yes No Yes No Yes No Yes No Tank Capacity: Tank Material: Tank Manufacturer: ProductStored: Wait time between applying pressure/vacuum/water and starting test: Test Start Time: Initial Reading (RI): Test End Time: Final Reading (RF): TestDuration: Change in Reading (RF-RI): Pass/Fail Threshold or Criteria: Test Result: Pass Fail Pass Fail Pass Fail Pass Fail Was sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA Was sensor properly replaced and verified functional after testing? Yes No NA Yes No NA Yes No NA Yes No NA Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests) 1 Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment testing. {California Code of Regulations, Title 23, Section 2637(a)(6)} 3 ✔ ✔ CalibratedGauges 0.00" 87 ✔ 12,000 Steele Unknown 87- gasoline 5min 0.00 1 hour -10.00hg 10:30am -10.00hg 9:30am 0.00 ✔ ✔ ✔ SWRCB, January 2002 Page ____ of ____ 5.SECONDARY PIPE TESTING Test Method Developed By: Piping Manufacturer Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure Vacuum Hydrostatic Other (Specify) Test Equipment Used: Equipment Resolution: Piping Run # Piping Run # Piping Run # Piping Run # PipingMaterial: Piping Manufacturer: PipingDiameter: Length of Piping Run: ProductStored: Method and location of piping-run isolation: Wait time between applying pressure/vacuum/water and starting test: Test Start Time: Initial Reading (RI): Test End Time: Final Reading (RF): TestDuration: Change in Reading (RF-RI): Pass/Fail Threshold or Criteria: Test Result: Pass Fail Pass Fail Pass Fail Pass Fail Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests) 412 ✔ ✔ CalibratedGauges 0.00" 87-P Fiberglass Smith 2.00" 100.00' 87-gasoline Test boot 5min 9:30am 5.00psi 10:30am 5.00psi 1 hour 0.00 0.00 ✔ 91-P Fiberglass Smith 2.00" 110.00' 91-gasoline Test boot 5min 9:30am 5.00psi 10:30am 5.00psi 1 hour 0.00 0.00 ✔ SWRCB, January 2002 Page ____ of ____ 6.PIPING SUMP TESTING Test Method Developed By: Sump Manufacturer Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure Vacuum Hydrostatic Other (Specify) Test Equipment Used: Equipment Resolution: Sump # Sump # Sump #Sump # Sump Diameter: Sump Depth: Sump Material: Height from Tank Top to Top of Highest Piping Penetration: Height from Tank Top to Lowest Electrical Penetration: Condition of sump prior to testing: Portion of Sump Tested1 Does turbine shut down when sump sensor detects liquid (both product and water)?* Yes No NA Yes No NA Yes No NA Yes No NA Turbine shutdown response time Is system programmed for fail-safe shutdown?* Yes No NA Yes No NA Yes No NA Yes No NA Was fail-safe verified to be operational?* Yes No NA Yes No NA Yes No NA Yes No NA Wait time between applying pressure/vacuum/water and starting test: Test Start Time: Initial Reading (RI): Test End Time: Final Reading (RF): Test Duration: Change in Reading (RF-RI): Pass/Fail Threshold or Criteria: Test Result: Pass Fail Pass Fail Pass Fail Pass Fail Was sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA Was sensor properly replaced and verified functional after testing? Yes No NA Yes No NA Yes No NA Yes No NA Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests) 1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an asterisk (*) is “NO” or “NA”, the entire sump must be tested. (See SWRCB LG-160) Please see Incon results: 7 ✔ ✔ TS-STS 0.00" 87-stp 36.00" 48.00" Fiberglass 12.00" 10.00" Clean dry Highest penetration ✔✔ Automatic ✔ ✔ 5min 15 min 0.002" ✔ ✔ ✔ 91-stp 36.00" 48.00" Fiberglass 12.00" 10.00" Clean dry Highest penetration ✔✔ Automatic ✔ ✔ 5min 15 min 0.002" ✔ ✔ ✔ ✔ SWRCB, January 2002 Page ____ of ____ 7.UNDER-DISPENSER CONTAINMENT (UDC) TESTING Test Method Developed By: UDC Manufacturer Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure Vacuum Hydrostatic Other (Specify) Test Equipment Used: Equipment Resolution: UDC # UDC # UDC # UDC # UDC Manufacturer: UDC Material: UDC Depth: Height from UDC Bottom to Top of Highest Piping Penetration: Height from UDC Bottom to Lowest Electrical Penetration: Condition of UDC prior to testing: Portion of UDC Tested1 Does turbine shut down when UDC sensor detects liquid (both product and water)?* Yes No NA Yes No NA Yes No NA Yes No NA Turbine shutdown response time Is system programmed for fail- safe shutdown?* Yes No NA Yes No NA Yes No NA Yes No NA Was fail-safe verified to be operational?* Yes No NA Yes No NA Yes No NA Yes No NA Wait time between applying pressure/vacuum/water and starting test Test Start Time: Initial Reading (RI): Test End Time: Final Reading (RF): Test Duration: Change in Reading (RF-RI): Pass/Fail Threshold or Criteria: Test Result: Pass Fail Pass Fail Pass Fail Pass Fail Was sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA Was sensor properly replaced and verified functional after testing? Yes No NA Yes No NA Yes No NA Yes No NA Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests) 1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an asterisk (*) is “NO” or “NA”, the entire UDC must be tested. (See SWRCB LG-160) Please see Incon results:Please see Incon results: ✔ ✔ TS-STS 0.00" 1-2 Highest penetration Clean dry 16.00" 13.00" 31.00" Fiberglass Unknown ✔ N/A ✔ 5min 0.002" ✔ ✔ ✔ 15min ✔ 3-4 N/A ✔ 0.002" ✔ 15min 5min ✔ ✔ Highest penetration Clean dry 15.00" 12.00" 31.00" Fiberglass Unknown ✔ ✔ 5-67-8 Unknown Unknown Fiberglass Fiberglass 31.00"31.00" 13.00"13.00" 15.00"15.00" Clean dry Clean dry Highest penetration Highest penetration ✔✔ ✔ ✔ ✔ ✔ N/AN/A ✔✔ ✔✔ 5min 5min 15min15min 0.002"0.002" ✔✔ SWRCB, January 2002 Page ____ of ____ 8.FILL RISER CONTAINMENT SUMP TESTING Facility is Not Equipped With Fill Riser Containment Sumps Fill Riser Containment Sumps are Present, but were Not Tested Test Method Developed By: Sump Manufacturer Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure Vacuum Hydrostatic Other (Specify) Test Equipment Used: Equipment Resolution: Fill Sump # Fill Sump # Fill Sump # Fill Sump # Sump Diameter: Sump Depth: Height from Tank Top to Top of Highest Piping Penetration: Height from Tank Top to Lowest Electrical Penetration: Condition of sump prior to testing: Portion of Sump Tested Sump Material: Wait time between applying pressure/vacuum/water and starting test: Test Start Time: Initial Reading (RI): Test End Time: Final Reading (RF): TestDuration: Change in Reading (RF-RI): Pass/Fail Threshold or Criteria: Test Result: Pass Fail Pass Fail Pass Fail Pass Fail Is there a sensor in the sump? Yes No Yes No Yes No Yes No Does the sensor alarm when either product or water is detected? Yes No NA Yes No NA Yes No NA Yes No NA Was sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA Was sensor properly replaced and verified functional after testing? Yes No NA Yes No NA Yes No NA Yes No NA Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests) Please see Incon results: 10 ✔ ✔ TS-STS 0.00" 87-fill91-fill 36.00"36.00" 48.00"48.00" 15.00"15.00" 15.00"15.00" Clean dry Clean dry Highest penetration Highest penetration Fiberglass Fiberglass 5min 5min 15 min 15 min 0.002"0.002" ✔✔ ✔✔ ✔✔ ✔✔ ✔✔ SWRCB, January 2002 Page ____ of ____ 9.SPILL/OVERFILL CONTAINMENT BOXES Facility is Not Equipped With Spill/Overfill Containment Boxes Spill/Overfill Containment Boxes are Present, but were Not Tested Test Method Developed By: Spill Bucket Manufacturer Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure Vacuum Hydrostatic Other (Specify) Test Equipment Used: Equipment Resolution: Spill Box # Spill Box # Spill Box # Spill Box # BucketDiameter: BucketDepth: Wait time between applying pressure/vacuum/water and starting test: Test Start Time: Initial Reading (RI): Test End Time: Final Reading (RF): TestDuration: Change in Reading (RF-RI): Pass/Fail Threshold or Criteria: Test Result: Pass Fail Pass Fail Pass Fail Pass Fail Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests) 11 ✔ ✔ TS-STS 0.00" 87-fill 91-fill 14.00"14.00" 12.00"12.00" 5min 5min 10:30am 10:30am 8.75"9.00" 0.00" 11:30am 11:30am 8.75"9.00" 1 hour 1 hour 0.00" 0.0625"0.0625" ✔✔