HomeMy WebLinkAbout 6 month 989 RESULTS 2017TAIT
RISING TO THE CHALLENGE
p: 7141560/81222 www.toit.com
April 18, 2017
VIA FED EX. 7789 3386 6958
Bakersfield Fire Department
2101 H Street
Bakersfield CA 93301
Re: Secondary Containment Testinc
Pacific Bell Telephone Co. dbaAT&T California
3221 S. H STREET, BAKERSFIE -D, CA
GEOPAR: SA098
To Whom it May Concern:
701 N. Par1kcenter Drive, Santa Ana, CA 92705
Enclosed are the results for the following Itests completed on April 19, 2017:
■ Secondary Containment Testinjg Report Form
Please do not hesitate to call me if you h6ve any questions.
Sincerely,
Carlos E. Cardenas
Program Manager
CA tic# 588098 / AZ tic# 095984 1 NV tic# 0049666 / TX tic# CR0000041
SWRCB, January 2002
Secondary Containment Testing Report Form
This form is intended for use by contractors performing periodi testing of UST secondary containment systems. Use the
appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and
printouts from tests (if applicable), should be provided to the fa ility owner /operator for submittal to the local regulatory agency.
1_ FAC''TT,TTV TNF RMATTON Far -;fi,v m- SA098
Client Name: Pacific Bell Telephone Co dba ATT Californi
Pass
Date of Testing: 4/19/2017
Facility Address: 3221 S. H St. City:
Bakersfield State: CA Zip Code: 93304
Facility Contact: Grant Armstrong
Phone:
(661) 327 -6903
❑ Initial
❑ Repair Test
Date Local Agency Was Notified of Testing: 4/12/2017
6/9/2018
6 Month
❑ Other
Name of Local Agency Inspector (ifpresent during testing):
have Gardner
❑ Triennial
'7 T- PQTTNC~ C"NTRACT( -P INFORMATION
Company Name: TAIT Environmental Services
Pass
Technician Conducting Test: Adolfo Aguilar
Not
Tested
Credentials: El CSLB Licensed Contractor ❑ SWR
B Licensed Tank Tester Q ICC UST Service Technician
License Type: A B ASB C -10 HAZ
License Number: 588098
Manufacturer
Manufacturer Com
Training
onent(s) Date Training Expires
ICC Technician 5238610
6/9/2018
Franklin Fueling / Incon TS -STS 1007483708
3/1/2019
❑
❑
El
3. SUMMARY OF T�ST RESULTS
Component
Pass
Fail
Not
Tested
Rep
Ma
irs
e
SA0980001 Piping Sump
❑
❑
❑
MMM
❑
❑
❑
El
■
❑
❑
❑
0
MM
❑
❑
❑
❑
❑
❑
❑
000
❑
❑
❑
EJ
❑
❑
❑
❑
�
no
❑
❑
❑
EJ
❑
El
F--1
,—
I!!
�,
❑
❑
❑
❑
❑
❑
❑
❑❑
❑
Component
If hydrostatic testing was performed, describe what was done w'th the water after completion of tests:
Took Non -Haz. Test Water To TAIT Shop.
no
��L=
MMM
MMM
00■
■
■
mmmm
MM
M
000
0�0
�
no
.
•
For any equipment capable of generating a print out of test resu �ystem ts, you must attach a copy of the test report to this certification.
❑ printout attached.
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements
Technician's Signature: ;0�f " Date: 4/19/2017
SWRCB, January 2002
6. PIPING SUMP TESTING
Test Method Developed By: ❑ Sump Manufacturer
❑ Other (Spec)
0 Industry Standard ❑ Professional Engineer
Test Method Used: ❑ Pressure
❑ Other (Spec)
❑ Vacuum X❑ Hydrostatic
Test Equipment Used: Incon TS -STS
Equipment Resolution: .0006"
NMI 0111". 11 IN
SA0986001 Piping
Sump Diameter:
48"
Sump Depth:
51 "
Sump Material:
Fiberglass
Height from Tank Top to Top of
Highest Piping Penetration:
22"
Height from Tank Top to Lowest
Electrical Penetration:
15"
Condition of sump prior to testing:
Excellent
Portion of Sump Tested'
>2" above Highest Pnt
Does turbine shut down when
sump sensor detects liquid (both
product and water) ?*
❑Yes ❑No ONA
yes ❑No ❑NA
❑Yes ❑No ❑NA
❑Yes ❑No ❑NA
Turbine shutdown response time
N/A
Is system programmed for fail -safe
shutdown ?*
❑Yes ❑No [X] NA
yes ❑No ❑NA
❑Yes ❑No ❑NA
❑Yes ❑No ❑NA
Was fail -safe verified to be
operational ?*
❑Yes ❑No ❑ NA
Yes ❑No ❑NA
❑Yes ❑No ❑NA
❑Yes ❑No ❑NA
Wait time between applying
pressure /vacuum /water and starting
test:
15 Minutes
Test Start Time:
10:40 AM
11:00 AM
Initial Reading (RI):
5.1328"
5.1351"
Test End Time:
10:55 AM
11:15 AM
Final Reading (RF):
5.1326"
5.1349"
Test Duration:
15 Min.
15 Min.
Change in Reading (RF -R,):
.0002"
.0002"
Pass/Fail Threshold or Criteria:
.002"
.002"
Test Result:
0 Pass ❑ Fail
Pass ❑ Fail
❑Pass ❑Fail
❑ Pass ❑Fail
Was sensor removed for testing?
FX_jYes ❑No ❑NA
yes ❑No ❑NA
❑Yes ❑No ❑NA
❑Yes ❑No ❑NA
Was sensor properly replaced and
verified functional after testing?
F-Wes FX_jNo ❑NA
Yes ❑No ❑NA
❑Yes ❑No ❑NA
❑Yes ❑No ❑NA
Comments — (include information on repairs made prior to
t sting, and recommended follow -up for failed tests)
Re- Installed Sensor To Lowest Point But Not Tested.
' If the entire depth of the sump is not tested, specify how much as tested. If the answer to anX of the questions indicated with an
asterisk ( *) is "NO" or "NA ", the entire sump must be tested. (S e SWRCB LG -160)