Loading...
HomeMy WebLinkAboutAST 2018UNIFIED PROGRAM INSPECTION CHECKLIST Aboveground Petroleum Storage Tank Program FACILITY NAME Y INSPECT ON DATE INSPECTION TIME COMMENTS Prepare an SPCC plan [CFR 112.3] XX ADDRESS „, } 7 jCAJ PHONE NO. NO OF EMPLOYEES FACILITY CONTACT.. BUSINESS ID NUMBER /_,ti ;}_� CO�VSE - O..INSPEC.T NAME /TITLE DESCRIPTION Y N N/A COMMENTS Prepare an SPCC plan [CFR 112.3] XX Review or apaend SPCC plan [CFR 112.5 (a)(d)] ' SPCC plan available on site [CFR 112.3(e)] Conduct inspections and test in accordance with written procedures [CFR 112.7(e)] Maintain records of inspections, tests and/or procedures [CFR 112.7(e)] R6e6rds of inspections or tests signed by inspector [CFR 112.7(e)] DESCRIPTION Y N N/A COMMENTS Self- certification for Tier I or H facility 112.6(a)(1),(b) 1 XX Professional engineer certification CFR112.3 d and 112.6(b)(4)] ' Documentation of 5 year review and evaluation of SPCC plan [CFR 112.5(b) Amendments required within 6 months of changes/certifications CFR .112.5(a) and 112.6(a)(2 ), (b)(4) Management. authorization of resource commitment to implement the SPCC CFR 112.7 & 112.6(a)] .Diagram with location and contents of containers, transfer stations, connecting piping [112.7(a)(3)] ; ' Type of oil and storage capacity for each container [CFR 112.7(a)(3) Discharge prevention measures and procedures for routine handling {CFR 112.7(a)(3)] Countermeasures for discovery, response and clean-up [CFRI 12.7(a)(3)] Required contact list and phone numbers [CFR 112.7(a)(3)] AA V1�VI�V1\ •7.,VG..G.GI■ V■ vv ■�v w..v...w..�... ��.....�..._� __- ______ _- _ __ DESCRIPTION protection Y N N/A COMMENTS ``Provide co'r'rosion [CFR 112.8(c)(4)(5), (d)(1)] Containers compatible with materials stored [CFR 112.8(c)(1) = Implement SPCC plan review changes or amendments within 6 months CFR 112.5(a)(d) Prepare an oil contingency plan or written control /removal commitments [CFR 112.7(d)] VLV 1 �4J1\ 4. V. Vv ■ ■u■■ ■ ■..a■■■... vv.... ... ...... ..��.. �.. � _----- - - - - a DESCRIPTION Y N N/A COMMENTS Training ro ram CFR 112.7(f) Train perspnnel in operation and maintenance of equipment [CFR 112.7(£) ] <L Conduct annuals ill prevention briefings [CFR 112.7(f)(3)] a79;;;V 1 IVF\ J. 1 CRUNINa .■■.7r c.va■v■ ■. vw....... - -- - --- DESCRIPTION Y N N/A COMMENTS 'Meet provisions of conditional exemption [H &S 25270.4.5(b)] Facility security adequate [CFR 112.7(g)] Clean-up materials readily available CFR 112.7(c) Overfill protection procedures or devices in place and operative [CFR 112.8(c)(8)] Portable /mobile containers positioned to prevent discharge CFR 11 2.8(c) 11 / unloading rack drains into containment area [CFR 112.7(h) ] ' -Loading Provide appropriate containment /diversionary structures to prevent discharge CFR 112.8(a), 112.7(c) Secondary containment adequate to contain capacity of largest container + precipitation [CFR 112.8(c Remove accumulation of oil in secondary containment [CFR 112.8(c)(10)` Secondary containment valve(s) closed CFR 112.8] Implement SPCC plan elements [CFR 112.3 ] ?� ANY HAZARDOUS WASTE ON SITE? .YES ❑ NO Signature ofRecef Receipt v Explain: POST INSPECTION INSTRUGIIO.NS: • Refer to the back of this inspection report for regulatory citations and corrective actions • Correct the violation(s) noted above by • Within 5 days of correcting all of the violations, sign and return a copy of this page to: Bakersfield Fire Dept., Prevention Services, 2101 H Street, California 93301 Date Pink - Prevention Services Copy Signature (that all violations have been corrected as noted) White - Business Copy Yellow - Business Copy to be Sent in after return to Compliance FD2156b (Rev 9/10)