Loading...
HomeMy WebLinkAboutSB989 2017I environmental services, inc. 25971 Towne Centre Drive, Foothill Ranch, CA 92610 Tel: (949) 460-5200 Fax: (949) 460-5210 Date: To: From: Sent Via: Re: 2/28/2017 Ernie Medina Bakersfield City CUPA 1500 Truxtun Ave Bakersfield, CA 93301 Bill Moothart Email TRANSMITTAL Secondary Containment Test Circle K Store #2708605 5600 AUBURN ST BAKERSFIELD, CA 93306 The following test report(s) are included: SCT-3 yr Comments: Please do not hesitate to call me at (949) 460-5200 if you have any questions or concerns regarding this work. 1451583 SWRCB, Januaty 2002 Page __ of __ Secondary Containment Testing Report Form This .form is intended.for use by contractors pe!forming periodic testing o.fUSt secondary containment systems. Use the appropriate pages ofthis.form to report resultsjor all components tested The completedfoi·m, written test procedures, and phntoutsji·pm tests (if applicable), should be provided to the faci !ity o11'nerloperqtorfor subiJiiftal to the !ocalregulatory agency. 1. FACILITY INFORMATION Facility Name: Circle K Store #2708605 I Date of Testing: 2/9/2017 Facility Address: 5600 AUBURN ST, BAKERSFIELD, CA 93306 Facility Contact: Circle K Stores Inc. j Phone: (661) 871-6273 Date Local Agency Was Notified of Testing: 1/23/2017 Name of Local Agency Inspector (if present dui'ing testing): Shane Gardner ' 2. TESTING CONTRACTOR INFORMATION Company Name: Belshite Envitonmental Setvices, Inc. Teclmician Conducting Test: Jeff Badders Credentials: ~ CSLB Licensed Contractor D SWRCB Licensed Tank Tester License Type: A -General Engineering Conttactor J License Number: 808313 " ' ' Manufacturer Tt:aining Manufacturer Component( s) Date Training Expires See Attached 3. SUMMARY OF TEST RESULTS Component Pass Fail Not Repairs Component Pass Fail Not Repairs Tested Made Tested Made ' Tank Annulars 3 ~ D D D 0 0 0 0 I Secondary Pige 3 D ~ D D Q1 _EailNI 0 0 D 0 Piping Sump 3 D ~ D D 87 Failed 0 D 0 0 UDC 2 ~ D D D 0 D 0 0 Fill Sump D D D D Site Direct Bury 0 D 0 0 Spill Bucket 3 ~ D D D Only Fills Tested 0 D D 0 If hydrostatic testing was performed, describe what >vas done with the water after completion of tests: 0 Pla.ced in drums left on site for proper disposition. 0 Transported to next site for use in additional testing, CERTIFlCATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best of my knmVledge, the facts stated in this document are accurate aitd in full ciJmplic(iJCeWit!t legalrequirenleJJ.ts Teclmician's Signature: (? ./.:S .. ···;::/l:$(~~ ,,~.o. .. -------------+-------------------------Date: ___ ""'2/,_,9.u/2"-'0~1_,_7 ___ _ Test Method Developed By: Test Method Used: 4. TANK ANNULAR TESTING D Tank Manufacturer D Other PP•~CIJVJ D Pressure D Other (Spec([V) !2l Industry Standard !2l Vacumn D ProfessionalEngineer 0 Hydrostatic Test Equipment Used: Test plugs, venturi pump and gauges Equipment Resolution: 0.5% of st•an .................. ~._ .... , Is Tank Exempt From Testing?' Tank Capacity: Tank Material: Tank Manufacturer: Product Stored: Wait time between applying pressure/vacuum/water and test: Test Start Time: Initial Reading (Rr): Test End Time: Final Reading (RF ): Test Duration: Pass/Fail Threshold or Criteria: Test Result: Was sensor removed for testing? Was sensor properly rer:,lac:ed verified functional 87 Maste1· 89 91 Owens Corning Owens Corning Owens Corning 89 91 10 minutes 10 minutes 10 minutes 08: 10 In. Vac 10 In. Vac 10 In. Vac 10 In. Vac 10 In. Vac 10 In. Vac 0 0 No Detectable Loss No Detectable Loss No Detectable Loss Pass Pass Pass N/A N/A N/A N/A N/A N/A Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) 1 Secondary containment systems where the contin~10us monitoring autoll1atically inonitors both the primary and secondary containll1ent, such as systems that are hydrostatically monitored or under constantvacuum, are exempt from periodic containment testing. {California Code ofRegulations, Title23, Section 2637(a)(6)} 5. SECONDARY PIPE TESTING Test Method Developed By: D Piping Manufacturer ~ Industry Standard D Professional Engineer 0 Other (Spec(fy) Test Method Used: ~ Pressure D Vacuum D Hydrostatic 0 Other (Spec(fy) Test Equipment Used: Test reducer boots, air compressor and gauges Equipment Resolution: 0.5% of span 91 87M 89 Piping Material: Fiberglass Fiberglass Fiberglass Piping Manufacturer: AO Smith AO Smith AO Smith Piping Diameter: 3" 3" 3" Length of Piping Run: 45' 45' 45' Product Stored: 91 87 89 MP.thorl and location of piping-run isolation: Reducer Boots/Fittings Reducer Boots/Fittings lo. ,J. Boots/Fitting~ Wait time between applying pressure/vacutJm/water and 10 minutes 10 minutes 10 minutes starting test: Test Start Time: 08:15AM 08:30AM 08:30AM Initial Reading (RI): 5 5 5 Test End Time: 09:15AM 09:30AM 09:30AM Final Reading (RF): 2 5 5 Test Duration: 60Min 60Min 60Min Change in Reading (RF-RI): -3 0 0 Pass/Fail Threshold or Criteria: No Detectable Loss No Detectable Loss No Detectable Loss Test Result: Fail Pass Pass Comments -(include informafion on repairs made prior to testing, and recommended.follow-up for failed tests) 91 secondary is failing underground. No visual failure at sump or UDC. 6 PIPING SUMP TESTING Test Method Developed By: 0 Sump Manufach1rer 18.1 Industry Standard 0 Professional Engineer 0 Other (,'>pec!M Test Method Used: 0 Pressure 0 Vacuum 18.1 Hydrostatic 0 Other (Specifj') inmP.nt I neon Sump Test System Equimi1ent Resolution +/-0.002" -r 91 89 87 Master Sump Diameter: 42" 42" 42" Sump Depth: 45' 45' 45' Sump Material: Fiberglass Fiberglass Fiberglass Height from Tank Top to Top of Higl1est Piping Penetration: 22" 22" 22" -Height from Tank Top to Lowest Electrical Penetration: 10" 10" 10" Condition of sump prior to testing: Good Good Good Portion of Sump Tested1 4' Above Pen. 4 Above Pen. 4' Above Pen Does rnrbine shut down when sump sensor :,:~~~~~·liquid (both 0 Yes 0 No 18JNA DYes ONo ~NA 0 Yes 0 No ~NA D YesO No 18JNA product and Turbine shutdown response time N/A N/A N/A Is system progranuned for fail-safe shutdown?" OYesONo~NA 0 Yes 0 No 18.1 NA DYes 0 No ~NA 0 Yes 0 No 18.1 NA Was f~il-"~fp verified to be operational?. 0 Yes 0 No 18.1 NA 0 Yes 0 No 18.1 NA 0 Yes 0 No0NA OYesONo 0NA Wait time between applying pressure/vacuum/water and starting 30 minutes 30 minutes 30 minutes test: Test Start Time: 09:45AM 10:19 AM 08:56AM Initial Reading (R1): 4.3315 5.7628 5.2858 Test End Time: lO:OOAM 10:34AM 09:11AM Final Reading (RF): 4.3312 5.7623 5.2026 Test Duration: 15 min. 15 min. 15 min. Change in Reading (RF-RI): -0.0003 -0.0005 -0.0832 Pass/Fail Threshold or Criteria: +!-0.002" +/-0.002 +!-0.002 Test Result: Pass Pass Fail Was sensor removed for testing? Yes Yes Yes W: sensor properly 110pwvw and wriflt:u functional after testing? Yes Yes Yes Comments -(include.information on repairs made prior to testing, and recommendedfollow-up for failed tests) Sensor functionality was not confirmed. This nrocedure is not nm1 of the Secondarv Containment Testin!! scone of work 87 turbine failed at penetration of secondary line. 1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to ill!Y. of the questions indicated with an asterisk(*) is "NO" or "NA", the entire sump must be tested. {See SWRCB LG-160) · 7. UNDER-DISPENSER TESTING Test Metl10d Developed By: Test Metl10d Used: D UDC Manufacturer D Otl1er (Spec((y) D Pressure D Other (Specify) 15" Fair 121 Industry Standard D onal Engineer D Vacuum 121 Hydrostatic 15" Fair OYesONo 1:2lNA OYesONo 1:2lNA DYesONo 121NA DYesONo 121NA DYes ONo 121 NA 0 Yes D No l:2l NA 0 Yes D No 121 NA DYes D No 121 NA 30 minutes Yes Yes Comments -(include information on repairs made prior to testing, w1d recommended.fol!ow-up for failed tests) Sensor functionality was not confirmed. This J)rocedure is not J)ati of the Secondary Containment Testing scope of work 1 If the entire deptl1 of the UDC is not tested, specify how much was tested. If the answer to fillY. of the questions indicated witl1 an asterisk(*) is "NO" or "NA", tl1e entire UDC must be tested. (See SWRCB LG-160) 8. FILL RISER CONTAINMENT SUMP TESTING Facility is Not Eqwpp~;d With Fill Riser r~ lPnt Smnps D Fill Riser ronl: Sumps are Present, but were Not Tested D Test Method Developed By: D Sump Manufacturer f2l Industry Standard D Professional Engineer 0 Other (.S'pecijj') Test Method Used: D Pressure 0 Vacuum f2l Hydrostatic D Other (Spec(jjl} Equipment Used: lncon TS-STS Sump Test System Equipment Resolution: +/-0. 002" s~li) Sump Depth: ~~i?ht from Tanlc Top to Top of Highest Piping Penetration: Height from Tanlc Top to Lowest Electrical Penetration: rMilition of sump prior to testing: Portion of Sump Tested Sru_!lp M~ial: Wait tinte between applying pressure/vacuum/water and starting test: T~ Start Time: Initial ReHdins:r (Rr): Test End Time: Final Readins:r (Rr) Test Duration: rhiltHTP in ReHdins:r (Rr-Rr): Pass/Fail Threshold or Criteria: test Result! Is there a sensor in the sump? Does the sensor alarm when either product or water is DYes D No 12JNA DYes DNo 12JNA 0 Yes 0 No l2l NA D YesD No 12JNA detected? Was sensor uowuv~.-\,l for LtJMmg? Was sensor properly repl;wPil and verified functional after testing? Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) Direct Bury 9 SPILL/OVERFILL CONTAINMENT BOXES Facility is Not ~ With Spill/Overfill n •Boxes D SpilVOverfill Containment Boxes are Present, but were Not Tested D Test Method Developed By: D Spill Bucket Manufacturer ~ Industry Standard D Professional Engineer D Other (Specify) Test Method Used: D Pressure D Vacuum ~ Hydrostatic D Other (Specify) Test Equipment I neon TS-STS Sump Test System Equipment Resolution: +/-0.002" Spill Box# 91 Fill S1>ill Box# 89 Fill Spill Box# 87 Fill Spill Box# Bucket Diameter: 12" 12" 12" Bucket Depth: 12" 12" 12" Wait time between applying pressure/vacuum/water and 30 minutes 30 minutes 30 minutes ;tarting test: Test Strui Time: 08:56AM 10:19 AM 08:56AM Initial Reading CRr): 6.7734 6.7244 5.7129 Test End Time: 09:11AM 10:34 AM 09:11AM Final Reading (RF): 6.7733 6.7242 5.7121 Test Duration: 15 min. 15 min. 15 min. Change in Reading (RF-Rr): -0.0001 -0.0002 -0.0008 Pass/Fail Threshold or Criteria: +/-0.002" +!-0.002" +/-0.002" Test Result: Pass Pass Pass Comments -(include information on repairs made prior to testing, and recommendedfollow-up for failed tests) Name Badders, Jeff Badders, Jeff Badders, Jeff Badders. Jeff Badders, Jeff Badders, Jeff Manufacturer Training Training OPW EVR Phase I Phil Tite Spill Collectors & Associated Hardware FiberGlass Systems Piping (Formerly AO Smith) Modern Welding Tank Installation Xerxes UST Installation Training Seminar INCON Level4-Franklin Sump Test System Completed 9/15/2015 7/21/2015 7/11/2014 9/2/2015 9/16/2015 10/28/2016 Expires 9/15/2017 7/21/2017 7/11/2017 9/2/2018 9/16/2018 10/28/2018 1 2 3 4 5 6 7 8 9 10 11 12 13 BUSINESS NAME:Circle K #2708605 SITE ADDRESS: 5600 Auburn Street I CITY: Bakersfield IZIP:93306 MAP DATE:2/15/17ISURVEY BY: I DRAWN BY:ZK I AGENCY FACILITY#: A B c D E F G H K L M I 1---+----+~----+---+~t--+---+------------+------t+-- St t" ........ ,.."' . . ..... (.. .,, l-----~------~------4-----~----+------~-----~------~~~ I ,.. . ,_ ' . r _ •• · •. ~:· -'·,-1 ' . ' ! ; I i .,.\ 87 ' i-...... c-~, .. _... ' l----------+-------+--------~-------+-------+--------~------1 __ ,.-·-·. \.·""'-',, -.. -''.-----._ --:-------+---------1 ' 89 ',v / O\' 1\\'·. _j ,, .. '"0 . : ' -,, --'~ ·-·Ol -... .,,, .... 1------r----r----~----~-----+---~----~-----~, 91 ~ ; o.~~--=------------1~---1 ·~ -,,, '.9._.0 I . ' ··o·'' -'f--,:,o : -~ l-------r-------r-----+--------r------~--~----~----+--~ ·-·o,J-+-----------;i-----------+------1 ,.,.. -., I vvo.y ~ Auburn St ~~ , I **Nu tt:: ALL PIPING I nr.~TIONS ARE ESTIMATED & SCALING IS APPROXIMATE** LEGEND 8 DISPENSER 0 [£h] FLAMMABLE LIQUID I MSDS ~~~~~G~NCY PlAN I BR I BATH ROOM SHUTOFF -CASHIER ABSORBENT 8 GAS PUMP ~ s EMERGENCY FIRE HYDRANT MONITORING [fg COMBUSTIBUE ~ ®SEWER/FLOOR DRAIN SHUT OFF WEUL LIQUID TRASH BIN 0 EUECTRICAL PANEL • ® WATER I MC I MOTOR COOlANT + TANK MONITOR FENCE FIRST AID 0 SOLID WASTE DRUM * EVACUATION t PPE I Mol MOTOR OIL t FIRE EXTINGUISHER ••• VENT RISERS 0 LIQUID WASTE DRUM AREA IY.§] «O)) OVERFIUL ALARM c TEUEPHONE IE M I EMERGENCY EXIT I C:<>21 C02 CYLINDER 1?1 STORM DRAIN -DISPENSER w [UJ VENT RISERS or CUEAN AIR c::::::::::::) UST --·-- SENSOR TRANSFORMER with ~SEPARATOR ,,, ® NATURAL GAS SHUTOFF VENT SUMP/ s 0 NITROGEN VENT BOX BELSHIRE ENVIROMENTAL 5600 AUBURN ST BAKERSFIELD CA CIRCLE K 2703605 1-949-453-0391 02/09/2017 10:00 Al1 SUMP LEAK TEST REPORT 91 TS TEST STARTED 9:45 AM I TEST STARTED 02/09/2017 BEGIN LEVEL 4,3315 IN END TIME 10:00 AM END DATE 02/09/2017 END LEVEL 4,3312 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED 39 TS TEST STARTED 10:19 AM TEST STARTED 02/09/2017 BEGIN LEVEL 5, 7623 IN END TIME 10:3a AM END DATE 02/09/2017 END LEVEL 5, 7623 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED 37M TS I I TEST STARTED 8:56 AM TEST STARTED 02/09/2017 BEGIN LEVEL 5,2858 IN END TIME 9:11AM END DATE 02/09/2017 END LEVEL 5,2026 IN LEAK THREShOLD 0, 002 IN TEST RESULT FAILED DP 1-2 TEST STARTED 10:19 AM TEST STARTED 02/09/2017 BEGIN LEVEL 6,0648 IN END TIME 10:3a AM END DATE 02/09/2017 END LEVEL 6,06aa IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED DP 3-4 TEST STARTED 10:19 AM TEST STARTED 02/09/2017 BEGIN LEVEL 7,3043 IN END TIME 10:3a AM END DATE 02/09/2017 END LEVEL 7,3045 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED 91 FB TEST STARTED 8:56 AM / TEST STARTED 02/09/2017 BEGIN LEVEL 6, 7734 IN END TIME 9: 11 AM END DATE 02/09/2017 END LEVEL 6, 7733 IN LEAK THRESHOLD 0, 002 IN TEST RESULT PASSED 89 FB TEST STARTED 10:19 AM TEST STARTED 02/09/2017 BEGIN LEVEL 6, 7244 IN END TIME 10:34 AM END DATE 02/09/2017 END LEVEL 6, 7242 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED 37M FB ) TEST STARTED 8:56 AM TEST STARTED 02/09/2017 BEGIN LEVEL 5, 7129 IN END TIME 9: 11 AM END DATE 02/09/2017 END LEVEL 5, 7121 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED / \ D~ \