Loading...
HomeMy WebLinkAboutAST 2018UNIFIED PROGRAM INSPECTION CHECKLIST Aboveground Petroleum Storage Tank Program NAME FACILITY NA IN))SPE/)CTIO DATE INSPECTION TIME �¢�( y/y j @� T t.. P.5 f �' .- v f A .r�'.I� 6 N . Prepare an SPCC plan [CFR 112.3] ADDRESS PHONE NO. NO OF EMPLOYEES Review or amend SPCC plan [CFR 112.5 (a)(d)] BUSINESS ID NUMBER FACILITY CONTACT SPCC plan available on site [CFR 112.3(e)] CONSENT TO INSPECT NAME /TITLE r7GV I IVI'm I, I%GVV1 %A 'kV ■ \V V ■v0o. DESCRIPTION YJ N NIA COMMENTS Prepare an SPCC plan [CFR 112.3] Review or amend SPCC plan [CFR 112.5 (a)(d)] SPCC plan available on site [CFR 112.3(e)] 'A A r- Conduct inspections and test in accordance with written procedures CFR 112.7(e)] Maintain records of inspections, tests and/or procedures [CFR 11 2.7(e)]" Records of inspections or tests signed by inspector [CFR 112.7(e)] '" .7GL►IIVIr L. VI-vv r IGi11 1�1c.■uv■ ■...�. w......w......, ..�...._.. � ��- -- - -- - -. DESCRIPTION YJ N - N/A COMMENTS Self- certification for Tier I or II facility 112.6 a 1),(b)(1) Professional engineer certification CFR112.3(d ) and 112.6(b)(4)] Documentation of 5 year review and evaluation of SPCC plan [CFR 112.5(b)] 'A A r- Amendments required within 6 months of changes/certifications [CFR 112.5(a) and 112.6(x)(2), (b)(4)] Management authorization of resource commitment to implement the SPCC [CFR 112.7 & 112.6(a) Diagram with location and contents of containers, transfer stations, connecting piping [112.7(a)(3)] Type of oil and storage capacity for each container CFR 112.7(a)(3)] r*,� 3 Discharge prevention measures and procedures for routine handling {CFR 112.7(a)(3)] Countermeasures for discovery, response and clean-up [CFR112.7(a) (3)] Required contact list and phone numbers [CFR 112.7(a)(3)] _ -- - - - ... ... .,. � .. 'rK - -■ _ _ �►■�n-Vn e AT 0% r0111% r 01 G017A 01 rl JCl.rliVlq J. VC11C1A1 vrVV Ian uu�r1■.a. ■ ■w. ...,....w.....,. ...�_... -_ � _�__- _ DESCRIPTION _ _ Y -, NJ N/A - COMMENTS Provide corrosion protection [CFR 112.8(c)(4)(5), (d)(1)] Containers compatible with materials stored [CFR 112.8(c)(1) ~'` implement SPCC plan review changes or amendments within 6 months CFR 112.5 (a)(d)] Prepare an oil contingency plan or written control /removal commitments [CFR 112.7(d)] 'A A r- v7I..a I IVIM Y. vl` VV 1 Ii11■ ■ A WA112212 DESCRIPTION Y N N/A COMMENTS Training program CFR 112.7(f)] ~'` Train personnel in operation and maintenance of equipment [CFR 112.7(f)] Conduct annuals ill prevention briefings [CFR 112.7(f)(3)] 'A or. 114JItl U. I- Q41111 1110 Gy1IV11. VC■■■ ■v■■u.a - DESCRIPTION YJ N N/A COMMENTS Meet provisions of conditional exemption &S 25270.4.5 Facility security adequate [CFR 112.7( )] Clean-up materials readily available CFR 112.7(c)] Overfill protection procedures or devices in place and operative rCFR 11 2.8(c)(8)] Portable /mobile containers positioned to prevent discharge [CFR 112.8(c)(11) Loading / unloading rack drains into containment area [CFR 112.7(h)' Provide appropriate containment /diversionary structures to prevent discharge CFR 112.8(a), 112.7(c)] 3 Secondary containment adequate to contain ca acity of largest container + precipitation [CFR 112.8(c )] 14 Remove accumulation of oil in secondary containment [CFR 112.8(c)(10) Secondary containment valve(s) closed [CFR 112.8] Implement SPCC plan elements [CFR 112.3 NY HAZARDOUS WASTE ON SITE? -0-YES ❑ NO ISignatureof Recei t xplain: POST INSPECTION INSTRUCTIONS: • Refer to the back of this inspection report for regulatory citations and corrective actions • Correct the violation(s) noted above by • Within 5 days of correcting all of the violations, sign and return a copy of this page to: Bakersfield Fire Dept., Prevention Services, 2101 H Street, California 93301 Date Pink- Prevention Services Copy Signature (that all violations have been corrected as noted) White - Business Copy Yellow - Business Copy to be Sent in after return to Compliance FD2156b (Rev 9/10)