Loading...
HomeMy WebLinkAbout hazmat 2017_1-3FACILITY NAME INSPECTION DATE INSPECTION TIME '4 'c. %-I` a t_.- C o 4S `± C- /- 6/- i ..I Pre are an SPCC lan [CFR 112.3] ADDRESS PHONE NO. NO OF EMPLOYEES Review or amend SPCC plan {CFR 112.5 (a)(d)] X FACILITY CONTACT BUSINESS ID NUMBER SPCC plan available on site [CFR 112.3 (e)] CONSENT TO INSPECT NAME /TITLE P .F- = Q% v .mow ■.v.. .. ........�. ..... a- - - - - -- - °---- --- --- --- -'-- -- -- - DESCRIPTION. YJ N. N/A I COMMENTS Pre are an SPCC lan [CFR 112.3] Y ` Review or amend SPCC plan {CFR 112.5 (a)(d)] X `y SPCC plan available on site [CFR 112.3 (e)] Conduct inspections and test in accordance with written procedures CFR 112.7(e)] ` Maintain records of inspections, tests and/or procedures [CFR 112.7(e)] ` Records of inspections or tests signed by inspector [CFR 112.7(e)] k VVV..V.� t.. w■ ww _ _ _______ _ DESCRIPTION Y N NIA COMMENTS Self - certification for Tier I or R facility 112.6(a)(1),(b)(1) X ` Professional engineer certification CFR112.3(d) and 1 12.6(b) (4) X Documentation of 5 year review and evaluation of SPCC plan [CFR 112.5(b)] Amendments required within 6 months of char es /certifications [CFR 112.5(a) and 112.6(a)(2), (b)(4) Management authorization of resource commitment to implement the SPCC CFR 1 12.7 & I I2.6(a) Diagram with location and contents of containers, transfer stations, connecting i ing [112.7(a) (3)] k Type of oil and storage ca acity for each container [CFR 112.7(a)(3)] y- Discharge prevention measures and procedures for routine handling CFR 112.7(a)(3 )] Y Countermeasures for discovery, response and clean-up [CFR112.7(a)(3)] ly Required contact list and phone numbers [CFR 112.7(a)(3)] DESCRIPTION Y N N/A COMMENTS Provide corrosion protection [CFR 112.8(c)(4)(5), (d)(1)] X Containers compatible with materials stored CFR 112.8(c)(1)] X Implement SPCC plan review changes or amendments within 6 months CFR 112.5(a)(d)] Pre are an oil contingency plan or written control /removal commitments [CFR 112.7(d)]° DESCRIPTION Y N N/A COMMENTS Training program CFR 112.7(f) Train personnel in operation and maintenance of equipment [CFR 112.7(f)] X Conduct annuals ill prevention briefings [CFR 112.7(f)(3)] .��............. W...... - DESCRIPTION Y N N/A COMMENTS Meet provisions of conditional exemption [H &S 25270.4.5(b)] Facility security adequate [CFR 1 12.7(g)] X Clean- 2p materials readily available CFR 112.7(c)] Overfill protection procedures or devices in place and operative [CFR 112.8(c)(8) Portable /mobile containers positioned to prevent discharge CFR 112.8(c)(11) x Loading / unloading rack drains into containment area [CFR 112.7(h)] ;K Provide appropriate containment /diversionary structures to pre vent discharge [CFR 112.8(a), 112.7(c)] y- Secondary containment adequate to contain capacity of largest container + precipitati on CFR 112.8(c) Y Remove accumulation of oil in secondary containment CFR 112.8(c)(10)] ly Secondary containment valve(s) closed [CFR 112.8] Implement SPCC plan elements [CFR 112.3] ANY HAZARDOUS WASTE ON SITE? YES ❑ NO ISignature ofRecei t Explain: POST INSPECTION INSTRUCTIONS: • Refer to the back of this inspection report for regulatory citations and corrective action, • Correct the violation(s) noted above by • Within 5 days of correcting all of the violations, sign and return a copy of this page to: Bakersfield Fire Dept., Prevention Services, 2101 H Street, California 93301 White - Business Copy Yellow - Business Copy to be Sent in after return to Compliance Signature (that all violations have been corrected as noted) Date Pink - Prevention Services Copy FD2156b (Rev 9/10)