Loading...
HomeMy WebLinkAboutFMC 2017IMPACT VALVE LEAK DETECTOR MONITOR CERTIFICATION SPILL BUCKET TEST 11000 N. MoPac Expressway, Suite 500 Austin, Texas 78759 Phone: (512) 451-6334 Fax: (512) 459-1459 Date Printed and Mailed: 3/31/2017 BAKERSFIELD FIRE DEPARTMENT OFFICE OF ENVIRONMENTAL SERVICES INSPECTOR ERNIE MEDINA 1501 TRUXTUN AVE. BAKERSFIELD, CA 93301 Test Date: 3/24/2017 Order Number: 3433712 Dear Regulator, Enclosed are the results of recent testing performed at the following facility: 7-ELEVEN #32376, MKT 2368 9600 BRIMHALL RD. BAKERSFIELD, CA 93312 In an effort to keep all our record keeping and reporting requirements as current as possible, Tanknology kindly requests you notify Dawn Kohlmeyer in writing at dkohlmeyer@tanknology.com when your CUPA requires all records to be submitted electronically via the CERS database. Your assistance in this endeavor is greatly appreciated. Testing performed: Sincerely, Dawn Kohlmeyer Manager, Field Reporting LDT 5000 Field Test Apparatus Line Leak Detector Test Page 1 of 1 Work Order:3433712 Date:3/24/2017 Site Name / ID:7-ELEVEN #32376, MKT 2368 / 32376 Address:9600 BRIMHALL RD. City:BAKERSFIELD State:CA Zip:93312 Tank ID Product Product Line Tested From Existing/New Mechanical/Electronic Manufacturer/Model Serial No. Pump Operating Pressure (psi) Calibrated Leak (ml/min) Calibrated Leak (gph) Holding PSI *N/A for Electronic LD's Resiliency (ml) *N/A for Electronic LD's Metering PSI *N/A for Electronic LD's Opening Time (sec) *N/A for Electronic LD's Test Results T2 RUL RUL 1 3 Existing Mechanical Vaporless LD-2000 02164 30.00 189.0 3.00 28.00 250.00 18 7 Pass T3 PUL PUL 1 3 Existing Mechanical Vaporless LD-2000 08041485 30.00 189.0 3.00 29.00 260.00 20 7 Pass Technician Comments: Technician Name:Franscico Castro Certification #:64037 Technician Signature:Expire Date:1/27/2020 Environmental Compliance for Petroleum Systems © 2017 Tanknology Inc., Austin, TX.    All rights reserved.    tanknology.com Impact Valve Inspection Impact Valve Operational Inspection Work Order:3433712 Date:3/24/2017 Site Name/ID:7-ELEVEN #32376, MKT 2368 Address:9600 BRIMHALL RD. City:BAKERSFIELD State:CA Zip:93312 Dispenser Number Grade Secure Mount? Valve Lock?Pass/ Fail Comments 1/2 87 Pass Fail Not Tested 1/2 91 Pass Fail Not Tested 3/4 87 Pass Fail Not Tested 3/4 91 Pass Fail Not Tested 5/6 87 Pass Fail Not Tested 5/6 91 Pass Fail Not Tested 7/8 87 Pass Fail Not Tested 7/8 91 Pass Fail Not Tested 9/10 87 Pass Fail Not Tested 9/10 91 Pass Fail Not Tested 11/12 87 Pass Fail Not Tested 11/12 91 Pass Fail Not Tested Technician Comments: Technician Name:Franscico Castro Signature: Environmental Compliance for Petroleum Systems ©2017 Tanknology Inc., Austin, TX. All rights reserved. tanknology.com Appendix VI (Copies of Monitoring System Certification form and UST Monitoring Plot Plan available at http://www.swrcb.ca.gov.) MONITORING SYSTEM CERTIFICATION For Use By All Jurisdictions Within the State of California Authority Cited: Chapter 6.7, Health and Safety Code; Chapter 16, Division 3, Title 23, California Code of Regulations This form must be used to document testing and servicing of monitoring equipment. A separate certification or report must be prepared for each monitoring system control panel by the technician who performs the work. A copy of this form must be provided to the tank system owner/operator. The owner/operator must submit a copy of this form to the local agency regulating UST systems within 30 days of test date. A. General Information Facility Name:7-ELEVEN #32376, MKT 2368 Bldg. No.: Site Address:9600 BRIMHALL RD.City:BAKERSFIELD Zip:93312 Facility Contact Person:Joseph or Kuldip 3/26/15 Contact Phone No.:661-588-4059 Make/Model of Monitoring System:Veeder Root TLS-350 Date of Testing/Servicing:3/24/2017 B. Inventory of Equipment Tested/Certified Check the appropriate boxes to indicate specific equipment inspected/serviced: Tank ID:T2 RUL - RUL In-Tank Gauging Probe.Model:847390-107 Annular Space or Vault Sensor.Model:794390-420 Piping Sump / Trench Sensor(s).Model:794380-352 Fill Sump Sensor(s).Model:794380-208 Mechanical Line Leak Detector.Model:Vaporless LD-2000 Electronic Line Leak Detector.Model: Tank Overfill / High-Level Sensor.Model:FLAPPER Other (specify equipment type and model in Section E on Page 2). Tank ID:T3 PUL - PUL In-Tank Gauging Probe.Model:847390-107 Annular Space or Vault Sensor.Model:794390-420 Piping Sump / Trench Sensor(s).Model:794380-352 Fill Sump Sensor(s).Model:794380-208 Mechanical Line Leak Detector.Model:Vaporless LD-2000 Electronic Line Leak Detector.Model: Tank Overfill / High-Level Sensor.Model:FLAPPER Other (specify equipment type and model in Section E on Page 2). Tank ID: In-Tank Gauging Probe.Model: Annular Space or Vault Sensor.Model: Piping Sump / Trench Sensor(s).Model: Fill Sump Sensor(s).Model: Mechanical Line Leak Detector.Model: Electronic Line Leak Detector.Model: Tank Overfill / High-Level Sensor.Model: Other (specify equipment type and model in Section E on Page 2). Tank ID: In-Tank Gauging Probe.Model: Annular Space or Vault Sensor.Model: Piping Sump / Trench Sensor(s).Model: Fill Sump Sensor(s).Model: Mechanical Line Leak Detector.Model: Electronic Line Leak Detector.Model: Tank Overfill / High-Level Sensor.Model: Other (specify equipment type and model in Section E on Page 2). Dispenser ID:1/2 Dispenser Containment Sensor(s).Model:794380-352 Shear Valve(s). Dispenser Containment Float(s) and Chain(s). Dispenser ID:3/4 Dispenser Containment Sensor(s).Model:794380-352 Shear Valve(s). Dispenser Containment Float(s) and Chain(s). Dispenser ID:5/6 Dispenser Containment Sensor(s).Model:794380-352 Shear Valve(s). Dispenser Containment Float(s) and Chain(s). Dispenser ID:7/8 Dispenser Containment Sensor(s).Model:794380-352 Shear Valve(s). Dispenser Containment Float(s) and Chain(s). Dispenser ID:9/10 Dispenser Containment Sensor(s).Model:794380-352 Shear Valve(s). Dispenser Containment Float(s) and Chain(s). Dispenser ID:11/12 Dispenser Containment Sensor(s).Model:794380-352 Shear Valve(s). Dispenser Containment Float(s) and Chain(s). *If the facility contains more tanks or dispensers, copy this form. Include information for every tank and dispenser at the facility. C. Certification - I certify that the equipment identified in this document was inspected/serviced in accordance with the manufacturers’ guidelines. Attached to this Certification is information (e.g. manufacturers' checklists) necessary to verify that this information is correct and a Plot Plan showing the layout of monitoring equipment. For any equipment capable of generating such reports, I have also attached a copy of the report; (check all that apply): System set- up Alarm history report Technician Name (print):Franscico Castro Signature: Certification No.: B37663 License. No.:743160 Class 'A' Testing Company Name:Tanknology Phone No.:(800) 800-4633 Testing Company Address:11000 N. MoPac Expressway Suite 500 Date of Testing/Servicing:3/24/2017 Monitoring System Certification Page 1 of 3 12/07 D. Results of Testing/Servicing Software Version Installed:329.02 Complete the following checklist: Yes No*Is the audible alarm operational? Yes No*Is the visual alarm operational? Yes No*Were all sensors visually inspected, functionally tested, and confirmed operational? Yes No*Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their proper operation? Yes No* N/A If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational? Yes No* N/A For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate positive shut-down? (Check all that apply) Sump/Trench Sensors; Dispenser Containment Sensors. Did you confirm positive shut-down due to leaks and sensor failure/disconnection? Yes; No Yes No* N/A For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank fill point(s) and operating properly? If so, at what percent of tank capacity does the alarm trigger? % Yes* No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the manufacturer name and model for all replacement parts in Section E, below. Yes* No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) Product; Water. If yes, describe causes in Section E, below. Yes No*Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable Yes No*Is all monitoring equipment operational per manufacturer's specifications? * In Section E below, describe how and when these deficiencies were or will be corrected. E. Comments: Monitoring System Certification Page 2 of 3 12/07 F. In-Tank Gauging / SIR Equipment: Check this box if tank gauging is used only for inventory control. Check this box if no tank gauging or SIR equipment is installed. This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. Complete the following checklist: Yes No*Has all input wiring been inspected for proper entry and termination, including testing for ground faults? Yes No*Were all tank gauging probes visually inspected for damage and residue buildup? Yes No*Was accuracy of system product level readings tested? Yes No*Was accuracy of system water level readings tested? Yes No*Were all probes reinstalled properly? Yes No*Were all items on the equipment manufacturer's maintenance checklist completed? * In the Section H, below, describe how and when these deficiencies were or will be corrected. G. Line Leak Detectors (LLD): Check this box if LLDs are not installed. Complete the following checklist: Yes No* N/A For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) Simulated leak rate: 3 g.p.h.; 0.1 g.p.h; 0.2 g.p.h. Yes No*Were all LLDs confirmed operational and accurate within regulatory requirements? Yes No*Was the testing apparatus properly calibrated? Yes No* N/A For mechanical LLDs, does the LLD restrict product flow if it detects a leak? Yes No* N/A For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? Yes No* N/A For electronic LLDs that are programmed for positive shut down, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? Yes No* N/A For electronic LLDs that are programmed for positive shut down, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? Yes No* N/A For electronic LLDs, have all accessible wiring connections been visually inspected? Yes No*Were all items on the equipment manufacturer's maintenance checklist completed? * In the Section H, below, describe how and when these deficiencies were or will be corrected. H.Comments: Page 3 of 3 12/07 SWRCB, January 2006 Spill Bucket Testing Report Form This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: 7-ELEVEN #32376, MKT 2368 Date of Testing: 3/24/2017 Facility Address: 9600 BRIMHALL RD. , BAKERSFIELD, CA 93312 Facility Contact: Joseph or Kuldip 3/26/15 Phone: 661-588-4059 Date Local Agency Was Notified of Testing: Name of Local Agency Inspector (if present during testing): 2. TESTING CONTRACTOR INFORMATION Company Name: TANKNOLOGY INC. Technician Conducting Test: Franscico Castro Credentials1: CSLB Contractor ICC Service Tech. SWRCB Tank Tester Other (Specify) License Number(s): 743160 / 8026747 3. SPILL BUCKET TESTING INFORMATION Test Method Used By: Hydrostatic Vacuum Other Test Equipment Used: LAKE TEST Equipment Resolution: 0.0625 in. Identify Spill Bucket (By Tank Number, Stored Product, etc.) Bucket Installation Type: Bucket Diameter: Bucket Depth: Wait time between applying vacuum/water and start of test Test Start Time (TI): Initial Reading (RI): Test End Time(TF): Final Reading (RF): Test Duration(TF–TI): Change in Reading (RF–RI) : Pass/Fail Threshold or Criteria: Test Result: Spill Box # Tank T2 RUL RUL - Fill 1 - Direct - Below Grade in containment sump Direct Bury Contained in Sump 11.00 15.00 15 min 09:00:00 14.00 in. 10:00:00 14.00 in. 1 hr 0.00 in. +/- 0.00 Pass Spill Box # Tank T3 PUL PUL - Fill 1 - Direct - Below Grade in containment sump Direct Bury Contained in Sump 11.00 15.00 15 min 09:00:00 14.00 in. 10:00:00 14.00 in. 1 hr 0.00 in. +/- 0.00 Pass Spill Box # Direct Bury Contained in Sump min +/- Spill Box # Direct Bury Contained in Sump min +/- Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. Technician's Signature:Date:3/24/2017 1State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements may be more stringent. WO: 3433712 7-Eleven Test Water Log Work Order: Site Name/ID: Address: City: 3433712 7-ELEVEN #32376, MKT 2368 9600 BRIMHALL RD. BAKERSFIELD Date: 3/24/2017 State: CA Zip: 93312 Work Performed:ATG, E-Stop, Impv, LDs, SB's Was Test Water left on site? Yes Test Fluid Transported Off Site by Tanknology Transported off Site by Other Company No Water used If Yes describe how much water and how contained? Left three: five gallon buckets onsite. If Yes who and when did you contact from site to report the water? If Transported Off Site by Tanknology how much was hauled? If Transported Off Site by Other Company what company and how much water? Technician Signature: Date: 3/24/2017 WO: 3433712 Site Diagram (This site diagram is for reference only and is not drawn to scale) Work Order:3433712 Site ID / Name:32376 / 7-ELEVEN #32376, MKT 2368 Address:9600 BRIMHALL RD. City:BAKERSFIELD State:CA Zip:93312 W.O.# SC1-3433712 I50301 MAR 24, 2017 10:43 AM # 1:235431 7-11 32376 I50302 MAR 24, 2017 10:43 AM # 2:9600 BRIMHALL I50303 MAR 24, 2017 10:43 AM # 3:BAKERSFIELD CA 93312 I50304 MAR 24, 2017 10:43 AM # 4:B0687875505001 I51700 MAR 24, 2017 10:43 AM SYSTEM TYPE AND LANGUAGE FLAG SYSTEM UNITS U.S. SYSTEM LANGUAGE ENGLISH SYSTEM DATE/TIME FORMAT MON DD YYYY HH:MM:SS xM I50F00 MAR 24, 2017 10:43 AM MON DD YYYY HH:MM:SS xM I10200 MAR 24, 2017 10:43 AM 235431 7-11 32376 9600 BRIMHALL BAKERSFIELD CA 93312 B0687875505001 SYSTEM CONFIGURATION SLOT BOARD TYPE POWER ON RESET CURRENT 1 4 PROBE / G.T. 163674 163620 2 INTERSTITIAL BD 202004 201933 3 INTERSTITIAL BD 202323 202161 4 8SMARTSENSOR BD 39413 39391 5 UNUSED 9554990 9503926 6 UNUSED 9550944 9482123 7 UNUSED 9540316 9483566 8 UNUSED 9550004 9481970 9 RELAY BOARD 15029 15029 10 UNUSED 9549451 9486185 11 UNUSED 9539916 9481833 12 UNUSED 9541491 9487803 13 UNUSED 9542081 9481242 14 UNUSED 9535696 9481526 15 UNUSED 9547658 9488612 16 UNUSED 9541885 9486316 COMM 1 ELEC DISP INT. 101249 101187 COMM 2 ELEC DISP INT. 101004 101030 COMM 3 SERIAL SAT BD 484006 483989 COMM 4 UNUSED 9546149 9486731 COMM 5 RS485 SERIAL BD 68771 68795 COMM 6 MT COMM BOARD 408642 407995 I60100 MAR 24, 2017 10:43 AM TANK CONFIGURATION DEVICE LABEL CONFIGURED 1 OFF 2 RUL ON 3 PUL ON 4 OFF I60200 MAR 24, 2017 10:43 AM TANK PRODUCT LABEL TANK PRODUCT LABEL 1 2 RUL 3 PUL 4 I60300 MAR 24, 2017 10:43 AM TANK PRODUCT CODE TANK PRODUCT LABEL 1 1 2 RUL 2 3 PUL 3 4 4 I60400 MAR 24, 2017 10:43 AM TANK FULL VOLUME TANK PRODUCT LABEL GALLONS 1 0 2 RUL 10028 3 PUL 10028 4 0 I60700 MAR 24, 2017 10:43 AM TANK DIAMETER TANK PRODUCT LABEL INCHES 1 0.00 2 RUL 96.00 3 PUL 96.00 4 0.00 I60900 MAR 24, 2017 10:43 AM TANK THERMAL COEFFICIENT TANK PRODUCT LABEL 1 0.000000 2 RUL 0.000700 3 PUL 0.000700 4 0.000000 I61200 MAR 24, 2017 10:43 AM TANK MANIFOLDED PARTNERS TANK PRODUCT LABEL SIPHON MANIFOLDED TANKS LINE MANIFOLDED TANKS 1 NONE NONE 2 RUL NONE NONE 3 PUL NONE NONE 4 NONE NONE I62100 MAR 24, 2017 10:43 AM TANK LOW PRODUCT LIMIT TANK PRODUCT LABEL GALLONS 1 0 2 RUL 900 3 PUL 769 4 0 I62200 MAR 24, 2017 10:43 AM TANK HIGH PRODUCT LIMIT TANK PRODUCT LABEL GALLONS 1 0 2 RUL 9526 3 PUL 9526 4 0 I62300 MAR 24, 2017 10:43 AM TANK OVERFILL LEVEL LIMIT TANK PRODUCT LABEL GALLONS 1 0 2 RUL 9025 3 PUL 9025 4 0 I62400 MAR 24, 2017 10:43 AM 2 RUL 1.5 3 PUL 1.5 I62800 MAR 24, 2017 10:43 AM TANK MAXIMUM VOLUME LIMIT TANK PRODUCT LABEL GALLONS 1 0 2 RUL 10028 3 PUL 10028 4 0 I62900 MAR 24, 2017 10:43 AM TANK DELIVERY REQUIRED LIMIT TANK PRODUCT LABEL GALLONS 1 0 2 RUL 1504 3 PUL 1504 4 0 I70300 MAR 24, 2017 10:43 AM LIQUID TYPE SENSOR LOCATION TYPE 1 RUL STP SUMP DUAL FLT. HIGH VAPOR 2 RUL ANNULAR TRI-STATE (SINGLE FLOAT) 3 PUL STP SUMP DUAL FLT. HIGH VAPOR 4 PUL ANNULAR TRI-STATE (SINGLE FLOAT) 5 TRI-STATE (SINGLE FLOAT) 6 TRI-STATE (SINGLE FLOAT) 7 DISP 1-2 DUAL FLT. HIGH VAPOR 8 DISP 3-4 DUAL FLT. DISCRIMINATING 9 DISP 5-6 DUAL FLT. DISCRIMINATING 10 DISP 7-8 DUAL FLT. DISCRIMINATING 11 DISP 9-10 DUAL FLT. DISCRIMINATING 12 DISP 11-12 DUAL FLT. DISCRIMINATING 13 RUL FILL SUMP TRI-STATE (SINGLE FLOAT) 14 PUL FILL SUMP TRI-STATE (SINGLE FLOAT) 15 TRI-STATE (SINGLE FLOAT) 16 TRI-STATE (SINGLE FLOAT) I72100 MAR 24, 2017 10:43 AM SMART SENSOR CONFIGURATION DEVICE LABEL CONFIGURED 1 DISP 1-2 ON 2 DISP 3-4 ON 3 DISP 5-6 ON 4 DISP 7-8 ON 5 DISP 9-10 ON 6 DISP 11-12 ON 7 OFF 8 PRESSURE SENSOR ON I72200 MAR 24, 2017 10:43 AM SMART SENSOR LABEL DEVICE LABEL 1 DISP 1-2 2 DISP 3-4 3 DISP 5-6 4 DISP 7-8 5 DISP 9-10 6 DISP 11-12 7 8 PRESSURE SENSOR I72900 MAR 24, 2017 10:43 AM VACUUM SENSOR PUMP NUMBER DEVICE LABEL PUMP NUMBER I72A00 MAR 24, 2017 10:43 AM VACUUM SENSOR VOLUME DEVICE LABEL VOLUME I72B00 MAR 24, 2017 10:43 AM VACUUM SENSOR RELIEF VALVE PRESENT DEVICE LABEL RELIEF VALVE I72C00 MAR 24, 2017 10:43 AM VACUUM SENSOR RELIEF VALVE PRESSURE DEVICE LABEL RELIEF VALVE PRESSURE I61500 MAR 24, 2017 10:43 AM TANK PRODUCT LABEL METER DATA 1 NO 2 RUL YES 3 PUL YES 4 NO I90200 MAR 24, 2017 10:43 AM SOFTWARE REVISION LEVEL VERSION 329.02 SOFTWARE# 346329-100-C CREATED - 09.07.01.16.29 S-MODULE# 330160-106-a SYSTEM FEATURES: PERIODIC IN-TANK TESTS ANNUAL IN-TANK TESTS CSLD BIR ISD I20600 MAR 24, 2017 10:43 AM 235431 7-11 32376 9600 BRIMHALL BAKERSFIELD CA 93312 B0687875505001 TANK ALARM HISTORY TANK 2 RUL HIGH WATER ALARM MAR 24, 2017 8:31 AM OVERFILL ALARM MAR 24, 2017 8:42 AM LOW PRODUCT ALARM MAR 24, 2017 8:28 AM HIGH PRODUCT ALARM MAR 24, 2017 8:43 AM INVALID FUEL LEVEL MAR 24, 2017 8:27 AM PROBE OUT MAR 24, 2017 8:47 AM MAR 24, 2017 8:27 AM HIGH WATER WARNING MAR 24, 2017 8:31 AM DELIVERY NEEDED MAR 24, 2017 8:28 AM MAX PRODUCT ALARM MAR 24, 2017 8:43 AM LOW TEMP WARNING MAR 24, 2017 8:47 AM TANK 3 PUL HIGH WATER ALARM MAR 24, 2017 8:29 AM OVERFILL ALARM MAR 24, 2017 8:42 AM LOW PRODUCT ALARM MAR 24, 2017 8:26 AM HIGH PRODUCT ALARM MAR 24, 2017 8:43 AM INVALID FUEL LEVEL MAR 24, 2017 8:46 AM MAR 24, 2017 8:25 AM PROBE OUT MAR 24, 2017 8:45 AM MAR 24, 2017 8:25 AM HIGH WATER WARNING MAR 24, 2017 8:29 AM DELIVERY NEEDED MAR 24, 2017 9:04 AM MAR 24, 2017 8:25 AM MAR 15, 2017 4:17 PM I30200 MAR 24, 2017 10:43 AM 235431 7-11 32376 9600 BRIMHALL BAKERSFIELD CA 93312 B0687875505001 LIQUID ALARM HISTORY REPORT SENSOR LOCATION 1 RUL STP SUMP MAR 24, 2017 8:55 AM FUEL ALARM MAR 24, 2017 8:52 AM SENSOR OUT ALARM JAN 25, 2017 8:32 AM FUEL ALARM 2 RUL ANNULAR MAR 24, 2017 8:54 AM FUEL ALARM MAR 24, 2017 8:52 AM SENSOR OUT ALARM JAN 25, 2017 8:49 AM FUEL ALARM 3 PUL STP SUMP MAR 24, 2017 8:56 AM LIQUID WARNING MAR 24, 2017 8:52 AM SENSOR OUT ALARM JAN 25, 2017 8:34 AM HIGH LIQUID ALARM 4 PUL ANNULAR MAR 24, 2017 8:56 AM FUEL ALARM MAR 24, 2017 8:52 AM SENSOR OUT ALARM JAN 25, 2017 8:52 AM FUEL ALARM 7 DISP 1-2 MAR 24, 2017 8:59 AM LIQUID WARNING MAR 24, 2017 8:52 AM SENSOR OUT ALARM JAN 25, 2017 8:25 AM HIGH LIQUID ALARM 8 DISP 3-4 MAR 24, 2017 10:08 AM HIGH LIQUID ALARM MAR 24, 2017 8:58 AM LIQUID WARNING MAR 24, 2017 8:52 AM SENSOR OUT ALARM 9 DISP 5-6 MAR 24, 2017 8:59 AM LIQUID WARNING MAR 24, 2017 8:52 AM SENSOR OUT ALARM JAN 25, 2017 8:27 AM HIGH LIQUID ALARM 10 DISP 7-8 MAR 24, 2017 8:58 AM LIQUID WARNING MAR 24, 2017 8:52 AM SENSOR OUT ALARM JAN 25, 2017 8:26 AM HIGH LIQUID ALARM 11 DISP 9-10 MAR 24, 2017 8:57 AM LIQUID WARNING MAR 24, 2017 8:52 AM SENSOR OUT ALARM JAN 25, 2017 8:27 AM HIGH LIQUID ALARM 12 DISP 11-12 MAR 24, 2017 9:31 AM SENSOR OUT ALARM MAR 24, 2017 8:57 AM LIQUID WARNING MAR 24, 2017 8:52 AM SENSOR OUT ALARM 13 RUL FILL SUMP MAR 24, 2017 8:59 AM FUEL ALARM MAR 24, 2017 8:54 AM FUEL ALARM MAR 24, 2017 8:54 AM FUEL ALARM 14 PUL FILL SUMP MAR 24, 2017 8:57 AM FUEL ALARM MAR 24, 2017 8:52 AM SENSOR OUT ALARM MAR 2, 2017 8:00 AM FUEL ALARM