Loading...
HomeMy WebLinkAboutAST insp 2017_23-24UNIFIED PROGRAM INSPECTION CHECKLIST Aboveground Petroleum Storage Tank Program FACILITY NAME Y INSPEC -jION DATE INSPECTION TIME COMMENTS Prepare an SPCC plan [CFR 112.3] ADDRESS PHONE NO. NO OF EMPLOYEES b RA . A4 C "7 SPCC plan available on site CFR 112.3(e)] FACILITY CONTACT^ BUSINESS ID NUMBER CONSENT TO INSPECT NAME /TITL`E Conduct inspections and test in accordance with written procedures CFR 112.7(e) ` CGr'_TlrlAl I • 1?arnrric Pawiaw• ('alitnrnia Health X Satpty [:ndP_' Yh2lH DESCRIPTION Y N N/A COMMENTS Prepare an SPCC plan [CFR 112.3] Review or amend SPCC plan [CFR 112.5 (a)(d)] SPCC plan available on site CFR 112.3(e)] " Conduct inspections and test in accordance with written procedures CFR 112.7(e) ` Maintain records of inspections, tests and/or procedures [CFR 112.7(e)] V Records of inspections or tests signed by inspector [CFR 112.7(e)] 4ZP 'TIrl1U 7- ¢P('(' Pinn Flamantc• c::%wnrnia HPairn & saTP_TV lynf]P_' Z5Z /U_4.5. Z5Z 1U. -IZ DESCRIPTION Y N N/A COMMENTS Self - certification for Tier I or II facility I12.6(a)(1),(b )(1)] Professional engineer certification [CFR 112.3 d and 112.6(b) (4)] Documentation of 5 year review and evaluation of SPCC plan CFR 112.5(b)] " Amendments required within 6 months of changes/certifications CFR 112.5(a) and 112.6(a)(2), (b)(4)] ` Management authorization of resource commitment to implement the SPCC [CFR 112.7 & 112.6(a) ] V Diagram with location and contents of containers, transfer stations, connecting piping 112.7(a)(3)] Type of oil and storage capacity for each container CFR 1 12.7(a) (3)] Dischar e prevention measures and procedures for routine handling CFR 112.7(a)(3) Countermeasures for discovery, response and clean-up [CFR112.7(a)(3)] Required contact list and phone numbers [CFR 112.7(a)(3)] r`p car -Vl"rd z• r_nnnrni %:9Jr-r- Wnnllirarnanrc• 1:211Tnrnia monirn h -'%arPry L-nUIP_- LnL1U_4 -n_ LnL /U_n_ LnL /u. IL DESCRIPTION Y N N/A COMMENTS Provide corrosion protection [CFR 112.8(c)(4)(5), (d)(1)] Containers compatible with materials stored CFR 112.8(c)(1)] Implement SPCC plan.review changes or amendments within 6 months CFR 112.5(a)(d) 0 Prepare an oil contingency plan or written control /removal commitments [CFR 112.7(d)] ` eGr-riniu e- CD('(- Pinn Traininev ['alitnrnM Haaltn X SaTPTV c:nnP' L!fLOU_4_!f DESCRIPTION Y N N/A COMMENTS Training program [CFR 112.7(f) Train personnel in operation and maintenance of equipment [CFR 112.7(f)] Conduct annuals ill prevention briefings [CFR 112.7(f)(3)] c=r-1F1r1n1 V,• ten.- itit.. Incnartinn• r-anTr%min H021Tn &% -%%.gTPTU I nnP-' - -- - - - -- -- - -- DESCRIPTION YJ NJ N/A COMMENTS Meer provisions of conditional exemption [H &S 25270.4.5(b)] Facility security adequate CFR 112.7(g)] Clean-up materials readily available CFR 112:7 (c) Overfill protection procedures or devices in place and operative [CFR 112.8(e)(8)] ° Portable /mobile containers positioned to prevent discharge [CFR 112.8(c)(11) Loading / unloading rack drains into containment area CFR 112.7(h) Provide appropriate containment /diversionary structures to prevent discharge [CFR 112.8(a ), 112.7(c)] Secondary containment adequate to contain capacity of largest container + precipitation CFR 1 12.8(c) Remove accumulation of oil in secondary containment [CFR 112.8(c)(10)] Secondary containment valve(s) closed CFR 112.81 Implement SPCC plan elements [CFR 112.3] kNY HAZARDOUS WASTE ON SITE? &'YES ❑ NO Si nature ofRecei t _xplain: POST INSPECTION INSTRUCTIONS: 0 Refer to the back of this inspection report for regulatory citations and corrective actions • Correct the violation(s) noted above by • Within 5 days of correcting all of the violations, sign and return a copy of this page to: Bakersfield Fire Dept., Prevention Services, 2101 H Street, California 93301 Signature (that all violations have been corrected as noted) Date White - Business Copy Yellow- Business Copy to be Sent in after return to Compliance Pink - Prevention Services Copy FD2156b (Rev 9/10)