HomeMy WebLinkAbout6.1-1692A.C. PAVING TESTING NOTES: SP7-39.01 7-1. ASPHALT CONCRETE (TYPE 'A'). ASPHALT CONCRETE SHALL BE TYPE A (MODIFIED) FOR ALL ARTERIAL AND COLLECTOR STREETS AND TYPE B (MODIFIED) FOR LOCAL STREETS AND SHALL CONFORM TO THE PROVISIONS IN SECTION 39, "ASPHALT CONCRETE," OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS. PRIOR TO THE ADDITION OF ASPHALT BINDER, THE COMBINED MINERAL AGGREGATE FOR TYPE A (MODIFIED) OR TYPE B (MODIFIED) ASPHALT CONCRETE SHALL CONFORM TO THE REQUIREMENTS OF SECTION 39-2.02, "AGGREGATE," OF THE SPECIFICATIONS FOR 3/4" MAXIMUM, MEDIUM GRADING. ASPHALT BINDER FOR TYPE A (MODIFIED) ASPHALT CONCRETE SHALL BE PG 64-10 VISCOSITY GRADED ASPHALT, UNLESS OTHERWISE DIRECTED BY THE ENGINEER. ASPHALT BINDER FOR TYPE B (MODIFIED) ASPHALT CONCRETE SHALL BE PG 64-10 VISCOSITY GRADED ASPHALT, UNLESS OTHERWISE DIRECTED BY THE ENGINEER. THE ASPHALT BINDER SHALL CONFORM TO THE REQUIREMENTS IN THE TABLE FOR "STEAM -REFINED PAVING ASPHALTS," IN SEC11ON 92-1.02, "GRADES," OF THE STANDARD SPECIFICATIONS. THE AMOUNT OF ASPHALT BINDER TO BE MIXED WITH THE MINERAL AGGREGATE SHALL BE DETERMINED BY THE CONTRACTOR IN ACCORDANCE WITH CALIFORNIA TEST METHOD 367 USING SAMPLES OF MATERIALS PROPOSED FOR USE IN THE WORK. THE AMOUNT OF ASPHALT BINDER SHALL BE APPROVED BY THE ENGINEER. AT LEAST 14 DAYS PRIOR TO THE START OF WORK, THE CONTRACTOR SHALL SUBMIT THE FOLLOWING FOR THE ENGINEER'S REVIEW AND APPROVAL: A. A LIST OF AGGREGATE AND ASPHALT SOURCES. B. DOCUMENTATION VERIFYING THAT THE AGGREGATES TO BE INCORPORATED IN THE WORK CONFORM TO THE REQUIREMENTS OF SECTION 39-2.02, "AGGREGATE," OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS. MATERIAL SIEVE ANALYSIS AND SAND EQUIVALENT TEST RESULTS SHOULD NOT BE OLDER THAN SIX (6) MONTHS. ALL OTHER TEST RESULTS SHOULD NOT BE OLDER THAN ONE (1) YEAR. C. AN ASPHALT CONCRETE MIX DESIGN DETERMINED IN ACCORDANCE WITH CALIFORNIA TEST 367. LABORATORY TEST RESULTS ON WHICH THE DESIGN IS BASED SHALL BE SUBMITTED WITH THE MIX DESIGN ALONG WITH THE THEORETICAL MAXIMUM DENSITY OF THE DESIGN MIXTURE AS DETERMINED BY ASTM D2041. THE ASPHALT CONCRETE MIX SHALL MEET THE REQUIREMENTS OF SECTION 39-2.02, "AGGREGATE," OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS. IF THE DATA SUBMITTED SHOWS THAT THE MATERIALS ARE SUBSTANTIALLY THE SAME AS WHEN THE DESIGN WAS PREPARED, THE DESIGN MAY BE UP TO THREE (3) YEARS OLD, THE DEVELOPER SHALL BEAR ALL COSTS ASSOCIATED WITH THE ASPHALT CONCRETE MIX DESIGN. WHERE NEW ASPHALT CONCRETE PAVEMENT IS TO CONFORM TO EXISTING PAVED SURFACES, THE EXISTING PAVEMENT SHALL BE SAW CUT. A PRIME COAT WILL NOT BE REQUIRED ON NON -PAVED AREAS TO BE SURFACED PRIOR TO THE PLACEMENT OF ASPHALT HOWEVER, ALL OTHER REQUIREMENTS OF SECTION 39-4.01, "SUBGRADE," OF THE STANDARD SPECIFICATIONS SHALL BE MET. THE AREA TO WHICH PAINT BINDER HAS BEEN APPLIED SHALL BE CLOSED TO PUBLIC TRAFFIC. CARE SHALL BE TAKEN TO AVOID TRACKING BINDER MATERIAL ONTO THE EXISTING PAVEMENT SURFACE BEYOND THE LIMITS OF CONSTRUCTION. PAVING SEAMS SHALL BE LOCATED TO MATCH DESIGNED TRAFFIC LANE STRIPE LOCATIONS UNLESS OTHERWISE PERMITTED BY THE ENGINEER. INTERSECTIONS AND TAPERED SHOULDERS SHALL BE SURFACED AS DIRECTED BY THE ENGINEER. ADDITIONAL ASPHALT CONCRETE SHALL BE PLACED AT ROAD CONNECTIONS AND PRIVATE DRIVES, WHERE SHOWN ON THE PLANS AND AS DIRECTED BY THE ENGINEER, AND HAND RAKED, IF NECESSARY, AND COMPACTED TO FORM SMOOTH, TAPERED CONNECTIONS. THE FIELD DENSITY OF COMPACTED ASPHALT CONCRETE SHALL BE DETERMINED BY: A. A PROPERLY CALIBRATED NUCLEAR ASPHALT TESTING DEVICE IN THE FIELD, OR B. ASTM D1188 WHEN SLABS OR CORES ARE TAKEN FOR LABORATORY TESTING. ZINC STEARATE MAY BE SUBSTITUTED WITH PARAFFIN. IN CASE OF DISPUTE, METHOD B ABOVE SHALL BE USED. WHERE THE COMPACTED THICKNESS OF A LAYER OF ASPHALT CONCRETE IS 0.15 FOOT OR LESS, PAVING OPERATIONS SHALL BE CONDUCTED IN SUCH A MANNER THAT, AT THE END OF EACH WORK SHIFT, THE LENGTH OF PAVEMENT ALONG THE LONGITUDINAL DROP-OFF BETWEEN ADJACENT LANES IS NOT GREATER THAN THAT WHICH CAN BE SURFACED DURING THE FOLLOWING SHIFT OF NORMAL PAVING OPERATIONS, ADDITIONAL ASPHALT CONCRETE SHALL BE PLACED ALONG THE TRANSVERSE DROP-OFFS ON EACH LANE. SUCH ADDITIONAL ASPHALT CONCRETE SHALL BE HAND RAKED AND COMPACTED TO FORM TEMPORARY CONFORMS BEFORE THE LANES ARE OPENED TO PUBLIC TRAFFIC. KRAFT PAPER, OR OTHER APPROVED BOND BREAKER, MAY BE PLACED UNDER THE CONFORMS TO FACILITATE THE REMOVAL OF THE CONFORMS WHEN PAVING OPERATIONS RESUME. WHERE THE COMPACTED THICKNESS OF A LAYER OF ASPHALT CONCRETE IS MORE THAN 0.15 FOOT, PAVING OPERATIONS SHALL BE CONDUCTED IN SUCH A MANNER THAT THE LAYER OF ASPHALT CONCRETE IS PLACED ON ALL CONTIGUOUS LANES OF THE TRAVELED WAY BEFORE THEA L NES ARE OPENED TO PUBLIC TRAFFIC. AT THE END OF EACH WORK SHIFT, THE DISTANCE BETWEEN THE ENDS OF A LAYER OF ASPHALT CONCRETE ON ADJACENT LANES SHALL NOT BE GREATER THAN 10 FEET. ADDITIONAL ASPHALT CONCRETE SHALL BE PLACED ALONG THE TRANSVERSE DROP-OFFS ON EACH LANE AND ALONG THE LONGITUDINAL DROP-OFF BETWEEN ADJACENT LANES. SUCH ADDITIONAL ASPHALT CONCRETE SHALL BE HAND RAKED AND COMPACTED TO FORM TEMPORARY CONFORMS BEFORE THE LANES ARE OPENED TO PUBLIC TRAFFIC. KRAFT PAPER, OR OTHER APPROVED BOND BREAKER, MAY BE PLACED UNDER THE CONFORMS TO FACILITATE THE REMOVAL OF THE CONFORMS WHEN PAVING OPERATIONS RESUME. ASPHALT CONCRETE SHALL BE COMPACTED TO A MINIMUM 92 PERCENT OF THE MAXIMUM THEORETICAL DENSITY AS DETERMINED BY ASTM D-2041. IN-PLACE DENSITY SHALL BE DETERMINED IN ACCORDANCE WITH CALIFORNIA TEST 375. IF THE IN-PLACE DENSITY OF ANY LOT OF ASPHALT CONCRETE IS LESS THAN 92 PERCENT OR GREATER THAN 94 PERCENT OF THE MAXIMUM THEORETICAL DENSITY, THE CONTRACTOR WILL BE ADVISED THAT THE REQUIRED RELATIVE COMPACTION IS NOT BEING ATTAINED AND THAT THE MATERIALS OR PROCEDURES OR BOTH, IF NEEDED, NEED ADJUSTMENT. ASPHALT CONCRETE SPREADING OPERATIONS SHALL NOT CONTINUE UNTIL THE CONTRACTOR HAS NOTIFIED THE CITY ENGINEER OF THE ADJUSTMENT THAT WILL BE MADE IN ORDER TO MEET THE REQUIRED COMPACTION. IF ANY SUCCESSIVE TEST AFTER NOTICE IS GIVEN DOES NOT MEET THE SPECIFIED RANGE, THE ASPHALT CONCRETE REPRESENTED BY THAT LOT SHALL BE REMOVED AND REPLACED WITH MATERIAL THAT MEETS THE IN-PLACE DENSITY REQUIREMENTS. IF THE TEST RESULTS FOR ANY LOT OF ASPHALT CONCRETE INDICATE THAT THE RELATIVE COMPACTION IS EITHER LESS THAN 90% OR MORE THAN 969'x, THE ASPHALT CONCRETE REPRESENTED BY THAT LOT SHALL BE REMOVED AND REPLACED WITH MATERIAL THAT DOES MEET THE IN-PLACE DENSITY REQUIREMENT. THE CORRECTIVE WORK SHALL BE AT THE CONTRACTOR'S EXPENSE. THE CONTRACTOR SHOULD BE AWARE OF EXISTING SEWER AND STORM DRAIN MANHOLES WITHIN THE ROADWAY. IF THE FINISHED SURFACE OF THE ASPHALT CONCRETE DOES NOT MEET THE SPECIFIED SURFACE TOLERANCES, IT SHALL BE BROUGHT WITHIN TOLERANCE BY EITHER: (1) ABRASIVE GRINDING WITH EQUIPMENT UTILIZING DIAMOND BLADES, (2) REMOVAL AND REPLACEMENT, OR (3) PLACEMENT OF AN ASPHALT CONCRETE OVERLAY. THE METHOD WILL BE SELECTED BY THE ENGINEER. THE CORRECTIVE WORK SHALL BE AT THE CONTRACTOR'S EXPENSE. IF ABRASIVE GRINDING IS USED TO BRING THE FINISHED SURFACE TO SPECIFIED SURFACE TOLERANCES. ADDITIONAL GRINDING SHALL BE PERFORMED, AS NECESSARY, TO ENLARGE THE GRINDING AREA SO THAT THE LONGITUDINAL LIMITS OF GRINDING ARE AT A CONSTANT OFFSET FROM, AND ARE PARALLEL TO, THE NEAREST LANE LINE OR PAVEMENT EDGE, AND THE TRANSVERSE LIMITS OF GRINDING ARE NORMAL TO THE PAVEMENT CENTERLINE. ALL GROUND AREAS SHALL BE NEAT RECTANGULAR AREAS OF UNIFORM SURFACE APPEARANCE. ABRASIVE GRINDING SHALL CONFORM TO THE REQUIREMENTS IN THE FIRST PARAGRAPH AND THE LAST FOUR PARAGRAPHS OF SECTION 42-2.02, "CONSTRUCTION" OF THE STANDARD SPECIFICATIONS. A FOG SEAL COAT SHALL BE APPLIED TO ALL FINISHED ASPHALT SURFACES AT THE DEVELOPER'S EXPENSE. THE FOG SEAL COAT SHALL BE EITHER REJUVENATING AGENT OR ASPHALTIC EMULSION AS DIRECTED BY THE ENGINEER. COMPACTION TESTS SHALL BE THE RESPONSIBILITY OF THE DEVELOPER/SUBDIVIDER/CONTRACTOR. THE NUMBER & LOCATION OF REQUIRED TESTS SHALL BE DETERMINED BY THE CITY ENGINEER. NOTE: 95% COMPACTION AT LEAST 1' ON EACH SIDE OF CROSS GUTTERS. SEWER PIPE INSTALLATION SEWER PIPE SHALL CONFORM TO THE PLANS, AND THESE SPECIAL PROVISIONS. THE PRICE PER LINEAL FOOT SHALL INCLUDE BUT NOT BE LIMITED TO EXCAVATION, BEDDING AND BACKFILL. HANDLING OF MATERIALS. ALL PIPE, FITTINGS, SPECIALS AND CASTINGS MUST BE CAREFULLY HANDLED AT ALL TIMES. ONLY SUITABLE AND PROPER EQUIPMENT AND APPLIANCES SHALL BE USED FOR THE SAFE LOADING, HAULING, UNLOADING, HANDLING AND PLACING OF MATERIALS, SPECIAL CARE SHALL BE EXERCISED SO THAT PREFORMED RESILIENT JOINTS ON PIPE AND FITTINGS WILL NOT BE DAMAGED. ANY PIPE OR FITTING WITH A JOINT DAMAGED OR FLATTENED WILL CAUSE THAT PIPE OR FITTING TO BE REJECTED. PIPE LAYING. NO PIPE SHALL BE LAID UNTIL THE ENGINEER INSPECTS AND APPROVES THE CONDITION OF THE BOTTOM OF THE TRENCH. PIPE SHALL BE INSTALLED IN STRICT ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. PIPE LAYING SHALL BEGIN FROM THE DOWNSTREAM END OF THE TRUNK SEWER OR AS DIRECTED BY THE ENGINEER. PIPE LAYING SHALL PROCEED WITH EACH PIECE LAID TRUE TO LINE AND GRADE, AND IN SUCH A MANNER AS TO FORM A CLOSE CONCENTRIC JOINT WITH THE ADJOINING PIPE AND TO PREVENT SUDDEN OFFSETS IN THE FLOW LINE. AS THE WORK PROGRESSES, THE INTERIOR OF THE SHALL BE CLEARED OF ALL DIRT AND DEBRIS OF EVERY DESCRIPTION. PIPE SHALL NOT BE LAID WHEN THE CONDITION OF THE TRENCH OR THE WEATHER IS UNSUITABLE, AT TIMES WHEN WORK IS NOT IN PROGRESS, OPEN ENDS OF PIPE AND FITTINGS SHALL BE CLOSED. WITH BELLED END PIPE, BELL HOLES SHALL THEN BE EXCAVATED AT EACH JOINT TO FACILITATE THE JOINT OPERATIONS, AND SHALL BE ONLY OF SUFFICIENT SIZE FOR THAT PURPOSE. IN ORDER THAT BELL HOLES MAY BE PROPERLY LOCATED, NOT MORE THAN SIX (6) HOLES SHALL BE EXCAVATED AHEAD OF ACTUAL PIPE LAYING, ON ACCOUNT OF THE VARIATIONS IN JOINT CONSTRUCTION OPERATIONS. SEWER PIPE INSTALLATION-CONT'D. CUTTING PIPE. THE CONTRACTOR SHALL PERFORM ALL WORK OF CUTTING PIPE AND SPECIAL CASTING NECESSARY TO THE ASSEMBLY, ERECTION, AND COMPLETION OF THE WORK. ALL PIPE SHALL BE CUT TO FIT ACCURATELY, WITH SMOOTH EDGES AND FACES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CORRECTNESS OF CUTTING AND NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR ANY MATERIALS WHICH ARE DAMAGED OR INCORRECTLY CUT. PIPELINE TESTING. ALL SEWERS SHALL BE TESTED FOR TIGHTNESS WHEN COMPLETED AND READY FOR SERVICE. TESTING SHALL BE CONDUCTED IN ACCORDANCE WITH THE UNIFORM PLUMBING CODE AIR TEST METHOD UPC SEC. 318-6(4), OR THE WATER EXALTRATION TEST OR AIR PRESSURE TEST PER SECTION 306-1.4, "TESTING PIPELINES" OF THE 1994 EDITIONS, "STANDARD SPECIFICATIONS" FOR PUBLIC WORKS CONSTRUCTION, AND CHAPTER 1.3 OF THE CITY OF BAKERSFIELD SUBDIVISION DESIGN MANUAL, AND THE PIPE SUPPLIER'S REQUIREMENTS. THE CONTRACTOR SHALL NOTIFY THE ENGINEER 24 HOURS PRIOR TO ANY TESTING. CLEANING PIPE LINES. CARE SHALL BE EXERCISED IN LAYING OF PIPE LINES TO EXCLUDE DIRT AND ANY OTHER FOREIGN MATERIAL. WHEN PIPE LAYING IS INTERRUPTED, AS AT NIGHT, THE PIPE ENDS SHALL BE SUITABLY CLOSED. UPON COMPLETION, AND BEFORE PLACING INTO SERVICE, ALL LINES SHALL BE FLUSHED AND MANDRELLED TO REMOVE ANY DIRT OR FOREIGN MATERIALS WHICH WOULD CLOG PUMPS, EQUIPMENT, SPRAY HEADS, ETC. THE CONTRACTOR SHALL MAKE PROVISIONS FOR PREVENTING FOREIGN MATERIAL FROM BEING FLUSHED INTO AN EXISTING SEWER LINE. SEWER LATERALS. SEWER LATERALS SHALL CONFORM TO THIS IN EVERY REGARD. EXISTING SEWER LATERALS SHALL BE LOCATED BY THE CONTRACTOR AND CONNECTED TO AND EXTENDED OR RECONSTRUCTED ACCORDING TO THE PLANS. COMPRESSION COUPLINGS MAY BE UTILIZED FOR CONNECTING TO EXISTING LATERALS. POSITIVE GRADE TO THE TRUNK SEWER SHALL BE MAINTAINED AND INVERT GRADES SET AS CALLED ON THE PLANS. SEWER WYES SHALL BE INSTALLED ON THE TRUNK IN ACCORDANCE WITH THE PIPE MANUFACTURERS RECOMMENDATIONS. PAYMENT FOR SEWER LATERALS WILL BE PAID AS SEWER FOR THE APPROPRIATE DIAMETERS. SYSTEM TESTING A MANDREL TEST AND PRESSURE TEST SHALL BE PERFORMED ON INSTALLED PIPE IN ACCORDANCE WITH THE CITY OF BAKERSFIELD SUBDIVISION MANUAL AND THE RECOMMENDATIONS OF THE MANUFACTURER. PRIOR TO FINAL ACCEPTANCE, ALL SEWER LINES SHALL BE INSPECTED WITH VIDEO EQUIPMENT DESIGNED FOR THIS PURPOSE. THE TELEVISION CAMERA SHALL HAVE THE CAPABILITY OF ROTATING 360', IN ORDER TO VIEW AND RECORD THE TOP AND SIDES OF THE PIPE, AS REQUIRED, THE VIDEO INSPECTION SHALL BE WITNESSED BY THE CITY'S CONSTRUCTION INSPECTOR, WHO WILL ALSO INITIAL AND DATE THE "CHAIN OF CUSTODY' FORM. THE SUBDIVIDER SHALL IMMEDIATELY NOTIFY CITY OF ANY PIPE LOCATIONS REVEALED TO BE NOT IN COMPLIANCE WITH THE SPECIFICATIONS. A RECORDED VIDEO CASSETTE, THE COMPLETED "CHAIN OF CUSTODY" FORM AND A WRITTEN LOG (WHICH INCLUDES THE STATIONING, BASED ON THE STATIONING OF THE APPROVED PLANS, OF ALL CONNECTED LATERALS) OF THE INSPECTION SHALL BE PROVIDED FOR VIEWING, AND SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO ACCEPTANCE. AFTER ACCEPTANCE, THE VIDEO CASSETTE SHALL BECOME THE PROPERTY OF THE CITY. WYE FITTINGS SHALL BE INJECTION MOLDED IN -UNE TYPE AND SHALL BE USED FOR ALL LATERAL CONNECTIONS AND SHALL BE ROTATED A MINIMUM OF 23 DEGREES ABOVE THE HORIZONTAL PLANE RUNNING THROUGH THE CENTERUNE OF THE MAIN. ALL LATERALS SHALL BE 4" IN DIAMETER EXCEPT AS NOTED ON PLANS, EXTENDING A MINIMUM OF 4' BEYOND THE PROPERTY UNE OR RIGHT-OF-WAY UNE WITH 30" OF COVER AT FLOW LINE. SURFACE MARKERS FOR SEWER LATERALS SHALL BE INSTALLED AT THE PROPERTY LINE OR RIGHT-OF- WAY LINE AS SHOWN IN THE "SEWER LATERAL MARKER" DETAIL, C.O.B. STD. DET. SW -1. LATERALS SHALL BE A MINIMUM OF 2.25' DEEP AND A MAXIMUM OF 7' DEEP AT PROPERTY UNE OR RIGHT-OF-WAY LINE AND A MINIMUM OF 2.5' DEEP AT FLOWLINE. ALL SEWER STUBS SHALL BE CLOSED WITH A STANDARD PLASTIC PLUG. SOLVENT WELDED. ALL MANHOLES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF BAKERSFIELD STANDARD DRAWINGS S-7, S-8, AND S-21 AND SECTIONS 70-1.02H AND 71-1.07 OF THE STANDARD SPECIFICATIONS OF THE STATE OF CALIFORNIA, DEPARTMENT OF TRANSPORTATION, CURRENT EDITION. ALL CLEANOUTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF BAKERSFIELD STANDARD DRAWING S-20. MANHOLES SHALL BE TYPE "A" FOR PIPES UNDER 48" IN DIAMETER AND TYPE "B" FOR PIPES 48" IN DIAMETER OR LARGER. UNLESS NOTED OTHERWISE. THE BOTTOM MANHOLE BARREL AT THE MANHOLE FOUNDATION SHALL BE SET ON A 2" MORTAR BED OR SET ON KENT -SEAL, IN A GROOVED FOUNDATION. BORED/JACKED PIP CASING OR SMOOTH OUTSIDE WALLED PIPE FOR BORED/JACKED PIPE SHALL BE INSTALLED. IT SHALL HAVE EVEN BEARING THROUGHOUT ITS LENGTH AND SHALL SLOPE TOWARD ONE END. SPACE BETWEEN CASING AND PIPELINE SHALL BE BACKFILLED WITH SAND. IF THE PIPE AND CASING ARE INSTALLED BY BORING, THE SPACE AROUND THE CASING ALSO SHALL BE BACKFILLED WITH GROUT OR SAND. THE ENDS OF SPACE BETWEEN THE CASING AND THE PIPE SHALL BE SEALED WITH GROUT. THE STRENGTH OF PIPE DESIGNATED IN THE PLANS OR SPECIFICATIONS IS DETERMINED FOR VERTICAL LOAD ONLY ANY ADDITIONAL STRENGTH REQUIRED BY BORING/JACKING OPERATIONS SHALL BE FURNISHED AT THE CONTRACTOR'S EXPENSE. THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER FOR APPROVAL ALL PLANS OF BORING/JACKING OPERATIONS PRIOR TO BORING OR JACKING. BORING/JACKING OPERATIONS SHALL BE CONDUCTED IN A SAFE AND EFFICIENT MANNER, CONSISTENT WITH CURRENT ACCEPTED PROCEDURES. WATER BORING SHALL NOT BE PERMITTED. THE CASING PIPE SHALL BE JACKED WITH SUCH PRECISION THAT WILL ALLOW THE REPLACEMENT OF THE PIPELINE TO THE LINE AND GRADE AS INDICATED ON THE PLANS. UPON COMPLETION OF THE INSTALLATION OF THE CASING AND INSTALLATION OF THE PIPELINE TO GRADE, THE VOID BETWEEN THE CASING OR RC PIPE AND THE EXCAVATION SHALL BE COMPLETELY FILLED WITH SAND, COMPACTED BY THE USE OF AIR -BLOWING SAND EQUIPMENT OR ANY OTHER MEANS ACCEPTABLE TO THE ENGINEER UPON HIS APPROVAL. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN A SAFE OPERATION AT ALL TIMES. SHOULD THE TUNNEL HEADING OPERATIONS RESULT IN DANGEROUS OR UNREASONABLE SLOUGHING OF MATERIAL WHICH MAY JEOPARDIZE THE SAFETY OF WORKERS OR THE STABILITY OF THE SOIL AND ROADWAY ABOVE, THE CONTRACTOR SHALL FURNISH AND INSTALL BREASTBOARDING AND/OR FACE CLOSURE WITH SUFFICIENT JACKS TO INHIBIT THE SLOUGHING AND/OR CLOSING THE WORK FACE. THE CONTRACTOR, BEFORE RESUMING WORK, SHALL FURNISH THE ENGINEER WITH A DETAILED PLAN OF PRECEDING WITH THE WORK, FOR HIS REVIEW AND APPROVAL. ANY AND ALL EXPENSES THEREFORE WILL BE CONSIDERED AS INCLUDED IN THE BID PRICE AND NO ADDITIONAL COMPENSATION WILL BE MADE THEREFORE. MINOR STRUCTURES MINOR STRUCTURES. PORTLAND CEMENT CONCRETE MINOR STRUCTURES SHALL CONFORM, IN DESIGN, MATERIALS, AND CONSTRUCTION, TO THE PROVISIONS OF SECTIONS 70-1.02 H OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS. MANHOLES SHALL CONFORM TO THE CITY OF BAKERSFIELD STANDARDS S-7 AND S-8. DROP INLETS SHALL CONFORM TO THE CITY OF BAKERSFIELD STANDARD S-12. TEMPORARY INLET GRATES SHALL CONFORM TO DETAILS ON THE PLANS. THE PRECAST CYLINDER, TAPER, AND ECCENTRIC FLAT TOP SECTIONS SHALL MEET THE STRENGTH REQUIREMENT OF ASTM. C-478. EACH SUCCESSIVE MANHOLE SECTION SHALL BE SET ON A BED OF PORTLAND CEMENT GROUT OR "KENT SEAL" TO MAKE A WATERTIGHT JOINT, SHALL BE NEATLY POINTED ON THE INSIDE, AND SHALL BE SET PLUMB. LIST OF MATERIALS ITEM UNIT QTY, A.C. PAVING TONS 325 CLASS II AGG. BASE CUYD 184 SUBGRADE PREPARATION CUYD 369 6" CURB AND GUTTER LF 744 SIDEWALK SF 1790 HANDICAP RAMP EA 2 SAW CUT LINE LF 488 STOP SIGN EA 1 DRIVEWAY -6" THICK SF 242 LED 100 WATT STREET LIGHT EA 1 STRIPING DETAIL 38 LF 107 STRIPING DETAIL 39 LF 327 INTERCONNECT CONDUIT LF 210 6" SDR35 PVC SEWER LINE LF 88 INSIDE DROP MANHOLE CONNECTION EA 1 SEWER PIPE BORE AND CASING EA SEE PLAN Lu DO le W M� w W STREET (� LENGTH LF 463 STANDARD NOTES 1. ALL IMPROVEMENTS SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS AND SPECIFICATIONS OF THE CITY OF BAKERSFIELD. 2. THE FOLLOWING CITY OF BAKERSFIELD STANDARDS SHALL BE CONSIDERED PART OF THESE PLANS: CITY OF '3T-1, ST -3, ST -6, ST -9, ST -10, ST -11, T-19 SW -3, SW -4, SW -5, SW -9, W-7 3. PAVING FOR ASHE ROAD SHALL BE: KERN �0.45' TYPE "A" A.C. OVER 0.40' CL 2 AGGREGATE BASE OVER ' 1.65COMPACTED O.G., O.G. TO BE COMPACTED TO 93% RELATIVE DENSITY PER C.O.B. STD. ST -9. 4. INSTALL TYPE "B" CURB AND GUTTER, PER C.O.B. STANC ARDS ST -1. 5. INSTAL 5.5' SIDEWALK ON ALL STREETS UNLESS OTHERWISE NOTED PER COB ST -3. 6• ALL MANHOLE AND LAMPHOLE FRAME AND COVERS SHALL BE SET 1/4" 3ELOW PAVEMENT GRADE. 7. UNDERGROUND SERVICE ALERT SHALL BE CONTACTED AT LEAST 2 WORKING DAYS PRIOR TO CONSTRUCTION. 1-800-227-2600. 8. WARN NG/REGULATORY SIGNS: SIGN PANELS SHALL BE MOUNTED ON POSTS WITH 1AWKINS M2G SERIES BOLT AND VANDAL 'ROOF NUT ASSEMBLY OR EQUAL. ROADSIDE SIGNS INSTALLED PER STD. T-19 SHALL BE LOCATED WITHIN SIDEWALK 6" FROM BACK. 9. AN OPEN STREET PERMIT SHALL BE OBTAINED F"ROM THE CITY OF BAKERSFIELD PUBLIC: WORKS DEPT. FOR ANY WORK PERFORMED WITHIN EXISTING ACCEPTED STREET RIGHT-OF-WAY. UNLESS SECURED BY A SUBDIVISION AGREEMENT, SECUFITY BASED ON AN ARDROVED ENGINEER'S ESTIMATE FOR THE WORK PERFCRMED WITHIN THE RIGHT-OF-WAY AND INSURANCE SHALL BE POSTED PRIOR TO ISSUANCE OF THE PERMIT. 10. AGGREGATE BASE: AGGREGATE BASE MATERIAL FOR ARTERIAL & COLLECTOR ROADWAYS SHALL BE CRUSHED AGGREGATE BASE (CAB) CONFORMING TO SECTION 200-2.2 OF THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, LATEST EDITION ("GREENBOOK"). AGGREGATE BASE MATERIAL FOR LOCAL ROADWAYS SHALL BE EITHER CAB OR CRUSHED MISCELLANEOUS BASE (CMB) CONFORMING TO SECTION 200-2.4 OF THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTON, LATEST EDITION. AGGREGATE BASE SHALL BE FURNISHED AND PLACED IN ACCORDANCE: WITH THE CONTRACT PLANS, THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION AND THESE DETAILED SPECIFICATIONS. AGGREGATE BASE SHALL BE GRADED TO WITHIN THE CITY TOLERANCES AND COMPACTED TO 95% OF THE MAXIMUM DRY DENSITY IN ACCORDANCE WITH ASTM D-1557. 11. SUBGFADE PREPARATION: THE CONTRACTOR SHALL FINE GRADE AND COMPACT STREET SUBGRADE IN ACCORDANCE WITH THE CONTRACT PLANS, CITY REQUIREMENTS AND STANDARD SPECIFICATIONS. SUBGRADE SHALL BE GRADED TO WI'HIN THE CITY TOLERANCES AND COMPACTED TO 95% OF THE MAXIMUM DRY DENSITY IN ACCORDANCE WITH ASTM D-1557. 12. COMPACTION TESTS SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. THE NUMBER AND LOCATION OF REQUIRED TESTS SHALL BE DETERMINED &Y THE CITY ENGINEER. 13. PRIOR TO THE START OF ANY PHASE OF CONSTRUCTION THE CITY CONSTRUCTION INSPECTION DEPARTMENT SHALL BE GIVEN 24 HOURS NOTICE. (661) 326-2049 14. DUST CONTROL: CONTRACTOR SHALL OBTAIN A COPY OF THE DUST CONTROL PLAN (DCP) FOR THIS PROJECT FROM THE DEVELOPER, AND SHALL KEEP A COPY ON SI`_E AT ALL TIMES. FOR THE DURATION OF CONTRACTOR'S OCCUPANCY OF THIS SITE, CONTRACTOR IS REQUIRED TO COMPLY WITH THE PROVISIONS OF SAID PLAN. 15. PRIOR TO PAVING, THE DESIGN ENGINEER FOR THE PROJECT SHALL VI=RIFY THAT CONDFIONS CONDITIONS REMAIN THE SAME AS SHOWN IN THE APPROVED PLANS. SHOULD CONDITIONS BE CHANGED, A REVISED PLAN SHALL BE SUBMI''TED TO THE CITY FOR APPORVAL 10 DAYS PRIOR TO PAVING. 16. CONTRACTOR SHALL PROVIDE_ TRAFFIC CONTROL ALONG CITY STREETS FOR TIE DURATION OF THE WORK, INCLUDING NIGHTS, WEEKENDS ANC HOUDAYS. TRAFFIC CONTRCL SHALL CONFORM TO THE GUIDELINES OF THE STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION'S "MANUAL OF TRAFFIC CONTROL FOR CONSTRUCTION AND MAINTENANCE WORK ZONES" AND CITY STANDARDS. ONE LANE FOR EACH DIRECTION OF TRAFFIC SHALL BE MAINTAINED AT ALL TIMES. THE CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN TO THE CITY ENGINEER FOR APPROVAL PRIOR TO THE START OF ANY CONSTRUCTION. NO STREET PERMIT WILL BE ISSUED NOR SHALL ANY CITY INSPECTION BE PROVIDED UNTIL SAID TRAFFIC CONTROL PLAN HAS BEEN APPROVED BY THE CITY ENGINEER. 17. PUBLIC STREET LUMINAIRES ARE TO BE "LED" AS SPECIFIED IN C.O.B. SPECIAL PROVISIONS SECTION 86-6.01 OF WHICH MODELS INCLUDE: HOLOLPHANE LVUI SERIES; LEO TIEK GCI SERIES; CREE <SP SERIES OR APPRCVED EQUAL. 18. CONTRACTOR TO OBTAIN ENCROACHMENT PERMIT FROM KERN DELTA WATER DISTRICT PRIOR TO ANY CONSTRUCTION WITHIN KERN DEL -A EASEMENT 19. KERN DELTA TO BE INCLUDED IN PRE -CONSTRUCTION CONFERENCE PHONE (661) 834-4656 BASIS OF BEARINGS: THE BEARING 0' SOO'48'12W, SHOWN FOR "HE CENTERLINE OF ASHE ROAD PER PARCEL MAP NO. 11263 PHASE 1, FILED FOR RECORD IN BOOK 55 OF PARCEL MAPS AT PAGES 110 AND 111 IN THE OFFICE OF THE KERN COUNTY F'ECORDER, WAS USED AS THE BASIS OF BEARINGS HEREON. BENCH MARK: CHISELED "0" CN TOP OF CURB, WESTERLY FLOWUNE OF ASHE ROAD, APPROXIMATELY 160 FEET NORTH OF RAILROAD TRAC<S. ELEVATION = 369.37' (CITY DATUM) NOTES, NOT ALL UNDERGROUND UTILITIES OR FACILITIES WERE LOCATED BY THIS SURVEY AND THE SURVEYOR ASSUMES NO RESPONSIBILITY FOR UNDERGRCUND UTILITIES NOT SHOWN OR FOR INFORMATION DERIVED FROM ANY OUTSIDE SOURCES. INDEX OF SHEETS SHEET TITLE 1. OVER SHEET 2. ;TREET IMPROVEMENT, SEWER AND STRIPING PLANS 7 8 0 9 10 WHITE PILANZ Cl __/z a 18 17 15 a' RC,JECT SITE �� w o� Q � o 19 2D o 21 ti ow 22 o 0 Z!:R:RISPANAMA LsoN TJOS R2 E 30 29 28 = 27 z McCUTCHENQ En Flr T ROAD VICINITY (NAP NO SCALE. B llkKERSFIELD CALIFORNIA OFFSITE STREET IMPROVEMENT AND SEA"ER PLANS 4901 ASIHE ROAD BAKERSFIELID, CALIFORNIA C.U.P. 13- 0163 �,H�..a�Ca,�,.n.�.,�.,.._ WDID NO.SFi�cs�i872 ,I I KEY MAP SCALE: 1"=50' I0 sLd l7" NOTE: 1. A PRE -CONSTRUCTION CONFERENCE WILL BE REQUIRED FOR THIS PROJECT. CONTACT THE CONSTRUCTION DIVISION AT (661) 326-3106 OR (661) 326-3049 AT LEAST 10 WORKING DAYS PRIOR TO THE DESIRED START OF CONSTRUCTION TO SET UP AN APPOINTMENT FOR THE PRE -CONSTRUCTION CON-ERENCE. 2. PRIOR TO THE START OF ANY PHASE OF CONSTRUCTION, THE CITY CONSTRUCTION INSPECTION DEPARTMENT SHALL BE GIVEN 48 HOURS NOTICE. TELEPHONE 326-3049 3. ALL MATERIALS SUPPLIED FOR THIS PROJECT WILL REQUIRE A CERTIFICATE OF COMPLIANCE STATING THAT THE REQUIREMENTS & STANDARDS SET FORTH BY THE CITY OF BAKERSFIELD HAVE BEEN MET. ENGINEER'S STATEMENT THESE PLANS AND SPECIFICATIONS WERE PREPARED BY ME OR UNDER MY DIRECTION AND TO THE BEST OF MY KNOWLEDGE AND BELIEF COMPLY WITH CITY OF BAKERSFIELD ORDINANCES, STANDARDS, AND DESIGN CRITERIA AND INCLUDE ALL IMPROVEMENT (REQUIREMENTS OF THE ADVISORY AGENCY OR OTHER REVIEW BOARD. I AM RESPONSIBLE FOR ALL CALCULATIONS AND DRAWINGS ON THESE PLANS AND ANY ERRORS, OMISSIONS, OR VIOLATIONS OF THOSE ORDINANCES, STANDARDS AND DESIGN CRITERIA SHALL BE CORRECTED DURING CONSTRUCTION. i APPROVED BY: ROC3ER A. MCINTOSH R.C.E. 33322 EXP. 6-30-16 '-w I _,e_ae ROVED BY: KERN DELTA i (STINE CANAL \ APPROVED BY: DISTRICT 16- p- /,�_ DATE cfl l3 1- DATE NICOLAS 0. FIDLER PUBLIC WORKS DIRECTOR DATE R.C.E. 61069 EXP. 12-31-1(o REVIEWED BY:-- - ASSISTANT PUBLIC WORKS DIRECTOR REVIEWED BY: /'' ' - � - �_ _ I`1 ! J' f ty TRAFFIC ENGINEER WO(DDMERE DRIuE DIG LERT iaall: TOLL FREE 1-1300-227-2600 AT FEAST TWO DAYS BEFORE YOU DIG UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA CITY RECORDS NO.: o � t- m � cV I D - M O of p o O L Z LL. m a :3 o W U -- - o LLJ w Q Li. a cn Ld p o Q d W cn -- -� -" /wa C,4coe" ecLiJ z } J J ILL W L L W �LLJ CL tt,► cr Lu DO le W M� w W W JCI i- CO)> loc (, c• a; W i �!Mo WI s, a5 o Z U I c C v Y W v_,«,_ ,j U c i U U w r- n v) N Eli m o c� (� U Ww 0a W W ss W r� UJ o� z Q ILL W L W CL tt,► cr Lu DO le W W w W W JCI i- CO)> loc (, c• a; W i � WI s, a5 V:ILL 11_0 0 c v W c Z O II J W J O II II Lu \ O II II II 1 00 3o Jo FLOWAGE AND DRAINAGE J ~ ww m o J J J J Y4- o EASEMENT PER DOC. NO. oo po _`nes v \ N p o '� U z � 0215017267 DATED 06 J ~ J J J \z 00 o "' "' N m SEE 2/13/15, O.R. "' 9's C 7 z " c, `> L` wQ (6 't' a J SEPARATE SEE JJ J� Y� �0 06 0Zz 0606 J J = J -� uj J U W GRADING PLAN SEPARATE 0ii 0_i L� o a w w `n \q'3 O F `� o 0 �� �� �� v o¢ J oi06 GRADING PLAN 0n0r ma o� 0�,m0x sn MM ca�0 - ��Q �� ca ca mm of z� + EL _j ++ gjzZ 0600 Oi OO (6 \ W W �� +I M� W T) n <cn ¢l=i U-) <U¢2 MM C> m0', r- r- On d[n0 ++ y 0- �� a0 _j m� WH mU ) NN Z cp cO Z fit") Z c0 f7( ++ ¢ ++ Q a Qf X I -f\ OCD 00 00 p O r7M t I r,�j ,�-� In� D!tWt��W HO ZZOQ mYW ++ O_ ++ 0_ NN a- N �' I""i m' Z �M 4(n0 (nW WW(,n� V)v) UQ2 W ;3 1;3 W In W rh \ U ¢¢ I Cj ¢¢ z 3 U -r w cn ri I ADDITIONAL R/W i w (~i� (~i� w F w o Q Q z z Z tl DEDICATION PER m v' 0n > m(n� v>cn ¢ LI) L11 ¢ cn0n ¢ <n N DOC. N0.AaKERER a SEE 1 0215017266 DATED o pSE�� DETAIL "1" 5 R1= 2/13/15, OR 3 18 16 L.S. I I a w 14 Ex. L.S. 2 19 1 2 R/W 1 1 ICNA� n rEr 1 2 3 __ _5 7 �o w I _ .. �. �\R/W ONNECT - - _ 19 _ NO OF CONC. a� s2�c/ �. � 1 _ f DEWALx a r - O 1 O . ,, + ELEC rc 'E (370.0) - - - ---- CD E aE EhDt;&G -------.. T I 1 -EX EDGE :,E ?AVEMENT 4 ENC 1 u -- -- - r- - �-� _ _ r7 EX. C&li � 1 - -� -� ---- --- = - - - - - 00 • ' _� 11 4 18 N - - - ao 1 1 1 I � CL NEW DRIVEWAY --------------- -- _____C- " STA. 32+41.60, F.L. �t50 32+00 _ _A 1.33+00 }, ' " 16.29' N00'48'12"E- 3s+o0 _ �s+oa _ N - - - _ ^481 E _. _ CONIC. MON. W/ BRASS CAP ( n" �'� `� EX ME AN CURB !- 731.42' STAMPED "LS 5332" IN I -- - s . X_ v SEWER app "TYPICAL s__ I I - SEX 30" SFwF 8 9 I EX. RR LAMPHOLE PER P.M. BOOK 55, O ¢ N GUY Wes; NEW 8" WATER � - XING ARM PAGES 110 & 111 ` EX. CONC. WTH STEEL CASING I �� 3C < CULV SEE SEPARATE �� OFFSITE WATER PLAN _ 0° N I NE COR. SEC. --- _ -- - ---EX. 16" WATE 0 � 3 7 �3 --- _.ZU N V) 12 1, 0 2 = N � J ¢ J W ' >-J P m w CURVE TABLE CURVE RADIUS LENGTH TANGENT DELTA H1-30.00' 2 30.00 _ 47.12'_ 3_0.00' 90'00'00" 47.12 30.00' 90100'00" VERTICAL 1" = 5' w 0n v) 0D v) 0 N 382 -r - - _ - --T -- - 382 50.Ob' T I VERT. CURVE I 380-- N - 380 O I N O N O O i O O Z M 378 °' m 0) 0 p co CD to t- - - _ 378 00 \ 00CID CD 00 t > e W N W WOf J ro w 00 r, w w 0>o UD Gjw 376 U j > j ,� v - - 376 ~ J J J ! cn C» a) W U w 4m cn cr;t0 tG ED f Y CO j CO \ p H O W W W 06 M M r O Q r- M M M CS W Of w W O Q. U N M �() - n � N CID d� �J ^ wmYW + 374 z: CIS °' - W W W w ►= � w �m �w Q M 374 mUN N Z to Z O + J J J + W + w W f W I. m Zw ,7U r7 - H U�U 1 z_ 3 U r� J M J N ®PEASOT�EDGE OF ADE c N Q �� ci \ `t 1 a ''' vs.. Q 0¢ Q. o o W m a I O-' X^ O 00 O M W W W M U O > U Uw + a+ w a 4 V a > ww E -U > Q ZZOaH. 372 w �' N; m m� moo_ W W W 372 Z:5 e u ¢ z 'e PAVEMENT m U) M w v~i a6 0n r� _ _ - - - - - - - - - - --- _ - _ - _- - W _ E.- Z _ _ _ _ m(n� a, ¢ V) ¢ -I- - - - - -- -- -- ----- - - --- _ - 1$=1.1 - - 370L- I - --- - - _ �. � _ __ _ .7sx. _ E ==s--- 370 - - w S=0.20% ---- S S=-1.25 5=1.51% I I --- S=0 94� PROPOSED WEST FLOWLINE I 368 s=o•g4% APRROXIMATE GRADE tS=1.0% PROPOSED WEST FLOWLINE 0 VEST EDGE OF - I - -- - 368 EX. FLOW -INE 366 - - + -}- 366 364 --- . .1 -.. - --- --1-- - - - -- -- --- -- -- -- _ . --- - 364 I I I I I 'I 362 - - - + , EXITING �'X ' --- -- - - -- -•- + - - - I I - --- ` i --- - - - -- 362 E ! CU4VERT BO 360 -61, --- ---- 360 358 _ - 358 31+00 32+00 33+00 34+00 35+00 36+00 37+00 ONSITE R/W LANDSCAPE AREA I t2'�i-I 6' I I 2%MIN. 4:1 MAX. 2% PROPOSED 5.5' WIDE SIDEWALK PROPOSED CURB & GUTTER VARIES 55-68' ±19.7' 2' 10 z W ¢ w w EXISTING r PAVEMENT L-0.45' A.C. PAVING 1.15' AGG. BASE " 0.90' COMPACTED O.G. TO 95% RELATIVE DENSITY. SECTION A SCALE: NONE 2 LEGEND: O~ \ ,d. Vw) w 0 ¢ U ASHE ROAD V) ZW 0 Of ow z O pW Gv 0 -i BEGIN VERTICAL CURVE a� + �Nm mM STA. 31+50.00 TO STA. 36+35.46 Z M Z 0 co SCALE: HORIZONTAL 1" 50' BEGIN CURVE G.B. GRADE BREAK 0 ~ w UJ = x00 POINT OF INTERSECTION TP TOP OF PAVEMENT d VERTICAL 1" = 5' w 0n v) 0D v) 0 N 382 -r - - _ - --T -- - 382 50.Ob' T I VERT. CURVE I 380-- N - 380 O I N O N O O i O O Z M 378 °' m 0) 0 p co CD to t- - - _ 378 00 \ 00CID CD 00 t > e W N W WOf J ro w 00 r, w w 0>o UD Gjw 376 U j > j ,� v - - 376 ~ J J J ! cn C» a) W U w 4m cn cr;t0 tG ED f Y CO j CO \ p H O W W W 06 M M r O Q r- M M M CS W Of w W O Q. U N M �() - n � N CID d� �J ^ wmYW + 374 z: CIS °' - W W W w ►= � w �m �w Q M 374 mUN N Z to Z O + J J J + W + w W f W I. m Zw ,7U r7 - H U�U 1 z_ 3 U r� J M J N ®PEASOT�EDGE OF ADE c N Q �� ci \ `t 1 a ''' vs.. Q 0¢ Q. o o W m a I O-' X^ O 00 O M W W W M U O > U Uw + a+ w a 4 V a > ww E -U > Q ZZOaH. 372 w �' N; m m� moo_ W W W 372 Z:5 e u ¢ z 'e PAVEMENT m U) M w v~i a6 0n r� _ _ - - - - - - - - - - --- _ - _ - _- - W _ E.- Z _ _ _ _ m(n� a, ¢ V) ¢ -I- - - - - -- -- -- ----- - - --- _ - 1$=1.1 - - 370L- I - --- - - _ �. � _ __ _ .7sx. _ E ==s--- 370 - - w S=0.20% ---- S S=-1.25 5=1.51% I I --- S=0 94� PROPOSED WEST FLOWLINE I 368 s=o•g4% APRROXIMATE GRADE tS=1.0% PROPOSED WEST FLOWLINE 0 VEST EDGE OF - I - -- - 368 EX. FLOW -INE 366 - - + -}- 366 364 --- . .1 -.. - --- --1-- - - - -- -- --- -- -- -- _ . --- - 364 I I I I I 'I 362 - - - + , EXITING �'X ' --- -- - - -- -•- + - - - I I - --- ` i --- - - - -- 362 E ! CU4VERT BO 360 -61, --- ---- 360 358 _ - 358 31+00 32+00 33+00 34+00 35+00 36+00 37+00 ONSITE R/W LANDSCAPE AREA I t2'�i-I 6' I I 2%MIN. 4:1 MAX. 2% PROPOSED 5.5' WIDE SIDEWALK PROPOSED CURB & GUTTER VARIES 55-68' ±19.7' 2' 10 z W ¢ w w EXISTING r PAVEMENT L-0.45' A.C. PAVING 1.15' AGG. BASE " 0.90' COMPACTED O.G. TO 95% RELATIVE DENSITY. SECTION A SCALE: NONE 2 LEGEND: u _ u \ ABBREVIATIONS f O F.L. FLOWLINE P.o.V.C. POINT ON VERTICAL CURVE C.L. CENTERLINE B.V.C. BEGIN VERTICAL CURVE ELEV. ELEVATION E.V.C. END VERTICAL CURVE B.C.R. BEGIN CURB RETURN P.I. POINT OF INTERSECTION E.C.R. END CURB RETURN P.R.C. POINT OF REVERSE CURVATURE B.C. BEGIN CURVE G.B. GRADE BREAK E.C. END CURVE TC TOP OF CURB P.I.V.C. POINT OF INTERSECTION TP TOP OF PAVEMENT -_..-Z ~~ OF VERTICAL CURVE FC FINISH CONCRETE P.O.C. POINT ON CURVE T.O.M. TOP OF MANHOLE P/L PROPERTY LINE R/W RIGHT-OF-WAY E.P. EDGE OF PAVEMENT M.H. MANHOLE EX. EXISTING INV. INVERT C/G CURB & GUTTER S/W SIDEWALK IRR IRRIGATION FH FIRE HYDRANT XFL EXISTING FLOWLINE XEP EXISTING EDEGE OF PAVEMENT C.O.B. CITY of BAKERSFIELD t� II �I CONSTRUCT HAN`)ICAP RAMP PER C.C.B. STANDARD ST -19. EXISTING SURVEY MONUMENT AS DESCRIBED -+- FURNISH & INSTALL STREET SIGN PER K.C.D.S. PLATE T-1. - FURNISH & INSTALL PUBLIC STREET LIGHT. PUBLIC STREET LIGHT LUMINAIRES ARE TO BE "LED" AS SPECIFIED IN C.O.B. SPECIAL PROVISIONS SECTION 86-6.01. SPECIAL PROVISIONS SECTION 86-6.01 OF WHICH MODELS INCLUDE: PROPOSED WATER LINE HOLOLPHANE LVUI SERIES; ® SAWCUT EXISTINh E.P. 2' BACK OR AS DIRECTED BY CITY ENGINEER. LEO TEK GCI SERIES; EXISTING INTERCONNECT BOX TO BE RELOCATED. CREE XSP SERIES OR APPROVED EQUAL. R1-1 FURNISH & INSTALL "STOP" SIGN PER C.O.B. STANDARD. EXISTING MEDIAN Th 9 R VALUE: 34 CSI CONC. MON. W/ BRASS CAP I STAMPED "LS 5332" IN LAMPHOLE PER PARCEL MAP NO. 11263 PHASE 1, P.M. BOOK 55, PAGES 110 & 111 I TAPER DATA NO. O STATION u _ u \ 58.00LT. f O O J o�0 U? w 57.35LT. 35+68.18 J J 35+75.68 UW JJ $3 Zz 0606 p�rnrn ....',.� NN mUEn 48.59LT. 36+28.18 ++ ZOO UJw 47.97LT. ® 0 CONSTRUCT TYPE "B" CURB & GUTTER PER C.O.B. STD ST -1 15 �I 1. -- -- - -_..-Z ~~ CURVE NUMBER FOR CURVE DESCRIPTION [] CSI CONC. MON. W/ BRASS CAP I STAMPED "LS 5332" IN LAMPHOLE PER PARCEL MAP NO. 11263 PHASE 1, P.M. BOOK 55, PAGES 110 & 111 I TAPER DATA NO. O STATION OFFSET FROM 35+45.68 58.00LT. 35+53.18 57.81 LT. 35+60.68 57.35LT. 35+68.18 56.56LT. 35+75.68 55.47LT. 36+05.68 50.47LT, 36+13.18 49.38LT. 36+20.68 48.59LT. 36+28.18 48.13LT. 36+35.68 47.97LT. F GPS N Ln' EXISTING U CULVERT LLI i --N F aLL O (7 N r J M}� EXISTING ` z CU'LVERI' ¢ `n cn 'n NEW DRIVEWAY SEE PLAN VIEW I EXIST. ZCURB & I PROPOSED CURB & GUTTER GUTTER I AND SIDEWALK NEW 2" GAS LINE BY OTHERS EXISTING BOX CULVERT w w FLCVIAGE AND DRAINAGE EASEMENT PER DOC. NO. )215017267 DATED J 3 ? 2/13/15, O.R. CD w rn w p O O w o w J p O p J M o to O t!-) 0 0 00 p o O p0 (n J r l W d -� d J O _ I LLd W O O C.7 W U ¢ J Z J ¢ J r J ¢ w J Z J Z J =i J O O o I-- _ ~ cv N M ai - Qi O� � Z 21 00 G. r n F- M I� I J wIn � W w WO Z00 H00 ZO �O Z_1.0 wm I H� �Or70 .0- __j Z U C) C:, X M O O +ti O tea¢ + W+ W+ Q C» ci) G W w 0_ + p+ [L N � N D_ +~ M 0 --'p 0+ J 0) Q C¢ w r-) M UJ n w r7 w M o -- _� Z M Z M w raj �[i O -- - Q N CD a 0 a,,� 0 d Q" � o d 4DDIT10NAL R/W a s 1 a I`) Q+ �_� \ ¢ cn z Z �- R1- DEDICATION PER ` m v~) m v~i z TYP. 1 w + w o ¢z c 0~i� w c`-i� `. a v~i.. ¢ cn w N DOC. NO. Y 1 2 R/W w 0n o o �a �U 1 2 R/W 0215017266 DATED ` - - - - - 6 o o a m 0n 2/13/15, O.R. z l - - - Lj cn 10 DETAIL 38 I LL _ z DETAIL 39 �sm N FUTURE DETAIL 9 iv DETAIL 39 N wa CID Ln N wN \--EXISTING DETAIL 9 TO REMAIN ��+ 31+50- � 32+00 3+pp -s - 311. �> • 3-I - - - - -- - +�- 36+00 _ __ 16.29 °- N00 4812E _ _ -- T - -=- -�� 0 35 c . r J o -- - - 731.42' 0 0 0 0 o cn rn °' Q Q J w NE COR. SEC. W " w " 21, 30/27 W p O (mD- (0 cn 00 0 + nrn _ O m 2+ N W) 0 o W � ¢ Lj CD z J O Q Z ¢ Ln F- CD `u' ASHE ROAD I 'IRIPING PLAN STA. 31 +5L1.00 TO STA. 36+35.46 SCALE: HORIZONTAL 1" = 50' 374 372 370 368 366 364 362 360 358 356 354 352 350 348 346 344 342 340 338 336 334 APR AMATE IINISHIED DETAIL I PER DOC. No. 94-174551 O.R. I AS SHOWN GRAD. ALONG ROP WIDE PACIFIC GAS & ELECTRIC CO. EASEMENT PER 12 1 - � BK. SEWER LINE HEADWALL CONSTRUCTION NOTES: CONSTRUCTION NOTES-CONT'D.: CONNECTION TO PVC LINED SEWERLINE OR MANHOLE PACIFIC RAIL ROAD RIGHT-OF-WAY PER BK. 47, ® 0 CONSTRUCT TYPE "B" CURB & GUTTER PER C.O.B. STD ST -1 15 �I 1. THI= CORED HOLE SHALL BE APPROXIMATELY 3 INCHES GREATER THAN THE OUTSIDE ,i CURVE NUMBER FOR CURVE DESCRIPTION [] KERN DELTA WATER DISTRICT'S STINE CANAL EASEMENT, EACH SIDE (TOTAL OF 42') PER C.O.B. STD. ST -5 AT STA. 32+41.48, C.L. DIAMETER OF THE CONNECTING LINE. THE CORED HOLE SHALL BE DESIGNED TO CUT A 1, I, 11 ® EASEMENT LEGEND O CONSTRUCT 5.5' COMBINATION TYPE SIDEWALK PER C.0.3. STD ST -3 16 SEE SEPARATE OFFSITE WATER PLAN FOR DETAILS. HO -E WITH MINIMUM DAMAGE TO THE REINFORCING STEEL, PIPE OR PLASTIC LINER. s PROPOSED TO SEWER LINE I, 1, I, i I o to ® ITEM OF WORK - SEE SCHEDULE t� II �I CONSTRUCT HAN`)ICAP RAMP PER C.C.B. STANDARD ST -19. 17 I 2. PR!OR TO THE INSTALLATION OF THE PVC BOOT ON THE CONNECTION, THE PLASTIC - - - - - - - - PROJECT BOUNDARY �1- 1, I, I, T- SPECIAL PROVISIONS SECTION 86-6.01. I LIIJER AROUND THE PIPE AT THE CORED HOLE SHALL BE CLEANED PER THE PLASTIC PROPOSED WATER LINE O TAPER NUMBER FOR TAPER DESCRIPTION ® SAWCUT EXISTINh E.P. 2' BACK OR AS DIRECTED BY CITY ENGINEER. II I, I, EXISTING INTERCONNECT BOX TO BE RELOCATED. LINER MANUFACTURER'S RECOMMENDATION. THE END OF THE CONNECTING LINE SHALL w < C) I1 Ii I, BE: SEALED TO THE PVC BOOT WITH SIKA 449/203 PRIMER AND SIKA FLEX IA ' STEEL CASING- 11 ►1 II 11 1 EXISTING UTILITY POLES TO BE RELOCATED BY OTHERS. C.0.6. STD. W- FOR EXTEND INTERCONNECT LINE TO PROJECT BOUNDARY FOR FUTURE - PIPE BORE AMY------ - -- - FURNISH &INSTALL INTERCONNECT CONDUIT SECTION LETTER I CASING DETAIL. I ----- 3. 1 1 I 1 1 11 I SEE GATE ENTRANCE s" III GRADING PLAN 11 I FOR CONNECTION THI= CONNECTION. I _ x - - - - - 2 O7 v 1. FOR WATER - SEE SEPARATE OFFSITE WATER PLAN FOR DETAILS. m W X=I 1- OLu N 3 CYc - Z I. FQ ooNQc�" O7- oU w Z V) zo - �<Zz U3 �zL13 _5 - ..__. -. - Ur-oo� ',FD'O ao.-. a¢0U `n ..) o 061-066 wW v» -*0n pQWZ rn ZZ Mr7 r7 ---- . QNZ¢Un LL C7 tjWWW 00 �� � w z 0 z "'www N V)(nWW V1 X F»> BASE OVER 1.00' COMPACTED O.G. TO BE COMPACTED TO 95% RELATIVE W Nzzz THI= CONNECTING LINE SHALL BE CENTERED IN THE CORED HOLE AND PLACED SO 'T IS INSTALL 88.41 L.F. OF 6" SDR35 PVC SEWER N DENSITY PER C.O.B. STANDARD. THICKNESS IS BASED ON PAVEMENT i$ ® S=-0.50% i SECTION B SCALE: NONE 2 374 372 370 368 366 364 362 360 358 356 354 352 350 348 346 344 342 340 338 336 334 40'(ta Sllnaw roe st iJlbtaltAlr sow •� Fant R 1N9DE DROP to, (413m1 t xo' skr4w maw* cmmdcdw 1 or SM 44_d Ir w S#errrsr lar Now So poft) '. bm" w V 1:5149 DROP Sblow, ms** Cow S" m mkr aid Ir sw (A"w 00**, ML 1I MM siw *w d Mo. �' tom) �'M attrbee r>a o�t�rr Mo r1 dddm noires. -- �al.v err aeo. �IorFs L A# wak AW aa+nsa± to the cw-*-a 'Stt*oird4Wkfftkrr., .710 , IArla Awm6 o of au I'm ddhR 2 :1a 11161 N# cty & alk"d alb be Wrwd o/ de My a$w, .i AN wdrila !a/ a+wbn to 5aa:.t E5 at of mew tart jr (ONO) cr vow `tier StIv o%*,d il, r ("E 61 t n E+:aK STANDARD A40 MANHOLE TYPE "A" INSIDE AND CMTSIDE DROP T3 CM OF BAKI LD CALF-OF'1A ! Tper tti P P_4. _- WOR -5 DEPAR-NEN' NOTE: SEE CALTRANS TRAFFIC MANUAL FOR DETAILS [ CITY OF BAKERSFIELD STREET RIGHT-OF-WAY DEDICATION ALL PERMANENT STRIPING & PAVEMENT MARKINGS 10 PAINT 12" LIMIT LINE USING THERMOPLASTIC PAINT PER PER BK. 6456, PG. 78 O.R. TO BE THERMOPLASTIC PAINT PER CALTRANS STANDARD CALTRANS STANDARD SPECIFICATION SECTION 84, 2010 EDITION. E21 CITY OF BAKERSFIELD STREET RIGHT-OF-WAY DEDICATION SPECIFICATION SECTION 84, 2010 EDITION. 11 DETAIL 1 PER DOC. No. 94-174551 O.R. AS SHOWN PER PLAN. [j SCALE: 1' WIDE PACIFIC GAS & ELECTRIC CO. EASEMENT PER 12 TAPERED DOWN NEW SIDEWALK TO AVOID EXISTING CONCRETE � BK. 6395, PG. 1049 O.R. LEGEND (CONT.) HEADWALL CONSTRUCTION NOTES: CONSTRUCTION NOTES-CONT'D.: CONNECTION TO PVC LINED SEWERLINE OR MANHOLE PACIFIC RAIL ROAD RIGHT-OF-WAY PER BK. 47, ® 0 CONSTRUCT TYPE "B" CURB & GUTTER PER C.O.B. STD ST -1 15 CONSTRUCT 32' WIDE COMMERCIAL DRIVEWAY WITH 5' WING ON 1. THI= CORED HOLE SHALL BE APPROXIMATELY 3 INCHES GREATER THAN THE OUTSIDE EXISTING SEWER MANHOLE CURVE NUMBER FOR CURVE DESCRIPTION [] KERN DELTA WATER DISTRICT'S STINE CANAL EASEMENT, EACH SIDE (TOTAL OF 42') PER C.O.B. STD. ST -5 AT STA. 32+41.48, C.L. DIAMETER OF THE CONNECTING LINE. THE CORED HOLE SHALL BE DESIGNED TO CUT A L0 ® EASEMENT LEGEND O CONSTRUCT 5.5' COMBINATION TYPE SIDEWALK PER C.0.3. STD ST -3 16 SEE SEPARATE OFFSITE WATER PLAN FOR DETAILS. HO -E WITH MINIMUM DAMAGE TO THE REINFORCING STEEL, PIPE OR PLASTIC LINER. s PROPOSED TO SEWER LINE o to ® ITEM OF WORK - SEE SCHEDULE O3 CONSTRUCT HAN`)ICAP RAMP PER C.C.B. STANDARD ST -19. 17 FURNISH AND INSTALL LED 100 WATT STREET LIGHT PER C.O.B. 2. PR!OR TO THE INSTALLATION OF THE PVC BOOT ON THE CONNECTION, THE PLASTIC - - - - - - - - PROJECT BOUNDARY �1- C) 0) SPECIAL PROVISIONS SECTION 86-6.01. 5 LIIJER AROUND THE PIPE AT THE CORED HOLE SHALL BE CLEANED PER THE PLASTIC PROPOSED WATER LINE O TAPER NUMBER FOR TAPER DESCRIPTION ® SAWCUT EXISTINh E.P. 2' BACK OR AS DIRECTED BY CITY ENGINEER. C8> EXISTING INTERCONNECT BOX TO BE RELOCATED. LINER MANUFACTURER'S RECOMMENDATION. THE END OF THE CONNECTING LINE SHALL w < C) BE: SEALED TO THE PVC BOOT WITH SIKA 449/203 PRIMER AND SIKA FLEX IA --- -- --- RIGHT-OF-WAY SECTION DESIGNATION: O EXISTING UTILITY POLES TO BE RELOCATED BY OTHERS. �� EXTEND INTERCONNECT LINE TO PROJECT BOUNDARY FOR FUTURE ww SE:t\LANT OR AN APPROVED EQUAL. - -- - FURNISH &INSTALL INTERCONNECT CONDUIT SECTION LETTER ® EXISTING TRAFFIC DELINEATORS TO BE REMOVED. TRAFFIC SIGNAL CONNECTION TO THE NORTH. NOTES: 3. TFII-- PVC BOOT SHALL BE ORDERED SO IT WILL FIT SNUGLY TO THE OUTSIDE WALL OF k- A �� M THI= CONNECTION. - -' Tiff - FURNISH & INSTALL SPLICE BOX FOR INTERCONNECT TR3=NO. 3 1/2 SIZE TR5=N0. 5 SIZE TR6=No. 6 SIZE - - - - - 2 O7 SIDEWALK TO BE WIDENED TO CREATE 4' CLEARANCE FROM 1. FOR WATER - SEE SEPARATE OFFSITE WATER PLAN FOR DETAILS. 4. THE PVC BOOT AND WELD STRIPS SHALL BE INSTALLED AND TESTED FOR HOLIDAYS SHEET WHERE SECTION IS SHOWN In EXISTING UTILITY POLE. 2. "A" ASHE ROAD -PAVEMENT TO BE 0.45 TYPE A A.C. OVER 0.50 AGG. PER THE PLASTIC LINER MANUFACTURER'S RECOMMENDATION. CALTRANS TYPE IV ARROW, LEFT OR RIGHT AS APPLICABLE,® CONTRACTOR TO VERIFY LOCATION AND INVERT ELEV. OF BASE OVER 1.00' COMPACTED O.G. TO BE COMPACTED TO 95% RELATIVE 5. THI= CONNECTING LINE SHALL BE CENTERED IN THE CORED HOLE AND PLACED SO 'T IS TO BE PAINTED PER CALTRANS STANDARD PLAN A24A EXISTING UTILITIES, E.G. SEWER, WATER, DRAIN, BEFORE N DENSITY PER C.O.B. STANDARD. THICKNESS IS BASED ON PAVEMENT FLUSH WITH THE INSIDE WALL OF THE RCP. "STOP" MARKING PER CAL -TRANS STANDARDS CONSTRUCTION AND NOTIFY ENGINEER OF DISCREPANCIES. CONSTRUCTED ON THE EAST SIDE OF ASHE ROAD IN CONNECTION WITH 6. THI= BOOT WELD STRIPS SHALL BE MANUFACTURED BY AMERON, INC. OR AN O9 CONSTRUCT INSIDE DROP CONNECTION ON EXISTING MANHOLE DERELL'S STORAGE PROJECT. 00 PVC EQUAL APPROVED BY THE CITY ENGINEER. "BIKE LANE" MARKING PER CAL -TRANS STANDARDS FOR PROPOSED 3" SEWER - SEE C.O.B. STANDARD DETAIL E;4SEMENT LEGEND: U C3 SW -3 THIS DRAINING NOTE: SEE CALTRANS TRAFFIC MANUAL FOR DETAILS [ CITY OF BAKERSFIELD STREET RIGHT-OF-WAY DEDICATION ALL PERMANENT STRIPING & PAVEMENT MARKINGS 10 PAINT 12" LIMIT LINE USING THERMOPLASTIC PAINT PER PER BK. 6456, PG. 78 O.R. TO BE THERMOPLASTIC PAINT PER CALTRANS STANDARD CALTRANS STANDARD SPECIFICATION SECTION 84, 2010 EDITION. E21 CITY OF BAKERSFIELD STREET RIGHT-OF-WAY DEDICATION SPECIFICATION SECTION 84, 2010 EDITION. 11 REMOVED EXISTING CURB & GUTTER/SIDEWALK AND RECONSTRUCT PER DOC. No. 94-174551 O.R. AS SHOWN PER PLAN. [j 55' WIDE PACIFIC GAS & ELECTRIC CO. EASEMENT PER 12 TAPERED DOWN NEW SIDEWALK TO AVOID EXISTING CONCRETE � BK. 6395, PG. 1049 O.R. HEADWALL - SEE DETAIL "1" THIS DRAWING. C1 SOUTHERN PACIFIC RAIL ROAD RIGHT-OF-WAY PER BK. 47, 13 FURNISH & INSTALL "STOP" SIGN PER C.O.B. STANDARC. R PG. 356 OF DEEDS & PER BK. 63, PG. 5 OF DEEDS. 14 PROTECT IN PLACE EXISTING DRIVEWAY. [] KERN DELTA WATER DISTRICT'S STINE CANAL EASEMENT, 0 L0 100 FEET PER BOOK 128, PAGE 284 DIG ALERT 0 �1 Q Cn O F r) O /4V6, cJ m(nv) CN - 00 o Q _ � o O Z co J U Qf It o �2 Z I m Q J R o LJ w Q 00 0 L0 0 �. c� wco 0 ccnn o to m W m Q 6 �1- C) 0) 5 _ � Call: TOLL FREE 1--800-227-2600 A-" LEAST TWO DAYS BEFORE YOU DIG UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA }tea ` c /4V6, cJ m(nv) CN i _ J J + 10C..) J Z I �2 lJ LJ 0 Call: TOLL FREE 1--800-227-2600 A-" LEAST TWO DAYS BEFORE YOU DIG UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA }tea m(nv) 1-4) '.r) Z Q + J �2 0- LJ L0 � c� z 0 �g FE H W 9= �1- C) 0) _ � -.0a:Luf Z ao;_ < C) U) ww U W o rn N O �� M w J U O cr In N N N 06 06 00 U C3 d' Ctf W LJCL CL n E3 WLJ cr C! M � M N W OD W cm I I N 1-4) '.r) Z Q + J 0- Lu3 W co � c� z 0 FE H W 9= �1- W 0) _ � -.0a:Luf ao;_ < U W o rn N O �� M w J U O W OD W cm I I N