Loading...
HomeMy WebLinkAbout1.2-6760 RevisedLEGEND: AS813EVIATION5 CL CENTERLINE INV INVERT SD STORM DRAIN MH MANHOLE CB CATCH BASIN JB JUNCTION BOX SMH SEWER MANHOLE SCO SEWER CLEANOUT SDMH STORM DRAIN MANHOLE EXIST EXISTING ELEV ELEVATION R/W RIGHT OF WAY T.O. - 363t-2,2__. TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION PHASE BOUNDARY r r yti r t ,f X r! CONSTRUCT SEWER MANHOLE TYPE "A" PER C.O.B. STD. S-7. CONSTRUCT SEWER CLEANOUT PER C.O.B. STD. S-20. CONSTRUCT STORM DRAIN PER CITY STANDARDS CONSTRUCT STORM DRAIN MANHOLE TYPE "A" PER C.O.B. STD. S-7. cStr CONSTRUCT CATCH BASIN TYPE "A" PER C.O.B. STD. S-12. W_ WATER LINE SHOWN AT LOCATIONS OF PIPE CROSSINGS CITY OF BAKERSFIELD KERN COUNTY CALIFORNIA SEWER, & STORM DRAIN PLANS VICINITY • r 0 CL MULTIPLE UTILITY TRENCH (L SEWER MAIN ck q , 4' TYP. 4' I STAMP AN 'S" Ss WATERLINE d ¢ FACE ABOVE IN THE CURBlYP FINISHED STREET Q m 3: SEWER LETERAL GRADE I® 60" 36" TYP. 7' 7 MAX. oo TYP. AX. 4' LATERAL (TYP) ~ ` ` _ _ ____�4' LATERAL (TYP) ON DEEP SEWER' SLOPE LATERALS �` ` ® '' ®� SET LATERAL PROVIDING PROPER TO LOT LINE SOTHAT THE END OF CLEARANCE UNDER WATERLINE AND LATERAL IS WITHIN REQUIRED UTILITY TRENCHES TOLERANCE. NOTE: CONTRACTOR TO VERIFY THAT WATER DETAIL MAIN AND SEWER LATERAL CROSSINGS TYPICAL SEWER LATERAL INSTALLATION ARE IN CONFORMANCE WITH CALIFORNIA HEALTH CODE REQUIREMENTS. FOR SHALLOW INSTALLATION OF SEWER LATERALS FROM SHALLOW SEWER MAINS, THE SEWER LATERALS MUST CROSS OVER THE WATER O. U11LITY TRENCH. THESE INSTALLATIONS i. LATERALS CROSSINGCROSSING OVER THE WATERMAIN. A SEWER LATERAL :f CONSTRUCTED OF CON11NUOUS 20' SECTIONOF 0+ :R 14 PER •1i PIPE OR EQUIVALENT, CENTERED ON THE PIPE BEING ",a is TRACT Na. 6290 UNIT 3 Mi SK, 56, PG. 131 4 7 _ /"r`"rs 10 5 t� O V) d 6 3 Z 7 4 I 8 }- 3 PRO s 8.92 A APN: 10 (DACARW R(W%V WAY) d1211 0 a 13 31 14 15 16 17 27 25 19 14 srrr 20 APN= 532--040--c HIGHWAY D PROJECT MAP SCALE: 1"=200' SHEET NO. INDEX INDEX F SHEETS SHEET T1 TLE 1. COVER SHEET 2. NOTES & SPECIFICATIONS X. KANOSH COBBLE DRIVE AGASSIZ ROCK WAY SEWER IMPROVEMEL4!S— TOTAL yr SEWER LINE 941 LF 8" SEWER LINE 165 LF STANDARD MANHOLE 4 EA SEWER CLEAN OUT 1 EA STORM DBAIbI ILAPROVEMENTS TOTAL 18" STORM DRAIN 900 LF STORM N MANHOLES 3 EA BASINSCATCH / A. NOTE: 1. PRIOR TO THE START OF ANY PHASE OF CONSTRUCTION, INSPEC11ON DEPARTMENT ` HOURS TELEPHONE 326-3049 2. ALL MATERIALS SUPPLIED FOR THIS PROJECT WILL REQUIRE Qr , CERTIFICATE , , COMPLIANCE r, STANDARDS STATING THAT THE REQUIREMENTS & FORTHSET BY S BAKERSFIELD HAVE BEEN 3. NO CITY INSPECTIONSFOR THE WORK w AREA a, , STREET PERMIT NTH APPROPRIATE rrrr+rr, SECURITY AND INSURANCE HAS BEEN OBTAINED. ENGINEER'S STATEMENT THESE PLANS AND SPECIFICATIONS WERE PREPARED BY ME OR UNDER MY DIRECTION AND TO THE BEST OF MY KNOWLEDGE AND BELIEF COMPLY WITH CITY OF BAKERSFIELD ORDINANCES, STANDARDS, AND DESIGN CRITERIA AND INCLUDE ALL IMPROVEMENT REQUIREMENTS OF THE ADVISORY AGENCY OR OTHER REVIEW BOARD. ANY ERRORS, OMISSIONS, OR VIOLATIONS OF THOSE ORDINANCES, STANDARDS, AND DESIGN CRITERIA ENCOUNTERED DURING CONSTRUCTION SHALL BE CORRECTED AND SUCH CORRECTIONS REFLECTED ON CORRECTED PLANS SUBMITTED TO THE CITY ENGINEER. , w • r, . '� � w r, , n r r � w r • APPROVED BY: NICOLAS FIDLER, PUBLIC WORKS DIRECTOR • 61069 EXP. 12-31-18 Ma REVIEWED BY BENCHMARK: TOP OF CONCRETE MONUMENT IN LAMPHOLE AT THE EAST END OF AGASSIZ ROCK WAY. ELEVATION = 347.12' (U.S.G.S. DATUM NAVD 88) (PER TRACT 6491 MONUMENT ELEVATION MAP) BASIS OF BEARINGS: THE BEARING OF N 89'04'29" W SHOWN FOR THE SOUTH LINE OF THE SOUTHEAST QUARTER OF SECTION 341, T. 30 S., R. 27 E. SHOWN ON TRACT NO. 6491 PHASE 3, M. BOOK 58, PAGE 91 WAS USED AS THE BASIS OF BEARINGS SHOWN HEREON. LEGAL DESCRIPTION: THE EAST HALF OF THE WEST HALF OF THE SOUTHWEST QUARTER OF THE SOUTHEAST QUARTER OF SECTION 34, TOWNSHIP 30 SOUTH, RANGE 27 EAST, MOUNT DIABLO MERIDIAN, AS PER THE OFFICIAL PLAT THEREOF ON FILE IN THE OFFICE OF THE SURVEYOR GENERAL. EXCEPTING THEREFROM THE WEST 208 FEET OF THE SOUTH 225 FEET OF THE EAST HALF OF THE WEST HALF OF THE SOUTHWEST QUARTER OF THE SOUTHEAST QUARTER OF SECTION 34, TOWNSHIP 30 SOUTH, RANGE 27 EAST, MOUNT DIABLO MERIDIAN, AS PER THE OFFICIAL PLAT THEREOF ON FILE IN THE OFFICE OF THE SURVEYOR GENERAL. W,A mi� Know what'sbelow. Call beforeyou 1! C3 i I y r- 1 `i M STANDARD NOTES 1. GENERAL. CONTRACTOR WILL FURNISH ALL MATERIALS, TOOLS, LABOR, EQUIPMENT AND SUPERVISION NECESSARY TO COMPLETE INSTALLATION. UNDERGROUND SERVICE ALERT (USA) SHALL BE NOTIFIED AT LEAST 2 WORKING DAYS BEFORE CONSTRUCTION. TELEPHONE 1-800-227-2600. CONTRACTOR TO CALL FOR USA LOCATE AND POTHOLE ALL MARKED UTILITIES THAT CROSS OR ARE WITHIN 5' HORIZONTAL DISTANCE OF SEWER AND STORM DRAIN LINES. VERTICAL AND HORIZONTAL LOCATION MALL BE ASCERTAINED BY THE CONTRACTOR AHEAD OF ANY EXCAVATIONS TO VERIFY THAT THE PROPOSED DESIGN DOLS NOT CONFLICT WITH ANY UTILITIES, IN THE EVENT A CONFLICT EXISTS THE ENGINEER SHALL BE NOTIFIED iN ORDER TO REDESIGN THE ALIGNMENT. IF RELOCATION OF EXISTING UTILITIES IS DEEMED NECESSARY THE CONTRACTOR SHALL BE COMPENSATED FOR INSTRUCTED RELOCATION. IF REDESIGN OF THE ALIGNMENT REQUIRES ADDITIONAL FITTINGS, PIPE OR EXCAVATION THE CONTRACTOR SHALL BE COMPENSATED FOR REVISION. iN THE EVENT A UTILITY IS DAMAGED THE CONTRACTOR SHALL BE WHOLLY RESPONSIBLE FOR iTS REPAIR. CONTRACTOR SHALL VERIFY LOCATIONS AND ELEVATIONS OF EXISTING SEWER LINES THAT THE NEW SYSTEM TIES INTO PRIOR TO TRENCHING. ANY DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER SO THAT ANY NECESSARY ADJUSTMENTS MAY BE MADE. UTILITIES SHALL BE THOROUGHLY RESEARCHED AND LOCATED BY CONTRACTOR PRIOR TO TRENCHING. CROSSING UTILITIES SHALL BE DAYLiGHTED AND CHECKED FOR GRADE, BY CONTRACTOR PRIOR TO TRENCHING. ALL EXISTING IMPROVEMENTS, (CURB, GUTTER, SIDEWALK, CROSS GUTTER, FENCES, ETC.) THAT ARE REMOVED, DAMAGED, UNDERCUT OR THAT DO NOT MEET CURRENT C.O.B. STANDARDS SHALL BE REPAIRED OR REPLACED AS DIRECTED BY THE CITY ENGINEER. ALL EXISTING PAVING AND SURFACING REMOVED, DAMAGED OR UNDERCUT SHALL BE REPLACED IN ACCORDANCE WITH THE CITY OF BAKERSFiELD STANDARD DRAWING ST -6, EXCEPT AS NOTED ON PLANS. STAMP AN *S*INTO THE CURB FACE OVER EACH SEWER LATERAL » 2• STANDARD DETAILS THE FOLLOWING CITY OF BAKERSFIELD STANDARDS SHALL BE CONSIDERED PART OF THESE PLANS: D-11, D-14, D-16, D-18 SW -1, SW -2, SW -3, SW -4, SW -5, SW -6, SW -9, SW -11, ST -6, ST -22 3. VCP INSTALLATION MATERIALS :: THE PIPE AND FITTINGS SHALL BE EXTRA STRENGTH VITRIFIED CLAY CONFORMING TO CURRENT ASTM SPECIFICATION C-700 AND SHALL BE INSTALLED IN CONFORMANCE WiITH THE PROVISIONS OF SECTION 71 OF THE STANDARD SPECIFICATIONS OF THE STATE OF CALIFORNIA, DEPARTMENT OF TRANSPORTATION, CURRENT EDITION AND THE CURRENT ASTM SPECIFICATIONS C-12. JOINTS : THE PIPE AND FITTINGS SHALL HAVE A SOCKET END AND A SPIGOT END WITH COMPRESSION JOINTS CONFORMING WITH THE CURRENT ASTM SPECIFICATION C-425. THE PIPE AND FITTINGS FOR 6*, 8*, 10% AND 12* SANITARY SEWER MAiNS MAY BE PLAIN—END WITH COMPRESSION COUPLINGS CONFORMING WiTH THE CURRENT ASTM SPECIFICATION C-425. EXCEPTING THAT A STAINLESS STEEL SHEAR RING AS MANUFACTURED BY MISSION CLAY PRODUCTS CORPORATION FOR THEIR *MAINLINE° BANDSEAL COyiPRESSION COUPLING, OR APPROVED EQUAL, SHALL BE REQUIRED. THE PiPE AND FITTINGS FOR PRIVATE SANITARY SEWER HOUSE OR BUILDING LATERALS MAY BE PLAIN—END WITH COMPRESSION COUPLINGS CONFORMING WITH THE CURRENT ASTM SPECIFICATION C-425. (STAINLESS STEEL SHEAR RINGS ARE NOT REQUIRED) 4. ABS PiPE INSTALLATION JOINTS : USE ONLY SOLVENT WELDED JOINTS. THE ASSEMBLY OF JOINTS SHALL BE IN ACCORDANCE WITH THE MANUFACTURERS RECOMMENDATIONS. WHERE ABS PIPE CONNECTS TO VCP, USE COUPLINGS APPROVED BY THE CITY OF BAKERSFIELD. INSTALLATION,: PIPE AND FITTINGS SHALL BE INSTALLED IN ACCORDANCE WITH THE CURRENT ASTM SPECIFICATION D-2321. ONLY CLASS 1, 11AND IIi EMBEDMENT MATERIALS WILL BE CONSIDERED SUITABLE. 5, PVC PIPE INSTALLATION s !•!; i r, i r • • REINFORCED CONCRETE PIPE NTH PVC LINING SHALL MEET THE FOLLOWING REQUIREMENTS: 1.A. MATERIALS. REINFORCED CONCRETE PiPE (RCP) SHALL BE EITHER CLASS IV OR CLASS V WITH WALLS *B* OR *C*. RCP SHALL MEET ASTM C 76 FOR STRENGTH, ASTM C 361 OR AWWA C302 EXCEPT TEST PRESSURE SHALL BE 5 PSI FOR RUBBER GASKETS, AND LINER TESTS iN ACCORDANCE WITH THE FOLLOWING PARAGRAPHS. PIPE SHALL BE WET CAST, VIBRATED AND STEAM OR WATER CURED. JOINTS SHALL BE BELL AND SPIGOT DESIGN WITH A CONTAINED 0—RING GASKET PVC LINER SHALL BE CAST INTO THE WALL OF THE RCP AND SHALL COVER 360° OF THE PIPE. ALL WORK FOR AND IN CONNECTION WITH THE INSTALLATION OF THE LINING IN CONCRETE PIPE AND FIELD SEALING AND WELDING OF JOINTS SHALL BE DONE IN STRICT CONFORMITY LITH ALL APPLICABLE SPECIFICATIONS, INSTRUCTIONS AND RECOMMENDATIONS OF THE LINING MANUFACTURER. LINER SHALL MEET THE FOLLOWING REQUIREMENTS. 1.13. PHYSICAL PROPERTIES OF LINER. ALL PLASTIC LiNER PLATE SHEETS, WELDING STRIPS AND OTHER ACCESSORY ITEMS, SHALL HAVE THE FOLLOWING PHYSICAL PROPERTIES WHEN TESTED AT 77-F t5 (25'C t3 }. PR9EERTY immAL (PA TENSILE STRENGTH 2200 PSI MiN. 2100 PSI MIN. (15 MPA MIN.) (14.5 MPA MIN.) ELONGATION AT BREAK 200% MIN. 200% MIN. SHORE DUROMETER, TYPE D 1—SEC. 50-60 f5 (WITH RESPECT TO INITIAL TEST RESULT) 10—SEC. 35-50 t5 WEIGHT CHANGE ±1.5 TENSILE SPECIMENS SHALL BE PREPARED AND TESTED IN ACCORDANCE WITH ASTM D412 USING DiE B. WEIGHT CHANGE SPECIMENS SHALL BE 1—INCH 25—MM BY 3—INCH (75—MM) SAMPLES, SPECIMENS FOR TESTING OF INITIAL PHYSICAL PROPERTIES MAY BE TAKEN FROM LINER PLATE SHEET AND WELDING STRIP AT ANY TiME PRIOR TO FINAL ACCEPTANCE OF THE WORK. LINER PLATE LOCKING EXTENSIONS EMBEDDED IN CONCRETE SHALL WITHSTAND A TEST PULL OF AT LEAST 100 POUNDS PER LINEAR INCH (1800 KG/M), APPLIED PERPENDICULARLY TO THE CONCRETE SURFACE FOR A PERIOD OF ONE MINUTE, WITHOUT RUPTURE OF THE LOCKING EXTENSIONS OR WITHDRAWAL FROM EMBEDMENT. THIS TEST SHALL BE MADE AT A TEMPERATURE OF 70- — 80' F(21* — 27* C) INCLUSIVE. ALL PLASTIC LINER PLATE SHEETS, INCLUDING LOCKING EXTENSIONS, ALL JOINT, CORNER AND WELDING STRIPS SHALL BE FREE OF CRACKS, CLEAVAGES OR OTHER DEFECTS ADVERSELY AFFECTING THE PROTECTIVE CHARACTERISTICS OF THE MATERIAL, THE ENGINEER MAY AUTHORIZE THE REPAIR OF SUCH DEFECTS BY APPROVED METHODS. THE LINING SHALL HAVE GOOD IMPACT RESISTANCE, SHALL BE FLEXIBLE AND SHALL HAVE AN ELONGATION SUFFICIENT TO BRIDGE UP TO 1/4—INCH 6 MM SETTLING CRACKS, WHICH MAY OCCUR IN THE PIPE OR iN THE ,ANT AFTER INSTALLATIONS, WITHOUT DAMAGE TO THE LINING. 1.C. CHEMICAL RESISTANCE OF LINER.* AFTER CONDITIONING TO CONSTANT WEIGHT AT 110 F(43 C), TENSILE SPECIMENS AND WEIGHT CHANGE SPECIMENS SHALL BE EXPOSED TO THE FOLLOWING SOLU11OINS FOR A PERIOD OF 112 DAYS AT 77* F t5 (25r C f3 ). AT 28—DAY INTERVALS, TENSILE SPECIMENS AND WEIGHT CHANGE SPECIMENS SHALL BE REMOVED FROM EACH OF THE CHEMICAL SOLUTIONS AND TESTED IN ACCORDANCE WITH SECTION 7-2.03(1.8) PARA. 2 ABOVE. IF ANY SPECIMEN FAILS TO MEET THE 112—DAY REQUIREMENTS BEFORE COMPLETION OF THE 112—DAY EXPOSURE, THE MATERIAL WILL BE SUBJECT TO REJECTION. 01EMICAL =119N . 91 SODIUMSULFURIC ACID !'! # HYDROXIDEAMMONIUM NITRIC1 FERRIC i# ► SOA• DETERGENT (LINEAR ALKYL BENZYL SULFONATE OR LAS BACTERIOLOGICAL Is ! ► . »' R + • • # •- 1.D. DETAILS AND DIMENSIONS OF - SHEETS. LINER SHEETS SHALL, BE A MINIMUM OF 0.065 LOCKING SAME MATERIAL AS THAT OF •: EXTRUDED NTH THE INSTALLATIONOF ! OF INCLUDING OF SHEETS IN COLD WEATHER AND THE WELDING OF ALL JOINTS, SHALL BE DONE IN ACCORDANCE RECOMMENDATIONS •,♦•' • LINER • r COVERAGE OF iT BE LESS THAN THE MINIMUM SHOWN ON INSTALLEDTHE PLANS. THE LINING SHALL BE WITH THE LOCKINGEXTENSIONS NTH THE LONGITUDINAL OF PIPE. THE LINING SHAH BE ! SNUGLY IN PLACE AGAINST INNER FORMS. ! # -1 t 121 ! i i i ! • ! " f !, • it ;• # + • ! i• rf ! * ! , i r • r • ► i ►` # ` i Lm 2:01 EXPIC 1V IT11 4,111 MIN WT, ! # # • " i .. • # r i ! .. r r rr i i ► •" i ► � # • r � ' r • rare •/ ♦ • M # ` i s ! M #• # r ! w ! ! ! ! # ► ! i t ! • ' ,# i • • : r ! #, ' ! - # # r r ...# i# ! • t # • � ! 1 � r ,• i i r ; +! ►, 1 ! ! : ! i• • r •!', ! ! • ! a ''i ! • ! ' # : i �# # r ,! • t ! ' #; « ► # r #i i ! # - • ! - !i • r • ' # # « ' .i 1 ! # ! t • # ..! i i 1 ► ! •! #' • r. INSTALLED1.1. TES11NG AND REPAIRING DAMAGED SURFACES. AFTERTHEPIPEIS IN THE TRENCH, SURFACES COVERED s # INCLUDING WELDS, BE TESTED WITH AN APPROVED, CONTRACTOR SUPPLIED, ELECTRICAL HOLIDAY DETECTOR (TINKER & RASOR MODEL NO. AP—W WITH POWER PACK OR APPROVED EQUAL) WITH THE INSTRUMENT SET BETWEEN t•t AND 2ZOOO VOLTS. ALL WELDS SHALL BE PHYSICALLY TESTED BY A NONDESTRUCTIVE PROBING METHOD. ALL PATCHES OVER HOLES, OR REPAIRS TO THE LINER WHEREVER DAMAGE HAS OCCURRED, SHALL BE ACCOMPUS14ED IN ACCORDANCE WITH SECTION 7-2.0.3(l.E) PARA. ABOVE. i EACH TRANSVERSE WELDING STRIP WHICH EXTENDS TO A LOWER EDGE OF THE LINER WILL BE TESTEDTHE PURCHASING AGENCY. THE BY WELDING STRIPS EXTEND INCHES (50 MM) BELOW THE LINER TO PROVIDE A TAB. A, 10—POUND (5 KG) PULL WILL BE APPLIED TO EACH TAB. THE FORCE WILL BE APPLIED NORMAL TO THE FACE OF THE STRUCTURE BY MEANS OF •• BALANCE LINER ADJOINING STRIP WILL BE r AGAINST THE CONCRETEDURING APPLICATION OF THE FORCE. SEPARATION10—POUND (5 KG) PULL WIH BE MAINTAINED IF A WELD FAILURE DEVELOPS, UNTIL NO FURTHER ► BE BEEN h • • MADE.• • ► : • OF SHOWINGAFTER THE WELDING STRIP HAS PASSED INSPECTION. INSPEC71ON SHALL BE MADE WITHIN 2 DAYS AFTER THE JOINT HAS BEEN COMPLETED IN ORDER TO PREVENT TEARING THE PROJECTING WELD STRIP AND CONSEQUENT DAMAGE TO THE LINER FROM EQUIPMENT AND MATERIALS USED IN OR TAKEN THROUGH THE WORK. SHOP DRAWINGS. CONTRACTOR SHALL SUBMIT MANUFACTURER INFORMATION •NAL, MATERIAL AND JOINT CRITERIA TO THE ENGINEER FOR PIPE TRENCH CLASSIFICATION. RCP CLASS IV SHALL BE TRENCH DESIGNATIONCLASS INSTALLEDSHALL PER ASTM TRENCH DESIGNATION W. PVC O. PIPE SIZES r LESS. POLY CHLORIDE PIPE SHALL MEET THE FOU OWING REQUIREMENTS: 1. MATERIAL PVC PIPE SHALL MEET OR EXCEED ALL REQUIREMENTSFORTH IN ASTM D 3034 WITH SDR OF 35. ELASTOMERIC SEALS AND JOINTS SHALL CONFORWI TO ASTM # 3212 AND ASTM F 477. METHODS MANUFACTURING TESTING CONFORM • CERTIFICATES COMPLIANCE SHALL BE MADETO THE ENGINEER. INSTALLATION.3. ! PIPE SHALL# • GUIDELINES, !NS AND ASTM D 2321 "UNDERGROUND INSTALLATION OF THERMOPLASTICFLEXIBLE • • FIELD4. r PRESSURE CONFORM TO THESE SPECIFICATIONS AND THE FOLLOWING: DEFLECTION MEASUREMENT OF PVC PIPE. AFTER 30 DAYS OF INSTALLA11ON THE CONTRACTOR SHALL MEASURE PIPE DEFLECTION BY PULLING A GO—NO—GO 5% MANDR THE MANDREL SHALL BE PULLED THROUGH THE PIPE WITH ROPE BY NE PERSON WITHOUT ADVANTAGE.- E + ES AT LEAST AS• DIAMETER.LONG AS THE PIPE #. BE # CONFORMANCE WITH PIPE AND MANDREL MANUFACTURER'S RECOMMENDATIONS. THE MANDREL DIAMETER WILL BE CALCULATED USING THE FOLLOWING FORMULA: MANDREL DIAMETER = BASE WHERE Y ALLOWABLE DEFLEC11ON • MANDRELASE I.D. ACTUAL INSIDE PIPE DIAMETER (PROVIDED BY PIPE THE ii! NUMBER OF VANES NTH SEVEN (7) SECTIONTHE MINIMUM LENGTH OF THE CIRCULAR POR11ON OF THE MANDREL SHALL BE EQUAL TO THE NOMINAL DIAMETER OF THE PIPE. ANY OF r PIPE THAT FAILS THE MANDREL EXCAVATED RE—BACKFILLED, RECOMPACTED AND RETESTED UNTIL THE MANDREL TEST CAN BE • r RE—ROUNDINNOT BE ALLOWED. PIPE TRENCH CLASSIFICATION. PVC PIPE SHALL BE INSTALLED PER CITY STANDAR S-39, AS MODIFIED ON THE CONTRACT PLANS. COMPACTION ABOVE THE PIPE ZONE SHALL BE AS SHOWN ON THE PLANS. THE EXCAVATION OF #- PIPING r IN THE GROUND SHALL BE IN OPEN—CUT r 'i ! 'i ► BORING IS REQUIRED. THE TRENCHES SHAH BE OF WIDTH AS SHOWN ON STANDARD S-39 AND DETAILED SECTIONS ON THE PLANS FOR PROPER PIPE INSTALLATION. THE HOLES i " BELLS AND FITTINGS SHALL BE EXCAVATED BY HAND, TO A WIDTH PROVIDING UNIFORM BEARING ALONG THE LENGTH OF THE PIPE. IT IS THE INTENTION 0 THESE REQUIREMENTS • PROVIDE UNIFORM BEARING!- THE PIPE. INSTALLATIONSCONTRACTOR SHALL PROVIDE TRENCHING IN ACCORDANCE NTH THE DETAILED SECTIONS PROVIDED IN THE PLANS. SELEC11ON OF TRENCH TYPES WILL BE AS REQUIRED BY THE TYPES OF PIPE SELECTED FOR CONSTRUCTION. STORM DRAIN AND UTILITY CONDUIT ►`"# TRENCH SHALL1 AND REQUIREMENTS. T. BRAQNQ AND 21QRING REGULATIONSEXCAVATION SHALL BE SUPPORTED AS SET FORTH IN THE RULES, ORDERS, AND OF DIVISION OF ! CONTRACTOR 11 REGISTERED CIVIL NGINEER TO THE STATE DIVISION OF INDUSTRIAL SAFETY, JUSTIFYING THE ALTERNATE PROCEDURES ! BE USED. FAILURE TO COMPLYOF ORDERS AND REGULATIONS SHALL BE SUFFICIENT CAUSE FOR THE STATE DIVISIi SECTIONTO IMMEDIATELY SUSPEND ALL WORK. COMPENSATION FOR LOSSES INCURRED BY THE CONTRACTOR BY SUCH AN EMERGENCY SUSPENSION SHALL NOT BE ALLOWED. DURING BACKFILLING, THE BOTTOM OF THE SHORING SHALL BE KEPT ABOVE THE LEVEL OF THE BAcKnLL AT ALL TIMES. OF #' #" CODE REQUIRESCONTRACTOR TO SUBMI TO THE ENGINEER DETAILED PLAN, DRAWING DESIGN OF SHORING,fir+ SLOPING OR OTHER PROVISIONS TO BE MADE BY THE CONTRACTOR FOR THE PURPOSE OF WORKER PROTEC11ON FROM THE HAZARD OF CAVING GROUND DURING THE EXCAVATION OF !• CONSTRUCTION OF PROJECT. IF SUCH PLAN VARIES FROM THE SHORING SYSTEM STANDARD ESTABUSHED BY THE CONSTRUCTION SAFETY ORDERS, THE PLANS SHALL BE PREPARED AND CERTIFIED BY A REGISTERED CIVIL ORHOWEVER, I ESS EFFECTIVE THEN THOSE REQUIRED BY THE CONSTRUCTION SAFETY ORDERS IS PROHIBITED ON `# !/ ► ► •# # : CONTRACTORTHE TO THE ENGINEER SIEVE ANALYSIS FOR UTILIZATIONOF IN—SITU MATERIALS. AQ81EANG EIRM BEDDING BELQW RJEE SERINGUbJE. CONTRACTOR SHALL PROVIDE 'FIRM BEDDIW SUPPORT FOR THE PIPE BELOW THE SPRINGLINE. FIRM BEDDING MEANS THAT THE PIPE MUST REST ON THE GRANULAR MATERIAL SPECIFIED PREVIOUSLY SPECIFICATIONS. BELL THAT O PART OF # t IS SUPPORTED BY THE BELLS OR COUPLINGS.DURING BEDDING AND BACKFILLING, CONSOLIDATION OF MATERIAL AROUND AND UNDER BELLS AND COUPLINGS SHALL BE AVOIDED. CONTRACTOR SHALL SHOVEL—SLICE OR HAND TAMP BEDDING IN THE HAUNCH AREAS, AS THIS WILL MINIMIZE VOIDS BENEATH THE PIPE AND IN THE HAUNCH AREAS. SHOVEL—SLICING OR HAND TAMPING SHALL BE DONE BEFORE THE BEDDING IS BROUGHT UP TO THE QUARTER POINT OF PIPE. BACKFILL.INITIAL U&MILL "BEDDING MATERIAL" AS SPECIFIED BY ASTM 2321-8 SHALL BE USED IN THE PIPE ZONE FOR INITIAL AND INSPECTED, INITIAL BACKFILL SHALL BE PLACED ON BOTH SIDES AND OVER THE PIPE TO SUCH A DEPTH THAT, AFTER THOROUGH CONSOLIDATION, THE FINAL DEPTH SHALL BE AT LEAST i THE ELEVATIONi ON PLANS.• . MANNERBE CONSOLIDATED BY VIBRATORY OR MECHANICAL TAMPING AND THE EQUIPMENT AND OF TAMPING ► s �. •rsr WRITING s ENGINEER PRIOR TO IN +r COMMENCING OPERATION. '+CT EQUIPMALLOWEDUNDERr i OF THE ENGINEER. HOWEVER, THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE RESULTING FROM THE USE OF THIS EQUIPMENT.HYDRA-HAMMERNOT PERMITTED. BACKFILLEDSUB=ENT EAQKELL, ABOVE THE LEVEL OF INITIAL BACKFILL, THE TRENCH MAY BE FROM TRENCH EXCAVATION, OR AT THE OPTION OF ! • • SELECT IMPORTED MATERIALS MAY BE USED. EQUIPMENTMATERIAL OR IMPORTED MATERIAL MAY BE COMPACTED BY TAMPING AND/OR ROLLING, USING r METHODS APPROVED MATERIALMEN THE CONTRACTOR COMPACTS BY TAMPING AND/OR ROLLING, THE BACKFILL # IN LAYERS NOT#LOOSE DEPTH, EACH LAYER BEING THOROUGHLY COMPACTED BY TAMPING AND/OR ROLLING BEFORE •r LAYERS ARE PLACED. COMPACTION OF SUBSEQUENT BACKFILL WITHIN TWO AND ONE—HALF (2-1/2) FEET OF FINISHED PERMANENT SURFACING GRADE SHALL BE ACCOMPLISHED BY TAMPING AND/OR ROLLING AS SPECIFIED ABOVE. WHERE THE TRENCH IS WITHIN THE PAVEMENT ON STREETS, THE BACKFILL WITHIN TWO AND ONE—HALF (2-1/2) FEET OF FINISHED PERMANENT GRADE SHAM BE COMPACTED TO NINETY PERCENT (90%) RELATIVE COMPACTiOON. i# #• iiiq .ACH LAYER OF BACKFILL SHAH BE THOROUGHLYCOMPACTED TO THE RELATIVE COMPAC11ON OF NOT LESS THAN IS SHOWN ON CITY OF BAKERSFIELD STANDARD S -311T AS MODIFIED ON • PLANS, i EXCEPT COMPACT10N WITHIN THE .';'%`OADWAY STRUCTURAL is NO LESS THAN NINETY PERCENT • i. AIELATIVE COMPACTIONFOR •.FINISHED 30 AND SHALL BE DETERMINED BY CALIFORNIA TEST METHODS 216 OR 231, OR ASTM (CURRENT EDITION) D1557 AND ONE i'THE FOLLOWINGD2922 OR !F THE RELATIVE COMPACTION. DETERMINED BY TESTING, FAILS TO MEET THE FoPECIFIED PERCENTAGE, THE TRENCH SHALL BE RE—EXCAVATED AND RE—COMPACTED. COMPACTION TESTS WILL BE THE SUBDIVIDERS RESPONSIBILITY. THE NUMBER AND LOCATIONS OF DETERMINED BY THE CITY ENGINEER. PRICESEWER PIPE SHALL CONFORM TO THE PLANS, AND THESE SPECIAL PROVISIONS. THE FOOT SHALL INCLUDEBUT NOTBE LIMITED TO EXCAVATION,BEDDING BACKnLL HANDLINGOF " i CASTINGS MUST BE JOINTCAREFULLY HANDLED AT ALL TIMES. ONLY SUITABLE AND PROPER EQUIPMENT AND APPLIANCES SHALL BE USED FOR THE SAFE LOADING, HAULING, UNLOADING, HANDLING AND PLACING OF MATERIALS, SPECIAL CARE SHALL BE EXERCISED SO THAT PREFORMED RESILIENT JOINTS ON PIPE AND FITTINGS WILL NOT BE DAMAGED. ANY PIPE OR FITTING WITH A DAMAGED OR r WILL CAUSE THAT PIPE OR FITTING TO BE REJECTED. r M • • r r . • r •• ! • :+ • ! it «.r.•. *.•► •. • i •.;.. •wls. • i. : ! # •• + • •: PIPELINE ALL SEWERS . SHA TESTING. A BE TESTED FOR TIGHTNESS WHEN COMPLETED S LL AND READY FOR SERVICE. TESTING SHALL BE CONDUCTED IN ACCORDANCE WITH THE UNIFORM PLUMBING CODE AIR TEST METHOD UPC SEC. 318-6(4), OR THE WATER EXFILTRATION TEST OR AIR PRESSURE TEST PER SECTION 306-1.4, TESTING PIPELINES OF THE 1994 EDITIONS, STANDARD SPECIFICATIONS* FOR PUBLIC WORKS CONSTRUCTION, AND CHAPTER 1.3 OF THE CITY OF BAKERSFIELD SUBDIVISION DESIGN MANUAL, AND THE PIPE SUPPLIER'S REQUIREMENTS. THE CONTRACTOR SHALL N01IFY THE ENGINEER 24 HOURS PRIOR TO ANY TESTING. r 11. SYSTEM TESTING A MANDREL TEST AND PRESSURE TEST SHALL BE PERFORMED ON INSTALLED PIPE IN ACCORDANCE WITH THE CITY OF BAKERSFIELD SUBDIVISION MANUAL AND THE RECOMMENDATIONS OF THE MANUFACTURER. PRIOR TO FINAL ACCEPTANCE, AH SEWER LINES SHALL BE INSPECTED NTH VIDEO EQUIPMENT DESIGNED FOR THIS PURPOSE. THE TELEVISION CAMERA SHALL HAVE THE CAPABILITY OF ROTATING ,3607, IN ORDER TO VIEW AND RECORD THE TOP AND SIDES OF THE PIPE, AS REQUIRED. THE VIDEO INSPECTION SHALL BE WITNESSED BY THE CITYS CONSTRUCTION INSPECTOR, WHO WILL ALSO INITIAL AND r i#FORM.# r' SHALL IMMEDIATELY• OF SHALLANY PIPE LOCATIONS REVEAIED TO BE NOT IN COMPLIANCE WITH THE SPECIFICATIONS. A RECORDED VIDEO CASSETTE, THE COMPI ETED "CHAIN OF CUSTODY* FORM AND A WRITTEN LOG (WHIQi INCLUDES THE STATIONING, BASED ON THE STATIONING OF THE APPROVED PLANS, OF ALL CONNECTED LATERALS) OF THE INSPECTION AND SHALL BE APPROVED BY THE CITY ENGINEEA PRIOR TO ACCEPTANCE. AFTER ACCEPTANCE, THE VIDEO CASSETTE SHALL BECOME THE PROPERTY OF THE CITY. 12. WYE FITTINGS SHAH BE INJECTION • r AND SHALL BE ► FOR ALL LATERAL CONNEC11ONS AND SHAH BE ROTATED A MINIMUM OF 23 DEGREES ABOVE THE HORIZONTAL PLANE RUNNING THROUGH THE CENTERLINE OF THE MAIN. AH LATERALS SHALL - • # •EXTENDING OF 4' BEYOND THE PROPERTY LINE OR RIGHT—OF—WAY LINE NTH • 30" OF COVER AT j W LINE. SURFACE MARKERS FOR SEWER LATERALS SHALL BE INSTALLED PROPERTY s! r s ! • RIGHT-OF— WAY LATERALS - is BE . • AND i r PROPERTY r MINIMUM # # # r • • + RIGHT—OF—WAY r OF DEEP AT FLOWLINE. 13. ALL SEWER STUBS SMALL BE CLOSED WITH A STANDARD PLASTIC PLUG. SOLVENT WELDED. 14. ALL MANHOLES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CiTY OF BAKERSFIELD STANDARD DRAWINGS S-7, S-8, AND S-21 AND SECTIONS 70-1.02H AND 71-1.07 OF THE STANDARD SPECIFICATIONS OF THE STATE OF CALIFORNIA, DEPARTMENT OF TRANSPORTATION, CURRENT EDITION. ALL CLEANOUTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF BAKERSFIELD STANDARD DRAWING S-20. MANHOLES SHALL BE TYPE *A* FOR PIPES UNDER 48* IN DIAMETER AND TYPE *B* FOR PIPES 48* iN DIAMETER OR LARGER. UNLESS NOTED OTHERWISE. THE BOTTOM MANHOLE BARREL AT THE MANHOLE FOUNDATION SHALL BE SET ON A 2* MORTAR BED OR SET ON KENT—SEAL, iN A GROOVED FOUNDATION. 15. STORM DRAIN PIPE STORM DRAIN PIPE. CONTRACTOR SHALL UTILIZE RCP PIPE, CLASS III WITH RUBBER GASKET JOINTS PER ASTM SPECIFICATION C-76, UNLESS OTHERWISE NOTED ON THE CONTRACT PLANS. REINFORCED CONCRETE PIPE. REINFORCED CONCRETE PiPE SHALL CONFORM TO THE PROVISIONS IN SECTION 650 *REINFORCED CONCRETE PIPE, OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS. EXCEPT AS OTHERWISE DESIGNATED BY CLASSIFICATION ON THE PLANS OR iN THE SPECIFICATIONS, JOINTS FOR CULVERT AND DRAINAGE PIPES SHALL CONFORM TO THE PLANS OR SPECIFICATIONS FOR STANDARD JOINTS. HYDROSTATIC TESTS SPECIFIED BY SECTION 65-1.08 LAYING SIPHON AND PRESSURE PIPE% OF THE STANDARD SPECIFICATIONS WILL NOT BE REQUIRED. REINFORCED CONCRETE PiPE SHALL HAVE RUBBER GASKETED JOINTS CONFORMING TO SECTION 65-1.068, RUBBER GASKETED JOINTS% OF THE STANDARD SPECIFICATIONS. HANDLING OF MATERIALS. ALL PIPE, FITTINGS, SPECIALS AND CASTINGS MUST BE CAREFULLY HANDLED AT ALL TIMES. ONLY SUITABLE AND PROPER EQUIPMENT AND APPLIANCES SHALL BE USED FOR THE SAFE LOADING, HAULING, UNLOADING, HANDLING AND PLACING OF MATERIALS, SPECIAL CARE SHALL BE EXERCISED SO THAT PREFORMED RESILIENT JOINTS ON PiPE AND FITTINGS WILL NOT BE DAMAGED. ANY PIPE OR FITTING WITH A JOINT DAMAGED OR FLATTENED WILL CAUSE THAT PIPE OR FITTING TO BE REJECTED. PIPE LAYING. NO PIPE SHALL BE LAiD UNTiL THE ENGINEER INSPECTS AND APPROVES THE CONDITION OF THE BOTTOM OF THE TRENCH. PIPE SHALL BE INSTALLED IN STRICT ACCORDANCE WiTH MANUFACTURER'S RECOMMENDATIONS. PIPE LAYING SHALL BEGIN FROM THE DOWNSTREAM END OF THE STORM DRAiN OR AS DIRECTED BY THE ENGINEER. PIPE LAYING SHALL PROCEED WITH EACH PIECE LAID TRUE TO LINE AND GRADE, AND IN SUCH A MANNER AS TO FORM A CLOSE CONCENTRIC JOINT WITH THE ADJOINING PIPE AND TO PREVENT SUDDEN OFFSETS IN THE FLOW LINE. AS THE WORK PROGRESSES, THE INTERIOR OF THE PIPE SHALL BE CLEARED OF ALL DIRT AND DEBRIS OF EVERY DESCRIPTION. PiPE SHALL NOT BE LAID WHEN THE CONDITION OF THE TRENCH OR THE WEATHER IS UNSUITABLE. AT TIMES WHEN WORK IS NOT IN PROGRESS, OPEN ENDS OF PIPE AND FITTINGS SHALL BE CLOSED. WITH BELLED END PIPE, BELL HOLES SHALL THEN BE EXCAVATED AT EACH JOINT TO FACILITATE THE JOINT OPERATIONS, AND SHALL BE ONLY OF SUFFICIENT SiZE FOR THAT PURPOSE. IN ORDER THAT BELL HOLES MAY BE PROPERLY LOCATED, NOT MORE THAN SIX (6) HOLES SHALL BE EXCAVATED AHEAD OF ACTUAL PIPE LAYING, ON ACCOUNT OF THE VARIATIONS IN JOINT CONSTRUCTION OPERATIONS. THE CONTRACTOR SHALL MAKE PROVISIONS FOR PREVENTING FOREIGN MATERIAL FROM BEING FLUSHED INTO AN EXISTING STORM DRAIN LINE. CUTTING PIPE. THE CONTRACTOR SHALL PERFORM ALL WORK OF CUTTING PIPE AND SPECIAL CASTING NECESSARY TO THE ASSEMBLY, ERECTION, AND COMPLETION OF THE WORK. ALL PIPE SHALL BE CUT TO FIT ACCURATELY, WITH SMOOTH EDGES AND FACES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CORRECTNESS OF CUTTING AND NO ADDITIONAL COMPENSATION WiLL BE ALLOWED FOR ANY MATERIALS WHICH ARE DAMAGED OR INCORRECTLY CUT. IM CASING OR SMOOTH OUTSIDE WALLED PiPE FOR BORED/JACKED PIPE SHALL BE n INSTALLED. IT SHALL HAVE EVEN BEARING THROUGHOUT ITS LENGTH AND SHALL SLOPE TOWARD ONE END. SPACE BETWEEN CASING AND PIPELINE SHALL BE BACKFILLED WITH SAND. IF THE PIPE AND CASING ARE INSTALLED BY BORING, THE SPACE AROUND THE CASING ALSO SHALL BE BACKFILLED WITH GROUT OR SAND. THE ENDS OF SPACE BETWEEN THE CAGING AND THE PIPE SHALL BE SEALED NTH GROUT. THE STRENGTH OF PIPE DESIGNATED IN THE PLANS OR SPECIFICATIONS IS DETERMINED FOR VERTICAL LOAD ONLY ANY ADDITIONAL STRENGTH REQUIRED BY BRINGfJA CLING OPERATIONS SHALL BE FURNISHED AT THE CONTRACTOR'S EXPENSE. THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER FOR APPROVAL ALL PLANS OF BORING JACKING OPERATiOONS PRIOR TO BORING OR JACKING. BORING/JACKING OPERATIONS SHALL BE CONDUCTED IN A SAFE AND EFFICIENT MANNER, CONSISTENT WITH CURRENT ACCEPTED PROCEDURES. WATER BORING SHALL NOT BE PERMITTED. THE CASING PiPE SHALL BE JACKED WITH SUCH PRECISION THAT WILL ALLOW THE REPLACEMENT OF THE PIPELINE TO THE LINE AND GRADE AS INDICATED ON THE PLANS. 17. UPON COMPLETION OF THE INSTALLA11ON OF THE CASING AND INSTALLATION OF THE PIPELINE TO GRADE, THE VOID BETWEEN THE CASING OR RC PIPE AND THE EXCAVATION SHALL BE COMPLETELY FILLED WITH SAND, COMPACTED BY THE USE OF AIR—BLOWING SAND EQUIPMENT OR ANY OTHER MEANS ACCEPTABLE TO THE ENGINEER UPON HIS APPROVAL. IT iS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN A SAFE OPERATION AT ALL TIMES. SHOULD THE TUNNEL HEADING OPERATIONS RESULT IN DANGEROUS OR UNREASONABLE SLOUGHING OF MATERIAL WHICH MAY JEOPARDIZE THE SAFETY OF WORKERS OR THE STABILITY OF THE SOUL AND ROADWAY ABOVE, THE CONTRACTOR SHALL FURNISH AND INSTALL BREASTBOARDING AND/OR FACE CLOSURE WITH SUFFICIENT JACKS TO INHIBIT THE SLOUGHING AND/OR CLOSING THE WORK FACE. THE CONTRACTOR, BEFORE RESUMING WORK, SHALL FURNISH THE ENGINEER WITH A DETAILED PLAN OF PRECEDING NTH THE WORK, FOR HIS REVIEW AND APPROVAL. ANY AND ALL EXPENSES THEREFORE WILL BE CONSIDERED AS INCLUDED IN THE BID PRICE AND NO ADDITIONAL COMPENSATION TILL BE MADE THEREFORE. MINOR STRUCTURES. PORTLAND CEMENT CONCRETE MINOR STRUCTURES SHALL CONFORM, IN DESIGN, MATERIALS, AND CONSTRUCTION, TO THE PROVISIONS OF SECTIONS 70-1.02 H OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL PROVISIONS. MANHOLES SMALL CONFORM TO THE CITY OF BAKERSFIELD STANDARDS S-7 AND S-8. DROP INLETS SHALL CONFORM TO THE CITY OF BAKERSFIELD STANDARD S-12. TEMPORARY INLET GRATES SHALL CONFORM TO DETAILS ON THE PLANS. THE PRECAST CYLINDER, TAPER, AND ECCENTRIC FLAT TOP SECTIONS SHALL MEET THE STRENGTH REQUIREMENT OF ASTM. C-478. EACH SUCCESSIVE MANHOLE SECTION SHALL BE SET ON A BED OF PORTLAND CEMENT GROUT OR *KENT SEAL* TO MAKE A WATERTIGHT JOINT, SHALL BE NEATLY POINTED ON THE INSIDE, AND SHALL BE SET PLUMB. SURVEY MONUMENT AND FRAME AND COVER WITH ENCASEMENTS SHALL BE ADJUSTED OR INSTALLED NEW TO FINISH GRADE AT THE LOCATIONS SHOWN ON THE PLANS, IN ACCORDANCE WITH THESE SPECIAL PROVISIONS, AND CITY STANDARD S-29. THE SURFACE OF THE CONCRETE SHALL BE PROTECTED FROM PUBLIC TRAFFIC FOR A MINIMUM OF THREE DAYS. AT THE OPTION OF THE CONTRACTOR MINOR CONCRETE CONTAINING A MINIMUM OF SEVEN SACKS OF CEMENT PER CUBIC YARD MAY BE USED AND THE TIME REQUIRED FOR PROTECTION OF THE CONCRETE SURFACE FROM PUBLIC TRAFFIC SHALL BE REDUCED TO A MINIMUM OF ONE DAY. THE MONUMENT WILL BE SET BY OTHERS. THE OWNER WILL PROVIDE SURVEYS. CONTRACTOR SHALL GIVE THE OWNER 24 HOURS NOTICE WHEN SURVEYS ARE REQUIRED. ANY MONUMENT FRAME OR COVER DAMAGED BY THE CONTRACTOR OR HIS OPERATIONS SHALL BE REPLACED BY THE CONTRACTOR AT NO COST TO THE OWNER. Know whars below. call before you dig. a ca T AFT HIGHWA (NOT A PART) • A A 10 mo 04 a I oi 'o a "O # 0; r -T Kj 0! 2 7Qv + + C- 4 - 2E =0 — - t� • A A 10 &-Bran cno 04 a I oi 'o a "O # 0; r -T Kj 0! 2 7Qv + + C- 4 - 2E TV_ 1 V_ — — t� -a ui 04 + cc)+, INSTALL 261.153 LF OF C14 0) 0) # Ir - • z &-Bran cno N, 27.18! li it 25 SEWER CLEANOUT NO. 1 STAK 10+31167, C.L. 5.500—LT= STA. 10+69.85, SEWER C MONUMENT STA. 9+80.00 C.L. R/W Kul 04 a I oi 'o a "O # 0; r -T Kj 0! 2 7Qv + + C- 4 - 2E TV_ 1 V_ — — t� -a ui 04 + cc)+, INSTALL 261.153 LF OF C14 0) 0) .g Ir - • z tis t4) C; 400 4a M •N # / • C14 z it z z ca 3:: • w _j 0 ('0 OD 00 co N, 27.18! li it 25 SEWER CLEANOUT NO. 1 STAK 10+31167, C.L. 5.500—LT= STA. 10+69.85, SEWER C MONUMENT STA. 9+80.00 C.L. R/W Kul AGASSIZ ROCK WAY SEE SHEET 4 TRACT BOUNDARY 0 m•....■ _k — — — — — T 28 1 1 1 1 1 R/W5 1 1 io 20$ 201 1 30' :2 4 go C3 Ui. ®. 0) C.4 0 > C> R/W _j 8 1 cl, _j 'ji co C5 W> -a 4 _cb 0 _j _j _j -4 - -7 rN z 0; 10vain L> C.11 uj c:1 K) 0 04-�z j al 149 — 4 -C-4 06 ce M 0) 8 0; a -c�- 3 667 29 -ju 31 0;932 33 3 2 �gg i --Frz d -4 rz (A 0; cr M to) rzo; d 4 0 Ld "III I m cn r- 0; 3r. r- co r - i LO v-: -410 C-4 3r. 06 39 C4 Bt 3c 1 C4 3m 'co at Pei 3c C> + C14 co 4m co c> 04 co *0 V_ (D Co + 01 (V/)) 04 ac> o) C,4 C4 L C1 I + 00-0) + +, -uj C5 3c C) ccs c) *6 + C4 v 04 c*4 V_ Lj C4 co C14 .04 r, $4 co Go uj cl 34 cq v-- 0) V_ 0) V_ 0) 1 1m V_ 0) v- (7) v- 0) 1-0) 04 SN cr) C-4 504 C.14 P4 0) Ur. v- 03 Nco Ice m 'o) z cf) + C-4 + co + + < I w 00 w- tb�451 02 1 2 cn En 2 2 cn z t C -3i cn col) z t< 9.13' cn z cn cn �< z C3 cn z z cn z (n z cn Z cn V) z cn z coo, loe R/W 5. r R/W Nr MONUMENT 11-K _w A IP 04 a I oi 'o a "O c; 0; r -T Kj 0! 2 7Qv + + C- 4 - 2E TV_ 1 V_ — — t� -a ui 04 + cc)+, INSTALL 261.153 LF OF C14 0) 0) 00 Ir - • z AGASSIZ ROCK WAY SEE SHEET 4 TRACT BOUNDARY 0 m•....■ _k — — — — — T 28 1 1 1 1 1 R/W5 1 1 io 20$ 201 1 30' :2 4 go C3 Ui. ®. 0) C.4 0 > C> R/W _j 8 1 cl, _j 'ji co C5 W> -a 4 _cb 0 _j _j _j -4 - -7 rN z 0; 10vain L> C.11 uj c:1 K) 0 04-�z j al 149 — 4 -C-4 06 ce M 0) 8 0; a -c�- 3 667 29 -ju 31 0;932 33 3 2 �gg i --Frz d -4 rz (A 0; cr M to) rzo; d 4 0 Ld "III I m cn r- 0; 3r. r- co r - i LO v-: -410 C-4 3r. 06 39 C4 Bt 3c 1 C4 3m 'co at Pei 3c C> + C14 co 4m co c> 04 co *0 V_ (D Co + 01 (V/)) 04 ac> o) C,4 C4 L C1 I + 00-0) + +, -uj C5 3c C) ccs c) *6 + C4 v 04 c*4 V_ Lj C4 co C14 .04 r, $4 co Go uj cl 34 cq v-- 0) V_ 0) V_ 0) 1 1m V_ 0) v- (7) v- 0) 1-0) 04 SN cr) C-4 504 C.14 P4 0) Ur. v- 03 Nco Ice m 'o) z cf) + C-4 + co + + < I w 00 w- tb�451 02 1 2 cn En 2 2 cn z t C -3i cn col) z t< 9.13' cn z cn cn �< z C3 cn z z cn z (n z cn Z cn V) z cn z coo, loe R/W 5. r R/W Nr MONUMENT 11-K _w A IP 04 a I oi 'o a "O c; 0; r -T Kj 0! INSTALL 394.11 + + C- 4 - + tV TV_ 1 V_ — f� INSTALL 261.153 LF OF W RGJ--RCP 0 0.12% • t4) C; 400 4a M •N # / • L40 w j 2r TRACT BOUNDARY 04 a I oi 'o a "O c; 0; r -T Kj 0! INSTALL 394.11 + + C- 4 - + tV TV_ 1 V_ — f� INSTALL 261.153 LF OF W RGJ--RCP 0 0.12% TRACT BOUNDARY 10+00 11+00 12+00 13+00 14+00 15+00 16+00 (STA. 9+80.00 C.L. TO 20+11.09 C.L.) SCALE: 1" = 50' HORIZONTAL SCALE: 1" = 5' VERTICAL 70 "A i o.j CL CENTERLINE SMH SEWER MANHOLE INV INVERT SCO SEWER CLEMOUT SID STORM DRAIN SDMH STORM DRAIN MANHOLE MH MANHOLE EXIST EXISTING ELEV ELEVATION co CATCH BASIN JB JUNCTION BOX R/W RIGHT OF WAY SCP STREET CONSTRUCTION PLAN mm mmm mm mom mm PHASE BOUNDARY wm, a TRACT BOUNDARY 3,88.5. TOP OF MANHOLE/Top OF CLEANOUT ELEVATION CONSTRUCT SM PER CITY STANDARDS CONSTRUCT SEWER MANHOLE TYPE PER C.O.B. STD. SW -4. CONSTRUCT SEWER CI-EANOUT PER C.O.B. STD. SW -6. CONSTRUCT STORM DRAIN PER CITY STANDARDS CONSTRUCT STORM DRAIN MANHOLE TYPE *A* PER C.O.B. SM. SW -4. CONSTRUCT CATCH BASIN TYPE *A" PER C.O.B. STD. D-14. NOTES 1) ALL CATCH BASINS ARE TO BE TYPE "A* WITH 3.5' OPENINGS PER C.O.B. STD. D-14. 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS UNLESS OTHERWISE NOTED. SECTION LETTER 2 SHEET WERE SECTION IS SHOWN � mof 344 mm gm 336 INSTALL 394.11 LF OF Tr RGJ— 9 —012% INSTALL 261.153 LF OF W RGJ--RCP 0 0.12% • t4) C; d C14 z z z ca 3:: • w _j 0 ('0 OD 00 co w OD 00 00 w LJ z Vi =W V_ OD 10D r.zz z > z oc - 0) Z Z + ck x c 0; MMM tq pr) 0) z0 Z 0 ---,z C14 n rm_ f) pe) W10D Olt v-: C5 7t It >; . >: w w aj F1 IISHED cn _j_j_jAPPR ww_j_APPROXIMATE w w w D)aMATE r GRAD CENT NISHED '-RUNEw 0 � -pin A Tr* MKAM4 f1ft ?I IMF•0 GRADE 0 CENE IA°� 9 _—T -H :A INvER,r las DRAIN INVERT I B* DRAIN ............. 1, 4VERT 6m SEWER L ..... .. ................... 600 -WO ......... M. -INVERT 6* SEWER ..... 41 : - womotoo—ol• INVERT 6* SEWER 1-0 0- 0 w 0zcn z cn _t1NVERT6* SEWER -.0howtotot 0 C4 cnj Z _j 0 z _j %.A Zoo 62 0 X to 1-0 zD OD (0 (0 z > Ld z z z1-* _21 w z z toto (o X w zzz .J _ 00) 0 ZD 06 06 06 + r Z (0 (0 to /off 4m_ 7 oi >: fn 4 Ori OriU4 w-- 6 19 w wj _j _ 111111 > V+ -- Ix (o K)n >: --i UA US in 61 INS LL W.0 LF OF f INST) LL 81.59 cn LF OF 6" V) w w w w_j w —9 co 1— _j cn w SEWER 1.00% S__WER 0 --1.00% INSTALL W.00 Of 6" SEWER 00.50% _j cn (n w _j w w INSTALL 376.18 LF OF 6' SEWLIt 0 —1.0)% 10+00 11+00 12+00 13+00 14+00 15+00 16+00 (STA. 9+80.00 C.L. TO 20+11.09 C.L.) SCALE: 1" = 50' HORIZONTAL SCALE: 1" = 5' VERTICAL 70 "A i o.j CL CENTERLINE SMH SEWER MANHOLE INV INVERT SCO SEWER CLEMOUT SID STORM DRAIN SDMH STORM DRAIN MANHOLE MH MANHOLE EXIST EXISTING ELEV ELEVATION co CATCH BASIN JB JUNCTION BOX R/W RIGHT OF WAY SCP STREET CONSTRUCTION PLAN mm mmm mm mom mm PHASE BOUNDARY wm, a TRACT BOUNDARY 3,88.5. TOP OF MANHOLE/Top OF CLEANOUT ELEVATION CONSTRUCT SM PER CITY STANDARDS CONSTRUCT SEWER MANHOLE TYPE PER C.O.B. STD. SW -4. CONSTRUCT SEWER CI-EANOUT PER C.O.B. STD. SW -6. CONSTRUCT STORM DRAIN PER CITY STANDARDS CONSTRUCT STORM DRAIN MANHOLE TYPE *A* PER C.O.B. SM. SW -4. CONSTRUCT CATCH BASIN TYPE *A" PER C.O.B. STD. D-14. NOTES 1) ALL CATCH BASINS ARE TO BE TYPE "A* WITH 3.5' OPENINGS PER C.O.B. STD. D-14. 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS UNLESS OTHERWISE NOTED. SECTION LETTER 2 SHEET WERE SECTION IS SHOWN � mof 344 mm gm 336 328 B SECTION 3,) SCALE: 1 = 10 HORIZONTAL 1 = 5' VERTICAL 344 • • 328 B SECTION 3,) SCALE: 1 = 10 HORIZONTAL 1 = 5' VERTICAL 344 • _7 2. � mol W� mm mm A, t, &M W6 m m # KANOSH COBBLE DRIVE WF ql4FFT 3 14 COBBLE MOUNTAIN ROAD KANOSH COBB (NOT A PART) SEE SHEET (SEE TRACT 6491 - PHASE 3) AGASSIZ ROCK DRIVE 11+42.81 C.L. TO 13+03.15 SCALE: 1 " = 50' HORIZONTAL ■ ui 15 LLi duj Z-jw 9 CD U) z LAJ LLJ Z 06 c6 CD :z 0 16 < 17 0 N co 0 r - co 8 N o x < 't 0 on o Z 00 6z 14c 18ca c� < Z,� R I Lo, J < —1 -i < to 00W F= � I*- Li 00 U-5 a C-4 _j + + W co 73 D m to Z cqo in ``' to to CV Of w wrl no] "STA. 11+42.81 C.L. TO 13+03.15 C.L.) SCALE: 1" = 50' HORIZONTAL SCALE: 1" = 5' VER11CAL 13+00 wol m m NMI mm KX M m W* *NOTE CONTRACTOR TO REMOVE PLUG IN EXISTING 18" STORM DRAIN AND 8" SEWER AND VERIFY EACH INVERT ELEVATION PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES. CL CENTERLINE i 3z,, -br EA51IN _G RQJ 00.129., INSTAll 154.33 LF OF 11 RGJ-RCP 0 0.1:M SD STORM DRAIN SDMH STORM DRAIN MANHOLE 0 CONSTRUCT STORM DRAIN MH MANHOLE V)z Ai EXISTING MANHOLE TYPE *A* PER C.O.B. SID. SW -4. SCALE: 1 50' CB CATCH BASIN ELEV ELEVATION JB JUNCTION BOX R/W RIGHT OF WAY 1 -Ir CONSTRUCT CATCH BASIN 00 *9 50" 25' 50' 100, 0000)o STREET CONSTRUCTION PLAN TYPE PER C.O.B. STD. D-14. ZW o z cn 3!: f -t rn It U4 2' It 2 0 —I i w Go cc C-- v- v- . . . 00%% cn z z Z- C. 4) >> +>:>: V_ wui oo P-111 w co cou CF) ey; oi q in (nz=.,Z >: N no) K I w w 0 wnNI Lno-x;l ATE 4 H ED >; APPROXIMATE kDE 0 CE4TERUNE EXIS-HNG bKAUt %I kotN ltKL Nt W w —1 V) W w w'. >i Fl 0 4c WATER J ICTION, THE T-ELEVAT CTOR IS iE-EXLM INVERT 18" DRAIN PRIORCONSTRI CONTR) ONS -0" -0 IG_ 1 & & 1 r STORM BRAIN AT THE TIE - IN LOCA ON AND NOTIFY THE ENGINE I? sall wz m OD t> (0 Z ,c 40DOO Z " w j z z 44 5 =17 ce _-Z go uj co v- Ile po v- LAJ w w >: w w u6xj zz 4 A 147.76 LF OF EXSL B " SEWER 0 0.352; IN 165,43 LF OF' 8" SEWOR 0 -036X w W cn C/) hi w w wrl no] "STA. 11+42.81 C.L. TO 13+03.15 C.L.) SCALE: 1" = 50' HORIZONTAL SCALE: 1" = 5' VER11CAL 13+00 wol m m NMI mm KX M m W* *NOTE CONTRACTOR TO REMOVE PLUG IN EXISTING 18" STORM DRAIN AND 8" SEWER AND VERIFY EACH INVERT ELEVATION PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES. CL CENTERLINE SMH SEWER MANHOLE CONSTRUCT STORM DRAIN PER CITY STANDARDS INV INVERT sco SEWER CLEANOUT F1 SD STORM DRAIN SDMH STORM DRAIN MANHOLE 0 CONSTRUCT STORM DRAIN MH MANHOLE EXIST EXISTING MANHOLE TYPE *A* PER C.O.B. SID. SW -4. SCALE: 1 50' CB CATCH BASIN ELEV ELEVATION JB JUNCTION BOX R/W RIGHT OF WAY 1 -Ir CONSTRUCT CATCH BASIN 00 *9 50" 25' 50' 100, SCP STREET CONSTRUCTION PLAN TYPE PER C.O.B. STD. D-14. TRACT BOUNDARY _T 0 �55 TOP OF MANHOLE/TOP OF CLEANOUT ELEVATIOK • s CONSTRUCT SEWER PER CITY STANDARDS G CONSTRUCT SEWER MANHOLE TYPE "A" PER C.O.B. STD. SW -4. CONSTRUCT SEWER CLEANOUT PER C.O.B. SID. SW -6. NOTES 1) ALL CATCH BASINS ARE TO BE TYPE "A" WITH 3.5' OPENINGS PER C.O.B. STD. D-14. 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVA11ONS UNLESS OTHERWISE NOTED. SEC119N DES 914ABON: SECTO LETTER L 2 �4_ SHUT WERE SECRON IS SHOW