HomeMy WebLinkAboutinspection report 2017BAKERSFIELD FIRE DEPARTMENT
Prevention Services Division
2101 H Street
Bakersfield, CA 93301
Phone: 661- 326 -3979
Fax: 661 -852 -2171
Underground Storage Tank - Double Wall Components PAGE 1 OF
Date: 0 t
Facility No:
Inspection Type:
®01 Routine
❑ 04 Complaint
Cert. No:
Cert. No:
❑ 03 Re- inspection
E] Other
Facility Name: �, ��,a t I'� -"�",Z.oC;� S-Tt� it
Address: 3 coo 141 * V -�
Inspector: Shane Gardner
Designated Operator:
Service Tech:li� -c,JS Y Manufacturer Cert No:
Cert. No:
Service Contractor Company:
Monitoring Console Manufacturer: Veeder Root
Consent To Inspect Granted By: Name:
License Class & No:
Monitoring Console Model No.: TLS 300
Title:
Tank ID
Tank ID
Tank ID
Tank ID
1 2 3 4
Contents Contents Contents Contents
Install Date Install Date Install Date Install Date
Size Size Size Size
Listed citations are to the California Health and Safety Code HSC and California Code of Regulations (CCR)
No Violation Observed z Out of Compliance 3 Not APPlicable ° Undetermined 5 Corrected On Site 6 Repeat Violation 7 Violation De ree s Si niflcant 0 erational Compliance
Violation No. Facility Tank Information NVO' OUT NA' UD4 COS' RPT6 Degree? SOC8 Comments
2030021
Facility has a valid Permit to Operate from the CUPA
- HSC 6.7 25284
Complete and accurate UST Operating Permit
Application has been submitted - 23 CCR 16 2711;
HSC 6.7 25284, 25286
Facility has an approved Monitoring Plan - 23 CCR 16
2632(d)(1), 2634(d), 2641(h)
Facility has an approved UST Response Plan - 23
16 2632(d)(2), 2634(e), 2641(h)
W1
F-1
F-1
F-1
El
F-1
El
F-1
El
1:1
❑
2010010
0
❑
❑
❑
❑
❑
❑
❑
F1
El
1-1
2010013
2010014
®
F1
F1
❑
❑
❑
2030041
A complete and accurate plot plan has been updated
and submitted - 23 CCR 16 2632(d)(1)(C), 2641(h),
2711(a) (8)
®
❑
❑
❑
° F1
❑
2010006
Owner /Operator has not made false statements,
certifications, or representations on any required
document - HSC 6.7 25299
19
NVO
F1
OUT
F1
NA
❑
UD
❑
COS
❑
RPT
SOC
Comments
2010003
Owner /Operator has a DO and /or informed the CUPA
of any change(s) within 30 days - 23 CCR 16 2715(a)
Degree
Violation No.
Testing
F\-7r
El
❑
❑
El
❑
2030002
Leak detection equipment tested by qualified service
technician annually - 23 CCR 16 2638(a) & (b), 26416),
2715(1)
❑
r
F-1
F-1
F-1
2030074
Annual Monitoring System Certification Form to the
CUPA within 30 days of completion of the test - 23
CCR 16 2638(d)
Underground Storage Tank - Double Wall Components
PAGE 2OP
Violation No.
Testing
NVO
OUT
NA
UD
COS
RPT
Degree
SOC
Comments
2030048
Secondary containment testing conducted every 36
months in accordance with requirements - 23 CCR 16
F-1
El
El
F-1
F-1
2010009
Secondary containment test results submitted to the
CUPA within 30 days after the test - 23 CCR 16
F-1
F1
F1
El
El
Ini
2030055
Spill bucket tested annually - HSC 6.7 25284.2
F]
F�
F
2030042
0.1 gph annual line test performed and passed for
pressurized piping without fail safe or shut down - 23
F-1
F�
Y
El
El
F�
2010005
ELD testing results sent to the board and the CUPA
within 60 days of completion of the test - 23 CCR 16
F�
F-1
Ni
F�
El
F�
2030064
CUPA was notified within 48 hours prior to testing -
0
El
F-1
F�
El
F-1
2030068
Initial or triennial ELD testing conducted on UST
system 1000' of public well - 23 CCR 16 2640(e),
F-1
F
LAJ
F�
F�
F-1
Violation No.
Install/Repair
NVO
OUT I
NA
UD
COS
RPT
Degree
SOC
comments
2060001
As-built plans for new installations and/or with the
permit application have been submitted - 23 CCR 16
F�
F�
F-1
El
F�
Violation No.
General Monitoring
NVO
OUT
NA
UD
COS
RPT
Degree
SOC
Comments
2030003
Leak detection system maintains continuous
monitoring that activates an audible and visual alarm
R
F-1
El
F-1
F-1
El
2030016
The annular space of the tank is continuously
monitored and activates an audible and visual alarm -
S
F-1
F-1
F�
F-1
F�
F-1
2030017
DW pressurized piping is equipped with Fail Safe &
Positive Shut Down in lieu of annual line testing - 23
leN
F-1
F-1
El
FI
F�
CCR 16 2636(0(5)
2030018
DOUble-walled pressurized piping is continuously
monitored with a system that activates an audible ser
and visual alarm or stops or the flow at the dispen
F-]
F-]
F_�
F-1
2030043
Leak detection equipment properly installed,
calibrated, operated, and maintained - 23 CCR 16
F-1
El
F�
0
El
F-1
2638(a), 26416)
2060005
UST system constructed with a monitoring system
capable of detecting entry into secondary
containment - HSC 6.7 29291(b)
F]
El
F-1
El
F-1
2060015
Leak detection equipment is located so that leak is
detected at the earliest possible opportunity - 23 CCR
5�
F�
F-1
El
F�
F-1
F�
2030062
Leak detection equipment has not been tampered
with or disabled - HSC 6.7 25299(a)(9)
F�
El
F�
F�
El
F
57030075
System is in compliance with Emergency Generator
Tank system Line Leak Detector exemption —
, F-1
El
F-1
F-1
El
Underground Storage Tank - Double Wall Components
PAGE 3 OF
Violation No.
conditions - 23 CCR 16 26360(6)
NVO
OUT
NA
UD
COS
RPT
Degree
SOC
Comments
2060022
System constructed with a monitoring system
capable of detecting entry of hazardous substance or
water into secondary containment - HSC 6.7
25290.2(d)
❑
F-1
El
F-1
F-1
F-1
❑
2060023
2030034
Tag /sticker on affixed monitoring equipment being
certified, repaired, or replaced - 23 CCR 16 26380
FKI
F-1
1-1
El
F-1
❑
containment - HSC 6.7 25290.1(d)
Violation No.
VPH Monitoring
NVO
OUT
NA
UD
COS
RPT
Degree
SOC
Comments
2030065
Interstitial space of the UST is under constant VPH
monitoring - HSC 6.7 25290.1(e)
❑
❑
❑
❑
❑
❑
2060023
System constructed with a monitoring system
capable of detecting entry of hazardous substance
liquid /vapor phase, or water into secondary
❑
[:1
F1
El
❑
containment - HSC 6.7 25290.1(d)
Violation No.
Line Leak Detector
NVO
OUT
NA
UD
COS
RPT
Degree
SOC
Comments
2060012
LLD installed on pressurized piping system - 23 CCR
16 26360(2); HSC 6.7 25290.1(h), 25290.2(8), 252910,
Yr
❑
❑
❑
❑
❑
❑
25292(e)
2030025
LLD on pressurized piping monitors at least hourly, is
able to detect a 3.0 gph leak, and restricts /shuts off
flow when leak detected - 23 CCR 16 26360(2)
E�
❑
❑
❑
❑
❑
❑
Violation No.
Secondary Containment
NVO
OUT
NA
UD
COS
RPT
Degree
SOC
Comments
2030008
Secondary containment installed after July 1, 2003 is
free of water - HSC 6.7 25290.1(c)(3), 25290.2(c)(3)
❑
❑
❑
❑
❑
Secondarily contained piping maintained to allow
liquid to flow into the sump in the event of a leak - 23
CCR 16 2630(d), 2641(x)
❑
F-1
F-1
❑
El
F-1
2030047
Secondary containment maintained tight and has
been confirmed by testing - HSC 6.7 25290.1(c),
25290.2(c), 25291(a)(2), 25292(e)
®
F-1
❑
F-1
❑
El
2060020
Spill bucket installed, is liquid tight, has 5 gal cap,
has functional drain valve or other means to remove
liquid, and is resistant to galvanic corrosion - 23 CCR
r;U
❑
❑
o
❑
❑
❑
16 2635(b)(1), 2665
Violation No.
Overfill
NVO
OUT
NA
UD
COS
RPT
Degree
SOC
Comments
2030035
UST system is operated to prevent unauthorized
release, including spills and overfills - HSC 6.7
❑
❑
❑
❑
❑
❑
25292.1(a)
2030036
Overfill prevention system has not been overridden
and meets overfill requirements - 23 CCR 16
❑
❑
F-1
El
❑
❑
2635(b)(2), 2665
Violation No.
Certifications
NVO
OUT
NA
UD
COS
RPT
Degree
SOC
Comments
2010007
Submit/maintain current Certificate of Financial
Responsibility /mechanism of financial assurance - 23
CCR 16 2711; 23 CCR 18 2808.1, 2809 - 2809.2; HSC 6.7
f�b
❑
❑
F1
❑
❑
25292.2; HSC 6.75 25299.30 - 25299.34
2030007
Positive statement of compatibility for UST system
components submitted and /or maintained - 23 CCR 16
F-1
❑
❑
❑
❑
26316), 2631.1(b)
Underground Storage Tank - Double Wall Components
PAGE 4 OF
Violation No.
Designated Operator
NVO
OUT
NA IUD
UD
COS
RPT
Degree
SOC
Comments
2010004
Copies of DO inspections for last 12 months
maintained - 23 CCR 16 2715(e)
❑
❑
❑ I
❑
❑
❑
2030001
2030020
Unburied fuel piping visually inspected at least
monthly and log kept - HSC 6.7 25281.5(b)(3)
Maintenance /Tests
2030013
Designated operator properly conducted the monthly
inspection and the reports are complete and all
inspection
facility employees have been properly trained - 23
CCR 16 2715(c)
NA
❑
F-1
❑
RPT
❑
El
Comments
Violation No.
2010012
UST records of monitoring, testing, repairing, and
closure maintained - HSC 6.7 25293
2030012
At least one employee is present during operating
hours that has received DO training - 23 CCR 16
2715(0
❑
El
❑
El
❑
❑
2010008
Monitoring, maintenance, repairs, linings, and
upgrade records maintained for life of UST - 23 CCR
16 2712(b)
✓
2010015
List of employees trained by the DO properly
maintained - 23 CCR 16 27150(3)
❑
1.0
❑
❑
❑
Violation No.
Permit Condition /Approval
NVO
Violation No.
Logs
Records of monitoring and maintenance (e.g. alarm
logs) and appropriate follow -up actions are
maintained - 23 CCR 16 2632, 2634, 2712(b)
NVO
OUT
NA
UD
COS
RPT
Degree
SOC
Comments
❑
❑
❑
❑
❑
❑
2030001
2030020
Unburied fuel piping visually inspected at least
monthly and log kept - HSC 6.7 25281.5(b)(3)
Maintenance /Tests
❑
NVO
❑
OUT
NA
❑
UD
❑
COS
❑
RPT
Degree
❑1
SOC
Comments
Violation No.
2010012
UST records of monitoring, testing, repairing, and
closure maintained - HSC 6.7 25293
❑
❑
❑
❑
2010008
Monitoring, maintenance, repairs, linings, and
upgrade records maintained for life of UST - 23 CCR
16 2712(b)
✓
❑
❑
❑
El
❑
F-1
Violation No.
Permit Condition /Approval
NVO
OUT
NA
UD
COS
RPT
Degree
SOC
Comments
2030078
Owner /Operator retained a copy of the permit to
operate at the facility - 23 CCR 16 2712(i)
UST Response Plan is available onsite - 23 CCR 16
2712(i)
UST Monitoring Plan maintained onsite - 23 CCR 16
2712(i)
Facility has a current written owner /operator
agreement - 23 CCR 16 2620(b); HSC 6.7 25284(a)(3)(A)
& (8)
Any unauthorized release from the primary
containment recorded - HSC 6.7 25294
Compliance with all operating permit requirements -
23 CCR 16 2712
UST system below ground connected to a E Gen
system maintained in accordance with
exclusion /exemption status - HSC 6.7 25281.6(a)
Na
ry
T�2
❑
❑
❑
❑
❑
❑
❑
El
❑
El
❑
F-1
❑
❑
F-1
❑
❑
❑
F-1
2030046
2030033
2030037
F]
Iii
L�
F-1
❑
Vill
❑
F-1
F-1
El
❑
❑
❑
❑
2030061
2030039
❑
❑
FV
❑
El
F-1
2030076
Tank system located in below grade structure meets
the exemption conditions - HSC 6.7 25283.5(a)
F-1
F-1
F-1
F-1
❑
2030014
Owner /Operator received approval and has
implemented a training program at an unstaffed
facility - 23 CCR 16 27151(2)
Facility exhibited that the methods used to monitor
the UST system meets the standards in 2643(f - 23
CCR 16 2630(d), 26430, 2644.1(a)(2)
❑
❑
F1
F1
❑
❑
❑
❑
❑
❑
2030015
Underground Storage Tank - Double Wall Components
PAGE 5 OF
2030073
Facility has corrected cited violations within 30 days
of receiving report - 23 CCR 16 2712(0)
❑
❑
NA
❑
❑
❑
Degree
SOC
Comments
2030066
2030077
Owner /Operator notified /prepared report upon
discovery of unauthorized release - 23 CCR 16
2650(e), 2652; HSC 6.7 25295(a)(1)
F]
F-1
L7
El
I
F-1
❑
F-1
2060027
Tank system primary containment is constructed,
operated, and maintained product -tight - 23 CCR 16
2631(a); HSC 6.725290.1(c)(1), 25290.2(c) (1), 25291(a)(1)
UST system is made of or lined with materials that
are compatible with the substance stored - 23 CCR 16
2631.1, 2660(m); HSC 6.7 25290.1(c)(1), 25290.2(c)(1),
25291(a)(1)
Violation No.
Red Tag
NVO
OUT
NA
UD
COS
RPT
Degree
SOC
Comments
2030045
Red Tag information is legible and has not been
removed or tampered with - 23 CCR 16 2717.1(g)
❑
❑
❑
❑
❑
❑
❑
2030044
Facility did not deposit or allow a deposit of
petroleum into a UST that has a red tag affixed to the
fill pipe - 23 CCR 162717.1(0)
❑
F-1
tZ
❑
❑
❑
❑
Violation No.
Tank Closure
NVO
OUT
NA
UD
COS
RPT
Degree
SOC
Comments
2030063
Facility is in compliance with temporary closure
requirements - 23 CCR 16 2630(d), 26430, 2644.1(e)(2)
❑
❑
❑
❑
❑
❑
❑
❑
2030038
UST system properly closed and complies with
permanent closure requirements - 23 CCR 16 2670,
2672; HSC 6.7 25298
General Facility Requirements
Administration /Documentation — General - 23 CCR 16
Multiple; HSC 6.7 Multiple
❑
OUT
El
F-1
F-1
RPT
Degree
SOC
Comments
Violation No.
Install /Repair
Repaired and retested the system due to a failed
ELD test when located within 1,000' of public well -
HSC 6.7 25292.4(d), 25292.5(c)
NVO
OUT
NA
UD
COS
RPT
Degree
SOC
Comments
2030066
❑
❑
[7,541
❑
❑
❑
2060027
Tank system primary containment is constructed,
operated, and maintained product -tight - 23 CCR 16
2631(a); HSC 6.725290.1(c)(1), 25290.2(c) (1), 25291(a)(1)
UST system is made of or lined with materials that
are compatible with the substance stored - 23 CCR 16
2631.1, 2660(m); HSC 6.7 25290.1(c)(1), 25290.2(c)(1),
25291(a)(1)
�
❑
El
❑
❑
❑
F-1
❑
F]
❑
F-1
2060024
2060021
Striker plate installed and positioned correctly - 23
CCR 16 2631(c), 2662(d)
�
❑
❑
❑
❑
❑
2060007
Primary and secondary containment designed and
constructed to an engineering specification - 23 CCR
16 2631(b), 2631(d)
�
❑
❑
❑
❑
❑
2060004
Corrosion protection installed for USTs and /or
cathodic protection system meets the consensus
standards - 23 CCR 16 2635(a)(2)(A), 2662(c)(1)(8)
Enhanced leak detection testing performed before
the tank is placed in use - HSC 67 25290.1Q)
❑
❑
❑
❑
❑
❑
2060008
❑
❑
�
❑
❑
❑
Violation No.
General Facility Requirements
Administration /Documentation — General - 23 CCR 16
Multiple; HSC 6.7 Multiple
NVO
OUT
NA
UD
COS
RPT
Degree
SOC
Comments
2010
❑
❑
❑
❑
❑
Underground Storage Tank - Double Wall Components
FACILITY NAME
INSPECTION DATE
INSPECTION TIME
V= Violation; 1,11 Minor
Violation
COMMENT
ADDRESS
PHONE NO.
NO OF EMPLOYEES
t !
APPROPRIATE PERMIT ON HAND (BMC :15.65.080)
FACILITY CONTACT
BUSINESS ID NUMBER
Consent to Inspect Name/Title
. 2 'S .SZ` }. �. r .a+ �.... a, +, �o. s. d we:.^.. � � ,�tf t?::., _�. •"L ' ` ».,. s '� .n.. . r ;s . �.,,
'v �.vR l ? '� �.. CC.. `,}" :o. M. .. ;.t ... h. ... • > £ a: ..:... :L ,. a � .... ,.. ... 1s� w �.Ex.r
wa`X, �...
., , ,.
k 13?x cLSd
ROUTINE ❑ COMBINED ❑ JOINTAGENCY ❑ MULTI- AGENCY. ❑ COMPLAINT ❑ RE- INSPECTION
C V - omp lance
OPERATION
CERS
V= Violation; 1,11 Minor
Violation
COMMENT
APPROPRIATE PERMIT ON HAND (BMC :15.65.080)
3010001
BUSINESS PLAN CONTACT INFORMATION ACCURATE (CCR: 2729.1)
1010008
VISIBLE ADDRESS (CFC: 505.1, BMC: 15.52.020)
CORRECT OCCUPANCY (CBC: 401)
NIP
VERIFICATION OF INVENTORY MATERIALS (CCR: 2729.3)
" 1010004
VERIFICATION OF QUANTITIES (CCR: 2729.4)
1010006
VERIFICATION OF LOCATION (CCR: 2729.2)
PROPER SEGREGATION OF MATERIAL (CFC: 2704.1)
VERIFICATION OF SDS AVAILABILITY (CCR:. 2729.2(3)(b))
VERIFICATION OF HAZ MAT TRAINING (CCR: 2732)
1020002
VERIFICATION OF ABATEMENT SUPPLIES & PROCEDURES (CCR: 2731(c))
EMERGENCY PROCEDURES ADEQUATE. (CCR: 2731)
1010010
CONTAINERS PROPERLY LABELED (CCR: 66262.34(f), CFC: 2703.5)
3030007
HOUSEKEEPING (CFC: 304.1)
FIRE PROTECTION .(CFC: 903 & 906)
3030032
SITE DIAGRAM ADEQUATE & ON HAND (CCR: 2729.2)
1010005
ANY HAZARDOUS WASTE ON SITE? J-90(ES ❑ NO
Signature of Recei tM�`�
�x
v
Ekpl.ain:
^w,,
Inspector:.°
POST INSPECTION INSTRUCTIONS:
• Correct the violation(s) noted above by
• Within 5 days of correcting all of the violations, sign and return a copy of this page to: Signature (that all violations have been corrected as noted)
Bakersfield Fire Dept., Prevention Services, 2101 H Street, California 93301
Date
Pre�
White — 'Business Copy Yellow— Station Copy s . Pik'', eri�ervices FD2155 (Rev 8//14)
HAZARDOUS WASTE BAKERSFIELD FIRE DEPARTMENT
UNIFIED PROGRAM CONSOLIDATED FORMS Prevention Services
I o 8 R S F E D 2101 H Street
SMALL QUANTITY HAZARDOUS PINE Bakersfield, CA 93301
WASTE GENERATOR INSPECTION Air phone: 661- 326 -3979 • Fax: 661 -852 -2171
Facility Name: / """`; t� t "ems Date:
Site-Address: - Time In: Time Out:
Owner /Operator: r t Phone: EPA ID # ", � 000 5^ ,? t`
Type of Inspection
Routine 0 Re- inspection/Follow -up' 0 Combined Routine Inspection 0 Joint Inspection 0 Complaint 0 Focused 0 Other
"'CONSENT TO INSPECT GRANTED BY (Name / Title): a 0 e- P14 (1 A ° 04Aj All� r
Inspection may involve obtaining photographs, review and copying of records, and determination of compliance with hazardous waste handling requirements.
M. V. 1
C = C
Cam l
lamt: v = Class I, R or inor io atton
N/A V
CERS
COMMENTS
Recordkee in documentation
Generator has an EPA ID number [HSC 25143.131 3
3010002
Contingency lan information posted near phone [CCR 66262.34(d)(2)] 3
3010022
Facility personnel demonstrate trainin awareness [CCR 66262.34(d)(2)] 3
3020001
Manifests/Consolidated Manifest recei is complete [CCR 66262.23(a)] 3
3010008
Blue co (s) of manifest mailed to DTSC [CCR 66262.23(a)(4)] 1
1 3
3010011
Bills of Ladin recei is available [CCR 66262.40(a)] 1
1 3
3010010
LDRs available and com lete CCR 66268.7(a)] 3
3030006
Onsite recycling reported using UPCF [HSC 25143.101 3
3030001
Container /tank management
Containers are in good condition CCR 66262.34@ 2 3
3030013
Containers are closed except when adding/removing [CCR66262.34(d )(2)] 3
3030017 :
: <
INSPECTOR °.
POST INSPECTION INSTRUCTIONS:
• Correct the violation(s) noted above by
• Within 5 days of correcting all of the violations, sign and return a copy of this page to:
Bakersfield Fire Dept., Prevention Services, 2101 H St. Bakersfield, CA 93301
White - Business Copy; Yellow= Station Copy
Signature (that all violations have been corrected as noted)
Date
Pink- Prevention Services Copy
FD2171 (Rev 9/14)