Loading...
HomeMy WebLinkAboutRES NO 187-17RESOLUTION NO. 187- 1 7 RESOLUTION OF THE CITY OF BAKERSFIELD ADOPTING THE TAFT HIGHWAY - FARMERS CANAL BRIDGE DISTRICT AND MAKING FINDINGS RELATIVE THERETO. (WARD 6) WHEREAS, by Resolution of Intention No. 1952, adopted November 15, 2017, a public hearing was called for December 13, 2017, at the hour of 5:15 pm in the Council Chambers in the City Hall, 1501 Truxtun Avenue, Bakersfield, California, regarding the establishment of the Taft Highway - Farmers Canal Bridge District; and WHEREAS, notice of such hearing has been given to all affected property owners as such are shown on the latest equalized assessment roll; and, WHEREAS, such hearing has been duly and regularly held, and all persons interested have been given an opportunity to appear and be heard. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Bakersfield as follows: 1. The foregoing recitals are true and correct and incorporated herein by reference. 2. The Taft Highway - Farmers Canal Bridge District has been identified in the circulation element of the 2010 General Plan. 3. The Taft Highway - Farmers Canal Bridge District is in addition to existing major thoroughfares serving the area. 4. No majority protest as to the formation of the Taft Highway - Farmers Canal Bridge District exists. 5. The Council hereby finds that, as to the Taft Highway - Farmers Canal Bridge District, as described in the plans and maps attached hereto and incorporated herein by reference, subdivision and development of property within each such area will require construction of facilities, described in each such area either on the basis of benefits conferred on property for subdivision or on the need for such facilities created by the proposed subdivision and development of other property within such area, and that the fees provided within the schedule attached, are fairly apportioned. 6. The Taft Highway- Farmers Canal Bridge District is hereby adopted. 0n KE9 S TROJEM \Bridge MsUicffaR Hwy- Faemels CanaMn w dmx C J' J P. IGI IJAI I HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the Council of the City of Bakersfield at a regular meeting thereof held on DEC 13 2017 , by the following vote: AYES: COUNCILMEMBER RIVERA. GON ALES, WEIR, SMITH, FREEMAN, SULLIVAN. PARAR NOES: COUNCILMEMBER *40t ABSTAIN: COUNCILMEMBER Non ABSENT: COUNCILMEMBER NtX%L. CHRISTOPHER RRY ACTING CITY CLERK and Ex Officio Clerk of the Council of the City of Bakersfield APPROVED: DEC 12 2017 By: KAREN GOH MAYOR of the City of Bakersfield APPROVED AS TO FORM: VIRGINIA GENNARO City AHorney By: ANDREW HEGLUND Deputy City Attorney Attachments: Exhibit "A" Cost Estimate Exhibit "B" Fee Schedule Exhibit "C" Limits of Improvements Exhibit "D" Benefit Area 6PKcq SVPROJECTSVBnd, [),.,61FaR Hw Fii mees CSnWVRes est dmx OO i o � OR191NFI FARMERS CANAL CROSSING EXPANSION BRIDGE & THOROUGHFARE DISTRICT Item No Item Description Canal Expansion Improvements L Double 64'RGJ -RCP extension 2. Misc Structural Conc.(Ie lfeadwalls, etc) 3. Demolition 8 disposal of existing headwalls 4. Rip Rap 5. 6' Chain Link Fence 6. 14' Opening Chainlink Gala Kern Delta Fees 7. Seepage Fee 8. Engineering 8 Legal Review Fees 9. Engineering 8 Legal Review Fees 20 % Contingency: TOTAL EXHIBIT A Data 8/182017 Job No: 17021 Prepared By: rrj Cry Unit Unit $ Rem $ 112 If 14.25 cy 15 tons 10 cy 94 If 4 Pair 56 If 1 Is 1 Is `oQPGFE5S /0,y N. C T a N C m OF CA 8' I 700.00 2500.00 500.0 12500 75.0 3800 00 Sub -Total 132.27 50000.00 soo.00 Sub -Total Total MCINTOSH & ASSOCIATES, CMI Engineers 8 LanO Survalas, 2001 Wheelan Court Bakersfield, California 93309 FARMERS CANAL CROSSING EST Page 1 oft 78,400 35,625 7,500 1,250 7,050 14,400 144,225 7,407 50,000 No 57,907 202,132 40,426 262,658 gAK£9 BONLY�RTGIfJ/�L� EXHIBIT B Taft Highway— Farmers Canal Bridge District Fee Schedule PROJECT COST PER ENGINEER'S ESTIMATE ..................................... ............................... ....................$242,558.00 BRIDGEDISTRICT AREA ............................................................... ............................... .........................542.85 ACRES PROJECT COST PER ACRE ($ 242, 558+ 542.85) $446.82 /ACRE YEAR FEE 2017 $ 446.82 2018 $ 446.82 2019 $ 460.22 2020 $ 474.03 2021 $ 488.25 2022 $ 502.90 2023 $ 517.99 2024 $ 533.53 2025 $ 549.53 2026 $ 566.02 2027 $ 583.00 2028 $ 600.49 2029 $ 618.50 2030 $ 637.06 2031 $ 656.17 2032 $ 675.86 Notes: 1. The fee shall apply to all properties within the Bridge District boundaries, regardless of zoning. 2. The fee for calendar years 2017 and 2018 is $446.82 /Acre. 3. Starting January 1, 2019, fee will be based upon an inflation factor of 3% annually. 4. The Fees are based and charged per the Net Acreage of each parcel as of September 26, 2017. gPNF9 'o c^ t]RIQiNnL EXHIBIT "C" NEW 6' CHAIN LINK FENCE NEW 14' CHAIN LINK GATE i/ 1 11 I 1 T I I 9G Ju SCALE 1" = 40' CINTOSH FARMERS CANAL CROSSING EXPANSION PROJECT CAM 6i 2017 MAJOR BRIDGE AND THOROUGHFARE DISTRICT FILE NO. 17021EMOI DONE BV: CROgers TAFT HIGHWAY I+EEr 1 o",a A \WAaHlzxz l\PRo \PRWEC.s\17 zlnW- DEMECSV -PRW� VM1917s\1702+EMO - CANU XINC UPANVDNDM 5 EX. CONC. HEADWALL ,NEW l l l II I I II I l I II I l II 1 11 I 1 T I I 9G Ju SCALE 1" = 40' CINTOSH FARMERS CANAL CROSSING EXPANSION PROJECT CAM 6i 2017 MAJOR BRIDGE AND THOROUGHFARE DISTRICT FILE NO. 17021EMOI DONE BV: CROgers TAFT HIGHWAY I+EEr 1 o",a A \WAaHlzxz l\PRo \PRWEC.s\17 zlnW- DEMECSV -PRW� VM1917s\1702+EMO - CANU XINC UPANVDNDM 5 ORIGINAL