Loading...
HomeMy WebLinkAboutAST 2017UNIFIED PROGRAM INSPECTION CHE KLIST Aboveground Petroleum Storage Tank rogram FACILITY NAME INSPECTION DATE INSPECTION TIME `� t') v; 12 K L l v\3 CI I •� ;.. '. r tug. l..l� . `" `-, r f ADDRESSy PHONE NO. NO OF EMPLOYEES -Prepare Review or amend SPCC plan [CFR 112.5 (a)(d)] k, FACILITY CONTACT BUSINESS ID NUMBER rV-) Al tam'-_ C { i '_;1 X r "'- C: z t E, CONSENT TO INSPECT NAME /TITLE Conduct inspections and test in accordance with written procedures [C R 112.7(e)] CCf TIr1A1 01 • DnnArria 1?n11in'Le1' r'alitr% nm H021th IG- -?.ti21PEAtV I :nf101 7!11 /I) DESCRIPTION Y N N/A COMMENTS an SPCC plan CFR 112.3] r -Prepare Review or amend SPCC plan [CFR 112.5 (a)(d)] k, �C SPCC plan available on site [CFR 112.3(e)] 2.5(a)(d)] X Conduct inspections and test in accordance with written procedures [C R 112.7(e)] Maintain records of inspections, tests and/or procedures CFR 112.7(e) 112.7 & 112.6(a) Records of inspections or tests signed by inspector [CFR 112.7(e)] I �C CCf`TInKI 7• CDr'r' Dl�n Flnmantc• r'alitr%min Haaltltlx tiat0TV [:nrIP_' 7!17 /ll_4_h_ Z`1Z 11J_1Z DESCRIPTION Y N N/A COMMENTS Self- certification for Tier I or H facility [ 1 12.6(a)(1),(b)(1)] r Professional engineer certification [CFR 112.3(d ) and 11 2.6(b) 4 k, Documentation of 5 year review and evaluation of SPCC plan [CFR 112.5(b) ] 2.5(a)(d)] X Amendments required within 6 months of changes/certifications [CFR 112.5(a) uid 112.6(a)(2), (b )(4) Management authorization of resource commitment to implement the SPCC [CFR 112.7 & 112.6(a) -Diagram with location and contents of containers, transfer stations, connecting in 112.7(a)(3) % ,, of oil and storage capacity for each container [CFR 1 12.7(a)(3) itation [CFR 112.8(c)] -Type Discharge prevention measures and procedures for routine handling {CFR 112. (a)(3) X Countermeasures for discovery, response and clean-up [CFR 1 12.7(a)(3)] x Required contact list and phone numbers [CFR 112.7(a)(3) SECTION 3: General SPGG Ke ulrements: c;aurornla meann & ,-)arez Voue; A0A1U.'r+.10, c;)ceu.0 c;)Aiu. 1L DESCRIPTION Y N N/A COMMENTS Provide corrosion protection [CFR 112.8(c)(4)(5), (d)(1)] r Containers compatible with materials stored CFR 112.8(c)(1) k, SPCC plan review changes or amendments within 6 months CFR 1 2.5(a)(d)] X -Implement Prepare an oil contingency plan or written control/removal commitments [CFR I 12.7(d)] eef%rinll A• QDf+f% Dl -nn Tr�ininrr• r`!alifnrnin Nanlfh R Rnfafv r_nfla• 7-9;77A -d_5 DESCRIPTION Y N N/A COMMENTS program CFR 112.7(f)] -Training Train personnel in operation and maintenance of equipment [CFR 112.7(f)] Conduct annuals ill prevention briefings [CFR 112.7(f)(3)] )] X SECTION 5: Facility Inspection: cautornla Heann & 5 Tety uoue, zazru.4.* DESCRIPTION Y N N/A COMMENTS Meet provisions of conditional exemption [H &S 25270.4.5(b) Facility security adequate [CFR 112.7( )] Clean-up materials readily available CFR 11 2.7(c) Overfill protection procedures or devices in place and operative CFR 11 2.8(c)( ) )] Portable /mobile containers positioned to prevent discharge CFR 112.8(c)(11) / unloading rack drains into containment area [CFR 11 2.7(h)]` -Loading / FR 112.8(a), 112.7(c)] ° ° containment adequate to contain capacity of largest container + pre ci i itation [CFR 112.8(c)] -Secondary c Secondary containment valve(s) closed [CFR 112.8] Implement SPCC plan elements [CFR 112.3] ANY HAZARDOUS WASTE ON SITE ?,XYES ❑ NO S Si natureofRecei t Explain: i POST INSPECTION INSTRUCTIONS: • Refer to the back of this inspection report for regulatory citations and correc i ive actions ers 1e rp Date White - Business Copy Yellow - Business Copy to be Sent in after return to Compliance Pink - Prevention Services Copy FD2156b (Rev 9/10) r