Loading...
HomeMy WebLinkAbout3200 pan inspection report 2017_4-10Violation Program Requirement i ,o SOC Comments No > = Z 0 (L O) Z O _ o> Line Leak Detector 2060012 Line leak detector installed on pressurized RD piping system - HSC 6.7 ® ❑ ❑ ❑ ❑ ❑ None ❑ 25290.1(h), 25290.2(8), Yes 25291(1), 25292(e), 2636(1) (2) 2030026 Line leak detectors detect a 3 gph leak and /or RD audible and visual alarm ® ❑ F-1 ❑ ❑ ❑ None function properly - 23 Yes CCR 16 2636(0(6), 2666(c) 2030027 Turbine shuts down when RD a leak is detected or when line leak detector is ❑ ❑ ® ❑ ❑ ❑ None ❑ disconnected - 23 CCR 16 Yes 2666 c 2030025 Pressurized piping able to detect a 3.0 gph leak RD within an hour, and ❑ ❑ ❑ ❑ ❑ None ❑ restricts the flow or Yes alarms - 23 CCR 16 26360 (2) Secondary Containment 2060010 UST storing a hazardous RD substance has secondary ® ❑ ❑ ❑ ❑ ❑ None ❑ containment - HSC 6.7 Yes 25292 Underground Storage Tank Program - DW Inspection Report v 2.0