Loading...
HomeMy WebLinkAboutAST 2018UNIFIED PROGRAM INSPECTION CHECKLIST Aboveground Petroleum Storage Tank Program FACILITY NAME INSPECTION DAR INSPECTION TIME N/A COMMENTS Prepare an SPCC plan [CFR 112.3] ADDRESS PHONE NO. NO OF EMPLOYEES Review or amend SPCC plan [CFR 112.5 (a)(d)] FACILITY CONTACT BUSINESS ID NUMBER 1 1 r+A'P SPCC plan available on site [CFR 112.3(e)] CONSENT TO INSPECT NAME/ FFL r% 0% "­aw: 90% wnnirn X. `Mrnry I :nno- ir%i e n wrw •.w..i .. .ors ��•+•� - �______ -. _____ ______. __ _ _ DESCRIPTION YJ N N/A COMMENTS Prepare an SPCC plan [CFR 112.3] Review or amend SPCC plan [CFR 112.5 (a)(d)] 1 1 r+A'P SPCC plan available on site [CFR 112.3(e)] >- Conduct inspections and test in accordance with written procedures [CFR 112.7(e)] ' Maintain records of inspections, tests and/or procedures [CFR 112.7(e)] ?" Records of inspections or tests signed by inspector [CFR 112.7 e yrV ■ ■vr■� r. - DESCRIPTION Y N N/A COMMENTS Self- certification for Tier I or H facility 112.6(a)(1), (b)(1)] Professional engineer certification [CFR 112.3(d) and 11 2.6(b)(4) Documentation of 5 year review and evaluation of SPCC plan [CFR 112.5(b)] 1 1 r+A'P Amendments required within 6 months of changes/certifications CFR 112.5(a) and 112.6(a)(2), (b)(4)] >- authorization of resource commitment to implement the SPCC CFR 112.7 & 112.6(a)] ` e -Management Dia ram with location and contents of containers, transfer stations, connecting pi pin [112.7(a)(3) ?" of oil and storage capacity for each container CFR 112.7(a)(3)] -Type Discharge prevention measures and procedures for routine handling CFR 112.7(a)(3)] '),01 1 Countermeasures for discovery, response and clean-up CFR112.7(a)(3)]° `?- -Required contact list and phone numbers [CFR 112.7(a)(3)] 1P DESCRIPTION Y N N/A COMMENTS Provide corrosion protection CFR 112.8(c)(4)(5), (d)(1) Containers compatible with materials stored [CFR 112.8(c)(1) Implement SPCC plan review changes or amendments within 6 months CFR 112.5(a)(d)] Pre are an oil contingency plan or written control /removal commitments [CFR 112.7(d)] `" DESCRIPTION Y N N/A COMMENTS program CFR 112.7(f)] -Training Train personnel in operation and maintenance of equipment [CFR 112.7(f)] Conduct annuals ill prevention briefings [CFR 112.7(f)(3)] DESCRIPTION Y N N/A COMMENTS Meet provisions of conditional exemption (H &S 25270.4.5(b)]' Facility security adequate [CFR 112.7( )] Clean-up materials readily available CFR 112.7(c)] Overfill protection procedures or devices in place and operative [CFR 112.8(c)(8) Portable /mobile containers positioned to prevent discharge CFR 112.8(c)(1 1) / unloading rack drains into containment area CFR 112.7(h)] -Loading Provide appropriate containment /diversionary structures to 2revent discharge [CFR 112.8(a), 112.7(c) '),01 1 Secondary containment adequate to contain capacity of largest container + precipitat ion [CFR 112.8(c)] `?- Remove accumulation of oil in secondary containment CFR 112.8(c)(10)] 1P Secondary containment valve(s) closed CFR 112.8] ''" Implement SPCC plan elements [CFR 112.3] ANY HAZARDOUS WASTE ON SITE ? ES ❑ NO ISignature of Receipt -- _-.s"�.. Explain: POST INSPECTION INSTRUCTIONS: • Refer to the back of this inspection report for regulatory citations and corrective actions • Correct the violation(s) noted above by • Within 5 days of correcting all of the violations, sign and return a copy of this page to: Bakersfield Fire Dept., Prevention Services, 2101 H Street, California 93301 Date Pink - Prevention Services Copy Signature (that all violations have been corrected as noted) White - Business Copy Yellow - Business Copy to be Sent in after return to Compliance F132156b (Rev 9/10)