HomeMy WebLinkAboutRES NO 013-18RESOLUTION NO. 013-18
RESOLUTION OF THE CITY OF BAKERSFIELD _
ADOPTING THE EAST PANAMA LANE - CENTRAL
CANAL (NORTH HALF) BRIDGE DISTRICT AND
MAKING FINDINGS RELATIVE THERETO. (WARD 1)
WHEREAS, -by Resolution of Intention No. 1957, adopted February 7, 2018, a public
hearing was called for February 21, 2018, at the hour of 5:15 pm in the Council Chambers
in the City Hall, 1501 Truxtun Avenue, Bakersfield, California, regarding the establishment of
the East Panama Lane - Central Canal (North Half) Bridge District; and
WHEREAS, notice of such hearing has been given to all affected property owners as
such are shown on the latest equalized assessment roll; and,
WHEREAS, such hearing has been duly and regularly held, and all persons interested
have been given an opportunity to appear and be heard.
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Bakersfield as follows:
1. The foregoing recitals are true and correct and incorporated herein by reference.
2. The East Panama Lane - Central Canal (North Half) Bridge District has been
identified in the circulation element of the 2010 General Plan.
3. The East Panama Lane - Central Canal (North Half) Bridge District is in addition to
existing major thoroughfares serving the area.
4. No majority protest as to the formation of the East Panama Lane - Central Canal
(North Half) Bridge District exists.
5. The Council hereby finds that, as to the East Panama Lane - Central Canal (North
Half) Bridge District, as described in the plans and maps attached hereto and
incorporated herein by reference, subdivision and development of property within
each such area will require construction of facilities, described in each such area
either on the basis of benefits conferred on property for subdivision or on the need
for such facilities created by the proposed subdivision and development of other
property within such area, and that the fees provided within the schedule
attached, are fairly apportioned.
6. The East Panama Lane - Central Canal (North Half) Bridge District is, hereby
adopted.
SAPROJECTS\Bridge District\East Panama Ln - Central Canal\Res est.docx
0AKF9N
Fr-
V
OR;G;NAL
I HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the
Council of the City of Bakersfield at a regular meeting thereof held on
FEB 2 1 , by the following vote:
AY COUNCILMEMBER IVB$. GONZALES,WEIR, SMITH, FREEMAN, SULLIVAN, PARLIER
NOES: COUNCILMEMBER[]f�C
COUNCILMEMBER NUIVE
BSENi: COUNCILMEMBER
CHRISTOPHER SERRY
ACTING CITY CLERK and Ex Officio Clerk
of the Council of the City of Bakersfield
APPROVED:
FEB 2 1 2011
By:
KAREN OH
99z -
MAYOR of the City of Bakersfield
APPROVED AS TO FORM:
VIRGINIA GENNARO
City AHorne r
8y:
ANDREW HEGLUND
Deputy City Attorney
Attachments:
Exhibit "A" Cost Estimate
Exhibit "B" Fee Schedule
Exhibit "C" Limits of Improvements
Exhibit "D" Benefit Area
S\PROJECTS\Bridge M'ti East Panama Ln - CmInal Canal\Res escdmx oF0AXF9m
? T
ti m
U p
OFIIAJNwF
EXHIBIT A
EAST PANAMA LANE - CENTRAL
CANAL (NORTH HALF)
BRIDGE DISTRICT
Data:
Job No:
Prepared By:
1/212018
17-0 1
JKD
Item Na. Item Description
Qty
Unit
Unit $
Item $
Carol Expansion lmprovamares
1. Double 60-RGJ42CP extension
34.5
1
60000
20,700
2, Ni.c Stmetural Cone.oe HeaAvalls, etc)
24.8
q
250000
62,000
3. Damellllan& deposal of existing headwalls
13.3
Ions
600.00
6,650
4. S Chain Link Fence
22
ti
75.00
1,650
5. 14' Opening Chainink Gate
1
Pair
3600.00
3,600
Sub -Total
94,600
Kam Delta Foes
6. $eepage Loa. Fee
35
If
24947
8,731
7. Plan Review Fee
1
Ie
5000.00
5,000
8, Encroachment Permit
1
Is
500.00
500
Sub -Total
14,231
Engineering and Surveying
1
Is
10,000.00
10,000.00
Total
118,831
20 %Contingency:
23,766
TOTAL
142,597
o``gAKF9N
MCI NTOSH St ASSOCIATES, CHfi Engineers 8 Lad Sumyors, 2601 wTesbo Coun, Bakersfield, CNifor 93309 m
Copy of EASTSIDE CANAL CROSSING EST - revised 1-2-2018 Pagel of 1 BOND EZ p
ARI®INAL
EXHIBIT B
EAST PANAMA LANE — CENTRAL CANAL (NORTH HALF) BRIDGE DISTRICT
FEE SCHEDULE
PROJECT COST PER ENGINEER'S ESTIMATE
BRIDGE DISTRICT AREA.................................................................................................. 79.99 ACRES
PROJECT COST PER ACRE ($242,558 / 542.851 .......... ............................................... 51,782.68/ACRE
YEAR
FEE
2018
$1,782.68
2019
$1,782.68
2020
$1,836.16
2021
$1,891.25
2022
$1,947.98
2023
$2,006.42
2024
$2,066.61
2025
$2,128.61
2026
$2,192.47
2027
$2,258.25
2028
$2,325.99
2029
$2,395.77
2030
$2,467.65
2031
$2,541.68
2032
$2,617.93
2033
$2,696.46
Notes:
1. The fee shall apply to all properties within the Bridge District boundaries, regardless of zoning.
2. The fee for calendar years 2018 and 2019 is $1,782.68/ac.
3. Starting January 1, 2020, fee will be based upon an inflation factor of 3% annually.
4. The Fees are based and charged per the Gross Acreage of each parcel as of January 2, 2018.
SOA
O
> q
Z5 AF
QRIQINAL
EXHIBIT "C'
C 3
PARCH 4
P.M. NO. -1 2
P I
P.M. BK. 55. Pas.
"N A,
N E
BL CK
WHIGH
8 ALL
NEW
f HEA 4XLC
PROPOSED
ULTIMATE CLAB & GUTTER
EASTAND SIDEWALK
PANAMA LANE 3 i REMOVE
L11
I EK CONE.,
TO REI*IN
40 10 SCALE: 1" - 40'
1
MCINFM GATEWAY HOUSING, LLC DATE: 01/02/1 8
&A&%xw5 EAM PANAMA LANE -CENTRAL CANAL (NORTH HALF) FILE NO. 17041EM0I
61 DONE BY JOB NO. 17-04
FBT R';
lw.ozT;.u=Z.7Z MIDGE DISTRICT SHEET I OF do
AR'QIm4I-
OVOH a0OMN01103
b
d
�
o
s
OVOH a0OMN01103
3 N3NV WINO 'S
0
z
-
o
n
m
N
U
dye
I�Z�
ti
N
m
a N
Q
—
N
0
a
m
WNVB IVNLND
0
r 6
I z
a ad w
pns�
«an
SN21VdSz<ZQ
dIn133MS
w
ma
s
aw
<
g:
31
a
e
r
�
0
w
o
a
gS
:m
p
<�
Ofl
f
a
3 N3NV WINO 'S