Loading...
HomeMy WebLinkAbout1.1-6760STANDARD NOTES GENESAL 1. CONTRACTOR WILL FURNISH ALL MATERIALS, TOOLS, LABOR, EQUIPMENT AND SUPERVISION NECESSARY TO COMPLETE INSTALLATION. 2. IF THE PROJECT IS SUBJECT TO THE PROVISIONS OF THE NATIONAL POLLUTANT DISCHARGE EUMINA11ON SYSTEM (NPDES), A -NOTICE OF INTENT- (NOI) TO COMPLY NTH THE 11ERMS OF THE GENERAL PERMIT TO DISCHARGE STORM WATER ASSOCIATED NTH CONSTRUCTION ACTIVITY (SWRCB ORDER NO. 2009-009-DWQ AS AMENDED BY ORDER 2010-0014-DWQ AND ORDER 2012-0006-DWQ) MUST BE FILED NTH STATE WATER RESOURCES CONTROL BOARD IN SACRAMENTO BEFORE THE BEGINNING OF ANY CONSTRUCT10N ACTIVITY. COMPLIANCE WITH THE GENERAL PERMIT REQUIRES THAT A STORM WATER POLLUTION PLAN (SWPPP) BE PREPARED CONTINUOUSLY CARRIED OUT, AND ALWAYS BE AVAILABLE FOR PUBLIC INSPECTION DURING NORMAL CONsTw�TiON HOURS. WASTE DISCHARGE IDENTIFICATION (WDID) NUMBER 5F15C378611 HAS BEEN ISSUED BY THE STATE WATER RESOURCES CONTROL BOARD FOR THIS PROJECT. 3. UNDERGROUND SERVICE ALERT (USA) SHALL BE NOTIFIED AT LEAST 2 WORKING DAYS BEFORE CONSTRUCTION. TELEPHONE 1-800-227-2600. 4. CONTRACTOR TO CALL FOR USA LOCATE AND POTHOLE ALL MARKED UTILITIES THAT CROSS OR ARE WITHIN 5' HORIZONTAL DISTANCE OF SEWER AND STORM DRAIN LINES. VERTICAL AND HORIZONTAL LOCATION SHALL BE ASCERTAINED BY THE CONTRACTOR AHEAD OF ANY EXCAVATIONS TO VERIFY THAT THE PROPOSED DESIGN DOES NOT CONFLICT WITH ANY UTILITIES. IN THE EVENT A CONFLICT EXISTS THE ENGINEER SHALL BE NOTIFIED IN ORDER TO REDESIGN THE ALIGNMENT. IF RELOCATION OF EXISTING UTILITIES IS DEEMED NECESSARY THE CONTRACTOR SHALL BE COMPENSATED FOR INSTRUCTED RELOCATION. IF REDESIGN OF THE ALIGNMENT REQUIRES ADD11IONAL FITTINGS, PIPE OR EXCAVATION THE CONTRACTOR SHALL BE COMPENSATED FOR REVISION. IN THE EVENT A UTILITY IS DAMAGED THE CONTRACTOR SHALL BE WHOLLY RESPONSIBLE FOR ITS REPAIR. 5. ALL EXIS11NG I MPROVEMENTS (CURB,GUTTER, SID - EWALK, CROSS GUTTER, FENCES, ETC.) THAT ARE REMOVED, DAMAGED, UNDERCUT AND/OR THAT DO NOT MEET CURRENT STANDARDS SET BY PUBLIC WORKS SHALL BE REPAIRE& OR REPLACED AS DIRECTED BY THE CITY, ENGINEER. 6. ALL EXISTING PAVING AND SURFACING REMOVED, DAMAGED OR UNDERCUT SHALL BE REPLACED IN ACCORDANCE NTH THE CITY OF BAKERSFIELD STANDARD DRAWING ST -6, EXCEPT AS NOTED ON PLANS. 7. ALL MANHOLES AND CI EANOUTS WITHIN TRACT, INCLUDING EXISTING MANHOLES, SHALL BE ADJUSTED TO FINISH GRADE IN ACCORDANCE NTH CITY STANDARDS. EXISTING MANHOLES MAY REQUIRE REMOVAL OF EXISTING CONE, AND REMOVAL OR "CHANGE OUT" OF BARREL RINGS. 8. ALL IMPROVEMENTS SHALL BE IN ACCORDANCE NTH THE REQUIREMENTS AND SPECIFICATIONS OF THE CITY OF BAKERSFIELD. 9. THE FOLLOWING CITY OF BAKERSFIELD STANDARDS SHALL BE CONSIDERED PART OF THESE PLANS: ST -1, ST -3, ST -5, ST -7, ST -10, ST -11, ST -12, ST -13, ST -14, ST -15, ST -16, ST -20, ST -21, ST -22, ST -23, ST -24, ST -25, ST -26, D-14, D-16, D-17, SW -5, SW -6, T-1, CALTRANS A88A, 10. PAVING FOR RESIDENTIAL AND LOCAL STREETS SHALL BE: 0.20' TYPE *B" ASPHALT CONCRETE OVER 0.95' AGGREGATE BASE (PER NOTE 28) OVER 0.50' O.G. TO BE COMPACTED TO 957* RELA11VE DENSITY PER C.O.B. STD. ST -13. 11. INSTALL STANDARD SURVEY MONUMENT FRAME AND COVER PER CITY OF BAKERSFIELD STD. DWG. ST -13. TO BE INSTALLED @ EXISTING 12.. INSTALL TRAFFIC CONTROL SIGNS + INSTALL STANDARD STREET NAME SIGNS PER C.O.B. STD. T-1 INSTALL METRO SIZE STREET NAME SIGNS PER C.O.B. STD, T-1 INSTALL STREET LIGHT- HOLOPHANE-LVUI SERIES PER C.O.B. STD. SP7-86-10. 13. STREET LIGHTS SHALL MATCH THOSE EXISTING IN THE VICINITY AND IN ACCORDANCE WITH C.O.B. STANDARD DETAIL ST -14. 14. STREETLIGHT LUMINAIRES ARE TO BE LED AS SPECIFIED IN COB SPECIAL PROVISIONS SEC71ON 86-6.01 OF WHICH MODELS INCLUDE: AMERICAN ELECTRIC LIGHTING ATBO, AUTOBAHN SERIES LEOTEK ECI THRU EC7 SERIES CREE XSP/XSPR SERIES AND OTHERS ON APPROVED LIST OR AN EQUIVALENT AS APPROVED BY CITY ENGINEER 15. NTH THE EXCEPTION OF THOSE ON RETURNS, STREET SIGNS AND STREET LIGHTS SHALL BE INSTALLED AT THE EXTENSION OF THE NEAREST LOT LINE TO WHERE THEY ARE SHOWN HEREIN. 16. INSTALL TYPE "B" CURB AND GUTTER, PER C.O.B. STANDARDS, ON ALL STREETS UNLESS OTHERWISE NOTED. 17. INSTALL 5' COMBINATION SIDEWALK ON ALL LOCAL STREETS AND 6' COMBINATION SIDEWALK ON ARTERIAL AND COLLECTORS UNLESS OTHERWISE NOTED. 18. SE WEIR LATERAL LOCATIONS TO BE STAMPED ( S ) INTO THE CURB FACE OVER EACH SEWER LATERAL. 19. STAMP "C* INTO CURB FACE AT ALL MEDIAN CONDUIT CROSSINGS. 20. INSTALL ADD111ONAL # 3-1/2 PULL BOX FOR STREET LIGHTS AT P.G.& E. SERVICE POINT. 21. ALL PULL BOXES TO BE INSTALLED ON A GRAVEL BED A MINIMUM OF 6" THICK. 22. INSTALL HANDICAP RAMP PER CALTRANS 2002 REVISED DUAL 21. UNIT STANDARD PLAN R.S.P. A88A-CASE A. 23. ALL MANHOLE AND LAMPHOLE FRAME AND COVERS SHALL BE SET lle BELOW PAVEMENT GRADE. 24. WARNING/REGULATORY SIGNS: SIGN PANELS SHALL BE MOUNTED ON POSTS WITH HAWKINS M2G SERIES BOLT AND VANDAL PROOF NUT ASSEMBLY OR EQUAL ROADSIDE SIGNS INSTALLED PER STD. T-19 SHALL BE LOCATED WITHIN SIDEWALK 6" FROM BACK. 25. COMPACTION TESTS SHALL BE I THE RESPONSIBILITY OF THE DEVELOPER/SUBDIVIDER/CONTRACTOR. THE NUMBER AND LOCATION OF REQUIRED TESTS SHALL BE DETERMINED BY THE CITY ENGINEER. 26. AN OPEN STREET PERMIT SHALL BE OBTAINED FROM THE CITY OF BAKERSFIELD PUBLIC WORKS DEPT. FOR ANY WORK PERFORMED WITHIN EXISTING ACCEPTED STREET RIGHT-OF-WAY. 27. UNLESS SECURED BY A SUBDIVISION AGREEMENT, SECURITY BASED ON AN APPROVED ENGINEER'S ESTIMATE FOR THE WORK PERFORMED WITHIN THE RIGHT-OF-WAY AND INSURANCE SHALL BE POSTED PRIOR TO ISSUANCE OF THE PERMIT. 28. AGGREGATE BASE: AGGREGATE BASE MATERIAL FOR ALL ROADWAYS SHAH MEET THE SPECIFICATIONS FOR CLASS 2 AGGREGATE BASE (CL 2 AB) -CONFORMING TO SEC11ON 26 OF THE STATE STANDARD SPECIFICATIONS, LATEST EDITION. 29. AGGREGATE BASE SHALL BE FURNISHED AND'PLACED IN ACCORDANCE WITH THE CONTRACT PLANS, THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION AND THESE DETAILED SPECIFICATIONS. AGGREGATE BASE SHALL BE GRADED TO WITHIN THE CITY TOLERANCES AND COMPACTED TO 9570 OF THE MAXIMUM DRY DENSITY IN ACCORDANCE WITH ASTM D-1557. 30. NO PUBLIC WORKS INSPECTION WILL BE GIVEN FOR THE WORK IN THE UNDEDICATED ROADWAYS IN THIS PROPERTY UNTIL A SUBDIVISION PERMIT HAS BEEN OBTAINED. 6' WING W/2 —CENTERUNE STORM DRAIN B.C.R. C4 1 ---_'CENTERUNE STORM DRAIN UP CURB AND GUTTER FLOWUNE CURB rAND GUTTER SIDEWALK W 6' WING LANDSCAPE TYPICAL CATCH BASIN LOCATION AT CURB RETURN N. T. S. CITY OF BAKERSFIELD KF.RN COUNTY CALIFORNIA STREET CONSTRUCTION PLANS G04D 123 19 20 21 22 \\-Tios, nE 30 0 29 28 0 27 26 0 0 McCUTC.1HEN ROAD .170< m — 0 _jl_ ix W 31 ji 34 0 m W J& I cn McKEE Irff0_AD J, I — 11 L -HWY. PUIMPIGN CC 119 CENTER M5 cn 6 a: PROJEC T3 u' S1 TE 0 9 z 8 U_ f'l 10 11 12 cn cn L 0 T-37 S1 LR2 7E L 0' 1FIF-11 VICINITY MAP NO SCALE LIST OF MATERIALS ITEM UNIT TOTAL A.C. PAVING TONS 726 CL. 11 AGG. BASE CUYD 742 SUBGRADE PREPARATION CUYD 927 6* CURB AND GUTTER LF 2500 HANDICAP RAMPS EA. 2 DRIVEWAYS SOFT 4230 SIDEWALK SQFT 12011 SAWCUT LF 40 STANDARD STREET NAME SIGNS EA. 2 5800 LUMEN STREET LIGHTS EA. 4 MONUMENT ENCASEMENTS EA. 5 LOCAL STREET FRONTAGE 1191 LF FOR - T AC.T NO. 6760 TRACT ]No. 6290 UNIT 3 M, SK, 56, PG. 131 4 7 10 5 0 6 3 b-1 7- U) CO :� 7 4 a— _____4 13 PROJECT S]TE 8.92 ACRES GROSS AFNs 532-040-02 9 15 10 AGASS Z ROCK W6 v Z" 11 — @ I I 12 X2 c1c 13 31 20 14 30 F 21 15 28 z LO M C; 16 Z 25 23 3 17 27 18 TAFT HIGHWAY (NOT A PART) (S-d-d-F—FSITE FiLLAR "q n_ PROJECT MAP SCALE: 1"=200' SHEET NO. INDEX INDEX OF SHEETS SHEET TI TLE 1. COVER SHEET 2. NOTES & SPECIFICATIONS 3. KANOSH COBBLE DRIVE 4. AGASSIZ ROCK WAY LEGEND (CONT.): LEGEND; STORM DRAIN - REFER TO SEWER & STORM DRAIN PLANS 0 ABBREVIATIONS cStr FL FLOWIJNE POVC POINT ON VERTICAL CURVE CL CENTERLINE BVC BEGIN VERTICAL CURVE ELEV ELEVATION EVC END VER11CAL CURVE BCR BEGIN CURB RETURN PI POINT OF INTERSECTION ECR END CURB RETURN PRC POINT OF REVERSE CURVATURE BC BEGIN CURVE PCC POINT OF COMPOUND CURVATURE PIVC POINT OF INTERSEC11ON TC TOP OFCURB FURNISH & INSTALL IRRIGATION CONDUIT OF VER11CAL CURVE TP TOP OF PAVEMENT SDMH STORM DRAIN MANHOLE FC FINISH CONCRETE INV INVERT RCP REINFORCED CONCRETE PIPE G.B. GRADE BREAK RGJ RUBBER GASKETED JOINT @) FURNISH & INSTALL SURVEY MONUMENT PER C.O.B. SID. ST -13. @ EXISTING SURVEY MONUMENT CTION LETTER + FURNISH & INSTALL STREET SIGN PER C.O.B. STD. T-1. + FURNISH & INSTALL METRO STREET SIGN PER C.O.B. SM. T-1. SHEE'r SECTION IS LOCATED FURNISH & INSTALL STREET LIGHT­HOLOPHANE-LVUI SERIES PER C.O.B. SID. SP7-86-10. FURNISH & INSTALL TRAFFIC SIGNS PER C.O.B. SM. T-1 9: 1-1 - STOP WI -7 - DOUBLE ARROW *R6-1* - ONE WAY *M-6" - SINGLE ARROW �R5-1* - DO NOT ENTER 'W1-1* - CURVE ARROW -R26(CA)- - NO PARKING "W3 -Y - SIGNAL AHEAD *R3 -5R" - RIGHT TURN ONLY *W3 -l' - STOP AHEAD "R4-7" - KEEP RIGHT `S5-2* - END SCHOOLZONE -R81(CAr - BIKE LANE "S4 -t - MEN 04ILDREN ARE PRESENT 'W31 (CAr - END 'S4-37 - SCHOOL *W14-1" - DEAD END "R2-1* - SPEED LIMIT 20 *W14 -t - NO OUTLET LEGEND (CONT.): D STORM DRAIN - REFER TO SEWER & STORM DRAIN PLANS 0 STORM DRAIN MANHOLE - REFER TO SEWR & STORM DRAIN PLANS cStr CATCH BASIN - REFER TO SEWER & STORM DRAIN PLANS S SEWER - REFER TO SEWER & STORM DRAIN PLANS SEWER MANHOLE - REFER TO SEWER & STORM DRAIN PLANS SEWER CLEAN OUT - REFER TO SEWER & STORM DRAIN PLANS CONSTRUCT 18' BOTTOM WIDTH DRIVEWAY W/3' WINGS PER C.O.B. SM. ST -4. (UNLESS OTHERVASE NOTED) PHASE BOUNDARY m m m TRACT BOUNDARY PROPOSED EDGE OF PAVEMENT FURNISH & INSTALL TRAFFIC SIGNAL CONDUIT TS FURNISH & INSTALL IRRIGATION CONDUIT IR FURNISH & INSTALL INTERCONNECT CONDUIT Ic ]23 5 FURNISH & INSTALL SPLICE BOX FOR INTERCONNECT TR3--NO. 3 1/2 SIZE TR5=NO. 5 SIZE TR6=NO. 6 SIZE @ CURVE NUMBER FOR CURVE DESCRIPTION ALONG CURB TAPER NUMBER FOR TAPER DESCRIPTION ALONG CURB ITEM OF WORK - SEE SCHEDULE CTION LETTER SECTION LINE SHEE'r SECTION IS LOCATED NOTE: 1. PRIOR TO THE START OF ANY PHASE OF CONSTRUCTION9 THE CITY CONSTRUCTION INSPECTION DEPARTMENT SHALL BE GIVEN 24 HOURS NOTICE. TELEPHONE 3126-3049 2. ALL MATERIALS SUPPLIED FOR THIS PROJECT WILL REQUIRE A CERTIFICATE OF COMPLIANCE STATING THAT THE REQUIREMENTS & STANDARDS SET FORTH BY THE CITY OF BAKERSFIELD HAVE BEEN MET. 3. NO CITY INSPEC11ONS WILL BE GIVEN FOR THE WORK IN THIS AREA UN11L A STREET PERMIT WITH APPROPRIATE SECURITY AND, INSURANCE HAS BEEN OBTAINED. ENGINEER'S STATEMENT THESE PLANS AND SPECIFICATIONS WERE PREPARED BY ME OR UNDER MY DIRECTION AND TO THE BEST OF MY KNOWLEDGE AND BELIEF COMPLY WITH CITY OF BAKERSFIELD ORDINANCES, STANDARDS, AND DESIGN CRITERIA AND INCLUDE ALL IMPROVEMENT REQUIREMENTS OF THE ADVISORY AGENCY OR OTHER REVIEW BOARD. ANY ERRORS, OMISSIONS, OR VIOLATIONS OF THOSE ORDINANCES, STANDARDS, AND DESIGN CRITERIA ENCOUNTERED DURING CONSTRUCTION SHALL BE CORRECTED AND SUCH CORRECTIONS REFLECTED ON CORRECTED PLANS SUBMITTED TO THE CITY ENOINEER. APPROVED BY: ROGER A. McINTOSH R.C.E. 33322 �-2'7- 1 DATE (* 17-a 1 \7 APPROVED BY:, NICOLAS FIDLER, PUBLIC WORKS DIRECTOR DATE R.C.E. NO. 61069 EXP. 12-31-18 REVIEWED BY: ASSISTANT PUBLIC WORKS DIRECTOR -7 REVIEWED BY: _57/ 2- �,// 7 TRAFFIC ENGINEER BENCHMARK: TOP OF CONCRETE MONUMENT IN LAMPHOLE AT THE EAST END OF AGASSIZ ROCK WAY. ELEVATION = 347.12' (U.S.G.S. DATUM NAVD 88) (PER TRACT 6491 MONUMENT ELEVATION MAP) BASIS OF BEARINGS: THE BEARING OF N 89"04'29" W SHOWN FOR THE SOUTH LINE OF THE SOUTHEAST QUARTER OF SECTION 34, T. 30 S., R. 27 E. SHOWN ON TRACT NO. 6491 PHASE 3, M. BOOK 58, PAGE 91 WAS USED AS THE BASIS OF BEARINGS SHOWN -'HEREON. LEGAL DESCRIPTION: THE EAST HALF OF THE WEST HALF OF THE SOUTHWEST QUARTER OF THE SOUTHEAST QUARTER OF SECTION 34, TOWNSHIP 30 SOUTH, RANGE 27 EAST, MOUNT DIABLO MERIDIAN, AS PER THE OFFICIAL PLAT THEREOF ON FILE IN THE OFFICE OF THE SURVEYOR GENERAL. EXCEPTING THEREFROM THE WEST 208 FEET OF THE SOUTH 225 FEET OF THE EAST HALF OF THE WEST HALF OF THE SOUTHWEST QUARTER OF THE SOUTHEAST QUARTER OF SECTION 34, TOWNSHIP 30 SOUTH, RANGE 27 EAST, MOUNT DIABLO MERIDIAN, AS PER THE OFFICIAL PLAT THEREOF ON FILE IN THE OFFICE OF THE SURVEYOR GENERAL. C)Aj Cj f17 Know what's below. Call before you dig. z STANDARD NOTES (CON n. 31. SUBGRADE PREPARATION: THE CONTRACTOR SHALL FINE GRADE AND COMPACT STREET SUBGRADE IN ACCORDANCE NTH THE CONTRACT PLANS, CITY REQUIREMENTS AND STANDARD SPECIFICATIONS. SUBGRADE SHALL BE GRADED TO WITHIN THE CITY TOLERANCES AND COMPACTED TO 95% OF THE MAXIMUM DRY DENSITY IN ACCORDANCE NTH ASTM D-1557. 32. INSTALL BLUE MARKERS IN THE STREET AT THE FIRE HYDRANTS PER THE FIRE DEPARTMENT REQUIREMENTS. 33. ANY ITEMS IN PUBLIC RIGHT-OF-WAY THAT ARE DAMAGED OR DO NOT MEET CURRENT STANDARDS SET BY PUBLIC WORKS WILL REQUIRE REPAIR AND/OR UPGRADING AS PER CITY ENGINEER. 34. MAXIMUM SLOPE RATIO FROM BACK OF SIDEWALK TO FACE OF WALL OR STRUCTURE SHALL BE 4:1. EXCEPT FOR TWO FEET BEHIND THE SIDEWALK WERE THE MAXIMUM SLOPE SHALL BE 2X ALTERNATIVELY, THE CITY ENGINEER MAY APPROVE CURBING BEHIND THE SIDEWALK OR OTHER METHOD TO PREVENT EROSION ONTO THE SIDEWALK. 35. PRIOR TO PAVING, THE DESIGN ENGINEER FOR THE PROJECT SHALL VERIFY THAT CONDITIONS REMAIN THE SAME AS SHOWN IN THE APPROVED PLANS. SHOULD CONDITIONS BE CHANGED, A REVISED PLAN SHALL -BE SUBMITTED TO THE CITY FOR APPROVAL 10 DAYS PRIOR TO PAVING 36. DUST CONTROL CONTRACTOR SHALL OBTAIN A COPY OF THE DUST CONTROL PLAN (DCP) FOR THIS PROJECT FROM THE DEVELOPER, AND SHALL KEEP A COPY ON SITE AT ALL TIMES. FOR THE DURATION OF CONTRACTOR'S OCCUPANCY OF THE SITE, CONTRACTOR IS REQUIRED TO COMPLY WITH THE PROVISIONS OF SAID PLAN. 37. STORM WATER POLLUTION PREVENTION CONTRACTOR SHALL OBTAIN A COPY OF THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) FOR THIS PROJECT FROM THE DEVELOPER, AND SHAH KEEP A COPY ON SITE AT ALL TIMES. FOR THE DURATION OF CONTRACTOR'S OCCUPANCY OF THE SITE, CONTRACTOR IS REQUIRED TO COMPLY WITH THE PROVISIONS OF SAID PLAN. 38. CONSTRUCTION OPERATIONS SHALL BE ACTIVELY IN PROGRESS ONLY BETWEEN THE HOURS OF &30 A.M. - 4:00 P.M., MONDAY THROUGH FRIDAY, EXCEPT LEGAL HOLIDAYS. WHERE CONSTRUCTION OPERATIONS ARE ACTIVELY IN PROGRESS, A MINIMUM OF ONE TRAFFIC LANE� NOT LESS THAN TWELVE FEET IN WIDTH, SHALL BE OPEN FOR USE BY PUBLIC TRAFFIC. WHERE CONSTRUCTION OPERATIONS ARE NOT ACTIVELY IN PROGRESS, NOT LESS THAN TWO SUCH LANES SHALL BE OPEN FOR USE BY PUBLIC TRAFFIC. PUBLIC TRAFFIC MAY BE PERMITTED TO USE THE SHOULDERS AND, IF HALF -WIDTH CONSTRUCTION METHODS ARE USED, MAY ALSO BE PERMITTED TO USE THE SIDE OF THE ROADBED OPPOSITE TO THE ONE UNDER CONSTRUCTION. NO ADD11IONAL COMPENSATION WILL BE ALLOWED FOR ANY SHAPING OF SHOULDERS NECESSARY FOR THE ACCOMMODATION OF PUBLIC TRAFFIC THEREON DURING PAVING OPERATIONS. IN ORDER TO EXPEDITE THE PASSAGE OF PUBLIC TRAFFIC THROUGH OR AROUND THE WORK AND WHERE ORDERED BY THE ENGINEER, THE CONTRACTOR SHALL, AT HIS OWN EXPENSE, FURNISH, INSTALL, AND MAINTAIN CONSTRUCTION AREA SIGNS, LIGHTS, FLARES, TEMPORARY RAILING (TYPE K), BARRICADES, AND OTHER FACILITIES FOR THE SOLE CONVENIENCE AND DIREC11ON OF PUBLIC TRAFFIC. ALSO, WHERE DIRECTED BY THE ENGINEER, THE CONTRACTOR SHALL FURNISH COMPETENT FLAGMEN WHOSE SOLE DUTIES SHALL CONSIST OF DIRECTING THE MOVEMENT OF PUBLIC TRAFFIC THROUGH OR AROUND THE WORK. 39. TRAFFIC STRIPES AND PAVEMENT MARKINGS TO BE REMOVED WILL BE AS SHOWN ON PLANS AND AS DESIGNATED BY THE ENGINEER. TRAFFIC STRIPES AND PAVEMENT MARKINGS SHALL BE REMOVED TO THE FULLEST EXTENT POSSIBLE FROM THE PAVEMENT BY ANY METHOD THAT DOES NOT MATERIALLY DAMAGE THE SURFACE OR TEXTURE OF THE PAVEMENT OR SURFACING. WERE BLAST CLEANING IS USED FOR THE REMOVAL OF PAINTED TRAFFIC STRIPES AND PAVEMENT MARKINGS, THE AREA SHALL BE SHIELDED SO THAT NO MATERIAL FROM THE BLASTING OPERATION IS ALLOWED TO ENTER THE AREA THAT IS OPEN TO THE PUBLIC TRAFFIC. SAND OR OTHER MATERIAL DEPOSITED ON THE PAVEMENT AS A RESULT OF REMOVING TRAFFIC STRIPES AND MARKINGS SHALL BE REMOVED AS THE WORK PROGRESSES. ACCUMULATIONS OF SAND OR OTHER MATERIAL WHICH MIGHT INTERFERE WITH DRAINAGE OR MIGHT CONSTITUTE A HAZARD TO TRAFFIC WILL, NOT BE PERMITTED. TRAFFIC STRIPES SHALL BE REMOVED BEFORE ANY CHANGE IS MADE IN THE TRAFFIC PATTERN. BLAST CLEANING FOR REMOVAL OF TRAFFIC STRIPES SHALL BE FEATHERED OUT TO IRREGULAR AND VARYING WIDTHS. PAVEMENT MARKINGS SHALL BE REMOVED BY BLAST CLEANING A RECTANGULAR AREA, RATHER THAN JUST LETTERING OR MARKINGS, SO THE OLD MESSAGE CANNOT BE IDENTIFIED. AFTER REMOVAL OF TRAFFIC STRIPES AND PAVEMENT MARKINGS, A FOG SEAL COAT SHALL BE APPLIED IN CONFORMANCE WITH THE PROVISIONS IN SECTION 37, BITUMINOUS SEALS", OF THE STANDARD SPECIFICATIONS AND THE FOLLOWING: IN TRAFFIC STRIPE REMOVAL AREAS, THE FOG SEAL COAT SHALL BE APPLIED OVER THE TRAFFIC STRIPE REMOVAL AREA AND TO IRREGULAR AND VARYING WIDTHS WITH AN AVERAGE WIDTH OF 2 FEET ON EACH SIDE OF THE BLAST CLEANED TRAFFIC STRIPE REMOVAL AREA. IN PAVEMENT MARKING REMOVAL AREAS, THE FOG SEAL COAT SHALL BE APPLIED TO THE BLAST CLEANED RECTANGULAR AREA. FULL COMPENSATION FOR FURNISHING AND APPLYING FOG SEAL AS SPECIFIED HEREIN SHALL BE CONSIDERED AS INCLUDED IN THE CONTRACT PRICE PAID PER SQUARE FOOT FOR REMOVAL OF TRAFFIC STRIPE AND PAVEMENT MARKING AND NO SEPARATE PAYMENT WILL BE MADE THEREFORE, NOTHING IN THESE SPECIAL PROVISIONS SHALL RELIEVE THE CONTRACTOR FROM HIS RESPONSIBILITIES AS PROVIDED IN SECTION 7-1.09, *PUBLIC SAFETV OF THE STANDARD SPECIFICATIONS. TRAFFIC STRIPES AND PAVEMENT MARKINGS SHALL BE THERMOPLASTIC AND SHALL CONFORM TO SECTION 84-Z *THERMOPLASTIC TRAFFIC STRIPES AND PAVEMENT MARKINGSo` OF THE STANDARD SPECIFICATIONS. PAVEMENT MARKERS SHALL CONFORM TO SEC11ON 85 *PAVEMENT MARKEW OF THE STANDARD SPECIFICATIONS. IMMEDIATELY AFTER MY CONSTRUCTION OPERATIONS WHERE TRAFFIC DELINEATION IS OBLITERATED OR WHEN DIRECTED BY THE ENGINEER, THE CONTRACTOR SHALL REPLACE ALL OBLITERATED PAVEMENT DELINEATION WITH TEMPORARY DELINEATION DURING THE SAME WORK PERIOD. AND IN NO CASE LATER THAN 7:30 A.M. FOLLOWING SUCH WORK PERIOD. TEMPORARY DELINEATION CONSISTS OF REFLECTIVE TRAFFIC LINE TAPE APPLIED IN PIECES NOT LESS THAN 4 INCHES LONG NOR LESS THAN 4 INCHES WIDE, SPACED NO MORE THAN 20 FEET APART ON TANGENTS AND NO MORE THAN 10 FEET APART ON CURVES. APPLY REFLECTIVE TRAFFIC LINE TAPE IN ACCORDANCE NTH THE MANUFACTURER'S INSTRUCTIONS. TEMPORARY DELINEA11ON MUST BE THE SAME COLOR AS THE PERMANENT DELINEATION. REMOVE TEMPORARY DEUNEA11ON APPLIED TO ASPHALT CONCRETE PATCHES IMMEDIATELY PRIOR TO APPLYING ASPHAL11C EMULSION TACKCOAT FOR ASPHALT CONCRETE OVERLAY. TRAFFIC STRIPES,AND PAVEMENT MARKINGS SHALL CONFORM TO SECTION 84, 'TRAFFIC STRIPES & PAVEMENT MARKINGS.' OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS. TRAFFIC STRIPES AND PAVEMENT MARKINGS SHALL BE THERMOPLASTIC AND SHALL CONFORM TO SECTION 84-2, -THERMOPLASTIC TRAFFIC STRIPES AND PAVEMENT MARKINGsr. PAVEMENT MARKERS SHALL CONFORM TO SECTION 85 *PAVEMENT MARKERS.' AND THESE SPECIAL PROVISIONS. PAVEMENT MARKERS SHALL BE PLACED WITH RAPID SET EPDXY PER SECTION 95-2.04 OF THE STANDARD SPECIFICATIONS. ASPHALT CONCRETE PAVING NOTES: 1. ASPHALT CONCRETE SHALL BE TYPE W (MODIFIED) FOR ALL ARTERIAL AND COLLECTOR STREETS AND TYPE B (MODIFIED) FOR LOCAL STREETS AND SHALL CONFORM TO THE PROVISIONS IN SECTION 39, "ASPHALT CONCRETE," OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS. 2. PRIOR TO THE ADDITION OF ASPHALT BINDER, THE COMBINED MINERAL AGGREGATE FOR TYPE A (MODinED) OR TYPE B (MODIFIED) ASPHALT CONCRETE SHALL CONFORM TO THE REQUIREMENTS OF SECTION 39-2.02, "AGGREGATE," OF THE STANDARD SPECIFICATIONS FOR 3/4- MAXIMUM, MEDIUM GRADING. 3. ASPHALT BINDER FOR TYPE A (MODIFIED) ASPHALT CONCRETE SHALL BE PG 64-10 PERFORMANCE GRADED ASPHALT, UNLESS OTHERWISE DIRECTED BY THE CITY ENGINEER. ASPHALT BINDER FOR TYPE B (MODIFIED) ASPHALT CONCRETE SHALL BE PG 64-10 PERFORMANCE GRADED ASPHALT, UNLESS OTHERWISE DIRECTED BY THE CITY ENGINEER. THE ASPHALT BINDER SHALL CONFORM TO THE REQUIREMENTS IN THE TABLE FOR `STEAM -REFINED PAVING ASPHALTS,* IN SECTION 92-1.02, IGRADES," OF THE STANDARD SPECIFICATIONS. 4. THE AMOUNT OF ASPHALT BINDER TO BE MIXED WITH THE MINERAL AGGREGATE SHALL BE DETERMINED BY THE CONTRACTOR IN ACCORDANCE WITH CALIFORNIA TEST METHOD 367 USING SAMPLES OF MATERIALS PROPOSED FOR USE IN THE WORK. THE AMOUNT OF ASPHALT BINDER SHALL BE APPROVED BY THE ENGINEER. 5. AT LEAST 14 DAYS PRIOR TO THE START OF WORK, THE CONTRACTOR SHALL SUBMIT THE FOLLOWING FOR THE CITY ENGINEER'S REVIEW AND APPROVAL - A. A LIST OF AGGREGATE AND ASPHALT SOURCES. B. DOCUMENTATION VERIFYING THAT THE AGGREGATES TO BE INCORPORATED IN THE WORK CONFORM TO THE REQUIREMENTS OF SECTION39-2.02, "AGGREGATE,- OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS. MATERIAL SIEVE ANALYSIS AND SAND EQUIVALENT TEST RESULTS SHOULD NOT BE OLDER THAN SIX (6) MONTHS. ALL OTHER TEST RESULTS SHALL BE NO OLDER THAN ONE (1) YEAR. C. AN ASPHALT CONCRETE MIX DESIGN DETERMINED IN ACCORDANCE WITH CALIFORNIA, TEST 367. LABORATORY TEST RESULTS ON WHICH THE DESIGN IS BASED SHALL BE SUBMITTED WITH THE MIX DESIGN ALONG WITH THE THEORETICAL MAXIMUM DENSITY OF THE DESIGN MIXTURE AS DETERMINED BY ASTM D2041. THE ASPHALT CONCRETE MIX SHALL MEEr THE REQUIREMENTS OF SECTION 39-2.02, *AGGREGATE," OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS. IF THE DATA SUBMITTED SHOWS THAT THE MATERIALS ARE SUBSTANTIALLY THE SAME AS WHEN THE DESIGN WAS PREPARED, THE DESIGN MAY BE UP TO THREE (3) YEARS OLD. THE CONTRACTOR SHALL BEAR ALL COSTS ASSOCIATED WITH THE ASPHALT CONCRETE MIX DESIGN. 6. WHERE NEW ASPHALT CONCRETE PAVEMENT IS TO CONFORM TO EXISTING PAVED SURFACES, THE DOSTING PAVEMENT SHALL BE SAW CUT IN A NEAT STRAIGHT LINE, EITHER PARALLEL OR PERPENDICULAR TO THE CENTERLINE OF THE STREET, AND AT A MINIMUM DISTANCE OF ONE (1) FOOT FROM THE EXISTING EDGE OF PAVEMENT. 7. A PRIME COAT WILL NOT BE REQUIRED ON NON -PAVED AREAS TO BE SURFACED PRIOR TO THE PLACEMENT OF ASPHALT CONCRETE. HOWEVER, ALL OTHER REQUIREMENTS OF SECTION 39-4.01, -SUBGRADE,- OF THE STANDARD SPECIFICATIONS SHALL BE MET. 8. THE AREA TO WHICH PAINT BINDER HAS BEEN APPLIED SHALL BE CLOSED TO PUBLIC TRAFFIC. CARE SHALL BE TAKEN TO AVOID TRACKING BINDER MATERIAL ONTO THE EXISTING PAVEMENT SURFACE BEYOND THE LIMITS OF CONSTRUCTION. 9. PAVING SEAMS SHALL BE LOCATED TO MATCH DESIGNED TRAFFIC LANE STRIPE LOCATIONS UNLESS OTHERWISE PERMITTED BY THE CITY ENGINEER. 10. INTERSECTIONS AND TAPERED SHOULDERS SHALL BE SURFACED AS DIRECTED BY THE CITY ENGINEER. ADDITIONAL ASPHALT CONCRETE SHALL BE PLACED AT ROAD CONNECTIONS AND PRIVATE DRIVES WHERE SHOWN ON THE PLANS AND AS DIRECTED BY THE CITY ENGINEER AND SHALL BE HAND RAKED, IF NECESSARY, AND COMPACTED TO FORM SMOOTH, TAPERED CONNECTIONS. 11. WHERE THE COMPACTED THICKNESS OF A LAYER OF ASPHALT CONCRETE IS 0.15 FOOT OR LESS, PAVING OPERATIONS SHALL BE CONDUCTED IN SUCH A MANNER THAT, AT THE END OF EACH WORK SHIFT, THE LENGTH OF PAVEMENT ALONG THE LONGITUDINAL DROP-OFF BETWEEN ADJACENT LANES IS NOT GREATER THAN THAT WHICH CAN BE SURFACED DURING THE FOLLOWING SHIFT OF NORMAL PAVING OPERATIONS. ADDITIONAL ASPHALT CONCRETE SHALL BE PLACED ALONG THE TRANSVERSE DROP-OFFS ON EACH LANE. SUCH ADDITIONAL ASPHALT CONCRETE SHALL BE HAND RAKED AND COMPACTED TO FORM TEMPORARY CONFORMS BEFORE THE LANES ARE OPENED TO PUBLIC TRAFFIC. KRAFT PAPER, OR OTHER APPROVED BOND BREAKER, MAY BE PLACED CONFORMS TO FACILITATE THE REMOVAL OF THE CONFORMS WHEN PAVING OPERATIONS RESUME. 12. WHERE THE COMPACTED THICKNESS OF A LAYER OF ASPHALT CONCRETE IS MORE THAN 0.15 FOOT, PAVING OPERATIONS SHALL BE CONDUCTED IN SUCH A MANNER THAT THE LAYER OF ASPHALT CONCRETE IS PLACED ON ALL CONTIGUOUS LANES OF THE TRAVELED WAY BEFORE THE LANES ARE OPENED TO PUBLIC TRAFFIC. AT THE END OF EACH WORK SHIFT, THE DISTANCE BETWEEN THE ENDS OF A LAYER OF ASPHALT CONCRETE ON ADJACENT LANES SHALL NOT BE GREATER THAN 10 FEET. ADDITIONAL ASPHALT CONCRETE SHALL BE PLACED ALONG THE TRANSVERSE DROP-OFFS ON EACH LANE. SUCH ADDITIONAL ASPHALT CONCRETE SHALL BE HAND RAKED AND COMPACTED TO FORM TEMPORARY CONFORMS BEFORE THE LANES ARE OPENED TO PUBLIC TRAFFIC. KRAFT PAPER, OR OTHER APPROVED BOND BREAKER, MAY BE PLACED UNDER THE CONFORMS TO FACILITATE THE REMOVAL OF THE CONFORMS WHEN PAVING OPERATIONS RESUME. 13. ASPHALT CONCRETE SHALL BE COMPACTED TO A MINIMUM 92 PERCENT OF THE MAXIMUM THEORETICAL DENSITY AS DETERMINED BY ASTM D-2041. IN-PLACE DENSITY SHALL BE DETERMINED IN ACCORDANCE WITH CALIFORNIA TEST 375. 14. IF THE IN-PLACE DENSfTY,OF ANY LOT OF ASPHALT CONCRETE IS LESS THAN 92 PERCENT OR GREATER THAN 94 PERCENT OF THE MAXIMUM THEOREnCAL DENSITY, THE CONTRACTOR WILL BE ADVISED THAT THE REQUIRED RELATIVE COMPACTION IS NOT BEING ATTAINED AND THAT THE MATERIALS OR PROCEDURES OR BOTH, IF NEEDED, NEED ADJUSTMENT. ASPHALT CONCRETE SPREADING OPERATIONS SHALL NOT CONTINUE UNTIL THE CONTRACTOR HAS N011FIED THE CITY ENGINEER OF THE ADJUSTMENT THAT WILL BE MADE IN ORDER TO MEET THE REQUIRED COMPACTION. IF ANY SUCCESSIVE TEST AFTER NOTICE IS GIVEN DOES NOT MEET THE SPECIFIED RANGE� THE ASPHALT CONCRETE REPRESENTED'BY THAT LOT SHALL BE REMOVED AND REPLACED WITH MATERIAL THAT MEETS THE IN-PLACE DENSITY REQUIREMENTS. 15. IF THE TEST RESULTS FOR ANY LOT OF ASPHALT CONCRETE INDICATE THAT THE RELATIVE COMPACTION IS EITHER LESS THAN 90% OR MORE THAN 967a, THE ASPHALT CONCRETE REPRESENTED BY THAT LOT SHALL BE REMOVED AND REPLACED WITH MATERIAL THAT DOES MEET THE IN-PLACE DENSITY REQUIREMENT. THE CORRECTIVE WORK SHALL BE AT THE CONTRACTOR"S EXPENSE. 16. THE FIELD DENSITY OF COMPACTED ASPHALT CONCRETE SHALL BE DETERMINED BY: A. A PROPERLY CALIBRATED NUCLEAR ASPHALT TESTING DEVICE IN THE FIELD, OR B. ASTM D1188 WHEN SLABS OR CORES ARE.TAKEN FOR LABORATORY TESTING. ZINC STEARATE MAY BE SUBSTITUTED WITH PARAFFIN. C. IN CASE OF DISPUTE, METHOD B ABOVE SHALL BE USED. 17. IF THE FINISHED SURFACE OF THE ASPHALT CONCRETE DOES NOT MEET THE SPECIFIED SURFACE TOLERANCES, IT SHALL BE BROUGHT WITHIN TOLERANCE BY EITHER: A. ABRASIVE GRINDING WITH EQUIPMENT UTILIZING DIAMOND BLADES, B. REMOVAL AND REPLACEMENT, OR C. PLACEMENT OF AN ASPHALT CONCRETE OVERLAY. i8. IF ABRASIVE GRINDING IS USED TO BRING THE FINISHED SURFACE TO SPECIFIED SURFACE TOLERANCES. ADDITIONAL GRINDING SHALL BE PERFORMED, AS NECESSARY, M ENLARGE THE GRINDING AREA SO THAT THE LONGITUDINAL LIMITS OF GRINDING ARE AT A CONSTANT OFFSET FROM, AND ARE PARALLEL TO, THE NEAREST LANE LINE OR PAVEMENT EDGE, AND THE TRANSVERSE LIMITS OF GRINDING ARE NORMAL TO THE PAVEMENT CENTERLINE. ALL GROUND AREAS SHALL BE NEAT RECTANGULAR AREAS OF UNIFORM SURFACE APPEARANCE. ABRASIVE GRINDING SHALL CONFORM TO THE REQUIREMENTS IN THE FIRST PARAGRAPH AND THE LAST FOUR PARAGRAPHS OF SECTION 42-2.02, "CONSTRUCTION' OF THE STANDARD SPECIFICATIONS. A FOG SEAL COAT SHALL BE APPLIED M ALL FINISHED ASPHALT SURFACES AT THE DEVELOPER'S EXPENSE THE FOG SEAL COAT SHALL BE EITHER REJUVENATING AGENT OR ASPHAL11C EMULSION AS DIRECTED BY THE CITY ENGINEER. 19. ARTERIAL AND COLLECTOR STREET BASE MATERIAL SHALL BE CRUSHED AGGREGATE BASE (CAB) CONFORMING TO SECTION 200-2.2 OF THE *GREENBOOKm. BASE MATERIAL FOR LOCAL STREETS SHALL BE CAB OR FINE GRADATION CRUSHED MISCELLANEOUS BASE (CMB) CONFORMING TO SECTION 200-2.4 OF THE -GREENBOOK ........ WHICH ALLOWS UP TO 50% OF THE VOLUME TO BE RECLAIMED ASPHALT CONCRETE PORTLAND CEMENT CONCRETE, LEAN CONCRETE BASE, CEMENT TREATED BASE OR A COMBINATION OF THESE MATERIALS. OTHER RECYCLED BASES SHALL NOT BE ALLOWED. AGGREGATE BASE SHALL BE COMPACTED TO A MINIMUM OF 95% OF MAXIMUM DRY DENSITY. 20. THE PAVING CONTRACTOR SHALL GRADE THE PAVING AREAS PER CALTRANS MODIFIED STANDARD SPECIFICATION SEC11ON 19-1.03. 21. IMMEDIATELY PRIOR TO PLACING SUBSEQUENT LAYERS OF MATERIAL THERON, THE GRADING PLANE SHALL CONFORM TO THE FOLLOWING: A. WHEN ASPHALT CONCRETE OR ASPHALT CONCRETE BASE IS TO BE PLACED ON THE GRADING PLANE, THE GRADING PLANE AT ANY POINT SHALL NOT VARY MORE THAN 0.04 FOOT ABOVE OR BELOW THE GRADE ESTABLISHED BY THE ENGINEER. B. WHEN THE SUBBASE OR BASE MATERIAL (OTHER THAN ASPHALT CONCRETE BASE) IS TO BE PLACED ON THE GRADING PLANE, THE GRADING PLANE AT ANY POINT SHALL NOT VARY MORE THAN 0.04 FOOT ABOVE OR BELOW THE GRADE ESTABLISHED BY THE ENGINEER. TRENCHING NOTES: STORM DRAIN NOIES: 1. TRENCH EXCAVATION 1. SJQRM DRAIN PIPE THE EXCAVA11ON OF TRENCHES FOR PIPING LAID IN THE GROUND SHALL BE IN OPEN -CUT CONTRACTOR SHALL UTILIZE RCP PIPE, CLASS III NTH RUBBER GASKET JOINTS PER ASTM FROM THE SURFACE OF THE GROUND EXCEPT WHERE BORING IS REQUIRED. THE TRENCHES SPECIFICATION C-76, UNLESS OTHERWISE NOTED ON THE CONTRACT PLANS. to 0 SHALL BE OF WIDTH AS SHOWN ON STANDARD S-39 AND DETAILED SECTIONS ON THE PLANS wr 04 FOR PROPER PIPE INSTALLATION. REINFORCED CONCRETE PIPE. REINFORCED CONCRETE PIPE SHALL CONFORM TO THE PROVISIONS IN SECTION 65, "REINFORCED CONCRETE PIPE", OF THE STANDARD THE HOLES FOR BELLS AND FITTINGS SHALL BE EXCAVATED BY HAND, TO A WIDTH SPECIFICA11ONS AND THESE SPECIAL PROVISIONS. PROVIDING UNIFORM BEARING ALONG THE LENGTH OF THE PIPE. IT IS THE INTEN11ON OF THESE REQUIREMENTS TO PROVIDE FIRM, UNIFORM BEARING FOR THE PIPE. EXCEPT AS OTHERWISE DESIGNATED BY CLASSIFICATION ON THE PLANS OR IN THE SPECIFICATIONS, JOINTS FOR CULVERT AND DRAINAGE PIPES SHALL CONFORM TO THE CONTRACTOR SHALL PROVIDE TRENCHING IN ACCORDANCE NTH THE DETAILED SECTIONS PLANS OR SPECIFICATIONS FOR STANDARD JOINTS. PROVIDED IN THE PLANS. SELEC11ON OF TRENCH TYPES WILL BE AS REQUIRED BY THE TYPES OF PIPE SELECTED FOR CONSTRUCTION. STORM DRAIN AND UTILITY CONDUIT HYDROSTA11C TESTS SPECIFIED BY SECTION 65* 1.08 "LAYING SIPHON AND PRESSURE INSTALLA11ONS SHALL MEET CITY STANDARD S-39. PIPE", OF THE STANDARD SPECIFICATIONS WILL NOT BE REQUIRED. TRENCH LINES SHALL MEET ALL FEDERAL AND STATE SAFETY REQUIREMENTS. REINFORCED CONCRETE PIPE SHALL HAVE RUBBER GASKETED JOINTS CONFORMING TO SEC11ON 65-1.06B. *RUBBER GASKETED JOINTS". OF THE STANDARD SPECIFICATIONS. 2. BRACING AND SHORING HANDLING OF MATERIALS. ALL PIPE, FITTINGS, SPECIALS AND CASTINGS MUST BE EXCAVATION SHALL BE SUPPORTED AS SET FORTH IN THE RULES, ORDERS. AND REGULATIONS < OF THE STATE DIVISION OF INDUSTRIAL SAFETY. IF THE CONTRACTOR DESIRES TO DEVIATE CAREFULLY HANDLED AT ALL TIMES. ONLY SUITABLE AND PROPER EQUIPMENT AND FROM THE SAFETY ORDERS, HE SHALL SUBMIT DATA By A REGISTERED CIVIL ENGINEER TO APPLIANCES SHALL BE USED FOR THE SAFE LOADING, HAULING, UNLOADING, HANDLING THE STATE DIVISION OF INDUSTRIAL SAFETY, JUSTIFYING THE ALTERNATE PROCEDURES TO BE AND PLACING OF MATERIALS, SPECIAL CARE SHALL BE EXERCISED SO THAT PREFORMED USED. FAILURE TO COMPLY NTH ANY OF THESE RULES, ORDERS AND REGULATIONS SHALL RESILIENT JOINTS ON PIPE AND FITTINGS WILL NOT BE DAMAGED. ANY PIPE OR FITTING BE SUFFICIENT CAUSE FOR THE STATE DIVISION TO IMMEDIATELY SUSPEND ALL WORK. WITH A JOINT DAMAGED OR FLATTENED WILL CAUSE THAT PIPE OR FITTING TO BE COMPENSATION FOR LOSSES INCURRED BY THE CONTRACTOR BY SUCH AN EMERGENCY REJECTED. SUSPENSION SHALL NOT BE ALLOWED. DURING BACKFILLING, THE BOTTOM OF THE SHORING PIPE LAYING. NO PIPE SHALL BE LAID UNTIL THE ENGINEER INSPECTS AND APPROVES SHALL BE KEPT ABOVE THE LEVEL OF THE BACKFILL AT ALL TIMES. THE CONDITION OF THE BOTTOM OF THE TRENCH. PIPE SHALL BE INSTALLED IN STRICT SECTION 6422 OF THE CALIFORNIA LABOR CODE REQUIRES THE CONTRACTOR TO SUBMIT TO ACCORDANCE NTH MANUFACTURER'S RECOMMENDATIONS. 0 04 THE ENGINEER A DETAILED PLAN, DRAWING THE DESIGN OF SHORING, BRACING, SLOPING OR to 0 OTHER PROVISIONS TO BE MADE BY THE CONTRACTOR FOR THE PURPOSE OF WORKER PIPE LAYING SHALL BEGIN FROM THE DOWNSTREAM END OF THE STORM DRAIN OR AS 16 DIRECTED BY THE ENGINEER. PIPE LAYING SHALL PROCEED WITH EACH PIECE LAID TRUE co PROTECTION FROM THE HAZARD OF CAVING GROUND DURING THE EXCAVATION OF TRENCHES TO LINE AND GRADE, AND IN SUCH A MANNER AS TO FORM A CLOSE CONCENTRIC JOINT w < 0 N NECESSARY FOR THE CONSTRUCTION OF THE PROJECT. IF SUCH PLAN VARIES FROM THE 'D - to SHORING SYSTEM STANDARD ESTABLISHED BY THE CONSTRUCTION SAFETY ORDERS, THE NTH THE ADJOINING PIPE AND TO PREVENT SUDDEN OFFSETS IN THE FLOW LINE. AS 0 Z 00 0 1* THE WORK PROGRESSES, THE INTERIOR OF THE PIPE SHALL BE CLEARED OF AH DIRT 0 w 6 PLANS SHALL BE PREPARED AND CERTIFIED BY A REGISTERED CIVIL OR STRUCTURAL AND DEBRIS OF EVERY DESCRIPTION. PIPE SHALL NOT BE LAID WHEN THE COND11ION OF 0 z ENGINEER- HOWEVER, USE OF SYSTEMS THAT ARE LESS EFFECTIVE THEN THOSE REQUIRED BY z U - THE CONiTRuc-nON SAFETY ORDERS IS PROHIBITED ON THIS PROJECT. THE TRENCH OR THE WEATHER IS UNSUITABLE. AT 11MES MEN WORK IS NOT IN < -_j . i < PROGRESS, OPEN ENDS OF PIPE AND FITTINGS SHALL BE CLOSED. uj 0 3. TRENCH BACKFILL w 00 WITH BELLED END PIPE, BELL HOLES SHAH THEN BE EXCAVATED AT EACH JOINT TO d "... _j FACILITATE THE JOINT OPERATIONS, AND SHALL BE ONLY OF SUFFICIENT SIZE FOR THAT _j T- < TRENCHES SHAH NOT BE LEFT OPEN FARTHER THAN THREE HUNDRED (300) FEET IN ui co m PURPOSE. IN ORDER THAT BELL HOLES MAY BE PROPERLY LOCATED, NOT MORE THAN 0 E Q0 ADVANCE OF PIPE LAYING OPERATIONS OR TWO HUNDRED (200) FEET TO THE REAR SIX (6) HOLES SHALL BE EXCAVATED AHEAD OF ACTUAL PIPE LAYING, ON ACCOUNT OF o in THEREOF, UNLESS OTHERWISE PERMITTED BY THE ENGINEER. THE VARIA11ONS IN JOINT CONSTRUCTION OPERATIONS. 04 W ui AH WORK SHALL CONFORM TO THE APPLICABLE SEC11ONS OF THE STANDARD THE CONTRACTOR SHALL MAKE PROVISIONS FOR PREVENTING FOREIGN MATERIAL FROM < SPECIFICATIONS, DATED JULY, 1992. BEDDING CLASS SHAH BE AS SPECIFIED IN THE PIPE BEING FLUSHED INTO AN EXISTING STORM DRAIN LINE. m OPTIONS. STORM DRAIN AND UTILITY CONDUIT INSTALLATIONS SHAH BE IN ACCORDANCE NTH CITY STANDARD S-39, EXCEPT THAT COMPACTION SHALL BE NO LESS THAN NINETY PERCENT CUTTING PIPE. THE CONTRACTOR SHALL PERFORM ALL WORK OF CUTTING PIPE AND (90%) UP TO THIRTY INCHES (30-) FROM FINISHED GRADE SPECIAL CASTING NECESSARY TO THE ASSEMBLY, ERECTION. AND COMPLE11ON OF THE BACKFILL MATERIALS IN THE PIPE ZONE SHAH BE PLACED IN LAYERS NOT TO EXCEED WORK. ALL PIPE SHALL BE CUT TO FIT ACCURATELY, WITH SMOOTH EDGES AND FACES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CORRECTNESS OF CUTTING AND NO TWELVE (12) INCHES SIMULTANEOUSLY, ON EACH SIDE OF THE PIPE, IN SUCH A MANNER ADDITIONAL COMPENSATION WILL BE ALLOWED FOR ANY MATERIALS WHICH ARE DAMAGED AS NOT TO DAMAGE OR DISTURB THE PIPE OR ITS ALIGNMENT AND GRADE. OR INCORRECTLY CUT. BACKFILL MATERIAL ABOVE THE PIPE ZONE SHALL BE FREE OF DELETERIOUS MATERIALS AND 2. BOREDZAACKED PIPE v6 LUMPS OR STONES EXCEEDING THREE (3) INCHES IN GREATEST DIMENSION AND SHALL BE PLACED IN LAYERS NOT EXCEEDING EIGHTEEN (18) INCHES. EACH LAYER SHAH BE CASING OR SMOOTH OUTSIDE WALLED PIPE FOR BORED/JACKED PIPE SHALL BE C'5 - THOROUGHLY COMPACTED BY VIBRATORY OR MECHANICAL TAMPING, OR BY A COMBINATION INSTALLED. IT SHALL HAVE EVEN BEARING THROUGHOUT ITS LENGTH AND SHALL SLOPE OF THESE METHODS. FLOODING AND JET11NG SHALL NOT BE ALLOWED. THERE MUST BE AT TOWARD ONE END. SPACE BETWEEN CASING AND PIPELINE SHALL BE BACKFILI ED WITH' LEAST ONE FOOT OF COVER OVER THE PIPE BEFORE COMPACTION ABOVE THE PIPE ZONE SAND. IF THE PIPE AND CASING ARE INSTALLED BY BORING, THE SPACE AROUND THE WILL BE ALLOWED. CASING ALSO SHALL BE BACKFILLED WITH. GROUT OR SAND. THE ENDS OF SPACE BETWEEN THE CASING AND THE PIPE SHALL BE SEALED WITH GROUT. THE STRENGTH IMPORTED BEDDING AND BACKFILL MATERIAL SHALL BE OBTAINED, AND ANY EXCESS BEDDING OF PIPE DESIGNATED IN THE PLANS OR SPECIFICATIONS IS DETERMINED FOR VERTICAL AND BACKFILL MATERIAL SHALL BE DISPOSED OF, BY ANY LEGAL MEANS AT THE EXPENSE LOAD ONLY ANY ADDITIONAL STRENGTH REQUIRED BY BORING/JACKING OPERATIONS OF THE CONTRACTOR. SHAH BE FURNISHED AT THE CONTRACTOR'S EXPENSE. THE CONTRACTOR MAY SUBMIT TO THE ENGINEER SIEVE ANALYSIS FOR UTIUZA11ON OF -THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER FOR APPROVAL ALL PLANS OF IN-SITU MATERIALS. BORING/JACKING OPERATIONS PRIOR TO BORING OR JACKING. BORING/JACKING ACHIEVING FIRM BEDDING BELOW PIPE SPRINGLINE CONTRACTOR SHALL PROVIDE "FIRM OPERATIONS SHALL BE CONDUCTED IN A SAFE AND EFFICIENT MANNER, CONSISTENT NTH >_ BEDDING" SUPPORT FOR THE PIPE BELOW THE SPRINGLINE. FIRM BEDDING MEANS THAT THE CURRENT ACCEPTED PROCEDURES. WATER- BORING SHALL NOT BE PERMITTED. THE im PIPE MUST REST ON THE GRANULAR MATERIAL SPECIFIED PREVIOUSLY IN THE SPECIFICATIONS. CASING PIPE SHALL BE JACKED NTH SUCH PRECISION THAT WILL ALLOW THE REPLACEMENT OF THE PIPELINE TO THE LINE AND GRADE AS INDICATED ON THE PLANS. BELL OR COUPLING HOLES SHALL BE CAREFULLY EXCAVATED AT PROPER INTERVALS, SO UPON COMPLETION OF THE INSTALLA11ON OF THE CASING AND INSTALLA11ON OF THE THAT NO PART OF THE LOAD IS SUPPORTED BY THE BELLS OR COUPLINGS. ' DURING BEDDING PIPELINE TO GRADE, THE VOID BETWEEN THE CASING OR RC PIPE AND THE EXCAVATION AND BACKFILLING, CONSOUDA11ON OF MATERIAL AROUND AND UNDER BELLS AND COUPLINGS SHALL BE COMPLETELY FILLED WITH SAND, COMPACTED BY THE USE OF AIR -BLOWING SHAH BE AVOIDED. SAND EQUIPMENT OR ANY OTHER MEANS ACCEPTABLE TO THE ENGINEER UPON HIS CONTRACTOR SHALL SHOVEL -SLICE OR HAND TAMP BEDDING IN THE HAUNCH AREAS, AS APPROVAL. THIS WILL MINIMIZE VOIDS BENEATH THE PIPE AND IN THE HAUNCH AREAS. SHOVEL -SLICING IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN A SAFE OPERATION AT ALL TIMES. OR HAND TAMPING SHALL BE DONE BEFORE THE BEDDING IS BROUGHT UP TO THE QUARTER SHOULD THE TUNNEL HEADING OPERA11ONS RESULT IN DANGEROUS OR UNREASONABLE POINT OF THE PIPE. SLOUGHING OF MATERIAL WHICH MAY JEOPARDIZE THE SAFETY. OF WORKERS OR THE STABILITY OF THE SOIL AND ROADWAY ABOVE, THE CONTRACTOR SHALL FURNISH AND z INITIAL BAcKnLL *BEDDING MATERIAL" AS SPECIFIED BY ASTM 2,321-8 SHALL BE USED IN 0 THE PIPE ZONE FOR INITIAL BACKFILL. AFTER THE PIPE HAS BEEN PROPERLY LAID AND INSTALL BREASTBOARDING AND/OR FACE CLOSURE WITH SUFFICIENT JACKS TO INHIBIT En THE SLOUGHING AND/OR CLOSING THE WORK FACE. THE CONTRACTOR, BEFORE > INSPECTED, INITIAL BACKFILL SHALL BE PLACED ON BOTH SIDES AND OVER THE PIPE TO SUCH A DEPTH THAT, AFTER THOROUGH CONSOLIDATION, THE FINAL DEPTH SHALL BE AT RESUMING WORK, SHALL FURNISH THE ENGINEER NTH A DETAILED PLAN OF PRECEDING I FAST TO THE ELEVATION SHOWN ON THE PLANS. THE MATERIAL SHALL BE CONSOLIDATED NTH THE WORK, FOR HIS REVIEW AND APPROVAL. ANY AND ALL EXPENSES THEREFORE BY VIBRATORY OR MECHANICAL TAMPING AND THE EQUIPMENT AND MANNER OF TAMPING WILL BE CONSIDERED AS INCLUDED IN THE BID PRICE AND NO ADD171ONAL COMPENSATION MUST BE APPROVED IN WRITING BY THE ENGINEER PRIOR TO COMMENCING OPERATION. WILL BE MADE THEREFORE. IMPACT EQUIPMENT MAY BE ALLOWED UNDER THE DIRECTION OF THE ENGINEER. HOWEVER, 3. MINOR STRUCTURES THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE RESULTING FROM THE USE OF THIS EQUIPMENT. HYDRA -HAMMER WILL NOT BE PERMITTED. MINOR STRUCTURES. PORTLAND CEMENT CONCRETE MINOR STRUCTURES SHALL SUBSEQUENT BACKFILL ABOVE THE LEVEL OF INITIAL BACKFILL, THE TRENCH MAY BE CONFORM, IN DESIGN, MATERIALS, AND CONSTRUCTION, TO THE PROVISIONS OF SECTIONS BACKFILLED WITH NATIVE MATERIAL RESULTING FROM TRENCH EXCAVATION, OR AT THE 70-1.02 H OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS OPTION OF THE CONTRACTOR, SELECT IMPORTED MATERIALS MAY BE USED. NATIVE MANHOLES SHAH CONFORM TO THE CITY OF BAKERSFIELD STANDARDS S-7 ANb S-8. MATERIAL OR IMPORTED MATERIAL MAY BE COMPACTED BY TAMPING AND/OR ROLLING, DROP INLETS SHALL CONFORM TO THE CITY OF BAKERSFIELD STANDARD S-12. TEMPORARY INLET GRATES SHALL CONFORM TO DETAILS ON THE PLANS. < USING EQUIPMENT AND METHODS APPROVED BY THE ENGINEER. MEN THE CONTRACTOR COMPACTS BY TAMPING AND/OR ROLLING, THE BACKFILL MATERIAL THE PRECAST CYLINDER, TAPER. AND ECCENTRIC FLAT TOP SECTIONS SHALL MEET THE Li SHALL BE PLACED IN LAYERS NOT EXCEEDING EIGHTEEN (18) INCHES IN LOOSE DEPTH, EACH STRENGTH REQUIREMENT OF ASST. C-478. EACH SUCCESSIVE MANHOLE SECTION SHALL BE SET ON A BED OF PORTLAND CEMENT GROUT OR "KENT SEAL" TO MAKE A LAYER BEING THOROUGHLY COMPACTED BY TAMPING AND/OR ROLLING BEFORE SUCCEEDING WATER11GHT JOINT, SHALL BE NEATLY POINTED ON THE INSIDE, AND SHALL BE SET LAYERS ARE PLACED. PLUMB. COMPACTION OF SUBSEQUENT BACKFILL WITHIN TWO AND ONE-HALF (2-1/2) FEET OF 4. ADJUST SURVEY MONUMENT ENCASEMENTS FINISHED PERMANENT SURFACING GRADE SHALL BE ACCOMPLISHED BY TAMPING AND/OR ROLLING AS SPECIFIED ABOVE. WHERE THE TRENCH IS WITHIN THE PAVEMENT ON STREETS, SURVEY MONUMENT AND FRAME AND COVER NTH ENCASEMENTS SHALL BE ADJUSTED OR THE BACKFILL WITHIN TWO AND ONE-HALF (2-1/2) FEET OF FINISHED PERMANENT GRADE INSTALLED NEW TO FINISH GRADE AT THE LOCATIONS SHOWN ON THE PLANS, IN SHALL BE COMPACTED TO NINETY PERCENT (910%) RELATIVE COMPACTION. ACCORDANCE WITH THESE SPECIAL PROVISIONS, AND CITY STANDARD S-29. SUBSEQUENT BACKFILL PLACED BY TAMPING AND/OR ROLLING SHALL BE FREE FROM STONES THE SURFACE OF THE CONCRETE SHALL BE PROTECTED FROM PUBLIC TRAFFIC FOR A z OR LUMPS EXCEEDING THREE (3) INCHES IN GREATEST DIMENSIONS, VEGETABLE MATTER, OR MINIMUM OF THREE DAYS. < OTHER UNSATISFACTORY MATERIALS. AT THE OPTION OF THE CONTRACTOR, MINOR CONCRETE CONTAINING A MINIMUM OF j SEVEN SACKS OF CEMENT PER CUBIC YARD MAY BE USED AND THE TIME REQUIRED FOR co IN NO CASE SHALL JETTING BE ALLOWED FOR BACKFILL COMPACTION WITHIN THE STREET. PROTECTION OF THE CONCRETE SURFACE FROM PUBLIC TRAFFIC SHALL BE REDUCED TO z MEN APPROVED BY THE ENGINEER, JETTING MAY BE USED IN NON -STREET AREAS. A MINIMUM OF ONE DAY. Z 0 ul CD 0 BACKFALL TESTING AND COMPACTION TESTING OF BACKFILL MATERIALS AND COMPACTION SHALL BE IN ACCORDANCE NTH SECTION 19, "EARTHWORK" AND SECTION 6-3, "TESTING", OF THE MONUMENT WILL BE SET BY THE OTHERS. THE OWNER WILL PROVIDE SURVEYS. THE STANDARD SPECIFICATIONS, STATE OF CALIFORNIA, DEPARTMENT OF PUBLIC WORKS, CONTRACTOR SHALL GIVE THE OWNER 24 HOURS NOTICE WHEN SURVEYS ARE REQUIRED. DIVISION OF HIGHWAYS. EACH LAYER OF BACKFIH MATERIAL SHALL MEET THE COMPACTION, ANY MONUMENT FRAME OR COVER DAMAGED BY THE CONTRACTOR OR HIS OPERA11ONS SAND EQUIVALENT, AND GRADATION REQUIREMENTS BEFORE THE NEXT LAYER IS PLACED. z d SHALL BE REPLACED BY THE CONTRACTOR AT NO COST TO THE OWNER. us Z W, IDL EACH LAYER OF BACKFILL SHALL BE THOROUGHLY COMPACTED TO THE RELATIVE COMPACTION > JI.. ca OF NOT LESS THAN IS SHOWN ON CITY OF BAKERSFIELD STANDARD S-39 AS MODIFIED ON 0 Z THE CONTRACT PLANS, EXCEPT THAT COMPACTION WITHIN THE ROADWAY STRUCTURAL 0 SEC11ON SHALL BE NO LESS THAN NINETY PERCENT (907.) RELATIVE COMPACTION FOR THE z TOP FINISHED 30-, AND SHALL BE DETERMINED BY CALIFORNIA TEST METHODS 216 OR 231, w 0 Lu OR ASTM (CURRENT EDITION) D1557 AND ONE OF THE FOLLOWING D2922 OR D1556. 0 1 - la. 0 IF THE RELA11VE COMPACTION, AS DETERMINED BY TESTING, FAILS TO MEET THE SPECIFIED Lu Z PERCENTAGE, THE TRENCH SHALL BE RE -EXCAVATED AND RE -COMPACTED. Lli z cc COMPAC11ON TESTS WILL BE THE SUBDIVIDERS RESPONSIBILITY. THE NUMBER AND LOCATIONS OF THE TESTS SHALL BE DETERMINED BY THE CITY ENGINEER. 4. ALL MANHOLES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF BAKERSFIELD STANDARD DRAWINGS S-7, S-8, AND S-21 AND SEC11ONS 70-1.02H AND 71-1.07 OF THE STANDARD SPECIFICATIONS OF THE STATE OF CALIFORNIA, DEPARTMENT OF TRANSPORTATION, CURRENT EDITION. ALL CLEANOUTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF BAKERSFIELD STANDARD DRAWING S-20. MANHOI ES SHALL BE TYPE OA" FOR PIPES UNDER 48" IN DIAMETER AND TYPE "B" FOR PIPES 48" IN DIAMETER OR LARGER. UNLESS NOTED OTHERWISE. THE BOTTOM MANHOLE BARREL AT THE MANHOLE FOUNDA11ON SHALL BE SET ON A 2" MORTAR BED OR SET ON KENT -SEAL., IN A GROOVED FOUNDATION. m TAFT HIGWAY (STATE ROUTE VI-KER-119) SEE CAL TRANS PLANS FOR TAFT HIGHWAY WIDENING W > a. Uj c, U_ a. 0J DRIVEWAY STA. 10+50.32 P.R.C. STA. 10+62.28 C.L. 28.97 52! WIDE PRIVATE ACCESS STA. 10+34.48 F.L. EASEMENT,PER SEPARATE INSTRUMENT __j___ late a C1 + P.R.C. STA. 10+34-48 C.L. 43.98 LT. STA. 10+01.70 F.L. ce R/W m 25 C) MONUMENT < STA. 9+80.00, C.L. F5 DRIVEWAY STA. 9+36.89, F.L. QL MONUMENT I IDENTICAL POINTS 360 358 356 354 352 350 348 344 342 27 C> t2 cs Ui CN " A C3 J .4 40� 4 j. 11 `4 C> - >; -W-j W _j _j C> 4 J m tz LL:1 ,,z fr.: w -j 4LA:l 0 L,:2 8 L.L L,:--, u:_29 C> "It as I ouv6)2 6 4 8 d-) < 06 Go co >_ 9r_: to M 6 �i 4 CD ci < 0, U_ + + US + += ++ < L,J + C-4 CN �u CS1 _j IN III) C4 CID 0) L,J + + + + + ��: + cq cq C4 cj LL, _j > CL Uj Uj v) Q0 IV) <10 g j< m.,� co f� It" C4 CIO 0 ji 30 LZ 1.1: _j 31 L.L 06 cd 061 as Ole C4 V) 5 CD + < 00 c� + + C7 2+00 18* DRAIN :5-- + Uj U') + U 13'32'10" C3 ��i - CIO _57\ 13+00 C4 42.00' 106.81' C) 0 I C4 V) cn L S_ Cl Q R/W 6* SEWER 18" DRAIN C6 _Wj CN + .00 11 W5327" J .35.00' 13.70� ci 22*25'35" C8, I z W 0:: C6 J U� U: LZ 2 Wi V.: 00 OD + + S C1 U.) CIO 5 00, > c� VERT. CURVE R�T 0) W co 1124 < + F<: 1-5: C12 00 00 m k 14.2V j W U! cn co 0) 23 0 3 c; 11 . r,: qI+ c; C4 Ld - co in < r-6 0 _j_j D. 3r C4 .00z Q L,: _j J. 0 LI: < C14 + 4 04 rr, 00 0030,w W a cn C3 U: W�> Z_ cn g g ; � L -4j: -.<� OC46 c; LLJ DO: i c " LIJ + L> n .4 ck� a 20.00' cn Wdui LA_ N 04 22C c) :� cr, C2 N@j W r- co C4 + (In + + 04 En + + C-4 C-4 V) 4- 9+80 Ix v- v- W V_ V- 0 c:9 C3 W co cn z n 6: in co N r -O rc raboo I,-: C.LW .aE BREAK [to -0-i STA. 10+60.03 C.L. 20.001 RT. OR STA. 11+10.37 F.L. E.C. STA. 10+16.85 C.L 20-1710 RT_ STA. 9+80-38 C.L. 42.00 RT. =_ STA. 8+94-90 WEST F.L. q DRIVEWAY STA. 9+84-59 EAST F.L. STA. 10+01.94, F.L. CONSTRUCT 21Y BOTTOM WIDTH TYPE -B COMMERCIAL DRIVE APPROACH W/5' WINGS PER C.O.B. SM. DET. ST -4. STA. 10+67.20 F.L. P.R.C. STA. 10+0913 c.L -2o.83 RT. STA. 10+60.11 F -L I,% it L-07- N J U:1 ji 30 LZ 1.1: _j 31 L.L 06 cd 061 as 06 CD CD C1 CD + < 00 c� + + C2 + 1* :5-- + Uj U') + U 13'32'10" C3 ��i - CIO _57\ V) J U:1 _j J 32 LZ U: _j Lz 33 06 c� I 00 8 06 CD 5.7' Irz co < <5 N 6 < -) C2 + 1* :5-- + Uj U') + U 13'32'10" C3 ��i - 75.52' 52.82' 103,01,08, C4 42.00' 106.81' C) 0 I C4 V) cn L 200 Cl Q R/W 50.00' AGASSIZ ROCK WAY SEE SHEET 4 R/W CURVE RADIUS R/W TANGENT DELTA C1 5.7' 50.00' 35.00' 90,00,00" C2 5D.00! 7.OV 3.56' 13'32'10" C3 42.OV 75.52' 52.82' 103,01,08, C4 42.00' 106.81' C) 0 _20T- 200 Cl Q 32.77' 50.00' d C-4 C6 30' c; F4 .00 11 W5327" J .35.00' 13.70� 6.94! 22*25'35" C8, I z W 0:: 1-- J U� U: LZ 2 Wi V.: 00 OD + + S C1 U.) CIO W5 + + 35.00' > c� VERT. CURVE oo 0) W co + + < + F<: 1-5: C12 00 00 m k 14.2V Go cn cn W U! cn co VERT. CURVE 3 U) cn C4 v) L R - I BOUNDARY J LL: (6 P_ rt En < /W J to 9 CD 16 18 0,0 C1 c; 6 c; C4 N C4 Ile) 5 J 4 It . I'= cj d LL: U_ M m (US) co to J C4 IQ -.7 LL:1 x r ` LL: � LLJ 3 L.,: 4 LL: c,:C; C; CST ,I� W cr� 0;1 cr� < P- C> LL: c� R. c� W C� . m c&wm 4 6 g, 7 m Go W -1 4 = + + 04 0) + Q 0)00 _j CD m + + + > 00 00 W Uj ir CL W r I i.,� cv lu LLJ n m 01 CL Cn Cn cncn Z 0 (n c=41 V) A a 1>01(.!, 1OV&S ;-\ P, - - 8 PJARADE BREAAVK STA. 20+53.09, C.L. STA. 20+7&18� F.L. F -L URIvE rA wi y R/wT p . I � ;:__� �, 5 j j j LLJ UA J J _j J _j _j U:I a- _j _j J < U:I I T U_ LZ L.L: 1 2 LL: U_ T-0 -x WT U_ LL: L.L_ U_ U_ L.L: L" 11 Ld W5 LO LO to lx� m le L6 V) Lri e U-> _j ce p.: m cp rz >_ n 9 Lr) I P.: n X% >_ 04 0 0 1 1 r- >_ * r -z cr F: >_ LL: C114 C_� >_ m LO c� 11 0: + I C114 LL_ +1 LO r, Ul) + cl +1 Q = 00 + NO C> 00 < + + + V-1 �iq.� .12 9� + r + 9 + +1 1 cl, 06 Lo + Uj 00 Uj + 00 a a > m cj > 00 C4 cs U>J vo-, I W + > > - > 00 N V_ E - N cs g >- Lri FX E 1� > W m in cn < C,4 t;41 Fl:� ;� m , I - �<_ C> J 1 Lq C, pc! 3: + F_ Its U: co = 2 au- 0,4-- ch _j _j N CD W V) V) LL.* cn 3 -�fl 9 cn 8 -17 - 0 C4 V) (=> 8 r�r) �<� - + c:' + uj ;�21 20 <1 6 ;"l 5 14 6 LA: 6 C4 p, a -fc6 d 4 0; r m to M C1 IR 6 C3 c!" U_ r- colt<: Lo M cn N 00 Ln 06 - r-- .0 00 r- U_ to Ln co 10 + + + + + co to ul) "1 00 Go 00 cz _j + j; + 0 + + cc c� 0- (n cn 003 a. ch ch = . . I I I cn (A 0:110 r/) < �_ cn qm 400NNO-0 4m 4m 40 4E 400FANEWD 4W ml� m TRACT BOU KANOSH COBBLE DRIVE (STA. 9+80.00 C.L. TO 20+11.09 C.L.) SCALE: 1" = 50' HORIZONTAL 9+00 10+00 360 358 356 354 352 350 348 346 344 342 11+00 12+00 13+00 14+00 15+00 16+00 17+00 (STA. 9+89.27 F.L. TO 20+78.56 F.L.) SCALE: 1 = 50' HORIZONTAL SCALE: 1" = 5' VERTICAL 360 358 356 354 352 50 348 346 344 342 21+0021+25 CURVE RADIUS LENGTH TANGENT DELTA C1 35.00' 50.00' 35.00' 90,00,00" C2 5D.00! 7.OV 3.56' 13'32'10" C3 42.OV 75.52' 52.82' 103,01,08, C4 42.00' 106.81' 136.13' 145*42'22" C5 35.OW 32.77' 50.00' 53*39'07" C6 84.00' 162.51 .00 11 W5327" C7 .35.00' 13.70� 6.94! 22*25'35" C8, 20.00' 31.42 1 20.00' 90'00'29" C9 20.OV VERT. C URVE 20.00' 89*59'31" C10 35.00' 27.13' VERT. CURVE 44-24!55" C11 42.00' 197.06' 42.87' 268*49'50r C12 35.00 50.0 14.2V VERT. CURVE VERT. CURVE zo cq VERT. RVE r -O rc raboo I,-: [to -0-i OR 0 0 W W tA 7 6t u� 1.1 0 0 ol a LCS r: 0) 9 d - 0 Ul _j Zi bo >: U> >: 1T 0_! 62 ?� !2 7- c; 0! W Ite cp -5 >: z I to 0 p N in vz W EASTIN3* GROUNC 0 _j W Ld tn + z 04 b 1W Ln + 04 >: + to E)QS1ING GROUND 0 00 104 co + z 00 0) C4 to co 06 V,: PROP(YSED FLOWLINE C> f*- 6 V- 0 11 V_ C5 0 V­ -PROPOSED FLOWLINE _j + W - TL V_ C4 U11 0; rl� W + + C14 co V) Lj < + LAJ L (4 W L5 Gi m LAS 0) v- ul 0) 031 a) LU _j Uj ui Lq Uj z C3 >: z C4 d E)OSTING GROUND 0 + 00 Uj Go + z cn .: rc-,, 00 + CST Ld be c; co 06 U4 vz to _c, x !R _711p CL CIO Ck- CA Uj EXISTING GROUND cc 11 0 W CL V) CL f N F ROPOSED S=A. - >: .1 00 04 cf) W < W 24! I 06 OLD L '06.81' S=- 255% CD 8 U.1 cr- CD a + --k CZ Ui W + cd ch 04 6 + v- PROPO SO F S=0.50% 0)0 r- -7 0 S= -0.5011 S60.25% a: I S=O .25, C S=0.39% n Lid bi + "(M- - Co -4 w-1 -77 La ...... N K) a: g cn c: -PROPOSED WEST I-IOWLINE a: PROPISED EAST' F NE J PROPOSE) EAST ROWLJNE u4 PROPOSED WESt FLOWLINI - - __ 0 < - - - n < --i W C.> I at u4 >: W W U cz SLOWU _0 231; Q cn c_ cn c� ch L 7 5.52' W Cn Uj In - - d - --JJ CIO 0 _j W S --O.107. .......... . ...... S___O.5Ox IS -0.25% S=0.231 S=-0,29% 0-29-M.' < ............ .......... S-0.25% t S, . . ........... . ............. . .......... I ROPOSED EAST R-(,IWUNE 9+00 10+00 360 358 356 354 352 350 348 346 344 342 11+00 12+00 13+00 14+00 15+00 16+00 17+00 (STA. 9+89.27 F.L. TO 20+78.56 F.L.) SCALE: 1 = 50' HORIZONTAL SCALE: 1" = 5' VERTICAL 360 358 356 354 352 50 348 346 344 342 21+0021+25 11+00 12+00 13+00 14+00 15+00 16+00 17+00 (STA. 9+89.27 F.L. TO 20+78.56 F.L.) SCALE: 1" = 50' HORIZONTAL SCALE: 1" = 5' VER11CAL 18+00 19+00 20+00 360 358 356 354 352 350, 348 34166 344 342 21+00 --.-- ce. 11� CURVE TABLE CURVE RADIUS LENGTH TANGENT DELTA C1 35.00' 50.00' 35.00' 90,00,00" C2 30.00, 7.OV 3.56' 13'32'10" C3 42.OV 75.52' 52.82' 103,01,08, C4 42.00' 106.81' 136.13' 145*42'22" C5 35.OW 32.77' 50.00' 53*39'07" C6 84.00' 162.51 121.97' 11 W5327" C7 .35.00' 13.70� 6.94! 22*25'35" C8, 20.00' 31.42 1 20.00' 90'00'29" C9 20.OV VERT. C URVE 20.00' 89*59'31" C10 35.00' 27.13' 14.2W 44-24!55" C11 42.00' 197.06' 42.87' 268*49'50r C12 35.00 50.0 14.2V VERT. CURVE VERT. RVE I,-: 0 0 zq bo 62 ?� !2 0! W5 0 p N in >: OD C5 0 z LAS LLJ _j a) LU _j Uj ui Lq Uj z C3 >: z C4 E)OSTING GROUND 0 + 00 Uj Go + z cn .: rc-,, 00 + CST Ld be c; co 06 vz to x !R _711p 0 im + Uj EXISTING GROUND 0 f N F ROPOSED FLOWLINE - >: .1 00 04 Z, < W 24! I 06 OLD CD 8 U.1 cr- CD a + --k CZ Ui W + cd ch 04 6 + v- PROPO SO F W 0: a: oo n Lid bi + "(M- - Co -4 w-1 -77 La V_ N K) a: g cn c: a: a: La u4 T - cs - - __ 0 < - - - n < --i W C.> I at cz Q cn c_ cn c� ch L 7 5.52' CL Cn Uj In C.D CIO 0 _j W S --O.107. .......... . ...... S___O.5Ox IS -0.25% S=0.231 S=-0,29% 0-29-M.' ............ .......... S-0.25% S=-0.35% . . ........... . ............. . .......... I ROPOSED EAST R-(,IWUNE S=O. 5% WTV V R 0 F S-0.25% 10 �Sgfflm T r -L 0 '01UP I E PROPOSED EAST FLOWIJ 4E PROPO4, K S T 0 U N E S=0.39% 11+00 12+00 13+00 14+00 15+00 16+00 17+00 (STA. 9+89.27 F.L. TO 20+78.56 F.L.) SCALE: 1" = 50' HORIZONTAL SCALE: 1" = 5' VER11CAL 18+00 19+00 20+00 360 358 356 354 352 350, 348 34166 344 342 21+00 --.-- ce. 11� CURVE TABLE CURVE RADIUS LENGTH TANGENT DELTA C1 35.00' 54.98' 35.00' 90,00,00" C2 30.00, 7.OV 3.56' 13'32'10" C3 42.OV 75.52' 52.82' 103,01,08, C4 42.00' 106.81' 136.13' 145*42'22" C5 35.OW 32.77' 17.70' 53*39'07" C6 84.00' 162.51 121.97' 11 W5327" C7 .35.00' 13.70� 6.94! 22*25'35" C8, 20.00' 31.42 1 20.00' 90'00'29" C9 20.OV .31.41' 20.00' 89*59'31" C10 35.00' 27.13' 14.2W 44-24!55" C11 42.00' 197.06' 42.87' 268*49'50r C12 35.00 27.13' 14.2V SCALE: 1 50" LEGEND: R1-1 NOTES: CONSTRUCTION NOTES: 50" 25' ov 50' 100' ABORENAA-DONS FURNISH & INSTALL TRAMC SIGNS PER C.O.B. SM. T-19: ONE= CONSTRUCT 18! BOTTOM WIDTH DRIVEWAY W/S WINGS FL FLOWLINE POVC POINT ON VERTICAL CURVE *Rl-l" - STOP *W1-7" - DOUBLE ARROW PER C.O.B. SM. ST -7 ON SHEET' 4. 1. SEE SEWER AND STORM DRAIN PLANS FOR STORM DRAIN CONSTRUCT TYPE "B" CURB & GUTTER PER C.O.B. STD, ST -1 CL CENTERLINE BVC BEGIN VERTICAL CURVE *R6-1* - ONE WAY "WI - SINGLE ARROW ME= glum= Oman= mmumm PHASE BOUNDARY AND SEWER DETAILS. ELEV ELEVATION EVC END VERTICAL CURVE mR5-1" - DO NOT ENTER "Wl-l* - CURVE ARROW PROPOSED EDGE OF PAVEMENT 2. LOCAL STREETS - PAVEMENT TO BE 0.20' TYPE "B" A.C. CONSTRUCT 4.5' COMBINATION SIDEWALK PER C.O.B. BCR BEGIN CURB RETURN PI POINT OF INTERSECTION -R26(CA)" - NO PARKING "W3-3* - SIGNAL AHEAD OVER 0.40' AGGREGATE BASE OVER 0.50' COMPACTED O.G. TO STD ST -5 ON SHEET 4 ECR END CURB RETURN PRIC POINT OF REVERSE CURVATURE *R3 -5R" - RIGHT TURN ONLY "W3-1* - STOP AHEAD Ts FURNISH & INSTALL TRAFFIC SIGNAL CONDUIT BE COMPACTED TO 95% RELATIVE DENSITY PER C.O.B. STD. ST -9. BC BEGIN CURVE PCC PONT OF COMPOUND CURVATURE *R4-7* - KEEP RIGHT *S5 -t - END SCHOOL ZONE PIVC POINT OF INTERSECTION TC TOP OF CURB R81(CAr - BIKE LANE *S4 -t - WHEN CHILDREN ARE PRESENT IR FURNISH & INSTALL IRRIGATION CONDUIT 3. ALL CATCH BASINS TO BE 1'1?E "A" NTH 3.5' OPENINGS INSTALL STREET SIGN PER C.O.B. STANDARD DETAIL T-1. OF VERTICAL CURVE TIP TOP OF PAVEMENT -W31(CA)- - END "S4 -Y - SCHOOL PER C.O.B. STD. D-14, UNLESS NOTED OTHERWISE. CONSTRUCT HANDICAP RAMP PER CALTRANS 2010 STANDARD FC FINISH CONCRETE *WI4-1" - DEAD END *R2-1" - SPED LIMIT 20 ic FURNISH & INSTALL INTERCONNECT CONDUIT "WI4-2" - NO OUTLET PLAN R.S.P. A88A-CASE A. 1R6 TR5 ]E3 V, FURNISH & INSTALL SPLICE BOX FOR INTERCONNECT FURNISH & INSTALL SURVEY MONUMENT PER C.O.B. SM. ST -1 3. D STORM DRAIN - REFER TO SEWER & STORM DRAIN PLANS TR3=NO. 3 1/2 SZE TR5--NO. 5 SIZE TR6=NO. 6 SIZE SECTION DESIGNATION: CONSTRUCT SINGLE FAMILY RESIDENTIAL DRIVE APPROACH @ EXISTING SURVEY MONUMENT 0 STORM DRAIN MANHOLE - REFER TO SEWER & STORM DRAIN PLANS CURVE NUMBER FOR CURVE DESCRIPTION ALONG CURB SEC10N LEM PER C.O.B. STD, ST -7 ON SHEET 4 + FURNISH & INSTALL STREET SIGN PER C.O.B. SM. T-1. CATCH BASIN - REFER TO SEWER & STORM DRAIN PLANS. TAPER NUMBER FOR TAPER DESCRIPTION ALONG CURB PAINT 12" LIMIT LINE USING THERMOPLASTIC PAINT PER CALTRANS Know what's below. FURNISH & INSTALL METRO STREET SIGN PER C.O.B. SM. T-1. S_ SEWER - REFER TO SEWER & STORM DRAIN PLANS ITEM OF WORK - SEE SCHEDULE 2 STANDARD SPECIFICATION PTH-02ALKYD. Cal I before you dig. + MEET *IRE SEC11ON IS SH'OWMN C>- FURNISH & INSTALL STREET UGHT-58W LUMEN PER C.O.B. STO. ST -14. SEWER MANHOLE - REFER SEWER & STORM DRAIN PLANS. e9 FURNISH & INSTALL STREET UGHT-9500 LUMEN PER C.O.B. SM. ST -14. 0 SEWER CLEANOUT - REFER TO SEWER & STORM DRAIN PLANS. 1.1-6760 Ole *%. N TRACT BOU11NDARY LLI i. - 41C EYJS71NG CL PROPOSED PAVEMENT PAVEMENT )C77 doe DETAIL "A" SCALE: 1 " = 10" COBBLI (SEE T% qv� L W *111-l" - STOP *WI -7* - DOUBLE ARROW *R6-1* - ONE WAY 3: SM nn: d CL R26(CA)- - NO PARKING V-3' - SIGNAL AHEAD *R3 -5R* - RIGHT TURN ONLY QD *R4-7* - KEEP RIGHT 0 z *R81(CA)* - BIKE LANE *S4-2* - WHEN CHILDREN ARE PRESENT :W31(CA)* - END VERT. CU RVE VERT. CU a: *WI4-2" - NO OUTLET COBBL (SEE -M 4. 0' 2LIft to# do of Wffl0A I.X mix - 2.#X am F 1.0- Lo ta SEC77ON "A -A T114�3 N mama a 4MRSW pw or M&M S" MW of "&Mw S&P of aw MW* &W cW&N to Me wpr=w Alcum of ft ifinfim WNW &vw ra" mvwd " M&N to &W "*WWI$ of me valk ftn&* 4waxym- "Wflff a scam Of aft &M ffmat hft maw for no"Imt VW40* 4ft*am-, WWt aly WIMW $am &W be $MW of Me fimw of MMW a deewAy ft ary I A mof Mrat Pm* hwed by Me CRY of &OW. me acum b6v rwowd &W bo 0 Mkimm of 51Y k 8*03" POW #Nk �"t past ww*wy &W swcub &W *Tp ob nb* J*t or am ft t -,r - 0# wwk oft ft City IV Inapt W kcaffm & to odjwwt O*ft kAWMW41 IN" 01"he *MW by ft C& &*MI bo wxhWed bw to gra* od am od mpww k on of MAMM dy 'o. Swum b* rqkww my be pww 0;" a*" pwmwt do as ddwmW b AS7M 0-1567 to la�dpfh d ff in Poo Mdft Wd me me pdw "v" Of ft CRY y 6- b*w hp of xbrt& &pw. O#Anft ft a*&# pawmwt 56d be $Not a mimm 4 anp* f4r df* Wm" SW W&W to ft of M I#= the 0* of c0awk a, as &Mw pommw pokh Nf*wwtr d me &W*WvxfflWqkW for M#w aw cofibm to ft r"dwamis of Andw aid ST -11. awmte (mk cm -d -it cagmt 50 &/ar)dj I/. carb W 9whr Wd 6* of ""a* sw be pme Cwm* AW cxd* no oldRIM H*W pnw ApWal* not mwdwc* qp my 12 No'dim qpvxh caubvcft sW be palmdad in shd or 5 &*v hm SW be wftw on the $0 PAL -W day cwb rdwn nad to Me mwok wd &W mt be kss dw L50 00 aftr Aft WYwd Fww and xdgv* sW 13 Edp of *ft qVroad Ad be a wh of 25'hm adjand k( Sm be wmw km"* prkr to Awe= t of wwwo. 14 E*ft ad, If k gW cwdft = y to sanut wd mwaW awvk sW bt bwkd noft @*W ed ffm rad� No it 0C=M*& mskvft of nm raVoW &1w pm a' bum Ad* kmw&&y dw **&* ffrox* or vNedw of 014" wroxt has shd mew a swam -Tr i -of 0% d q4V wwwW cwdwmhy to on awdtofta & xrftv Of or k A* WN my so Wft ""Md A-01 Z &Wmix I*& *W be cosbwW at belft #4* of **Nw ph" 1*k lo- rdaTO awbe at mar of wwch od at ta madmo khrmb Old as d*W by me CNY ft1w. VIP Vol Ap % ,cot LEGEND: A15BREVIAIIQNS FL FLOWLINE POVC POINT ON VERTICAL CURVE CL CENTERLINE BVC BEGIN VERICAL CURVE ELEV ELEVATION EVC END VERTICAL CURVE BCR BEGIN CURB RETURN PI POINT OF INTERSECTION ECR END CURB RETURN PRC POINT OF REVERSE CURVATURE BC BEGIN CURVE PCC POINT OF COMPOUND CURVATURE PIVC POINT OF INTERSECTION TC TOP OF CURB OF VERTICAL CURVE TP TOP OF PAVEMENT FC FINISH CONCRETE FURNISH & INSTALL SURVEY MONUMENT PER C.O.B. SID. ST -13. @ EXISTING SURVEY MONUMENT + FURNISH & INSTALL STREET SIGN PER C.O.B. STD. T-1. + FURNISH & INSTALL METRO STREET SIGN PER C.O.B. STD. T-1. _<D- FURNISH & INSTALL STREET UGHT-5800 LUMEN PER C.O.B. SM. ST -14. E�) FURNISH & INSTALL STREET UGHT-9500 LUMEN PER C.O.B. STD. ST -14. R1-1 KANOSH COBBLE DRIVE SEE SHEET 3 E MOUNTAIN ROAD (NOT A PART) KANOSH COBBLE DRIVE SEE SHEET 3 ACT 6491 - PHASE 3) AGASSIZ ROCK DRIVE (STA. 11+42.81 C.L. TO 13+07.82 C.L.) SCALE: 1" = 50' HORIZONTAL 360 358 356 354 352 350 348 346 344 342 J60 358 356 354 352 350 348 346 344 342 360 358 356 354 352 350 348 346 344 342 11+00 12+00 13+00 (STA. 11+42.81 F.L. TO 12+67.82 F.L.) SCALE: 1" = 50' HORIZONTAL SCAI F: 1" = 5' VER11CAL *111-l" - STOP *WI -7* - DOUBLE ARROW *R6-1* - ONE WAY "WI -6* - SINGLE ARROW SM nn: 'WI -l' - CURVE ARROW R26(CA)- - NO PARKING V-3' - SIGNAL AHEAD *R3 -5R* - RIGHT TURN ONLY `W3-1' - STOP AHEAD *R4-7* - KEEP RIGHT "S5-2* - END SCHOOL ZONE *R81(CA)* - BIKE LANE *S4-2* - WHEN CHILDREN ARE PRESENT :W31(CA)* - END VERT. CU RVE VERT. CU RVE *WI4-2" - NO OUTLET 50* " D- STORM DRAIN - REFER TO SEWER STORM DRAIN PLANS 0 STORM DRAIN MANHOLE - REFER TO SEWER & STORM DRAIN PLANS co 2 SEWER - REFER TO SEWER & STORM DRAIN PLANS PROPOSED EDGE OF PAVEMENT bo 0 SEWER CLEANOUIT - REFER TO SEWER & STORM DRAIN PLANS. STI) ST -5 ON SHEET 4 TS_ FURNISH & INSTALL TRAFFIC SIGNAL CONDUIT BE COMPACTED TO 95% RELA11VE DENSITY PER C.O.B. STD. ST -9. 0! C-4 3. ALL CATCH BASINS TO BE TYPE "A" NTH 3.5' OPENINGS INSTALL STREET SIGN PER C.O.B. STANDARD DETAIL T-1. ic FURNISH & INSTALL INTERCONNECT CONDUIT PER C.O.B. STD. D-14, UNLESS NOTED OTHERWISE. >:10 TR3 5 T&6 PLAN R.S.P. A88A-CASE A. FF, W SECTIQN DESIGNA-11ON: Lu. Ld z R cS Or C4 R .z TAPER NUMBER FOR TAPER DESCRIP11ON ALONG CURB PAINT 12" LIMIT LINE USING THERMOPLASTIC PAINT PER CALTRANS cq 4 + 04 !:� im W + V_ + ITEM OF WORK SEE SCHEDULE 0i to + C14 (10 c :k 04 + C14 v__ 02 M cn a: cn a� U! cn c� C3 cd cn W cn S-0.57 �L ---------- Q_ cn 0 - F STING NORTH WLJ NE SM ol PROPOSED NORTH FLOWLNE ...... lx� SDUTH f LOWLINE PROP DSED SOU TH FLOVAJ NE z 360 358 356 354 352 350 348 346 344 342 11+00 12+00 13+00 (STA. 11+42.81 F.L. TO 12+67.82 F.L.) SCALE: 1" = 50' HORIZONTAL SCAI F: 1" = 5' VER11CAL FURNISH & INSTALL TRAFFIC SIGNS PER C.O.B. SM. T-19. *111-l" - STOP *WI -7* - DOUBLE ARROW *R6-1* - ONE WAY "WI -6* - SINGLE ARROW SM nn: 'WI -l' - CURVE ARROW R26(CA)- - NO PARKING V-3' - SIGNAL AHEAD *R3 -5R* - RIGHT TURN ONLY `W3-1' - STOP AHEAD *R4-7* - KEEP RIGHT "S5-2* - END SCHOOL ZONE *R81(CA)* - BIKE LANE *S4-2* - WHEN CHILDREN ARE PRESENT :W31(CA)* - END `S4-3! - SCHOOL VERT. CU RVE *WI4-2" - NO OUTLET 50* " D- STORM DRAIN - REFER TO SEWER STORM DRAIN PLANS 0 STORM DRAIN MANHOLE - REFER TO SEWER & STORM DRAIN PLANS CATCH BASIN - REFER TO SEWER & STORM DRAIN PLANS. 2 SEWER - REFER TO SEWER & STORM DRAIN PLANS PROPOSED EDGE OF PAVEMENT bo 0 SEWER CLEANOUIT - REFER TO SEWER & STORM DRAIN PLANS. STI) ST -5 ON SHEET 4 TS_ FURNISH & INSTALL TRAFFIC SIGNAL CONDUIT BE COMPACTED TO 95% RELA11VE DENSITY PER C.O.B. STD. ST -9. 0! FURNISH & INSTALL IRRIGA11ON CONDUIT 3. ALL CATCH BASINS TO BE TYPE "A" NTH 3.5' OPENINGS INSTALL STREET SIGN PER C.O.B. STANDARD DETAIL T-1. ic FURNISH & INSTALL INTERCONNECT CONDUIT PER C.O.B. STD. D-14, UNLESS NOTED OTHERWISE. CONSTRUCT HANDICAP RAMP PER CALTRANS 2010 STANDARD TR3 5 T&6 PLAN R.S.P. A88A-CASE A. FURNISH & INSTALL SPLICE BOX FOR INTERCONNECT W SECTIQN DESIGNA-11ON: Lu. Ld CURVE NUMBER FOR CURVE DESCRIPTION ALONG CURB SECION LEM PER C.O.B. STI) ST -7 ON SHEET 4 TAPER NUMBER FOR TAPER DESCRIP11ON ALONG CURB PAINT 12" LIMIT LINE USING THERMOPLASTIC PAINT PER CALTRANS cq STANDARD SPECIFICATION PTH-02ALKYD. ITEM OF WORK SEE SCHEDULE 2 SHEET WHM SEC'00N IS SHOYN + C14 (10 04 2 cn c� W cn Q_ cn 0 - -S--0.57%- SM ol ...... lx� SDUTH f LOWLINE PROP DSED SOU TH FLOVAJ NE z FURNISH & INSTALL TRAFFIC SIGNS PER C.O.B. SM. T-19. *111-l" - STOP *WI -7* - DOUBLE ARROW *R6-1* - ONE WAY "WI -6* - SINGLE ARROW *R5-1" - DO NOT ENTER 'WI -l' - CURVE ARROW R26(CA)- - NO PARKING V-3' - SIGNAL AHEAD *R3 -5R* - RIGHT TURN ONLY `W3-1' - STOP AHEAD *R4-7* - KEEP RIGHT "S5-2* - END SCHOOL ZONE *R81(CA)* - BIKE LANE *S4-2* - WHEN CHILDREN ARE PRESENT :W31(CA)* - END `S4-3! - SCHOOL W14_1' - DEAD END *112-1' - SPED LIMIT 20 *WI4-2" - NO OUTLET 50* " D- STORM DRAIN - REFER TO SEWER STORM DRAIN PLANS 0 STORM DRAIN MANHOLE - REFER TO SEWER & STORM DRAIN PLANS CATCH BASIN - REFER TO SEWER & STORM DRAIN PLANS. s- SEWER - REFER TO SEWER & STORM DRAIN PLANS PROPOSED EDGE OF PAVEMENT SEWER MANHOLE - REFER SEWER & STORM DRAIN PLANS. 0 SEWER CLEANOUIT - REFER TO SEWER & STORM DRAIN PLANS. 1560 358 356 354 352 350 348 346, 344 342 11+00 12+00 13+00 (STA. 11 +42.81 F.L. TO 12+67.82 F.L.) SCALE 1 " = 50' HORIZONTAL SCALE: 1" = 5' VER11CAL ac C3 Iq gm 15 WE N3i (Slop W 0 C4 16 cn + 0A W I cn 17 18 19 R/W I" R/W U.1 W z _10-70 imox off 0.20! A.C. PAW O.W AM CMNAIION O..W CNIPACM O.G. 70 J SM" 95X MEUIVE DENSTY cm & IDUTI'm LOCAL STREET SEC11ON SCALE: 1 " =10' HORIZONTAL 1 =5! VER11CAL 71 = 4.5 R=66 Sim mat we Note Z Ir dw we*md Abo J*4 see Able, Z Ckb & Cotter per stodbrd 000 ST -L -- ------ T - --------- 11 ---- ON6 RaW per ;0I swad kwei sT-ta 50 fair 00h. at fdW I I.. - -.* SM MO* I I Rot -4 -my &0 Sk" 10' x mi 2a 2. X zat mot 4. r mh *4.5' *7 af ka s&a* Ww o&nrin *wWby ft aty &*w. d 0" OW c*dv s&&* od W d low $&us* jWW Od*wt to &*0* a, k*" am a- IN offi"*e ~ed by ft a�v &OW. L AN waftwAo wd,malaft " ccabm to �&e �q*cbk swum,of * *wr=aa wbwed Uie,,pf,cvr&* 004*wt of rMMwahm skaw $pffl*vAW: fim/W how as *Sk*&d 4wdk01Axs'o cw'mt aty Wpr*vd e*kw. I A cwmt $ked Pm# ftW b at ,y of Ahr.*V PWk " 4wkwt must xcwVwy d wwk jWM ft CRY rot -of -wax 3 Ufv* " be, msftded 4W to P** Wd MW sacikw od cwpww to, xW of mat'rav -dy dazdly a 0vwjW by ASIM 9-07 -to a dpffi of 6.e bebw kp of atp* 4 Cmde for $*In* &�d caftfam to me ""Wts Of Me Stodand *dketkns forIMAW CMOs* (Mb. owt cotot of m alcu )4 ametv aw awk w adaw WM prior WOW 14 WOW #" * cdy fthw- 5. roltor k m " be wffwed on,* %* #bW nW to Me 0000te W sW� be mt Im, ffm 1.5* OW0, al"' b* S00"d, roms'and a4v* sw 1W, wetted hwne*d# piv,ta plammi- of -onmte 6, CmWe whow &W be MmW wooffio odpd W & 4fivOw kht ft flvt" ": ms*t, of pebmed vt* of dN** /vMrWt,cWp=W Mat OW&M to me MOMMIts of * Stw&d *c*dkw 9. soc*fis of ofvm# SUMV& bdV nmowd fir r*47mmt &W be $00t at #v &r& of 49 h aty &*W. YN SK&O &* mmwd " bov of 5.0 in tvpffi wO anuft " GNP No &** J*t or a" &a R*fqMWt M&M ja Awk*a md kaffm to ffie adfimt a"q# wow olt *Wd%( 10. AWAIWUM sdw* &W he und at ktamtka wd kw slWs al wtow W cafttar sk"Its old M Y, be L"d at at�-*-$= OW kxx*F an *4 0w& Alff o8w ow of woAft&w s*#* qV gh*t to ox "MW of ft Qry &**W. **ft" so*# or MI** 00 Pf* "row km 00 CRY &owl t)W mst bo q*mwd by Me 41 A# req*wwfs & ADA. Know what's below. Call before you dig. NOTES.- QONSIEUCION NOTES: IFNI mom CONSTRUCT 18' BOTTOM WIDTH DRIVEWAY W/3' WINGS PER C.O.B. STD. ST -7 ON SHEET 4. 1. SEE SEWER AND STORM DRAIN PLANS FOR STORM DRAIN (D CONSTRUCT TYPE "B" CURB & GUTTER PER C.O.B. STD, ST -1 SCALE: 1 pt laamm Emminm Mumma= immummo gawnumm PHASE BOUNDARY AND SEWER DETAILS. 50* " 2. LOCAL STREETS - PAVEMENT TO BE 0.20' TYPE "B" A.C. CONSTRUCT 4.5' COMBINATION SIDEWALK PER C.O.B. 50' 25' of 50' 100 9 PROPOSED EDGE OF PAVEMENT OVER 0.40' AGGREGATE BASE OVER 0.50' COMPACTED O.G. TO STI) ST -5 ON SHEET 4 TS_ FURNISH & INSTALL TRAFFIC SIGNAL CONDUIT BE COMPACTED TO 95% RELA11VE DENSITY PER C.O.B. STD. ST -9. IR FURNISH & INSTALL IRRIGA11ON CONDUIT 3. ALL CATCH BASINS TO BE TYPE "A" NTH 3.5' OPENINGS INSTALL STREET SIGN PER C.O.B. STANDARD DETAIL T-1. ic FURNISH & INSTALL INTERCONNECT CONDUIT PER C.O.B. STD. D-14, UNLESS NOTED OTHERWISE. CONSTRUCT HANDICAP RAMP PER CALTRANS 2010 STANDARD TR3 5 T&6 PLAN R.S.P. A88A-CASE A. FURNISH & INSTALL SPLICE BOX FOR INTERCONNECT TR3--NO. 3 1/2 SIZE TR5--NO. 5 SIZE TR6=NO. 6 SIZE SECTIQN DESIGNA-11ON: CONSTRUCT SINGLE FAMILY RESIDENTIAL DRIVE APPROACH CURVE NUMBER FOR CURVE DESCRIPTION ALONG CURB SECION LEM PER C.O.B. STI) ST -7 ON SHEET 4 TAPER NUMBER FOR TAPER DESCRIP11ON ALONG CURB PAINT 12" LIMIT LINE USING THERMOPLASTIC PAINT PER CALTRANS STANDARD SPECIFICATION PTH-02ALKYD. ITEM OF WORK SEE SCHEDULE 2 SHEET WHM SEC'00N IS SHOYN Know what's below. Call before you dig.