HomeMy WebLinkAbout5634 stine inspection report 2017_9-10Violation
Program Requirement
° o
SOC
Comments
No
D
0
Q
z
o
O
a
o
Logs
2030001
Leak detection alarm
logs, maintenance and
RD
records of appropriate
❑
❑
❑
❑
❑
None
❑
follow -up actions
Yes
maintained - 23 CCR 16
2632, 2634, 2712(b)
Maintenance /Tests
2010008
Monitoring, maintenance,
repairs, linings, and
RD
upgrade records
❑
❑
❑
❑
❑
None
❑
maintained for the proper
Yes
time period - 23 CCR 16
2712(b)
Documentation
2030033
Failure to maintain on site
an approved monitoring
❑
❑
❑
❑
❑
None
plan - 23 CCR 16 2632,
2634, 2711, 2712(1)
2030037
Written agreement
between the tank owner
and tank operator to
monitor the tank system
❑
❑
❑
❑
❑
None
is maintained - 23 CCR 16
2620(b); HSC 6.7
25284 a 3
2030061
Suspected or actual
RD
unauthorized release
reported in appropriate
E
I
❑
®
❑
❑
❑
None
❑
time frame - HSC 6.7
Yes
29294, 29295
eneral Operating Requirements
Permit Condition /Approval
2030039
Compliance with all
operating permit
❑
❑
❑
❑
❑
None
conditions - 23 CCR 16
2712; HSC 6.7 25299
2030059
UST system maintained
in accordance with
exclusion /exemption
❑
❑
❑
❑
❑
None
status - HSC 6.7 25281.6,
25283.5
2030014
Owner /Operator received
approval and has
implemented a training
❑
®
❑
❑
❑
None
program at an unstaffed
facility - 23 CCR 16
2715 (0(2)
2030015
Facility exhibited that the
method used to monitor
the tank meets the
monitoring methods in
❑
❑
❑
❑
❑
None
2643(f) - 23 CCR 16 2643
Underground Storage Tank Program - DW
Inspection Report
V 2.0