Loading...
HomeMy WebLinkAbout3300 white inspection report 2017_4-10Violation Program Requirement ° ,o SOC Comments No _ Cl) a� ca 0 Q z o U a W .o Testing 2030002 Owner /Operator has tested and certified leak ® ❑ ❑ ❑ ❑ ❑ None detection equipment annual) - 23 CCR 16 2638 2030048 Secondary containment testing conducted every 36 months in accordance ® ❑ ❑ ❑ ❑ ❑ None with requirements - 23 CCR 16 2637 2030055 Spill buckets have been tested annually as ❑ ❑ ❑ ❑ ❑ None required - HSC 6.7 25284.2 2010009 Secondary containment test results submitted to the CUPA within 30 days ® ❑ ❑ ❑ ❑ ❑ None after the test - 23 CCR 16 2637(e 2030064 CU PA was poperly notified within the prescribed number of ❑ ❑ ❑ ❑ ❑ None hours prior to testing - 23 CCR 16 2637(1), 2638(e), 2643(g), 2644.1(a)(4) Install /Repair 2060009 Permits obtained to install, replace, repair, or ® ❑ ❑ ❑ ❑ ❑ None modify part of the UST system - 23 CCR 16 2712 UST System Observation General Monitoring 2030003 Leak detection system maintains continuous RD monitoring that activates ❑ ❑ ❑ ❑ ❑ None ❑ an audible and visual Yes alarm - 23 CCR 16 2632, 2634, 2636, 2666 2030016 The annular space of the tank, piping and sumps RD are continuously monitored and activates ❑ ❑ ❑ E-] ❑ None ❑ the alarm - 23 CCR 16 Yes 2631(g), 2632(c)(2)(A) &(8), 2633(c), 2636 2030017 Product piping outside the UDC is fail -safe and shuts down the pump or ❑ ❑ ❑ ❑ ❑ None restricts flow - 23 CCR 16 2636(0 (5) 2030018 Turbine sump monitor RD activates an audible and visual alarm or stops the ❑ ❑ ❑ ❑ ❑ None ❑ flow of at the dispenser - Yes 23 CCR 16 2636(0(1) Underground Storage Tank Program - DW Inspecti n Report v 2.0