Loading...
HomeMy WebLinkAboutPM 3509 and 3001 Panama Commercial Sewer StudySEWER STUDY FOR Commercial Development Parcel Map No. 3509 Near Panama Lane and State Hwy 99 Bakersfield, California 93313 Project # 14036.00 July 2017 Prepared for: Marshall E. Helm Corp 2739 Panama Lane Bakersfield, CA 93313 Contact: James LaMar (661) 324-9701 Prepared By: David Fidelino Checked By: Blaine S. Neptune R.C.E. 55102 2001 Wheelan Court Bakersfield, CA 93309 (661) 834-4814 2017 Commercial Development (Parcel Map No. 3509) SEWER STUDY 2 Objective The objective of this study is as follows: 1)The purpose of this study is to determine the difference of sewer discharge from the initially zoned R-1 to a proposed zoning of commercial 2)To determine the downstream effects of any additional sewer discharge to the existing sewer line on Panama Lane and Stine Road. Existing Facilities The site is currently undeveloped and surrounded by undeveloped R-1 zoned land to the south. Cruz Thru Express Car Wash (to the west), Greenlawn Mortuary (to the east), and Panama Lane (to the north) are existing proprieties and not a part of these improvements. A 24” sewer main line runs westerly along Panama Lane towards the Stine Road Trunk Line on westerly side of Stine Road. This trunk line ultimately discharges south to the McCutchen Trunk and ultimately to the Wastewater Treatment Plant #3. Planned Land Uses The future commercial, formerly zoned R-1, will be a portion of an overall commercial future development, 13.00 acres. Results The proposed development will tie into the existing 24” sewer, located on the north side of Panama Lane. The sewer system within the proposed commercial parcel will be analyzed as part of a separate study. Based on our calculations in the enclosed spreadsheet, the future commercial is expected to generate 0.131 cfs (58.815 gpm) of peak sewer flow. The most an R-1 zoned residential would generate is 0.140 cfs (62.960 gpm), assuming 6,000 sq-ft lots. Thus an additional 42.066 gpm will discharge into the sewer system due to the zone change. Sewer monitoring was done at two intersections downstream from the proposed tie-in point, Panama Lane & Stine Road and Stine Road & McCutchen Road. The analysis measured the velocity (fps) and level (in) of discahrge in the pipe during a span of several days. This service was required to determine the existing flow running through this point in the overall sewer system. Based on this information, the monitor calculated the average, maximum, and minimum flow (gpm) in each sewer manhole. The first monitoring location is a sewer manhole located at the northeasterly corner of the intersection of Panama Lane and Stine Road. Based on City GIS, a 27-in pipe is tributary to this manhole which peaked at 16.4 inches with a max velocity of 1.23 fps. The monitor calculated an existing flow of 1415.204 gpm (3.15 cfs) at this manhole. The Commercial Development (Parcel Map No. 3509) SEWER STUDY 3 next monitoring location is a sewer manhole located north of the intersection of McCutchen Road and Stine Road. Based on City GIS, a 30-in pipe is tributary to this manhole which peaked at 16.2 inches with a max velocity of 4.68 fps. The monitor calculated an existing flow of 5019.429 gpm (11.18 cfs) at this manhole. Calculations have been provided to illustrate these monitored conditions. The developed commercial site would increase the flow to 3.28 cfs (1474.019 gpm) for the 27-in pipe and 11.31 cfs (5078.244 gpm) for the 30-in pipe. The calculations show the amount of flow each pipe will convey with the proposed site. AS-Builts were not available thus an assumption of 0.03% (27 inch) and 0.17% (30 inch) was used for the pipe slope in these calculations. These assumptions were dictated by the measured velocity through the pipe at peak flow. Another set of calculations shows the amount of discharge required for the pipe to be flowing full at 8/10ths depth. The capacity flows are 4.29 cfs for the 27-in pipe and 19.50 cfs for the 30-in pipe. Location of Pipe Max Flow Max Flow Pipe Excess Sewer Manhole Size from Monitor with Project Capacity Capacity Panama Lane 27 inch 3.15 cfs 3.28 cfs 4.29 cfs 1.01 cfs Stine Road 30 inch 11.18 cfs 11.31 cfs 19.50 cfs 8.19 cfs Based on the City GIS, most of the area tributary to the monitored locations are existing residential/commercial properties or under construction. Thus based on these results this proposed development should not exceed the 8/10ths depth for both pipes and adversely affect sewer capacity for future projects. C.E.Q.A. Compliance Development of the proposed project will not result in significant impacts to the existing and proposed sewer collection and treatment facilities. The development will be serviced by the City of Bakersfield’s Wastewater Treatment Plant No. 3 which currently has a capacity of 32.0 million gallons per day. Commercial Development (Parcel Map No. 3509) SEWER STUDY 4 Vicinity Map ________________________________ ____________________________________________________________Not to Scale PROPOSEDCOMMERCIAL SITE SE W E R S T U D Y 7/ 2 6 / 1 7 Gr e e n l a w n P r o j e c t Mi n i m u m V e l o c i t y F u l l : 2 Ma n i n i n g s " n " : 0 . 0 1 1 SE R V I C E L a n d D E N . A R E A E . D . U . A v e r a g e A v e r a g e A v e . R e s . P e a k D e s i g n AR E A Us e DU / A C ac r e s cf s / a c Fl o w , c f s Fl o w , c f s Fa c t o r Fl o w , c f s Co m m e r c i a l Z o n e C N / A 1 3 . 0 0. 0 0 5 6 0 0 . 0 7 2 8 0 1 . 8 0 0 0 . 1 3 1 58 . 8 1 5 R- 1 Z o n e SF 1 3 . 0 9 5 0. 0 3 8 1 9 3 . 6 7 3 0 . 1 4 0 62 . 9 6 0 -4 . 1 4 6 13 . 0 0 ac r e s 6, 0 0 0 sq . f t . l o t 95 E. D . U . 16 . 3 8 i n c h e s 1 4 1 5 . 2 0 4 g p m = 3 . 1 5 cf s 14 1 5 . 2 0 4 + 5 8 . 8 1 5 = 1 4 7 4 . 0 1 9 g p m = 3 . 2 8 cf s 15 . 8 6 in c h e s 50 1 9 . 4 2 9 gp m = 11 . 1 8 cf s 50 1 9 . 4 2 9 +5 8 . 8 1 5 = 50 7 8 . 2 4 4 gp m = 11 . 3 1 cf s NO T E S : 1) E x i s t i n g P i p e S i z e s w e r e o b t a i n e d f r o m C i t y G I S 2) E x i s t . F l o w i s t h e m a x i m u m r e c o r d e d f l o w b a s e d o n t h e s e w e r m o n i t o r i n g r e s u l t s ( a t t a c h e d ) Le v e l i n E x i s t . P i p e E x i s t . F l o w i n E x i s t . P i p e St i n e R o a d ( E x . 3 0 " S e w e r ) Fu t u r e R e s i d e n t i a l ( R - 1 Z o n e ) << < D i r e c t F l o w ( g p m ) i n t o E x i s t . 2 4 " o n P a n a m a L a n e << < D i r e c t F l o w ( c f s ) i n t o E x i s t . 2 4 " o n P a n a m a L a n e Pa n a m a L a n e ( E x . 2 4 " S e w e r ) Ca l c u l a t e d E . D . U . << < D i f f e r e n c e T r i b u t a r y F l o w ( g p m ) Pr o p o s e d F l o w Ex i s t i n g P i p e L o c a t i o n << < D i r e c t F l o w ( c f s ) i n t o E x i s t . 2 4 " o n P a n a m a L a n e << < D i r e c t F l o w ( g p m ) i n t o E x i s t . 2 4 " o n P a n a m a L a n e Ty p e o f D e v e l o p m e n t T o t a l A r e a A s s u m e d A v g . L o t S i z e P: \ P R O J E C T S \ 1 4 0 3 6 . 0 0 - G R N L A W N \ S t u d i e s \ S e w e r \ C a l c u l a t io n s \ 1 4 0 3 6 S S 0 1 . x l s 7 Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Monday, Oct 2 2017 <Name> Circular Diameter (ft) = 2.25 Invert Elev (ft) = 1.00 Slope (%) = 0.02 N-Value = 0.013 Calculations Compute by: Known Q Known Q (cfs) = 3.15 Highlighted Depth (ft) = 1.41 Q (cfs) = 3.150 Area (sqft) = 2.63 Velocity (ft/s) = 1.20 Wetted Perim (ft) = 4.12 Crit Depth, Yc (ft) = 0.60 Top Width (ft) = 2.17 EGL (ft) = 1.43 0 1 2 3 4 Elev (ft)Section 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 Reach (ft) <Existing Peak Flow measured from the Monitoring Device - Ex. 27" Pipe> Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Monday, Oct 2 2017 <Name> Circular Diameter (ft) = 2.25 Invert Elev (ft) = 1.00 Slope (%) = 0.02 N-Value = 0.013 Calculations Compute by: Known Q Known Q (cfs) = 3.28 Highlighted Depth (ft) = 1.46 Q (cfs) = 3.280 Area (sqft) = 2.73 Velocity (ft/s) = 1.20 Wetted Perim (ft) = 4.22 Crit Depth, Yc (ft) = 0.61 Top Width (ft) = 2.15 EGL (ft) = 1.48 0 1 2 3 4 Elev (ft)Section 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 Reach (ft) <Name><Existing plus Proposed Flows in the existing 27" Pipe on Panama Lanee Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Monday, Oct 2 2017 <Name> Circular Diameter (ft) = 2.25 Invert Elev (ft) = 1.00 Slope (%) = 0.02 N-Value = 0.013 Calculations Compute by: Known Q Known Q (cfs) = 4.29 Highlighted Depth (ft) = 1.801 Q (cfs) = 4.290 Area (sqft) = 3.44 Velocity (ft/s) = 1.25 Wetted Perim (ft) = 5.02 Crit Depth, Yc (ft) = 0.71 Top Width (ft) = 1.78 EGL (ft) = 1.83 0 1 2 3 4 Elev (ft)Section 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 Reach (ft) <Pipe Capacity at 8/10 Depth for existing 27" Pipe on Panama Lane> Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Wednesday, Jul 12 2017 <Existing Peak Flow measured from the Monitoring Device - Ex. 30" Pipe Circular Diameter (ft) = 2.50 Invert Elev (ft) = 1.00 Slope (%) = 0.17 N-Value = 0.011 Calculations Compute by: Known Q Known Q (cfs) = 11.18 Highlighted Depth (ft) = 1.34 Q (cfs) = 11.18 Area (sqft) = 2.69 Velocity (ft/s) = 4.16 Wetted Perim (ft) = 4.11 Crit Depth, Yc (ft) = 1.12 Top Width (ft) = 2.49 EGL (ft) = 1.61 0 1 2 3 4 Elev (ft)Section 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Wednesday, Jul 26 2017 <Name> Circular Diameter (ft) = 2.50 Invert Elev (ft) = 1.00 Slope (%) = 0.17 N-Value = 0.011 Calculations Compute by: Known Q Known Q (cfs) = 11.31 Highlighted Depth (ft) = 1.35 Q (cfs) = 11.31 Area (sqft) = 2.72 Velocity (ft/s) = 4.16 Wetted Perim (ft) = 4.14 Crit Depth, Yc (ft) = 1.13 Top Width (ft) = 2.49 EGL (ft) = 1.62 0 1 2 3 4 Elev (ft)Section 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 Reach (ft) <Name><Existing plus Proposed Flows in the existing 30" Pipe on Stine Road> Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Wednesday, Jul 12 2017 <Pipe Capacity at 8/10 Depth for existing 30" Pipe on Stine Road Circular Diameter (ft) = 2.50 Invert Elev (ft) = 1.00 Slope (%) = 0.17 N-Value = 0.011 Calculations Compute by: Known Q Known Q (cfs) = 19.50 Highlighted Depth (ft) = 2.00 Q (cfs) = 19.50 Area (sqft) = 4.21 Velocity (ft/s) = 4.63 Wetted Perim (ft) = 5.54 Crit Depth, Yc (ft) = 1.50 Top Width (ft) = 2.00 EGL (ft) = 2.33 0 1 2 3 4 Elev (ft)Section 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 Reach (ft) REFERENCE EX. 24"S EX. 24"S EX. 24"S EX. 24"S EX. 24"S EX. 24"S EX. 24"SEX. 24"S EX. 24"S