HomeMy WebLinkAbout3300 white inspection report 2017_4-10Violation
Program Requirement
° ,o
SOC
Comments
No
_
Cl)
a� ca
0
Q
z
o
U
a
W
.o
Testing
2030002
Owner /Operator has
tested and certified leak
®
❑
❑
❑
❑
❑
None
detection equipment
annual) - 23 CCR 16 2638
2030048
Secondary containment
testing conducted every
36 months in accordance
®
❑
❑
❑
❑
❑
None
with requirements - 23
CCR 16 2637
2030055
Spill buckets have been
tested annually as
❑
❑
❑
❑
❑
None
required - HSC 6.7 25284.2
2010009
Secondary containment
test results submitted to
the CUPA within 30 days
®
❑
❑
❑
❑
❑
None
after the test - 23 CCR 16
2637(e
2030064
CU PA was poperly
notified within the
prescribed number of
❑
❑
❑
❑
❑
None
hours prior to testing - 23
CCR 16 2637(1), 2638(e),
2643(g), 2644.1(a)(4)
Install /Repair
2060009
Permits obtained to
install, replace, repair, or
®
❑
❑
❑
❑
❑
None
modify part of the UST
system - 23 CCR 16 2712
UST System Observation
General Monitoring
2030003
Leak detection system
maintains continuous
RD
monitoring that activates
❑
❑
❑
❑
❑
None
❑
an audible and visual
Yes
alarm - 23 CCR 16 2632,
2634, 2636, 2666
2030016
The annular space of the
tank, piping and sumps
RD
are continuously
monitored and activates
❑
❑
❑
E-]
❑
None
❑
the alarm - 23 CCR 16
Yes
2631(g), 2632(c)(2)(A) &(8),
2633(c), 2636
2030017
Product piping outside the
UDC is fail -safe and shuts
down the pump or
❑
❑
❑
❑
❑
None
restricts flow - 23 CCR 16
2636(0 (5)
2030018
Turbine sump monitor
RD
activates an audible and
visual alarm or stops the
❑
❑
❑
❑
❑
None
❑
flow of at the dispenser -
Yes
23 CCR 16 2636(0(1)
Underground Storage Tank Program - DW Inspecti n Report v 2.0