HomeMy WebLinkAbout3300 white inspection report 2017_6-10Violation
Program Requirement
4.,
0 o
SOC
Comments
No
_
Q
o
CO
CL
o CO
0 o
Z
o
z
0
W
a�
Line Leak Detector
2060012
Line leak detector
installed on pressurized
RD
piping system - HSC 6.7
❑
❑
❑
❑
❑
None
F1
25290.1(h), 25290.2(8),
Yes
25291(f), 25292(e),
2636(1) (2)
2030026
Line leak detectors detect
a 3 gph leak and /or
RD
audible and visual alarm
❑
❑
❑
❑
❑
None
function properly - 23
Yes
CCR 16 2636(0(6),
2666(c)
2030027
Turbine shuts down when
a leak is detected or
RD
when line leak detector is
❑
®
❑
❑
❑
None
❑
disconnected - 23 CCR 16
Yes
2666 c
2030025
Pressurized piping able to
detect a 3.0 gph leak
RD
within an hour, and
®
❑
❑
❑
❑
❑
None
❑
restricts the flow or
Yes
alarms - 23 CCR 16
2636(0 (2)
Secondary Containment
2060010
UST storing a hazardous
RD
substance has secondary
❑
❑
❑
❑
❑
None
❑
containment - HSC 6.7
Yes
25292
Underground Storage Tank Program - DW Inspection Report v 2.0