Loading...
HomeMy WebLinkAbout3200 pan inspection report 2017_3-10Violation Program Requirement i ° o SOC Comments No > _ a = o F- o z p z v o> 2030019 Monitoring system in the U DCs activates an audible and visual alarm ® ❑ ❑ ❑ ❑ ❑ None or stops the flow at the UDC -23 CCR 16 2636 (0(1) 2030043 Leak detection equipment RD properly programmed or properly operated - 23 ® ❑ F-] ❑ ❑ F-1 None F-1 CCR 16 2632, 2634, 2636, Yes 2666 2060005 System constructed with a monitoring system capable of detecting entry ® ❑ ❑ ❑ ❑ ❑ None into secondary containment - HSC 6.7 25291(b) 2060014 Correct leak detection equipment installed for RD the type of system ® ❑ ❑ ❑ ❑ ❑ None ❑ present - 23 CCR 16 2638, Yes HSC 6.7 25290.1, 25290.2, 25291 2060015 Sensor located in the RD proper position /location - ® ❑ ❑ ❑ ❑ ❑ None ❑ 23 CCR 16 2630(d), 2641(a) Facility is in compliance Yes 2030062 RD with not tampering with or ® ❑ ❑ ❑ ❑ ❑ None ❑ disabling leak detection devices or alarms - HSC Yes 6.7 25299 a 9 2060022 System constructed with a monitoring system capable of detecting entry Z ❑ ❑ ❑ ❑ ❑ None into secondary containment - HSC 6.7 25290.2 d 2030034 Tag /sticker on affixed monitoring equipment being certified, repaired, ❑ 1:1 El El E-1 None or replaced - 23 CCR 16 2638 VPH Monitoring VPH RD 2030065 Interstitial monitoring of the annular spaces of the ❑ ® ❑ ❑ ❑ None ❑ UST is properly maintained - HSC 6.7 Yes 25290.1 e 2060023 System constructed with a monitoring system capable of detecting entry into secondary ❑ ® ❑ ❑ ❑ None containment - HSC 6.7 25290.1(d) Underground Storage Tank Program - DW Inspection Report v 2.0