HomeMy WebLinkAboutZM_103-04COUNTY
CITY
PanoramaVistaPreserve
B E A R D S L E Y C A N A L
JUNCTIONRD
C H I N A GRADE LOOP
FP-SFP-S
A
A A
A
CITY OF BAKERSFIELD
LEGENDLEGEND
ITALIC ZONING DESIGNATIONS = PRE-ZONED COUNTY
82-32 82-33 82-3482-31
103-04 103-02103-03103-05103-06
103-11103-08 103-09 103-10103-07
103-14103-15103-16103-18 103-17
0 400 800
Feet
R-1 ONE FAMILTY DW ELLING ZONE - 6,000 SQ. FT. MINIMUM LOT SIZE
E ESTATE ZONE - 10,000 SQ. FT. MINIMUM LOT SIZE
R-S RESIDENTIAL SUBURBAN ZONE - 24,000 SQ. FT/DW ELLING UNIT
R-S-1A RESIDENTIAL SUBURBAN ZONE - 1 ACRE MINIMUM LOT SIZE
R-S-2.5A RESIDENTIAL SUBURBAN ZONE - 2-1/2 ACRE MINIMUM LOT SIZE
R-S-5A RESIDENTIAL SUBURBAN ZONE - 5 ACRE MINIMUM LOT SIZE
R-S-10A RESIDENTIAL SUBURBAN ZONE - 10 ACRE MINIMUM LOT SIZE
R-2 LIMITED MULTIPLE FAMILY DW ELLING ZONE - 4,500 SQ. FT. MIN. LOT SIZE (SINGLE FAMILY) 6,000 SQ. FT. MIN LOT SIZE (MULTI-FAMILY) 2,500 SQ. FT. LOT AREA/DW ELLING UNIT
R-3 MULTIPLE FAMILY DWELLING ZONE - 6,000 SQ. FT. MINIMUM LOT SIZE 1,250 SQ. FT. LOT AREA/DW ELLING UNIT
R-4 HIGH DENSITY MULTIPLE FAMILY DW ELLING ZONE - 6,000 SQ. FT. MINIMUM LOT SIZE 600 SQ. FT. LOT AREA/DW ELLING UNIT
R-H RESIDENTIAL HOLDING ZONE - 20 ACRE MINIMUM LOT SIZE
A AGRIGULTURE ZONE - 6,000 SQ. FT. MINIMUM LOT SIZE
A-20A AGRICULTURE ZONE - 20 ACRE MINIMUM LOT SIZE
P.U.D.PLANNED UNIT DEVELOPMENT
TT TRAVEL TRAILER PARK ZONE
MH MOBILEHOME ZONE
C-O PROFESSIONAL AND ADMINISTRATION OFFICE ZONE
C-1 NEIGHBORHOOD COMMERCIAL ZONE
C-2 REGIONAL COMMERCIAL ZONE
C-C COMMERCIAL CENTER ZONE
C-B CENTRAL BUSINESS ZONE
P.C.D.PLANNED COMMERCIAL DEVELOPMENT ZONE
M-1 LIGHT MANUFACTURING ZONE
M-2 GENERAL MANUFACTURING ZONE
M-3 HEAVY INDUSTRIAL ZONE
P AUTOMOBILE PARKING ZONE
RE RECREATION ZONE
CH CHURCH OVERLAY ZONE
OS OPEN SPACE ZONE
HOSP HOSPITAL OVERLAY ZONE
AD ARCHITECTURAL DESIGN OVERLAY ZONE
FP-P FLOODPLAIN PRIMARY ZONE
FP-S FLOODPLAIN SECONDARY ZONE
AA AIRPORT APPROACH ZONE
DI DRILLING ISLAND ZONE
PE PETROLEUM EXTRACTION COMBINING
SC SENIOR CITIZEN OVERLAY ZONE
HD HILLSIDE DEVELOPMENT COMBINING ZONE
CITY LIMITS
Date: 2018-05-22
103-04