Loading...
HomeMy WebLinkAbout3200 pan inspection report 2017_2-10Violation Program Requirement a o SOC Comments No o _ Q o CO (L 0)o z o z :D W o'> Testing 2030002 Owner /Operator has tested and certified leak ® ❑ ❑ F� ❑ ❑ None detection equipment annual) - 23 CCR 16 2638 2030048 Secondary containment testing conducted every 36 months in accordance ® ❑ ❑ ❑ ❑ ❑ None with requirements - 23 CCR 16 2637 2030055 Spill buckets have been tested annually as ® ❑ ❑ ❑ ❑ ❑ None required - HSC 6.7 25284.2 2010009 Secondary containment test results submitted to the CUPA within 30 days ® ❑ ❑ ❑ ❑ ❑ None after the test - 23 CCR 16 2637(e) 2030064 CUPA was poperly notified within the prescribed number of ® ❑ ❑ El ❑ D None hours prior to testing - 23 CCR 16 26370, 2638(e), 2643(g), 2644.1(a)(4) Install /Repair 2060009 Permits obtained to install, replace, repair, or ® ❑ El ❑ ❑ [] None modify part of the UST system - 23 CCR 16 2712 UST System Observation General Monitoring 2030003 Leak detection system maintains continuous RD monitoring that activates ® ❑ ❑ ❑ ❑ ❑ None ❑ an audible and visual Yes alarm - 23 CCR 16 2632, 2634, 2636, 2666 The annular space of the 2030016 tank, piping and sumps RD are continuously monitored and activates ❑ ❑ ❑ ❑ ❑ None ❑ the alarm - 23 CCR 16 Yes 2631(8), 2632(c)(2)(A) &(B), 2636 2030017 -2633(g), Product piping outside the UDC is fail -safe and shuts down the pump or ❑ ❑ ❑ ❑ ❑ None restricts flow - 23 CCR 16 2636(1) (5) Turbine sump monitor RD 2030018 activates an audible and visual alarm or stops the ❑ ❑ ❑ ❑ ❑ None ❑ flow of at the dispenser - Yes 23 CCR 16 26360(1) Underground Storage Tank Program - DW Inspection Report v 2.0