Loading...
HomeMy WebLinkAbout3200 pan inspection report 2017_8-10Violation Program Requirement 4- 0 4) 0 SOC Comments No 0 > a (1) d a. 2 a)6 z 0 z D 0 W (5 > Red Tag 2030045 Red Tag information is legible and has not been ❑ F-1 Z ❑ ❑ ❑ None tampered with - 23 CCR 16 2717.1 (g) 2030044 Facility did not allow for deposit of petroleum into a UST that has a red tag None affixed to the fill - 23 CCR 162717.1(0 Install/Repair 2060024 UST system is made of or lined with materials that are compatible with the z None substance stored - 23 CCR 16 2631.1 2060021 Striker plate installed and positioned correctly - 23 Z None CCR 16 2631(c), 2662(d) Z There were no violations noted for thi� inspection. ❑This report shall serve as a "NOTICE TO COMPLY" for Minor Violations, and a "NOTICE OF VIOLATION" for Major violations. You are, hereby, ordered to correct the above noted violations within 30 days, or according to correction summaries provided. Formal enforcement and/or penalty assessment may be initiated for any violations noted, and for those not corre-ted in a timely manner. (NOTE: If this is a preliminary report, a final report will follow.) Inspectors Signature: Date: 19/4. Inspector: Enter # of Violations: RD: � RP: Check one box for facility Significant OpIT'Irational Status (SOC) to be reported to SWRCB and US EPA: ❑ SOC with both Release Detection and Release Detection (Facility has no Release Prevention and no Release Prevention Violations) ❑ Not in SOC (Facility has both Release Prevention and Release Detection Violations) ❑SOC with Release Detection only (Facility has no Release Detection violations but one or more Release Prevention violations) ❑ SOC with Release Prevention only (Fac lity has no Release Prevention violations but one or more Release Detection violations) Underground Storage Tank Program - DW Inspection Report V 2.0