HomeMy WebLinkAbout2.7-129LIST OF DRAWINGS
CONVENTIONAL SYMBOLS
— — — — — EXIST. CURB do GU TIER
-- - - - - - - - - - - - -- EXIST A.C. FLOWLINE
EXIST. EDGE OF PAVEMENT
GUARD RAIL
IMPRO VEMEN IS
EA SEMEN T
- - RI GH T- OF- WA Y
CEN TERL INE
RAILROAD TRACKS
x CHAIN LINK FENCE
w
G
❑H
TV
n
L-1
M.H.
0
P.P.
...E
PIER CAP STRENGTHEN/NG
FOR
BEALE AVENUE OVERCROSSING
UTILITY SYMBOLS
EXIST WATER LINE
EXIST GAS LINE
EXIST AERIAL
LINES
EXIST UNDERGROU D
TV CABLES
EXIST OIL LINE
MANHOLE
POWER POLE
EXISTING MONUMENT
FUTURE MONUMEN T
STREET LIGHT
STREET LIGHT W/MAST , RM
CLEAN OUT
^F
W.M.
El
® G.M.
S
SD
E
T
F❑
FIRE HYDRANT
WATER METER
WATER VALVE
GA S METER
GAS VALVE
BENCHMARK
A U TO SCOPE
EXIST SEWER LINE
EXIST STORM DRAIN
EXIST UNDERGROUND
POWER LINE
EXIST UNDERGROUND
PHONE LINE
EXIST FIBER OPTIC LINE
PRE-EMPTION DEVICE
(BRIDGE No. SOC -0 973)
LOCATION MAP
NOT TO SCALE
FINAL PAY QUANTITIES
PRESTRESSING STEEL 3, 400 LBS
(1 %4" O GAL V POST- TENSIONING BARS)
BEALE AVENUE
OVERCROSSING
m
2,7,12.,"
11 09-18-09
STATE OF CALIFORNIA
NO TE. -
THE CONTRACTOR MUST POSSESS THE FOLLOWING
VALID LICENSES:
CL4ss A
NO TE. -
THE CON TRA C TOR SHALL CONTACT THE USA L OCA TOR
SERVICE 1-800-642-2444, 48 HOURS PRIOR TO
EXCA VA TION.
QROFESS/
WARREN A. MINNER ?,
No. 863 ;;0
xp. 2-31
`�� STRUCTURAL �P
qTF of CA-\F���
fN
Z
I
Lij
APPROVED BY= �
RAUL M. RCJAS, R.C.E. 39800, EXPIRES 12-31-11 DATE �Ny
PUBLIC WORKS DIRECTOR
Q.
APPROVAL RECOMMENDED BY:
A SISTAN PUBLIC WORKS DIRECTOR DATE i
I �
CIVIL ENGINEER IV — D SIGN ENGINEERING DATELu
! Ld
co
TRAFFIC ENGINEERINC
PIER CAP STRENGTHENING
FOR
BEALE AVENUE OVERCROSS/NG
NO
OF
6
SHEETS
0 1 2 3
SHEET 1 TI TLE
SHEET
SHEET 2 GENE
AL PLAN
SHEET 3 STRENGTHENING
DETAILS No. 1 - PIER 4
SHEET 4 STRENGTHENING
DETAILS No. I - PIER 5
SHEET 5 STRENGTHENING
DETAILS No. 1 - PIER 6
SHEET 6 GENE
AL NOTES
STATE STANDARDS
A I OA - ABBREVIATIONS
A I OB - SYMBOLS
CONVENTIONAL SYMBOLS
— — — — — EXIST. CURB do GU TIER
-- - - - - - - - - - - - -- EXIST A.C. FLOWLINE
EXIST. EDGE OF PAVEMENT
GUARD RAIL
IMPRO VEMEN IS
EA SEMEN T
- - RI GH T- OF- WA Y
CEN TERL INE
RAILROAD TRACKS
x CHAIN LINK FENCE
w
G
❑H
TV
n
L-1
M.H.
0
P.P.
...E
PIER CAP STRENGTHEN/NG
FOR
BEALE AVENUE OVERCROSSING
UTILITY SYMBOLS
EXIST WATER LINE
EXIST GAS LINE
EXIST AERIAL
LINES
EXIST UNDERGROU D
TV CABLES
EXIST OIL LINE
MANHOLE
POWER POLE
EXISTING MONUMENT
FUTURE MONUMEN T
STREET LIGHT
STREET LIGHT W/MAST , RM
CLEAN OUT
^F
W.M.
El
® G.M.
S
SD
E
T
F❑
FIRE HYDRANT
WATER METER
WATER VALVE
GA S METER
GAS VALVE
BENCHMARK
A U TO SCOPE
EXIST SEWER LINE
EXIST STORM DRAIN
EXIST UNDERGROUND
POWER LINE
EXIST UNDERGROUND
PHONE LINE
EXIST FIBER OPTIC LINE
PRE-EMPTION DEVICE
(BRIDGE No. SOC -0 973)
LOCATION MAP
NOT TO SCALE
FINAL PAY QUANTITIES
PRESTRESSING STEEL 3, 400 LBS
(1 %4" O GAL V POST- TENSIONING BARS)
BEALE AVENUE
OVERCROSSING
m
2,7,12.,"
11 09-18-09
STATE OF CALIFORNIA
NO TE. -
THE CONTRACTOR MUST POSSESS THE FOLLOWING
VALID LICENSES:
CL4ss A
NO TE. -
THE CON TRA C TOR SHALL CONTACT THE USA L OCA TOR
SERVICE 1-800-642-2444, 48 HOURS PRIOR TO
EXCA VA TION.
QROFESS/
WARREN A. MINNER ?,
No. 863 ;;0
xp. 2-31
`�� STRUCTURAL �P
qTF of CA-\F���
fN
Z
I
Lij
APPROVED BY= �
RAUL M. RCJAS, R.C.E. 39800, EXPIRES 12-31-11 DATE �Ny
PUBLIC WORKS DIRECTOR
Q.
APPROVAL RECOMMENDED BY:
A SISTAN PUBLIC WORKS DIRECTOR DATE i
I �
CIVIL ENGINEER IV — D SIGN ENGINEERING DATELu
! Ld
co
TRAFFIC ENGINEERINC
PIER CAP STRENGTHENING
FOR
BEALE AVENUE OVERCROSS/NG
NO
OF
6
SHEETS
0 1 2 3
26'-0'f
63'-0'f
PIERS SYMMETRICAL ABOUT C BRIDGE
f
-0 V2 -0 f
26'-0'f
3'-6'f ,
n
4' 7 % 'f TYP ' n EXIST CONC BARRIER
- � RAILING - TYP
,I I
I -I-- -I
L� -- ---- ----..............-t------------------------------------� fi
L---- ----- ------ ------ J
-----�--- -fir-------��------ t ---------
EXIST STEEL PLATE
' ' ' I ' ' ' GIRDER TYP
in
--1--�---L-J--�--1--J--�---` J--�--L 1---•---L-J--�--l.--J---�--L-J--� I I I
--------------------- -- — — — — -------------------------------------------------------
EXIST ANCHOR"
EXIST HS RODS I OA ( B
I , 1
EXIST PIER CAP
EXIST CATCHER EXIST PIER ; II ,� EXIST PIER
BLOCKS (NS)
12'-6'f 161- f ' I 16'-0"f 12'-6 Y
)
57' 0'f
I
I
APPROX OG I APPROX OG
1—===1 I I 1 I I-------------------�T-----_---------.----- II—T=ITIT=
—IiIiII=II=I=-
.. ---------
—
-1 I I-1 I I-1 I I..
II---------------------�
I
-----------
I �
I
I ,
I
1--------------------
-----------------------
PIER
-----------------------------------------JPIER
PIER 5
TYPICAL ECTION 1/8 = 1' —0In
EXIST ANCHOR 1?
EXIST HS RODS
EXIST CATCHER
BLOCKS (FS)
EXIST PIER CAP
3'-6 "f
EXIST ANCHOR FL'
EXIST HS RODS -
EXIST PIER CAP -
26'-0 "f
63'-0'�&
PIERS SYMMETRICAL ABOUT � BRIDGE
26'-O"&
3'- 6'f
I ;H I ' EXIST CONC BARRIER
RAILING - TYP
�1-- f -l�
`l ------------------------s------------------------------------- J r'
EXIST STEEL PLA TE
Ir—, r—, I r--, r--, I r r r—, i t—� r—, i t --I r—, i t—�—, i� GIRDER, TYP
� L I , r��� I I
I I i i 1 I i i I I i i I I I I I I
t_______
L---���-----� L ----- J L----- L-- --� L -----j L ----- J L-----�
EXIST ANCHOR F
I , I
I A I I
I
EXIST CA TCHER
1
EXIST PIER I I BL OCKS (NS & FS)
12-6.f I 16 -Of 16, 0'f I 12-6f
I I
57, I 0 „�
APPROX OG - APPROX OG
---l"IT=TIT=TfT Z7"I�•------------------- — -------
-------------
—� T=TIT=TIT=TIT
-III—I � I—I � I—I I I� t S I I I—III—III—III•
=1 I I—III—I I 1=1 Ir --------------------- i ---------------------J;111-111=111=1 11=
I I
I I
I I
r-1--------------- -----------------------------.i'-�
I I
L ----------------------- t
I I
-----------------------
PIER 6
TYPICAL SECTION 1/81'-0�
945'_4"f '(MEASURED ALONG BRIDGE)
99'-0'f 100'-0 "f 100'-0'f 145'-0 "f 100'-0 "f 100'-0'f 100'-0'�t 100'-0 "f 99'-O "f
20'-0'f 20'-O'�& 27.185'f
T T
BB 'I I� BRG! ! I EXIST HINGE I I FROM TOP I I I BRG I� EB
OF RAL
II I I I
____________-------------------- --- - _- _-- _---_- _ _ - ---- -- -_- ----
-- ----- — ---- --_--- _
--- --------- __________________________________ ----------------
=
-------------- --- -- _
1------------ -------- _ - -
--------------- I I T----
•-------------- ---- ------ I I I - -_
___ ; _----- APPROX OG
'------------- III III III ,i, APPROX OG �-------
1 � III I � III III y�
II ---------------------'1------------ ----- -III-------------- III _ _ _J'L--------------- -----
-
____ III _ III 111
II
-- ---- - ---
--------r=nr-riT—TIT T— ----------- ----- --- — I—STI—=11r=fir r--�}�------------------------------------ f
I' -1 11-1 I—III—� 1 �- W = i i -� =LT 17[=-
-
I- 4a 1LL
�--1,1.� C�7 C`i'� C�7 — TF
— Cy _I_7 C+� — — — — Cts C+� X11_ a
7 T I A 25.019'± B A ^� of
�' FROM TOP h
jl �I �I ml ml mj zj zl zl �I
ml WI WI WI OF RAIL Wj Wj W� I WI �I
QI ml ml �I �I- �I ml mWl ml ml
C EXIST TRACK - TYP
EXIST HINGE
27'-1D%„f
I I
--------
--------- - I _-
----- ---
-
--
-------__1-----_-- - ----___--_-- -�1r
4I
'Nil
--- ---
I I 1 III
11
II I I I
I 1 I I
27'-9'f
ml WI WI WI
QI m; ml m;
Z
ELEVATION 1"= 50'
BURLINGTON NORTHERN SANTA FE
RAILROAD TRACKS
16'-1 �21 "� 1 33'-8 Y2'�
Q) 0
•T------------------------------- r------------- T------ ---------_----�
------------
------------
�- -�- r-�- ---- --I - I I I II EB
II
� � I'
1-_' -' --'-- ' --' - ' -- ' ----� '--��---1 _ 1 -- L-------------------_ ------ _ _ _ ' BEALE AVE
1-----------------------------------------1----------_•---------
+---I�y _- ----- _ _- --- - - - --- ----_ _ _-
1 1 1 1 1 1 1 1 II
-- - II ----------------------- ---- ----- - --- I N16°14'03'Ef
--I T--r-------���y1� '------\- ' ' .�-111{ I I}}III I
________`_____________________ ___________---------T ------- ---- ------ ---
+;
15'-11 %f
DESIGN
DETAILS
! �' I mi rnj �I
�j 19'-6%"� �! 20'-8 2"f ml mi
I I I I I I
PLAN 1"= 50'
BY D. KOO CHECKED W MINNER
BY M. AQUTAN CHECKED D. KOO PREPARED FOR THE - WARREN A. MINNER
CITY OF BAKERSFIELD
ORIGINAL SCALE IN INCHES I I I I
FOR REDUCED PLANS 0 1 2 3
QROFESS/�Nq!
REGISTERED STRUCT RAL ENGINEER
WARREN A. MINNER
Lu rTi
�•, lg No. 863
PLANS APPROVAL DATE * Exp. 12-31-10
STRUCTURAL �P
MINNER, STINNETT, KOO & AGBAYANI qTF
STRUCTURAL & CIVIL ENGINEERS
1716 OAK STREET, BAKERSFIELD, CALIFORNIA 93301
PHONE (661) 324-9724 FAX (661) 324-3416
JOB #: 07-075
PIER CAP STRENGTHENING LEGEND
O: INSTALL (4) NEW POST -TENSIONING BARS
O: INSTALL (5) NEW POST -TENSIONING BARS
LEGEND
------- DENOTES EXISTING STRUCTURE
--- ---------- DENOTES NEW CONSTRUCTION
�� DIRECTION OF TRAFFIC
NO TES:
1. HORIZONTAL CLEARANCES SHOWN ARE MEASURED FROM FACE OF
EXIST/NG PIER TO � OF NEAREST EXISTING TRACK.
2. THE CONTRACTOR SHALL VERIFY ALL CONTROLLING FIELD DIMENSIONS
BEFORE ORDER/NG OR FABRICATING ANY MATERIAL.
BEALE AVENUE OVERCROSSING
PIER CAP STRENGTHENING
GENERAL PLAN
DISREGARD PRINTS BEARING REVISION DATES (PRELIMINARY STAGE ONU
EARLIER REVISION DATES — 01-18-0802-20-0812-30-0809-18-09
SHEET OF
2 6
6'_9 '�E
i
TYP'
REGISTERED STRUCTU AL ENGINEER 2c
I� _
f EXIST GIRDER
TYP (
0 WARREN A. MINNER ?,
W rn
I
I
I I
I
9 • l� ' 09 � No. 863
----- ---------I--------
-------- --------
-- — —
I
APPROVAL DATE * Exp. 12-31-10
-----PLANS
------------
I-------- I--------
I
STRUCTURAL �P
& AGBAYANI q�F
l
MINNER, STINNETT, KOO o �Fo`�`�
F CAL
i
STRUCTURAL & CIVIL ENGINEERS
1
Q
V N
I
I I
I I
I
I I I
I I
I I
I I ^ N
1716 OAK STREET, BAKERSFIELD, CALIFORNIA 93301
PHONE (661) 324-9724 FAX (661) 324-3416
°O
i
�- - I- - - -i--
- - -- - -
- ----- - - -I - - --F--
I PIER 4 \N
- - I- -fid- - -- r,�
JOB #: 07-075
SUGGESTED PRESTRESSING PROCEDURE
I
FOR PIER 4
N
I ( I
I I
I I I I
I I
I
"
MEANS AND METHODS ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR PERFORMING THE
-----------------
- -
----- ------- -------I-------
- - -
----�
WORK. STRICTLY FOLLOW RECOMMENDATIONS AND GU/DEL/NES OF THE MANUFACTURER FOR
- ------J--
THE POST TENSIONING BARS. THE FOLLOW/NG PROCEDURE IS SUGGESTED TO ENSURE
�-
I
PROPER PRESTRESSING AND TO MINIMIZE ECCENTRIC MOMENT TO THE EXISTING PIER CAP.
----L�- I----------
'
----1- 1 ---------------LJ-
--------------- -- - ---------------1-
---J
1. INSERT NEW POST-TENSION/NG BAR No. 1 THRU THE EX/STING HOLE /N THE CONCRETE
3
CATCHER BLOCK. CLEAN AND ENLARGE HOLE AS NEEDED TO PASS BAR THRU. GREASE BAR
EXIST CONC CATCHER
BLOCK (2) NEW 1 %4 " 0 GAL V EXIST ANCHOR
LL' 5x24 "x5'-3 % "f
TO AVOID BONDING OF BAR TO THE CONCRETE. JACK THE BAR TO 50 KIPS
N
POST -TENSIONING BARS
2. REMOVE EXISTING HIGH STRENGTH ROD No.2. INSTALL NEW POST -TENSIONING BAR No.2
EACH SIDE - TOTAL 4
AND JACK TO 50 KIPS.
PARTIAL
PLAN 1/2 = 1 -O
J. REMOVE EXISTING HIGH STRENGTH ROD No.J INSERT NEW POST -TENSIONING BAR No.3
PIER 4
THRU THE EXISTING HOLE /N THE CONCRETE CATCHER BLOCK. CLEAN AND ENLARGE HOLE AS
TOTAL EFFECTIVE
PRESTRESSING FORCE
NEEDED TO PASS BAR THRU. GREASE BAR TO A VOID BOND/NG OF BAR TO THE CONCRETE.
REQUIRED FOR (4) POST TENSIONING
JACK THE BAR TO 50 KIPS.
SYMMETRICAL ABO
T BRIDGE
BARS = 421 kips MINIMUM.
4. REMOVE EXISTING HIGH STRENGTH ROD N0.4. INSTALL NEW POST -TENSIONING BAR No.4
2'-0 "f
26'_0 "f
3'-6 "f
AND JACK TO 50 KIPS.
5. INCREASE JACKING FORCE AN EQUAL AMOUNT A T BARS No. 1, No.2, No.3 AND No. 4
SEQUENTIALLY UNTIL REACH/NG THE FINAL JACKING FORCE.
SEISMIC RETROFIT
' I
I �
'
THE BRIDGE WAS RETROFITTED IN 2002 WHEN SHEAR KEYS
I
AND CATCHER BLOCKS WERE ADDED. THE EXISTING HIGH
PIER 4
STRENGTH RODS WERE SHEATHED WITH PVC TUBING WHERE
NECESSARY TO PREVENT BONDING WITH NEW CONCRETE.
-----------1---
EXIST STEEL GIRDER
I
-----------
j I
—'
'
,------------------------------------ --------------+-
----------------------------------
--------------------------------------
I
'
I
I I
-_-_____-_.-______�._
-_____-1----------_
__
I ,t -4
n
II
t ---_f --------------------------- '
,r �—,r—� —., — J
��
ry
r,
ii
n ii
„
II
Ir" 11
I.
;-----------=-------------I-------------;
F
�—----------------------------------------
EXIST STEEL GIRDER
.�
a (2) NEW 1 %4 0 GAL V
POST- TENSIONING BARS
I
I EX/ST BRIDGE BRG
II
II '
II
EACH SIDE -TOTAL 4
I
I
I ' ' EX/ST 5" ANCHOR
9
A
I
I ;
I
-----� n I----------
----I I; F- ---------
;; _ ---
-- -----�
fL',..
REMOVE EXIST HS RODS AND
I
„
� II, r--- ,, F---------------„
EX/ST ANCHOR
�, I
INSTALL NEW 1 /4 � GAL V
!14"0
I I � /4 >
I REPLACE WITH NEW 1 0
I
POST ENSIONING BAR
I GAL V POST -TENSIONING
NING BARS-T
I
r ___
r---_ _,
_JL
THRU EXIST OPEN HOLE
THRU EXIST HOLES
i
I
I r
I BAR No 1 BAR/ROD No. 2
- - - -
z - -
I
�-------�-----y-----
I I
II
I I I o
REMOVE EXIST HS ROD AND I ,BAR/ROD No. 3 BAR/R00 No. 4
I
z-
---� -�
REPLACE WITH NEW 1 j4»O
N
GAL V POST- TENSIONING
--------------------------
------------
----------------------------------------------------------------------------------------------------
------------------------------------------=----------------------------------------------------------
-----------------------------
------------------------
o
BAR THRU EXIST HOLE I `
I I
. I
-----------------------------------
------------------------------------------------------------------------------------------------------
------------------------
J
I I l
i I I
N
I I t,
I I I cfl
".f- � 1 »t
EXIST HS RODS TO 3 0
I
TYP - EXIST H RODS TO REMAIN
8 8 I S
------'-----------------------------------------------------------
-
REMAIN, TOTAL 6
EXIST CONC CATCHER BLOCK
EXIST PIER CAP BEYOND
EXIST CA TCHER
BLOCK (NS ONLY)
34'f
J4
EXIST PIER
EXIST PIER CAP
5 -3 /
�l
2
I
16'-0 "f
I ”
I 12'-6'�t
S "f
LEGEND
Q NEW 1 !14"0 GAL V POST- TENSIONING BARS
-1------------------
----�k------------------------
NOTE
+ EX/ST 1 %4 "� POST -TENSIONING RODS TO REMAIN
1. FOR 'POST -TENSIONING BAR NOTES'; SEE "GENERAL
PARTIAL
ELEVATION 1/2"= T-0" NOTES" SHEET 6.
3 PIER CAP END DETAIL
1"=1'-0"
PIER 4
PIER 4 - EAST END
7 -1 �-
DESIGN
BY D. Koo
CHECKED W MINNER
BEALE AVENUE OVERCROSSING
PREPARED FOR THE -
WARREN A. MINNER
DETAILS
BY M. AQUTAN
CHECKED p Koo
PIER CAP STRENGTHENING
CITY OF BAKERSFIELD
STRENGTHENING DETAILS No.
_
1 PIER 4
ORIGINAL SCALE IN INCHES I I I I I I I
DISREGARD PRINTS BEARING
REVISION DATES (PRELIMINARY STAGE ONLY)
SHEET
OF
FOR REDUCED PLANS
0 1 2 3
EARLIER REVISION DATES —
01-18-0802-20-0812-30-0809-18-09
I
I 1
1 7
3
6
(2) NEW 1 %4 " 0 GALV
e OoF ESS /oNq
EXIST CONC CATCHER BLOCK POST—TENSIONING BARS
EXIST ANCHOR
F 5'x24'x5'-3 2'f
STRUCTU AL ENGINEER
THIS SIDE TRHU CONC
REGISTERED
CATCHER BLOCK
I
I
WARREN A. MINNER m
I_
I
I_ I_
I I I I
I_
I I
I
I
No. 863
12-31-10
PLANS APPROVAL DATE Exp.
I
I I I
I I I I I I
I I I
I I I
sXqT STRUCTURAL
----- --------1------- - ------- - - - - - -
- - - - - _ _ _ _ _
_ _ _ _ _ _ _
MINNER, STINNETT, KOO & AGBAYANI F
STRUCTURAL & CIVIL ENGINEERS OFF' CA��FO
----- --------1-
1 ( I
I
I I I
1716 OAK STREET, BAKERSFIELD, CALIFORNIA 93301
PHONE (661) 324-9724 FAX (661) 324-3416
v !�
I
I I I
I
JOB #: 07-075
W
r
I
I I I
I I
( I
PIER 5\
SUGGESTED PRESTRESSING PROCEDURE
�-
- I- - - --I--
- ------ - - + - - --1-- - -�- - -
-I - - --�--
- - i- --�-}-
- -- ,�
FOR PIER 5
MEANS AND METHODS ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR PERFORMING THE
N
I
I I
C
I
I I
WORK. STRICTLY FOLLOW RECOMMENDATIONS AND GUIDELINES OF THE MANUFACTURER FOR
I
I I
I I I I
____----_--___J______----------J—_______
I I
--------J--------
I I
---J
THE POST—TENSIONING BARS. THE FOLLOW/NG PROCEDURE /S SUGGESTED TO ENSURE
PROPER PRESTRESSING AND TO MINIMIZE ECCENTRIC MOMENT TO THE EXISTING PIER CAP.
_—_—_ ___—___—J_
I
I I
I
EXIST GIRDER —
I
TYP (
1. INSTALL NEW POST TENSIONING BAR N0.9. JACK THE BAR TO 50 KIPS.
I I (3) NEW 1 %4 " O GALV
�— »t
6 9
'
1
TENSIONING
POST—
2. REMOVE EXISTING HIGH STRENGTH ROD No. 1. INSTALL NEW POST TENSIONING BAR No.1
TENSIONING BARS
I I
4
AND JACK TO 50 KIPS.
THIS SIDE
TYP
J. REMOVE EXISTING HIGH STRENGTH ROD No.2. INSERT NEW POST TENSIONING BAR No.2
PARTIAL PLAN 1/277= 1'-0"
THRU THE EXISTING HOLE /N THE CONCRETE CATCHER BLOCK. CLEAN AND ENLARGE HOLE AS
PIER 5
NEEDED TO PASS BAR THRU. GREASE BAR TO AVOID BOND/NG OF BAR TO THE CONCRETE.
TOTAL EFFECTIVE
PRESTRESSING FORCE
JACK THE BAR TO 50 KIPS.
'
SYMMETRICAL A
OUT � BRIDGE
REQUIRED FOR (5) POST TENSIONING
BARS = 526 kips MINIMUM.
4. REMOVE EXISTING HIGH STRENGTH ROD NO-J. INSTALL NEW POST—TENSIONING BAR No-3
AND JACK TO 50 KIPS.
I
2 _0»
26'-0 �f
3'-6'
5. REMOVE EXISTING HIGH STRENGTH ROD No. 4. INSERT NEW POST TENSIONING BAR No. 4
THRU THE EXISTING HOLE /N THE CONCRETE CATCHER BLOCK. CLEAN AND ENLARGE HOLE AS
NEEDED TO PASS BAR THRU. GREASE BAR TO AVOID BOND/NG OF BAR TO THE CONCRETE.
SEISMIC RETROFIT
r---
JACK THE BAR TO 50 KIPS.
THE BRIDGE WAS RETROFITTED IN 2002 WHEN SHEAR KEYS
6. INCREASE JACKING FORCE AN EQUAL AMOUNT AT BARS No. 9, No. 1, BAR N0.2, BAR No.3
AND CATCHER BLOCKS WERE ADDED. THE EXISTING HIGH
;
AND BAR No.4 SEQUENTIALLY UNTIL REACHING THE FINAL JACKING FORCE.
STRENGTH RODS WERE SHEATHED WITH PVC TUBING WHERE
;
I
NECESSARY TO PREVENT BONDING WITH NEW CONCRETE.
I I
I
, I
I
1---�
�
�
I
PIER 5
--------------------
r
r- ;
I/� EXIST STEEL GIRDER
J
1-------- -
-------------------------------------------------
�
I
I
I
_
---_�
-----------------------------------
f----------------------------� r---_----------------.----_--
�t-,r_�
'
I �"--------------t
`- -
I - ,I
—
___
�_---�
— -----------------------------
I
(3)
NEW 1 %4"0 GAL
`r' I r
EXIST STEEL GIRDER
" POST—
a THIS
TENSIONING BARSIt
SIDE, (2) NEW BARS ON
f
------------I---------------------------------------------------�
II
II
---------------------------------------
I-----------------
��
THE
OTHER SIDE — TOTAL 5
EX/ST BRIDGE BRG
II II
II
"
I
1
"
LAM
p
��--------� I—----------- -- ii-------
II II —� Ii-------
II I I �I I II I
II
"
'
—� II
"
II
EXIST ANCHOR FL'
REMOVE EXIST HS RODS AND I EXIST 5" ANCHOR
REPLACE WITH NEW 1 %4 "0 I I I
=----Jr-
III
JL .1L----
1
_ JL
GAL V POST— TENSIONING BAR REMOVE EXIST HS
1
r----,r-
I----
RODS AND REPLACE
THRU EXIST HOLESI I I
I
I I
'
I I I I I
I
I 1 1
I I WITH NEW 1 !14"0 GAL V
I I
I I I I I
I
I I
I I
POST— TENSIONING BARS
F
-L_____y_ �_____ ,
I
I I
THRU EXIST HOLES
i BAR/ROD No. 1 BAR/ROD No. 2
BAR/ROD No. 3 BAR/ROD No. 4
-------------,
--------------------
-------------------------------------------------------------------------------------------------------
----------------
------------
o
N
INSTALL NEW 1 j4 " O GALV I i - - - , - - -
--------------------------------
----------------------=--------------------------------
---------------
---------1_J
N
II
POST TENSIONING BAR I I I I EXIST CONC
J
.N
d-
THRU EXIST OPEN HOLE I I I I CA TCHER BL 0C
'
I
'
o
p
BAR/ROD No. 9
'
------------------------------------------------------------------
� T
----------------------------- ----------------------------------------=-------------------------=--=---=--=-------=------------=-------------------------------------------------
---------- ------
-------- -- —
, _=
, —
EXIST HS RODS TO
REMAIN, TOTAL 5
4 ``�
�
�
L I I
— — — — — -------------------1— --- —
I 1 � ,,t I 171 „t
8 TYP — EXIST HS
,,,—
EXIST CA TCHER
I RODS TO REMAIN
---'
BLOCK (FS ONLY)
2'-4'i&
'-fEXIST
PIER CAP BEYOND
I
EXIST PIER
EXIST PIER CAP
3 41 'f 3 41 "f
I
I
5'-3 % 'f
2
1
12'-6"f
5"f
LEGEND
-T------
L ---------
— — — — — — — ------------------ —1-
NOTE.• 1
0 NEW 1 /4 O GAL V POST— TENS/ON/NG BARS
1. FOR 'POST TENSIONING BAR NOTES"SEE "GENERAL
+ EXIST 1 %4 "0 POST— TENSIONING RODS TO REMAIN
PARTIAL ELEVATION 1/2"= 1'—O"
NOTES" SHEET s.
1
4
PIER CAP END DETAIL 1"=1'-0"
PIER 5PIER
5 — EAST END Yt�rK
DESIGN
BY D. Koo
CHECKED W. MINNER
BEALE AVENUE OVERCROSSING
PREPARED �o� THE -
WARREN A. MINNER
DETAILS
I
BY M. AQUTAN
CHECKED D. Koo
PIER CAP STRENGTHENING
I
CITY OF
BAKERSFIELD
_
STRENGTHENING DETAILS No. 2 PIER 5
ORIGINAL SCALE IN INCHES
DISREGARD PRINTS BEARING
REVISION DATES (PRELIMINARY STAGE ONLY)
SHEET
OF
FOR REDUCED PLANS
0 1
2 3
EARLIER REVISION DATES —
01-18-0802-20-0812-30-0809-18-09
I
I
1
1
4
6
EXIST CONC .CATCHER 2 NEW 1!14"0 GAL V
E SS / pN�`
1
BLOCK - TYP POST- TENSIONING BARS
EXIST ANCHOR �'
S "x24 "x5'-3 %QROF
2
REGISTERED STRUCTU AL ENGINEER k)
EACH SIDE TRHU CONC
CATCHER BLOCKS — TOTAL 4)
I
W WARREN A. MINNER m
7
No. 8 63
0
12-31-10
PLANS APPROVAL DATE Exp.
STRUCTURAL
-- — — — —
—
MINNER, ,KOO GAGBAYANI
STRUCTURAL &CIVILL ENGINEERS OF CAl-\F
1716 OAKSTREET, SFIE1
PHONE (661 324-9724 FAX (661) 3243416
j
I
7-Q 075
JOB #: 0�
PIER 6
SUGGESTED PRESTRESSING PROCEDURE
FOR PIER 6
--T----
-- —
— — —
MEANS AND METHODS ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR PERFORMING THEJ--
I
I
WORK. STRICTLY FOLLOW RECOMMENDATIONS AND GUIDELINES OF THE MANUFACTURER FOR
THE POST -TENSIONING BARS. THE FOLLOW/NG PROCEDURE IS SUGGESTED TO ENSURE
I I I I
I I
I I
PROPER PRESTRESSING AND TO MINIMIZE ECCENTRIC MOMENT TO THE EXISTING PIER CAP.
I
�j
I I
EXIST GIRDER — TYP
I
5
1. REMOVE EXISTING HIGH STRENGTH ROD No. 1. INSERT NEW POST TENSIONING BAR No. 1
THRU THE EXISTING HOLE IN THE CONCRETE CATCHER BLOCKS. CLEAN AND ENLARGE HOLE
AS NEEDED TO PASS BAR THRU. GREASE BAR TO A VOID BOND/NG OF BAR TO THE CONCRETE.
PARTIAL PLAN 1 2�= 1'-O� �
7YP
JACK THE BAR TO 50 KIPS.
PIER 6
2. REPEAT THE PROCEDURE AS OUTLINED /N 1. ABOVE FOR BARS N0.2, No.3 AND No.4.
TOTAL EFFECTIVE PRESTRESSING FORCE
REQUIRED FOR (4)
POST TENSIONING
J. INCREASE JACKING FORCE AN EQUAL AMOUNT AT BARS No. 1, No.2, No.3 AND No.4
I
SYMMETRICAL ABO
T I� BRIDGE
BARS = 421 kips
MINIMUM.
SEQUENTIALLY UNTIL REACHING THE FINAL JACKING FORCE.
26 ,-O', E
I
I
SEISMIC RETROFIT
I i
THE BRIDGE WAS RETROFITTED IN 2002 WHEN SHEAR KEYS
AND CATCHER BLOCKS WERE ADDED. THE EXISTING HIGH
STRENGTH RODS WERE SHEATHED WITH PVC TUBING
WHERE
NECESSARY TO PREVENT BONDING WITH NEW CONCRETE.
�
----------i --------- i L
-----------
---------------------------------------------
I
r j� �_ ---�
I PIER 6
EXIST STEEL GIRDER
L--------�
,-------------------
---------------------------------------------
7_ ----- ____ ,r--------
---------------------------------------------------
------------------------------------------------- -
(2) NEW 1 %4 " 0 GALV
EXIST STEEL GIRDER
° POST- TENSIONING BARS
EACH SIDE —TOTAL 4
r-------------------------------------------------------------------------------------------------------
iiII i
II
-----------
REMOVE EXIST THREADED
---------------------------------------�
EX/ST BRG I
I
I IBRIDGE
EXIST 5" ANCHOR it
�----I
�-----�
_
r----� II r - � F---� ii �---� r ------I ii
(---- r----
�
i� EX/ST ANCHOR FL'
� II
ROD AND REPLACE WITH
NEW 1 %4"� GALV POST- I
I i � I REMOVE EXIST HS
I I
JL----��----I
JL
TENSIONING ROD THRUI
I
I I I RODS AND REPLACE
I I
---��=�L_�1----
I
I
I------------'
;----
EXIST HOLE
I WITH NEW 1 /4 0 GAL V
-- ------------------------
'
, I
BARIROD No. 1 BARIROD No. 2 1 ( POST TENSIONING BARS
I
I I
I
I
— ---`----y--
--it 1
vl
_ I THRU EXIST HOLES
BARIROD No. 3 BARIROD No. 4
-
----------------------- --------- -------------------
--------------
-------------------------------------------------�---------------------E--------------------------------------------------
---------------------------------------------------------------------
-------------------r--------------------------------------------
o
N EXIST coNc I
I
I I I I
iII�
-
--------------------
-------------------------
-------------------------------------------------+
----------------------------------------------------------------------F------------------------------------------------t---------------------r ----------------------------------------
---------------------------
I
--------------------------------------------------------[4--------------
I-
L---I
N
CATCHER BLOCK
EXIST CONC
CATCHER BLOCK
III
cz
i
I L ------------J
L------------� L------------ I-----------
J-
1
Q)
L - -
I I
- ---1------------------------ ----- l-- - - - - J
7 »t I ----------- 7 j-
1
,- EXIST HS RODS TO 5 i
TYP - EXIST HS
—'
REMAIN TOTAL 6
�
REMOVE EXIST HS ROD AND
RODS TO REMAIN
REPLACE WITH NEW 1 %4 0
I
2'-4'Y 2 —4 ly
J
r ' '
GAL V POST- TENSIONING 3 EXIST PIER CAP BEYOND
3 f 3� f
BAR THRU EXIST HOLE
4'-8'f
I
I
I EXIST PIER CAP EXIST
CATCHER
I
EXIST PIER
I
BLOCK (NS do FS)
5'-3 % "�
I
I
16,_0"f
12'-6"f
L
LEGEND
rt ------
— —
— — — — — — — —
--------,k -- — — — — — — — — — — — — — — — — — — — — — — —
Q NEW 1 %4"0 GALV POST—TENSIONING BARS
NOTE.
+ EXIST 1 %4 " O POST TENSIONING RODS TO REMAIN
1. FOR 'POST—TENSIONING BAR NOTES" SEE "GENERAL
PARTIAL ELEVATION 1/2�= 1'-O"
NOTES" SHEET 6.
5 PIER CAP END
DETAIL 1�=1'-0�
PIER 6
PIER 6 - EAST
END
DESIGN
BY D. Koo
CHECKED W. MINNER
BEALE AVENUE OVERCROSSING
PREPARED r�oR THE -
WARREN A. MINNER
DETAILS
BY M. AQUTAN
CHECKED D. Koo
PIER CAP STRENGTHENING
CITY OF BAKERSFIELD
_
STRENGTHENING DETAILS No. 3 PIER 6
ORIGINAL SCALE IN INCHES
DISREGARD PRINTS BEARING
REVISION DATES (PRELIMINARY STAGE ONLY)
SHEET
OF
FOR REDUCED PLANS
0 1 2 3
EARLIER REVISION DATES -
01-18-0802-20-0812-30-0809-18-09
I
I
1
1
5
6
QROFESS/ONS`
REGISTERED STRUCT AL ENGINEER �
GENERAL NOTES: LOAD FACTOR DESIGN`
WARREN A. MINNER
w m
SCOPE. N0. 863
TO STRENGTHEN THE CANTILEVERED PIER CAP AT PIERS 4, 5 AND 6 WITH GALVANIZED POST—TENSIONING PLANS APPROVAL DATE * Exp. 12-31-10
BARS TO INCREASE THE ULTIMATE MOMENT CAPACITY OF THE PIER CAP `" STRUCTURAL
& AGBAYANI TF
MINNER, STINNETT, KOO
OF CN
-\F
STRUCTURAL & CIVIL ENGINEERS
1716 OAK STREET, BAKERSFIELD, CALIFORNIA 93301
STANDARD SPECIFICATIONS AND STANDARD PLANS PHONE (661) 324-9724 FAX (661) 324-3416
ALL CONSTRUCTION SHALL BE PERFORMED IN ACCORDANCE WITH THE STATE OF CALIFORNIA DEPARTMENT OF JOB #: 07-075
TRANSPORTATION 'STANDARD SPECIFICA TIONS " AND 'STANDARD PLANS" BOTH DATED MAY 2006.
DESIGN:
BRIDGE DESIGN SPECIFICATIONS (1996 AASHTO WITH INTERIMS AND REVISIONS BY CALTRANS)
POST -TENSIONING BAR NOTES
LIVE LOADING: 1. ALL POST TENSIONING BARS SHALL CONFORM TO ASTM A772 WITH ULTIMATE TENSILE
HS20-44, ALTERNATIVE AND PERMIT DESIGN LOAD STRENGTH OF 150,000 PSI BEFORE GALVANIZING.
2. USE CONTINUOUS BARS WITH NO SPLICES FOR THE ENTIRE LENGTH OF THE PIER CAP.
REINFORCED CONCRETE.
POST—TENSIONING BARS INSIDE THE EXISTING HOLES THRU THE CONCRETE CATCHER BLOCKS
EXISTING CONCRETE ( ASSUMED FOR STRENGTHENING DESIGN) SHALL BE PROPERLY GREASED TO AVOID BONDING BETWEEN THE BARS AND CONCRETE.
=
fy 40, 000 PSI
f c = 4, 000 PSI 3. EFFECTIVE PRESTRESS FORCE REQUIRED (AFTER ALL LOSSES) IS SHOWN ON THE DRAWING
FOR EACH PIER. THE EFFECTIVE PRESTRESS IS EQUAL TO APPROXIMATELY 60% OF THE
TENSILE STRENGTH OF THE BARS. EACH BAR SHALL HAVE APPROXIMATELY EQUAL PRESTRESS
STRUCTURAL STEEL: FORCE. JACKING FORCE SHALL BE DETERMINED BY THE MANUFACTURER TO ACHIEVE THE
1. GALVANIZED POST—TENSIONING BARS SHALL BE 'DYWIDAG" BARS OR APPROVED EQUAL CONFORMING TO FINAL EFFECTIVE PRESTRESS FORCE.
THE FOLLOWING:
ASTM A772, TYPE I (PLAIN) BARS (ENDS MAY BE THREADED FOR ANCHORAGE.) 4. TAKE EXTRA PRECAUTION TO REMOVE THE EXISTING HIGH STRENGTH RODS AS INDICATED ON
f's = 150,000 PSI (ULTIMATE TENSILE STRENGTH BEFORE GALVANIZING) THE DRAWINGS. THE EXISTING RODS WERE POST—TENSIONED AFTER THE BRIDGE WAS
BARS WILL LOSE APPROX/MATEL Y 5q OF STRENGTH AFTER GAL VANIZ/NG. CONSTRUCTED IN THE 1960s. PROTECT EXISTING HIGH STRENGTH RODS TO REMAIN. DO NOT
USE EXISTING RODS AS ANY MEANS OF SUPPORTS DURING CONSTRUCTION. AVOID HANGING
2. AFTER INSTALLATION, REPAIR ANY DAMAGED GALVANIZING WITH 2 COATS OF COLD GALVANIZING COMPOUND. ANYTHING ON THE EXISTING RODS.
SUBMITTALS. -
SUBMIT MATERIAL SPECIFICATIONS FOR THE POST—TENSIONING BARS, BAR ANCHORS, AND JACKING
PROCEDURE INCLUDING MAGNITUDE OF JACKING FORCE TO THE ENGINEER FOR HIS REVIEW AND APPROVAL
PRIOR TO COMMENCEMENT OF WORK.
TESTING AND INSPECTION: (PAID FOR BY OWNER)
PROVIDE TENSION TESTS FOR ALL POST—TENSIONING BARS. MILL TESTS ARE ACCEPTABLE IF MATERIAL CAN
BE IDENTIFIED. CONTINUOUS INSPECTION BY A SPECIAL INSPECTOR SPECIALIZING IN POST—TENSIONING WORK
IS REQUIRED DURING ALL PHASES OF THE PROJECT THE CITY WILL EMPLOY THE INSPECTOR.
RAILROAD:
' 1. ALL WORK WITHIN THE RAILROAD RIGHT—OF—WAY SHALL BE COORDINATED WITH THE RAILROAD AND
PERFORMED IN ACCORDANCE WITH THE RAILROAD REQUIREMENTS. CONTACT THE UNION PACIFIC RAILROAD
PRIOR TO DOING ANY WORK ON THE PROJECT. THE CONTRACTOR WILL NEED TO PROVIDE A PROPOSED
ACCESS PLAN TO ENSURE PERSONNEL AND EQUIPMENT CAN SAFELY GET TO AND FROM THE WORK AREA.
THE ADJACENT TRACKS CANNOT BE FOULED BY THE PROPOSED WORK. WORKING FROM A MAN LIFT OR JLG
OR OTHER EQUIPMENT MAY NOT BE ALLOWED NEXT TO THE LIVE TRACK.
2. A RAILROAD FLAGMAN IS REQUIRED WHEN ANY WORK IS PERFORMED WITHIN 25 FEET OF THE NEAREST
RAIL
J. A VERTICAL CLEARANCE OF 21 FEET ABOVE THE PLANE OF THE TOP—OF—RAIL AND 12 FEET HORIZONTAL
AT RIGHT ANGLE FROM CENTER LINE OF TRACK ON BOTH SIDES OF THE TRACK SHALL BE MAINTAINED
THROUGH ALL PHASES OF CONSTRUCTION.
4. CARE SHALL BE TAKEN TO AVOID CONTAMINATING BALLAST.
GENERAL NOTES:
1. TYPICAL DETAILS AND GENERAL NOTES APPLY IN ALL CASES UNLESS SPECIFICALLY SHOWN OTHERWISE ON
THE DRAWINGS.
2. WHERE NO DETAIL IS SHOWN, CONSTRUCTION SHALL BE AS SHOWN FOR OTHER SIMILAR WORK.
3. NO DEVIATIONS FROM THE DESIGN DRAWINGS ARE PERMITTED WITHOUT THE PERMISSION OF THE ENGINEER.
4. ALL CONSTRUCTION SHALL BE PERFORMED IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS AND ANY
LOCAL ORDINANCES.
5. CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO PROCEEDING WITH THE WORK IN A PARTICULAR
AREA.
6. IF FIELD CONDITIONS ARE NOT AS SHOWN ON DRAWINGS, OR IF INTERFERENCES TO CONSTRUCTION ARE
DISCOVERED, CONTRACTOR SHALL NOTIFY ENGINEER BEFORE PROCEEDING WITH WORK.
F
DESIGN
BY D. KOO
CHECKED W. MINNER
BEALE AVENUE OVERCROSSING
PREPARED FOR THE -
WARRENEPROJECT A. MINNER
DETAILS
By M. aQulaN
CHECKED D. KOO
I
CITY OF BAKERSFIELflPIER
CAP STRENGTHENING
I
I
GENERAL NOTES
ORIGINAL SCALE IN INCHES
DISREGARD PRINTS BEARING
REVISION DATES (PRELIMINARY STAGE ONLY)
SHEET
OF
FOR REDUCED PLANS 0 1 2 3
EARLIER REVISION DATES-
01-18-0802-20-0812-30-0809-18-09
I
I
1
1
6
6