Loading...
HomeMy WebLinkAbout3699 Wilson Road ELD Results 5-11-18 UST System Well Proximity Test Report ELD Test Date: Customer: Location: Tested By: CGRS, Inc. 5444 Dry Creek Road Sacramento, CA 95838 Project No:6-13036-15876-9533 76/GO GO 76/GO GO 3699 Wilson Rd. Bakersfield, CA 93309 3699 Wilson Rd. Bakersfield, CA 93309 May 11, 2018 Location:CGRS Project No : Test Date: CGRS Techs: CA Tank Tech Signature: 5/11/2018 Sergio L. Nunez CA Tank Tester #06-1727 Date Reviewed by: 6/13/2018 Chris Murphy Director of CA Operations Date 12k 12k Test Certification Well Proximity Enhanced Leak Detection (ELD) 76/GO GO May 11, 2018 6-13036-15876-9533 Bakersfield, CA 93309 Sergio L. Nunez3699 Wilson Rd. 91 Octane Primary Containment System PASS Well Proximity ELD Test Results Diesel Primary Containment System PASS 87 Octane Primary Containment System PASS 12k This document certifies that the UST systems listed below at the above referenced location has been tested and passed the Enhanced Tracer Tight, tightness test. CGRS further certifies that this test meets the testing requirements for underground storage tank systems as per the California Code Regulations, Title 23, Chapter 16 Section 2644.1 (a) (1& 2). Test Date:Technicians: Site Information Contractor Information Facility:Contractor Name : Address:Address: City, State, Zip:City, State, Zip: County:Contact: CUPA Contact:Telephone/Email: CUPA Phone/Email: Tank No.Capacity (gal.)Product Type Manufacturer Depth to GW Tank Bottom (in.)Product Level (in.)Brine Tank 1 12,000 87 Octane DW Fiberglass Xerxes >-108 188 38 No Tank 2 12,000 91 Octane DW Fiberglass Xerxes >-108 188 32 No Tank 3 12,000 Diesel DW Fiberglass Xerxes >-108 188 30 No Tank Top Sumps Manufacturer Diameter (in.)Depth (in.)Volume (gal.)Description S1 Bravo 44 52 342.28 87 TS S2 Bravo 42 52 311.87 87 FS S3 Bravo 44 52 342.28 91 TS S4 Bravo 42 52 311.87 91 FS S5 Bravo 44 52 342.28 DSL TS S6 Bravo 42 52 311.87 DSL FS UDCs Manufacturer Length (in.)Width (in.)Depth (in.)Volume (gal.)Description UDC1 Bravo 42 22 36 144.00 1 UDC2 Bravo 42 22 36 144.00 2 UDC3 Bravo 42 22 36 144.00 3 UDC4 Bravo 42 22 36 144.00 4 Transition Sump Manufacturer Length (in.)Width (in.)Depth (in.)Volume (gal.)Description N/A N/A N/A N/A N/A N/A N/A Spill Buckets Tank Diameter (cm.)Depth (cm.)Initial Time Initial Reading (in.)Final Time Final Reading (in.) 87 Fill 87TK 27 30 12:00 10 13:00 10 87 Vapor 87TK 27 30 12:00 16 13:00 16 91 Fill 91TK 27 30 12:00 12 13:00 12 91 Vapor 91TK 27 30 12:00 10 13:00 10 DSL Fill DSLTK 27 30 12:00 14 13:00 14 Product Piping Manufacturer Type Size (in.)Length (ft.) 8 7PL A.O. Smith DW Fiberglass 2 145 91 PL A.O. Smith DW Fiberglass 2 150 DSL PL A.O. Smith DW Fiberglass 2 155 Vent Piping Manufacturer Type Size (in.)Length (ft.) 87 Vent A.O. Smith SW Fiberglass 2 35 91 Vent A.O. Smith SW Fiberglass 2 30 DSL Vent A.O. Smith SW Fiberglass 2 35 Vapor Piping Manufacturer Type Size (in.)Length (ft.) VR A.O. Smith SW Fiberglass 3 180 Reviewed By Date CA Tank Tester Signature DateCA License No. 6/13/2018 06-1727 Sacramento, CA 95838 5/11/2018 Chris Murphy PIPING COMPONENTS IN CONTAINMENT TANKS 916-991-1100/tpearce@cgrs.com Kern Howard Wines; CT Perkins; Shane Gardner; Kris Karns hwines@BakersfieldFire.us; ctperkins@bakersfieldfire.us; sgardner@bakersfieldfire.us; kkarns@bakersfieldfire.us Bakersfield, CA 93309 Well Proximity Project Worksheet 76/GO GO The following fueling system information has been provided by the customer and is what was observed at the site. 5/11/18 CGRS/#803616 Sergio L. Nunez 5444 Dry Creek Rd.3699 Wilson Rd. Test Date:Technicians: Site Information Contractor Information Facility:Contractor Name : Address:Address: City, State, Zip:City, State, Zip: County:Contact: CUPA Contact:Telephone/Email: CUPA Phone/Email: Date Sample ID Compound Conc., ug/L 5/10/2018 Probe #1 R 0ug/L 5/10/2018 Probe #2 R 0ug/L 5/10/2018 Probe #3 R 0ug/L 5/10/2018 Probe #4 R 0ug/L 5/10/2018 Probe #5 R 0ug/L 5/10/2018 Probe #6 R 0ug/L 5/10/2018 Probe #7 R 0ug/L 5/10/2018 Probe #8 R 0ug/L 5/10/2018 Probe #9 R 0ug/L 5/10/2018 Probe #10 R 0ug/L 5/10/2018 Probe #11 R 0ug/L 5/10/2018 Probe #12 R 0ug/L 5/10/2018 Probe #13 R 0ug/L 5/10/2018 Probe #14 R 0ug/L 5/10/2018 Probe #15 R 0ug/L 5/10/2018 Probe #16 R 0ug/L 5/10/2018 Probe #17 R 0ug/L 5/10/2018 Probe #18 R 0ug/L 5/10/2018 Probe #19 R 0ug/L Probe Information Howard Wines; CT Perkins; Shane Gardner; Kris Karns 916-991-1100/tpearce@cgrs.com hwines@BakersfieldFire.us; ctperkins@bakersfieldfire.us; sgardner@bakersfieldfire.us; kkarns@bakersfieldfire.us 3699 Wilson Rd.5444 Dry Creek Rd. Bakersfield, CA 93309 Sacramento, CA 95838 Kern Chris Murphy 76/GO GO CGRS/#803616 Well Proximity Project Worksheet The following fueling system information has been provided by the customer and is what was observed at the site. 5/11/18 Sergio L. Nunez 1 PROBE LOCATION LEGEND TURBINE SUMPTS 1 DISPENSER UNDERGROUND PIPING DATE:REVIEW: PROJECT:DRAFT: 6/8/2018 9533aa 3699 WILSON ROAD BAKERSFIELD, CALIFORNIA 93309 76 PROBE LAYOUT DRS 4 2 3 1 STOREVENTS 1 2 3 4 15 14 13 16 17 18 19 6 5 7 8 10 9 11 12 TS TS TS